07-14-1998 PC MIN - SPECIAL
.
.
.
~~~~@w~~
SPECIAL MEETING OF THE ELK RIVER PLANNING COMMISSION
HELD AT ELK RIVER CITY HALL
TUESDAY, JULY 14,1998
Members Present:
Chair Mesich, Commissioners Chambers, Cote, Kuester, Morris
and Schuster
Members Absent:
Commissioner Thompson
Staff Present:
Scott Harlicker, Assistant Planner; Steve Wensman, Planner; Pat
Klaers, City Administrator; Terry Maurer, City Engineer; Peter Beck,
City Attorney; Debbie Huebner, Recording Secretary
Pursuant to due call and notice thereof, the meeting of the Elk River Planning
Commission was called to order at 6:30 p.m. by Chair Mesich.
COMMISSIONER COTE MOVED TO APPROVE THE JULY 14, 1998 PLANNING
COMMISSION AGENDA. COMMISSIONER KUESTER SECONDED THE MOTION. THE
MOTION CARRIED 6-0.
Terry Maurer indicated the following issues will be reviewed:
1. Land use
2. Environmental
3. Street and utility
4. Grading and drainage
5. Park and recreation
6. Miscellaneous issues
Homer Tompkins, President of Contractor Property Developer's Company, provided
a general overview of the proposed 365 acre mixed residential project.
Bill Henderson of BrightKEYS Homes, indicated he will be constructing the
townhome/twinhomes included in the project. Mr. Henderson noted that he has
been building in the Twin Cites for 9 years and his company has won several
Reggie and Trillium Awards. Mr. Henderson reviewed changes made in the design
Special Planning Commission Minutes
July 14. 1998
Page 2
.
plans for the townhomes as follows: 1) entrances for the end units have been
changed to the side. canopies and rounded windows have been added; 2) the
plan has been changed to include single level row units (former plan had 2-story
back to back); 3) the townhomes in the northwest area have been changed to
single level units.
Ed Hasek, Westwood Professional Services, explained that the project has grown
from the original 280 acres to 365 acres. He reviewed concept and site plans
illustrating wetlands, forestry. sidewalks and trails.
Mr. Hasek stated a 11.5 acre park will be located in the center of the park and 6
acres of property along Trott Brook will be dedicated to the city for a trail.
Amenities will be installed in the park which will be credited toward their park
dedication fees. A 23 acre parcel located in the northeast corner of the property
will be dedicated to the city, but he noted the Park & Recreation Commission was
not willing to give any credit since the site is mostly wetland.
Mr. Hasek explained that the first phase of the development will consist of 64
townhomes and 84 single family homes (approximately 32% of the construction of
the site). Lungren Bros. Homes will be constructing 8 different styles of the
Heartland series homes on the 85' wide and larger lots with room for a 3 car
garage. Five styles of the Heritage series will be constructed on the smaller lots.
.
Commissioner Schuster asked for clarification on the proposed phasing of the
project. Mr. Tompkins indicated the 151 phase will take approximately 2-1/2 years
to complete. Commissioner Schuster questioned if the project will start before the
realignment of County Road 12. Mr. Tompkins indicated that they have been
asked to construct a connection to the new roadway.
1. Land Use Issues
Terry Maurer, City Engineer. indicated the following concerns still need to be
addressed:
-Density
-Lot sizes (47 lots under 80' wide)
-Need for future variances (decks, additions. etc.)
-Environmental issues (Le.. tree loss)
Scott Harlicker indicated there are two possible options to reduce the density of
the town homes; 1) spread the development out more along County Road 12. or.
2) reduce the number of units.
.
Discussion followed regarding the density of the town homes, amount of green
space, distance between buildings and driveways. Jeff Beahen. Assistant Police
Chief. expressed his concern that higher density means increased police calls. He
suggested that more space be provided between and behind buildings, and that
address information be provided on the ends of the buildings to aid them in
locating a particular house number. Bill Henderson of BRIGHTKeys noted that the
townhomes are not rental units and will be individually owned. Mr. Henderson
indicated most of their buyers are "empty nesters" in the 45-65 years age bracket.
Also, there is a growing market for single professionals who do not want the
.
.
.
Special Planning Commission Minutes
July 14.1998
Page 3
upkeep associated with owning a home, such as mowing, snow removal, repairs.
He noted that only 15% of their buyers have children.
Commissioner Chambers indicated he had visited the Centerville site and felt the
quality of construction was good, but was concerned about the density. Chair
Mesich asked what was the density of the Centerville townhomes. Mr. Hasek
indicated the density is 8.8 units per acre and they are proposing 5.8 units per acre
for the southwest townhouse development. Mr. Hasek noted that the 9.8 acre site
has approximately 37% of solid surface and 63% open space. The solid surface
includes walkways, driveways, buildings, etc.
Chair Mesich questioned whether or not the size of the project was discussed with
the School District. Mr. Hasek stated he has met with Bruce Powers, Administrator
of District Standards, and was told he was aware of the proposed project. Mr.
Powers had indicated the District expects, at some point in the future, a school will
be needed on the east side of Highway 169 but did not know what type of school
it would be.
Commissioner Cote expressed his concern for the smaller lots on Street A. He felt if
there were fewer lots, there would not be so many driveway accesses onto the
street. He anticipated the situation would become similar to an existing situation in
the city with speed and increased traffic.
Commissioner Kuester expressed concern that there is no off street parking for the
townhomes. Commissioner Chambers noted that the Centerville project does
have areas for off street parking. Mr. Hasek indicated there is parking on both
sides of S Street, and that the town homes will have two car garages and longer
driveways for parking, which is different from the Centerville townhomes.
Commissioner Morris stated he was concerned with the density of the townhomes,
the number of trees which will be lost, and the number of single family lots less than
80' wide.
Commissioner Cote indicated the residents of Elk River have often expressed the
desire for the city to not allow densities like those found in other communities such
as Maple Grove.
Further discussion followed regarding creating an open space area for the
townhomes by eliminating some units.
A discussion followed regarding the covenants which will be enforced in the
development and the type of home owner's associations which will be
implemented for the single family and townhomes. Mr. Tompkins explained that
potential home owners must go through an architectural review committee to
have their plans approved. He indicated that the building trend is for smaller lots
with larger homes on them.
Chair Mesich expressed his appreciation to the developers for the changes which
were made in the townhome concepts to improve the quality.
.
.
.
Special Planning Commission Minutes
July 14, 1998
Page 4
2. Environmental Issues
Terry Maurer indicated a EAW has been submitted and response time for
comments is open until July 29th, He did not anticipate any serious environmental
concerns.
Wetlands - Terry indicated there are 102 acres of wetlands in 52 different wetlands.
He felt the developers have done an excellent job of avoiding the wetlands and
will only be mitigating approximately 2 acres of wetland. He does not anticipate
any problems in this area.
Shoreland Ordinance - No information has been received from the DNR at this
point.
Oak Wilt - There is one pocket of Oak wilt which will be removed and the
developer has submitted a plan to deal with the issue.
Flood Fringe - Filing in the flood fringe will require a conditional use permit for lots
abutting Trott Brook.
Archeological survey and Phase II Environmental survey have been completed.
staff has referred the developers to the County regarding a county ditch issue.
Terry reviewed the storm drainage plan for the eastern area and how it relates to
this project.
3.
4.
Street and Utility Issues
Gradina and Drainaae Issues
Terry indicated staff is recommending that a 70' right of way be granted for the
realignment of County Road 12. He reviewed accesses onto the county roads.
Terry noted staff is recommending all streets within the plat be 32' with the
exception of Street A which is recommended to be 36', Terry indicated there are
14 cul-de-sacs in the plat, noting that city ordinance does not have a restriction on
the number of cul-de-sacs. He recommended a condition be included to require
a connection between streets at the time of Phase Two to incorporate a
northwest entry. Staff suggested the number and size of the monumental signs be
reconsidered. He explained the location is important so that they do not interfere
with the drainage and utility easements.
Terry explained the location of the watermain connections and the concerns of
the fire chief to providing looping of the watermain.
Discussion followed regarding the county right of way requirements and the city's
easement requirements. Terry Maurer indicated the city does not want to be in
the situation where utilities would have to be run under the trail. The developers
did not feel a would be problem on the north side.
Fran Hagen with Westwood Professional Services, explained why it is not feasible to
make the connection recommended by city staff due to the steep grade and loss
of trees it would cause. He suggested the city consider a policy for allowing
narrower streets based on traffic counts. Mr. Hagen also explained why the
.
.
.
Special Planning Commission Minutes
July 14. 1998
Page 5
secondary access on County Road 13 was needed and felt the right-in right-out
would be adequate.
Further discussion followed regarding the requested 28' street width. Mr. Hagen
did not feel the extra street width was needed and the extra width would better
serve as green space.
Ed Hasek explained his reasons why he did not support the connection between
Street F and Street S, and felt it would create more traffic than should be traveling
on these streets.
Scott Harlicker indicated that having a street connection on the west would also
serve as a connection for pedestrians and bicyclists.
Commissioner Kuester discussed how the layout of the streets affects school bus
routing.
Commissioner Cote expressed his support for the 32' wide streets and felt the
developer must provide reasoning for the lesser right of way for County Road 12.
Discussion followed regarding the possibility of a sign at the end of the two loops of
Street A.
Commissioner Morris stated he could not support the 28' street width and was
concerned there was no access to the north.
Terry Maurer state that he felt the drainage and tree preservation plan submitted
were realistic of what will actually be happening.
5. Park and Recreation Issues
Terry Maurer indicated the proposal includes a 11.2 acre centrally located park
with amenities, 6 acre linear park along Trott Brook and cash or improvements to
go towards the remaining park dedication.
steve Wensman, Planner. expressed concern for the trail ending at a townhouse
driveway. He also expressed concern for the tight layout of the park amenities in
relation to backyards. Also, he stated a maintenance access is needed for Outlot
F as well as a pedestrian linkage.
Discussion followed regarding parking needs for the park. Mr. Hasek indicated the
Park & Rec Commission felt the off street parking would be adequate to serve the
park.
A discussion followed relating to a trail connection to County Road 12. The
developers indicated they were willing to work with staff on this issue.
Special Planning Commission Minutes
July 14.1998
Page 6
.
6. Miscellaneous Issues
Signing - Terry Maurer indicated staff would like the developers to take a look at
the quantity and size of the monument signing throughout the plat.
Chair Mesich opened the public hearing at this time.
Thomas Christian, owner of property near the proposed town homes, stated he
would like to see underground utilities. He expressed his concern for access to his
property, increased traffic and speeding.
Terry Maurer indicated the utilities have plans to run a new overhead main line
along Highway 12. He noted developer plans to have underground utilities
throughout the plat.
COMMISSIONER KUESTER MOVED TO CONTINUE THE PUBLIC HEARING FOR THE TROTT
BROOK FARMS REZONING, PRELIMINARY PLAT AND CONDITIONAL USE PERMIT TO THE
JULY 28, 1998 PLANNING COMMISSION MEETING. COMMISSIONER MORRIS
SECONDED THE MOTION. THE MOTION CARRIED 6-0.
There being no further business, the meeting of the Elk River Planning Commission
adjourned at 10:30 p.m.
. Respectfully submitted,
^Oe~e' X/tu6~)
Debbie Huebner
Recording Secretary
.