7.5. SR 02-19-2019 ��i
Eof
lk — - Request for Action
River
To Item Number
Mayor and City Council 7.5
Agenda Section Meeting Date Prepared by
Public Hearinj lFebruary19, 2019 Zack Carlton,Planning Manager
Item Description Reviewed by
River Walk Apartments— 17354 Zane Street NW Chris Leeseberg, Senior Planner
A. Right-of-way Vacation: Zane Street NW Reviewed by
B. Simple Plat: River Walk Cal Portner, City Administrator
C. Zone Change to PUD
D. Conditional Use Permit for PUD
Action Requested
A. Continue, by motion,the request to vacate a portion of the Zane Street Right-of-Way to the March
18, 2019, Council meeting.
B. Continue, by motion,the request for approval of a Simple Plat to the March 18, 2019, Council
meeting.
C. Continue, by motion,the request for approval of a Zone Change to the April 15, 2019, Council
meeting.
D. Continue, by motion,the request for approval of a
Conditional Use Permit establishing a Planned Unit
Development to the April 15, 2019, Council meeting. _
Background/Discussion
The aPPlicant submitted updated plans on February 14, 2019,
9
which include a cul-de-sac and work to address some of the u
C_R_33
comments from staff s comment letter dated January 14, 2019,
and the feedback from the January 22, 2019,work session.
2
Park Dedication
The updated plan includes a 15-foot trail easement along the RR
north edge of the project,but does not reflect the direction given
by the Parks and Recreation Commission on November 14, Hy 10
2018. Prior to the motion to continue,the applicant would like to - CR 12
discuss the park dedication and trail easement recommendations
as they further refine the plans. A representative from the Parks •
Commission will be at the meeting.
The applicant has also submitted a written extension request for y�
all four of the applications associated with project. The extension
9
pushes the last date for a decision by the City Council to April
17, 2019.
The Elk River Vision Apre
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires prosperity p o w E e E u e r
INIM UREI
Statutory Review Period
The applicant extended the review period,by written request, to April 17, 2019.
Attachments
■ Updated Plans received February 14, 2019
■ Park and Recreation Commission Minutes from November 14, 2018
■ Written Extension Request to April 17, 2019
■ Staff Comment Letter dated January 14, 2019
N:\Public Bodies\Agenda Packets\02-19-2019\Final\x7.5 sr River Walk Apartments 2-19-2019.docx
/ mw
Z n
I H
4 a a= J U Q Z
U
F O J O iW U O
< N
0 Q UQ
Z d Z
O n0
ooQ��oz
M aO Z U H l 0,0
Q oaodo �wJ�
a s�oo �=wcn
If
H I �
a �o�a o�QU
w _O U O p O O Z p
> H4Uw� V a
O'O¢� Q�>Z
O 1 a 0 S-� O
Q U O r Z n W I
to F BOJ dam'¢
T aUa ZO NLLI IUi
(n Z O z~ U U O p W
�� ZFo�m �o}a
zQ
(/1acs v �tio za
d0 Xxw
L,jJU OW =<
Q JdZOZ JIi LLH
m� a¢¢UO aoov
Z N I.
I I
j 'II I II
I I
I III II I -
� III II I II
� U IIII I II -
I I
z
r
Q a
I'. U II
I
l III I II m Ill I II iY
I III I I
S31NVdW00 S001218 3H1
NVId SNOU ONOOo� O
0NIiSIX3 V10S3NNIN 3 U
SNOISV38 S1dV VZV-ld 2J3AIb 2R Ai VMb3nlb X
L-
11 I ��
I I
I _
I -
11
IO
_I I
i
i
w I low N i Wil^ `_-__ • _ _
I—
® / l l^m III Ild -11i---
---------------
--------------
-----------
II ' — '-------- ----- --- --------------- LL
--------------—
Q �m
o -I
---
o- F --
Li
ly
S MIS RIyER
0
i I �
a=
0
H
CO)
Z
0
W
O
I.L.
W
= Z
S- 1MdHOO S001218 3H1
a nez-erz-oze ae,�e2 M3N3a ALB aid s� c� z NVId l.11llin :a.4
�oaoa��s Q �� w a3NMo aid s a
(INV 31lS VlOS3NNIN '2J3AIb 71 ]]
M31A3a Alp aid 8l 9l ZL S1dV VZV-ld �JIAI2J 2R Ai VMb3AI?J X U
SNOISN3a
z n a O
Zo
F0a�
p Q U x J U Q Z
a zo�Q
3J0V
OJOI NVO Z
� w
Q N Q U Z d Z
�o o
0W�
�
0��
F-
m "JQ(noo����~ ,�waOQT
�UQ- A>~NQomaOof,
>¢r
Q
W
ILL
> D' -, N" z
Q SOQpo
on -
zw1:�1 � LLJ
w
Oz
O '�wOOo�=ei
Q O Q J J
p y a
- W ��>� ZO ZO�K �> 4N�om NO ���om�op
O Q O Q w � tt~
> VVH L� p N - N
W HQ0 Q�Ow� Qo' p N wao ui 6 m N -
U~ H Z f J U w
Yz W H
U —
Q >J
}07 ODP7 M OZ
ow
fn J J d O J Z w W UOf
~zvi>U O~WCJ Oz w ��a�a d
U xOz� VVOw zQ d -wo
z� oI, m �o}a zoa :5ao
ZQ F <<
Z~ p N p
N aU i M>, zaUcc Uw
d 0 X X J U O W W Q Z_
w W (N/1 w�wtiZ V xxp H O
0<
QJ d Z O Z J W W H X 0
m� QQQUO QOOcn w a
NO 10
-71
m
�s
/ x ,
mn
" 1
_ �iv cpm orz(��8gi �s a
s� o gamma la ;
77
u
pocr wer
�I
� I I
w2o li
O
-M-M m Ili
•rr•,te��.., ¢;3.II a -
8aILL
—
��-'r--'--
1�1------------' - --�
w�m
_-
-
-
-
-
-
-m= III 4 �N
00
I LL�
I r >
m =
O---------------- --- i
—'/ 0 w—w_�w SIssIPPI
0
U , RI
oar
o,w /II o
,— II
Q
O
o � w
0
3 Ln
0
U
a as"m'ewaaa mas
+ v0v A+e1s' Q �•\�
�J
Mdld lON1NOO
NOIS083 V ONI4VN0
S31NVdW00 S001218 dHl
o4
VlOS3NNIW 2J3AIb 71 3
N
U
e«« °a
o
M3N3a Alp aid 6l fl z
"" " w
M31A3a
Alp aid 8l bl ZLW
sNolsln3a
S1dV VZV-ld 2J3Al2J 2R >1�VMb3nlb
xWY
a
Z
n
w z
W
Q
ow
w o J
pz
Z
pU
W K w Q
o o ooh
a
c~io�
zoNQ ���
o a a Z oww� dom�w aQ �z Qz �a3 0. 12
Z Q W
�
3 W� U
oW01 woo
�m 0�=
w- YQ wZ' Owl O�GZw ==4 OF-
y
Sao= �aZ
mN poa z�uxi=� QQ wd ON Q1
3 Z
o
N�zO �v10
Jw m oNZONO ov J3} zpwz vlx w= wv~im WV
>
O l Q tO
w Z
N o w~ N x Z\ w Q Z D a ; W Q W O Q
= o
m
> U N N x
Q N O
J K Z O Z Z W O f> Q r d Q Q U N m W Q Q Q N li Z
LU
p w N O
=
Q
OU Q lwi Z Q O U p p 0 O p w 0 Q= x o p= w w
d
plUap ~=IJN
_.
OJO J= Q Z(Wj�W(nw��QZxW (�QF NZQwz JZ0vl
o� OQr
R
Q �(� o
�p
vtn l<pWWma—pmQ
z
KF W VIZ<wx Q�W UQo p Owd �m—wx
L
o
U
az vl vl F oQQ �����QQwo Q�� z� �pQNp
W
>
ZpoO>O ooQO
U O
�0 U WOp QZ�VIw Z�om O�Q ml,1QOZN��o
Q N
pZ Q H
H Q VI
u- to �U>Z
F L�
H H U Z U U O p r N p W Y~ U a j J r a H
O pa �wzZ~aQpWZ>�w��¢apw3poZxml�ax�w
Q Q
wO- SU��
cnaYa
WO(%Ip�YK(namc~.)v'�UpQ d>wUQOpOtnQ=�N�pOH>Q
o
�p�oZ
ovwiww?,00���amo�o����a��No�op��oQ�N�w
p
FZa>a prw�
D o N H U ~
U W
'wZa�ol���Jo?Jz>Eaw3W a�oaamop,wwo
C'
Z p H H Q
o
c7 Q J Y N~ J W Z� J 1
x
z Q
z Q j mlw
> N
a
p
o o w a o w z N 3 U> Z Q K O O O o. Y O j m N O Q== Q N W
() a N x a F U O j 0 In W K Z— p J w F 3 w H> w d
�n
V/ aU
dw
In_wti0 Z
W pU==p
d U CC
W W H
8C.) l< ��—m QZw(np\Od�p OQ(/Ix Qp W�pVIOV VI
Ow pJ pZ W
O W Qw
~HZ
W UI OOJZQZ� Z>w�� OUO�� WpZw
WZU��O�WVI o W WWw Qp UOUa WOh ZC�>�C7U=p<w
w<
Q
mm
dpZZ
J d Z O Z J
QQaoo Qoovl
W W H
w
I O W
��p¢ m ti 6 i
SP
a
R
ICER
0�>m
xWY
i
SP
a
R
ICER
City of
lk
i1VerMembers Present:
Council Liaison:
Meeting of
the Elk River Parks and Recreation Commission
Held at
the Elk River City Hall Wednesday, November
14, 2018 Chair Anderson,
Commission members Ahlness, Holmgren, Niziolek, Rathbun, Soltvedt,
and Williams Mr. Olsen
Staff Present:
Parks and Recreation Director, Michael Hecker, Recreation Manager Steve Benoit, Parks
Superintendent Tim Sevcik, Senior Planner Chris Leeseberg, Recreation Coordinator
Tonya Love, and Recreation Assistant Dawn Larson Call Meeting
to Order Pursuant to
due call and notice thereof, the meeting of the Elk River Parks and Recreation Commission was
called to order at 6:30 p.m. by Chair Anderson. 2. Consider
I 1 / 14/ 18 Agenda Moved by
Commissioner Ahlness and seconded by Commissioner Soltvedt to approve the November
14, 2018, Parks and Recreation Commission meeting agenda. Motion carried 7-
0. 3.1
Consider 10/3/ 18 Regular PRC Minutes Commissioner Ahlness
requested the following change to Item 7.1; change Commissioner Ahlness
to Commissioner Rathbun for being on the Woodland Trails Regional Park
Committee. Moved by
Commissioner Niziolek and seconded by Commissioner Williams to approve the
following October 3, 2018 Parks and Recreation Commission Minutes with the suggested
changes. Motion carried 7-0. 4. Open
Forum - None 5 Riverwalk
Apartment Park Concept Mr. Leeseberg
presented his staff report. Chair Anderson
asked for clarification on what the different colored boundaries meant on the floodplain map.
Mr. Leeseberg
explained it was required setbacks. Mr. Leeseberg
also explained that the map that the Commission had seen two months prior
Parks & Recreation Commission Minutes
November 14, 2018
Page 2
did not have the current map's additional building with 67 units on the other side of the
proposed storage facility.
Chair Anderson asked the Commission if the request could be approved next month or if it
had to be this month considering the change of plans and additional apartment units. Also
asking if the new information presented would change the Commissions point of view from
the general consensus by the Commission at the September 12, 2018 meeting to receive cash
dedication for the property.
Dan Anderson, Briggs Companies, stated that the process does not make or break the project
of having park dedication and it is expected to have that. Their biggest concern is regarding
the transient action in the area with 28-30 reports a month to the police department. The
vandalism is over the top and damage is overwhelming. Issue is more about when we put
people there that they are safe, creating a safe environment for them.
The commission discussed the proposed drive to the western portion of the property but
ultimately decided not to provide input on it as they recommended only cash dedication. They
discussed the need for a trail easement running north and south along the bluff line and how
to access this easement from Zane Street.
The commission also had a discussion on the need for a future location of a boat landing
once Babcock closes) and did not think this property was a good location. They agreed the
city should focus on an area further south near the proximity of the proposed interchange of
167t1i Avenue and Highway 169.
Moved by Commissioner Niziolek and seconded by Commissioner Rathbun to accept
staff recommendation of park dedication to be paid in the form of cash for the number
of units approved by the City Council at the rate applicable when the subdivision is
released for recording. (This will be $4,897.02/unit at the 2018 high density rate) A 50-
foot trail easement from under Highway 101 Bridge to the southern property line of the
site shall be provided with the majority of the easement being located above and along
the bluff line. The final location shall be approved by city staff. Adding that a 30-foot
wide trail easement, connecting the 50-foot easement to Zane Street, shall be provided.
Motion carried 7-0.
6. Discussion Items — None
pI*ERII IT
NA WRE
Parks & Recreation Commission Minutes Page 3
November 14, 2018
7. Parks and Recreation Director Update
Mr. Hecker presented his staff report. Mr. Hecker also thanked Commissioner Williams for his
leadership and hard work over the past year in support of the Active Elk River campaign.
8.1 Recreation Manager's Update
Mr. Benoit presented his staff report. Mr. Benoit also presented his power point on the 19s'
Annual Family Spooktacular 2018 pointing out that this year's event had record attendance.
8.2 Street and Park Superintendent Update
Mr. Sevcik presented his staff report.
Chair Anderson asked if the group remembered the discussions in the past about the park
signs being horizontal instead of vertical signs Mr. Sevcik presented. He stated, that the
vertical signs were not the ones approved by the Commission and requested if he could get a
copy of the commission recommendations regarding the wayfinding project.
Mr. Hecker explained that the City Council approved the vertical ones and the process of
installation is already underway.
9. Announcements
10. Adjournment
There being no further business, Chair Anderson adjourned the meeting of the Elk River
Parks and Recreation Commission work session at 7:52 p.m.
Minutes xxreuared bdDawn Larson.
Dave Anders&n. Chair
Tina Allard, City Clerk
P I I E I E I I r
NATURE
Daniel J. Andersen
Briggs Companies
633 Upton Ave, Elk River MN
RE City of Elk River — Riverwalk Apartments
Case Numbers: EV 18-05, P 18-12, ZC 18-05, and CU 18-
15
To whom it may concern,
This letter is to request and consent to extension of the time
periods provided under Minnesota Statutes, section 15.99 and
section 462.358 for approval or denial of the four applications
listed above to April 17, 2019.
It is our intent to amend the applications to provide added
information per the site plan more in keeping of the
requirements allowed is this region and use.
Regards
Daniel J. Andersen
Briggs Companies
633 Upland Ave, Elk River MN
Phone: 763.635.1000
www.ElkRiverMN.gov
January 14, 2019
Sun Rae Apartments, LLC
Attn: Dan Anderson
633 Upland Ave NW, Suite C
Elk River, MN 55330
RE: Zone Change, Conditional Use Permit Application, Easement Vacation, and Plat.
Dear Applicant,
Thank you for submittal of updated plans and drawings on December 15, 2018. Staff reviewed the
updated drawings and has the following comments. Please note that many of the comments are
similar to the comments noted on August 15, 2018, and December 7, 2018. Many of the comments
have not been addressed and additional drawings are required to establish an understanding of the
project.
Please address these comments in a response letter and on future plans/submittals:
General Comments:
1. Submit an updated plat reflecting the lot lines shown on the submitted plans. The plat needs
to include all of the necessary drainage and utility easements.
The preliminary and final plats include the proposed lot lines shown on the revised plans. This information is
contained within with this submittal.
Drainage and utility easement vacations and proposed easements are not shown.
2. A cul-de-sac will be required at the north end of Zane Street. Update plans and the
easement vacation request to reflect the change.
The proposed driveway accesses and drive aisles for the Riverwalk Apartment site should be sufficient for
emergency vehicle turnaround at the north end of Zane Street. A fire truck turning plan can be submitted
separately to verify vehicle movements through the site.
The cul-de-sac is required to ensure public (i.e. garbage trucks, buses, tractor/trailer) turn
around can occur within the public right-of-way and accommodate maintenance by public
works vehicles.
3. The Parks and Recreation Commission reviewed the project on November 14, 2018, and
recommends Park Dedication be satisfied through cash dedication and trail easements. The
trail easements must be included in the updated plat.
The revised plans and updated plat show a 30’ trail easement between the Riverwalk Apartment and the Lodge
sites.
Easement is not shown on either plat.
VIA EMAIL: dj@thebriggscompanies.com
4. What does the “lower drive” connect to? The plans show it leaving the site. Will this be
constructed as part of the project?
The “lower drive” has been removed from the preliminary plans and a 30’ trail easement has been added.
Easement has not been added to either plat.
5. Need a formal access agreement between the new 4-story apartment and the 4-story
apartment addition in order to share access point between them.
A formal access agreement between the Riverwalk Apartment site and this project will be completed during the
construction documents phase.
Access agreement can be a condition of approval – prior to recording plat.
6. Site plan does not match the renderings. Example, the south garage entrance on the 4-story
apartment addition building is shown in a different location.
The civil and architectural plans will be coordinated to match. The south garage entrance as shown on the
rendering sketch does not work for the existing site conditions; hence the architectural plans will match the site plan
in this instance.
Updated elevations and renderings are required.
7. The minimum parking setback is 10’ from property lines. If the deviation is to be a part of the
PUD, please specify a setback distance. Include the proof-of-parking locations for Elk River
Lodge in site plans for this project.
The minimum parking setback as shown on the plans is 5’ and will be part of the PUD. The existing
parking stall counts for Elk River Lodge have not changed from prior submittals; a total of 67stalls (25
covered stalls and 42 surface stalls).
Parking setback and stall counts will be noted in required PUD agreements.
8. Plans identifying the portions of the Saxon building being removed should be submitted.
An existing conditions plan is included with this submittal that shows the proposed removals.
Complete
9. Please submit floor plans for the Saxon Apartment building. The plans should show the
relationship between the storage area and apartments. Identify the square footage/unit
count for the storage portion of the building.
Floor plans will be submitted separately that will show the relationship between the storage area and
apartments with the square footage/unit count for the storage portion of the building identified.
Floor plans have not been submitted and are required for review.
10. Ordinance requires 2.5 parking stalls per unit, or 258 spaces for Riverwalk and 190 spaces
for Saxon Apartments. The parking requirements are not satisfied.
These projects are proposed as a PUD with a current ratio of 2.06 parking stalls per unit for the Riverwalk
Apartments and 2.26 parking stalls for River Plaza (Saxon Apartments).
Parking deviations must be approved by City Council. Approved counts will be memorialized
in a PUD agreement.
11. Ordinance requires one covered parking stall per residential unit. The Riverwalk building
meets this requirement, but the Saxon Apartments do not.
River Plaza has been revised to show additional underground garage parking within the proposed building
addition and a detached garage building.
Approved parking counts will be memorialized in a PUD agreement.
12. The parking requirements do not include the storage component of the building.
Floorplans identifying square footage of the storage areas are required to review the parking
requirements.
The parking requirements for the storage component are included with the 8 parking stalls adjacent to that
area. With a storage area of 18,670 SF, this results in a ratio of 1 stall per 2,500 SF of storage area.
Submit floor plans identifying residential and storage areas within the building.
13. Submit landscape plans for review and comment. This is a requirement for approval.
Landscape plans will be submitted separately.
Landscape plans have not been submitted.
14. Submit lighting plans for review and comment. This is a requirement for approval.
Site lighting plans will be submitted separately.
Lighting plans have not been submitted.
15. Submit colored architectural elevations identifying material and color selections for all
elevations. Façade improvements/modifications to the existing Saxon building must be
detailed. This is a requirement for approval.
Colored architectural elevations identifying material and color selections for all elevations are included with this
submittal.
Architectural elevations have not been submitted.
16. Include proposed signage on site plans and elevations.
The proposed signage is shown on the site plans and building elevations.
Building elevations have not been submitted.
17. The Saxon Apartments no longer provide emergency fire access to the rear of the building.
Please update the plans to demonstrate access for emergency vehicles.
The plans have been updated to show emergency fire access to the rear of the building via a Grasspave system
similar to the Riverwalk Apartments.
The updated site plan does not satisfy the minimum fire access requirements along the south
and west side of the building.
18. Additional comments will be provided upon receipt of referenced plans and changes.
So noted
19. Staff reserves the right to continue review of all site, grading and utility plans.
So noted
Public Works:
1. Identify all existing utilities and corresponding drainage easements on an updated survey
that includes the lot lines shown on the updated plans.
This information was included on the original Certificate of Survey and is shown on the Preliminary Plat.
Plat documents continue to show existing easements running beneath proposed buildings
and revised stormwater plans outside of existing easements. Update plans to satisfy the
requirement.
2. A formal agreement for the proposed shared storm sewer system between the two
properties must be formalized in an easement and agreement.
A formal storm sewer system agreement with easements between the two properties will be completed during the
construction documents phase.
Comment may be satisfied through condition of approval, prior to recording of the final plat.
3. Proposed lot lines must have standard drainage and utility easements dedicated.
Standard drainage and utility easements along the proposed lot lines are included in the preliminary and final
plats.
Easements are not shown on the preliminary or final plat.
4. Parking bump-outs are not permitted on the public roadway in front of the proposed 4-
story apartment building.
According to City Code Sec 74-95 – Angle and parallel parking: Angle parking may be permitted on
any street by ordinance of the council. On any such street, every vehicle parked shall be parked with the
front of the vehicle facing the curb or the edge of the traveled portion of the street at an angle of
approximately 45 degrees. On all other streets, cars shall be parked parallel to the curb or edge of the
roadway in accordance with law.
These parallel parking stalls are requested as part of the PUD.
The request must be approved by the City Council.
5. Sewer service shown off the north end of the 4-story apartment addition building extends off
of the proposed lot. All services (sewer and water) must remain within their own lot and
connect to the public system in the roadway adjacent to said lot.
The existing sanitary sewer service as shown of the north end of the Saxon building was for the connection when it
had a septic system. During the construction documents phase, it will be determined if this sanitary service is still
necessary. If it is, a new sanitary sewer will be installed within the proposed River Plaza lot.
Plans need to be updated to include all proposed service lines.
6. Submit grading plans for the new 4-story apartment site.
The preliminary grading plan has been revised to show spot elevations on the Riverwalk Apartments site.
Additional spot elevations, proposed grades and contours will be included in the construction documents for both
projects.
Full grading plans are required.
7. Proposed contours must be shown in all areas.
Additional spot elevations, proposed grades and contours will be included in the construction documents
for both projects.
Full grading plans are required.
8. Further detail grades on the grass pave area and the entrance to it from the paved drive
lane.
Additional spot elevations for the Grasspave areas will be included in the construction documents for both
projects. Curb and gutter in these areas is proposed to be surmountable (MnDOT D412).
Full grading plans (with contours) are required.
9. Need to reestablish the capacity and functionality of the existing storm water pond below
bluff. It seems the proposed access drive is conflicting in location.
The existing stormwater pond below the bluff will be expanded and redesigned to meet the City’s current
stormwater requirements. The proposed access drive has been removed.
Complete
10. Detail the design of the retaining walls along south side of project.
The proposed landscape retaining walls (less than 4’ high) will be design-build and will be included in the
construction documents phase.
Full grading plans (including construction details) are required.
11. Submit full updated civil/site plans for the proposed 4-story apartment building.
The preliminary plans have been revised to show the Riverwalk Apartments site along with the River Plaza
(Saxon Apartments) site. Construction documents for both projects will be submitted separately after PUD
approval.
Updates required.
12. Show all proposed grades in dark solid lines.
Proposed spot elevations and pond contours are shown in dark solid lines.
Full grading plans (with contours) are required.
13. Additional comments will be provided upon receipt of referenced plans and changes.
So noted
14. Staff reserves the right to continue review of all site, grading and utility plans.
So noted
Stormwater:
1. Stormwater management requirements need to be met as listed in Ordinance Sec. 78-503.
- Stormwater and urban runoff control. and Sec. 78-504. - Post construction
stormwater management for proposed impervious surfaces. http://mn-\
elkriver.civicplus.com/Document Center/View/3180.
The preliminary plans and stormwater analysis, design and report have been revised to meet the current
stormwater management requirements. Additional stormwater information (MIDS results, storm sewer sizing
calculations, etc.) will be included in the construction documents phase.
Complete stormwater plans have not been submitted for review. The review will be completed
once the all pertinent documents have been received.
2. Explain in detail the pre and post impervious surface is sq. ft. in the submitted stormwater
report. Also, separate the projects as phase 1 and phase 2 or explain the how the
stormwater infrastructure works together.
The preliminary plans have been updated with pre and post hardcover calculations for both projects and the
stormwater report has been revised to match. The proposed stormwater basin will work together for both projects.
The existing/proposed hardcover calculations show a reduction. Staff cannot verify these
numbers. Please the hardcover numbers.
3. Within the stormwater report, include pre and post for volume and water quality treatment.
The stormwater report has been revised to include this information.
The report does not match calculated hardcover existing/proposed numbers. The discrepancies
need further explanation.
4. MnDNR will follow up with comments regarding requirements for state floodplain and
the Mississippi River Wild and Scenic and Recreational requirements.
So noted.
DNR comments were received on January 11, 2019. See attached. Include a response to all of
their comments.
5. The project must meet all state and city ordinance requirements for the floodplain regulation.
No site improvements, including stormwater basin expansion and construction, are proposed within the
100-year base flood elevation boundary.
Any improvement within the floodplain will need approval prior to installation.
6. Submit soil borings and infiltrometer tests for all proposed infiltration basin areas.
A geotechnical report was completed in 2017 for this site but does not include the area below the bluff (where the
infiltration basin is proposed) or the area between the existing parking lot and the Elk River Lodge site. This
report will be amended to include soil borings in these areas and submitted separately.
Staff will review these documents once they have been submitted.
7. Submit soil borings for the proposed infiltration basin (within proposed area) in order to
identify water baring soils. The infiltration basin details must meet state requirements and
have a separation of 3’ from the proposed bottom of the basin and water baring soils.
Please refer to the response to the previous plan review comment. The infiltration basin will be designed,
expanded and constructed to meet State and City requirements for groundwater separation.
Staff will review these documents once they have been submitted.
8. Stormwater pre-treatment is required prior to any proposed infiltration basins.
Stormwater pre-treatment will be provided using manhole sumps and sized using the MIDS calculator
during the construction documents phase.
Staff will review these documents once they have been submitted.
9. The plans show a basin bottom of 861.00 but the stormwater report lists 860.00. This needs
to be addressed.
The proposed infiltration basin will have a sloped bottom from elevation 863 down to elevation 862 but
with no area that the 862 elevation. A basin profile detail will be included in the construction documents.
Staff will review these documents once they have been submitted.
10. The proposed 18” FES needs to discharge within the basin sidewall, not short of the basin
within the hillside, also, include energy dissipation according to city standards.
The preliminary plans have been revised to show the proposed 18” FES discharging within the basin
sidewall and energy dissipation via a 4.2’ invert drop in the upstream manhole (CB #7).
Ok
11. Will the existing 18” FES and stormwater system stay on-line or be abandoned? If so, Hydro
CAD needs to be included for this and the basin needs to be cleaned out to original design or
enlarged based on requirements.
The existing 18” FES and stormwater system will be removed and this is shown on the existing conditions
plan. As stated previously, the existing stormwater basin will be expanded based on the current City
requirements.
Staff will review these documents once they have been submitted.
12. The proposed stormwater lines show it tying together at CB #8, provide detail of how this
will work.
CB #8 is proposed to be built over the existing storm sewer pipe because there is insufficient depth within
the existing system to accommodate the proposed improvements. A detail of CB #8 will be included in
the construction documents.
Staff will review these documents once they have been submitted.
13. Provide pipe sizing chart report.
Storm sewer sizing calculations will be completed during the construction documents phase.
Staff will review these documents once they have been submitted.
14. Show parking lot contours, direction of flow and grade percentages. Also, show pipe slope
percentages.
As stated previously, final contours, grades and flow arrows will be included in the construction documents.
Pipe slopes are shown on the preliminary plans.
Staff will review these documents once they have been submitted.
15. Indicate where all roof drainage is being directed to, and not which CB #.
Existing and proposed roof drainage will be directed to locations of the Dura-Slope trench connections.
More detailed information will be included in the construction documents for each project.
Staff will review these documents once they have been submitted.
16. The city was not able to review the proposed stormwater system for the ‘proposed 4-story
apartment building’ because it is cut off on page C-2, update accordingly.
The proposed storm sewer system for the Riverwalk Apartments project is included in the revised preliminary
plans.
The plans do not match calculated hardcover existing/proposed numbers. The discrepancies
need further explanation.
17. Submit long term maintenance plan for all BMPS.
Long term maintenance plans for all proposed stormwater BMPs will be completed during the construction
documents phase.
Staff will review these documents once they have been submitted.
18. Submit full MIDS report.
A full MIDS report will be completed during the construction documents phase.
Staff will review these documents once they have been submitted.
19. Staff reserves the right to continue review of all site, grading and utility plans.
So noted
Environmental:
1. MnDNR will follow up with comments regarding requirements for state floodplain and the
Mississippi River Wild and Scenic and Recreational requirements.
So noted
Comments were received from MnDNR on January 11, 2019. Please review attached letter and
respond to their concerns.
2. Provide before and after hardcover calculations for the Saxon site. Ordinance limits impervious
surfaces to 25% or no net increase.
The preliminary plans have been updated with pre and post hardcover calculations for both
projects.
The plans show a 30.5% hardcover calculation, which does not meet city standards. Please
verify your hardcover calculations.
3. Section 30-2022 requires a 30 foot setback from the top-of-bluff. Move structures outside of the setback.
Both of these projects are proposed as a PUD which includes the flexibility of building
within the 30’ setback from the top of bluff.
A deviation from the standard will require approval from the DNR and City Council. Any
approved deviations will be memorialized in a PUD agreement.
4. Submitted plans showing the hardcover calculations. Sketches indicate the area inside the
building, courtyard, will have impervious surfaces.
a. If land along the river is dedicated for park use, the hardcover calculations will change.
Updated plans will be required based on park recommendations.
The preliminary plans have been updated with pre and post hardcover calculations for both projects.
The plans do not match calculated hardcover existing/proposed numbers. The discrepancies
need further explanation.
5. The proposed site does not meet setbacks from the Mississippi River, does not meet bluff
setbacks and potential grading plans are concerning from an environmental standpoint. Bluff
destabilization is the biggest concern overall for proposed project. There is no wetland
delineation on file for this site. Any encroachment into the bluff setback or bluff area may
require approval from the Department of Natural Resources. As submitted previously, there
are height restriction concerns as well. Structures along the Mississippi like this may not be
higher than 30 feet tall.
The only proposed site improvements within the 100-foot setback from the 100-year base flood elevation
boundary is the expansion of the existing stormwater basin below the bluff. The existing bluff will be protected
and monitored by an independent testing company during construction. A wetland determination was completed
for this site with no wetlands identified. Height restrictions for both of the proposed buildings will be met.
If hardcover is proposed within 45 feet of a suspected wetland, a wetland delineation will be
required. Building elevations showing the proposed heights have not been received and will be
reviewed upon receipt. Please review the DNR comment letter dated January 11, 2019, and
provide additional responses to their comments.
The recommended environmentally beneficial practices listed in the City’s plan review
comments will be considered as possible options within the PUD to offset any mutually
determined negative environmental impacts resulting from deviations to the City and
State regulations. These environmentally beneficial practices will be addressed in the
PUD and implemented accordingly.
Additional comments provided by MnDOT or MnDNR will need to be addressed as part of an
approved project. Unaddressed comments may be included as conditions for approval. Staff
reserves the right to continue review of all site, building, grading and utility plans
Thank you, and please let me know if you have any questions.
Sincerely,
Zack Carlton, Planning Manager
763.635.1035
Ecological and Water Resources Division
1035 S Benton Dr.
Sauk Rapids, MN 56379
Minnesota Department of Natural Resources • Division of Ecological and Water Resources
800 Oak Savanna Ln. SW Cambridge MN 55008
January 11, 2019
City of Elk River Planning Commission
13065 Orono Parkway
Elk River MN 55330
RE: MISSISSIPPI RIVER DEVELOPMENT CUP for PID # 75-521-0110, 75-521-0120, and 75-704-0205
Dear City of Elk River Planning Commission,
I have reviewed the newly submitted plans with the addition of the parcel to the south for a CUP to construct a
multi-family development unit along the Mississippi River. This letter is an addendum to the letter I sent on
August 31, 2018, I have found the following issues in these new set of plans.
The construction plans do not show the height of the building, but the plans do show that the building will be a 4
story building. I do not know if this building will meet the height restriction of 30 feet per Sec 30-2022 (c). A
Height greater than 30 feet could alter the scenic, historical, natural value that was outlined in Minnesota
Statute 103F.315. Typically 4 story buildings are a greater height then 30 feet.
The plans show a line denoting the 30 foot set back from the top of the bluff. This setback line is found to bisect
both the first addition the second addition and the Northeast parking lot. Having these structures built here
would be in conflict with Sec 30-2022, 2024. Sec 30-2022 which requires a setback of 30 feet from the top of the
bluff. Sec 30-2024 states roads, driveways, and parking areas shall meet structure setbacks and shall not be
placed within bluff zones. This is again stated in Sec 30-2135. In addition Sec 30-2023 does not allow for
intensive vegetation clearing within the bluff impact zone. Which by placing a parking lot and structure would
require complete removal of vegetation. Having these structures located here will also require grading and
filling of the bluff area which could destabilize the bluff.
In addition to the structures being placed within the setback the plans show that there will be a parking lot
constructed to the west of the multi-family units. This parking structure is shown to be built into the side of the
bluff which could also further destabilize the bluff. This is in conflict with Sec 30-2135. The driveway that gives
access to this parking area is also down the bluff which would require manipulation of the bluff which could
destabilize the bluff. This parking structure could also be in conflict with Sec 30-2023 Intensive vegetation
clearing within the shore and bluff impact zone. As a parking structure would require the complete removal of
vegetation.
Sincerely,
James Bedell
Area Hydrologist
|1035 S Benton Dr.| Sauk Rapids, MN 53379 | (320) 223-7850 | james.bedell@state.mn.us |
Minnesota Department of Natural Resources • Division of Ecological and Water Resources
1035 S Benton Dr. Sauk Rapids, MN 56379
CC: Tim Crocker DNR EWR Region 3 North District Manager
Dan Petrik DNR EWR Land Use Specialist
Ceil Strauss DNR EWR Floodplain Hydrologist