4.7. SR 11-18-2019 EOty1� ,.,�� Request for Action
River
To Item Number
Mayor and Council 4.7
Agenda Section Meeting Date Prepared by
Consent November 18, 2019 Lori Ziemer, Finance Director
Item Description Reviewed by
2020-2024 Capital Improvement Plan Cal Portner, City Administrator
Reviewed by
Action Requested
Adopt,by motion, the 2020-2024 Capital Improvement Plan (CIP).
Background/Discussion
City staff and Council have reviewed the proposed 2020-2024 CIP leading up to its adoption. During
work session,we reviewed the specific projects, costs, funding sources, and 5-year cash flow projections.
The CIP is a revolving document that is re-evaluated on an annual basis and upon each annual update
some projects will be deleted, added, or even delayed,reflecting community needs and the financial ability
to fund the project.
The CIP is a long-term planning tool and all purchases over$50,000 will come back to Council for
approval per our financial management policies.
A few highlights of the CIP for 2020 include:
■ IT infrastructure upgrade
■ Wayfinding signage, final phase
■ Comprehensive Plan update
■ Equipment replacement to include: patrol squads, fire grass truck, and dump trucks
■ Woodland Trails grant project
■ Architectural design of public safety facilities
■ Twin Lakes Road extension
Financial Impact
Projects and funding sources are identified in the 2020-2024 CIP.
Attachments
■ 2020-2024 Capital Improvement Plan
POWERED 6T
A IR
CAPITAL IMPROVEMENT PLAN
2020 – 2024
City of Elk River
CAPITAL IMPROVEMENT PLAN
2020 – 2024
Enclosed is the City of Elk River’s Capital Improvement Plan (CIP) for the years 2020-2024.
The document has been prepared for the City Council and community to anticipate major
expenditures in advance of the year they may become budget requests. The CIP is a
planning management tool that forecasts the city’s capital needs over a five-year period
based on the city’s long-range plans, goals, and policies. City staff estimates the amount of
funding that is needed for projects to be completed in the next five years. Projects listed in
the first year are included in the budget and upon each annual update of the CIP some
projects will be deleted, added, or even delayed reflecting community needs and financial
ability to fund the project.
Approval of the CIP by Council does not authorize spending or initiation of a given project
nor allocate funding for any of the projects; it simply states the Council’s support and
acknowledgement of the Capital Improvement Plan as a planning tool.
Capital improvements to streets, parks, buildings, equipment, software, and vehicles are
included in the CIP. This plan shows the estimated project costs and the anticipated funding
source. Specific information is shown on each project within this document.
The CIP does not put specific designation on the priority of the projects. This uniqueness
of the type of project generally is associated with a funding source. Cash flow estimates are
done frequently to review cash reserve levels associated with the project funds.
Capital Improvement Plan
City of Elk River, Minnesota
PROJECTS BY FUNDING SOURCE
2020 2024thru
TotalSourceProject #2020 2021 2022 2023 2024
Capital Improvement Bonds
FS-03 6,000,0006,000,000Fire Station #3
PS-03 4,000,0004,000,000Public Safety Building
10,000,00010,000,000Capital Improvement Bonds Total
Capital Outlay Reserve
BZ-02 15,00015,000Building Safety Equipment
EL-01 15,60015,600Election Equipment
FD-10 27,00027,000Fire Department/EOC Equipment
TC-01 460,000115,000 165,000 95,000 25,000 60,000Annual Technology Upgrades
517,600172,600 165,000 95,000 25,000 60,000Capital Outlay Reserve Total
City Development Fund
Plan-02 75,00075,000Comprehensive Plan
75,00075,000City Development Fund Total
Equipment Replacement Fund
AD-03 3,6003,600Administration - Vehicles
BM-01 115,00075,000 40,000Building Maint. - Vehicles/Equipment
FD-01 105,00050,000 55,000Fire - Vehicles
FD-02 169,00065,000 52,000 52,000Fire Trucks
FD-07 20,00020,000Fire - Mobile Equipment
PD-01 500,000187,500 62,500 125,000 125,000Police - Marked Squads
PD-02 280,00035,000 105,000 70,000 70,000Police - Unmarked Squads
PD-03 87,00043,500 43,500Police - CSO Vehicles
PK-18 140,00040,000 30,000 70,000Parks - Pickup Trucks
PK-19 171,00015,000 90,000 66,000Parks - Mobile Equipment
ST-01 275,00065,000 160,000 50,000Streets - Pickup Trucks
ST-02 1,285,000510,000 255,000 260,000 260,000Streets - Dump Trucks
ST-03 595,000225,000 370,000Streets - Mobile Equipment
3,745,600856,100 553,000 753,500 902,000 681,000Equipment Replacement Fund Total
ERMU
TC-01 65,00065,000Annual Technology Upgrades
65,00065,000ERMU Total
Federal Grants
II-08 2,000,0002,000,000Kelley Pkwy/Twin Lakes Rd/TH 10 Intersection
Page 12020-2024 CAPITAL IMPROVEMENT PLAN
TotalSourceProject #2020 2021 2022 2023 2024
PF-64 640,000640,000Trail Development - TH 10 Extension
2,640,0002,640,000Federal Grants Total
Government Buildings Reserve
BL-10 95,00095,000City Hall
FS-03 300,000300,000Fire Station #3
PS-03 250,000250,000Public Safety Building
645,000645,000Government Buildings Reserve Total
GRE Reserve
EP-02 460,000460,000Radio Communications Upgrade
FD-03 600,000600,000Fire Trucks - Engines
IA-02 400,000400,000Ice Arena - Building
II-34 200,000200,000Wayfinding Signage
1,660,000600,000 1,060,000GRE Reserve Total
Ice Arena
IA-01 140,000140,000Ice Arena - Equipment
IA-02 160,000160,000Ice Arena - Building
300,000140,000 160,000Ice Arena Total
Library
LB-03 10,00010,000Library - Equipment
10,00010,000Library Total
Liquor Fund
LS-01 100,000100,000Northbound Liquor Store
100,000100,000Liquor Fund Total
MnDOT Cooperative Funds
II-08 1,000,0001,000,000Kelley Pkwy/Twin Lakes Rd/TH 10 Intersection
1,000,0001,000,000MnDOT Cooperative Funds Total
Municipal State Aid
II-00 1,950,0001,950,000Hwy 169 Frontage/Backage Road Improvements
II-08 4,800,0001,800,000 3,000,000Kelley Pkwy/Twin Lakes Rd/TH 10 Intersection
II-22 178,000178,000School Street Traffic Enhancements
PM-01 3,500,0002,500,000 1,000,000Pavement Management Program
ST-12 125,000125,000Traffic Control - Twin Lakes Rd & 181st Ave
10,553,0001,978,000 5,625,000 1,950,000 1,000,000Municipal State Aid Total
Park Dedication
PF-64 340,00020,000 320,000Trail Development - TH 10 Extension
Page 22020-2024 CAPITAL IMPROVEMENT PLAN
TotalSourceProject #2020 2021 2022 2023 2024
340,00020,000 320,000Park Dedication Total
Park Improvement Fund
PIF-20 652,000652,0002020 Park Improvement Projects
PIF-21 230,000230,0002021 Park Improvement Projects
PIF-22 200,000200,0002022 Park Improvement Projects
PIF-23 140,000140,0002023 Park Improvement Projects
PIF-24 130,000130,0002024 Park Improvement Projects
1,352,000652,000 230,000 200,000 140,000 130,000Park Improvement Fund Total
Pavement Management Fund
II-00 1,950,000500,000 1,450,000Hwy 169 Frontage/Backage Road Improvements
II-22 59,00059,000School Street Traffic Enhancements
PM-01 6,800,000300,000 3,350,000 300,000 2,550,000 300,000Pavement Management Program
8,809,000359,000 3,850,000 1,750,000 2,550,000 300,000Pavement Management Fund Total
Special Assessments
II-08 500,000500,000Kelley Pkwy/Twin Lakes Rd/TH 10 Intersection
500,000500,000Special Assessments Total
Storm Water
II-00 100,000100,000Hwy 169 Frontage/Backage Road Improvements
PM-01 300,000250,000 50,000Pavement Management Program
STM-1 450,000200,000 250,000Storm Water projects
850,000200,000 250,000 100,000 300,000Storm Water Total
Street/Capital Improvement
II-00 400,000400,000Hwy 169 Frontage/Backage Road Improvements
Plan-02 75,00075,000Comprehensive Plan
475,000475,000Street/Capital Improvement Total
Trunk Utility Fund
II-36 2,700,000200,000 2,500,000Hwy 169 Utility Modifications
Plan-02 50,00050,000Comprehensive Plan
2,750,000250,000 2,500,000Trunk Utility Fund Total
46,387,2006,357,700 28,833,000 5,008,500 5,017,000 1,171,000GRAND TOTAL
Page 32020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Administration
2020 2024thru
Contact Building & Env. Admin.
Description
Lease of an electric pool vehicle.
Project #AD-03
Justification
In support of the Energy City initiatives and the EV charging station program.
Useful Life Unassigned
Project Name Administration - Vehicles Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
3,6003,600Vehicles
3,600 3,600Total
Total20202021202220232024Funding Sources
3,6003,600Equipment Replacement Fund
3,600 3,600Total
Page 42020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Public Buildings
2020 2024thru
Contact Building Maintenance Supv.
Description
City Hall projects include:
Carpet installation - $45,000
Energy management system upgrade - $50,000
Project #BL-10
Justification
City hall was renovated in 2003 and fixtures/furnishings are beginning to show wear and in need of upgrades.
Useful Life Unassigned
Project Name City Hall Category Building Maintenance
Type Maintenance
Total20202021202220232024Expenditures
95,00095,000Building Maintenance
95,000 95,000Total
Total20202021202220232024Funding Sources
95,00095,000Government Buildings Reserve
95,000 95,000Total
Page 52020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Building Maintenance
2020 2024thru
Contact Building Maintenance Supv.
Description
Replacement vehicles/equipment for building maintenance division:
2020 - Genie lift & trailer
2021 - 2008 Ford F350
Project #BM-01
Justification
Based on annual condition assessment
Useful Life Unassigned
Project Name Building Maint. - Vehicles/Equipment Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
75,00075,000Equipment
40,00040,000Vehicles
75,000 40,000 115,000Total
Total20202021202220232024Funding Sources
115,00075,000 40,000Equipment Replacement Fund
75,000 40,000 115,000Total
Page 62020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Building & Safety
2020 2024thru
Contact Building Offical
Description
Plan review table
Project #BZ-02
Justification
Ability to review plans electronically to improve effeciency and access and eliminate paper submission processes as identified by the City Council
in their goal for business friendly operations.
Useful Life 10 years
Project Name Building Safety Equipment Category Office Equipment
Type Equipment
Total20202021202220232024Expenditures
15,00015,000Equipment
15,000 15,000Total
Total20202021202220232024Funding Sources
15,00015,000Capital Outlay Reserve
15,000 15,000Total
Page 72020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Elections
2020 2024thru
Contact City Clerk
Description
Election equipment
Project #EL-01
Justification
Cost share agreement with Sherburne County payable in annual installments 2017 - 2020
Useful Life Unassigned
Project Name Election Equipment Category Equipment
Type Equipment
Total20202021202220232024Expenditures
15,60015,600Equipment
15,600 15,600Total
Total20202021202220232024Funding Sources
15,60015,600Capital Outlay Reserve
15,600 15,600Total
Page 82020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Emergency Management
2020 2024thru
Contact Fire Chief
Description
Upgrade portable radios for police and fire
Project #EP-02
Justification
Replace obsolete portable radios that are 15-20 years old. Current radios are no longer manufactured so support is limited and parts are difficult to
obtain.
Useful Life 10 years
Project Name Radio Communications Upgrade Category Equipment
Type Equipment
Total20202021202220232024Expenditures
460,000460,000Equipment
460,000 460,000Total
Total20202021202220232024Funding Sources
460,000460,000GRE Reserve
460,000 460,000Total
Page 92020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Fire
2020 2024thru
Contact Fire Chief
Description
Replace fire vehicles as follows:
2022 - 2013 Chev Tahoe - Fire Marshal
2023 - 2015 Chev Tahoe - Fire Chief
Project #FD-01
Justification
Based on annual condition assessment.
Useful Life 10 years
Project Name Fire - Vehicles Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
105,00050,000 55,000Vehicles
50,000 55,000 105,000Total
Total20202021202220232024Funding Sources
105,00050,000 55,000Equipment Replacement Fund
50,000 55,000 105,000Total
Page 102020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Fire
2020 2024thru
Contact Fire Chief
Description
2020 - 2002 Ford F350 Utility 1
2021 - 2004 Ford F350 Grass 3
2023 - 2006 Ford F350 Grass 4
Project #FD-02
Justification
Based on annual condition assessment.
Useful Life 15 years
Project Name Fire Trucks Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
117,00065,000 52,000Vehicles
52,00052,000Buildings
65,000 52,000 52,000 169,000Total
Total20202021202220232024Funding Sources
169,00065,000 52,000 52,000Equipment Replacement Fund
65,000 52,000 52,000 169,000Total
Page 112020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Fire
2020 2024thru
Contact Fire Chief
Description
Fire Engine replacements as follows:
2021 - 2001 Pierce Engine 3
Project #FD-03
Justification
Based on annual condition assessment. The fire engines are the primary front-line response units.
Useful Life 20 years
Project Name Fire Trucks - Engines Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
600,000600,000Vehicles
600,000 600,000Total
Total20202021202220232024Funding Sources
600,000600,000GRE Reserve
600,000 600,000Total
Page 122020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Fire
2020 2024thru
Contact Fire Chief
Description
2023 - 2004 Polaris UTV
Project #FD-07
Justification
Based on annual condition assessment.
Useful Life Unassigned
Project Name Fire - Mobile Equipment Category Equipment
Type Equipment
Total20202021202220232024Expenditures
20,00020,000Equipment
20,000 20,000Total
Total20202021202220232024Funding Sources
20,00020,000Equipment Replacement Fund
20,000 20,000Total
Page 132020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Fire
2020 2024thru
Contact Fire Chief
Description
Audio/video equpment upgrade for Emergency Operations Center.
Project #FD-10
Justification
The audio/video equipment in the EOC is used for trainings and meeting and is of the age where technical issues have been experienced more
frequently.
Useful Life 6 years
Project Name Fire Department/EOC Equipment Category Equipment
Type Equipment
Total20202021202220232024Expenditures
27,00027,000Equipment
27,000 27,000Total
Total20202021202220232024Funding Sources
27,00027,000Capital Outlay Reserve
27,000 27,000Total
Page 142020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Fire Stations
2020 2024thru
Contact Fire Chief
Description
Construct Fire Station #3 to decrease call time for eastern part of City.
Project #FS-03
Justification
Based on current population growth, a station will be needed in the eastern area as an enhancement for response time.
Useful Life 50 years
Project Name Fire Station #3 Category Buildings
Type Building
Total20202021202220232024Expenditures
300,000300,000Design
6,000,0006,000,000Construction
300,000 6,000,000 6,300,000Total
Total20202021202220232024Funding Sources
6,000,0006,000,000Capital Improvement Bonds
300,000300,000Government Buildings Reserve
300,000 6,000,000 6,300,000Total
Page 152020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Ice Arena
2020 2024thru
Contact Ice Arena Manager
Description
2021 - Replace 2008 Zamboni
Project #IA-01
Justification
Useful Life 10 years
Project Name Ice Arena - Equipment Category Equipment
Type Equipment
Total20202021202220232024Expenditures
140,000140,000Equipment
140,000 140,000Total
Total20202021202220232024Funding Sources
140,000140,000Ice Arena
140,000 140,000Total
Page 162020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Ice Arena
2020 2024thru
Contact Ice Arena Manager
Description
2020 - Construction of the multipurpose lease space.
2022 - Replace the dehumidifier/furnace with a new HVAC system for the new field house.
Project #IA-02
Justification
The dehumidifier/furnace for the new fiield house is over 25 years old and was overhauled seven years ago. Since then, the unit has experienced
several major repairs.
Useful Life 20 years
Project Name Ice Arena - Building Category Buildings
Type Building
Total20202021202220232024Expenditures
560,000400,000 160,000Buildings
400,000 160,000 560,000Total
Total20202021202220232024Funding Sources
400,000400,000GRE Reserve
160,000160,000Ice Arena
400,000 160,000 560,000Total
Page 172020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Infrastructure Improvements
2020 2024thru
Contact Public Works Director
Description
Design and implement improvements to the frontage and backage road system east and west of the Hwy 169 Redefine project (this replaces the
Line Ave improvements)
Project #II-00
Justification
Improvements to the local road connections to Hwy 169 to assure the successful completion of connectiing commercial uses along both the east
and west sides of Hwy 169 from the railroad north to 197th Ave
Useful Life 25 years
Project Name Hwy 169 Frontage/Backage Road Improvements Category Street Construction
Type Infrastructure
Total20202021202220232024Expenditures
200,000100,000 100,000Design
700,000300,000 400,000Land Acquisition
3,500,0003,500,000Construction
400,000 500,000 3,500,000 4,400,000Total
Total20202021202220232024Funding Sources
1,950,0001,950,000Municipal State Aid
1,950,000500,000 1,450,000Pavement Management Fund
100,000100,000Storm Water
400,000400,000Street/Capital Improvement
400,000 500,000 3,500,000 4,400,000Total
Page 182020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Infrastructure Improvements
2020 2024thru
Contact Public Works Director
Description
Complete frontage road Kelley Parkway and Twin Lakes Road extension to new signalized intersection on TH 10/169 at 168th Avenue
Project #II-08
Justification
System expansion and access control on TH 10/169 corridor from 171st Avenue to 165th Avenue
Useful Life 25 years
Project Name Kelley Pkwy/Twin Lakes Rd/TH 10 Intersection Category Street Construction
Type Improvement
Total20202021202220232024Expenditures
600,000600,000Design
1,200,0001,200,000Land Acquisition
6,500,0006,500,000Construction
1,800,000 6,500,000 8,300,000Total
Total20202021202220232024Funding Sources
2,000,0002,000,000Federal Grants
1,000,0001,000,000MnDOT Cooperative Funds
4,800,0001,800,000 3,000,000Municipal State Aid
500,000500,000Special Assessments
1,800,000 6,500,000 8,300,000Total
Page 192020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Infrastructure Improvements
2020 2024thru
Contact Public Works Director
Description
Upgrade two School Street flashing pedestrian crossings west of Freeport Ave and east of Jackson Ave and upgrade pedestrian ramps along the
corridor, relocate the traffic signal at School Street and Lions Park Drive to the west.
Project #II-22
Justification
Existing flashing pedestrian crossings and pedestrian ramps do not meet current design standards. The existing traffic signal at the School Street
and Lions Park Drive intersection will be relocated.
Useful Life 15 years
Project Name School Street Traffic Enhancements Category Street Maintenance
Type Maintenance
Total20202021202220232024Expenditures
12,00012,000Land Acquisition
225,000225,000Design/Construction
237,000 237,000Total
Total20202021202220232024Funding Sources
178,000178,000Municipal State Aid
59,00059,000Pavement Management Fund
237,000 237,000Total
Page 202020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Infrastructure Improvements
2020 2024thru
Contact City Clerk
Description
The Wayfinding Master Plan is a blueprint for creating an easy to follow system of signs for entrance identification, directional signs for various
modes of transportation, parking, parks, interpretive, and kiosks.
Project #II-34
Justification
Enhance overall brand of the community, establish identity, ease navigation, market city amenities, and promote economic development.
Useful Life 25 years
Project Name Wayfinding Signage Category Landscaping/Boulevards
Type Improvement
Total20202021202220232024Expenditures
200,000200,000Improvements
200,000 200,000Total
Total20202021202220232024Funding Sources
200,000200,000GRE Reserve
200,000 200,000Total
Page 212020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Infrastructure Improvements
2020 2024thru
Contact Public Works Director
Description
Trunk sanitary sewer system modifications to accommodate Hwy 169 Redefine project
Project #II-36
Justification
Relocate utilities in the MNDOT ROW
Useful Life 20 years
Project Name Hwy 169 Utility Modifications Category Utilities
Type Infrastructure
Total20202021202220232024Expenditures
200,000200,000Design
2,500,0002,500,000Utilities
200,000 2,500,000 2,700,000Total
Total20202021202220232024Funding Sources
2,700,000200,000 2,500,000Trunk Utility Fund
200,000 2,500,000 2,700,000Total
Page 222020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Library
2020 2024thru
Contact Park & Rec. Director
Description
Improvements to the Library building and grounds:
2020 - Furniture/shelving
Project #LB-03
Justification
Beautification and maintenance of the library building and grounds.
Useful Life Unassigned
Project Name Library - Equipment Category Building Maintenance
Type Equipment
Total20202021202220232024Expenditures
10,00010,000Equipment
10,000 10,000Total
Total20202021202220232024Funding Sources
10,00010,000Library
10,000 10,000Total
Page 232020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Liquor Fund
2020 2024thru
Contact Liquor Store Manager
Description
2023 - Northbound roof replacement
Project #LS-01
Justification
Built in 1996, Northbound liquor store is of the age where the roof will need replacement.
Useful Life 20 years
Project Name Northbound Liquor Store Category Building Maintenance
Type Maintenance
Total20202021202220232024Expenditures
100,000100,000Building Maintenance
100,000 100,000Total
Total20202021202220232024Funding Sources
100,000100,000Liquor Fund
100,000 100,000Total
Page 242020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Police
2020 2024thru
Contact Police Captain
Description
2020 - 2015 Ford Utility (3)
2021 - 2014 Ford Utility (1)
2023 - 2016/2017 Ford Utility (2)
2024 - 2017 Ford Utility (2)
Project #PD-01
Justification
Based on annual condition assessment
Useful Life 4 years
Project Name Police - Marked Squads Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
500,000187,500 62,500 125,000 125,000Vehicles
187,500 62,500 125,000 125,000 500,000Total
Total20202021202220232024Funding Sources
500,000187,500 62,500 125,000 125,000Equipment Replacement Fund
187,500 62,500 125,000 125,000 500,000Total
Page 252020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Police
2020 2024thru
Contact Police Captain
Description
2021 - 2012 Chev Impala
2022 - 2012 Chev Impala, 2012/2013 Chev Tahoe
2023 - 2014 Ford Utility, 2015 Chev Equinox
2024 - 2016 Ford Taurus, 2016 Ford Utility
Project #PD-02
Justification
Based on annual condition assessment.
Useful Life 7 years
Project Name Police - Unmarked Squads Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
280,00035,000 105,000 70,000 70,000Vehicles
35,000 105,000 70,000 70,000 280,000Total
Total20202021202220232024Funding Sources
280,00035,000 105,000 70,000 70,000Equipment Replacement Fund
35,000 105,000 70,000 70,000 280,000Total
Page 262020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Police
2020 2024thru
Contact Police Captain
Description
2021 - 2014 Ford Utility
2022 - 2014 Ford Utility
Project #PD-03
Justification
Based on annual condition assessment
Useful Life 6 years
Project Name Police - CSO Vehicles Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
87,00043,500 43,500Vehicles
43,500 43,500 87,000Total
Total20202021202220232024Funding Sources
87,00043,500 43,500Equipment Replacement Fund
43,500 43,500 87,000Total
Page 272020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Park Development/Improveme
2020 2024thru
Contact Public Works Director
Description
TH 10 Trail Extension - Design and install lighted trail from Gary St to Morton Ave
Project #PF-64
Justification
The bulk of this project will be constructed with the MNDOT TH 10 resurfacing project expected in 2021. The project is partially funded with a
federal grant.
Useful Life 20 years
Project Name Trail Development - TH 10 Extension Category Trail Improvements
Type Improvement
Total20202021202220232024Expenditures
20,00020,000Design
960,000960,000Construction
20,000 960,000 980,000Total
Total20202021202220232024Funding Sources
640,000640,000Federal Grants
340,00020,000 320,000Park Dedication
20,000 960,000 980,000Total
Page 282020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Park Improvement Fund
2020 2024thru
Contact Park & Rec. Director
Description
2020 projects include:
Houlton restoration (FMR match) - $10,000
Lions Park Master Plan - $15,000
Woodland Trails Grant Match - $387,000
Woodland Trails Amenities - $90,000 (Well, shelter/shelter pads, trails, picnic tables)
YAC dugouts - $150,000
Project #PIF-20
Justification
Annual maintenance/repairs of our park system.
Useful Life Unassigned
Project Name 2020 Park Improvement Projects Category Park Improvements
Type Maintenance
Total20202021202220232024Expenditures
652,000652,000Improvements
652,000 652,000Total
Total20202021202220232024Funding Sources
652,000652,000Park Improvement Fund
652,000 652,000Total
Page 292020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Park Improvement Fund
2020 2024thru
Contact Park & Rec. Director
Description
2021 park projects include:
Country Crossing basketball court - $50,000
Fresno Park basketball court - $30,000
Trott Brook tennis court - $150,000
Project #PIF-21
Justification
Annual maintenance/repairs of our park system.
Useful Life Unassigned
Project Name 2021 Park Improvement Projects Category Park Improvements
Type Maintenance
Total20202021202220232024Expenditures
230,000230,000Improvements
230,000 230,000Total
Total20202021202220232024Funding Sources
230,000230,000Park Improvement Fund
230,000 230,000Total
Page 302020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Park Improvement Fund
2020 2024thru
Contact Park & Rec. Director
Description
2022 park projects include:
Lions Park playground - $200,000
Project #PIF-22
Justification
Annual maintenance/repairs of our park system.
Useful Life Unassigned
Project Name 2022 Park Improvement Projects Category Park Improvements
Type Maintenance
Total20202021202220232024Expenditures
200,000200,000Improvements
200,000 200,000Total
Total20202021202220232024Funding Sources
200,000200,000Park Improvement Fund
200,000 200,000Total
Page 312020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Park Improvement Fund
2020 2024thru
Contact Park & Rec. Director
Description
2023 projects include:
Sport court resurfacing - $40,000
Woodland Trails storage garage - $100,000
Project #PIF-23
Justification
Annual maintenance/repairs of our park system.
Useful Life Unassigned
Project Name 2023 Park Improvement Projects Category Park Improvements
Type Maintenance
Total20202021202220232024Expenditures
140,000140,000Improvements
140,000 140,000Total
Total20202021202220232024Funding Sources
140,000140,000Park Improvement Fund
140,000 140,000Total
Page 322020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Park Improvement Fund
2020 2024thru
Contact Park & Rec. Director
Description
2024 projects include:
Country Crossing playground - $100,000
Ridgewood Park basketball court - $30,000
Project #PIF-24
Justification
Annual maintenance/repairs of our park system.
Useful Life Unassigned
Project Name 2024 Park Improvement Projects Category Park Improvements
Type Maintenance
Total20202021202220232024Expenditures
130,000130,000Improvements
130,000 130,000Total
Total20202021202220232024Funding Sources
130,000130,000Park Improvement Fund
130,000 130,000Total
Page 332020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Park Maintenance
2020 2024thru
Contact Parks Supt.
Description
2021 - 2007 GMC 3500
2022 - 2001 Chev 1500
2023 - 2005 Chev 2500, 2008 Ford F250
Project #PK-18
Justification
Based on annual condition assessment.
Useful Life Unassigned
Project Name Parks - Pickup Trucks Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
140,00040,000 30,000 70,000Vehicles
40,000 30,000 70,000 140,000Total
Total20202021202220232024Funding Sources
140,00040,000 30,000 70,000Equipment Replacement Fund
40,000 30,000 70,000 140,000Total
Page 342020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Park Maintenance
2020 2024thru
Contact Parks Supt.
Description
2020 - 2006 Toro Groundsmaster
2023 - 2009 John Deere Tractor
2024 - 2006 FEMA Trailer, 1999 Mower Trailer, 2006 Mower Trailer
Project #PK-19
Justification
Based on annual condition assessment
Useful Life Unassigned
Project Name Parks - Mobile Equipment Category Equipment
Type Equipment
Total20202021202220232024Expenditures
171,00015,000 90,000 66,000Equipment
15,000 90,000 66,000 171,000Total
Total20202021202220232024Funding Sources
171,00015,000 90,000 66,000Equipment Replacement Fund
15,000 90,000 66,000 171,000Total
Page 352020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Planning
2020 2024thru
Contact Public Works Director
Description
Update the Comprehensive Plan, which includes the transportation plan and urban services district study, as part of the Hwy 169 Redefine project.
Project #Plan-02
Justification
With the Hwy 169 Redefine project an updated comprehensive and transportation plan and a study of urban services will aid all city departments in
their prospective future planning.
Useful Life Unassigned
Project Name Comprehensive Plan Category City-Wide Development
Type Study
Total20202021202220232024Expenditures
200,000200,000Study
200,000 200,000Total
Total20202021202220232024Funding Sources
75,00075,000City Development Fund
75,00075,000Street/Capital Improvement
50,00050,000Trunk Utility Fund
200,000 200,000Total
Page 362020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Infrastructure Improvements
2020 2024thru
Contact Public Works Director
Description
Preventative maintenance on our streets includes sealcoating, crackfilling and small overlay projects.
Street improvement projects to replace, overlay or rehabilitate aged and deteriorated streets, storm drainage, and adjacent walks will be completed
every other year.
Project #PM-01
Justification
Individual street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street
segment. These techniques may range from preventative maintenance to a full reconstruction of the surface and aggregate base. As they are
implemented, the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our pavements.
Useful Life 25 years
Project Name Pavement Management Program Category Street Construction
Type Improvement
Total20202021202220232024Expenditures
300,000100,000 100,000 100,000Design
9,300,0005,900,000 3,400,000Construction
1,000,000200,000 200,000 200,000 200,000 200,000Preventative Maintenance
300,000 6,100,000 300,000 3,600,000 300,000 10,600,000Total
Total20202021202220232024Funding Sources
3,500,0002,500,000 1,000,000Municipal State Aid
6,800,000300,000 3,350,000 300,000 2,550,000 300,000Pavement Management Fund
300,000250,000 50,000Storm Water
300,000 6,100,000 300,000 3,600,000 300,000 10,600,000Total
Page 372020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Public Safety Building
2020 2024thru
Contact Police Chief
Description
Public safety building projects include:
- Additional garage space and 2nd floor build out for Police department
- Expansion of Fire Station #2
Project #PS-03
Justification
Expansion of the Police Department includes buildout of the 2nd floor and additional garage space to accommodate space needs and traffic flow.
Expansion of Fire Station #2 is needed to accommodate space for gear, equipment, personnal decontamination, and growth in the training program.
Useful Life 20 years
Project Name Public Safety Building Category Buildings
Type Building
Total20202021202220232024Expenditures
250,000250,000Design
4,000,0004,000,000Construction
250,000 4,000,000 4,250,000Total
Total20202021202220232024Funding Sources
4,000,0004,000,000Capital Improvement Bonds
250,000250,000Government Buildings Reserve
250,000 4,000,000 4,250,000Total
Page 382020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Streets
2020 2024thru
Contact Street Supt.
Description
2021 - 2008 Ford F550
2023 - 1988 Ford F350, 2002 Dodge Ram 1500, 2010 Ford F550,
2024 - 2011 Dodge 5500
Project #ST-01
Justification
Based on annual condition assessment
Useful Life 10 years
Project Name Streets - Pickup Trucks Category Vehicles
Type Vehicle
Total20202021202220232024Expenditures
275,00065,000 160,000 50,000Vehicles
65,000 160,000 50,000 275,000Total
Total20202021202220232024Funding Sources
275,00065,000 160,000 50,000Equipment Replacement Fund
65,000 160,000 50,000 275,000Total
Page 392020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Streets
2020 2024thru
Contact Street Supt.
Description
2020 - 2003 Sterling Dump Truck, 2006 International Dump Truck
2021 - 2007 International Dump Truck
2022 - 2009 Sterling Dump Truck
2023 - 2007 International Dump Truck
Project #ST-02
Justification
Based on annual condition assessment.
Useful Life 15 years
Project Name Streets - Dump Trucks Category Heavy Equipment
Type Vehicle
Total20202021202220232024Expenditures
1,285,000510,000 255,000 260,000 260,000Vehicles
510,000 255,000 260,000 260,000 1,285,000Total
Total20202021202220232024Funding Sources
1,285,000510,000 255,000 260,000 260,000Equipment Replacement Fund
510,000 255,000 260,000 260,000 1,285,000Total
Page 402020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Streets
2020 2024thru
Contact Street Supt.
Description
2022 - 2008 Cat Loader
2024 - 2012 JD Tractor, 2012 Elgin Sweeper
Project #ST-03
Justification
Based on annual condition assessment.
Useful Life 15 years
Project Name Streets - Mobile Equipment Category Heavy Equipment
Type Equipment
Total20202021202220232024Expenditures
595,000225,000 370,000Equipment
225,000 370,000 595,000Total
Total20202021202220232024Funding Sources
595,000225,000 370,000Equipment Replacement Fund
225,000 370,000 595,000Total
Page 412020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Infrastructure Improvements
2020 2024thru
Contact Public Works Director
Description
Install a revised traffic control system at the intersection of Twin Lakes Rd & 181st Avenue.
Project #ST-12
Justification
Continued traffic demands at this intersection will warrant a change in traffic control in the near future. Actual year for construction will be based
on traffic warrant criteria being met. Costs reflect 1/4 of the cost of the system as Sherburne County will participate in their 3 legs of the
intersection.
Useful Life 20 years
Project Name Traffic Control - Twin Lakes Rd & 181st Ave Category Street Construction
Type Improvement
Total20202021202220232024Expenditures
125,000125,000Design
125,000 125,000Total
Total20202021202220232024Funding Sources
125,000125,000Municipal State Aid
125,000 125,000Total
Page 422020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Storm Water
2020 2024thru
Contact Storm Water Coordinator
Description
Bi-annual pond cleaning, stormwater repairs, BMP inventory.
2020 - Dodge Ave south of 8th St - Basin 197
2023 - Trott Brook
(Storm water infrastructure projects combined with street projects are included on the pavement management CIP sheet.)
Project #STM-1
Justification
These projects include the testing, removal, and disposal of sediment deposits from our stormwater ponds. This is needed to assure the storm water
system is functioning as designed and achieving the water quality standards of our NPDES permit.
The smaller stormwater repairs include minor pipe upsizing, culvert replacement, manhole and catch basin repairs and fixing of washout areas.
Useful Life Unassigned
Project Name Storm Water projects Category Maintenance Projects
Type Maintenance
Total20202021202220232024Expenditures
450,000200,000 250,000Construction/Maintenance
200,000 250,000 450,000Total
Total20202021202220232024Funding Sources
450,000200,000 250,000Storm Water
200,000 250,000 450,000Total
Page 432020-2024 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
Department Technology/Communications
2020 2024thru
Contact IT Coordinator
Description
Technology upgrades include:
2020 - Infrastructure upgrade ($180,000)
2021 - Network upgrades ($130,000), Enterprise backup ($25,000), Laptops/Council ($10,000)
2022 - Squad camera storage ($40,000), Virus software ($25,000), Wireless network ($30,000)
2023 - Microsoft server ($25,000)
2024 - Security camera system ($60,000)
Project #TC-01
Justification
Annual replacement and upgrade of information technology software/hardware.
Useful Life Unassigned
Project Name Annual Technology Upgrades Category Technology/Communiciations
Type Technology
Total20202021202220232024Expenditures
525,000180,000 165,000 95,000 25,000 60,000Software/Hardware
180,000 165,000 95,000 25,000 60,000 525,000Total
Total20202021202220232024Funding Sources
460,000115,000 165,000 95,000 25,000 60,000Capital Outlay Reserve
65,00065,000ERMU
180,000 165,000 95,000 25,000 60,000 525,000Total
Page 442020-2024 CAPITAL IMPROVEMENT PLAN