Loading...
8.4.A. & B. SR 06-06-2005 Item#8.4.A & B. MEMORANDUM TO: Mayor and City Council FROM: Phil Hals, Street Superintendent DATE: June 6, 2005 SUBJECT: Public Works Site Improvements The CUP for the salt/ sand building and cold storage building was reviewed by the Planning Commission on May 24, 2005 with a recommendjltion for approval being forwarded for the June 20, 2005 City Council meeting. Staff has designed the building foot prints and the building manufacturer will provide the engineered plans for the building structure. The City will have to hire a structural engineer to provide signed detail drawings for the foundations. Two local cast-in-place concrete contractors recommended Ulteig Engineering of Fridley. Staff received a quote from Ulteig not to exceed $2,500.00 for the necessary documents. They also assured me that they can meet our time line. A comparison bid from another engineering firm came in at $5,000.00. On another related topic, we have started to delivery grass clippings and brush chips to Plaisted Company's site on County Rd. #33 and Proctor Road. We hope to have our facility emptied before July fIrst to coordinate the area site grading. 6-06-05 June 2005 6-20-05 6-30-05 7 -05-05 July 2005 " " August 2005 " " " " " " Sept. 2005 PUBLIC WORKS SITE IMPROVEMENTS SCHEDULE City Council approval for securing bids and quotes Start contracted site grading which includes clearing, grubbing and pond excavation City Council consider CUP for buiilding construction Staff receives building bids and quotes City Council award building bids and other quotes Contractor demo existing buildings Contractor removes and relocates, fencing City and/or contractor complete Site grading including Oak Knoll fIeld 3 Contractor install concrete curb and gutter City and/or contractor install concrete slabs Contractor constructs building f01lmdations Contractor constructs buildings MEMO TO: Mayor and City Council FROM: Phil Hals SUBJECT: Public Works Site Improvements DATE: May 27, 2005 PAGE #2 PUBLIC WORKS SITE IMPROVEMENT SCHEDULE CONTINUED " " Contractor install Class 5 base Contractor installs bituminous paving City plant trees for screening Sept. 2005 Oct. 2005 Recommendation: Staff would like Council approval to proceed as fqllows: ~ Approval to hire Ulteig Engineering to pr~wide foundation drawings for a fee not to exceed $2,500.00. ~ Approval to advertise for bids for Class 5 base, and bituminous paving. ~ Approval to secure quotes for concrete curb and gutter, concrete slabs, fence removal and installation, building demolition and storm sewer installation.