8.1. SR 03-04-2019Request for Action
To
Item Number
Mayor and City Council
8.1
Agenda Section
Meeting Date
Prepared by
General Business
March 4, 2019
Michael Hecker, Parks and Recreation Director
Item Description
Reviewed by
Woodland Trails Regional Park Master Plan Change
Cal Portner, City Administrator
Reviewed by
Action Requested
Discuss the proposed location change of the nature -based playground area, nature center and picnic
shelter in the Woodland Trails Regional Park Master Plan.
Approve, by motion, change to the Woodland Trails Regional Park Master Plan.
Background/Discussion
Since November of 2018, the Woodland Trails Regional Park (WTRP) Grant Committee has met several
times with WSB consultants planning the nature -based play area, nature center and picnic shelter.
Members of the committee strongly feel the location of the nature playground; future nature center and
picnic shelter should be moved to a different location than indicated in the master plan. The committee
met on January 22 and made a motion to change the preferred locations of the playground, nature center
and shelter.
The WTRP Master Plan was adopted by City Council and the Greater Minnesota Regional Parks and
Trails Commission (GMRPTC) in July of 2016. Both the DNR Grant Coordinator and the GMRPTC
Coordinator have reviewed the master plan and commented it may be amended without impacting grant
funding. They both noted any cost increases due to the location change is entirely the responsibility of
the city.
The Parks and Recreation Commission met at a special meeting on January 23 to discuss and
unanimously recommend changes to the WTRP Master Plan with the condition any additional costs due
to change of location do not come out of either the Park Improvement Fund or Park Dedication Fund.
WSB Consultant Candace Amberg will present to City Council the latest playground design concepts at
the proposed location, including estimated costs. The major implication of the changed location is the
additional costs for grading and earthwork required with the higher elevations west side of the parking
lot, and additional work required by WSB. The original scope of the project in which WSB was chosen
for their design work is based on the WTRP Master Plan.
While the nature center facility as shown in the master plan is not part of this project, it is an anchor to
the overall project. The new location will need additional trails and trail improvements for an ADA
A IR
accessible route from the parking lot to the building. This building would be designed and constructed in
the future with grant funds available through the GRMPTC.
Because of the additional work making changes to location and design, we will not meet the original
timeline in project scope of an early April bidding period. The extended timeline will not affect the work
tasks and related consultant fees. We still hope for a competive bidding environment later this year.
Financial Impact
Relocation of the nature playground to the west side of the parking lot will require additional site grading
and earthwork estimated to cost between $12,000 to $15,000. The additional work required to make
changes to the design is between $2,000 to $4,000, depending on the number of changes and meetings
required. This is in addition to the total fee of $43,000 for WSB, which comes from the Park
Improvement Fund.
The nature center relocation to the west side will require an accessible trail from the parking lot and, if
the nature center is built higher than the existing trail elevation on the north side of the parking lot,
additional trails will be required to access the higher elevation estimated at $28,000. This location change
will also require moving the parking lot lights estimated at $10,000.
The preliminary estimated cost for a future nature center is $600,000. If the nature center were to include
more than one level as discussed by the committee, an interior elevator would be necessary, estimated at
an additional $90,000.
Attachments
■ WTRP Master Plan Site Location and Proposed Site Location
■ WTRP Playground Concept Plan Master Plan Location
■ WTRP Playground Concept Plan Master Plan Proposed Location
■ Park Improvement Fund Spreadsheet
N:APublic Bodies\Agenda Packets\03-04-2019\Final\x8.1 sr Woodland Trails Master Plan change.docx
Wetland Restoration
Ir
a ? ? A �L.►Small Open Av Picnic Shelter�__� -,' �J �r ' \`y r
(Site To Be Determined)---
- — �. _ i PROPOSED ;,Y• � e� ,,` _� ---
14
-- LOCATION 'r.� __ �.,�►�� >,� � .• ',,�_ _ ` -
5
Kiosk/Trailhead
Enhanced Wayfinding
Medium Sized Nature Center With
j� _ [ MASTER PLAN - Moderate Level of Programming
(Site To Be Determined)
f
a l ,k
Y /
f'
*Re-configure d parking lot with ! •�' ti�ha - / t{�`� — _ - --
enhanced drainage
_�•`)A�'� \�� �f� / ,.''!J / - Large,rea
Nature Based Play A
Never Relocated Park
Storage with Screening ` ; ,{e. F Y- r J -I '-'1-� (Site To Be Determined)
'Enh
% '� �/��Couase Bunced ilding
ening of Golf r
r`dw ��� �
• r
■ � •,l 200 - / / i 1 ti �, V ' \ .. } ��
n
Cf)
Nature Play I Concept izmargement
Elk River, Minnesota
February 26, 20191 WSB Project number: 013222-000
s 0 WS%
s�ie � Fees
FUTURE NATU
CENTER
SEEENLARGEMENT
SMALL
I o TURErjFU
PICNICHELTER
I �rr I
APS;
WETLAND
I LARGE
GROUP
SHELTER
I I
FUTURE �.
TRAILS
PARKING LOT
i
rr�
City of Elk River
Park Improvement Fund
updated 02/27/2019
Actual
2017
2018F
2019F
2020F
2021 F
2022F
2023F
Notes
Revenues
Other Revenue
Interest Income
7,724
5,000
2,000
2,000
2,000
2,000
2,000
Youth Baseball Association - Dugouts
-
26,540
11,540
11,540
11,540
-
-
Youth Football - Oak Knoll Lights
15,000
12,000
7,416
7,416
7,416
7,416
-
Lacrosse - Oak Knoll Lights
-
12,000
7,416
7,416
7,416
7,416
-
Youth Basketball - Lions Park Courts
-
13,400
-
-
-
-
-
Grants
-
-
362,000
-
-
-
-
Misc.
175
-
-
-
-
-
-
Land Lease
12,000
-
-
-
-
-
-
Transfer In -Liquor Fund
228,016
197,174
195,000
195,000
195,000
195,000
195,000
Transfer In -Excess Fund Balance
119,382
-
-
-
-
-
-
Donations
9,526
1,245
-
-
-
-
-
Total Revenue
391,823
267,359
585,372
223,372
223,372
211,832
197,000
Expenditures
Athletic field improvements - dugouts
77,770
63,718
-
-
-
-
-
Athletic field improvements - scoreboards
79,687
-
-
-
-
-
-
Bailey Point - amenities
5,875
-
-
-
-
-
Barrington Playground Replacement
88,209
-
-
-
-
-
-
DAAC Fence Replacement
-
-
-
-
-
-
-
Future Funds
DAAC Infield Reconstruction
-
-
-
-
-
-
-
Future Funds
DAAC Irrigation
-
97,437
-
-
-
-
-
DAAC Scoreboards
-
25,990
-
-
-
-
-
Replace 4 scoreboards
Deerfield Basketball Court
-
-
-
-
-
25,000
-
Deerfield Playground Replacement
-
81,011
-
-
-
-
-
purchase and installation, playground is in need of replacement
Heritage Landing Trail (Country Crossing)
-
-
-
-
120,000
-
-
Hillside Park Improvements
54,974
49,572
-
-
-
-
-
Phase 1 and 2 mtn bike trail reconstruction
Houlton restoration (FMR match)
10,000
10,000
10,000
10,000
-
-
-
obligated funds to restoration grant
Lions Basketball Court
-
18,440
-
-
-
-
-
Replace 4 hoops, add 4 LED lights
Lions Park Bitumunous Trails
-
-
-
-
-
-
-
Referendum??? ($203,280)
Lions Park Center Parking Lot
-
-
-
-
-
-
-
Referendum ($200,000)
Lions Park Master Plan
-
-
15,000
-
-
-
-
Lions Park Playground
-
-
-
200,000
-
-
-
Oak Knoll Lights/Scoreboard
-
120,836
-
-
-
-
-
Add lights to Oak Knoll 4 and scoreboard
Oak Knoll Parking Lot
-
-
-
-
153,000
-
-
Orono Park Master Plan
8,490
-
-
-
-
-
-
Park Property Lines
3,275
-
-
-
-
-
-
Parks Master Plan Update
7,149
22,084
-
-
-
-
-
Picnic tables/benches
9,000
-
-
-
-
-
-
Rivers Edge - Plaza Improvements
24,246
-
-
-
-
-
-
Skate Park Design
11,625
-
-
-
-
-
-
Barrington (1/2), Country Crossing (Full), Lions (2 Full), Fresno (Full),
Sport Court Resurfacing
-
-
50,000
-
-
-
-
Deerfield (1/2)
Sport Court Resurfacing
-
-
-
-
9,000
-
-
Highlands Tennis and Basketball (1/2)
Trott Brook Basketball (1), West Oaks Basketball (1/2), Riverplace
Basketball (1), Ridgewood Basketball (1/2), Kliever Point (1/2), Kliever
Sport Court Resurfacing
-
-
-
-
-
-
40,000
Lake (1/2),
Tennis Court Replacement - Trott Brook
-
-
-
-
-
150,000
-
City of Elk River
Park Improvement Fund
updated 02/27/2019
Actual
2017
2018F
2019F
2020F
2021 F
2022F
2023F
Notes
Tennis Court Resurface - Trott Brook
12,600
-
-
-
-
-
-
Trail Repairs & Connections
134,054
17,390
-
-
-
-
-
Woodland Trails Signs
10,000
Woodland Trails Survey
27,365
Woodland Trails Design Services
-
-
43,000
-
-
-
-
Woodland Trails Grant Match ($125,000 Total), Wayfinding/Sign/Kiosk
($50,000), GF Buckthorn Removal 2019-2020 ($50,000), Other
Woodland Trails Grant Match
-
-
25,000
-
-
-
-
($25,000)
Woodland Trail Grant Projects
-
-
362,000
-
-
-
-
Woodland Trails Storage Garage Replacement
-
-
-
-
-
-
100,000
Misc. park maintenance
395
-
-
-
-
-
-
Total Expenditures
527,349
506,478
542,365
210,000
282,000
175,000
140,000
Revenues less Expenditures
(135,526)
(239,119)
43,007
13,372
(58,628)
36,832
57,000
Cash Balance - Beginning
430,802
295,276
56,157
99,164
112,536
53,908
90,740
Cash Balance - Ending
295,276
56,157 M 99,164
112,536
53,908
90,740
1471740
March 4, 2019
1
Project Update
Play Development
Woodland Trails Nature
2
Construction Documents
•Site Topographical Survey
••Preferred Concept PlanDesign Development &
••Conceptual Design OptionsSite Construction
Project Overview
3
discussedactivities and materials
Committee Meetings
•••••Four meetings held toGuidance on nature play elements, Guidance on nature play locationGuidance on group shelter locationSeveral locations presented and -date
Steering Committee
4
play features to avoid conflicts of use)
accessibilitynature play area (not directly adjacent to trails and has direct trail access to related access trails
Preferred Overall Concept Plan
•••••Location north of existing parking lotAllows for future nature center and Fits with the natural scenic qualitiesCan connect to existing trails for
Design Development Plan
5
from parking lotscrambling, plyometric elements and suspension
incline walk
Nature Play Elements
••••••••••Larger climbing / rock elements more visible Future small picnic shelterSeating throughout4’ hill for water play that enters into sand playTurf covered tunnels for quieter
areasUse larger hills and embankments for rock Embankment slideMusical piecesFort building
Design Development Plan
6
•Climbing Walls
•Boulders
•Embankment Slides
Preliminary Features
7
•Water Play
•Challenge
•Balance
Preliminary Features
8
•Music
•Fort Building
•Creative Play
Preliminary Features
9
Landscape Features
•Seating
•Rain/Pollinator Garden &
Preliminary Features
10
nature play elements and and GMRPTC
•Altered locations for adopted by City Councilof changes to the DNR master planshelter from original
••Notification and approval Master Plan update to be
Modifications
11
mid to late March 2019
•Anticipated bidding in by fall of 2019anticipated in May
••Construction start Construction complete
Original Schedule
12
for fall construction January / February 2020 for
•Potentially bid late summer construction optimal bids with 2020 complete late fall 2019)atmosphere with construction (depending on bidding
•Alternate Option: Bid in
Current Schedule
13
that will continue to be modified Probable Costs: $270,000 on available budgets
•Nature PlayHigh level estimates prepared Probable Costs: $136,000donated materials/itemsas design progresses
•Preliminary Estimate of
•••••Group Shelter••••Currently does NOT account for Balance: 10% Contingency: $12,500Preliminary Estimate of Budget: $125,000Balance: 10% Contingency: $20,000Budget: $200,000Design
decisions will be based ($90,000)($23,500)
Preliminary Estimates
14
side (~500 cy = $8,000)primary access (~30,000)dependent on design, materials and
overall programmingelevator (~$90,000)trails depending on elevation of
Earthwork Quantities$15,000)
•••••Fill was potentially needed for east TwoWest location may need additional Potential cost range of $600,000+ Export for west side (~1000 cy = -story building would require an
Nature Center
Budget Considerations
15
(boulders, trees, sand, culverts)water well)
•Donated & available materials trails, concrete shelter pad & pad not in this contract
•••Benches built by othersItems by others (bituminous Bituminous trails and concrete
Potential Project Savings
16
methods of constructionbid alternates
Design Development
•••More refined designPrioritize elements & allow for Determine materials and
Next Steps
THANK YOU
17