95-088 RES
e
RESOLUTION 95-88
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ADOPTING FEES FOR SERVICES FOR 1996
WHEREAS, the cost incurred to process the various licenses, services,
zoning and planning requests, etc., has been studies; and
WHEREAS, the study of these fees has resulted in an increase in certain
fees; and
WHEREAS, this resolution reflects the fees charged by the City for 1996.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City
of Elk River, Minnesota, that fees for services for the year
1996 shall be adopted as indicated on the attached Fee
Schedule.
e
Passed and adopted by the Elk River City Council this 18th day of December,
1995.
ATTEST:
Sandra A. Thackeray, City Cl
e
e
e
e
CITY OF ELK RIVER 1996 FEE SCHEDULE
ASSESSMENT SEARCH/CERTIFICATION:
ANIMAL LICENSES
Cat
Dog
Kennel (over 3 dogs)
BOWLING ALLEY LICENSE:
BUILDING PERMIT:
Industrial, commercial, multifamily residential,
single family homes, and additions
State Residential Contractor License Search
Miscellaneous Building Permits
Heating, Ventilation, and Air Conditioning
Gas Fitting Permit Fee
Gas Fitter's License
Plumbing Permit
BURNING PERMIT~ - regular
Special Residential
Special to Clear Land
Special Daytime
CIGARETTE:
DOCUMENTS:
Audit
Budget
City Code
Copies
Growth Management Plan
Sif1n Ordinance
$ 15.00/each
$ 5.00/2 yrs.
$ 10.00/2 yrs.
$ 75.00/year
$ 50.00/1 0 lanes
$ 5.00 each addllane
State permit fee, UBC Table
1 A, pluls 65% plan check fee
Commercial/Industrial - 35%
plan check fee - single
family/twin home (valuation
based on current State of MN
bulding valuation data)
$
5.00/permit
City permit fee Schedule
Exhibit C plus State
Surcharge
City permit fee Schedule
Exhibit B
City permit fee Scheculd
Exhibit A
$ 24.00/year
City permit fee Schedule C
$ 0
$ 10.00
$ 25.00
$ 25.00
$ 25.00/year
$ 0
$ 0
$ 75.00
$ .25/page
$ 25.00
$ 5.00
City of Elk River Fee Schedule
Resolution 95-88 Page 2
Effective January 1, 1996
e --------------------------------
DOCUMENTS:
Solid Waste Ordinance $ 10.00
Subdivision Ordinance $ 10.00
Zoning Ordinance $ 25.00
FLAG. (City) $ 32.00 each
GARBAGE HAULER LICENSE: $ 60.00 1 st truck/
$ 15.00/each addl truck
GRADING PERMIT: $ 25.00 plus City
Consultant fees if
required to process
application
LIqUOR LICENSE:
Club $ 300.00/year
Intoxicating On Sale $4,000.00/year
Intoxicating Sunday On Sale $ 200.00/year
Non-Intoxicating Off Sale $ 75.00/year
Non-Intoxicating On Sale $ 225.00/year
Set Up $ 75.00/year
Wine $ 650.00/year
e Temporary Non-Intoxicating $ 20.00/day
Temporary Intoxicating $ 20.00/day
MAPS:
Large Base, Zoning or Land Use Map $ 3.00
Medium Base or Zoning Map $ 2.00
Medium Base Ward Map $ 2.00
MASSAGE ESTABUSHMENT:
Initial Fee
Single $ 200.00
Corporation $ 300.00
Partnership $ 300.00
Renewal Fee $ 150.00
MASSAGE THERAPIST:
Initial Fee $ 150.00
Renewal Fee $ 100.00
MECHANICAL AMUSEMENT:
Mechanical Rides $ 35.00/ride
Pin Ball Games $ 35.00/machine
Pool Tables (Coin Operated) $ 35.00/table
Video Games $ 35.00/game
e
City of Elk River Fee Schedule
Resolution 95-88
Effective January 1, 1996
e
MINERAL EXTRACTION:
PARK DEDICATION FEE: (Resolution 95-89)
Residential
Commercial
Industrial
PARKING STICKERS: (Railroad Parking Lot)
PAWN SHOPS:
e
PINS:
(Plastic-Elk River)
(Metal-Elk River)
SEPTIC INSTALLATION:
SEPTIC REPAIR:
SEWER AVAILABILITY CHARGE (SAC):
(Plant replacement interceptor)
SIGN PERMITS
Up to 100 square feet
101-300 square feet
Over 300 square feet
Yearly Advertising Structure
(Billboard) Inspection
SOLID WASTE FACILITY LICENSE:
STREET DISRUPTION OR UTILITY HOOKUP PERMIT:
SURFACE WATER MANAGEMENT IMPACT FEE:
e
Page 3
$ 20.00/acre to be
actively mined in
forthcoming year or not reclaimed
$ 5.00/acre approved but not
actively mined
$ 550.00/dwelling unit - 111 /96
$ 600.00/dwelling unit - 111 /97
$ 650.00/dwelling unit - 1/1/98
$ 1. 750.00/per acre - 1/1/96
$ 2,000.00/per acre - 1/1/97
N/A
$ 12.00/space
3 stickers/space maximum
$1.750.00/year
$ .35 each
$ 2.50 each
$ 60.00
$ 30.00
$1,300.00
$ 30.00
$ 90.00
$ 150.00
$ 10.00
$2,000.00 plus cost
reviewing license
Amount of annual cost
incurred by the City for
monitoring and inspecting
the facility plus the license
$ 25.00
$ 61.80 per residential lot (rural)
$ 123.60 per residential lot (urban)
$ 741.60 per acre (multifamily, commercial and
industrial)
e
e
e
City of Elk River Fee Schedule
Resolution 95-88
Effective January 1, 1996
TRANSIENT MERCHANT LICENSE:
$ 50.00/year
WATER ACCESS CHARGE:
(Contact Municipal Utilities-441-2020)
$ 300.00
WATER CONNECTION CHARGE:
(Contact Municipal Utilities-441-2020)
$ 700.00
WETLAND DRAINING OR FILLING PERMIT:
$ 75.00 plus City
Consultant fees if
required to process
application
ZONING/PLANNING APPLICATIONS: (Note: Extraordinary
City Consultant time will be charged back to
petitioners of all zoning requests)
Administrative Subdivision
$ 150.00 plus Park
Dedication is applicable
Conditional Use Permit
Commercial/Industrial
Residential
Amendments and Renewals requiring
Public Hearings
$ 300.00
$ 100.00
$ 75.00
Concept Review
$ 200.00 (applied to
application fee if
application proceeds)
Easement Vacation
Multiple Principal Buildings
$ 150.00
$ 200.00 plus Park
Dedication if applicable
Nonconforming Sign Alteration
$ 11 0.00
$ 300.00
Ordinance Amendment
Plats
$ 500.00 + $5.00 per lot for
each lot over 50.
Retainer/Application Fee
Concept Review fee.
Actual cost incurred by
the City for review of the
plat plus park dedication
if applicable
Permitted Home Occupations
$ 15.00
Planned Unit Development (PUD)
Charge for whatever zoning
is needed to review
the PUD (Conditional Use,
plat, Concept Review, etc.)
Page 4
City of Elk River Fee Schedule
Resolution 95.88 Page 5
Effective January 1, 1996
---------------..-------------------
e Site Plan Review $ 250.00
Variance $ 150.00
Zone Change $ 250.00
Other Zoning Requests $ 50.00
e
e
e
Exhibit A
City of Elk River
Fuel-Gas Piuinfi! Permit Fees
The Chief Building Inspector, before issuing any permit for the installation of
any fuel-gas piping, shall require the payment by the applicant for such
permit of fees in the amollnt herein provided.
~
Minimum Fee
....".
)
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less than Eighteen Dollars ($18.00).
Basic Fees
e
(A)
The fees for all fuel-gas piping permits shall be computed on the basis of the
number of. fuel-gas appliances. The fee for each appliance so. provided for
shall, except asherinafter other",ise specifically provided, be Six Dollars
($6.00) for each fuel.g'as appliance.
(B)
Where any such permit is issued for roughing in of fuel-gas lines for future
appliances, a fee of Six Dollars ($6.00) shall be charged for each line or lines.
(C)
In addition to the Six Dollar ($6.00) charge for each fuel-gas appliance and
future fuel-gas lines run for appliance, a Six Dollar ($6.00) charge for the
main fuel gas supply in the building shall be charged.
(D)
For the purpose of this article, a gas appliance shall be taken to mean a
furnace, range, water heater, dryer, fireplace, barbecue, etc.
e
ORD.fuellbz
e
EXHIBIT B
CITY OF ELK RIVER
HEATING. VENTILATION. AND AIR CONDITIONING
PERMIT FEES
FEES REQUIRED
The Chief Building Inspector, before issuing any permit for the installation,
alteration, or repair of any heating, ventilation, and air conditioning
appliance items, connections orappe:1dages, shall require the payment by the
applicant for such permit of fees in the amount herein.
TvlI'.N'1Mlf.M FEE
e
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less than $18.00.
MAXIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be more than $100.00 for a single family home.
PERMIT FEE FOR HEATING, VENTILATION, AND AIR CONDITIONING
APPLIANCE ITEMS, CONNECTIONS OR APPENDAGES
For any permit for the installation, alteration, or repair of the above-
referenced items, the fee shall be one percent (1%) of the valuation of the
work or as calculated under the Uniform Mechanical Code, whichever is
greater.
e
ordin-dalbz
e
EXHIBIT C
CITY OF ELK RIVER :MISCELLANEOUS PER:MIT FEES
Decks
$8.00 per square foot for valuation for permit fee; plus State Surcharge. Plan
check is included with this price.
Fences
Under 6 feet no charge/over 6 feet $15.00 plus state surcharge
Firevlaces and Wood Stoves
$20.00 plus state surcharge- $15.00 plus state surcharge for a burning
appliance installed into an existing chimney
Garages and Basement Finish
e
$10.00 per square footior valuation, use building permit fee plus State
Surcharge. Plan check is included with this price.
Re-Ro.91
Residential-$35.00 plus state surcharge. CommerciallIndustrial- $.50 per
square foot for valuation for permit fee plus State Surcharge.
Swimming Pools
$35.00 plus state surcharge
3 Season Porches
$40.00 X the square footage equals the valuation for the permit fee plus state
surcharge. Plan check is included with this price.
Moving Structures
e
Moving structures in- $150.00 plus state surcharge
Moving structures out- $35.00 permit fee
feeslbz