Loading...
8.1. SR 10-07-2019 Eclty1� ,.,�� Request for Action River To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business October 7, 2019 Justin Femrite, P.E. Public Works Director Item Description Reviewed by Active Elk River - Update on the Multipurpose Cal Portner, City Administrator Facility and Lion John Weicht Park Improvements Reviewed by Action Requested Approve,by motion, change order to the multipurpose facility contract for the addition of the private lease space. Background/Discussion Our architect,Tom Betti of 292 Design Group will provide an update on the project's progress. Specific items of detail will include revised layouts to the Lion John Weicht Park plaza area to meet project budget and show how the plaza area could incorporate the Veterans Memorial. Action requested will surround the approval of a Change Order to authorize the addition of the lease space to the project. As originally bid, this piece was not awarded with the original contracts. Council direction was to amend our plans and return to market for revised pricing to bring the scope of work closer to original estimates. The attached memo from RJM further details this piece. Financial Impact The approval of the lease space addition Change Order,in the amount of$398,559.40, consists of costs beyond the previously approved project budget. The cost for this additional space has always been intended to be funded outside of the Active Elk River budget. Attachments ■ Lion John Weicht Park Renderings ■ Change Order Memo from RJM ■ Change Order The Elk River Vision A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By service, and community engagement that encourages and inspires prosperity INAMIRE1 E W/ R ) Lu 2 ^ $ \ � 2 ( . . . . � . » � � r � } M \ I � \ . .nA }� OL \. Z_N - - -- - -- -- Jill d orn z I ` III H w I 2 J U a — F W a w z Z {II II z 0 t1II lri z r ISI III O Ir I I�I J 7'�u� I U JIM T � I � rtrtm: M Yi�v I Illj III I IIII VIII I IIIA Illh 1 I Ily'I�II \� - 011ljll ' � 7 Illlliu IhII III kj � � -�I I` IIIIVIII ➢ �` � ��lih IIIII VIII �V ! � ' -mrd IIIII IIIII r1 y I IIIA IIII I _ II II I IPrila = I IIII IIiI' --- III IIII IIIIII II jI ■ 'Y r._. rp- CONSTRUCTION October 3, 2019 Tom Betti 292 Design Group 3533 E. Lake Street Minneapolis, MN 55406 Re: PR#2 — Lease Area Expansion Tom — Attached for discussion is RJMs' COR #8 covering the estimated cost to construct the lease area add-on space at the Elk River Multipurpose Center as detailed within 292 Design Group's PR#2 plan set dated 9/5/19. As a comparison to the costs for the original Alt #1 for a similar buildout at Bid Day, this new valuation translates into a net reduction in cost of approximately $322,000. The biggest contributing factors that I can tell by comparing the two designs are as follows: • Simplification of the HVAC distribution system (only providing RTU unit with drops) • Elimination of the concrete SOG • Plumbing rough -in provision only/ elimination of restroom buildout • Simplification of structural steel design • Elimination of interior team room walls • Electrical / lighting reductions (shifting scope to future TI phase) • Precast panel fagade Additionally, this new valuation also gets the lease space back under the $450,000 valuation initially carried throughout the preliminary design/budget phase. Should you have any further questions with respect to the costs associated with this proposed expansion, please do not hesitate to call. Thanks, 7 Tim Ryan Project Executive CHANGE ORDER REQUEST City of Elk RiverTo : PCO: From: Tim Ryan PH: 952-232-6297 Email: tim.ryan@rjmconstruction.com Date: Project: Elk River Multi-Purpose Facility and Lion John Weicht Park 09/26/2019Description:PR#2 Lease Space Owner-8 13065 Orono Parkway Elk River, MN 55330 830 Boone Ave Golden Valley, MN 55427 MINNEAPOLIS OFFICE Details: Cost to furnish and install all material, labor and equipment to provide new proposed lease shell space per PR#2 construction documents. Item Subcontractor:Phase: 2,001.6001-10-05-General Conditions 24 hours of project engineer time to implement changes per PR #2 including submittal management, solicitation, review, and issuance of pricing. 1 33,996.00Crosstown Masonry, Inc.04-21-05-Concrete/Masonry PR#2 Lease Space: Includes labor and material to provide concrete and masonry systems scope of work per drawings and specifications. 2 18,117.98Distinctive Iron, LLC 05-12-05-Structural Steel PR#2 Lease Space: Furnish and deliver new steel beams and columns per drawings and specifications. Includes tax. 3 4,190.00High Five Erectors II, Inc 05-12-10-Structural Steel Erection PR#2 Lease Space: Provide labor and materials to unload and install new steel columns and beams per drawings and specifications. 4 2,060.00Top-All Roofing, Inc.07-53-05-Roofing PR#2 Lease Space: Furnish all labor and materials to provide a complete and functioning roofing assembly per drawings and specifications. 5 43,100.00Murphy Window and Door Commercial Inc 08-81-05-Glass and Glazing PR#2 Lease Space: Provide labor and materials to furnish and install a complete and functioning storefront system including all doors, hardware and glazing per drawings and specifications. 6 23,308.52RTL Construction, Inc.09-29-05-Gypsum PR#2 Lease Space: Provide labor and materials to provide new metal stud framed gypsum wall assembly per drawing details and specifications. Includes $13,500 to box out all steel columns and beams to required 2-hour fire rating with insulation and level 4 finish in lieu of intumescent paint. 7 4,000.0009-91-05-Painting Allowance for painting new gypsum board walls in hallway, and new HM frame and door at lease space. 8 11,955.00Summit Companies 21-10-05-Fire Protection PR#2 Lease Space: Provide labor and materials to furnish and install a complete and functioning sprinkler protection system within new lease space per drawings, specifications and codes. 9 19520-0033 Page 1 of 2 7,430.00Weidner Plumbing & Heating Co.22-01-05-Plumbing PR#2 Lease Space: Provide labor and materials to install new overflow drain, 4" underground sanitary waste line piping and necessary accessories to provide a complete and functioning plumbing system per drawings and specifications. 10 49,987.00Sentra-Sota Sheet Metal Inc.23-30-05-HVAC PR#2 Lease Space: Provide materials and labor to install all mechanical equipment, controls, insulation, and piping associated with new drawings and schedules to provide a complete and functioning mechanical system. Excludes Ebtron AFMS installation by SVL. 11 1,582.00Design Electric, Inc 26-01-05-Electrical PR#2 Lease Space: Provide labor and materials to furnish and install a complete and functioning electrical system per drawings, schedules and specifications. 12 43,459.00Minnesota Utilities & Excavating, LLC 31-22-05-Multipurpose Earthwork PR#2 Lease Space: Provide all labor, equipment and materials to grade, excavate and backfill the site and foundations as required per drawings and specifications. Includes an allowance of $8974 for 4.5' soil corrections at lease space building site utilizing on-site soils. 13 -1,570.47Ebert Construction 32-13-05-Site Concrete PR#2 Lease Space: Deduct sidewalk concrete per drawings and specifications. 14 4,249.30Metro Utilities, Inc.33-01-05-Site Utilities PR#2 Lease Space: Provide labor, material and equipment to relocate installed STRM 7A to align with modified invert elevations and piping lengths per drawings and specifications. 15 85,000.00Wells Concrete Products 03-42-05-03B.2 Precast Wall Panels PR#2 Lease Space: Provide labor and materials to furnish and install a complete and functioning precast wall system per drawings and specifications. Includes credit for eliminating west precast wall as shown on drawings. 16 47,642.00Molin Concrete Products Co.03-41-15-03B.3 Precast Plank/Stadia/Raker Beams PR#2 Lease Space: Provide labor and materials to furnish and install precast roofing planks per drawings and specifications. 17 6,000.0006-40-15-Carpentry PR#2 Lease Space: 6A Carpentry allowance to furnish and install (1) new hollow metal door and frame, roof blocking, fasteners, and metals. 18 3,671.85General Liability .95% 1,140.20Builders Risk .29% 7,239.42Contractor's Fee 1.85% 12,051.47 386,507.93Subtotal: 398,559.40Total For Change Order: Signed: ____________________________ Approved By: City of Elk River Submitted By: RJM Construction, LLC Date: _____________________________ Signed: ____________________________ Date: _____________________________ The work described in this Change Order Request consttutes a change in scope to the Contract Documents. Executon of this Change Order Request by the Owner acknowledges this change in scope. Should the fnal project costs exceed the Guaranteed Maximum Price at the completon of the project, it is hereby agreed that a project change order will be executed by the Owner, increasing the Contract value by the amount of this Change Order Request. 19520-0033 Page 2 of 2 Proposal Distinctive Iron is WBE, SBE, and TGB Certified Date 9/23/2019 Expiration Date 10/23/2019 Distinctive Iron, LLC. 19128 industrial Blvd NW Elk River, MN 55330 Phone 763-441-8000 Fax 763-441-8056 nick@d-iron.com TO RJM Construction Job Location Terms Delivery Date Bid Due Date Elk River Ice Arena Elk River, MN Progress Pmt Qty Description Unit Price Line total Furnish and Deliver - DI CO#3 PR#2 – Proposed Lease Space (Southeast corner of building) $16,952.50 - Qty 6 new column, 7 new beams Total Discount Subtotal $16.952.50 Sales Tax (6.875%) $1,165.48 Total $18,117.98 Quotation prepared by: Amanda Bass ___________________________________________________________ This is a quotation on the items listed only, subject to the conditions noted. To accept this quotation, sign here and return: ________________________________________________________________________________ We look forward to working with you! General Exclusions: Engineering, Hardware other than in direct relation with our product, Grouting of base plates, Installation unless noted, Finish paint or performance coatings, Stainless steel, aluminum, or brass. Galvanizing unless noted. Commercial Flat Roofing 100% CERTIFIED WBE AND DBE Architectural Sheet Metal 1 2657 32nd Ave. S. Suite B, Minneapolis, MN. 55406 An Equal Opportunity Employer Date: 09/26/2019 Attn: Tom Druk Project: Elk River Multi-Purpose Facility This proposal includes all material, taxes, labor and equipment necessary to complete the following sections and scopes of work. All applications and details to be completed per manufacturer’s specifications. Plans: 09/05/2019 PR#2 The cost for the revised items for this price request is $2,060.00 (Two Thousand Sixty Dollars) Thank you for the opportunity to provide this proposal. Please feel free to call if you have questions or would like further pricing. Proposal submitted by: Luis Amorrortu, Operations Manager Office: 651-291-7663, Cell: 612-246-0757 Email: luis@topallroofing.com Murphy Window & Door M W D 12536 314th Ave NW Princeton, MN 55371 Thank you Project: Elk River Multi-Purpose Facility Attn: RJM Construction Re: PR #02 Per the attached PR, Murphy Window and Door (MWD) proposes to add the following work to the contract, for the sum of $43,100.00 Storefront, Doors, Hardware, and Glazing for Entrance 108BSF17 Storefront, Doors, Hardware, and Glazing For Entrances 109A & 109BSF18 Storefront and Glazing (x1) Hank Thompson Elk River Multi-Purpose Request for Change 1000 School Street NW Elk River, MN 55330 To: RJM Construction RFC Number: RTL #001 Original Contract : $309,300.00 Other Approved Change Orders: $0.00 Total Contract to Date: $309,300.00 Other Pending Requests: $-15,000.00 This Request: $9,808.52 RTL Job # 19-255 Date:9/16/2019 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Detail Breakdown Below: Labor Hours Rate Total Add Walls 72 $80.00 $5,760.00 Labor Total 72 $5,760.00 Material Qty Unit Cost Tax Total Materials for same 1 $2,923.00 $233.84 $3,156.84 Material Total $233.84 $3,156.84 The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated. Upon approval the sum of $9,808.52 will be added to the contract price. Authorized Signature: _____________________________________________________ Date: _________ RJM Construction COST SUMMARY Description of Change: Add 2B Walls per PR 2 Cost Notes/Attachments Labor $ 5,760.00 Material $ 3,156.84 Total Cost $ 8,916.84 Overhead and Profit $ 891.68 10% Self-Performed Total $9,808.52 Subcontractors $ 0.00 Overhead and Profit on Subs $ 0.00 Subcontractor Total $0.00 Total Change in Contract $9,808.52 TO:RJM CONSTRUCTION ATTN:TOM DRUK PROJECT:ELK RIVER ICE ARENA PROJECT DATE: 09/25/19 CO# : 29 Wilson Ave NE, St Cloud MN 56304 CONTACT NAME:NATE BEIER Description Cost Labor Total 3,999.60$ 10 % Overhead & Profit 399.96$ Labor Total 4,399.56$ Materials & Equipment Total 1,520.07$ Tax on Materials & Equipment Only 119.71$ SubTotal 1,639.78$ 10% Overhead & Profit 163.98$ Material & Equipment Total 1,803.75$ Subcontractors 1,168.30$ 5% Overhead & Profit on Subs 58.42$ Subcontractor Total 1,226.72$ TOTAL COST OF CHANGE 7,430.00$ Labor By Task Hours Hourly Cost Total Cost -$ ADDED OVERFLOW DRAIN LABOR 36 90.90$ 3,272.40$ ADDED 4" SANITARY WASTE UNDERGROUND 8 90.90$ 727.20$ -$ -$ Sub-Total 3,999.60$ Materials and Equipment By Task Total Cost -$ 1,216.04$ 304.03$ -$ -$ Sub-Total 1,520.07$ Sub-Contractor Total Cost -$ 636.30$ 532.00$ -$ Sub-Total 1,168.30$ PR 2 - ADD ROOF DRAIN, ADD 4" UNDERGROUND SANITARY EXCAVATE/BACKFILL INSULATION ADDED OVERFLOW DRAIN, SEE DETAILS ATTACHED ADDED 4" SANITARY WASTE UNDERGROUND, SEE DETAILS ATTACHED COST SUMMARY P101, ADDED OVERFLOW DRAIN 6" DOWNSPOUT NOZZLE 1 179.04 179.04 6" OVERFLOW ROOF DRAIN 1 169.20 169.20 6" PVC PIPE 50 4.45 222.50 6" PVC 90'S LONG SWEEP 4 51.02 204.08 6" PVC 45'S 2 31.39 62.78 6" PVC Y 2 49.59 99.18 6" CLEANOUT ADAPTERS 2 21.31 42.62 6" PVC PLUGS 2 10.42 20.84 10" HANGERS/HARDWARE 10 21.58 215.80 1,216.04 ADDED 4" SANITARY WASTE UNDERGROUND 4" PVC PIPE 60.00 2.38 142.80 4" PVC COUPLINGS 3.00 4.58 13.74 4" PVC LS 90'S 1.00 11.94 11.94 4" FLOOR CLEAN-OUT 1.00 129.00 129.00 2" COPPER CAP 1.00 6.55 6.55 TOTAL 304.03 P101 TOTAL TO: RJM Construction Date: 9/23/2019 ATTN: Tom Druk PROJECT: Elk River Multi-Purpose SUBJECT:PR #2 We herewith submit our proposal and description for changes requested as follows: See page 2 (back up tab) for break down. DESCRIPTION OF CHANGE: Changes to sheet E201,E211,E212,E221,E400,E401 CHANGES INCLUDED LIGHTING, FIRE ALARM AND PANELBOARD MODIFICATIONS WITH ASSSOCIATE WIRING FOR EACH ITEM. AMOUNT:Sub Contractor -$ Material 1,221.40$ Labor 269.94$ Sub Total 1,566.34$ Bond 15.66$ Total 1,582.00$ This proposal will be valid until: For 30 days We retain the right to adjust commodity items that increase in price by more than 5% before approval. Normal working hours unless noted otherwise. No winter conditions unless noted Add all of the hours to final completion date of the project Delays in approval----All pricing is based on the condtions of the project on the date of the pricing request and may require additional hours and/or material if the job has progressed beyond the assumption of the conditions of when it was priced. Additional Comments: See attached breakdown. If you have any questions, please feel free to contact us. Thank you very much. Clarence Cronin ELECTRIC, INC. 4807 HEATHERWOOD ROAD | PO BOX 1252 | ST. CLOUD, MN 56302-1252 Design Electric, Inc. Corcoran, MN 55357 23350 County Road 10 Ph : 763-498-7844 Change Proposal Phone: Job:6968 Elk River Ice Arena-Lion John Number: Date: 4 9/24/19 To:City of Elk River Building Department 13065 Orono Parkway Elk River, MN 55330 Ph: 763/635-1060 Fax: 763/635-1090 Description:PR #2 We are pleased to offer the following specifications and pricing to make the following changes: Deduct sidewalks per PR #2. The total amount to provide this work is .................................................................................................. $-1,570.47 (Please refer to attached sheet for details.) If you have any questions, please contact me at (763)498-7844. Submitted by:Approved by: Date: David Swanson, Project Manager Ebert Constuction Page 1 of 2 Corcoran, MN 55357 23350 County Road 10 Ph : 763-498-7844 Change Proposal 4 Price Breakdown Continuation Sheet Description:PR #2 Description PriceMaterial Subcontract OtherEquipmentLabor Concrete Sitework $-1,570.47$-454.47$-1,116.00 Subtotal:$-1,570.47 Total: $-1,570.47 Page 2 of 2 UTILITIES, INC. 9656 161st Avenue NW Elk River, MN 55330 Phone (763) 633-3656 Fax (763) 633-3659 September 26, 2019 ** VIA EMAIL ** tom.druk@rjmconstruction.com Tom Druk RJM Construction Re: Elk River Multi-Purpose Facility – Elk River Change Order Request - PR 2 3003/4249.30 Tom, I am requesting a change order in the amount of $ 4,249.30 as Extra to Contract for additional costs to make changes per PR #2. Relocate STRM 7A that has already been installed. Following is a breakdown of these costs; Description Qty Unit Unit Cost Total Modify CB 7A (remove and reinstall) 1 ls $ 375.00 $ 375.00 490 excavator w/operator 6 hr $ 210.00 $ 1,260.00 Skid loader w/operator 1 hr $ 180.00 $ 180.00 RT82 trench roller 1 dy $ 320.00 $ 320.00 Labor 18 hr $ 96.00 $ 1,728.00 Total $ 3,863.00 Add 10% overhead & profit $ 386.30 Total Change order amount $ 4,249.30 Please forward the necessary change order documentation in this amount at your earliest convenience, as we require prior to work being completed. Should you have any questions or need additional information, please contact me. Sincerely, Ryan Van Nurden METRO UTILITIES, INC.