Loading...
6.1c ERMUSR 10-08-2019 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mark Fuchs—Operations Director MEETING DATE: AGENDA ITEM NUMBER: October 8, 2019 6.1c SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Had 14 new house services. • Continue collecting data with the GPS for our ArcView maps as time permits. • Finished acquiring the Connexus customers in areas 7 and 8 on September 17. We're in the process of changing out locks, removing tags from poles, and adding new signage to the underground equipment.Throughout this process, we'll be verifying what's in the map book to ensure its accuracy. • We are waiting on street light poles for the Monroe Estates Addition; the rest the infrastructure has been completed.There are a total of 13 lots in this addition. • Continue installing the underground infrastructure for the Lawatsch Farms Addition. During the installation we will also be rebuilding Pascal Street, Troy Street, and 189th Avenue. • Continue with installation of the new poles and light fixtures on Main Street. • A vehicle struck a street light pole on Twin Lakes Road that needed to be replaced. • We had a fault on a riser pole, south of the Parish Avenue Bridge. We had to replace the three phase overhead switch and replace a terminator on one of the underground phases. • Installed a single phase transformer for the new Edina Reality building on Parson Avenue in Otsego. • The overhead single phase primary fed service at 10000 Highway 10 has experienced numerous outages due to trees near the lines. We installed a new secondary service from Fillmore Street to fix the issue. • Tom Geiser and Dan Plude attendant the NISC Member Information Conference September 23-26 in St. Louis, Missouri. Page 1 of 1 262