4.6. SR 06-17-2019Request for Action
To
Item Number
Mayor and City Council
4.6
Agenda Section
Meeting Date
Prepared by
ConsentJune
17, 2019
Justin Femrite P.E., Public Works Director
Item Description
Reviewed by
Pay Estimates
Lori Ziemer, Finance Director
Reviewed by
Cal Portner, City Administrator
Action Requested
Approve, by motion, the pay estimates detailed below.
Background/Discussion
The following pay estimates have been reviewed and found to be accurate and in accordance with the
approved contracts.
Financial Impact
PROJECT
2019 Street Improvements
Attachments
■ Pay Estimates
The Elk River Vision
PAY EST. # CONTRACTOR
ASTECH Crop. Inc.
AMOUNT
$859,065.41
A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By
service, and community engagement that encourages and inspires prosperity INAMIRE1
CONTRACTOR'S PAY REQUEST NO 1
DISTRIBUTION:
2019 STREET IMPROVEMENTS
CONTRACTOR (1)
OWNER (1)
CITY OF ELK RIVER, MN
ENGINEER (1)
BMI PROJECT NO. R12.117280
BONDING CO. (1)
TOTALAMOUNT BID PLUS APPROVED CHANGE ORDERS
$2,221,995.76
TOTAL, COMPLETED WORK TO DATE
$904,279.38
TOTAL, STORED MATERIALS TO DATE
$0.00
DEDUCTION FOR STORED MATERIALS USED IN WORK COMPLETED
$0.00
TOTAL, COMPLETED WORK & STORED MATERIALS
$904,279.38
RETAINED PERCENTAGE ( 5%)
$45,213.97
TOTAL AMOUNT OF OTHER PAYMENTS OR (DEDUCTIONS)
$0.00
NET AMOUNT DUE TO CONTRACTOR TO DATE
$859,065.41
TOTAL AMOUNT PAID ON PREVIOUS ESTIMATES
$0,00
PAY CONTRACTOR AS ESTIMATE NO. 1
$859,065.41
Certificate for Partial Payment
I hereby certify that, to the best of my knowledge and belief, all items quantities and prices
of work and material shown on this Estimate are correct and that all work has been
performed in full accordance with the terms and conditions of the Contract for this project
between the Owner and the undersigned Contractor, and as amended by any
authorized changes, and that the foregoing is a true and correct statement of the
contract amount for the period covered by this Estimate.
Contractor: ASTECH Corp. Inc.
P.D. Box 1025
St. Cloud, MN 56302
By
Name
Title
Date - 3 _ D -0I r,
CHECKED AND APPROVED AS TO QUANTITIES AND AMOUNT:
ENGINEER: BOLTON & MENK, INC., 7533 SUNWOOD DRIVE NW #206, RAMSEY, MN 55330.
1""
By V PROJECT MANAGER
Date 6/3/2019
APPROVED FOR PAYMENT:
OWNER: CITY OF ELK RIVER
By
Name Title Date
And
Name Title Date
Partial Pay Estimate No.:
2019 STREET IMPROVEMENTS
CITY OF ELK RIVER, MN
BMI PROJECT NO. R12.117280
WORK COMPLETED THROUGH May 31, 2019
ITEM
NO.
ITEM
UNIT
PRICE
AS BID
PREVIOUS ESTIMATE
COMPLETED TO DATE
ESTIMATED
QUANTITY
ESTIMATED ESTIMATED
AMOUNT QUANTITY
ESTIMATED ESTIMATED
AMOUNT QUANTITY
ESTIMATED
AMOUNT
1
MOBILIZATION
$60,500.00
1
LS
$60,500.00
LS
$0.00
0.50
LS
$30,250.00
2
TRAFFIC CONTROL
$3,850.00
1
LS
$3,850.00
LS
$0.00
1.00
LS
$3,850.00
3
REMOVE CONCRETE CURB & GUTTER
$5.12
1960
LF
$10,035.20
LF
$0.00
723.00
LF
$3,701.76
4
REMOVE & REPLACE BITUMINOUS CURB (PATCH)
$8.88
1430
LF
$12,698.40
LF
$0.00
125.00
LF
$1,110.00
5
REMOVE BITUMINOUS CURB
$3.00
640
LF
$1,920.00
LF
$0.00
67.00
LF
$201.00
6
BITUMINOUS RECLAMATION (5" DEPTH)
$2.35
7403
SY
$17,397.05
SY
$0.00
12,844.00
SY
$30,183.40
7
BITUMINOUS RECLAMATION (9.5" DEPTH)
$2.60
14535
SY
$37,791.00
SY
$0.00
0.00
SY
$0.00
8
BITUMINOUS RECLAMATION (14" DEPTH)
$3.25
3948
SY
$12,831.00
SY
$0.00
0.00
SY
$0.00
9
MILL BITUMINOUS SURFACE (1.25")
$1.10
2626
SY
$2,888.60
SY
$0.00
1,933.00
SY
$2,126.30
10
MILL BITUMINOUS SURFACE (TAPER 1.25" - 0")
$0.39
119134
LF
$46,462.26
LF
$0.00
68,338.00
LF
$26,651.82
11
PLACE SALVAGED RECLAIM AGGREGATE (CV)
$8.95
2915
CY
$26,089.25
CY
$0.00
500.00
CY
$4,475.00
12
COMMON EXCAVATION (EV)
$13.55
3498
CY
$47,397.90
CY
$0.00
706.00
CY
$9,566.30
13
SUBGRADE EXCAVATION (EV)
$14.70
4541
CY
$66,752.70
CY
$0.00
283.00
CY
$4,160.10
14
SELECT GRANULAR BORROW (CV)
$16.50
2259
CY
$37,273.50
CY
$0.00
24.00
CY
$396.00
15
AGGREGATE BASE CLASS 5
$29.61
954
CY
$28,247.94
CY
$0.00
251.00
CY
$7,432.11
16
AGGREGATE SURFACING CLASS 2
$34.40
592
CY
$20,364.80
CY
$0.00
87.00
CY
$2,992.80
17
BITUMINOUS ROADWAY PATCH
$21.50
3030
SY
$65,145.00
SY
$0.00
493.00
SY
$10,599.50
18
BITUMINOUS DRIVEWAY/TRAIL PATCH
$23.00
266
SY
$6,118.00
SY
$0.00
87.20
SY
$2,005.60
19
7" CONCRETE DRIVEWAY/PED RAMP (PATCH)
$7.70
3168
SF
$24,393.60
SF
$0.00
918.00
SF
$7,068.60
20
4" CONCRETE SIDEWALK (PATCH)
$6.65
2796
SF
$18,593.40
SF
$0.00
912.00
SF
$6,064.80
21
TRUNCATED DOMES
$55.00
376
SF
$20,680.00
SF
$0.00
140.00
SF
$7,700.00
22
BITUMINOUS SURFACE REPAIR MIXTURE
$260.00
300
TON
$78,000.00
TON
$0.00
28.00
TON
$7,280.00
23
TYPE 9.5 WEARING COURSE MIXTURE (SPWEA240C)
$62.25
18971
TON
$1,180,944.75
TON
$0.00
9,286.00
TON
$578,053.50
24
TYPE 12.5 NON WEARING COURSE MIXTURE (SPNWB230C)
$61.00
3065
TON
$186,965.00
TON
$0.00
1,515.59
TON
$92,450.99
25
CONCRETE CURB & GUTTER (DES. B618)
$27.70
1255
LF
$34,763.50
LF
$0.00
441.00
LF
$12,215.70
26
CONCRETE CURB & GUTTER (DES. B412)
$14.85
1642
LF
$24,383.70
LF
$0.00
0.00
LF
$0.00
27
CONCRETE CURB & GUTTER (DES. SURMOUNTABLE)
$27.68
705
LF
$19,514.40
LF
$0.00
240.00
LF
$6,643.20
28
ADJUST FRAME & RING CASTING (MANHOLE)
$200.00
150
EA
$30,000.00
EA
$0.00
84.00
EA
$16,800.00
29
ADJUST FRAME & RING CASTING (CATCH BASIN)
$454.00
45
EA
$20,430.00
EA
$0.00
9.00
EA
$4,086.00
30
ADJUST GATE VALVE BOX
$250.80
61
EA
$15,298.80
EA
$0.00
33.00
EA
$8,276.40
31
RECONSTRUCT VALVE BOX
$385.00
10
EA
$3,850.00
EA
$0.00
2.00
EA
$770.00
32
CONSTRUCT DRAINAGE STRUCTURE (2x3)
$1,045.00
4
LF
$4,180.00
LF
$0.00
4.00
LF
$4,180.00
33
12" RC PIPE SEWER DESIGN 3006 CLASS V
$99.00
27
LF
$2,673.00
LF
$0.00
27.00
LF
$2,673.00
34
CASTING ASSEMBLY (CATCH BASIN)
$751.00
9
EA
$6,759.00
EA
$0.00
1.00
EA
$751.00
35
CONNECT TO EXISTING STORM SEWER
$3,008.50
1
EA
$3,008.50
EA
$0.00
1.00
EA
$3,008.50
36
SILT FENCE TYPE MACHINE SLICED
$2.20
500
LF
$1,100.00
LF
$0.00
0.00
LF
$0.00
37
STORM DRAIN INLET PROTECTION
$143.00
10
EA
$1,430.00
EA
$0.00
12.00
EA
$1,716.00
38
STABILIZED CONSTRUCTION EXIT
$1,980.00
6
EA
$11,880.00
EA
$0.001
0.00
EA
$0.00
39
TURF REINFORCEMENT MAT
$19.80
100
SY
$1,980.00
SY
$0.001
0.00
SY
$0.00
Partial Pay Estimate No.:
2019 STREET IMPROVEMENTS
CITY OF ELK RIVER, MN
BMI PROJECT NO. R12.117280
WORK COMPLETED THROUGH May 31, 2019
ITEM
NO.
ITEM
UNIT
PRICE
AS BID
ESTIMATED
QUANTITY
ESTIMATED
AMOUNT
PREVIOUS ESTIMATE
ESTIMATED ESTIMATED
QUANTITY AMOUNT
COMPLETED TO DATE
ESTIMATED ESTIMATED
QUANTITY AMOUNT
40
SEEDING
$550.00
1
ACRE
$550.00
ACRE
$0.00
0.00 ACRE
$0.00
41
SEED MIX 25-121
$4.29
240
POUND
$1,029.60
POUND
$0.00
0.00 POUND
$0.00
42
HYDRAULIC MATRIX-TYPE BONDED FIBER
$1.32
3500
POUND
$4,620.00
POUND
$0.00
0.00 POUND
$0.00
43
FERTILIZER TYPE
$0.55
350
POUND
$192.50
POUND
$0.00
0.00 POUND
$0.00
44
COMMON TOPSOIL BORROW (LV)
$40.00
270
CY
$10,800.00
CY
$0.00
121.00 CY
$4,840.00
45
4" SOLID LINE - EPDXY
$0.35
5265
LF
$1,842.75
LF
$0.00
0.00 LF
$0.00
46
4" DOUBLE SOLID LINE - EPDXY
$0.70
5925
LF
$4,147.50
LF
$0.00
0.00 LF
$0.00
47
4" BROKEN LINE - EPDXY
$0.35
500
LF
$175.00
LF
$0.00
0.00 LF
$0.00
48
24" SOLID LINE -EPDXY
$9.24
114
LF
$1,053.36
LF
$0.00
0.00 LF
$0.00
49
PAVEMENT MESSAGE - EPDXY
$125.00
4
EA
$500.00
EA
$0.00
0.00 EA
$0.00
50
CROSSWALK BLOCK - EPDXY
$3.30
756
SF
$2,494.80
SF
$0.00
0.00 SF
$0.00
TOTAL AMOUNT:
$2,221,995.76