Loading...
3.1 ICESR 05-31-2018Regular Meeting Of the Arena Commission I. CALL MEETING TO ORDER 2. PLEDGE OF ALLEGIENCE 3. GENERAL BUSINESS AGENDA 3.1 Revue Ballard 1 Kings Operations Study Tuesday, May 31, 2018 5:30 p.m. City Hall Uppertown Conference Room Meeting Protocol " No sidebar discussions No interruptions " State your concern ■ Ensure you understand • Don't take things personally Adhere to time limits ■ Come prepared " Lnsure all are heard 4. DATE OF NEXT ARENA COMMISSION MEETING November 20, 2018 6:00 p.m. in Uppertown Conference Room This agenda is available in alternate formats upon a 73 hour advanced notice. Auxiliary aids and services are also available upon a 72 hour advanced notice. Please contact the City Clerk at 763. 635.1000 to make a request Examples of alternate formats may include: large print, Braille, audio tape, etc. Examples of auxiliary aids may include a sign language interpreter, assistive listening device, etc. i'llwErl�e er ATURE Request for Action To Item Number Ice Arena Conunission 3.1 Agenda Section Meeting Date Prepared by Community Center Ma 31, 2018 Rich Czech, Arena Mana er Item Description Reviewed by Community Center/Arena Update Cal Portner, Ci Administrator Reviewed by Action Requested Discuss the status of the Community Center/Arena. Background/Discussion Ballard*King & Associates have completed a draft of their revenue study for the three recreation facility options. The final report should be completed next week and will be sent to each Arena Commissioner. Financial Impact N/A Attachments 0 N/A Ipnwf8[a Ir rvATURE] Elk River Operations Analysis ackg_roand, , .,_ The operations analysis represents a conservative approach to estimating expenses and revenues and was completed based on the best information available and a basic understanding of the project. Fees and charges utilized for this study reflect a philosophy designed to meet a reasonable cost recovery rate and future operations cost and are subject to review, change, and approval by the City. There is no guarantee that the expense and revenue projections outlined in the operations analysis will be met as there are many variables that affect such estimates that either cannot be accurately measured or are subject to change during the actual budgetary process or partnership. Expenditures Expenditures have been formulated on the costs that were designated by staff and Ballard*King and Associates to be included in the operating budget for the facility. The figures are based on the size of the center, the specific components of the facility, and the hours of operation. All expenses were calculated to the high side and the actual cost may be less based on the final design, operational philosophy, and programming considerations adopted by the City. The consulting team was tasked with exploring three different operating models that included a different mix of components. The Community Center includes two sheets of ice, community rooms and community programming. The Multi-purpose option includes two sheets of ice, an indoor turf field, leased space and community room. The Ice Arena option includes a two -sheet ice facility, concession area and upgraded locker room facilities. ategory Comm.Center Multi -Purpose _ ,Ice Arena Personnel Full-time Part-time Total $250,599 $316,493 $567,092 $250,599 $155,520 $406,119 $250,599 $132,284 $382,883 Cate o Comm Center Multi-PuKpose Ice Arena Utilities $228,750 $338,950 $ 210,000 (gas & elect) Telephone $ 3,500 $ 3,950 $ 3,500 Category _ Comm Center „Multi -Purpose Ice „Arena Fuel/Lube $ 300 $ 500 $ 300 Contract services $ 15,000 $ 15,000 $ 15,000 Training/Conference $ 1,900 $ 1,900 $ 1,900 Rental equipment $ 4,000 $ 7,500 $ 7,500 Concessions $ 45,000 $ 65,000 $ 35,000 Merch. for Resale $ 30,000 $ 40,000 $ 30,000 Publishing/Printing $ 7,500 $ 7,500 $ 7,500 Postage $ 250 $ 400 $ 250 Bank CC Fees $ 4,500 $ 8,000 $ 4,500 Operating Supplies $ 60,000 $ 80,000 $ 60,000 Uniforms $ 1,000 $ 1,500 $ 1,000 Insurance $ 5,000 $ 10,000 $ 5,000 Building Repair $ 30,000 $ 30,000 $ 20,000 Dues/Subscriptions $ 650 $ 650 $ 650 Building/Structure $ 7,500 $ 10,000 $ 10,000 Equipment $ 15,000 $ 25,000 $ 15,000 Total $459,850 $645,850 $427,100 Grand Total $1,026,942 $1,051,969 $809,983 2111a;c Pull -Time Staff Positions _ Facilityget Full -Time Existing FT Staff $179,950 PERA $ 21,100 Medicare S 4,100 Insurance $ 28,800 Workers Comp $ 9,350 Total Full -Time Personnel $243,300 Plus 3% for future increase $259,599 311'agc RAT �T ARD ICING A SS0CItl..TE9 Li D Recreation raeHity Planning and Operation Consult.ints Revenues The following revenue projections were formulated from information on the specifics of the project and the demographics of the service area and other similar facilities. Actual figures will vary based on the size and make-up of the components selected during final design, market stratification, philosophy of operation, fees and charges policy, and priority of use. All revenues were calculated conservatively as a result. Revenue Projection Model: Category Comm Center Multi -Pu ose Ice Arena Admissions $ 59,250 $ 73,000 $ 59,250 Bld Rentals $ 26,860 $ 26,860 $ 8,500 Ice Rental $534,000 $534,000 $ 534,000 Turf Rental $ 0 $151,520 $ 0 Recreation Fees $ 48,100 $ 48,100 $ 48,100 Skate Sharpening $ 4,500 $ 4,500 $ 4,500 Special Events $ 1,500 $ 7,500 $ 1,500 Vending $ 12,000 $ 17,500 $ 12,000 Birthday Parties $ 6,000 $ 11,250 $ 6,000 Advertising $ 25,000 $ 45,000 $ 25,000 Contributions $ 6,700 $ 6,700 $ 6,700 Dry Floor $ 24,375 $ 24,375 $ 24,375 Concessions $115,500 $165,500 $ 115,500 Silver Sneakers $ 12,960 $ 12,960 $ 0 Misc 6,500 $ 7,000 $ 5,000 Grand Total $8831245 $1,135,765 S 850,425 4jPac Expenditure — Revenue Comparison Category Community Multipurpose Ice Arena Center Expenditures $1,026,942 $1,451,969 $809,983 Revenue $883,245 $1,135,765 $850,425 Difference ($143,687) $83,796 $40,442 Recovery percentage 86 107% 105% Future years: Expenditures — Revenue Comparison: Operation expenditures are expected to increase by approximately 3% a year through the first 3 to 5 years of operation. Revenue growth is expected to increase by 4% to 8% a year through the first three years and then level off with only a slight growth (3% or less) the next two years. Expenses for the first year of operation should be slightly lower than projected with the facility being under warranty and new. Revenue growth in the first three years is attributed to increased market penetration and in the remaining years to continued population growth. In most recreation facilities the first three years show tremendous growth from increasing the market share of patrons who use such facilities, but at the end of this time period revenue growth begins to flatten out. It is not uncommon to see the amount of tax support to balance the community center budget increase as the facility ages. 5111agc Part -Time Worksheets Part -Time — Community Center Existing Part-time staff level $101,850 Benefits 17,000 Total Part -Time $118,850 Existing Senior/Comm Center $180,350 Positions Hours/Wk Amount Part -Time Front Desk 30 hrs/wk $ 16,065 ($10.50/hr) Benefits (7.65%) S 1,228 Total $ 17,293 Part -Time — lee Arena Existing Part-time staff level $101,850 Benefits $ 17,000 Total Part -Time $118,850 Positions Hours/Wk Amount Part -Time Program/Maint Attendant (32 wks) 26 hrs/wk $ 12,480 ($15.00/hr) Benefits (7.65%) $ 954 Total Part -Time Salaries $ 13,434 61Pa"t Part -Time Worksheets — Multipurpose Option Existing Part -tithe staff level $101,850 Benefits Total Part -Time $ 17,000 $118,850 Positions Hours/Wk Amount Part -Time Front Desk 30 hrs/wk $ 16,065 ($10.50/hr) Turf Attendant/Maint (32 wks) 45 hrs/wk $ 15,000 ($12.50/hr) Salaries $ 34,065 Benefits (7.65%) $ 2,605 Total $ 36,670 Turf Attendant (32 wks) Mon -Fri 5pm-1 Opm 5 1 5 25 Saturday 8am-10pm 12 1 1 12 Sunday Noon -bpm 10 1 1 8 Total 45 hours Total $15,040 71Page B LT.ARD*KING - 11 TAT E 5 L T ll Recreation Facility Planning and Operation Consultan. is Part-Time Worksheets — Multipurpose Option — Expanded Food Service Option only. Concession (32 wks) Mon-Fri 4pm-9pm 5 1 5 25 Sat_ a urday 9am — 9pm 12 1 1 12 1 pm-9pm 8 1 1 8 4pm-9pm 5 1 1 5 Sunday 9am-6pm 9 1 1 9 1 pm-6pm 5 1 1 5 Total 74 hours Positions Hours/Wk Amount Part -Time Concession Attendant (32 wks) 74 hrs/wk $ 23,680 ($10.00/hr) Revenue will increase an addition $60,000 should the City elected to expand the concession operation. 8 11' a �_-, c: Pro ram Fees and Revenue Worksheet Community Center Admissions CategoEy Number Fee Revenue Daily 9,000 $5.00 $45,000 Passes 150 $45.00 $ 6,750 Family Pass 75 $100 $ 7,500 Total $59,250 Rentals Building Rentals Category_ . _ _ Number Fee Revenue Dry Floor $24,375 Building Rentals $ 2,500 Lease Space $ 6,000 Meeting Rooms 312 $ 9,360 Banquet Room 18 $500 9,000 Total $51,235 Ice Rentals Category _ Number Fee Revenue Prime 2050 $200.00 $410,000 Non Prime 800 $155.00 $124,000 Total $534,000 Ice Programs Category Number Fee Revenue LTS 275 $44.00 $12,100 Hockey $36,000 $48,100 Birthday Parties Category Number Fee _.... Revenue Ice 40 $150.00 $6,000 911'Ligz Concessions Category Revenue $45,000 FC should gross 2.5 times the cost $112,540 Pro -Shop $ 3,000 Vending $ 12,000 $127,500 lee Arena Admissions Category Number Fee Revenue Daily 9,000 $5.00 $45,000 Passes 150 $45.00 $ 6,750 Family Pass 75 $100 $ 7,500 Total $59,250 Building Rentals Category Number Fee Revenue Dry Floor $19,500 Building Rentals $ 2,500 Lease Space 6,000 $28,000 lee Rentals Category Number Fee Revenue Prime 2050 $200.00 $410,000 Non Prime 800 $155.00 $124,000 Total $534,000 Birthday Parties Category Number Fee Revenue Ice 40 $150.00 $6,000 Concessions CategoryRevenue $45,000 FC should gross 2.5 times the cost $112,500 Pro -Shop $ 3,000 Vending $ 12,000 $127,500 1011'a(" c lee Programs Category Number Fee Revenue LTS 275 $44.00 $12,100 Hockey $ 57,600 Turf Field — N/P $36,000 $110/hr 32 $ 14,080 $48,100 Multi -Purpose $851hr 32 Admissions %2 Field N/P 8 $65/hr Category ate or _ _ Number Fee F „ Revenue Daily 10,800 $5.00 $54,000 Passes 200 $45.00 $ 9,000 Family Pass 100 $100 $10,000 Total $73,000 Rentals Category Number/wk Fee Weeks Revenue Turf Field — Prime 12 _._. $150/hr 32 $ 57,600 Turf Field — N/P 4 $110/hr 32 $ 14,080 '/2 Field Prime 10 $851hr 32 $ 27,200 %2 Field N/P 8 $65/hr 32 $ 16,640 Meeting Rooms 6 $30.00 52 $ 9,360 Banquet Room 18 $500.00 Annual $ 9,000 Tournaments 24 $150/hr 10 $ 36,000 Total $ 169,880 Building Rentals Category Number_ Fee Revenue Dry Floor _ $24,375 Building Rentals $ 2,500 Lease Space $ 6,000 $28,000 lee Rentals Category Number Fee Revenue Prime 2050 $200.00 $410,000 Non Prime 800 $155.00 $124,000 Total $534,000 11 l'agC lee Programs Category Number Fee Revenue LTS 275 $44.00 $12,100 Hockey $.36,000 $48,100 Birthday Parties Category Number „ „ Fee Revenue Ice/Turf 75 $150.00 $11,250^ Silver Sneakers Category Number/wk Visit Fee Months Revenue Fitness 90 360 $3.00 12 $12,960 Concessions Category _ -- _Revenue $65,000 FC should gross 2.5 times the cost $162,500 Pro -Shop $ 3,000 Vending $ 12,000 $127,500 121Pagc