Loading...
6.12. SR 06-20-2005 Item # 6.12. 13065 Orono Parkway Elk River, MN 55330 June 15, 2005 The Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: CITY COUNCIL DIRECTION ON VARIOUS TRANSPORTATION ISSUES Dear Council Members: This correspondence is intended to provide a summary of direction staff received from the City Council regarding various transportation issues at last Monday's workshop meeting. The following list provides the projects listed in my June 3, 2005 letter to the City Council by title with a brief description of the direction staff was given. 1. School Street Extension Westerly to Upland Avenue (County Road 44) Staff will begin to open a dialog with Elk River Concrete Company and the Burlington Northern Railroad Company regarding a possible alignment of School Street westerly to County Road 44. Prior to initiating these meetings, we will research the ownership of land in and around the area of the Elk River Municipal Utilities water treatment plant. This will be a relatively long term project. We will report back to the Council periodically on the progress. 2. County Road 44 Status Now that Sherburne County has decided to reclaim the existing bituminous pavement and provide a new bituminous surface on the old street section, staff will begin analyzing the ability to get a pedestrian facility in the County right-of-way. We will identify areas that will require additional easements or other extraordinary measures to facilitate the constructIon. 3. Elk Hills Drive Extension to CSAH 13 No action taken at this time. Phone: 763.635.1000 Fax: 763.635.1090 www.cLelk-river.mn.us Transportation Issues Jrme 15, 2005 Page 2 4. 193rd Avenue Extension Easterly to CSAH 13 Staff has provided a mailing to a wide area of property owners between the Hillside Estates development and CSAH 13. Attached is a copy of the letter and mailing list, along with a map showing the area included. Also attached is a resolution which would initiate the first phase of the easterly extension of 193rd Avenue, which would be the corridor study portion. 5. County Road 40 (Cleveland Avenue) Turnback Agreement Status Attached is a draft letter for the City Council's review and comment to Rhonda Lewis, County Engineer, copied to Brian Bensen, County Administrator, informing them of the City's Council's rejection of their offer on the Turnback Agreement for County Road 40 and expressing our understanding that they will now rebuild the road themselves in a rural nature. There was no action taken at Monday evening's meeting on the approval of the Right-of-Way Plat for County Road 40. 6. County Road 33 and 77 Turnback Agreement There was no action taken on this issue. 7. Master Agreement with Sherburne County to Tumback All County Roads Only an update of the status of this issue was presented. 8. TH 169 Corridor Study Only an update of this item was presented. 9. Highland Road Corridor Staff was directed to hold a public informational hearing with all properties in this area to discuss the Highland Road issues and potential City sewer and water issues. Staff will organize this hearing in the fall of this year and report back to the Council. 10. School Street/High School Driveway Signalization Staff was directed to contact the School District relative to their interest in construction of a signalized intersection and participating in the cost. Staff will make this contact and report back to the City Council. 11. Westbound 193rd Avenue at TH 169 Staff was directed to implement the change to provide for two thru-Ianes on westbound 19yd Avenue at 1H 169. S:\Engineer\2005 CCrnernos\06 15 05 Transp issues update.doc Transportation Issues Jrme 15, 2005 Page 3 12. Waco Street No action was taken at this time. 13. Dodge Avenue Attached is a resolution that would order the preliminaty feasibility report, giving two options to study. One would be a reclaiming and overlayment of the existing road section. The second option would be to reconstruct the road section similar to the northern part of Dodge Avenue. 14. Southbound Jackson Avenue at School Street Staff was directed to begin geometric layouts and come up with a conceptual plan for modifying the signal at School Street and J ackson Avenue, along with the striping to eliminate the two thru-Ianes from southbound J ackson Avenue and School Street. Staff was further directed to report back through the HRA so that they could comment relative to their plans for the area north of 1H 10 in the downtown area. 15. Pedestrian Countdown Timers No action taken at this time. Staff is looking for concurrence that we fully understand all the direction provided at the workshop relative to these various transportation issues. If you have any questions regarding any of these transportation issues, please call. Sincerely, ~~ Terry J. Maurer, PE City Engineer S:\Engineer\2005 CCmernos\06 15 05 Transp issues update.doc 13065 Orono Parkway Elk River, MN 55330 June 14, 2005 Dear Property Owner: At the June 13, 2005 City Council workshop, the Council discussed transportation priorities within the City of Elk River. One of the items discussed was the extension of 193r Avenue easterly from the Hillside Estates development to CSAH 13 to create a direct link from CSAH 13 to 1H 169 at a signalized intersection. Consensus at the workshop was this corridor was of a very high priority. The City Council asked staff to notify people in the area of this corridor that the Council will be discussing this issue further at the June 20, 2005 City Council meeting and will consider initiating a corridor study to determine the best route for extending 193rd Avenue to CSAH 13. If you have any questions regarding this issue, please call me at 763/635-1051, or plan to attend the City Council meeting on Monday, June 20, 2005 beginning at 6:30 p.m. Sincerely, ~.........~' A Q11t: Itwt/,,~ T:~ J. Kf:urer, PE City Engineer Phone: 763.635.1000 Fax: 763.635.1090 s: \EngineerImprovProj\200S Improvement Projects \193rd Avenue Corridor\06 14 05 Itr prop owners.doc www.cLelk-river.mn.us 193rd Avenue Corridor 75-125-4209 75-126-1300 Bruce & Cyndi Buranen Mary Jane Seelen 19101 Tyler St NW 19459 Tyler St NW Elk River, MN 55330 Elk River, MN 55330 75-126-1402 75-126-1405 75-126-2100 Richard & Michelle Eider Dennis & Jody Galvin Scott & Carrie Smieja 19357 Tyler St NW 19253 Tyler St NW 2520 Eastwood Lane Elk River, MN 55330 Elk River, MN 55330 Monticello, MN 55362 75-126-2101 75-126-2102 75-126-2400 Jay & B. Zimmerman Maas Scott & Carrie Smieja Laurie Forse 19384 Ulysses St NW 2520 Eastwood Lane 19401 Ulysses St NW Elk River, MN 55330 Monticello, MN 55362 Elk River, MN 55330 75-126-3105 75-126-4201 75-126-4202 David & Barbara Burandt Dennis & Jody Galvin Ronald & Janet Cardinal 19118 Tyler St NW 19253 Tyler St NW 19127 Tyler St NW Elk River, MN 55330 Elk River, MN 55330 Elk River, MN 55330 75-126-4203 75-126-4204 75-126-4206 Howard & Deborah Gulstad Barry & Karen Quam Brooks Darien & Barbara Gaddes 19030 Twin Lakes Rd 19215 Tyler St NW 19134 Twin Lakes Rd Elk River, MN 55330 Elk River, MN 55330 Elk River, MN 55330 75-126-4207 75-126-4210 75-126-4211 W. & K. Stubbe-Hovald Hovald Randy & Marcia Moen Brian R. Dehn 19221 Tyler St NW 19227 Tyler St NW 19128 Twin Lakes Rd Elk River, MN 55330 Elk River, MN 55330 Elk River, MN 55330 o . N ... (1) ... o - Co >< W CJ ... <C 0:: tJ) w LO 0 0 N ..q- ..- C () ::l """') () ~ ....1 Q) "0 > en 0: Q) .:..:: ::l W I- Q) ;:; .- l- e. eo :E RESOLUTION 05- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION INITIATING THE CORRIDOR STUDY ON 193RD AVENUE FROM TH 169 TO CSAH 13 WHEREAS, the City of Elk River has approved a Comprehensive Transportation Plan dated August 16, 2004; and, WHEREAS, one of the recommended actions in the Transportation Plans is to identify and construct east-west corridors. NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Elk River, Minnesota; 1. The City Engineer is directed to initiate a Corridor Study between the east side of the Hillside Estates area and CSAH 13, identifying viable corridor options for extending 193rd Avenue to meet CSAH 13. 2. The City Engineer is directed to hold an informational meeting with the affected area property owners. 3. The City Engineer shall report back to the City Council with one or more corridor options for extending 193rd Avenue to CSAH 13. Passed and adopted this 20th day of June, 2005. Stephanie A. Klinzing, Mayor ATTEST: Joan M. Schmidt, City Oerk S: \EngineerImprovProj\200S Improvement Projects \193rd Avenue Corridor\Resolution Ordering Study.doc 13065 Orono Parkway Elk River, MN 55330 June 15,2005 [Q)[Prl~[Ff Ms. Rhonda F. Lewis, P .E. Sherburne County Engineer 425 J ackson Avenue Elk River, MN 55330 RE: COUNTY ROAD 40 TURNBACK AGREEMENT Dear Ms. Lewis: On June 13, 2005 I presented the County Board's most recent offer relative to the turnback of County Road 40 to our City Council at a workshop session. After some discussion and a review of the history of this issue, our City Council has decided to reject the County's offer for the turnback of County Road 40. It is our understanding that with this rejection of the tumback agreement, the County will proceed to reconstruct County Road 40 on the designated alignment presented in County Road 40 Right-of-Way Map to a 44-foot wide rural section. With the Federal funding that has been designated for this project in fiscal year in 2006, we understand that construction on this roadway will begin sometime in 2006 with final completion in 2007. If our understanding of how this project will proceed is incorrect or if any information is needed from the City of Elk River to initiate this project at the County level, please advise us. Sincerely, Terry J. Maurer, PE City Engineer cc: Brian Bensen, County Administrator Patrick Klaers, City Administrator Phone: 763.635.1000 Fax: 763.635.1090 S:\EngineerImprovProj\2005 Improvement Projects\COilllty Road 40 Tumback\06 15 051tr Sherb Co.doc www.cLelk-river.mn.us RESOLUTION 05 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION FOR THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE DODGE AVENUE IMPROVEMENT FROM 5TII STREET TO APPROXIMATELY 1,000 FEET NORTH OF 2005 WHEREAS the City has determined that it should consider improving certain property by reclaiming and overlayment or reconstructing of the existing street (the Improvement); and WHEREAS Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to Terry J. Maurer, P.E., who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 20th day of June, 20005. Stephanie A. Klinzing, Mayor ATTEST: Joan M. Schmidt, City Clerk S:\EngineerImprovProj\200S Improvement Projects \Dodge Avenue \Resolu order prelim feas.doc