10 PRSR 10-09-2019N:\Departments\Parks and Recreation\Commission\Packets\2019\10-09-2019 PRC Packet\10 Director's Report 10-09- 19.docx Item: 10 Memorandum To: Parks and Recreation Commission From: Michael Hecker, Parks and Recreation Director Date: October 9, 2019 Subject: Director’s Report _______________________________________________________________________ This report is a monthly highlight of department activities related to collaborations, strategic planning, staff changes/developments, and park operations. Lion John Weicht Park Construction The soil remediation is very intense as they shore up the supporting soils. An alternate ballfield backstop technology will be utilized that will function better with improved soil base. Further, the value engineering needed to keep the project costs in alignment has resulted in two separate shelters. The recent rains the past week have been challenging in getting the new parking lot and Lions Park road installed. The flagpole discussion that started with the Commission last April has come to a final conclusion with a new flag location to become part of a Veterans Memorial at Lions Park. This was discussed at the recent Council meeting. We are having 292 Design Group add the TH10 veteran’s memorial which we will move to LJWP. 292 is working on a new drawing after they get the dimensions. A full review and update was discussed at the October 7 City Council meeting. Active Elk River Construction Active Elk River improvements to YAC and OKAC are underway. ERMU will soon begin electrical system upgrades at YAC in preparation for the new field light installation the week of October 15. At OKAC the new scoreboards will be installed on the two softball/baseball fields the last week in October and staff will install batting cages and temporary fencing in mid-October in preparation for the high school softball teams which will use this facility in 2020 and possibly in 2021. The underground electric and plumbing for the new arena is currently underway. Walls are starting to appear with precast installation expected late October. The footings and foundations for the new arena should be completed by the end of October, weather permitting. Stay posted on all of the construction progress by visiting www.ActiveElkRiver.com N:\Departments\Parks and Recreation\Commission\Packets\2019\10-09-2019 PRC Packet\10 Director's Report 10-09-19.docx Riverfront Concert Series The Bank of Elk River has agreed to continue as the exclusive sponsor for three years – 2020 for $18,500, 2021 for $19,000 and 2022 for $20,000. They previously sponsored the past three years at $16,000/yr. The bank also shared with staff results of an internal survey. Based on 30-employees who volunteered for the concert series this past summer the results show their top three bands of the series were 1. Fabulous Armadillos, 2. Arch Allies and 3. Whitesidewalls. Some of the comments expressed include: Great PR for the community. Great location. Most awesome music venue on earth. The T-shirt gun was a big hit – do it again. They typically go through about 25-30 cases of water for each concert. The most raffle tickets given out were over 1,200 at the Fabulous Armadillos concert.