05-22-2001 PC MIN
.
.
.
MEETING OF THE ELK RIVER PLANNING COMMISSION
HELD AT ELK RIVER CITY HALL
TUESDAY, MAY 22, 200 I
Members Present: Chair Pederson, Commissioners Franz, Mesich, Ropp and Schuster
Commissioner Baker arrived at 6:35 p.m.
Members Absent: None
Staff Present: Michele McPherson, Director of Planning; Scott Harlicker, Senior
Planner; Debbie Huebner, Recording Secretary
1. Call Meeting To Order
Pursuant to due call and notice thereof, the meeting of the Elk River Planning
Commission was called to order at 6:30 p.m. by Chair Pederson.
2.
Consider 5/22/01 Planning Commission Agenda
COMMISSIONER MESICH MOVED TO APPROVE THE MAY 22,2001
PLANNING COMMISSION AGENDA. COMMISSIONER ROPP
SECONDED THE MOTION. THE MOTION CARRIED 5-0.
3.
Consider 4/24/01 Planning Commission Minutes
COMMISSIONER FRANZ MOVED TO APPROVE THE APRIL 22, 2001,
MINUTES WITH THE FOLLOWING CORRECTION:
MEMBERS ABSENT: REMOVE "COMMISSIONER BAKER"
COMMISSIONER SECONDED THE MOTION. THE MOTION
CARRIED 5-0.
4. Planning Commission Representative to Attend City Council Meeting
Commissioner Schuster will attend the June 18,2001, City Council meeting.
5.1.
Request by Tiller Corporation for Amendment to Conditional Use Permit. Case No.
CD 01-20
Staff report by Steve Rohlf. Tiller Corporation is requesting an amendment to their
existing conditional use permit to mine, crush, screen and sell sand and gravel
products from their site north and south of 221 st Avenue just west of Highway 169.
Mr. Rohlf reviewed the areas proposed to be mined. He explained that the property
Planning Commission Minutes
May 22, 2001
Page 2
.
was included in the city's Environmental Impact Statement and a yearly license is
required for their operations, including the hot-mix asphalt plant.
Commissioner Baker arrived at this time (6:35 p.m.)
Mr. Rohlf described the woods located on the site, noting that buffers would be
required to save trees where possible. Also, a 140' buffer will be maintained between
the wetland on the site and excavation activities. Tiller is proposing to exchange land
with C.S. McCrossan Construction, Inc. as described in the staff report. This
arrangement is to make logical boundaries between the two properties, stopping the
mining in a valley versus the top of a ridge.
Mr. ~ohlf reviewed the following points as described in detail in the conditional use
permlt:
1. Ground water - Washing of gravel will not be allowed at Tiller's site due to
concerns that appropriating large amounts of ground water would cause the
contamination at the Elk River Landfill to laterally migrate faster.
2. Hours of operation will be 7:00 a.m. to 7:00 p.m., Monday through Saturday.
Tiller has requested exceptions be made for the hot-mix plan when a paving job
requires working at night to avoid heavy traffic times.
.
3. Setbacks are proposed as follows: 50' setback adjacent to 221 Sl Avenue and
Highway 169; a 200' buffer adjacent to the City trail; no setback between Tiller's
operation and the McCrossan property discussed previously; a 30' setback between
mining activities, and a 200' wide buffer required of the Elk River Landfill on their
property.
Commissioner Baker asked what type of buffer from the City trail Mr. Rohlf is
proposing. Mr. Rohlf stated that there will be a 200 foot wide area left undisturbed
(i.e., no tree cutting, mining, etc.).
Commissioner Franz asked if the issue with the adjacent property owner has been
resolved.
Chair Pederson opened the public hearing.
.
Mike Caron, Tiller Corporation, stated that he met with the neighbor and that his
concerns were screening and planting of trees. A tree plan has been developed
which will address the neighbor's concerns. Mr. Caron noted that odor from the
asphalt plant was a concern of the neighbor to the east in the past, but Tiller is now
able to adjust their plant operation to address this issue when it becomes a problem.
Commissioner Baker asked how the complaint process works. Mr. Caron stated that
it only takes a phone call and either he or his plant manager will go out to meet with
the neighbor. If complaints continue regarding odor, they can then use additives to
mask the odor. Mr. Rohlf noted that a severe inversion could result in suspension of
their permit.
Planning Commission Minutes
May 22, 2001
Page 3
.
John Kuester, Park and Recreation Commission Chair, asked how the buffer
along the city trail would be established. Steve Rohlf explained that Tiller has a chain
link fence on their western property boundary, and that it would be fairly easy to
measure the 200 foot buffer zone. He stated that inspections will be done
periodically and he expects Tiller to ensure that the trees survive. Mr. Rohlf noted
that conditions are included in the permit regarding oak wilt.
Commissioner Schuster asked how extensive the sale of gravel would be from the
site. Mr. Carons explained that Tiller's sales department handles sales by phone and
the only sign on the site will be consistent with the 1-2 zoning district. Mr. Carons
noted that some local contractors occasionally come in for a load of sand.
Commissioner Mesich asked how long the mining operation will be extended by this
additional land. Mr. Carons stated that at most, the operation may be extended by
2-5 years. Mr. Rohlf noted that the timing of the mining operations is being
accelerated by the demand from the metro area.
Commissioner Franz asked if there is enough top soil set aside for reclamation. Mr.
Caron stated that they are overburdened with topsoil and felt confident it will be
adequate.
.
COMMISSIONER BAKER MOVED TO RECOMMEND APPROVAL OF
THE REQUEST BY TILLER CORPORATION FOR AN AMENDMENT
TO THEIR CONDITIONAL USE PERMIT TO EXPAND THEIR
MINING AREA, CASE NO. CU 01-19, WITH THE CONDITIONS AS
OUTLINED IN THE STAFF REPORT AND CONDITIONAL USE
PERMIT. COMMISSIONER FRANZ SECONDED THE MOTION. THE
MOTION CARRIED 6-0.
Request by Brian Brueske (AquaPure) for an Interim Use Permit, Public Hearing -
Case No. CU 01-18
5.2.
.
Staff report by Scott Harlicker. Brian Brueske requests an interim use permit to
allow the development of industrial property which is within the Urban Service Area,
prior to the availability of municipal sewer and water. The property is owned by
Dick Hetland (Elk River Recycling Center) and is located at 16501 Highway 10. Mr.
Harlicker explained that the zoning code would allow construction of a second
principle structure prior to the immediate availability of water and sewer, with certain
conditions. However, Mr. Brueske has stated he wants to own, not lease his land
and building. Also, Mr. Harlicker eXplained that a PUD (planned Unit
Development) is not an option for development prior to water and sewer, due to the
small size of the property (1 acre). He discussed criteria for determining the
appropriateness of an interim use permit. Mr. Harlicker explained that the interim
use would expire upon availability of services and the property owner would be
required to pay assessments and other costs associated with hooking up to sewer and
water. Staff feels that the applicant's request is consistent with the criteria and
Planning Commission Minutes
May 22, 2001
Page 4
.
recommends approval of the request, with the four conditions listed in the staff
report.
Commissioner Baker asked if the city would incur any extra costs. City Engineer
Terry Maurer stated that the applicant would pay all costs of hooking up to city
sewer and water.
Commissioner Franz asked what happens to the septic system when the property is
hooked up to city sewer. Mr. Maurer explained that the septic tank is required to be
pumped, the cover crushed and filled in.
Chair Pederson opened the public hearing.
Brian Brueske, applicant, stated that he would like to build this fall, but April of
2002 will be a more likely date for construction.
Dick Hetland, property owner, asked if the City Engineer had any idea how long
before water and sewer would be available. Mr. Maurer stated that the water would
likely come down Highway 10 at some point, but he did not have any idea when
sewer would be available.
.
Commissioner Mesich felt language should be included in Condition #2 and #3 to
protect the City, and to reference "the city's ordinance" regarding the specified time
frame to hook up to services.
Commissioner Franz asked if there were any concerns for the septic system,
regarding the water purification process proposed by Mr. Brueske. Commissioner
Baker asked if any special permits for pollution were required for Mr. Brueske's
operation. Mr. Brueske stated that his process will not impact the drainfield and that
no special permits are required.
Commissioner Ropp asked if there are any requirements for abandoning the
drainfield when sewer becomes available. Mr. Maurer stated that the drainfield can
be left as is, unless the property owner were to build there or create a parking area, in
which case the materials would then need to be removed.
There being no other public comment, Chair Pederson closed the public hearing.
.
COMMISSIONER MESICH MOVED TO RECOMMEND APPROVAL OF
THE REQUEST BY BRIAN BRUESKE FOR AN INTERIM USE
PERMIT, CASE NO. CU 01-18, WITH THE FOLLOWING CONDITIONS:
1. THE INTERIM USE PERMIT IS FOR THE PRIVATE WELL AND
SEPTIC SYSTEM AND WILL TERMINATE AT THE TIME WHEN
CITY SEWER AND WATER BECOME AVAILABLE.
2. THE PROPERTY OWNER WILL AGREE TO PAY ALL TRUNK AND
LATERAL COSTS ASSESSED FOR EXTENDING WATER AND
Planning Commission Minutes
May 22, 2001
Page 5
.
5.7.
.
.
SANITARY SEWER TO THE SITE AND WILL WAIVE ALL RIGHTS TO
APPEAL THE AMOUNT ASSESSED FOR WATER AND SANITARY
SEWER.
3. THE PROPERTY OWNER WILL HOOK-UP TO CITY SEWER AND
WATER WITHIN THE SPECIFIED TIME FRAME IN THE CITY'S
CURRENT ORDINANCE APPLICABLE AT THE TIME THESE
SERVICES BECOME AVAILABLE.
4. PRIOR TO DEVELOPING THE PROPERTY, THE PROPERTY
SHALL BE PLATTED AND THE APPLICANT SHALL APPLY FOR SITE
PLAN REVIEW.
COMMISSIONER FRANZ SECONDED THE MOTION. THE MOTION
CARRIED 6-0.
Request by Chris Stephan for Home Occupation (Landscape Business). Public
Hearing - Case No. CU 01-19
Staff report by Michele McPherson. Chris Stephan requests a conditional use permit
for a home occupation for a landscape services business at 22531 Meadowvale Road.
Ms. McPherson reviewed the conditions listed in Section 900.25 of the City Code for
a permitted home occupation. The business employees 5 full-time employees who
report to the office 75% of the time, and 4 laborers who report to the jobsite daily.
She noted that the applicant is proposing a number of improvements to the site to
accommodate the proposed landscape business, including a 40' x 60' metal-skinned
pole building. The building will be accessed by two driveways off the existing
driveway to the home. Staff suggests further landscaping of the outdoor storage area
than what is proposed by the applicant. The city's ordinance permits a 4 square foot
wall sign, however, rural based businesses are permitted for off-premise directional
signs not exceeding 18 square feet under certain conditions. Staff recommends
approval of the request with the conditions listed in the staff report.
Commissioner Baker asked what the surrounding uses were. Ms. McPherson stated
that the surrounding uses are rural/agricultural and that there is a large amount of
wetlands with very little buildable land.
Chair Pederson opened the public hearing.
Roger Reinhart, 14050 227th Avenue NW, neighbor to the east of the applicant,
expressed concern that Mr. Stephan's business may grow much larger than he
anticipates. He stated that the landscaping company he works for started with 5
employees and has grown to 70 employees. Mr. Reinhart asked if there would be
significant loading and unloading, since that type of operation could be noisy.
Chris Stephan, applicant, stated that he also worked for a landscape company
which grew to six locations. He stated that he intends to keep his operation a small
family owned business. Currently, the business consists of his wife, his brother,
Planning Commission Minutes
May 22, 2001
Page 6
.
himself and 2 others. He stated that employees with generally come in to pick up a
truck or blue prints and then leave. He felt the traffic should be minimal but that it
would be year-round, since they also plow snow in the winter. Mr. Stephan felt the
only significant noise would be the sound of loading materials in the morning and
then the trucks would leave for the day. He stated that debris will be taken directly
to the landfill from the job site. Mr. Stephan explained that he expects his business
will grow but that he does not wish to outgrow the site. He anticipates not having
more than 12 to 15 people at maximum operation, and he does not look to expand
his fleet or equipment much beyond what he currently has.
Commissioner Mesich asked Mr. Stephan what kind of trucks he has. He stated that
he has a regular size pickup, a I-ton truck, and a 2-ton truck. There will be no retail
or wholesale sales from the site. Mr. Stephan noted that there may be an occasional
semi-delivery but it would be very seldom. The vehicles will be parked inside of the
pole building. Mr. Stephan stated that he does not intend to park vehicles around
the site, as is the case with his neighbor, who repairs antique cars and parks junk
vehicles all around the perimeter of his site. In the winter, the employees generally
take the trucks home for snowplowing.
Chair Pederson asked if Mr. Stephan's equipment has backup alarms. Mr. Stephan
stated that only the skid loader has a backup alarm.
.
Commissioner Baker asked if the city's nuisance ordinance would apply to this
business. Ms. McPherson stated that all property in the City must abide by the
nuisance ordinance. Commissioner Mesich asked how many residences are within
350 feet of Mr. Stephan's property. Ms. McPherson stated that 11 notices were
mailed to properties within 350 feet.
Chair Pederson asked if parking would be adequate if the business grew. Ms.
McPherson stated that if the applicant needed to expand beyond what was allowed
by this conditional use permit, he would need to come back for an amendment.
Commissioner Mesich felt there should be some sort of limit on the number of
employees. Chair Pederson expressed his agreement. Commissioner Mesich also
felt conditions should be included to prevent debris from being stored on the site
and to require vehicles to be parked inside.
Commissioner Baker asked if the Commission felt they should address large loads of
rock or materials coming into the site. Commissioner Mesich stated that he did not
feel the site would allow much storage.
Commissioner Franz asked if a condition could be added to require fencing or
screening. Ms. McPherson stated that the applicant is proposing to construct a 6
foot high wood or vinyl privacy fence and that staff is suggesting plantings be added.
.
Mr. Stephan stated that the low and wetland areas serve as a buffer.
Planning Commission Minutes
May 22, 2001
Page 7
.
Mr. Reinhart asked Mr. Stephan intended to do anything in the wooded area between
their two properties. Mr. Stephan stated that none of the woods would be cut down.
There being no further public comment, Chair Pederson closed the public hearing.
COMMISSIONER MESICH MOVED TO RECOMMEND APPROVAL OF
THE REQUEST BY CHRIS STEPHAN FOR A CONDITIONAL USE
PERMIT FOR A HOME OCCUPATION OF A LANDSCAPE SERVICES
BUSINESS, CASE NO. CU 01-19, BASED ON INFORMATION IN THE
STAFF REPORT AND COMMENTS RECEIVED DURING THE PUBLIC
HEARING, WITH THE FOLLOWING CONDITIONS:
1. SIGNAGE SHALL BE LIMITED TO A WALL SIGN OF 4 SQUARE
FEET IN AREA.
.
2. ALL MATERIALS, EQUIPMENT, AND THE DUMPSTER SHALL BE
KEPT WITHIN THE FENCED ENCLOSURE.
3. ADDITIONAL SCREENING THROUGH THE USE OF
CONIFEROUS TREES SHALL BE PLANTED ALONG THE SOUTH
PROPERTY LINE TO PROVIDE ADDITIONAL SCREENING FOR
THE ADJACENT NEIGHBOR TO THE SOUTH.
4. THE MAXIMUM NUMBER OF EMPLOYEES IS LIMITED TO 15.
5. DEBRIS MAY NOT BE STORED ON SITE.
6. ALL LARGE EQUIPMENT IS TO BE PARKED INSIDE THE POLE
BUILDING AT NIGHT.
COMMISSIONER BAKER SECONDED THE MOTION. THE MOTION
CARRIED 6-0.
5.8. Request by Gold Nugget Development for Preliminary Plat Approval of Kliever
Lake Fields. Public Hearing - Case No. P 01-08
Staff report by Michele McPherson. The applicant requests preliminary plat
approval of Kliever Lake Fields, comprised of 104 single family lots; Outlot A to be
dedicated for park; Outlot Be also to be dedicated for park, and Outlot C to be held
in abeyance for townhome development approval after the City revises its townhome
ordinance. Ms. McPherson reviewed existing conditions of the site, lot sizes and
streets. She noted that utilities, grading and drainage issues are addressed in the City
Engineer's report which is attached to the staff report. The Park and Recreation
Commission has recommended to accept 7.9 acres of land for park dedication for
this plat and future platting of Outlot C. The developer proposes to construct six
foot high fences and additional landscaping for buffering along County Road 12 and
. Fillmore Street. Ms. McPherson recommended a condition be added to require
Planning Commission Minutes
May 22, 2001
Page 8
.
clustering of mailboxes. Staff recommends approval of the request with the 12
conditions in the staff report.
Chair Pederson opened the public hearing.
Horst Graser, Gold Nugget Development, applicant, stated that initially the
project included a townhome component, but due to the moratorium, he will be
submitting an application for townhomes for Outlot C at a later date. He stated that
he plans to grade Outlot C to create some walk-out lots to provide some variety in
housing styles. Mr. Graser eXplained that Sherburne County has a large easement on
the property. He had hoped to expand the pond in the easement for his project but
the County recently denied his request. He stated that drainage needs to get to
Kliever Lake somehow. Commissioner Mesich asked where the pond would be
located if the County will not allow expansion of the pond in their easement. Mr.
Graser stated that he would have to look at locating the pond in the cul-de-sac area
north of the proposed park and then explained the layout of the park. He stated that
the average lot width is 83'.85', and some are 90'-95'. He proposed to start the
project this year and construct Street A. He noted that the city water tower will be
located to the south of this property.
.
Bruce Goetz, P.O. Box 421, Elk River, property owner to the south of the
proposed development, was concerned he may be forced to hookup to city services.
City Engineer Terry Maurer eXplained that services will be stubbed up to his
property line for the 40 acres to the west of him, but that there will be no costs or
assessments for Mr. Goetz.
John Kuester asked Mr. Graser to explain where the pond would be located, if he is
not able work out an agreement with the County. Mr. Graser pointed out a possible
site north of the park area. Mr. Graser noted that the park will not be impacted by
any over flow from the pond. Mr. Kuester asked what the line was for, running
diagonally through the park, which was shown on the plan. Mr. Graser eXplained
that there will be an underground storm sewer line running toward Kliever Lake.
.
Ruth Brown, property owner to the west (Kliever Lake Marsh), stated that she
and her husband will be moving into their new home at 17773 Tyler Street, and that
10 acres of their property connects to the southwest corner of the plat. She asked if
the property has access to the marsh and if so, what will be done to protect it from
being impacted. Terry Maurer explained that the property does not connect to the
marsh but that runoff does flow in that direction now. He felt the quality of the
water in the marsh would actually be improved due to the fact that all of the drainage
will go through the pond, settling out the floating material, sand and grit Mr. Maurer
stated that the County was granted a easement across the Holzem property. Mrs.
Brown stated that the County plans to use the old tile system to save money. Mr.
Maurer explained that the County has a new policy which restricts utilizing existing
County drainage easements for new plats. He stated that Mr. Graser will have to
deal with the County on this issue.
Planning Commission Minutes
May 22, 2001
Page 9
.
Mrs. Brown expressed concern for safety and/or liability issues with the number of
homes being proposed close to their property. She felt that the power line corridor
will serve as an aisle for people to walk or ride bikes or motorized vehicles into the
marsh area. She asked the developer to consider fencing the property on the south
and west, as well as along County Road 12 and Fillmore, to prevent future problems.
Commissioner Mesich stated that the 40 acres next to the Brown's property is also
going to be developed and a water tower placed on the site. Mr. Maurer explained
that the water tower will be located close to the border of Mr. Goetz's property. He
stated that it was his understanding that the access road to the tower would likely be
in a location that would become a street in the new development.
Commissioner Mesich asked how much of this land was flooded in the spring. Ms.
McPherson stated that there was one area on the north end of the site near County
Road 12 that had standing water, but that the rest of the site was relatively dry.
Commissioner Mesich asked if the wetlands have been delineated. Mr. Maurer stated
yes and that there are 3 small inlets to drain the site and the rest soaks into the
ground. Mr. Maurer explained that the drainage will be entirely different when it has
a fully developed drainage system. Ms. McPherson reviewed a drawing which
identified the three wetlands on site.
.
Commissioner Schuster questioned why the mailboxes are proposed to be clustered.
He eXplained that there is a significant amount of litter in his neighborhood where
the mailboxes are clustered, because of flyers falling out the back of the slots. Ms.
McPherson stated that the post office has requested the clustered boxes, and
suggested that the backs of the "shopper" slots could be closed.
Chair Pederson stated that it appears there are 11 lots which are less than 12,000
square feet, rather than 5 as stated in the memo. Ms. McPherson explained which
lots will be eliminated or added, due to the change in the park proposal. Chair
Pederson stated that more lots would be lost if the developer had to build a pond.
He questioned if there would be significant filling.
Mr. Graser eXplained that he proposes to mine out fill in Outlot C to raise the entire
site in order to provide more diversity in housing styles.
Commissioner Mesich asked what the price range would be for the homes. Mr.
Graser stated that the homes will be $160,000 to $220,000. Commissioner Mesich
asked the developer if he knew where the children moving into this area would go to
school and if there would adequate room for them. Mr. .Graser stated that he has
not spoken with the school district.
Chair Pederson suggested that sidewalks be installed on the street stubs which will
connect to future plats
.
Commissioner Mesich expressed his concern that new plats are being approved in
this area and construction has not begun on the new water tower. He asked when
the new tower would be in operation.
Planning Commission Minutes
May 22, 2001
Page 10
.
Mr. Maurer stated that the new water tower will be on line in late 2002 or early 2003.
Commissioner Mesich asked if there is still a water pressure problem for homes in
Trott Brook Farms. Mr. Maurer stated that the problems are not related to needing
a new water tower. The Municipal Utilities did not switch Trott Brook Farms over
to a high pressure system until they were able to put in a redundant line near Perkins.
Their plans were delayed and this switch over did not happen until this spring. Mr.
Maurer stated that there is no immediate need for the water tower to service the new
developments, but that they are planning ahead for future needs.
Commissioner Schuster asked what amenities are planned for the park. Mr. Kuester
stated that new parks to through a concept planning process. When a concept is
available, the neighbors are invited to a meeting to provide their comments. Mr.
Kuester stated that the park will likely consist of some sort of "pick up" playing field,
a picnic shelter, playground equipment, and possibly a basketball court.
Commissioner Schuster asked if the Park and Recreation Commission would
consider adding land to this park, when the property to the south is developed. Mr.
Kuester stated that would be a possibility.
Commissioner Mesich asked what the zoning of the property was previously. Ms.
McPherson stated that it was zoned R1e.
.
Chair Pederson asked what the current use of the property is. Ms. McPherson stated
that it is a farm field.
Commissioner Mesich stated that the Commissioners should take into consideration
the fact that the 2007 date for sewer and water extension was established to protect
the city from an infusion of high density in this area. He asked how the proposed
density of this plat compares to other plats in the city. Mr. Harlicker stated that this
development would be comparable to Country Crossing. Commissioner Mesich
asked what the density of the townhomes proposed for Outlot C would be. Mr.
Beck stated that the property will have to be rezoned to PUD or R3 in order to
develop the site with townhomes.
The Commissioners discussed possible impact of the pond on the preliminary plat
layout. It was the consensus of the Commissioners to table the plat until the
developer could finalize the location of the pond.
Mr. Graser stated that it is not an issue to amend the plat if necessary, but that he
would like to try to work with the County on their easement.
There being no further public comment, Chair Pederson closed the public hearing.
.
COMMISSIONER MESICH MOVED POSTPONE THE REQUEST BY
GOLD NUGGET DEVELOPMENT FOR PRELIMINARY PLAT
APPROVAL (KLIEVER LAKE FIELDS), CASE NO. P 01-08, TO THE
JUNE 12,2001 PLANNING COMMISSION SPECIAL MEETING. CHAIR
Planning Commission Minutes
May 22, 2001
Page 11
.
PEDERSON SECONDED THE MOTION. THE MOTION CARRIED 6-
O.
5.5.
Request by City of Elk River for Ordinance Amendment to Add Definition of
Animal Nutrition and Agricultural Research. and Establish an AR (Agricultural
Research) District. Public Hearing - Case No. OA 00-8
5.3.
Request by City of Elk River for Land Use Amendment for a Portion of Cargill
Property form LR (Low Density Residential) and LI (Light Industrial) to A
(Agricultural). Public Hearing - Case No. LU 00-6
5.4.
Request by City of Elk River for Rezoning of a Portion of Cargill Property to AR
(Agricultural Research) District. Public Hearing - Case No. ZC 00-7
.
Staff report by Scott Harlicker. The City of Elk River and Cargill have requested
amending the Zoning Code to create a definition for Agricultural Research and
establish an AR (Agricultural Research) District, an amendment to the land use plan
to change the land use designation of certain property from LR (Low Density
Residential) and LI (Light Industrial) to A (Agricultural), and to change the zoning of
the same property from R1a (Single Family Residential) and L1 (Light Industrial) to
AR (Agricultural Research). The proposed land use plan amendment also includes
adjusting the urban service boundary so that the new AR zoning district is not
included in the Urban Service Area. Staff recommends approval of the amendments
and rezoning based on the findings listed in the staff report.
City Attorney Peter Beck reviewed the history of the Cargill operation which began
in the 1950's. He stated that Cargill has had very little, if any, impact on the city
itself or the adjacent properties. Mr. Beck explained that in the past, the City has
been unable to fit Cargill's use into the zoning ordinance, and this request is an
attempt to create a zoning district unique to them. Cargill was assessed for the
extension of utilities into the eastern area and appealed the assessment, stating that
they did not want or need them. After more than two years of negotiations, the City
and Cargill have agreed to a settlement which includes processing the necessary
ordinance and land use amendments to accommodate Cargill's use of their property.
Mr. Beck explained the other terms of the settlement, including relocating of the
land trust property into the eastern area, and a land donation by Cargill.
Commissioner Franz asked if there were any other operations in the City that would
fit into this zoning district. Mr. Beck stated that there were not. He -noted that
Cargill is a unique operation which is internationally renown for agricultural research.
Mr~ Harlicker stated that the City has never had a clear definition for Cargill and he
felt the proposed definition fits what is actually on their site. He reviewed the
definition at this time.
.
Planning Commission Minutes
May 22, 2001
Page 12
.
Commissioner Baker asked if there were any significant changes since the Planning
Commission last reviewed this issue. Mr. Beck stated that the changes are very
minimal.
Chair Pederson asked why their use is being proposed as a conditional use and not a
permitted use. Mr. Beck explained why he felt the conditional use was a better
approach. Commissioner Baker asked if the purpose was to give the city some
control. Mr. Beck agreed that the conditional use permit process would provide
some control over the intensity of the use for issues such as number of animals,
traffic, impacts off-site on adjacent properties, etc.
Mr. Harlicker explained that the conditional use permit will cover the areas shown in
white and yellow on Exhibit A. As it is, if Cargill wanted to expand their office area
the would not be able to, because of the utilities issue. Approval of the ordinance
and land use amendments would allow expansion under the conditional use permit.
Scott noted that there is much more to Cargill's operation than livestock and that
they also do feed research.
Chair Pederson opened the public hearing.
Greg Fontaine of Dorsey-Whitney, representing Cargill, Inc., stated that the
intent of this process is to create a comprehensive solution to the technical
difficulties in dealing with the assessments and utility issues.
.
Chuck Jenson, Operations Team Leader for the Elk River Cargill operations,
stated that members of the City Council and staff have been out to visit the site, and
he encouraged the Planning Commissioners to do so.
Mr. Harlicker noted that Cargill has requested that where the words "agricultural
research" is mentioned in the proposed ordinance, they would like the words "and
development facilities" included.
Commissioner Mesich asked what is being done to maintain the quality of the
lagoons on site. Mr. Jensen stated that the lagoons were built to EP A standards and
cannot be changed without their approval. He noted that they worked with the
University of Minnesota on this issue.
Commissioner Baker asked for clarification on the rezoning and land use areas. Mr.
Harlicker explained the area proposed for rezoning and land use amendment. Mr.
Beck stated that all of Cargill's property east of the railroad tracks is being taken out
of the Urban Service Area and everything west of the railroad tracks will be included
in the Urban Service Area.
Commissioner Baker expressed his support for Cargill's operation. Commissioner
Franz stated that he felt Cargill's site was clean and well-kept.
.
Planning Commission Minutes
May 22, 2001
Page 13
.
.
.
Mr. Fontaine stated that he was in agreement with all Mr. Beck's comments with the
exception of the boundary to the west. He stated that he will check the settlement
documents for verification.
Mr. Beck explained language in the agreement which offers Cargill three options for
requesting connection to utilities.
COMMISSIONER BAKER MOVED TO RECOMMEND APPROVAL
THE REQUEST BY THE CITY OF ELK RIVER TO AMEND THE
ZONING CODE TO CREATE A DEFINITION FOR AGRICULTURAL
RESEARCH AND ESTABLISH AN AR (AGRICULTURAL RESEARCH)
DISTRICT, AS OUTLINED IN THE STAFF REPORT, CASE NO. OA 00-
8. COMMISSIONER FRANZ SECONDED THE MOTION. THE
MOTION CARRIED 6-0.
COMMISSIONER BAKER MOVED TO RECOMMEND APPROVAL OF
THE REQUEST BY THE CITY OF ELK RIVER FOR THE
FOLLOWING:
1. PROPOSED AMENDMENT TO THE COMPREHENSIVE LAND
USE PLAN CHANGING THE LAND USE DESIGNATION FROM LI
(LIGHT INDUSTRIAL) AND LR (LOW DENSITY RESIDENTIAL)
TO A (AGRICULTURAL CONSERVATION);
2. PROPOSED AMENDMENT TO THE COMPREHENSIVE LAND
USE PLAN CHANGING THE URBAN SERVICE BOUNDARY SO
THAT THE PROPERTY WITH THE LAND USE DESIGNATION OF
A (AGRICULTURAL CONSERVATION) IS NOT INCLUDED IN
THE URBAN SERVICE AREA;
3. PROPOSED ZONE CHANGE FROM It (LIGHT INDUSTRIAL) AND
R1A (SINGLE F AMIL Y RESIDENTIAL) TO AR (AGRICULTURAL
RESEARCH).
THE AMENDMENTS TO THE LAND USE PLAN ARE BASED ON
THE FOLLOWING FINDINGS:
. THE PROPOSED CHANGES TO THE LAND USE MAP ARE
CONSISTENT WITH THE COMPREHENSIVE PLAN BECAUSE:
1. THE PROPOSED AMENDMENTS PROMOTE AN ORDERLY
DEVELOPMENT PATTERN CONSISTENT WITH THE
SEMI-RURAL CHARACTER OF THE COMMUNITY.
2. THE PROPOSED AMENDMENTS WILL HELP PRESERVE
AGRICULTURAL USES IN THE CITY.
3. THE PROPOSED AMENDMENTS REFLECT THE LONG
RANGE PLANS FOR THE PROPERTY.
Planning Commission Minutes
May 22, 2001
Page 14
.
4. THE PROPOSED AMENDMENTS WILL ENCOURAGE THE
EXTENSION OF SEWER LINES ON A COST EFFECTIVE
BASIS WITHOUT UNDUE BURDEN ON TAXPAYERS.
THE ZONE CHANGE IS BASED ON THE FOLLOWING FINDINGS:
1. THE PROPOSED REZONING IS CONSISTENT WITH THE
COMPREHENSIVE LAND USE PLAN DESIGNATION OF A
(AGRICULTURAL).
2. THE CONDITIONS HAVE CHANGED TO WARRANT THE
PRESERVATION OF THIS PROPERTY AS AGRICULTURAL.
3. THE PROPOSED REZONING IS COMPATIBLE WITH THE
ADJACENT ZONING DISTRICTS.
4. THE PROPERTY IS OUTSIDE THE URBAN SERVICE AREA
AND WILL NOT BE SERVICED BY MUNICIPAL SEWER AND
WATER.
AS PRESENTED IN EXHIBIT A. COMMISSIONER FRANZ
SECONDED THE MOTION. THE MOTION CARRIED 6-0.
5.6.
Request by Cargill for Conditional Use Permit. Public Hearing Case No. CU 01-17
..
Staff report by Scott Harlicker. Cargill requests a conditional use permit for an
agricultural research facility. Mr. Harlicker noted that the conditional use permit
includes the areas shown in white and yellow shown on Exhibit A. He reviewed the
expansion requests by Cargill. Staff recommends approval of the request with the
conditions listed in the staff report.
Chuck Jensen of Cargill stated that the expansion request is based on their "best
guess" of what may happen in the next 20 years. Mr. Harlicker stated that any added
uses, additional square footage, or Cargill's desire to expand outside ofthe area in
yello:-," and white on Exhibit A would require an amendment to their conditional use
permIt.
Commissioner Mesich questioned how the number of animal units will be enforced.
Ms. McPherson stated that these are guidelines which Cargill is agreeing to follow
and it becomes a trust issue that they will abide by them. She noted that if Cargill
desired to increase the number of animal units significantly enough to require an
expansion, a building permit would be required. .
There being no further public comment, Chair Pederson closed the public hearing.
.
COMMISSIONER BAKER MOVED TO RECOMMEND APPROVAL OF
THE REQUEST BY CARGILL, INC. FOR A CONDITIONAL USE
PERMIT FORAN AGRICULTURAL RESEARCH FACILITY, AS SHOWN
IN WHITE AND YELLOW ON EXHIBIT A, WITH THE FOLLOWING
CONDITIONS:
Planning Commission Minutes
May 22, 2001
Page 15
.
1. A LANDSCAPE PLAN THAT COMPLIES WITH THE CITY'S
LANDSCAPE ORDINANCE BE SUBMITTED.
2. ANY EXPANSION THAT IS CONSISTENT WITH THE EXPANSION
REQUEST SUMMARY AND EXHIBIT A SHALL REQUIRE
ADMINISTRATIVE SITE PLAN REVIEW.
3. ANY EXPANSION THAT IS NOT CONSISTENT WITH THE
EXPANSION REQUEST SUMMARY OR EXHIBIT A SHALL REQUIRE
AN AMENDMENT TO THE CONDITIONAL USE PERMIT.
COMMISSIONER FRANZ SECONDED THE MOTION. THE MOTION
CARRIED 6-0.
5.9.
Request by City of Elk River for an Ordinance Amendment Regarding Government
Buildings and Facilities. Public Hearing - Case No. OA 01-06
.
Staff report by Michele McPherson. The City of Elk River requests an ordinance
amendment to add as a conditional use in the Business Park District, government
buildings and facilities. She explained that by changing the definitions for
government office and government buildings and facilities, the current Sherburne
County Government Center became a nonconforming use. Approval of the
proposed amendment would allow the County to expand its facility with Planning
Commission and City Council approval.
Chair Pederson opened the public hearing. There being no public comment, Chair
Pederson closed the public hearing.
The Commissioners discussed the pros and cons of adopting the proposed
ordinance. City Attorney Peter Beck stated that the Commission could chose to
redefine the courthouse definition. Ms. McPherson stated that she has requested
input from the County on this issue but she has not received any comments to date.
Commissioner Baker asked if there were any other options. Mr. Beck stated that a
new zoning district could be created but this would take some time. Ms. McPherson
stated that a zoning district is needed to address institutional or public facilities.
Discussion followed regarding whether to adopt the proposed ordinance or wait to
process a new ordinance amendment. Ms. McPherson noted that if the Commission
were to deny this amendment, they would need to provide findings for the denial.
She eXplained that if the ordinance is not approved, the County would not be able to
expand. Commissioner Schuster asked if the County would need a conditional use
permit. Ms. McPherson stated that they would need to meet the same standards as
any other conditional use permit, which requires Planning Commission and City
Council approval.
.
It was the consensus of the Commissioners to recommend that the City Council
direct staff to prepare and amendment to create a new zoning district for
institutional uses and public facilities, when time permits.
Planning Commission Minutes
May 22, 2001
Page 16
.
COMMISSIONER MESICH MOVED TO RECOMMEND APPROVAL OF
THE REQUEST BY THE CITY OF ELK RIVER FOR AN ORD.INANCE
AMENDMENT TO ADD GOVERNMENT BUILDINGS AND
FACILITIES AS A CONDITIONAL USE IN THE BUSINESS PARK
DISTRICT. COMMISSIONER PEDERSON SECONDED THE
MOTION. THE MOTION CARRIED 5-1. Commissioner Baker opposed.
6.
Other Business
6.1. Update on 5/21/01 City Council Meeting
Michele McPherson provided an update on the May 21,2001 City Council
meeting.
8. Adiournment
There being no further business, COMMISSIONER BAKER MOVED TO
ADJOURN THE MEETING. CHAIR PEDERSON SECONDED THE
MOTION. THE MOTION CARRIED 6-0.
The meeting of the Elk River Planning Commission adjourned at 10:20 p.m.
Respectfully submitted,
. /JMi ~
Debbie Huebner
Recording Secretary
.