4.5. PCSR 02-26-2019Request for Action To Item Number Planning Commission 4.5 Agenda Section Meeting Date Prepared by Public Hearings February 26, 2019 Chris Leeseberg, Senior Planner Item Description Reviewed by River Walk Apartments – 17354 Zane Street NW Jennifer Green, Sr. Admin. Assistant A. Zone Change from FAST to PUD, Case No. ZC Reviewed by 18-05 B. Conditional Use Permit to Establish a PUD, Case No. CU 18-15 Action Requested A. Continue, by motion, the Zone Change request to the March 26, 2019, Planning Commission meeting. B. Continue, by motion, the request for a Conditional Use Permit to establish a PUD to the March 26, 2019, Planning Commission meeting. Background/Discussion The applicant submitted updated plans on February 14, 2019, which include a cul-de-sac and work to address some of the comments from staff’s comment letter dated January 14, 2019, and the feedback from the January 22, 2019, work session. The applicant has also submitted a written extension request for all four of the applications associated with the project. The extension pushes the last date for a decision by the City Council to April 17, 2019. Statutory Review Period The applicant extended the review period, by written request, to April 17, 2019. Attachments  Updated Plans received February 14, 2019  Written Extension Request to April 17, 2019  Staff Comment Letter dated January 14, 2019 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity January 14, 2019 Sun Rae Apartments, LLC VIA EMAIL: dj@thebriggscompanies.com Attn: Dan Anderson 633 Upland Ave NW, Suite C Elk River, MN 55330 RE: Zone Change, Conditional Use Permit Application, Easement Vacation, and Plat. Dear Applicant, Thank you for submittal of updated plans and drawings on December 15, 2018. Staff reviewed the updated drawings and has the following comments. Please note that many of thecomments are similar to the comments noted on August 15, 2018, and December 7, 2018. Many of the comments have not been addressed and additional drawings are required to establish an understanding of the project. Please address these comments in a response letter and on future plans/submittals: General Comments: 1.Submit an updated plat reflecting the lot lines shown on the submitted plans. The plat needs to include all of the necessary drainage and utilityeasements. The preliminary and final plats include the proposed lot lines shown on the revised plans. This information is contained within with this submittal. Drainage and utility easement vacations and proposed easements are not shown. 2.A cul-de-sac will be required at the north end of Zane Street. Update plans and the easement vacation request to reflect thechange. The proposed driveway accesses and drive aisles for the Riverwalk Apartment site should be sufficient for emergency vehicle turnaround at the north end of Zane Street. A fire truck turning plan can be submitted separately to verify vehicle movements through the site. The cul-de-sac is required to ensure public(i.e. garbage trucks, buses, tractor/trailer) turn around can occur within the public right-of-way and accommodate maintenance by public works vehicles. 3.The Parks and Recreation Commission reviewed the project on November 14, 2018, and recommends Park Dedication be satisfied through cash dedication and trail easements. The trail easements must be included in the updated plat. The revised plans and updated plat show a 30’ trail easement between the Riverwalk Apartment and the Lodge sites. Easement is not shown on either plat. Phone: 763.635.1000 www.ElkRiverMN.gov 4.What does the “lower drive” connect to? The plans show it leaving the site. Will this be constructed as part of the project? The “lower drive” has been removed from the preliminary plans and a 30’ trail easement has been added. Easement has not been addedto either plat. 5.Need a formal access agreement between the new 4-story apartment and the 4-story apartment addition in order to share access point between them. A formal access agreement between the Riverwalk Apartment site and this project will be completed during the construction documents phase. Access agreement can be a condition of approval –prior to recording plat. 6.Site plan does not match the renderings. Example, the south garage entrance on the 4-story apartment addition building is shown in a different location. The civil and architectural plans will be coordinated to match. The south garage entrance as shown on the rendering sketch does not work for the existing site conditions; hence the architectural plans will match the site plan in this instance. Updated elevations and renderings are required. 7.The minimum parking setback is 10’ from property lines. If the deviation is to be a part of the PUD, please specify a setback distance. Include the proof-of-parking locations for Elk River Lodge in site plans for this project. The minimum parking setback as shown on the plans is 5’ and will be part of the PUD. The existing parking stall counts for Elk River Lodge have not changed from prior submittals; a total of 67stalls (25 covered stalls and 42 surface stalls). Parking setback and stall countswill be noted in required PUD agreements. 8.Plans identifying the portions of the Saxon building being removed should be submitted. An existing conditions plan is included with this submittal that shows the proposed removals. Complete 9.Please submit floor plans for the Saxon Apartment building. The plans should show the relationship between the storage area and apartments. Identify the square footage/unit count for the storage portion of the building. Floor plans will be submitted separately that will show the relationship between the storage area and apartments with the square footage/unit count for the storage portion of the building identified. Floor plans have not been submitted and are required for review. 10.Ordinance requires 2.5 parking stalls per unit, or 258 spaces for Riverwalk and 190 spaces for Saxon Apartments. The parking requirements are not satisfied. These projects are proposed as a PUD with a current ratio of 2.06 parking stalls per unit for the Riverwalk Apartments and 2.26 parking stalls for River Plaza (Saxon Apartments). Parking deviations must be approved by City Council. Approved counts will be memorialized in a PUD agreement. 11.Ordinance requires one covered parking stall per residential unit. The Riverwalkbuilding meets this requirement, but the Saxon Apartments do not. River Plaza has been revised to show additional underground garage parking within the proposed building addition and adetached garage building. Approved parking counts will be memorializedin a PUD agreement. 12.The parking requirements do not include the storage component of the building. Floorplans identifying square footage of the storage areas are required to review the parking requirements. The parking requirements for the storage component are included with the 8 parking stalls adjacent to that area. With a storage area of 18,670 SF, this results in a ratio of 1 stall per 2,500 SF of storage area. Submit floor plans identifying residential and storage areas within the building. 13.Submit landscape plans for review and comment. This is a requirement for approval. Landscape plans will be submitted separately. Landscape plans have not been submitted. 14.Submit lighting plans for review and comment. This is a requirement for approval. Site lighting plans will be submitted separately. Lighting plans have not been submitted. 15.Submit colored architectural elevations identifying material and color selections for all elevations. Façade improvements/modifications to the existing Saxon building must be detailed. This is a requirement for approval. Colored architectural elevations identifying material and color selections for all elevations are included with this submittal. Architectural elevations have not been submitted. 16.Include proposed signage on site plans and elevations. The proposed signage is shown on the site plans and building elevations. Building elevations have not been submitted. 17.The Saxon Apartments no longer provide emergency fire access to the rear of the building. Please update the plans to demonstrate access for emergency vehicles. The plans have been updated to show emergency fire access to the rear of the building via a Grasspave system similar to the Riverwalk Apartments. The updated site plan does not satisfy the minimum fire access requirements along the south and west side of the building. 18.Additional comments will be provided upon receipt of referenced plans and changes. So noted 19.Staff reserves the right to continue review of all site, grading and utility plans. So noted Public Works: 1.Identify all existing utilities and corresponding drainage easements on an updated survey that includes the lot lines shown on the updatedplans. This information was included on the original Certificate of Survey and is shown on the Preliminary Plat. Plat documents continue to show existing easements running beneath proposed buildings and revised stormwater plans outside of existing easements. Update plans to satisfy the requirement. 2.A formal agreement for the proposed shared storm sewer system between the two properties must be formalized in an easement and agreement. A formal storm sewer system agreement with easements between the two properties will be completed during the construction documents phase. Comment may be satisfied through condition of approval, prior to recording of the final plat. 3.Proposed lot lines must have standard drainage and utility easementsdedicated. Standard drainage and utility easements along the proposed lot lines are included in the preliminary and final plats. Easements are not shown on the preliminary or final plat. 4.Parking bump-outs are not permitted on the public roadway in front of the proposed 4- story apartmentbuilding. According to City Code Sec 74-95 – Angle and parallel parking: Angle parking may be permitted on any street by ordinance of the council. On any such street, everyvehicle parked shall be parked with the front of the vehicle facing the curb or the edge of the traveled portion of the street at an angle of approximately 45 degrees. On all other streets, cars shall be parked parallel to the curb or edge of the roadway in accordance with law. These parallel parking stalls are requested as part of the PUD. The request must be approved by the City Council. 5.Sewer service shown off the north end of the 4-story apartment addition building extends off of the proposed lot. All services (sewer and water) must remain within their own lot and connect to the public system in the roadway adjacent to said lot. The existing sanitary sewer service as shown of the north end of the Saxon building was for the connection when it had a septic system. During the construction documents phase, it will be determined if this sanitary service is still necessary. If it is, a new sanitary sewer will be installed within the proposed River Plaza lot. Plans need to be updated to include all proposed service lines. 6.Submit grading plans for the new 4-story apartmentsite. The preliminary grading plan has been revised to show spot elevations on the Riverwalk Apartments site. Additional spot elevations, proposed grades and contours will be included in the construction documents for both projects. Full grading plans are required. 7.Proposed contours must be shown in all areas. Additional spot elevations, proposed grades and contours will be included in the construction documents for both projects. Full grading plans are required. 8.Further detail grades on the grass pave area and the entrance to it from the paved drive lane. Additional spot elevations for the Grasspave areas will be included in the construction documents for both projects. Curb and gutter in these areas is proposed to be surmountable (MnDOT D412). Full grading plans (with contours) are required. 9.Need to reestablish the capacity and functionality of the existing storm water pond below bluff. It seems the proposed access drive is conflicting in location. The existing stormwater pond below the bluff will be expanded and redesigned to meet the City’s current stormwater requirements. The proposed access drive has been removed. Complete 10.Detail the design of the retaining walls along south side of project. The proposed landscape retaining walls (less than 4’ high) will be design-build and will be included in the construction documents phase. Full grading plans (including construction details) are required. 11.Submit full updated civil/site plans for the proposed 4-story apartment building. The preliminary plans have been revised to show the Riverwalk Apartments site along with the River Plaza (Saxon Apartments) site. Construction documents for both projects will be submitted separately after PUD approval. Updates required. 12.Show all proposed grades in dark solid lines. Proposed spot elevations and pond contours are shown in dark solid lines. Full grading plans (with contours) are required. 13.Additional comments will be provided upon receipt of referenced plans and changes. So noted 14.Staff reserves the right to continue review of all site, grading and utility plans. So noted Stormwater: 1.Stormwater management requirements need to be met as listed in Ordinance Sec.78-503. -Stormwater and urban runoff control. and Sec. 78-504. -Post construction stormwater management for proposed impervious surfaces. http://mn-\\ elkriver.civicplus.com/Document Center/View/3180. The preliminary plans and stormwater analysis, design and report have been revised to meet the current stormwater management requirements. Additional stormwater information (MIDS results, storm sewer sizing calculations, etc.) will be included in the construction documents phase. Complete stormwater plans have not been submitted for review. The review will be completed once the all pertinent documents have been received. 2.Explain in detail the pre and post impervious surface is sq. ft. in the submitted stormwater report. Also, separate the projects as phase 1 and phase 2 or explain the how the stormwater infrastructure works together. The preliminary plans have been updated with pre and post hardcover calculations forboth projects and the stormwater report has been revised to match. The proposed stormwater basin will work together for both projects. The existing/proposed hardcover calculations show a reduction. Staff cannot verify these numbers. Please the hardcover numbers. 3.Within the stormwater report, include pre and post for volume and water qualitytreatment. The stormwater report has been revised to include this information. The report does not match calculated hardcover existing/proposed numbers. The discrepancies need further explanation. 4.MnDNR will follow up with comments regarding requirements for state floodplain and the Mississippi River Wild and Scenic and Recreational requirements. So noted. DNR comments were received on January 11, 2019. See attached. Include a response to all of their comments. 5.The project must meet all state and city ordinance requirements for the floodplain regulation. No site improvements, including stormwater basin expansion and construction, are proposed within the 100-year base flood elevation boundary. Any improvement within the floodplain will need approval prior to installation. 6.Submit soil borings and infiltrometer tests for all proposed infiltration basin areas. A geotechnical report was completed in 2017 for this site but does not include the area below the bluff (where the infiltration basin is proposed) or the area between the existing parking lot and the Elk River Lodge site. This report will be amended to include soil borings in these areas and submitted separately. Staff will review these documents once they have been submitted. 7.Submit soil borings for the proposed infiltration basin (within proposed area) in order to identify water baring soils. The infiltration basin details must meet state requirements and have a separation of 3’ from the proposed bottom of the basin and water baring soils. Please refer to the response to the previous plan review comment. The infiltration basin will be designed, expanded and constructed to meet State and City requirements for groundwater separation. Staff will review these documents once they have been submitted. 8.Stormwater pre-treatment is required prior to any proposed infiltration basins. Stormwater pre-treatment will be provided using manhole sumps and sized using the MIDS calculator during the construction documents phase. Staff will review these documents once they have been submitted. 9.The plans show a basin bottom of 861.00 but the stormwater report lists 860.00. This needs to be addressed. The proposed infiltration basin will have a sloped bottom from elevation 863 down to elevation 862 but with no area that the 862 elevation. A basin profile detail will be included in the construction documents. Staff will review these documents once they have been submitted. 10.The proposed 18” FES needs to discharge within the basin sidewall, not short of the basin within the hillside, also, include energy dissipation according to city standards. The preliminary plans have been revised to show the proposed 18” FES discharging within the basin sidewall and energy dissipation via a 4.2’ invert drop in the upstream manhole (CB #7). Ok 11.Will the existing 18” FES and stormwater system stay on-line or be abandoned? If so, Hydro CAD needs to be included for this and the basin needs to be cleaned out to original design or enlarged based onrequirements. The existing 18” FES and stormwater system will be removed and this is shown on the existing conditions plan. As stated previously, the existing stormwater basin will be expanded based on the current City requirements. Staff will review these documents once they have been submitted. 12.The proposed stormwater lines show it tying together at CB #8, provide detail of how this will work. CB #8 is proposed to be built over the existing storm sewer pipe because there is insufficient depth within the existing system to accommodate the proposed improvements. A detail of CB #8 will be included in the construction documents. Staff will review these documents once they have been submitted. 13.Provide pipe sizing chart report. Storm sewer sizing calculations will be completed during the construction documents phase. Staff will review these documents once they have been submitted. 14.Show parking lot contours, direction of flow and grade percentages. Also, show pipe slope percentages. As stated previously, final contours, grades and flow arrows will be included in the construction documents. Pipe slopes are shown on the preliminary plans. Staff will review these documents once they have been submitted. 15.Indicate where all roof drainage is being directed to, and not which CB#. Existing and proposed roof drainage will be directed to locations of the Dura-Slope trench connections. More detailed information will be included in the construction documents for each project. Staff will review these documents once they have been submitted. 16.The city was not able to review the proposed stormwater system for the ‘proposed 4-story apartment building’ because it is cut off on page C-2, update accordingly. The proposed storm sewer system for the Riverwalk Apartments project is included in the revised preliminary plans. The plans do not match calculated hardcover existing/proposed numbers. The discrepancies need further explanation. 17.Submit long term maintenance plan for all BMPS. Long term maintenance plans for all proposed stormwater BMPs will be completed during the construction documents phase. Staff will review these documents once they have been submitted. 18.Submit full MIDSreport. A full MIDS report will be completed during the construction documents phase. Staff will review these documents once they have been submitted. 19.Staff reserves the right to continue review of all site, grading and utilityplans. So noted Environmental: 1.MnDNR will follow up with comments regarding requirements for state floodplain and the Mississippi River Wild and Scenic and Recreational requirements. So noted Comments were received from MnDNR on January 11, 2019. Please review attached letter and respond to their concerns. 2.Provide before and after hardcover calculations for the Saxon site. Ordinance limits impervious surfaces to 25% or no net increase. The preliminary plans have been updated with pre and post hardcover calculations for both projects. The plans show a 30.5% hardcover calculation, which does not meet city standards. Please verify your hardcover calculations. 3.Section 30-2022 requires a 30 foot setback from the top-of-bluff. Move structures outside of the setback. Both of these projects are proposed as a PUD which includes the flexibility of building within the 30’ setback from the top of bluff. A deviation from the standard will require approval from the DNR and City Council. Any approved deviations will be memorialized in a PUD agreement. 4.Submitted plans showing the hardcover calculations. Sketches indicate the area inside the building, courtyard, will have impervious surfaces. a.If land along the river is dedicated for park use, the hardcover calculations will change. Updated plans will be required based on park recommendations. The preliminary plans have been updated with pre and post hardcover calculations for both projects. The plans do not match calculated hardcover existing/proposed numbers. The discrepancies need further explanation. 5.The proposed site does not meet setbacks from the Mississippi River, does not meet bluff setbacks and potential grading plans are concerning from an environmental standpoint. Bluff destabilization is the biggest concern overall for proposed project. There is no wetland delineation on file for this site. Any encroachment into the bluff setback or bluff area may require approval from the Department of Natural Resources. As submitted previously, there are height restriction concerns as well. Structures along the Mississippi like this may not be higher than 30 feet tall. The only proposed site improvements within the 100-foot setback from the 100-year base flood elevation boundary is the expansion of the existing stormwater basin below the bluff. The existing bluff will be protected and monitored by an independent testing company during construction. A wetland determination was completed for this site with no wetlands identified. Height restrictions for both of the proposed buildings will be met. If hardcover is proposed within 45 feet of a suspected wetland, a wetland delineation will be required. Building elevations showing the proposed heights have not been received and will be reviewed upon receipt. Please review the DNR comment letter dated January 11, 2019, and provide additional responses to their comments. The recommended environmentally beneficial practices listed in the City’s plan review comments will be considered as possible options within the PUD to offset any mutually determined negative environmental impacts resulting from deviations to the City and State regulations. These environmentally beneficial practices will be addressed in the PUD and implemented accordingly. Additional comments provided by MnDOT or MnDNR will need to be addressed as part of an approved project. Unaddressed comments may be included as conditions for approval. Staff reserves the right to continue review of all site, building, grading and utility plans Thank you, and please let meknow if you have any questions. Sincerely, Zack Carlton, Planning Manager 763.635.1035 Ecological and Water Resources Division 1035 S Benton Dr. Sauk Rapids, MN 56379 January 11, 2019 City of Elk River Planning Commission 13065 Orono Parkway Elk River MN 55330 RE: MISSISSIPPI RIVER DEVELOPMENT CUP for PID # 75-521-0110, 75-521-0120, and 75-704-0205 Dear City of Elk River Planning Commission, I have reviewed the newly submitted plans with the addition of the parcel to the south for a CUP to construct a multi-family development unit along the Mississippi River. This letter is an addendum to the letter I sent on August 31, 2018, I have found the following issues in these new set of plans. The construction plans do not show the height of the building, but the plans do show that the building will be a 4 story building. I do not know if this building will meet the height restriction of 30 feet per Sec 30-2022 (c). A Height greater than 30 feet could alter the scenic, historical, natural value that was outlined in Minnesota Statute 103F.315. Typically 4 story buildings are a greater height then 30 feet. The plans show a line denoting the 30 foot set back from the top of the bluff. This setback line is found to bisect both the first addition the second addition and the Northeast parking lot. Having these structures built here would be in conflict with Sec 30-2022, 2024. Sec 30-2022 which requires a setback of 30 feet from the top of the bluff. Sec 30-2024 states roads, driveways, and parking areas shall meet structure setbacks and shall not be placed within bluff zones. This is again stated in Sec 30-2135. In addition Sec 30-2023 does not allow for intensive vegetation clearing within the bluff impact zone. Which by placing a parking lot and structure would require complete removal of vegetation. Having these structures located here will also require grading and filling of the bluff area which could destabilize the bluff. In addition to the structures being placed within the setback the plans show that there will be a parking lot constructed to the west of the multi-family units. This parking structure is shown to be built into the side of the bluff which could also further destabilize the bluff. This is in conflict with Sec 30-2135. The driveway that gives access to this parking area is also down the bluff which would require manipulation of the bluff which could destabilize the bluff. This parking structure could also be in conflict with Sec 30-2023 Intensive vegetation clearing within the shore and bluff impact zone. As a parking structure would require the complete removal of vegetation. Sincerely, James Bedell Area Hydrologist |1035 S Benton Dr.| Sauk Rapids, MN 53379 | (320) 223-7850 | james.bedell@state.mn.us | Minnesota Department of Natural Resources • Division of Ecological and Water Resources 800 Oak Savanna Ln. SW Cambridge MN 55008 CC: Tim Crocker DNR EWR Region 3 North District Manager Dan Petrik DNR EWR Land Use Specialist Ceil Strauss DNR EWR Floodplain Hydrologist Minnesota Department of Natural Resources • Division of Ecological and Water Resources 1035 S Benton Dr. Sauk Rapids, MN 56379