09-26-2000 PC MIN
.
.
.
MEETING OF THE ELK RIVER PLANNING COMMISSION
HELD AT ELK RIVER CITY HALL
TUESDAY, SEPTEMBER 26, 2000
Members Present:
Vice Chair Chambers, Commissioners Baker, Kuester, Pederson
and Schuster
Members Absent:
Chair Mesich
Staff Present:
Michele McPherson, Director of Planning; Terry Maurer, City
Engineer; Scott Harlicker, Senior Planner; Stephen Wensman,
Planner; Debbie Huebner, Recording Secretary
1. Call Meetin9 To Order
Pursuant to due call and notice thereof, the meeting of the Elk River Planning
Commission was called to order at 6:30 p.m. by Chair Chambers.
2.
Consider 9/26/00 Planninq Commission Aqenda
COMMISSIONER KUESTER MOVED TO APPROVE THE SEPTEMBER 26, 2000 PLANNING
COMMISSION AGENDA WITH THE FOLLOWING CHANGE:
ITEM 5.10. - REQUEST BY DAVID DECKER FOR CONDITIONAL USE PERMIT TO ALLOW
OUTDOOR STORAGE, PUBLIC HEARING - CASE NO. CU 00-33 - POSTPONED TO
NOVEMBER 28, 2000, PLANNING COMMISSION MEETING.
COMMISSIONER PETERSON SECONDED THE MOTION. THE MOTION CARRIED 5-0.
3. Consider 8/23/00 Planninq Commission Minutes
COMMISSIONER BAKER MOVED TO APPROVE THE AUGUST 23, 2000, MINUTES WITH
THE FOLLOWING CORRECTION:
ITEM 5.6., PAGE 11 - MOTION SHOULD REFLECT VOTE OF 4-1. COMMISSIONER
PEDERSON OPPOSED.
COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED
5-0.
4. Planninq Commission Representative to Attend October 16, 2000 City Council
Meetinq
Chair Mesich will attend the October 16, 2000, City Council meeting.
Planning Commission Minutes
September 26. 2000
Page 2
.
5.1.
Consider NCDA Commuter Rail Station Desion and Location
Scott Harlicker, Senior Planner, explained that the Planning Commission is being
asked to review the Northstar Corridor Development Authority's (NCDA)
Advanced Corridor Plan and make a recommendation to the City Council.
Mr. Dave Loch, representing the Northstar Corridor Development Authority
(NCDA), reviewed the Elk River station design and location. He explained that
the NCDA began in a study in 1997 to look for future solutions to ever increasing
traffic concerns. Counties in the NCDA included Hennepin, Anoka, Benton and
Sherburne, counties which are located along Highway 10 and 47, also along the
Burlington Northern Railroad line. The membership of the authority also includes
the cities, townships, railroad and transmit commissions in this corridor. Mr. Loch
explained that after the study was completed, the NCDA looked at station
designs. He reviewed the design of the Elk River station platforms, shelters,
parking and bus system. An artist's rendition of the proposed shelters was
provided.
Mr. Loch explained that when fully operational, there will be 18 trains running per
day. He noted that two will depart from Elk River each day; one at 5:45 a.m. and
one at 6:15 a.m. Two trains will also depart from St. Cloud at these times and stop
in Elk River, giving two additional later departures from Elk River.
.
The budget for the project is projected to be $231 million; 50% from the Federal
government, 40% from the State, and 10% from local funds (counties)30 - 50% of
the operational costs will be recovered from fares and the rest will come from
other sources;. Preliminary engineering is being completed at this time, and next
year they will complete the final design and begin construction. Mr. Loch stated
that construction will be a lengthy process and estimates opening will not be until
late 2004.
Mr. Loch explained that MN/DOT will eventually be the owner/operator of the
entire facility and will own the rolling stock. Burlington Northern will operate the
trains.
Mr. Loch reviewed the feeder bus system plans. He anticipates that a Sherburne
County Regional Transit Commission or "River Rider" will operate the bus system in
Elk River, and a similar situation in Benton County. A river crossing is planned
somewhere between Ramsey and Dayton. Future plans include tying bike paths
and trails into the system.
Mr. Loch explained that the facility will be located off from the signalized
intersection at 171 sl and Highway 10. He stated that the station design is
conceptual at this point and would be subject to change. However, the NCDA
will work closely with the cities on any changes.
The trains will operate with 3 cab cars initially and they anticipate there will be
9,300 boardings per day. In 2002-2003, the multi-modal facility will be
constructed in Elk River which includes a park and ride and bus system.
.
Commissioner Chambers asked how the Authority determined the Elk River station
location. Mr. Loch explained that they wanted to locate the station in the
Planning Commission Minutes
September 26, 2000
Page 3
.
downtown area but there wasn't enough room for the park and ride facility and
also, they felt it would be difficult to get the traffic from Highway 169 to the train
station in the downtown location. In addition, there were safety concerns with
the downtown, and they were looking for bare land which would not require
moving residences or businesses.
Chair Chambers opened the public hearing. There being no comments from the
public, Chair Chambers closed the public hearing.
Commissioner Kuester felt it would be appropriate to include in the resolution
items the Commission had concerns about, such as ensuring that the design of
the station and maintenance facility would be consistent with what was
presented to the City, and that City ordinances will be followed. Commissioner
Kuester asked if the stations in other cities would be the same design. Mr. Loch
stated that all the stations will be similar, but that the cities may enhance the
design with their own funds. For example, the City of Sf. Cloud plans to restore
and move their original depot structure to the new station location. Another city
will be adding a clock tower to their building.
.
Commissioner Chambers asked if MN/DOT will be running the facility when it is
completed. Mr. Loch stated yes and explained how MN/Dot became partners
with the NCDA. He explained that they have a Memorandum of Understanding
which provides for the purchase of the rolling stock by MN/DOT. Commissioner
Chambers stated he had concerns regarding MN/DOT following through on the
upgrading of the bus facility to the plan as presented. Mr. Loch stated that he
did not feel there would be an issue with upgrading the station; if it was not
clean, safe, and on time, people would not come.
Commissioner Pederson described the station he visited in Dallas, Texas. He
stated that the stations were all outdoors, because of the climate, and were very
nice. He noted that there were 2,000 riders on 10 miles of track. The property
values surrounding the station actually increased, rather that decreasing as
feared. Commissioner Pederson stated that he felt confident that the station
would pleasing, and in order to be successful it would have to be neat, clean
and attractive.
Commissioner Schuster asked who would have the ultimate approval on the
design and if it could be changed. Mr. Loch stated that there could be changes
but that they will be working with staff and the Commission would have an
opportunity to comment. Commissioner Schuster asked what would happen if
the City changed its mind and decided not to participate. Mr. Loch stated that
the Authority is now being faced with that issue and they do not know at this time
what will happen.
Commissioner Chambers stated that he was uncomfortable with the fact the
design could be changed without coming back to the Commission for approval.
.
Ms. McPherson explained that Planning Commission has the option to include
conditions in the approval. She noted that even though MN/DOT will be building
the parking lot for the bus station, the NCDA will be responsible for construction of
the building and platforms.
Planning Commission Minutes
September 26, 2000
Page 4
.
Commissioner Baker stated he would like to ensure that the Planning Commission
would have an opportunity to review any revised plans.
Commissioner Kuester asked how other cities are dealing with adding amenities
to the station. Mr. Loch stated that a provision is included in the conditions of
approval. The Commissioners discussed language for such a condition.
Commissioner Schuster stated that he hopes the citizens of Elk River realize that
what they are approving is the design and location of the station and that this is
their opportunity for input.
COMMISSIONER KUESTER MOVED TO RECOMMEND APPROVAL OF THE NORTHSTAR
CORRIDOR DEVELOPMENT AUTHORITY'S (NCDA) ADVANCED CORRIDOR PLAN WITH
THE FOLLOWING CONDITION:
1. THE CITY OF ELK RIVER HAVE AN OPPORTUNITY TO WORK WITH THE NCDA AND
MN/DOT ON ENHANCING THE DEPOT SITE.
COMMISSIONER PEDERSON SECONDED THE MOTION. THE MOTION CARRIED 5-0.
Scott Harlicker asked Mr. Loch if the Planning Commission's comments on the
landscaping were required at this time. Mr. Loch stated that they are not ready
to receive those comments at this time.
5.2.
Reauest by Metro Wind LLC for a Conditional Use Permit to Construct & Ooerate
Commercial Wind Turbine and Related Facilities, Public Hearina - Case No. CU
00-35
.
Staff report by Steve Rohlf. Metro Wind, a Minnesota based company, is
proposing to construct a wind turbine with a maximum capacity of 660 kW. Mr.
Rohlf explained that wind turbines are a conditional use in the A-1 / Agricultural
zone. The turbine is expected to provide power for 75-100 homes.
Mr. Jaunich, representing Metro Wind, stated that Elk River was chosen as the site
for a wind turbine because of its reputation for providing renewal energy sources,
and Elk River is also is community with growing energy demands. Mr. Jaunich
explained that the turbine is the harvesting mechanism to provide electricity and
is about the size of a mid-size sedan. The tubular tower will be 175 feet tall, with
the maximum height at 237 feet when one of the three blades is pointing
upward. Mr. Jaunich stated that no noticeable noise will be heard from the
generator unless a person was within 300 feet of the turbine.
Commissioner Baker asked type of noise would be heard. Mr. Jaunich stated that
the only audible sound would be a "whirring" type of sound coming from the
blades. Commissioner Baker asked if birds would be a problem. Mr. Jaunich
stated that birds tend to fly over and around the wind turbine. He noted that
their have been no reports of birds killed on any of Metro Wind's sites.
.
Steve Rohlf explained that another reason Elk River was chosen as a site is to
demonstrate that wind power can make economic sense even in Elk River, which
is at the low end of the commercial wind resource. Mr. Rohlf reviewed the
location of the turbine site, noting that there are only 4 homes in the areas. He
.
.
.
Planning Commission Minutes
September 26. 2000
Page 5
received calls from two residents in the area and both stated they had no
objections to the wind generator.
Mr. Jaunich explained that the turbine is slow-spinning and will be regulated to
turn at 26 rpms and no faster. no matter how strong the winds may be.
Commissioner Kuester asked if they have considered allowing a cellular provider
to locate on the tower. Mr. Jaunich explained that the close proximity of the
blades to the tower does not allow this type of use, however, they are
considering having a warning siren located on pole.
Commissioner Baker asked who would own and operate the turbine. Mr. Jaunich
stated that Metro Wind will be the owner and operator. He noted that they will
provide power through Elk River Municipal Utilities, and ultimately, to NSP.
Commissioner Schuster asked what the cost of the turbine will be. Mr. Jaunich
stated that the cost will be approximately $750,000.
Steve Rohlf noted that the site is open and has no ponds. He added that the
Municipal Utilities will be offering green power, such as wind power to their
customers soon.
Chair Chambers opened the public hearing. There being no comments from the
public, Chair Chambers closed the public hearing.
COMMISSIONER BAKER MOVED TO RECOMMEND APPROVAL OF THE REQUEST BY
METRO WIND LLC AS PRESENTED, TO CONSTRUCT A WIND TURBINE AND ASSOCIATED
FACILITIES, CASE NO. CU 00-35, CITING THAT THERE WAS NO PUBLIC OPPOSITION.
COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED -0.
5.3.
Reauest by Sian Art Co. for a Conditional Use Permit to Amend the Elk Park
Center Planned Unit Development IPUDI Aoreement to allow a 2nd Wall Siqn,
Public Hearing - Case No. CU 00-34
Staff report by Steve Wensman. Sign Art Company is requesting a conditional use
permit in order to amend the Elk Park Center Planned Unit Development (PUD)
Agreement to allow a second wall sign for Caribou Coffee. Mr. Wensman
explained that the sign is being requested to provide visibility on the east side of
the building. He noted that Salina Salon also requested a second sign on the
east wall, but Salina Salon did not have any lease space on that side of the
building and staff could not support an amendment to allow them one. Staff
recommends approval of this request.
Commissioner Baker asked if the sign would be illuminated. Kevin Snyder,
representing Sign Art, indicated that the sign would consist of white neon channel
letters, and the green and brown Caribou Coffee logo.
Chair Chambers opened the public hearing. There being no comments from the
public, Chair Chambers closed the public hearing.
Planning Commission Minutes
September 26, 2000
Page 6
.
COMMISSIONER BAKER MOVED TO RECOMMEND APPROVAL OF THE REQUEST BY
SIGN ART COMPANY FOR A CONDITIONAL USE PERMIT TO ALLOW A SECOND WALL
SIGN, CASE NO. CU 00-34. COMMISSIONER PEDERSON SECONDED THE MOTION.
THE MOTION CARRIED 5-0.
5.4.
Reauest bv Elk River Muffler & Brake for Preliminary Plat Approval (Houles
Addition!. Public Hearing - Case No. P 00-16
Staff report by Steve Wensman. Elk River Muffler and Brake is requesting
preliminary plat approval of Houles First Addition, to plat one 2.03-acre located in
the 11 zoning district on 17151 Avenue at Ulysses Street. Mr. Wensman reviewed
issues associated with the request including: existing conditions, right of way,
drainage, park dedication and utilities. Staff recommends approval of the
request and deletion of #5 in the conditions listed in the staff report.
Chair Chambers opened the public hearing. There being no comments from the
public, Chair Chambers closed the public hearing.
COMMISSIONER KUESTER MOVED APPROVAL OF THE REQUEST BY ELK RIVER MUFFLER
& BRAKE FOR PRELIMINARY PLAT FOR HOULES ADDITION, CASE NO. P 00-16, WITH
THE FOLLOWING CONDITIONS:
1. THAT THE CITY ENGINEER'S COMMENTS BE INCORPORATED INTO THE
PRELIMINARY PLAT.
.
2. SURFACE WATER MANAGEMENT FEE BE PAID IN THE AMOUNT REQUIRED BY THE
CITY AT THE TIME OF FINAL PLAT PRIOR TO RELEASING THE PLAT FOR RECORDING
WITH SHERBURNE COUNTY.
3. PARK DEDICATION FEE AND TRAIL FEE IN THE AMOUNT REQUIRED BY THE CITY AT
THE TIME OF FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING
WITH SHERBURNE COUNTY.
4. THAT FIVE-FOOT DRAINAGE AND UTILITY EASEMENTS BE GRANTED TO THE CITY
AROUND THE PERIMETER OF THE PROPERTY.
5. THAT THERE BE ACCESS CONTROL ALONG THE 1715T FRONTAGE WITH ALL
ACCESS FROM ULYSSES STREET.
COMMISSIONER PEDERSON SECONDED THE MOTION. THE MOTION CARRIED 5-0.
5.5. Reauest bv Elk River Muffler & Brake for Conditional Use Permit to allow Auto
Repair Shop in the 1-1 Zoning District. Public Hearina - Case No. CU 00-36
Staff report by Steve Wensman. Elk River Muffler and Brake is requesting a
conditional use permit in order to construct an auto repair shOp in the 11 zoning
district. The subject property is located on 17151 Street NW at the Ulysses
alignment.
.
.
.
.
Planning Commission Minutes
September 26. 2000
Page 7
Commissioner Kuester asked if Ulysses Street will be extended in the future. Terry
Maurer. City Engineer. indicated that Ulysses Street will eventually be extended to
165th Avenue.
Steve Wensman noted that the applicant has petitioned for city sewer and
water.
The Commissioners discussed whether outdoor storage needs to be addressed for
this conditional use permit. Ms. McPherson stated that a conditional use permit
would be required for outdoor storage.
Chair Chambers opened the public hearing.
Mr. John Weicht. representing the applicant. stated that the exterior of the
building would be rock face block with a single score accent band around the
building and would be painted a light color. Commissioner Chambers asked why
they are not proposing integrally colored block. Mr. Weicht explained that it
would be very expensive and difficult to match colors if they expanded the
facility in the future. Mr. Weicht stated that what they are proposing is typically
accepted in the 1-1 zoning district. Commissioner Chambers asked what is
required by ordinance. Ms. McPherson stated that the exterior proposed by the
applicant is acceptable according the City's ordinance.
Commissioner Chambers asked if there is business park property to the south of
this site. Ms. McPherson stated that the City Council is considering expanding the
Business Park in this area. but that it will be a number of years before any
development occurs.
Commissioner Pederson stated that the Planning Commission must abide by the
existing ordinance requirements.
There being no further comments from the public. Chair Chambers closed the
public hearing.
Commissioner Baker expressed his concern for that building standards for this site
be compatible with the adjacent Business Park development in the future.
COMMISSIONER PEDERSON MOVED TO RECOMMEND APPROVAL OF THE REQUEST
BY ELK RIVER MUFFLER AND BRAKE FOR A CONDITIONAL USE PERMIT, CASE NO. CU
00-36, WITH THE FOLLOWING CONDITIONS:
1. THAT THE CITY ENGINEER'S COMMENTS BE INCORPORATED INTO THE
PRELIMINARY PLAT.
2. THAT ADDITIONAL GOVERNMENTAL PERMITS BE OBTAINED, IF REQUIRED, FOR
CONSTRUCTION IN THE DELINEATED WETLAND.
3. THAT WRITTEN PERMISSION BE OBTAINED FROM NORTHERN NATURAL GAS FOR
THE SITE DEVELOPMENT IN THE GAS LINE EASEMENT.
4. THAT ALL PARKING STALLS BE A MINIMUM OF 9 FT X 18 FT (FACE OF CURB TO
FACE OF CURB) WITH A MINIMUM DRIVE LANE OF 24 FT.
.
.
.
Planning Commission Minutes
September 26, 2000
Page 8
5. PARKING SHAll BE ON PAVED SURFACES ONLY.
6. THAT A DUMPSTER BE SHOWN ON THE SITE PLANS AND CONSTRUCTED OF
MATERIALS SIMilAR TO THE BUilDING WITH A GATE.
7. THAT THE lANDSCAPE PLAN BE REVISED TO CONFORM TO CITY ORDINANCE.
8. THAT A LIGHTING PLAN BE PROVIDED THAT CONFORMS TO CITY ORDINANCE.
9. THAT AN AMENDMENT TO THE CONDITIONAL USE PERMIT .BE OBTAINED PRIOR TO
PHASE TWO OF THE SITE DEVELOPMENT.
COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
5.6.
Request bv John Bunkers for Conditional Use Permit for Car Wash Detail Shop,
Public Hearina - Case No. CU 00-38
Staff report by Steve Wensman. John Bunkers requests a conditional use permit
to allow a car wash detail shop in the Barrington Place Planned Unit
Development (568 Dodge Avenue). Mr. Wensman explained that Dolphin
Carwash plans to delay part of their expansion which was approved last month,
and instead, move their detail operation to Mr. Bunker's site. Mr. Wensman
reviewed issues related to the site regarding noise, hours of operation, easements,
emergency vehicle access, landscaping and parking. Staff recommends
approval of the request with the conditions outlined in the staff report.
Chair Chambers opened the public hearing.
Mr. lynn Caswell, 580 Dodge Avenue, stated that John Oliver and Associates has
no objection to Mr. Bunker's request as long as operations are done inside the
building. He expressed concern that the landscaping proposed by staff may
interfere with the site lines onto Dodge and suggested that if any trees were
planted, that they be tall overstory trees and trimmed high to allow maximum
visibility.
Commissioner Kuester stated that she felt the use proposed by Mr. Bunkers is
much more compatible than the earlier proposal.
Commissioner Chambers asked if any new signs are proposed for the property.
Mr. Wensman stated that none are proposed at this time, but that a sign permit
would be required if any are requested in the future.
There being no further comments from the public, Chair Chambers closed the
public hearing.
Commissioner Baker asked if the sign on the games building was permanent. Mr.
Bunkers stated that he did not feel the sign was acceptable and that the sign
would be coming down after the Christmas season when the tenant was in a
better financial position to replace it with a better quality sign.
,.
.
.
Planning Commission Minutes
September 26, 2000
Page 9
COMMISSIONER PEDERSON MOVED TO RECOMMEND APPROVAL OF THE REQUEST
BY JOHN BUNKERS FOR A CONDITIONAL USE PERMIT TO ALLOW A CAR WASH DETAIL
SHOP, CASE NO. CU 00-38, WITH THE FOLLOWING CONDITIONS:
1. THAT THE EMERGENCY SERVICE VEHICLE EASEMENT BE POSTED "NO
PARKING/FIRE LANE."
2. THE CURB CUT ON DODGE STREET BE REDUCED TO 30 FEET IN WIDTH, THE
MAXIMUM ALLOWED BY CITY ORDINANCE.
3. THAT A LANDSCAPE ISLAND BE ADDED ON THE NORTH SIDE OF THE PARKING LOT
ADJACENT TO DODGE STREET.
4. THAT A SIGN PERMIT BE OBTAINED PRIOR TO ANY NEW SIGNS BEING INSTALLED
ON THE PROPERTY.
5. THAT THE DETAIL SHOP BE CONDUCTED ENTIRELY WITHIN THE GARAGE.
6. THAT ADDITIONAL LANDSCAPING BE PROVIDED AS RECOMMENDED BY THE
PLANNING DEPARTMENT.
7. THAT THE ADDITIONAL PARKING BE PROVIDED TO ACCOMMODATE VEHICLES
WAITING TO BE SERVICED AND EMPLOYEE PARKING.
COMMISSIONER BAKER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
5.7.
Request by Lyman Co. for Preliminary Plat ADDrOval (Meadowwoods VillaaeL
Public Hearina - Case No. P 00-13
Staff report by Scott Harlicker. Lyman Company requests preliminary plat
approval for Meadowwoods Village, a 71 acre clustered single-family subdivision
of 40 lots, located at County Road 1 and 209th Street. Mr. Harlicker stated that
there will be 44 acres of private open space in the subdivision. He reviewed the
density calculations and standards for density bonuses. He explained that staff
does not feel the project meets the requirements to allow the 40th lot and feels
the plat should be reduced to 39 lots.
Mr. Harlicker reviewed the layout of the streets and lots, open space,
landscaping, community septic system, park dedication and trails. He noted that
the lots will have individual wells and the community septic system will be fenced
with split rail fencing and landscaped. Mr. Harlicker explained the location of the
proposed trails and sidewalks, noting a change recommended by staff in the
location of the trail crossing on 209th Avenue. Staff recommends approval of the
plat with the conditions outlined in the staff report, adding a Condition #25 to
require platting of the medians and the islands in the cui de sacs as outlots.
Terry Maurer. City Engineer. stated that the comments in his memo to the
Commission regarding drainage are relatively minor. He stated that he will be
reviewing the drainage plan prior to the City Council meeting.
Planning Commission Minutes
September 26. 2000
Page 10
.
Commissioner Baker asked why not place the trail crossing at County Road 1. Mr.
Harlicker explained that it is better to cross a street at a controlled intersection
than at mid-block. Commissioner Baker questioned why sidewalks are not
proposed on both sides of the street. He stated that he felt having sidewalks on
both sides of the street appears more balanced. Ms. McPherson state that
typically in the City there are sidewalks one side only, and that considering the
limited amount of traffic and the amount of amenities the developer is already
proposing, staff did not feel it would be appropriate to require sidewalks on both
sides of the streets.
Commissioner Kuester questioned why it was necessary to raise the grade in the
location noted by staff. Mr. Harlicker stated that the grading was necessary to
create walk-out lots which are proposed by the developer.
A question was raised regarding the American Wetland septic system proposed
by the developer. Terry Maurer stated that he did not have concerns about the
septic system, noting that this is the third style of community septic system which
the City has reviewed for clustered development. He explained that developers
will choose the system which best fits the size, soils and aesthetics of the individual
project.
.
Mike Gair, representing Lyman Development, reviewed other cluster
development projects which he has completed including 2 in Lake Elmo, one in
Inver Grove Heights, Otsego, 2 in Ham Lake and Wisconsin. Mr. Gair reviewed the
Meadowwoods project. He explained that the 30 foot knoll in the south of the
plat will be preserved. Outlot C is proposed to be a focal point for the
development, providing a gathering space for the residents, with a gazebo and
extensive landscaping. A picket fence will be installed to define the open space.
Mr. Gair reviewed the location of the trails and sidewalks. He asked the
Commission to consider the preservation of wood and the additional
landscaping in the development as meeting the requirement for the additional
lot.
Mr. Jim Johnston of Lyman Development explained that he feels they have met
the intent of the City's open space preservation ordinance. He explained that
they would be preserving the stand of pines along County Road because of the
rural character it lent to the development. He asked that the Planning
Commission consider allowing the 401h lot, stating that when the development
was complete, no one would look at it and say there is one too many lots. Mr.
Johnston explained that the North American Wetlands septic system has been
used in Europe for many years and utilizes plants to clarify the water before it
reaches the open pond.
Commissioner Baker asked what will be planted in the open space. Mr. Johnston
stated that prairie grasses will be planted. Commissioner Baker asked if it would
be possible for residents to use the open space for playing ball. Mr. Johnston felt
that would be up to the Homeowner's Association.
.
Mr. Johnston explained why the trail location was chosen. Ms. McPherson
explained that the Park and Recreation Commission felt the trail should be closer
to County Road 1 so trail users would not feel they were encroaching on the
Planning Commission Minutes
September 26. 2000
Page 11
.
private area. She further explained that the trail easement to the south was
requested for possible use in the future. Since the City does not know the future
of the gun club property, no trail would be built at this time.
Commissioner Baker asked if a density bonus has been granted in the past for
preserving a structure or architectural theme. Ms. McPherson stated that a
density bonus was allowed in Rolling Hills for preserving a barn.
Mr. Johnston stated that the development will have a defined architectural
theme which will include front porches and stoops, side-load garages and
garages set back into the back of the lot, wherever it is possible. He displayed
photographs of homes in other developments they have done which reflected
this type of style. Mr. Johnston described details of the proposed gazebo which
ties into the architectural theme. He noted that restrictive covenants will ensure
that quality exterior materials will be used including wood siding, brick, stucco
and a high grade vinyl siding.
Chair Chambers opened the public hearing.
.
Deb Meyers, 20927 Elk lake Road, a resident living across from the proposed
development, expressed her concern regarding safety issues associated with the
gun club, impact on the schools, traffic, the bike path and the community septic
system. Ms. Meyers stated that with 40 homes, there is a potential for 80 children
in the development. She explained her concern for safety since the fence
around the gun club is only about 4 feet high and can easily be climbed by a
child. Also, the number of children which will be added to the schools by this
development will require four additional classrooms. Ms. Meyers was concerned
that the bike path would interfere with their horseback riding. Possible odor and
leaching from the community septic system was also a concern, as well as the
additional traffic which would be generated on County Road 1.
George Zabee, representing the Elk River Gun Club, explained that the gun club
has been in existence since 1964 and is a community-minded organization. He
stated that the club provides safety training for young people including scouting
and 4-H groups. Mr. Zabee explained that the club has 300 acres of property and
fencing of the entire perimeter of the property was recently completed. He
stated that the club is not opposed to the cluster development but that they
have several concerns. He stated that one concern has been addressed which
was the need for a buffer. He felt that by leaving the trees on the knoll referred to
by the developer, a natural buffer would be created which would help with
noise, also. Mr. Zabee's second concern was that prospective buyers be made
aware that there is a gun range adjacent to the development. He asked that
the Planning Commission require the developer to print this information in their
literature which is distributed to buyers. Mr. Zabee also requested that the
developer be required to install a chain link fence around the northeastern
corner of the gun club. He concluded by stating it is true that the DNR was
interested in the gun club property, but that the gun club is not interested in the
DNR.
.
Katie T. of 13269 211th Avenue NW, asked why there will be an access onto 21lfh
and if it would be paved. Mr. Harlicker stated that a second access is required to
emergency purposes and there are no plans to pave it at this time.
Planning Commission Minutes
September 26, 2000
Page 12
.
Bert Adkinson, member of the Elk River Gun Club, stated that the gun club has
continuously tried to be sensitive to the neighbors. He explained that they have
records of all the property owners which are contiguous to the club. When the
club's property was surveyed, they sent letters to all the neighbors explaining
what was happening. They then began fencing the entire 3 Y2 miles around the
club property.
Roger Whiteoak, 20927 Elk Lake Road, expressed his concern with the traffic on
County Road 1. He asked if there are any plans for this road. Terry Maurer
explained that this road is under the County's jurisdiction, but that he is not aware
of any plans to change or improve the road. Mr. Whiteoak stated that the
number of accidents on this road has increased significantly since the Windsor
Woods development was started. He also was concern that his property would
be affected by use of a wetland for the community septic system.
Commissioner Chambers asked if the County has seen the plat. Terry Maurer
stated that they have received the plat but the City has not received any
comments from them. Ms. McPherson explained that a right turn lane will be
added on the southbound lane of County Road 1 and the shoulder will be
widened on the east side of the northbound lane. Also, she noted that staff has
proposed the trail to be located on the west side of the trees along County Road
1, on the Meadowwoods property.
.
Ms. Deb Meyers expressed concern that trees would be lost in order to construct
the turn lanes. Terry Maurer explained that the turn lanes would be constructed
within the County right of way and should not impact the trees. Mr. Johnston
stated that the trees are located on the private property. Ms. Meyers asked for
clarification where her driveway was located in relation to the road into the
proposed plat. Terry Maurer explained that the road would be approximately
380 feet north of her driveway.
There being no further public comment, Chair Chambers closed the public
hearing.
Commissioners Baker and Pederson expressed their concern for the safety of
children living next to the gun club. Commissioner Baker did not feel a chain link
fence would be enough to keep children out.
The Commissioners discussed the effectiveness of a chain link fence and were in
agreement that a child could climb an 6 or even 8 foot fence, as well. They also
agreed that to require the gun club to provide a tall security fence with
concertina wire would be unrealistic, due to the cost.
Mr. Johnston stated that the club has posted the perimeter of the property and
installed a four foot high mesh fence. He stated that they met with the gun club
early in the process of planning the development and he feels that they can be
good neighbors.
.
The Commissioners were generally in agreement that if the property was posted
and fenced, and buyers were informed of the fact they were buying property
.
.
.
Planning Commission Minutes
September 26, 2000
Page 13
adjacent to a gun range, the responsibility for safety of the children would
ultimately be left to the parents.
Commissioner Pederson stated that he felt the developers have done a good job
with the plat regarding landscaping and architectural style. He stated he had
concerns with allowing a five percent density bonus for preserving trees along a
county road.
Commissioner Schuster stated that he felt this cluster represented what the
Commission was looking for when they approved the cluster ordinance. He
stated that the County needs to address the traffic issue on County Road 1. He
felt the gun club adjacent to this development is a major issue and he is not sure
how the Planning Commission can deal with it. He felt that the gun club needs to
look at ways to address the issue, as well.
Commissioner Pederson agreed that the traffic is a County issue and that the City
Council would need to address the gun club issue and the impact on the schools.
Ms. Meyers asked for clarification on the septic system and whether or not her
property would be affected by it. Terry Maurer stated that the specific design of
the system will be reviewed before it is approved. He explained that when
discharge from a septic system moves through only 36 inches of sand it becomes
clean. Therefore, he did not see how this system could possibly have any affect
on their property on the other side of County Road 1. Mr. Maurer noted that
these types of systems have many years of history to prove that they work. He felt
that there are better controls with a community system which is under the
authority of a homeowner's association. Mr. Johnston added that monitoring
and testing of the system will be required and space has been left for a
secondary system, in the event the original system should fail for any reason.
Ms. Meyers requested that the Commissioners take her concerns into
consideration.
Commissioner Baker stated that he still has concerns regarding the gun club and
who is responsible for ensuring the residents' safety. He also stated that he does
not feel this plat meets the criteria for the additional lot which is being requested
by the developer.
Ms. McPherson stated that if the developer is required to provide full discloser of
the gun club, and the club is posted and fenced the property, it becomes the
homeowner's responsibility to protect their children. Commissioner Kuester felt
that information is the key to protecting the children. She suggested that the
young people moving into the development be provided an opportunity to see
the club and perhaps take the gun safety training which is offered, so that their
curiosity about the club will be satisfied.
COMMISSIONER PEDERSON MOVED TO RECOMMEND APPROVAL OF THE REQUEST
BY LYMAN COMPANY FOR PRELIMINARY PLAT APPROVAL OF MEADOWWOODS
VILLAGE, CASE NO. P 00-13, WITH THE FOLLOWING CONDITIONS:
Planning Commission Minutes
September 26, 2000
. 1.
2.
3.
4.
5.
6.
.
.
Page 14
A DEVELOPERS AGREEMENT OUTLINING THE TERMS AND CONDITIONS OF THE
PLAT APPROVAL AND INSTALLATION OF IMPROVEMENTS BE PREPARED AND
EXECUTED PRIOR TO RELEASING THE PLAT FOR RECORDING.
ALL COMMENTS OF THE CITY ENGINEER BE SHALL BE ADDRESSED.
A HOMEOWNERS ASSOCIATION DOCUMENT BE PREPARED SUBJECT TO THE CITY
ATTORNEY'S REVIEW AND APPROVAL PRIOR TO FINAL PLAT.
STREET LIGHTS BE INSTALLED AS REQUIRED BY ELK RIVER UTILITIES
A LETTER OF CREDIT BE PROVIDED TO THE CITY IN THE AMOUNT OF 100% OF THE
COSTS OF THE PUBLIC IMPROVEMENTS.
UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM ACCEPTED
BY THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25% OF THE
IMPROVEMENT COSTS SHALL BE SUBMITTED TO THE CITY FOR THE PERIOD OF ONE
YEAR.
7. PARK DEDICATION FEES IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF
FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING.
8. SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY THE CITY AT
THE TIME OF FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR
RECORDING.
9. A SEALCOAT FEE IN THE AMOUNT TO BE DETERMINED BY THE CITY ENGINEER BE
PAID PRIOR TO RELEASING THE PLAT FOR RECORDING.
10. A GRADING AND EROSION CONTROL PLAN BE APPROVED BY THE CITY
ENGINEER PRIOR TO THE ISSUANCE OF BUILDING PERMITS.
11. A DEVELOPMENT PLAN BE APPROVED BY THE CITY ENGINEER PRIOR TO THE
ISSUANCE OF BUILDING PERMITS.
12. ALL GRADING BE CERTIFIED PRIOR TO THE ISSUANCE OF BUILDING PERMITS.
13. OUTLOT A, OUTLOT B AND OUTLOT C BE PLACED IN A CONSERVATION
EASEMENT TO BE HELD BY THE HOMEOWNERS ASSOCIATION OR A QUALIFIED
LAND TRUST.
14. ALL MAILBOXES BE CLUSTERED.
15. A TREE PRESERVATION PLAN BE APPROVED PRIOR TO RELEASING THE PLAT FOR
RECORDING.
16. ANY TREES OFF SITE OR ON SITE, NEAR THE LIMIT OF GRADING THAT ARE TO BE
PRESERVED, SHALL BE FENCED WITH A SNOW FENCE AT THE DRIP LINE TO
PREVENT GRADING, COMPACTION, OR STORAGE OF EQUIPMENT, DEBRIS OR
MATERIALS. STAFF SHALL INSPECT FENCING PRIOR TO CLEARING OF TREES OR
GRADING COMMENCING.
.
.
.
Planning Commission Minutes
September 26, 2000
Page 15
17. ALL DISTURBED AREAS SHALL BE GRADED AND SEEDED.
18. ALL COMMENTS FROM SHERBURNE COUNTY HIGHWAY DEPARTMENT SHALL BE
ADDRESSED.
19. ALL SIDEWALKS, WOODCHIP TRAILS AND THE BITUMINOUS TRAIL NORTH OF 209TH
AVENUE SHALL BE INSTALLED BY THE DEVELOPER.
20. THE TRAIL FOR PUBLIC USE SHALL BE PLACED IN A TRAIL EASEMENT AND
GRANTED TO THE CITY.
21. MAINTENANCE OF THE OUTLOTS, THE LANDSCAPED MEDIAN ON 209TH AVENUE
AND THE LANDSCAPED ISLANDS IN THE CUL DE SACS SHALL BE THE
RESPONSIBILITY OF THE HOMEOWNERS ASSOCIATION AND SHALL BE INCLUDED
IN THE HOMEOWNERS ASSOCIATION AGREEMENT.
22. A RESTORATION AND MAINTENANCE PLAN FOR THE OPEN SPACE SHALL BE
INCLUDED IN THE HOMEOWNERS ASSOCIATION DOCUMENTS
23. THE NUMBER OF LOTS IN THE PLAT SHALL BE REDUCED TO 39.
24. ALL APPROPRIATE EASEMENTS SHALL BE SHOWN ON THE PLAT.
25. THE CUL DE SAC ISLANDS AND 209TH STREET MEDIAN BE PLATTED AS OUTLOTS.
26. THE DEVELOPER PROVIDE LITERATURE TO PROSPECTIVE BUYERS ALERTING THEM
TO THE EXISTENCE OF THE GUN CLUB AND THE EXISTENCE OF THE GUN CLUB BE
NOTED IN THE HOMEOWNERS ASSOCIATION DOCUMENTS.
COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
5.8. Request by Uristq Real Estate, LLC for Preliminary Plat Approval (Meadow Park 2nd
Addition\. Public Hearina - Case NO. P 00-15
Staff report by Scott Harlicker. Urista Real Estate has requested preliminary plat
approval of Meadow Park 2nd Addition, a replat of Outlot A, Meadow Park,
located on the south side of Main Street and west of Carson Street alignment.
Mr. Harlicker reviewed the request and stated that staff recommends approval
with the conditions listed in the staff report.
Terry Maurer, City Engineer, noted that an existing storm sewer runs diagonally
across the southwest corner and along the rear property line. He explained how
the drainage would be directed when adjacent properties develop in the future.
Chair Chambers opened the public hearing. There being no public comment,
Chair Chambers closed the public hearing.
COMMISSIONER KUESTER MOVED APPROVAL OF THE REQUEST BY URISTA REAL
ESTATE FOR PRELIMINARY PLAT APPROVAL OF MEADOW PARK 2ND ADDITION, CASE
NO. P 00-15, WITH THE FOLLOWING CONDITIONS:
.
.
.
Planning Commission Minutes
September 26. 2000
Page 16
1. ACCESS WILL BE LIMITED AND TEMPORARY FROM MAIN STREET WITH PERMANENT
ACCESS TO THIS LOT FROM CARSON STREET.
2. PARK AND RECREATION FEE IN THE AMOUNT REQUIRED AT THE TIME OF FINAL
PLAT SHALL BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING.
3. SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED AT THE TIME OF
FINAL PLAT SHALL BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING.
4. ALL COMMENTS OF THE CITY ENGINEER BE ADDRESSED.
COMMISSIONER PEDERSON SECONDED THE MOTION. THE MOTION CARRIED 5-0.
5.9.
Reauest by Vanman Companies for LeFebvre Truckina Co. for an Amendment to
a Conditional Use Permit for Driveway Width of 60 Feet. Public Hearina - Case No.
CU 00-37
Staff report by Scott Harlicker. Vanman Companies. on behalf of LeFebvre
Trucking Co.. is requesting an amendment to their conditional use permit to allow
a 60 foot wide driveway. LeFebvre Trucking is located in the northeast corner of
1 71 sf A venue and Ulysses Street. Mr. Harlicker explained that the purpose of
LeFebvre's request is so that they are able to accommodate trucks up to 110 feet
long which enter and leave their site. He explained the turning movements of the
trucks. stating that with the current situation. the trucks end up crossing the center
lane of the roadway. infringing on the oncoming traffic lane. Staff recommends
denial of the request.
Chair Chambers opened the public hearing.
Mr. Bob Strong, representing LeFebvre Companies, explained that they
attempted to obtain a driveway wider than 36 feet when they were granted their
initial conditional use permit. but their request was denied. He stated that they
are experiencing problems with the long over-size trucks entering and exiting their
site. as well as their regular tractor/trailers. A video was viewed at this time. which
demonstrated that their regular trucks are not able to maneuver in and out of the
site with the 36' driveway. Mr. Strong stated that if more right of way had been
taken and right turn lanes would have been added. there would be more room
for turning.
Commissioner Pederson asked how many of the oversize trucks come into the site
per day. Mr. Strong stated that there are no more than two per day and that
these trucks have an escort driver to stop traffic if necessary to allow the trucks
room to maneuver.
City Engineer Terry Maurer noted that Mayor Klinzing and Councilmember Motin
were out at the site and expressed their feeling that they would like the City to do
whatever was possible to help correct the situation. However. he felt that it
would be unacceptable for trucks to cross the centerline under any
circumstances. Mr. Maurer suggested that conditions be added to address
trucks entering from the east and that the entrance be striped.
Staff discussed landscaping improvements that are left to be completed.
.
.
.
Planning Commission Minutes
September 26, 2000
5.11.
Page 17
There being no further comments from the public, Chair Chambers closed the
public hearing.
COMMISSIONER PEDERSON MOVED TO RECOMMEND APPROVAL OF THE REQUEST
BY VANMAN COMPANIES ON BEHALF OF LEFEBVRE TRUCKING CO. FOR AN
AMENDMENT TO THEIR CONDITIONAL USE PERMIT TO ALLOW A 60 FOOT WIDE
DRIVEWAY, CASE NO. CU 00-37, WITH THE FOLLOWING CONDITIONS:
1. NO OVER-LENGTH TRUCKS WILL BE ALLOWED TO ENTER THE SITE FROM THE
EAST WHICH WOULD REQUIRE THE OPERATORS TO CROSS THE CENTER LINE
OF THE ROADWAY.
2. THE ENTRANCE SHALL BE STRIPED.
3. THE LANDSCAPING PLAN WHICH WAS APPROVED AS PART OF THE
CONDITIONAL USE PERMIT SHALL BE COMPLETED BY MAY 31, 2001.
COMMISSIONER BAKER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
Home Deoot Discussion
Mr. Harlicker explained that the recently painted Home Depot building does not
match the paint chip which was given to staff in the approval process. Staff feels
that the color on the building is more of a yellow shade than a tan. The original
paint chip, a sample of the Home Depot standard color, and a sample of the
actual paint on the building were passed around for the Commission to view. He
noted that none of the colors are the same. He noted that staff was asked to
approve each of the building materials as they moved through the construction
process, but not the color of the building. Mr. Harlicker stated that the Planning
Commission is asked to consider whether or not they will accept the color of the
Home Depot building, or require the contractor to repaint the building.
Mr. Todd Mosher of Greenberg Farrow, representing Home Depot, explained
Home Depot's position on the base color of the building. He felt that the shade
which the building was painted was an acceptable shade of tan. He did not
recall that staff was told the building would be painted exactly the color of the
paint chip. Mr. Mosher presented a sample board which is a replica of the one
presented to staff and the Commission during their approval process. He stated
that the board is used to demonstrate the various types of materials and may not
reflect the exact colors.
A representative of ICI Deluxe Pain Centers explained how a paint color can look
like another color when it is painted on different types of surfaces. He also
explained how paint batches can vary and that paint chip samples which are
given out by paint stores are produced by computer and are not actual "paint"
samples.
Commissioner Baker asked what staff's position was on the issue. Mr. Harlicker
stated that since the colors of the other building materials were determined
based on the color of the building, staff feels the building should be repainted.
Ms. McPherson stated that since the color does not match Home Depot's own
.
.
.
Planning Commission Minutes
September 26. 2000
Page 18
standards, the building would need to be repainted. Commissioner Baker then
asked Mr. Mosher what Home Depot's position was. Mr. Mosher stated that he
felt the city was approving the materials shown on the board, not the exact
colors.
Commissioner Schuster stated that he preferred the lighter color which the
building was painted, in comparison to the paint chip. He expressed concern,
however, that staff was presented one color and then the building was painted
another. He stated that he did not feel that it would be fair to make Home Depot
repaint the building.
The Commissioners were in agreement that this was a miscommunication issue
and that in the future, more specific information regarding colors will need to be
required. It was the consensus of the Commissioners to accept the color of the
Home Depot building.
6.1. Update on 8/22/00 City Council Meetina by Commissioner Kuester
Commissioner Kuester provided an update on the August 22, 2000 City Council
meeting.
7. Adiournment
There being no further business, COMMISSIONER BAKER MOVED TO ADJOURN THE
MEETING. COMMISSIONER PEDERSON SECONDED THE MOTION. THE MOTION
CARRIED 5-0.
The meeting of the Elk River Planning Commission adjourned at 11 :33 p.m.
~~
Debbie Huebner