Loading...
10.3. SR 10-07-2019 EGty1� ,.,�� Request for Action River To Item Number Mayor and City Council 10.3 Agenda Section Meeting Date Prepared by Work Session October 7, 2019 Justin Femrite, P.E. Public Works Director Item Description Reviewed by 169 Redefine—Project Update Cal Portner, City Administrator Reviewed by Action Requested No action required. Background/Discussion Staff will give a presentation of the current preliminary layouts for the 169 Redefine improvements project. Council is seeing these layouts ahead of a planned public open house to be held on October 29, 2019, at City Hall. Financial Impact Current project estimates are in line with the funding that has been allocated for this project. Attachments ■ None The Elk River Vision A wehoMing community withrevolutionary and spirited resourcefulness, exceptional POWERED By service, and community engagement that encourages and inspires prosperity INAMIRE1 Conceptual Layouts10-7-19 Hybrid RCUT / Displaced Left Diamond at Main Street School increase weave distanceRelocate south facing ramps at School to Street ••No impacts to adjacent intersectionsAccess provided to MnDOT facility st rd ••Highest volume turn is freeNo signals needed ••Limited work required on School191Lane maintained School and 193 Grade separated median u-turnbetween rd ••No grade separation at 193No signals needed rd rd •No impacts to adjacent intersections •Limited work required on 193 separated median u-turnsat 193 Use superstreet concept with grade th •Grade separation at 197 th •••Limited work required on 197thNo signals neededNo impacts to adjacent intersections median u-turnsbetween School and 197 Use superstreet concept with grade separated