Loading...
7.6. A. & B. SR 06-06-2005 Item 7.6 A & B 13065 Orono Parkway Elk River, MN 55330 May 27, 2005 File #: 819610]-0030 The Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River MN 55330 RE: NOR1HSTAR BUSINESS PARK FEASIBILITY STUDY Dear Council Members: Attached is the feasibility study for the Northstar Business Park to be located on the Brown property owned by the Economic Development Authority (EDA). This feasibility study was recommended by the ED A and ordered by the City Council. Prior to completing the final document, a draft was presented to the EDA and a section in the report discusses their comments. The improvements are proposed to be financed by tax increment financing and/ or tax rebate generated by development of the lots. The largest issue with this proposed improvement is how to balance the risk associated with developing a large portion of it without any users versus how to get users without having the business park developed. The EDA recommended an option outlined in the report that would prepare plans and specifications and platting for the entire area but only proceed with underground utilities in the first phase. The estimated cost of this option is approximately $250,000. I will be available to make a brief presentation to the City Council on June 6th. The Economic Development staff will also be present to discuss a potential user for the first lot in the site, and also a potential grant program through the Minnesota Department of Employment and Economic Development that could possibly help fund a portion of the infrastructure. Attached are two resolutions for the City Council's consideration. The first one receives the feasibility study and orders the public hearing to be held on July 5,2005. Even though the City is the only affected property owner, the City's tax increment financing (TIF) attorney has recommended that no steps be waived in the public improvement process if TIP Phone: 763.635.1000 Fax: 763.635.1090 www.cLelk-river.mn.us financing is to be used. The second resolution would order the preparation of plans and specifications and the platting process to begin for the Northstar Business Park. If you have any questions or comments regarding this issue, please call. Sincer"cly~ .,/"' ~,"#" ," ~ .-'; - ',,' - --'\ ~//!,' ,f4/.. '." , , '^"<, M "~l/f /; L I;;.(,.f,(~,,e,v Terry ].1vfaurer, PE City Engineer S:\EngineerImprovProj\2005 Improvement Projects\Northstar Business Park\05 2705 cc memo.doc RESOLUTION 05- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT IN THE MATTER OF THE NORTHSTAR BUSINESS PARK IMPROVEMENT OF 2005 WHEREAS the Feasibility Report ordered by the Council in Resolution 05-34 has been prepared with reference to the Northstar Business Park improvement and was received by the City on June 6, 2005; and WHEREAS the Feasibility Report recommends that the proposed improvement is feasible; NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The City Council will consider the Northstar Business Park improvements as described in the Feasibility Report and the assessment of the property abutting this proposed improvement for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Section 429, at an estimated total cost for the improvement of $1,307,600. 2. A public hearing shall be held before the City Council on the proposed improvement on the 5th day of July, 2005 at 6:30 o'clock p.m. at the Elk River City Hall Council Chambers. 3. The City Clerk shall provide two published notices (one week apart) in the official newspaper with at least three days between the last publication date and the hearing, and mailed notice ten days to the hearing as required by law. Passed and adopted this 6th day of June, 2005. Stephanie, A. Klinzing, Mayor ATTEST: Joan M. Schmidt, City Oerk S:\EngineerImprovProj\2005 Improvement Projects\Northstar Business Park\Resolution rev feas order ph.doc Stephanie A. Klinzing, Mayor RESOLUTION 05-_ A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING PREPARATION OF PLANS AND SPECIFICATIONS AND PlATTING IN THE MATTER OF THE NORTHSTAR BUSINESS PARK IMPROVEMENT OF 2005 WHEREAS a public hearing relating to the Northstar Business Park improvement will be held on July 5, 2005 before the Elk River City Council after ten days mailed notice and two weeks published notice of the hearing was given; and WHEREAS the City Council will duly considered the Feasibility Report and those matter presented at the public hearing by those person desiring to be heard on the matter; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. T eny J. Maurer is hereby designated as Project Engineer for this improvement. The Project Engineer is directed to prepare plans and specifications for the making of the improvement and the solicitation of competitive bids. 2. The Project Engineer is also directed to proceed with the platting process for Northstar Business Park. Passed and adopted this 6th day of June, 2005. ATTEST: Joan M. Schmidt, City aerk S:\EngineerlmprovProj\200S Improvement Projects\Northstar Business Park \Resolution order plns&spec&platting.doc Project No. 81961 OJ FEASIBiliTY STUDY NORTHSTAR BUSINESS PARK ELK RIVER, MINNESOTA JUNE 2005 FEASIBILITY STUDY FOR NORTHSTAR BUSINESS PARK ELK RIVER, MINNESOTA JUNE 2005 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Minnesota. Terry J. Maurer, P.E. Lic. No. 15316 Date ~~ Prepare : John M. Anderson, P.E. Lic. No. 25889 ~Q~ (pI I 10)" Date INDEX I. INTRODUCTION...................................................................................................... t. II. PROJECT SCOPE....... ........................ .......... ........ ..................... ............................ .1. III. NECESSITY AND COST-EFFECTiVENESS........... ........................... ......... .............1 IV. EXISTI NG CONDITIONS. ....... ........ ...... .............................. .............. ............ ............1. V. PROPOSED IMPROVEMENTS.... ..... .......... ...... ....... ..... ... ... ......... .... .... ........ ......... ...2 VI. PHASiNG......... .... ........ ..... ....... ... .......... ...... ....... ........... ...... ....... .... ... ......... ... ... ...... ..3.. VII. PLATTING and PERMITS........... ......................... ...................... ........ ......................:4. VIII. ESTIMATED PROJECT COST....... ............... ............................ ................ ...............4 IX. FINANCiNG.................................. ................................. ...... .......... ......................... .5.. X. ECONOMIC DEVELOPMENT AUTHORITY........... ............... ..................................5 XI. PROJECT SCHEDULE................................................... ............................6 XII. CONCLUSION..........................................................................................................6. Exhibits Exhibit 1 - Existing Site Exhibit 2 - Proposed Lot Layout Exhibit 3 - Proposed Street Section Exhibit 4 - Proposed Sanitary Sewer and Watermain Exhibit 5 - Proposed Storm Sewer Exhibit 6 - Proposed Pond Expansion I Wetland Fill Exhibit 7 - Phasing Plan .. I. INTRODUCTION On April 4, 2005 the City Council adopted Resolution 05-34 ordering the feasibility study for the development of the Northstar Business Park. The Council took this action in response to a recommendation from the Economic Development Authority (EDA). The area to be included in the project is shown on Exhibit 1. The land is officially owned by the EDA. II. PROJECT SCOPE The purpose of this study is to analyze the development of the public improvements for the Northstar Business Park development. The study will discuss the existing conditions, proposed improvements, phasing, estimated construction costs, and overhead costs which include city administration, design and construction engineering, fiscal, and legal expenses. III. NECESSITY AND COST-EFFECTIVENESS The improvements proposed in this study are necessary for a number of reasons. The construction of the development is a means of increasing the City's future property tax base, create quality job opportunities for current and future residents, and protect the long-term vitality of adjacent commercial and residential areas. The proposed improvements constitute a large enough project to attract competitive bids and therefore can be built in a cost-effective manner. Based on this information the project is necessary and cost-effective IV. EXISTING CONDITIONS Northstar Business Park is currently undeveloped. The site is approximately 80 acres. Roughly half of the area is wetland and cannot be developed as shown on Exhibit 1. A Northern Natural Gas (NNG) main that runs between the northern and southern property lines. Grades on or near the NNG main cannot be changed and permanent structures can not be built in this easement. Overhead power lines border the property on the west and north property lines. The power line along the west side of the property crosses the western edge of proposed Lot 7. Northstar Business Park is bordered by Elk River Business Park to the north, Twin Lakes Road to the east, and Burlington Northern Rail Road to the west. The property is currently not platted, the concept plan includes 9 Ids in varying size as shown on Exhibit 2. A regional storm water pond is located near the northwest corner of the site. This pond was constructed to to serve the storm sewer system in Twin Lakes Road. 1 Street V. PROPOSED IMPROVEMENTS The proposed improvements for the Northstar Business Park development include street, sanitary sewer, watermain, storm sewer construction, expansion of the regional storm water pond to serve the site, and mass grading to establish the lots. A detailed description of each proposed improvement is provided below. The street improvements consist of an urban style roadway 39.5 feet face to face in width with barrier concrete curb and gutter and a 6 foot wide sidewalk along one side. For the purposes of this report the soils conditions have been assumed to match those found in the Elk River Business Park just north of this site. This street section has been assumed to match the section built in Elk River Business Park. The proposed pavement section for all the streets will be a 10 ton design consisting of 8 inches Class 5 aggregate base, 2 inches of bituminous base course, and 2 inches of bituminous wear course. In the design phase a geotechnical investigation will be conducted to confirm the assumptions used for the preliminary pavement design. There will be full access to the site at the intersection of 175th Avenue and Twin Lakes Road. The northern access to the site will be right in/right out only. The existing median in Twin Lakes Road will not be opened due to the proximity to other full access intersections and the sight distance along Twin Lakes Road. The proposed street section is shown on Exhibit 3. Sanitary Sewer Sanitary sewer improvements will include extending gravity sewer from the existing stub at the intersection of 175th Avenue and Twin Lakes Road. The sanitary sewer will consist of 8 inch main with 6 inch service to all proposed lots. Gravity sewer will be extended at minimum grade to provide service to all proposed lots The proposed sanitary sewer improvements are shown on Exhibit 4. Watermain Watermain improvements loop through the property from the existing stub at the intersection of 175th Avenue and Twin Lakes Road; and terminate north of the property, tying into an existing stub off of Twin Lakes Road. An easement from Elk River Business Park for the northerly watermain connection will be required. The proposed watermain will be 8 inch ductile iron pipe (DIP) main, 8 inch DIP service to all proposed lots, and 6 inch DIP to all fire hydrants. Fire hydrants will be spaced along the roadway to provide adequate coverage of the fronts of the lots. A site by site review will be conducted as lots develop to determine if additional fire hydrants are needed. The proposed watermain improvements are shown on Exhibit 4. Storm Sewer The existing regional storm water pond adjacent to Lot 1 in the northern part of the property will be expanded to the east to accommodate all ponding requirements for the development when fully built out. Storm sewer improvements will extend from southern part of the property along the road right-of-way and ultimately outlet to the expanded regional pond. The storm sewer system will be designed for a 10-year rainfall event; 2 3 calculations will be in compliance with city qodes. The storm sewer system will be designed to provide lateral connections for site development of each lot to pick up storm water runoff internally. The proposed street design includes a low point near the common lot line between lots 7 and 8. The conceptual drainage design will provide for an overland overflow route between lots 7 and 8. A drainage easement will be place on this overflow route to provide for the 100 year rainfall event. The proposed storm sewer improvements are shown as Exhibit 5. General Sitework Mass site grading will bring the street to subgrade elevation and wil establish basic drainage patterns on the individual lots. As lots develop, site specific grading plans will need to be prepared to establish site drainage patterns. Due to the existing overhead power line and the grade along the north line, a retaining wall will need to be constructed along the north lot line of Lot 1. Wetlands The wetlands on the site were delineated during the development of Twin Lakes Road. The majority of the existing wetlands surrounds a drainage ditch that conveys drainage from Klievers Marsh through the site. Additionally on Lot 1 there is a wetland along the remnants of a drainage ditch that flowed from the Elk River Business Park into the main drainage ditch. The remnant drainage ditch on Lot 1 no longer conveys drainage and splits Lot 1 into two pieces. The area on Lot 1 west of the remnant ditch is not accessible from the north, west or south sides. The only feasible access to the western portion of Lot 1 is across the remnant ditch and because of this limited access it is necessary to fill this wetland in order to make reasonable use of the property. A Technical Evaluation Panel (TEP) review of this proposal will be necessary. The proposed wetland fill is shown on Exhibit 6. VI. PHASING The Northstar Business Park can be developed in multiple phases. The first phase would begin at the intersection of 175th Avenue and Twin Lakes Road. For purposes of discussion it is assumed that phase one would consist of approximately 750 feet of street and utilities, this would allow for the development of three proposed lots: 5, 6 & 7 and possibly Lot 4. A fire hydrant should be added at the phase break to allow for flushing since the watermain loop would not be complete. A temporary storm water pond could be constructed on proposed lot 8 to receive the storm water from the first phase, until future phases are completed. The temporary pond would discharge into the existing drainage ditch which flows to the expanded regional storm water pond. A temporary cul-de-sac would be installed to provide a vehicle turn around. Sanitary sewer is not affected by phasing, as it flows to the intersection of 17Sh Avenue and Twin Lakes Road. Site grading of the entire site and expansion of the regional storm water pond should be done as part of the initial phase to minimize additional costs associated with phasing and balance the site earthwork quantities. The proposed phasing plan is shown on Exhibit 7. Phasing should reduce the initial investment by the City and will defer the cost associated with future phases. VII. PLATTING and PERMITS Plattina Phase II $40,000 $64,000 $115,000 $200.000 $419,000 $42,000 $117,000 $0 $8000 $586,000 $1,307,600 The platting of the property will need to follow the City's platting process including submittal of a preliminary plat for review by both the Planning Commission and City Council. Following approval of the preliminary plat a final plat will be prepared for approval by the City and Sherburne County. Right of way and easements will be dedicated through the platting of the property. The proposed street right of way width is proposed as 70 feet to provide space for a 39.5 foot street, 14 to 20 foot boulevard and 6 foot concrete sidewalk on one side. Drainage and utility easements will be dedicated along with the final plat The initial platting would create three outlots. The first would include lots 1,2,7,8 and 9. The second outlot would include lots 3,4,5, and 6. The third would include lot 10. As specific site development needs are determined final plats of the outlots will be needed to create lot sizes suited to individual sites. Permits Several permits will be required prior to construction of the proposed improvements. Required permits include, but are not limited to, the following: · Minnesota Department of Health Watermain · Minnesota Pollution Control Agency Sanitary sewer and Grading · Minnesota Department of Natural Resources Water Appropriation (Dewatering) VIII. ESTIMATED PROJECT COST The estimated construction costs and associated overhead costs for the proposed improvements are summarized in Table 1. Based on past experiences on similar complex-type projects in the City, the overhead costs have been estimated at 28% of the total construction cost. The overhead costs include city administration, engineering design, construction staking and inspection, and fiscal and legal costs. Table 1 Project Cost Estimate Sanitary Sewer Improvements Water Improvements Storm Sewer Improvements Street Improvements, Site Grading, Pond Expansion Estimated Construction Costs Phase I $23,000 $31,000 $38,000 $404,000 $496,000 $49,600 $139,000 $8,000 $29.000 $721,600 Construction Contingencies (10%) Overhead (28%) Geotechnical Investigation Platting/Lot Staking Estimated Total Project Cost Estimated Total Project Cost (phase I & II) 4 5 IX. FINANCING It is the City's intent to assess all costs associated with the improvement against the benefiting property. Since the property is own~d by the EDA, the City will be assessing itself. It is the City's intent to use the proceeds from Tax Increment Financing (TIF) and/or Tax Rebate as lots are developed to pay the assessments. In discussions with Cathy Mehelich, Director of Economic Development and Lori Johnson, Finance Director the major financial issue is the timing of cash flow from TIF and/or Tax Rebate proceeds to retire the debt versus the desire to have marketable lots for industrial prospects. There are two options to address these canpeting issues. They are as follows: 1. Proceed with design of the plans and specifications for the entire development and the preliminary platting of the property, but do not bid or begin construction until there is at least one significant lot development proposed. If plans and specifications are complete a bid could be sought and construction could begin within 45 - 60 days. 2. A second option would be similar to the first with the exception that the City could proceed with bidding and construction of the underground utilities in the first phase but not the street component, (project cost estimated at $250,000) then when a prospect is ready to begin only the street component would need to be bid and built. If the development of a lot occurs prior to completion of the street. component temporary access to Twin Lakes Road could be allowed. Either ofthese options would help minimize the financial risk of lacking cash flow needed to retire the debt incurred with development of Northstar Business Park. X. ECONOMIC DEVELOPMENT AUTHORITY On May 9, 2005 a draft version of this report was presented to the Economic Development Authority. After lengthy discussion of the various options from full development of the entire Northstar Business Park to do nothing and wait for a significant prospect, the EDA passed a motion unanimously to recommend to the City Council that Option 2 described above be followed. That option would proceed with preparation of plans for the entire area but only bid and construct the underground utilities in the first phase. After industrial prospects are identified to generate significant proceeds to retire the debt, then finish construction in the first phase. Finally, future phases would proceed to construction as development of the lots in the first phase occurs. XI. PROJECT SCHEDULE Cathy Mehelich, Director of Economic Development, has identified the first prospect that agreed to locate in the Northstar Business Park. This prospect is anticipated to build approximately a 20,000 square foot building to be located on Lot 6. The following schedule assumes the need to have utility construction complete for a fall/winter occupancy. ~ EDA Acquires Property City Council Orders Feasibility Study City Council Receives Feasibility Study and Orders the Public Hearing City Council Authorizes Preparation of Plans/Specifications and Platting City Council Holds Public Hearing and Orders Improvement City Council Approves Plans/Specifications for First Phase Utilities and Authorizes Advertisement for Bids Planning Commission Reviews Preliminary Plat Bid Open City Council Approves Bid and Awards Contract Construction Begins City Council determines cost to be assessed and sets Assessment Hearing City Council Holds Assessment Hearing/Adopts Assessment Roll Construction Complete 1999 April 4, 2005 June 6, 2005 June 6, 2005 July 5, 2005 July 18, 2005 July 26,2005 August 10, 2005 August 15, 2005 August 2005 September 6,2005 October 3, 2005 October 2005 XII. CONCLUSION The total estimated project cost for the recommended development of the entire Northstar Business Park including overhead costs is $1,307,600. The project is beneficial to the community. As previously stated, this cost will be financed through assessment of the cost to the benefiting property owned by the city and paid through the use of TIF and/or Tax Rebate proceeds from lot development. To minimize the financial risk, it is recommended only a partial construction (underground utilities) of the first phase proceed at this time. The estimate cost of this approach is $250,000. Based on the information gathered and the analysis presented, the proposed improvements discussed in this study are feasible from an engineering standpoint. 6 \ 1\ I \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ '" \ .', \. ~~\, \. )..' " '~\~. -",,') \\~" \ \\~ \ '\::<:~ \ '\G>", \ ., Q \ ;'/1- \ '\\10 \ '>>,~", \ '.> ~-' \ ,;::~-, \ ,>~ \>::~ \ ","'\ \ ,. \ \-',. " \::~, \ 'l.,'\,. \ >:' " '~:~ \.. \ ; \. "<, \ ,,>"" \ >\ " \. "'>" \ " \. ,>.~, " .':->.... \. \'1<. \. ~\ \. ~," \ ,_'\. i.__,,- \. -~, \. --.:, \ '>'. \. >I...... \. ...." \. '('- " '.<,\. \ " \. '>:\. \ " OVERHEJ!lIj POWER LINES \ \ \ \ \ \ \ \ \ \ \ @\ o '00' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ r-' \ \ \ \ \ \ \ \ \ \ \ \ \ \_--------- , , , , , , , , , , , , , , , , , , , , , \ \ \ , \ , l-K1S0' 81961 lJ\81961 lJ-EXHIBITS.DWG (TELGAAR) NORTHSTAR BUSINESS PARK EXISTING SITE E~ ~ver EXHIBIT I-bNad R Geen ~ 1 May 31, 2005 8:39:59 a.m. OVERHEAD POWER LINES 1 t8.80 ACRES \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ..-' \ \ \ \ \ \ \ \ \ \ \ \ \ \_-------- 6 t 1.74 ACRES 7 tl1.99 ACRES ...., \ \ \ \ \ \ \ \ \ \ \ @ \\ o 'so' \ \ \ \ \ \ \ ! 1".180' e19611J\e19611J-EXHIBITS.DWG (TELGAAR) NORTHSTAR BUSINESS PARK PROPOSED LOT LAYOUT I-bJIad R Geen Ccrnpa1y Mey 31, 2005 8:39:59 a.m. EXHIBIT 2 '. R/W 15.25' 70' 39.50' FACE TO FACE 19.75' 19.75' 2.00% _ 6' CONCRETE SIDEWALK 8196' 1 J\819611 J-EXHIBITS.OWG (TELGAAR) I-brtad R lleen Carpa1y Moy 31, 2005 8;39;59 o.m. 2" WEARING COURSE MIXTURE (MVWE45035C) BITUMINOUS TACK COAT 2" NON-WEARING COURSE MIXTURE (LVNW35030C) 8" CLASS 5 AGGREGATE BASE COMPACTED SUBGRADE TYPICAL STREET SECTION. NORTHSTAR BUSINESS PARK PROPOSED STREET SECTION E~ River R W 15.25' 1/4" 1FT. EXHIBIT 3 Eo! River 4 s 10 @ o 120' J I l--t20' I-tMa'd R ~ CoolB1Y NORTHSTAR BUSINESS PARK PROPOSED SANITARY SEWER & WATER EXHIBIT Mey 3'. 2005 8:39:59 a.m. OVERHEPiD POWER LINES EXPANSION OF REGIONAL POND @ D fZO' , '-.120' 819611J\819611J-EXHIBITS.DWG (TELGMR) ,'\. NORTHSTAR BUSINESS PARK PROPOSED STORM SEWER EXHIBIT 5 Ii::Nvsd R ~ Cc:lr'rprT)' May 31. 2005 8:39:59 a.m. HE~ POWER LINES -- PROPOSED WETLAND FILL = 4796.26 SQ. FEET / / / / / / / / / / E~ River I-bMJd R Geen Ccrrpi.ny NORTHSTAR BUSINESS PARK PROPOSED POND EXPANSION & WETLAND FILL Mey 31, 2005 8:39:59 c.m. \ \ \ \ \ \ \ \ \ \ \ \ \ \ I EXHIBIT 6 .. HEPld POWER LINES 1 - - - - -- 6 7 " " " " " " " " " " " " " " " " " " " " " " ". " PHASE I @ Q 140' . I '-.140' 819611 J\81961 1 J-EXHIBITS.OWG (TELGAAR) E~ River 7 EXHIBIT NORTHSTAR BUSINESS PARK PHASING PLAN I-bM:rd R. Geen Carpa'ly May 31, 2005 8;39:59 c.m. ..