Loading...
9.2. SR 04-15-2019 EOty1� ,.,�� Request for Action River To Item Number Mayor and City Council 9.2 Agenda Section Meeting Date Prepared by Work Session Aril 15, 2019 Tim Sevcik, Street and Park Superintendent Item Description Reviewed by Snow and Ice Control Justin Femrite, Public Works Director Reviewed by Cal Portner, City Administrator Action Requested Provide input to staff regarding service levels for snow and ice control. Background/Discussion The Snow and Ice Control Policy was last reviewed by the Council on February 1, 2016. Continued growth of the city, emerging environmental concerns and changes in technology have changed our approach to snow and ice control since the policy was last reviewed. Staff will provide an overview of the city's snow and ice control procedures and policy. We are seeking feedback on service level expectations for our street and trail plowing operations and any desires to adjust levels of service in this area. Additionally,we are seeking guidance from the Council in regard to snow removal on city sidewalks. Current direction is for city crews to clear snow from 23-miles of our 52-mile sidewalk network. Financial Impact None Attachments ■ Snow and Ice Control Policy ■ Snow Plow Route Map —Streets ■ Snow Plow Route Map —Trails and Sidewalks POWERED 6T Template Updoted 4/14 INAMIRE1 r' °y J City of Snow & Ice Control Policy 12. 18.2017 Snow & Ice Control Policy Forward The primary purpose of snow/ice control is to provide for the safety and mobility of the public during periods of heavy snowfall, snow accumulation and icy conditions. Planned levels of service and existing capabilities of the City must be carefully correlated with computed costs of operations and the benefits expected to be achieved. It is the responsibility of the Public Works Division to provide a level of snow and ice control consistent with the City of Elk River's approved level of service funding. The City of Elk River's Snow and Ice Control policy provides for the planned and orderly control of snow/ice on city-maintained streets, alleys,walks,parking lots and some trails during periods of inclement weather. Operations are performed and coordinated by Street and Park personnel,with assistance from other divisions as needed. A planned, coordinated approach is essential to ensure effective and efficient response to snow and ice conditions. Unplanned,reactive responses to localized conditions conflict with and inhibit an effective approach to citywide snow/ice events. This policy is also a summary of procedures and policies of the City as they relate to snow and ice control operations. The Snow and Ice Control Policy is reviewed and updated annually. Snow control and handling is a hazardous, tiring, and stressful job,which may not be fully understood by the public. Operations are performed more often at night and often require crews to work arduous hours, on weekends, and holidays. We thank those individuals who through their dedication and best effort assist the City of Elk River by carrying out the details of this policy. INTRODUCTION Together,we are all responsible to keep Elk River safe for winter travel. The City assumes basic responsibility for control of snow and ice on city-maintained streets,alleys,walks,parking lots and trails, while property owners are responsible for private streets,parking lots, alleys, and sidewalks abutting their property. Reasonable ice and snow control is necessary so that citizens can use the above maintained transportation pathways as normally as possible under all but the most extreme weather conditions for routine travel and emergency services. The City will provide such control in as safe and cost effective manner as practical, keeping in mind safety,budget,personnel and environmental concerns. The City will use a combination of city employees, equipment, and may also utilize private contractors if needed. This policy will be enforced equally throughout the City. Decision to Begin Operations The Public Works Superintendent or designee(s) will decide when to begin snow and/or ice control operations. The criteria for that decision will include: ■ Reasonable threat of inclement weather predicted to occur within 24 hours; ■ Storm conditions that warrant pre-treatment with salt or brine solution; ■ Snow accumulation or as road conditions warrant; ■ Drifting of snow; ■ Icy conditions; ■ Time of snowfall. Use of Salt and Sand The City may use salt, salt brine, sand or a mixture thereof when there is hazardous ice or other conditions that warrant their use. Application will follow the same priorities followed for snow and ice control set forth in the "Snow and Ice Control Priorities" section. The City is concerned about the effect of such chemicals on the environment and will limit their use for that reason. Application of sand/salt will be limited on lower volume streets. The Public Works Superintendent or designee(s) shall determine when conditions warrant the application of sand and/or salt, and what mixture is appropriate for the conditions. Snow Removal Snow removal operations shall be performed on streets, alleys,walks,parking lots and trails maintained by the City. Snow removal priority and scheduling shall be based on needs and conditions,and shall be determined by the Public Works Superintendent or designee(s). Method of Snow Removal Snow will be plowed in a manner so as to minimize traffic obstructions. The center of the roadway will be plowed first. The discharge shall go onto the boulevard area of the street and minimize or reduce snow stack upon walkways,where practical. Weather Conditions/Suspension of Operations Snow and ice control operations will be conducted only when weather conditions do not endanger the safety of city employees and equipment. Factors that may delay snow and ice control operations include severe cold, significant winds, limited visibility, or damaged equipment. Generally, operations shall continue until all roads are passable. Widening and clean-up operations may continue immediately or on the following work day depending upon conditions and circumstances. Safety of the plow operators and the public is essential. Therefore, snow plowing/removal operations may be 0 suspended temporarily to allow personnel adequate time for rest. There may be instances when this is not possible depending on storm conditions and other circumstances. Operations may also be suspended during periods of limited visibility. Any decision to suspend operations shall be made by the Public Works Superintendent or designee(s) and shall be based on the conditions of the storm. Snow and Ice Control Priorities City streets are classified based on street function,traffic volume, and importance to the welfare of the community. Streets within the City are prioritized to clear major travel routes first. This allows public safety vehicles access to most parts of the City. 1. Main Arterials (Priority 1): High-volume streets that must be clear to provide access for emergency, fire,police, and medical services. 2. Secondary Arterials (Priority 2): All other streets that connect major sections of the city. 3. Residential Streets (Priority 3):Third priority streets are lower volume residential streets. 4. Cul de sacs (Priority 4): 5. Alleys (Priority 5): Alleys are considered the lowest priority and will be plowed once arterials and residential streets have been cleared. Downtown snow removal (including parking lots) commences between 2:00 a.m. and 6:00 a.m. depending on the severity of the snow event. Downtown businesses are responsible for removing snow from the front of their establishments within 24 hours after the snowfall. Sidewalks, Trails, City Operated Facilities, and Outdoor Ice Rinks The City Council designates sidewalks and trails that are plowed by the city. Clearing of non-designated city sidewalks is the responsibility of the property owner. City sidewalks, trails, city operated facilities and city outdoor ice rinks are classified based on traffic and use as well as the importance to the welfare of the community. These facilities are prioritized to clear routes-to- school and public facilities first. This allows for safety to the public and employees of city operated facilities as well as to pedestrians in high traffic corridors. 1. Safe Routes to School (Priority 1): Sidewalks and trails that must be cleared near school campuses to provide pedestrian access 2. City Operated Facilities (Priority 2): These facilities are prioritized based on traffic volume as well as the time of day the facility is open. Order of precedence for these facilities is: Public Safety Campuses, City Hall, Public Works Facility, Senior Activities Center,Library,Boys and Girls Club,Lions Park Center, Ice Arena,Liquor Stores, and rental facilities. 0 3. Trails, Sidewalks, Park Parking Lots (Priority 3): Sidewalks and trails which are not part of the safe-routes-to-schools and which have been designated by the city for snow removal and parking lots supporting park facilities. 4. Ice Rinks (Priority 4): Ice rinks are the lowest priority and will be cleared of snow and resurfaced once all other snow removal operations are complete,generally on day two following a snowfall. Driveways It is unlawful to deposit snow on public roadways per Minnesota Highway Traffic Regulations; State Statute 160.2715 Subd(5):Misdemeanors:It shall be unlaavful to obstruct any public street or bigbway or to deposit any snow or ice thereon;and, 169.42 Subd(1):Littering:No person shall throw, deposit,place, or dump upon any street or bigbway any snow, ice, etc. Residents observed doing such activities are subject to a citation and fine. Minimal Levels of Service The following are minimum levels of service which can be anticipated. The City will attempt to achieve better results where possible. Streets ■ Snow removal and/or sanding operations shall begin when snow accumulation or icing occurs on Priority 1 and Priority 2 streets, and shall continue periodically throughout the duration of the snowfall. It is the intention of the City to keep these routes open to traffic during a storm;however, it may not be possible to keep them snow or ice free. ■ All priority 1 and priority 2 streets shall be open to traffic (two lanes) within 24 hours after the snowfall subsides. ■ All remaining public streets shall be open to traffic (one lane) within 36 hours after the snowfall subsides. ■ All public alleys and cul-de-sacs shall be opened and made passable within 48 hours after the snowfall subsides. Sidewalks, Trails, City Operated Facilities, and Outdoor Ice Rinks ■ Snow removal and/or sanding operations shall begin when snow accumulation or icing occurs on Priority 1 and Priority 2 sidewalks, trails, and City operated facilities; and shall continue periodically throughout the duration of the snowfall. It is the intention of the City to keep these facilities open to pedestrian and vehicular traffic during a storm;however,it may not be possible to keep them snow or ice free. ■ All Priority 1 and Priority 2 sidewalks, trails, and City operated facilities shall be open to traffic within 24 hours after the snowfall subsides. ■ All Priority 3 sidewalks and trails shall be open to pedestrian traffic within 48 hours after the snowfall subsides. ■ All Priority 4 outdoor ice rinks shall be cleared of snow and resurfaced as manpower and equipment are available,generally within 48 hours after snowfall subsides. ■ Should a subsequent snowfall occur within the minimum times of service listed, that snowfall shall become the snowfall referred to in this policy. Items in the Public Right of Way Mailboxes The city does not assume liability for mailboxes damaged during snowplowing operations unless the Public Works Superintendent or their designee determines that a plow unit made direct contact. Staff shall investigate each complaint and determine if the mailbox was hit by city equipment. If so,a temporary mailbox will be installed until a replacement is erected in the spring. The city will replace mailboxes damaged from direct contact with city equipment with the `swing-away' style mailbox conforming to the U.S. Postal Service specifications. If a resident does not want the swing-away style, they will be reimbursed up to $75 (receipt required), to replace the mailbox with a style of their choice. Installation is the responsibility of the property owner. Mailbox structures in the public right-of-way should be constructed of break-away materials. Incidents involving cluster mailboxes will be determined on a case by case basis. Trash Containers Trash and recycling containers shall be placed behind the curb so it is clear of passing snowplows and resulting windows. Do not place trash and recycling containers in the street. The city is not responsible for damage to trash/recycling containers placed in the street. Lawn Sprinklers/Invisible Pet Fences The city is not responsible for damage to underground lawn sprinklers or invisible pet fences located within the public right-of-way. Homeowners are responsible to protect such systems from damage or to relocate sprinkler heads and fences within their property boundary. Sod Damage Sod damaged by city equipment will be repaired the following spring either by city crews using black dirt and seed; or by the property owner if they elect to do the repair using commercial sod. The city will reimburse the property owner for the sod purchased but not for labor costs. Reimbursement much be approved by the Public Works Superintendent or their designee prior to the corrective work or sod purchase. 0 Conditions Which May Impact Policy Goals ■ Vehicles disabled in deep snow ■ Weather so severe as to cause crews to be called in from the street,i.e.,whiteout conditions ■ Equipment rendered inadequate by the depths of the snow or drifts,re-fueling, refilling material spreaders,installing new plow cutting edges, and routine maintenance ■ Illegally parked,parked, or stalled vehicles that restrict or prevent access; those streets,walks and pathways will be assigned to lower priority,as available ■ Unforeseen emergencies ■ Equipment breakdown (Title) Policy History Adopted by: On date Item# O �s 0 „ s E } lip d � eQoR `s) I 2018-2019 Season Route #2 #3 #4 K „ #5 #6 ,. #7 Priority■.. X131 m„ Private Drives Rivet x = a o E .g 8 iI iI ffl iIsl IIIIih al il an `7 � � � i µyr p 1 i i m. —E + 2018-2019 MAP OF SIDEWALKS AND TRAILS �1 000 THE CITY WILL BE PLOWING Sidewalks Route I Route 2 Route 3 Route 4 Route 5 STS UPDATED 11.25.15 Ecjj� .......... W*Ilvff� Z�= City Council Policy ReviewSnow and Ice ControlCity of Elk River City Council Take feedback on service levels and policy changesDiscuss new technologies, BMPs, and resourcesPolicy review regarding snow and ice controlRecap the past two snow seasons (if it’s over…)Purpose City Council Maintenance Costs$17,124 Equipment 15,493 Gallons Fuelovertime1,818 hours of 4,522 Staff Hours1,330 Tons Salt37.9% Route Treated15,585 Miles Driven33 events2018-2017Maintenance Costs$35,767 Equipment 16,118 Gallons Fuelovertime1,838 hours of 5,122 Staff Hours980 Tons Salt22.8% Route Treated18,300 Miles Driven32 events2019-2018 Season Comparison2019 Snow-20182018 and -2017 City Council operations. snow and/or ice control will decide when to begin or designee(s) Superintendent Street and Park The City Policy City Council been cleared.and will be plowed once arterials and residential streets have Alleys are considered the lowest priority Alleys (Priority 5): de sacs (Priority 4):Cullower volume residential streets.Residential Streets (Priority 3): Third priority streets are connect major sections of the city.All other streets that Secondary Arterials (Priority 2):medical services. be clear to provide access for emergency, fire, police, and volume streets that must -HighArterials (Priority 1):Main Street Maintenance Division Priorities City Policy (cont.) City Council From the Policy–Service Minimum Level of City Council completed the following daysacs are plowed concurrently, however often -de-Culhours dependent on timing and duration of the snowfall14 -Snowfall of greater than 4” results in routes exceeding 12Average route is 10 hours on a snowfall of 4” or less20 centerline miles per plow route-17sac routes-de-8 plow routes and 8 culservice:of To meet minimum street plowing levels City Policy (cont.) City Council on day two following a snowfall.all other snow removal operations are complete, generally of snow and resurfaced once Cleared Ice Rinks (Priority 4): and park parking lotsschools, -to-routes-safeand trails which are not part of the Trails, Sidewalks, Park Parking Lots (Priority 3): Sidewalks day the facility is open. prioritized based on traffic volume as well as the time of City Operated Facilities (Priority 2): These facilities are campusesschool near Safe Routes to School (Priority 1): Sidewalks and trails Park Maintenance Division Priorities City Policy (cont.) City Council From the Policy–Service Minimum Level of City Council Greater than a 4” snowfall takes up to 96 hours to completeAverage sidewalk snow removal is 48 hours for 4” or lessMachineSidewalk miles of city sidewalk cleared with 1 23 15 hoursthan a 4” snowfall can result in plowing in excess of Greater trail route is 8 hours for a 4” or less snowfall Average routes and 2 shoveling crews3service:of To meet minimum park maintenance levels City Policy (cont.) City Council conditions and problem areasDispatch for current road and Sherburne County Communication with ERPD accurate weather developmentCoordination with NWS for permitsystems when conditions Utilizing pretreatment systemswet -Upgrading fleet with road loadersHLA plows for front end JOMA 6000 rubber/carbide data and GPS informationReal time salt distribution controllersCalibrated Force America salt Staff TrainingBest Management Practices City Council event parking restrictionscompliance of snow -Nonin the roadwayGarbage cans placed damage to plowing equipmentContractors piling in ROW causes Plowing Challenges City Council Inconsistencies in plow route96 hours to clear snow and ice-48miles of sidewalkCurrently 1 Sidewalk Machine for 23 districtszoned after a snowfall within residential zone districts and within 24 hours hours in commercial and industrial snow and ice during normal business that are not kept free of Sidewalks safety affecting peace and 34(a)(8) Public nuisances -SEC 46Sidewalk Snow Removal Plowing Challenges (cont.) City Council Sidewalk snow removal routesDesired policy changesService levelsDiscussion