Loading...
95-088 RES e RESOLUTION 95-88 A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ADOPTING FEES FOR SERVICES FOR 1996 WHEREAS, the cost incurred to process the various licenses, services, zoning and planning requests, etc., has been studies; and WHEREAS, the study of these fees has resulted in an increase in certain fees; and WHEREAS, this resolution reflects the fees charged by the City for 1996. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota, that fees for services for the year 1996 shall be adopted as indicated on the attached Fee Schedule. e Passed and adopted by the Elk River City Council this 18th day of December, 1995. ATTEST: Sandra A. Thackeray, City Cl e e e e CITY OF ELK RIVER 1996 FEE SCHEDULE ASSESSMENT SEARCH/CERTIFICATION: ANIMAL LICENSES Cat Dog Kennel (over 3 dogs) BOWLING ALLEY LICENSE: BUILDING PERMIT: Industrial, commercial, multifamily residential, single family homes, and additions State Residential Contractor License Search Miscellaneous Building Permits Heating, Ventilation, and Air Conditioning Gas Fitting Permit Fee Gas Fitter's License Plumbing Permit BURNING PERMIT~ - regular Special Residential Special to Clear Land Special Daytime CIGARETTE: DOCUMENTS: Audit Budget City Code Copies Growth Management Plan Sif1n Ordinance $ 15.00/each $ 5.00/2 yrs. $ 10.00/2 yrs. $ 75.00/year $ 50.00/1 0 lanes $ 5.00 each addllane State permit fee, UBC Table 1 A, pluls 65% plan check fee Commercial/Industrial - 35% plan check fee - single family/twin home (valuation based on current State of MN bulding valuation data) $ 5.00/permit City permit fee Schedule Exhibit C plus State Surcharge City permit fee Schedule Exhibit B City permit fee Scheculd Exhibit A $ 24.00/year City permit fee Schedule C $ 0 $ 10.00 $ 25.00 $ 25.00 $ 25.00/year $ 0 $ 0 $ 75.00 $ .25/page $ 25.00 $ 5.00 City of Elk River Fee Schedule Resolution 95-88 Page 2 Effective January 1, 1996 e -------------------------------- DOCUMENTS: Solid Waste Ordinance $ 10.00 Subdivision Ordinance $ 10.00 Zoning Ordinance $ 25.00 FLAG. (City) $ 32.00 each GARBAGE HAULER LICENSE: $ 60.00 1 st truck/ $ 15.00/each addl truck GRADING PERMIT: $ 25.00 plus City Consultant fees if required to process application LIqUOR LICENSE: Club $ 300.00/year Intoxicating On Sale $4,000.00/year Intoxicating Sunday On Sale $ 200.00/year Non-Intoxicating Off Sale $ 75.00/year Non-Intoxicating On Sale $ 225.00/year Set Up $ 75.00/year Wine $ 650.00/year e Temporary Non-Intoxicating $ 20.00/day Temporary Intoxicating $ 20.00/day MAPS: Large Base, Zoning or Land Use Map $ 3.00 Medium Base or Zoning Map $ 2.00 Medium Base Ward Map $ 2.00 MASSAGE ESTABUSHMENT: Initial Fee Single $ 200.00 Corporation $ 300.00 Partnership $ 300.00 Renewal Fee $ 150.00 MASSAGE THERAPIST: Initial Fee $ 150.00 Renewal Fee $ 100.00 MECHANICAL AMUSEMENT: Mechanical Rides $ 35.00/ride Pin Ball Games $ 35.00/machine Pool Tables (Coin Operated) $ 35.00/table Video Games $ 35.00/game e City of Elk River Fee Schedule Resolution 95-88 Effective January 1, 1996 e MINERAL EXTRACTION: PARK DEDICATION FEE: (Resolution 95-89) Residential Commercial Industrial PARKING STICKERS: (Railroad Parking Lot) PAWN SHOPS: e PINS: (Plastic-Elk River) (Metal-Elk River) SEPTIC INSTALLATION: SEPTIC REPAIR: SEWER AVAILABILITY CHARGE (SAC): (Plant replacement interceptor) SIGN PERMITS Up to 100 square feet 101-300 square feet Over 300 square feet Yearly Advertising Structure (Billboard) Inspection SOLID WASTE FACILITY LICENSE: STREET DISRUPTION OR UTILITY HOOKUP PERMIT: SURFACE WATER MANAGEMENT IMPACT FEE: e Page 3 $ 20.00/acre to be actively mined in forthcoming year or not reclaimed $ 5.00/acre approved but not actively mined $ 550.00/dwelling unit - 111 /96 $ 600.00/dwelling unit - 111 /97 $ 650.00/dwelling unit - 1/1/98 $ 1. 750.00/per acre - 1/1/96 $ 2,000.00/per acre - 1/1/97 N/A $ 12.00/space 3 stickers/space maximum $1.750.00/year $ .35 each $ 2.50 each $ 60.00 $ 30.00 $1,300.00 $ 30.00 $ 90.00 $ 150.00 $ 10.00 $2,000.00 plus cost reviewing license Amount of annual cost incurred by the City for monitoring and inspecting the facility plus the license $ 25.00 $ 61.80 per residential lot (rural) $ 123.60 per residential lot (urban) $ 741.60 per acre (multifamily, commercial and industrial) e e e City of Elk River Fee Schedule Resolution 95-88 Effective January 1, 1996 TRANSIENT MERCHANT LICENSE: $ 50.00/year WATER ACCESS CHARGE: (Contact Municipal Utilities-441-2020) $ 300.00 WATER CONNECTION CHARGE: (Contact Municipal Utilities-441-2020) $ 700.00 WETLAND DRAINING OR FILLING PERMIT: $ 75.00 plus City Consultant fees if required to process application ZONING/PLANNING APPLICATIONS: (Note: Extraordinary City Consultant time will be charged back to petitioners of all zoning requests) Administrative Subdivision $ 150.00 plus Park Dedication is applicable Conditional Use Permit Commercial/Industrial Residential Amendments and Renewals requiring Public Hearings $ 300.00 $ 100.00 $ 75.00 Concept Review $ 200.00 (applied to application fee if application proceeds) Easement Vacation Multiple Principal Buildings $ 150.00 $ 200.00 plus Park Dedication if applicable Nonconforming Sign Alteration $ 11 0.00 $ 300.00 Ordinance Amendment Plats $ 500.00 + $5.00 per lot for each lot over 50. Retainer/Application Fee Concept Review fee. Actual cost incurred by the City for review of the plat plus park dedication if applicable Permitted Home Occupations $ 15.00 Planned Unit Development (PUD) Charge for whatever zoning is needed to review the PUD (Conditional Use, plat, Concept Review, etc.) Page 4 City of Elk River Fee Schedule Resolution 95.88 Page 5 Effective January 1, 1996 ---------------..------------------- e Site Plan Review $ 250.00 Variance $ 150.00 Zone Change $ 250.00 Other Zoning Requests $ 50.00 e e e Exhibit A City of Elk River Fuel-Gas Piuinfi! Permit Fees The Chief Building Inspector, before issuing any permit for the installation of any fuel-gas piping, shall require the payment by the applicant for such permit of fees in the amollnt herein provided. ~ Minimum Fee ....". ) In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00). Basic Fees e (A) The fees for all fuel-gas piping permits shall be computed on the basis of the number of. fuel-gas appliances. The fee for each appliance so. provided for shall, except asherinafter other",ise specifically provided, be Six Dollars ($6.00) for each fuel.g'as appliance. (B) Where any such permit is issued for roughing in of fuel-gas lines for future appliances, a fee of Six Dollars ($6.00) shall be charged for each line or lines. (C) In addition to the Six Dollar ($6.00) charge for each fuel-gas appliance and future fuel-gas lines run for appliance, a Six Dollar ($6.00) charge for the main fuel gas supply in the building shall be charged. (D) For the purpose of this article, a gas appliance shall be taken to mean a furnace, range, water heater, dryer, fireplace, barbecue, etc. e ORD.fuellbz e EXHIBIT B CITY OF ELK RIVER HEATING. VENTILATION. AND AIR CONDITIONING PERMIT FEES FEES REQUIRED The Chief Building Inspector, before issuing any permit for the installation, alteration, or repair of any heating, ventilation, and air conditioning appliance items, connections orappe:1dages, shall require the payment by the applicant for such permit of fees in the amount herein. TvlI'.N'1Mlf.M FEE e In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than $18.00. MAXIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be more than $100.00 for a single family home. PERMIT FEE FOR HEATING, VENTILATION, AND AIR CONDITIONING APPLIANCE ITEMS, CONNECTIONS OR APPENDAGES For any permit for the installation, alteration, or repair of the above- referenced items, the fee shall be one percent (1%) of the valuation of the work or as calculated under the Uniform Mechanical Code, whichever is greater. e ordin-dalbz e EXHIBIT C CITY OF ELK RIVER :MISCELLANEOUS PER:MIT FEES Decks $8.00 per square foot for valuation for permit fee; plus State Surcharge. Plan check is included with this price. Fences Under 6 feet no charge/over 6 feet $15.00 plus state surcharge Firevlaces and Wood Stoves $20.00 plus state surcharge- $15.00 plus state surcharge for a burning appliance installed into an existing chimney Garages and Basement Finish e $10.00 per square footior valuation, use building permit fee plus State Surcharge. Plan check is included with this price. Re-Ro.91 Residential-$35.00 plus state surcharge. CommerciallIndustrial- $.50 per square foot for valuation for permit fee plus State Surcharge. Swimming Pools $35.00 plus state surcharge 3 Season Porches $40.00 X the square footage equals the valuation for the permit fee plus state surcharge. Plan check is included with this price. Moving Structures e Moving structures in- $150.00 plus state surcharge Moving structures out- $35.00 permit fee feeslbz