6.1e ERMUSR 09-10-2019 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Dave Ninow—Water Superintendent MEETING DATE: AGENDA ITEM NUMBER: September 10, 2019 6.1e SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Delivered 17 new water meters. • Sealed the water meter, installed encoder receiver transmitter, and took curb stop ties from 16 water services. • Completed 15 BACTI/Total Chlorine Residual Samples o All confirmed negative for Coliform Bacteria. o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH • Completed 22 routine fluoride samples o All samples met MDH standards. o Submitted MDH Fluoride Report • Completed two Total Trihalomethanes and Haloacetic Acids (THM/HAAS) samples for the MDH. • The first phase of the annual water system leak detection survey is complete.There were six areas identified as having potential water leaks. The next step is to locate the source of these possible leaks and make the necessary repairs. • On August 21, Metro Utilities lowered a section of the water main under School Street to allow room for the new storm sewer required for the new Multipurpose Facility. The water department worked with city staff to coordinate and notify customers before shutting off the water main from Proctor Avenue to Jackson Avenue. The water was off for less than three hours. • The water operators have been locating and exercising the valves located in the 2021 street project areas. We are doing this ahead of schedule to allow time to repair any valves before the projects begin. • During the demolition of the old ice arena, a live 1.5 inch copper water service was found that we had no record of.The demolition work had to be delayed until the unknown water service could be shut off. Water department staff helped find the connection point to the water main, then shut the line off and disconnected it from the water main. RJM Construction expressed their appreciation for the assistance from the water department. Page 1 of 2 219 • The water department has continued to locate and validate existing areas of the distribution system to increase accuracy of system maps. • The contractor that will be sandblasting and repainting The Auburn Street Water Tower is set to start work on September 9. ATTACHMENTS: • August 2018 Pumping by Well Page 2 of 2 220 ao c c_ E a. 4- 0 ab C1 m c aJ — in a. Lri Ta CO Mo a 0. OA N a. O Tu a Iti0 N N O m o C �-1 5 c ° ri N o cn - 11 2 .- c\° I- rn Q se o . . v 0 C r-I Q aJ N = oti - m