Loading...
5.5 LIBSR 07-23-2019 NOTE: At such time the board votes for a new item or for an improvement, the Board takes 5.1.b Library Zones Report it to Robbie Schake, Robbie takes it to Michael Hecker and Michael Hecker forwards to the Elk River Public Library Board 5.5 appropriate city staff for remediation or recommendation. The Library Board serves in an advisory capacity to City of Elk River for issues related to the Elk River Public Library grounds, the physical building and interior fixtures. The city is responsible for scheduling and coordinating all work to be completed. Updated for July Meeting Zone Assigned Specifics Zone Issues To Zone 1 Mary K. Entrance; butterfly garden; windmill, prairie grass; rain garden in parking lot, planter boxes for Master Gardeners summer gardening program *contact Karen Wingard for Volunteers/Master Gardeners Zone 2 Carole Front door, front garden, concrete pathways, patio, flag  Pavers in front of building need turnaround to be replaced. Ms. Schake reported to the city via. Facility dude. Zone 3 Mary E. Rain garden, book drop turnaround, employee parking lot; being  a good neighbor Zone 4 Mick Being a good neighbor, grass & rock areas  Put in fill over the roof drainage trench in the back of the building. The fill washes away every time it rains so Commissioner Stoffers suggested finding a permanent solution. Zone 5 Rita Rain garden, interior and exterior building maintenance, interior  Re-seal windows on back of furniture and shelving building by teen area. Rain garden ditch burning or weeding. Wi-fi in community room, exit doors leaking and cracking in floor, possibly add another CD rack section CIP ITEMS IN PROCESS 1. LED Lighting in parking lot –Cal Portner informed Board in March- Lights have arrived, they will be installed in shifts according to electrician availability PRIORITY CIP ITEMS 1. Chair Keifenheim and Robbie selected the new upholstery, and it has been ordered. Probably pushed off until th August for installation due to summer reading program starting June 10. 2. New armless computer chairs in the Computer Area ($2280-2500 Schake has included in 2019 budget-will examine after Caterpillar) 3. Reupholster cushions in the window seat in Teen area (these will be cleaned per recommendation of Upholstery company) CIP ITEMS IDENTIFIED BUT NOT RANKED FOR PRIORITY 1. More comfortable chairs or comfortable flooring in the Children’s area cave-possibly move existing chairs into cave 2. Cork floors replaced in the Teen area 3. New rug in Fiction lounge-clean and/or replace 4. New shelving units (or check for warranty) in Teen area 5. Diamond plated sheets (or something like that) installed on numerous walls in the Staff Area to protect the walls from cart damage (4/4/18: Reported to Gary Lore, Building Maintenance Super in case he wants to fix to prevent drywall damage. Not a high priority to the Board because it is out of public view.) N:\\Departments\\Parks and Recreation\\Library\\Library Board\\Agenda's, Minutes, Packets\\Agenda Packet Docs\\2019\\01-22-2019 5.1.b Library Zones Report Elk River Public Library Board 5.5 N:\\Departments\\Parks and Recreation\\Library\\Library Board\\Agenda's, Minutes, Packets\\Agenda Packet Docs\\2019\\01-22-2019