Loading...
5.5 LIBSR 05-28-2019J NOTE: At such time the board votes for a new item or for an improvement, the Board takes it to Robbie Schake, Robbie takes it to Michael Library Zones Report 5.5 �! Hecker and Michael Hecker forwards to the Elk River Public Library ary Board appropriate city staff for remediation or recommendation. The Library Board serves arr an advisory capacity to City of Elk River for issues related to the Elk River Public T sbrary gmundr, the physical building and interior fractures. The city is responsible for scheduling and coordinating all work to be completed, Updated for Mav Mee6ne Zone Assigned Specifics To Zone 1 Mary K. Entrance; butterfly garden; windmill, prairie grass; rain garden in • Butterfly Garden weeded. parking lot, planter boxes for Master Gardeners summer gardening program *contact Karen Wingard for'voiuntecia/iviaster (3arcieners Front door, front garden, concrete pathways, patio, flag ■ Pavers in front of building need Zone 2 Carole turnaround to be replaced. Rain garden, book drop turnaround, employee parking lot; being ■ Clean out the flower beds by the Zone 3 Mary E. a good neighbor drive thru backdrop and the front of the building and add new mulch Being a good neighbor, grass & rock areas ■ Put in fill over the roof drainage Zone 4 Mick trench in the back of the building ■ Put new mulch around the trees in the back of the building Rain garden, interior and exterior building maintenance, interior ■ Re -seal windows on back of Zone 5 Rita furniture and shelving building. CIP ITEMS IN PROCESS 1. LED Lighting in parking lot —Cal Portner informed Board in March- Lights have arrived, they will be installed in shifts according to electrician availability PRIORITY CIP ITEMS 1. Chair Keifenheim and Robbie selected the new upholstery, and it has been ordered. We had hoped to have it installed prior to summer reading program, but that will be dependent on how quickly the fabric comes in and how quickly Colbath Upholstery can get it installed. 2. New armless computer chairs in the Computer Area ($2280-2500 Schake has included in 2019 budget -will examine after Caterpillar) 3. Reupholster cushions in the window seat in Teen area (these will be cleaned per recommendation of Upholstery company) CIP ITEMS IDENTIFIED BUT NOT RANKED FOR PRIORITY 1. More comfortable chairs or comfortable flooring in the Children's area cave Cork floors replaced in the Teen area 3. New rug in Fiction lounge 4. New shelving units (or check for warranty) in Teen area 5. New DVD shelving units or hardware to anchor shelves together (tip over easily) 4. Diamond plated sheets (or something like that) installed on numerous walls in the Staff Area to protect the walls from cart damage (4/4/18: Reported to Gary Lore, Building Maintenance Super i", case he wants to fix to prevent drywall damage. Not a high priority to the Board because it is out of public view.) N:\Departments\Parks and Recreation\Library\Library Board\Agenda's, Minutes, Packets\Agenda Packet Docs\2019\01-22-2019