Loading...
6.1d ERMUSR 10-08-2019 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz—Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: October 8, 2019 6.1d SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In September, the locating department had a total of 467 locate tickets consisting of six emergency tickets, 13 cancellations, 408 normal tickets and 40 updated tickets.This is a 3.3% increase in volume of tickets from the previous month. • On September 17, two crews, each consisting of an office and a field staff member changed out meters within Areas 7 & 8, completing the change out of 106 meters in one day. This completes the 2015 Service Territory Transfer agreement a year ahead of schedule. The metering department would like to express their gratitude to the office staff for their assistance during the past few transfers. They have been instrumental in recording data accurately in the field that is utilized by Customer Information Systems. This has also allowed the field staff to stay focused on their task and work safely, without distractions. Field staff also disconnected all the load management radios within these areas and has been working on transitioning nine of these customers from a Connexus single metering rate. By adding an additional meter package, we will be able to transition these customers to our existing programs. This work should be completed next week. • On September 26, staff ran Engines 1, 3 & 4 without any issues. We have a vendor that is planning to diagnose and repair Engine 2 in mid-November. We will also have them take a look at Engine 3 at that time. It has been producing excessive smoke during multiple startups. • Mapping department continues to update points and attributes for all of our systems assets within the ESRI ArcView GIS system. Power Systems Engineering (PSE) has started on our ESRI upgrade along with the disaster recovery backup server build for GIS. PSE is working directly with city IT staff on this. • Structural Buildings has the building materials onsite for the West Substation Equipment Storage Garage. The grading and pad site were completed around the middle of Page 1 of 2 263 September.The scheduled start of construction has been pushed back to October 7 due to weather conditions. The anticipated completion date is October 31, which is still on schedule. Page 2 of 2 264