6.1c ERMUSR 08-13-2019Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mark Fuchs — Electric Superintendent MEETING DATE: August 13, 2019 SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Had 15 new house services. AGENDA ITEM NUMBER: 6.1c • Continue collecting data with the GPS for our ArcView maps as time permits. • Finished rebuilding the three phase overhead line on Jarvis Street from 165th Avenue to just north of the railroad tracks. We will continue south to Highway 10 this winter. • Continue installing the infrastructure required for the acquisition of Area 7, and are starting to install the infrastructure for Area 8. We will be acquiring Areas 7 and 8 in September. • Finished moving the underground and overhead infrastructure for the construction of roundabouts at County Road 13 and 33, and at County Road 13 and 40. • Finished the Nantucket Shores Addition in Otsego, which consists of 13 lots. With this project we also replaced the overhead single phase tap line on Nantucket Avenue with underground. • Continue installing the underground infrastructure for the Lawatsch Farms Addition. Along with this, we will be rebuilding Pascal Street, Troy Street, and 189th Avenue. • We had a primary fault on 196th Avenue in Area 3 that we acquired from Connexus. As a result of the fault, there was an immediate need to replace some primary wire and transformers. This area will need to be rebuilt in future. • We spliced in a single phase transformer for an 8 unit apartment on 191 %2 Avenue. We will finish hooking up the secondary service after the electrician installs the wires. • Aggregate Industries removed one of their three phase transformers and replaced it with a skid mounted transformer. • We are working on rerouting the primary wire for the new multipurpose facility. We will be able to do some of the work now and the rest when construction begins. • Disconnected power to the Lions Park building to allow for demolition. We will begin installation of the new three phase service once they have the final grade. • We had a primary fault for the Oak Knoll Park service. As Connexus was unable to locate the fault with their equipment, we found in necessary to install new wire. Page 1 of 2 114 • A single phase junction box was struck while the City was mowing the road ditches. The junction box will need to be replaced. • Helped fix the security lights at the Sherburne County Fairgrounds. ERMU donated their labor for this project, and billed Sherburne County for cost of materials. Page 2 of 2 115