Loading...
4.1. ERMUSR 12-17-2019UTILITIESCOMMISSIONMEETING TO:FROM: ERMU Commission Troy Adams, P.E. –General Manager MEETING DATE: AGENDA ITEM NUMBER: December 17, 2019 4.1 SUBJECT: Policy Manual Initiative ACTION REQUESTED: Approve, as outlined in the memo, the following: Remove the following policies from the PolicyManual: E.6a,E.7,E.7a, E.12, E.12a, E.12b, W.6a, W.6b, W.6c, W.8, W.8a, W.9a, and W.10. Move the following policies to the Commission Policy Manual: E.5, E.6, E.10, W.5, W.6, W.7, and W.9. Delegate authority to management and move the following policies to the Management Policy Manual: E.2, E.3, E.4, E.8, E.9, E.11, W.2, W.3, and W.4. BACKGROUND: In 2017, the Commission worked with staff and a consulting firm todevelop governancepolices based on the Carver Model governance style. The previous polices were left in place, redundant with the new policies. An initiative was created to develop a migration plan for relevant old policies to become part of the new policy manual, confirm delegation of authority to management for old policies that are not governance, and to eliminate or remove documents that are not policy. The initiative will address the section of the old policy manual per the following commission action request tentative schedule: • September: Rates, Fees, and Programs Section Service Agreements & Requirements Section • October: Personnel Section • November: Administration Section (Except A.1 Service Policies) • December: Electric Section (Except E.1 Electric Department Rules) Water Section (Except W.1 Water Department Rules) • March: A.1 Service Policies E.1 Electric Department Rules W.1 Water Department Rules Per the schedule, the Commission took action on the Rates, Fees, and Programs section as well as the Service Agreements & Requirements section in September. The Commission took action on the Personnel section in October. And, the Commission took action on the Administration section in November. ______________________________________________________________________________ Page 1 of 5 46 DISCUSSION: TheElectricandWatersectionscontain 29 policydocumentswithactionrequestsfor consideration.Theseareattachedforreference.Aninitiativeoverviewandchecklistisattached as well. As indicated in the attached overview, there are 13 policy documents in the Electric and Water sections which are proposed to be eliminated and/or removed from the policy. These policies are: E.6aPoleAttachmentAgreement: Thisisnotpolicy, ratheritistemplateformusedfor a thirdpartyattachingtoERMUpowerpoles. E.7PoleDisposal Policy: This policy is redundant.Thepolicy’s intent is already included inGovernancePolicyG.4l1UseandDisposalofUtilityProperty,includingspecific referencetopowerpoles.Thatlanguagewillbestrengthenedtoincludementionof indemnificationrequirementsregardingdonatedanddisposedmaterials. E.7a Pole Disposal Agreement: This is not policy; ratherit is a legal agreement establishing termsofuse including indemnification clausefor disposed powerpoles. E.12 Distributed Energy Resources and Net MeteringPolicy: This was a multi- stakeholder developed document created undertheauthority of the Minnesota Public Utilities Commission which all utilities were required to adopt. This should be a standalone commission controlled document, like the rate sheets, rather than a governance policy included in the governance manual. This document is required to be available to the public and is accessible through the ERMU website. E.12a RulesGoverningtheInterconnection of Cogeneration and Small Power Production: This is part of the E.12 and shouldbe standalone. E12.b Cogeneration and Small Power ProductionTariff: This is part of the E.12 and should be standalone. W.6a Payment and Assessment of the Coststo Repair Private Utility Lines: Thisis the City’spolicyincluded in the ERMU governancepolicymanual for reference. This should be removed from the ERMU policy book. W.6b PaymentandAssessmentoftheCoststoRepairPrivateUtilityLines: Thisis a city ordinanceincluded in the ERMU governance policy manual forreference.Thisshould be removed from the ERMU policy book. W.6c Petition,Waiverand Agreement for Payment of theCost of Repairs to Private Utility Lines: This is not policy.This isthe form used to apply for this program. W.8 Water Shut-Off Request: Thisis notpolicy. This is a form and should be removed from the policy manual. W.8a Water Shut-Off: This is a city ordinance included in theERMU governance policy manual for reference. This should be removed from theERMU policy book. W.9a WaterUseRestrictions: This is a city ordinance included in the ERMU governance policy manual for reference. This should be removed from theERMUpolicybook. W.10 Wellhead Protection Plan: This document should be a standalone plan andnot partofthe governance manual. ______________________________________________________________________________ Page 2 of 5 47 TherearesevenpolicydocumentsintheElectricandWatersectionswhichareproposedtobe movedandincorporatedintotheGovernancesection.Thisretainsthe Commission’sdirect authorityoverthesedocumentsastheywillbecomepartoftheCommissionPolicyManual.The six policy documents and their new policy numbers are: E.5MutualAidPolicy: Proposed to move policyto G.4r Mutual Aid. E.6PoleAttachment Policy: Proposed tointegratepolicyinto new policyG.4l4 Third Party Attachment to Assets along withadditionallanguage regarding attachment to water towers and street lights. E.10StreetLightInstallationandMaintenance – MemorandumofUnderstanding: Proposedto move to G.2a2 Street Light Installation and Maintenance – Memorandum of Understanding as a sub-policy to G.2aCommission – City CouncilRelationshipand Roles. W.5LoopingWater Mains: Proposed toincorporate policyinto W.1 Water Department Rules. W.6PaymentofPrivate Water LineConnection and Repair Cost – Memorandumof Understanding: Proposed to move policy toG.2a3Payment of PrivateWater Line Connection and Repair Cost – Memorandum of Understanding as a sub-policy to G.2a Commission – City CouncilRelationship and Roles. W.7Side Lot Easements: This policydirectly relates to W.5 Looping Water Mains; and along with W.5, this policy should be incorporated into W.1 WaterDepartmentRules. To be enforceable, this policy or the intent thereof should also be added into ordinance. W.9 Water Use Restrictions: Proposed to move to policy G.4o1 Water Use Restrictions as a sub-policy under the G.4o Environmental Stewardship policy. And, there are nine policy documentsin the Electricand Water sections which are proposed to be moved to the Management Policy Manual. This action would delegate the authority over these policies to management, while the Commission would retain indirect authority over through their oversight of the General Manager. These policy documents and their new policy numbers are: E.2Distribution ReliabilityStandard: Section 6 of Commission Policy G.4e Core Customer Servicesstates that theGeneral Manager shall establishstandards for reliability. Policy E.2 established those standardswhich are required by G.4e for the General Manager to establish through management policy. Policy E.2 should be delegated to management to oversee and periodically revise with a requirement to provide annual reporting to the Commission. E.3IntegrityTestingPolicy: This policyprovides procedural guidelines for an integrity testing program for qualified large demand electric customerswith generation. This document does not need to be a commission policy and should be delegated to management to oversee and periodically revise as needed. Reference to the integrity ______________________________________________________________________________ Page 3 of 5 48 testingprogramshouldbeaddedtodemandelectricrateandthelargedemandelectric ratereferringtomanagementforprogramdetails. E.4Mid-Block Street Lighting: This policy addresseslocations of fixtures and distance betweenfixtureswhichwouldvarybasedonthetypeoffixture, andisanoperational decisionratherthan a governancedecision.Theroleofthe Commissionisoverseeing expectedresultsandthemeansinwhichthoseresultsareachieved.Withregardsto street lighting and expected results, the Commission and council entered into a memorandum of understanding. This memorandum outlines the expectations for new and replacement street lights. It also outlines the process expectations including: street planning and construction notification requirement of the city to ERMU, authority for design standards, and material/labor costs associated with street lighting. The downstream information documented in policy E.4 would be the responsibility of management as established by the memorandum of understanding. This policy should be formally delegated to management to oversee and periodically revise as needed. E.8PoleMoveProcedure: Thisis notpolicy. This is a procedural document outlining the operational and/or circumstantial reasons for a power pole move. E.9Street Light Construction Standards: This is notpolicy.This document outlined materials and construction standards used for the street light pole options offered. The materials and the street light fixture types in this document are obsolete. The types of street light fixtures offered are listed through the rate sheet and the fee schedule. There does not need to be a policy document to also mandate the materials used as these may change annually with new products or approved manufactures/models. E.11 Two-Way Radio Guidelines: This document outlines radio use guidelines and is procedural, not policy. This document should be delegated to management to oversee and periodically revise as needed. W.2 Water Distribution SystemMaintenanceProgram: Thisis not policy. This document outlines operational system maintenance schedules and expectations for water operators. This document should be delegated tomanagement to oversee and periodically revise as needed. W.3Customer Contact for Water MeterChange-Out: This document outlines the processinwhichemployeescontactwatercustomersfor a meterchange-out.This documentshouldbedelegatedtomanagementtooverseeandperiodicallyreviseas needed. W.4Fire Hydrant Use and Maintenance: This document outlines the program forthe maintenance and use of public and private fire hydrants. The program is not governance; however, the fee association with maintenance serviceofprivate hydrants is approved by the Commission annually as part of the utilities’ Fee Schedule. This document outing the program should be delegated to management to oversee and periodically review as needed. The establishment and annual approval of the fee should remain the direct responsibility of the Commission as part of the Fee Schedule. ATTACHMENTS: ______________________________________________________________________________ Page 4 of 5 49 Commission Policy Manual and Management Policy Manual Implementation Overview ERMU Policies – Electric Section o E.2 – Distribution Reliability Standard o E.3 – Integrity Testing Policy o E.4 – Mid-Block Street Lighting o E.5 – Mutual Aid Policy o E.6 – Pole AttachmentPolicy o E.6a – Pole Attachment Agreement o E.7 – Pole Disposal Policy o E.7a – Pole Disposal Agreement o E.8 – Pole Move Procedure o E.9 – Street Light Construction Standards o E.10 – Street Light Installation and Maintenance - Memorandum of Understanding o E.11 – Two-Way Radio Guidelines o E.12 – Distributed Energy Resources and Net Metering Policy o E.12a – Rules Governing the Interconnection of Cogeneration and Small PowerProduction o E.12b – Cogeneration and Small PowerProduction Tariff ERMU Policies – Water Section o W.2 – Water Distribution System Maintenance Program o W.3 – Customer Contact for Water Meter Change-Out o W.4 – Fire Hydrant Use and Maintenance o W.5 – Looping Water Mains o W.6 – Payment of Private Water Line Connection and Repair Costs – Memorandumof Understanding o W.6a – Payment and Assessment of the Costs to Repair Private Utility Lines – City Policy (for reference only) o W.6b – Payment and Assessment of the Costs to Repair Private Utility Lines – City Ordinance(forreferenceonly) o W.6c – Petition,WaiverandAgreementforPaymentoftheCostofRepairstoPrivate Utility Lines o W.7 – SideLotEasements o W.8 – Water Shut-Off Request o W.8a – Water Shut-Off - City Ordinance (for reference only) o W.9 – Water Use Restrictions o W.9a – Water Use Restrictions - City Ordinance (for reference only) o W.10 – Wellhead Protection Plan ______________________________________________________________________________ Page 5 of 5 50 E.2 Distribution Reliability Standard 1.0Safety Standard Reference: Minnesota Rules, part 7826-0300 When constructing new facilities or reinvesting in existing utilities, Elk River Municipal Utilities shall comply with, at a minimum, the National Electrical Safety Code. Elk River Municipal Utilities shall make best efforts to comply with all regulations promulgated by the United States Occupational Safety and Health Administration (OSHA) and by the Occupational Safety and Health Division of the Minnesota Department of Labor and Industry. 2.0 Annual Safety Report Reference: Minnesota Rules, part 7826.0400 Elk River Municipal Utilities will file an annual safety performance report with its local governing body. The report will include summaries of all reports filed with OSHA and the Occupational Safety and Health Division of the Minnesota Department of Labor and Industry during the calendar year. The report will be available for inspection upon request in accordance to the data privacy act. 3.0 Distribution Reliability Standard Reference: Minnesota Rules, part 7826.0500 Elk River Municipal Utilities will submit a report of its reliability performance report to its local governing body annually. The report shall include at least the following information: A.The uSystem Average Interruption Duration Index year. SAIDI means the average customer-minutes of interruption per customer. It is determined by dividing the annual sum of customer-minutes of interruption by the average number of customers served during the year. B.System Average Interruption Frequency Index the average number of interruptions per customer per year. It is determined by 51 dividing the total annual number of customer interruptions by the average number of customers served during the year. C.The utilityCustomer Average Interruption Duration Index calendar year. CAIDI means the average customer-minutes of interruption per customer interruption. It approximates the average length of time required to complete service restoration. It is determined by dividing the annual sum of all customer-minutes of interruption durations by the annual number of customer interruptions. D.Elk River Municipal Utilities will note in its report unusual events, such as severe storms. E.Elk River Municipal Utilities will adopt an action plan, sought by its local governing body, for remedying any failure to comply with its own locally-set reliability standards. F.Elk River Municipal Utilities will track each interruption of a bulk power supply facility that impacts the local distribution system during the calendar year. Elk Rvier Municipal Utilities will compile SAIDI, SAIFI, and CAIDI indices including interruptions of bulk power supply, and a separate SAIDI, SAIFI, and CAIDI report on interruptions due solely to local distribution system causes. G.Elk River Municipal Utilities will diligently attempt to obtain detailed explanations from bulk power suppliers (generation and transmission companies) in regards to bulk supply interruptions and steps that have been taken or will be taken to prevent future interruption. H.Elk River Municipal Utilities shall inform its local governing body of any major service interruption. Major service interruption means bulk power supply or an interruption of service at the feeder level above which affects 500 or more customers for one or more hours. The utility may call the Minnesota Public Utilities Commission (651-296-0406) regarding any significant interruption caused by a bulk power supply facility. I.Data on staffing levels, including field employees responsible for responding to trouble and for the operation and maintenance of distribution lines. 5.0 Reliability Standards Reference: Minnesota Rules, part 7826-0600 The governing body of Elk River Municipal Utilities shall adopt its own locally-set reliability performance standards, in the form of proposed numerical values for SAIDI, SAIFI, and CAIDI. These standards shall remain in effect until changed by the governing body. 6.0 Customer Notice of Planned Service Interruptions Reference: Minnesota Rules, part 7826-0800 Elk River Municipal Utilities shall give customers the most effective actual notice possible of any planned service interruption expected to last longer than 20 minutes. For any planned interruption expected to exceed four (4) hours, the utility shall provide, if feasible, door-to-door 52 household visits 12 to 72 hours before the interruption. Planned service interruptions will be scheduled at times to minimize the inconvenience to customers. 7.0 Meter Reading Frequency Reference: Minnesota Rules, part 7826-0900 Elk River Municipal Utilities shall attempt to read all of its meters monthly. 8.0 Replacing Malfunctioning Meters Reference: Minnesota Rules, part 7826-1000 The utility shall replace a malfunctioning meter within ten calendar days of receiving a report from a customer questioning its accuracy or within ten calendar days of learning in some other way that it may be inaccurate. A meter testing fee may be applied per local utility rules and regulations. 9.0 Call Response Time Reference: Minnesota Rules, part 7826-1200 Calls to the office during regular business hours shall be answered within four rings. After hours emergency calls will be answered by 763-241-3796 or if there is no answer, call Sherburne County Dispatch at 763-241-2540 and have them page the Elk River Municipal Utilities on-call personnel. 53 E.3 Integrity Testing Policy 1.0Purpose The purpose of this policy is to provide an opportunity for rate relief to qualified Demand Electric Service customers from incremental demand charges resulting from approved integrity testing wh 2.0 Scope For new or existing Demand Electric Service customers,installing new or replacement equipment and conducting tests to determine the integrity of their equipment and/or electrical system can have a significant financial impact on their electric demand and power bill. It can costs if such testing coincides with the hour the monthly billing peak is established. To encourage the practice of performing integrity testing during off-peak hours, qualified customers may be eligible to apply for incentive to conduct integrity testing during off-peak hours. That incentive will come in the form of an agreement to waive the incremental demand charge associated with the additional peak demand created by integrity testing providing the following conditions are observed: A.The applicant is an ERMU Demand Electric Service customer in good standing. B.Integrity testing would occur during off-peak hours as defined in the policy. C.The term off-peak hours refers to the six hours from midnight to 6 AM any weekday (Monday through Friday) or the ten hours from midnight to 10 AM any weekend day or holiday. D.Integrity testing refers to commissioning of new or replacement equipment and/or facility testing that is typically performed to test the integrity of the customers equipment and/or electrical system or ERMU electrical systems serving the equipment or facility prior to the customer integrating the new or replacement equipment into full operation. E.The customer must complete a written application at least two business days prior to the proposed integrity testing date. ERMU will provide formal confirmation of the application approval. Approval is required to receive the integrity testing incentive. Such permission shall not unreasonably be withheld. Revised: January 9, 2018 54 E.4 Mid-Block Street Lighting 1.0Mid-Block Street Lighting A.In newly platted areas, street lights shall be installed at all major intersections and at mid-block, provided that no lights are spaced closer than 300 feet. Street lighting layout shall be approved by the Elk River Municipal Utilities and shall be consistent with the standard type of lighting currently being utilized by the City to provide for a uniform City Street Lighting System. 55 E.5 – Mutual Aid Policy 1.0Elk River Municipal Utilities Mutual Aid Policy A.In the event if a natural disaster or catastrophic event resulting in the compromise of water or electric utilities outside Elk River Municipal Utilities’ service territory, Elk River Municipal Utilities may be contacted through utility associations, utility companies or cities to provide assistance. This request for assistance may be that of labor or equipment resources. At the discretion of the Utility Management, resources may be dispatched in such a way as to not compromise Elk River Municipal Utilities or their customers. Adopted February 24, 2009 56 E.6 - Pole Attachment Policy 1.0Purpose and Summary Elk River Municipal Utilities, upon the terms and subject to the conditions set forth herein, may enter into an agreement providing a grant of license to a third party for the attachment of communication equipment. The Pole Attachment Agreement shall establish requirements for, but not limited to the following: payment terms, method to determine allocation installation costs, access, design standards, and hold harmless terms. 2.0Fees The annual license fee for communication equipment attachments shall be $6.50 per pole. Adopted March 11,1997 Revised July 12, 2011 1 57 ELK RIVER MUNICIPAL UTILITIES POLE ATTACHMENT AGREEMENT day of , , by and 1.Grant of License. Owner grants to Licensee, upon the terms and subject to the conditions set es of the Owner located Dayton, and Big Lake Township; identified in Exhibit A attached hereto and incorporated herein. 2.License Fees. a.Licensee agrees to pay b.The Annual License Fee shall be in the amount of the pole attachment rate set by Owner from time to time. The current pole attachment rate is set forth in Exhibit B attached hereto and incorporated herein. st c.The Annual License Fee shall be paid on or before January 31 of each year for so long as this Agreement remains in effect. There shall be no proration for any period of time of less than on year. d.As an additional license fee, Licensee shall reimburse Owner for all expenses incurred by Owner in making necessary alterations or additions to its poles for the purpose of g costs allocated to Licensee by Owner pursuant to Paragraph 6 hereof. 3.Maintenance of Communication Equipment. Licensee will be responsible for maintenance of the Communication Equipment and will have the right to access the Communication Equipment for maintenance purposes. However, Licensee must give Owner written notification before commencing any maintenance activities. Licensee will maintain its Communication Equipment at no cost to Owner. It is specifically contemplated and understood by the parties that Owner Communication Equipment will be reimbursed by Licensee. Page 1 of 5 58 4.Design Standards. Communication Equipment shall at all times be in conformity with the National Electric Safety Code, as amended and all applicable Federal, State, and Local regulations and requirements. All prepared by a qualified and certified engineer and submitted to Owner for review and approval ƦƩźƚƩ to the commencement of any work. 5.Right of Way for Lic Owner does not, in any manner, warrant or covenant with the Licensee regarding the validity of any easements, franchise or other authorizations warrant or covenant with Licensee regarding the validity of any rights hereby given with respect 6.Division of Costs. a.The cost of erecting new poles covered by this Agreement, to construct new pole lines, to make extensions to existing pole lines or to replace existing poles, shall be borne by the parties as follows: i.The cost in place of a normal pole or pole smaller than normal shall be borne by Owner. Owner shall have sole discretion to determine, from time to time, the specifications for a normal pole. ii.In the case of a pole larger than normal, where all or part of the extra height or strength is necessary because of the requirements of Licensee, including requirements for k to meet required clearances, the extra cost in place of such a pole shall be borne by Licensee. iii.In the case of a pole larger than normal where all or part of the extra height or strength is necessary because of requirements of Owner, including of trees or to meet required clearances, the extra cost in place of such a pole er. iv.In the case of a pole larger than normal where all or part of the extra height or strength is necessary because of the requirements of both parties, or the requirements of public authorities or property owners (other than requirements with regard to keeping the equipment of one party only clear of trees or to keep the required clearance for that one party), Licensee shall pay the Owner a sum equal to one-half the difference between the cost in place of such pole and the Page 2 of 5 59 cost in place of a normal pole, the rest of the cost of erecting such pole to be borne by Owner. v.Owner shall have sole discretion to determine the amounts and allocation of costs for larger than normal poles under this Section 6a. b.Any payments for poles made by Licensee under any provisions of this paragraph 6 shall be a license fee only and shall not entitle Licensee to ownership of any part of said poles for which it has contributed in whole or in part. c.Where an existing pole is prematurely replaced by a new one solely for the benefit of Licensee, the cost in place of the new pole shall be paid by Licensee, and Licensee shall also pay the value of the replaced pole, plus the cost of removal less the salvage value of such pole. The replaced pole shall be removed and retained by Owner. Owner shall have sole discretion to determine whether replacement of a pole is necessary and is being done for the benefit of Licensee. d.Owner shall have exclusive discretion to determine, from time to time, what is a normal pole, to determine when a normal pole needs to be replaced or upgraded, and to determine the costs and the allocation of costs to install, replace or upgrade a normal pole. 7.Installation of Communications Equipment. a. Licensee shall submit detailed plans to Owner for the installation of the Communications Equipment, including such information and plans as Owner shall require, so Owner can determine the feasibility of the proposed installation and determine any costs to be incurred pursuant to Paragraph 6 hereof. b. writing, if the plans have been approved and, if so, any alterations to the plans required by Owner and Owners determination of costs for the installation to be allocated to Licensee. c.Prior to the commencement of any work on the installation of the Communication Equipment by Licensee: i. of the installation to be allocated to Owner under Paragraph 6 hereof. Page 3 of 5 60 ii.Licensee shall deposit with Owner such amount as Owner shall determine, in its or other equipment caused by the installation and not corrected by Licensee. d.Following the approval of plans and the payment of amounts due, Licensee may proceed with installation of the Communications Equipment on such terms and schedule as Owner shall approve in a written approval to proceed. e.All Communication Equipment shall be installed to the satisfaction of ERMU, in its sole discretion. Licensee shall make any corrections, repairs or replacements to the Communications Equipment required by Owner and shall not put the Communications Equipment into service until Owner has issued its written approval of the installation. equipment occurring during the installation. f.Following approval by Owner of the installation of the Communication Equipment, Owner shall calculate the actual costs of the installation to be allocated to Licensee. If the costs allocated to Licensee are less than the amount pre-paid by Licensee, Owner shall refund Licensee any amounts due within 30 days. If the costs allocated to Licensee are more than the amount pre-paid by Licensee, Licensee shall pay all additional amounts due within 30 days of notice from Owner of those amounts. g.Owner shall also return to Licensee any amount of the deposit submitted by Licensee not required by Owner to repair poles or equipment damaged during the installation. 8.Termination of Use. If Owner desires at any time to abandon any pole, it shall give Licensee notice in writing to that effect at least ninety (90) days prior to the date on which Owner intends to discontinue use of the pole. Licensee shall thereupon remove its Communication Equipment from the pole no later than ten (10) days before expiration of the notice period. Licensee may at any time discontinue the use of any pole by removing any and all attachments it may have thereon. If Owner determines, in its sole discretion, that the abandoned pole may stay in place, Owner and Licensee may, if they both desire to, enter into negotiations for sale of the abandone right of way or property where the pole is located. The Owner of the right of way or property where the pole is located shall be a party to any such agreement. 9.Covenant to Hold Harmless. Licensee agrees to hold harmless and defend Owner against any related to Licensees installation, operation and/or maintenance of Communications Equipment representatives, nor to any other person for any personal injury, death or damage to property, Page 4 of 5 61 ed to Licensees installation, operation and/or maintenance of Communications Equipment on the poles. 10.Existing Rights of Other Parties. Owner has, prior to the execution of this Agreement, conferred upon others, not parties to this Agreement, by contract or otherwise, the rights or privileges to as affecting said rights or privileges, and Owner shall have the right, by contract or otherwise, to continue and to extend such existing rights or privileges. It is expressly understood, however, that for the purpose of this Agreement, the attachments of any other party shall be treated as attachments belonging to the Owner, and the rights, obligations and liability hereunder of the Owner with respect to such attachments shall be the same as if Owner were the actual owner of those attachments. 11.Assignment. This Agreement shall not be assignable by Licensee. 12.Benefited Parties. This Agreement shall inure to the benefit of the parties hereto. Nothing contained in this Agreement or the relationship created thereby shall be deemed to benefit third parties, or to establish a precedent in the relationship between Owner and any other party. Elk River Municipal Utilities \[Licensee\] By: By: Its: Its: Dated: Dated: GP:2999592 v2 Page 5 of 5 62 E.7 Pole Disposal Policy 1.0Procedure for Pole Disposals A.Occasionally existing overhead electrical distribution is upgraded, relocated, or replaced with underground. This may result in the Utility reclaiming used utility poles that would need to be disposed of. Used poles that are unfit for reuse as utility poles because of height or condition but are in reasonable condition for other uses will be given away or disposed of. These poles will be offered to the public and employees at a first come first serve basis. To receive any of these used utility poles, a Utility Pole Agreement waiver must be signed releasing the Utility of liability. 63 UTILITY POLE AGREEMENT This agreement is made this ____ day of ___________________, 20____, by and between Elk River Municipal Utilities Whereas ERMU is the owner of used utility poles; and Whereas Buyer desires to acquire from ERMU______________________used utility poles; Whereas, as a condition to the transfer of said utility poles to Buyer, ERMU requires Buyer to execute this Agreement. NOW, THEREFORE, in consideration of the foregoing and other valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows: 1.- BUYER HEREBY ACKNOWLEDGES AND AGREES THAT BUYER HAS HAD AMPLE OPPORTUNITY TO INSPECT AND EVALUATE THE PHYSICAL CHARACTERISTICS OF THE USED UTILILTY POLES, AND HAS INDEPENDTLY DETERMINED THE POLE(S) IS ACCEPTABLE IN ALL RESPECTS TO BUYER. BUYER FURTHER ACKNOWLEDGES AND AGREES BUYER IS ACCEPTING --IS WITHOUT RELYING UPON AN REPRESENTATIO OR WARRANTIES WITH RESPECT TO THE POLES MADE BY ERMU, ITS AGENTS, EMPLOYEES, OR INDEPENDENT CONTRACTORS, ORAL OR WRITTEN, EXPRESS OR IMPLIED. BUYER ACKNOWLEDGES THAT ERMU HAS MADE NO EXPRESS OR IMPLIED REPRESENTATIONS OR WARRANTIES WITH RESPECT TO THE USED UTILITY POLES OR ANY CONDITION THEREOF. 2.IDEMNIFICATION. Buyer hereby agrees to defend, indemnify and hold harmless ERMU, against any and all claims, demands, damages, cost and expenses, including transporting, and use of the used utility poles including any and all costs associated with the use, handling, storage, release or disposal of any Hazardous Substances. 3.USE. Buyer warrants and represents that Buyer will not burn or erect the used utility pole. 4.ENTIRE AGREEMENT. This Agreement contains the entire understanding between the parties with respect to the purchase and use of the used utility poles by the Buyer and supersedes all prior agreements and understandings between the parties with respect to such purchase. 64 ELK RIVER MUNICIPAL UTILITIES BUYER BY:_____________________________ BY:________________________________ Its:________________________ , Printed Name Address:____________________________ ___________________________________ Phone #:____________________________ 65 E.8 Pole Move Procedure 1.0Pole Move Procedure In the general policy of Elk River Municipal Utilities (ERMU), it states that 3Ø electric feeder lines be constructed overhead while any 3Ø or 1Ø taps are constructed underground.ERMU on occasion is asked to replace our overhead electric lines by either relocating or placing underground. These overhead lines may be either 1Ø or 3Ø. The conditions under which this can occur are as follows: A.Overhead line is in poor condition or is obsolete where replacement and upgrading is warranted while being fiscally responsible. B.Land use change requiring overhead system to be relocated or upgraded for capacity. C.Existing line not constructed in right-of-way or easement and land owner requests line to be relocated. D.NESC clearance issues that result in code violations. E.Moving entire overhead lines from rear lot line to front line due to accessibility while being fiscally responsible. F.Overhead line requires excess tree trimming where burying line is more economical than continued tree trimming. G.Governmental regulations requiring electric lines be placed underground for either new construction or maintenance requiring pole movement or replacement on existing overhead system. (Otsego) H.Customer desiring pole to be moved and reimburses ERMU for expense and it is technically feasible to move or bury. Burying spans in the middle of an overhead system is generally not advisable due to lightning. I.Right-of-Way or easement conditions require entire line to be relocated while not jeopardizing the reliability of the system and be fiscally responsible. Consideration shall be given to treating all affected customers equally. J.Resolve general safety concerns where it is in the best interest of ERMU or general public to relocate pole or line. 66 E.9 Street Light Construction Standards 1.0Street Light Construction Standards A. cobra head lamp. Used in existing areas with overhead line construction and existing areas with underground construction with no street lights. Installation cost per ERMU Street Light Agreement form. B. lamp. Used in new developments with underground electrical system at intersections of major roads. Installation cost per ERMU Street Light Agreement form. C.ried fiberglass pole with a 150 watt HPS traditionaire lamp. Used in new developments with underground electrical systems of minor street intersections and mid-block lighting if desired. Installation cost per ERMU Street Light Agreement form. 67 68 69 E.11 Two-Way Radio Guidelines 1.0Two- Way Radio Guidelines A.All of us depend on our two-way radios in our vehicles or on our person to communicate with one another. This communication may be either for routine business or an emergency situation. B.The FCC requires certain procedures when using two-way radios, as follows: 1)Channels are shared. Always monitor before keying up transmitter. 2)If other transmissions are in progress, wait for them to finish before beginning your own. It is not appropriate to start transmitting or keying up when another party is transitting. 3)Always identify yourself and your listener when initiating a transmission (e.g. Station 1 to Unit 2). 4)Keep your transmissions to business matters only no horseplay, rude sounds, or foul language. 5)Always try to keep your transmission as brief as possible. 6)Sign off by identifying yourself with your call sign (e.g. Station 1 over). 70 E.12 - Distributed Energy Resources and Net Metering Policy 71 To establish the application procedure and qualification criteria for all customers for the delivery, interconnection, metering and purchase of electricity from distributed energy resource facilities and to comply with applicable laws and rules governing distributed energy resources. The utility recognizes its obligation to provide interconnection to eligible qualifying facilities and will comply with all applicable laws and rules governing distributed energy resources. For purposes of this policy, the following terms have the meanings given them: A.Average retail energy rate - the average of the retail energy rates, exclusive of special rates based on income, age, or energy conservation, according to the applicable rate schedule of the utility for sales to the class of customer of which the customer/qualifying facility belongs. B.Avoided costs - the incremental costs to the utility of electric energy or capacity or both which, but for the purchase from the qualifying facility, the utility would generate itself or purchase from another source. C.Contract - the written agreement between the customer/qualifying facility and the utility, as established in the utility Interconnection of Cogeneration and Small Power Production. D.Distributed energy resource (DER) - a distributed generation system incorporated with or without an electric storage system. E.Interconnection application - the form to be used by the customer to submit its formal request for interconnection to the utility and which shall be substantially similar in form to that contained in the Distributed Energy Resources Interconnection Process adopted by the utility. F.Interconnection rules - any applicable rules developed in accordance with Minnesota Statutes §§216B.164 and 216B.1611. This includes the utilityRules Governing Interconnection of Cogeneration and Small Power Production. It also includes the utility Distributed Energy Resources Interconnection Process which includes its Simplified Process, Fast Track Process, and Study Process as well as the technical requirements incorporated therein or any future technical requirements adopted by the utility. G.Measured capacity - for purposes of determining capacity, it shall be measured based on the highest fifteen (15) minute average demand of the unit in any one billing period. H.Net metering/net billing - the process whereby the customer and the utility compensate each other based on the difference in the amount of energy each sells to the other at the net metered facility. I.Net metered facility - an electric generation facility constructed for the purpose of offsetting energy use through the use of renewable energy or high efficiency generation sources with a capacity of less than 40 kilowatts that has elected in writing to be compensated for excess generation through net metering/net billing. J.Total generator nameplate capacity - the nominal voltage (V), current (A), maximum active power (kWac), apparent power (kVA), and reactive power (kvar) at which a distributed energy resource (DER), is capable of sustained operation. For a qualifying facility with 1 72 nameplate rating in the qualifying facility. tion capacity may, with the utility similar device settings or adjustments as identified in IEEE 1547. The customer must fully, accurately and completely disclose in its interconnection application to the utility, the technical specifications for any capacity limiting device contemplated and the customer shall furnish the utility with any factory manuals or other similar documents requested from the utility regarding such limiting or other control devices which factor into the calculation of total generator capacity. K.Qualifying facility - a cogeneration or small power production facility which satisfies the conditions established in Code of Federal Regulations, title 18, part 292. The qualifying facility must be owned by a customer of the utility and located in the utility service area. L.Utility Elk River Municipal Utilities. In the event an inconsistency exists between terms in this policy and those established by applicable statute, rule or court order, then the definition so established shall supersede the definition used in this policy and shall govern. All customers are eligible for distributed generation, interconnection with the utility's distribution system and application of net metering upon the following terms and conditions. 1.The customer must meet the eligibility requirements set forth in the federal Public Utility Regulatory Policies Act of 1978 (PURPA) *18 C.F.R. 292.303, 292.304 and Minnesota's distributed generation laws. Minn. Stat. §216B.164. 2.The customer shall complete, sign and return to utility either the Interconnection Application or the Simplified Process Application in the form prescribed in the utility Distributed Energy Resources Interconnection Process. The application shall be approved by the utility prior to the customer beginning the project. The customer signature on the application indicates the customer shall follow the steps outlined in the u interconnection rules. 3.The customer shall enter into a written contract with the utility using the uniform contract contained in the utility Interconnection of Cogeneration and Small Power Production. 4.The qualifying facility shall pay the utility for all reasonable costs of interconnection including those costs outlined in Minnesota Statute 216B.164, the utilityDER Interconnection Process, and the State of Minnesota Interconnection Technical Requirements. 5.The qualifying facility total generator nameplate capacity shall be less than 40 kW and the facility shall operate at a measured capacity of less than 40 kW at all times to qualify for net metering/net billing or roll over credit compensation. 6.The utility may limit the capacity and operating characteristics of qualifying facility single phase generators in a manner consistent with the utility limitations for single phase motors, when necessary to avoid a qualifying facility from causing problems with the service of other customers. 7.The utility may require the qualifying facility to discontinue parallel generation operations when necessary for system safety. 2 73 8.The power output from the qualifying facility must be maintained so that frequency and voltage are compatible with normal utility service and do not cause that service to fall outside the prescribed limits of interconnection rules and other standard limitations. 9.The qualifying facility shall keep in force liability insurance against personal or property damage due to the installation, interconnection, and operation of its electric generating facilities. The amount of insurance coverage shall be the maximum amount of said insurance for a qualifying facility or net metered facility as outlined in the utility Interconnection Process. 10.Failure of the qualifying facility to operate its distributed energy resource at a measured capacity below the 40 kW AC capacity limit established by Minn. Stat. §216B.164, Sub. 3 and as contemplated by this policy, shall result in the following. The utility will notify the customer/qualifying facility of the fact that its generating equipment has failed to operate below the 40 kW AC maximum capacity and will provide the customer/qualifying facility with the date, time and kW reading that substantiate this finding. 11.The utility shall compensate the customer/qualifying facility for all metered electricity produced by said qualifying facility during the thirty (30) day period during which the failure occurred, at the utility's wholesale power supplier's avoided cost rate. 12.The utility shall continue to pay the customer/qualifying facility for subsequent electricity produced and delivered pursuant to the contract, at the utility's wholesale power supplier's avoided cost rate until: 1.The problem with the generator that caused it to operate at or above the statutory maximum capacity has been remedied; and 2.The utility has been provided documentation adopted by a Minnesota Professional Engineer that confirms the problem with the generator has been remedied. 13.Any customer account eligible for net metering/net billing is not eligible for any other load management discounts unless agreed to by the utility. 14.Payment for the purchase of the qualifying facility of a credit on the custome payment to the customer within fifteen (15) days of the billing date, whichever is selected and indicated in the contract. 15.The customer must be, and continue to be, current with payment on its electric account with utility. 16.The customer must not enter into any arrangement that violates the utility to provide electric service in its service area under Minnesota Statutes §§216B.37-44. 17.In the event that the distributed generator fails to meet the requirements of this policy for a total distributed generation capacity of less than 40 kW AC, and fails to satisfy the corrective requirements set forth in Section 12 above, then the utility will have the right to (1)cancel the contract with the owner of the qualifying facility, and (2) enter into a new contract with the owner of the qualifying facility that, among other changes, adjusts the qualifying facilityqualifying facilityoutput. To the extent that the utility does not have the obligation to make purchases from qualifying facilities of 40 kW or greater due to transfer of the obligation to the utility's wholesale supplier that has been approved by the Federal Energy Regulatory Commission, the new agreement will be between the utility's wholesale supplier and the 3 74 qualifying facility. In either case, the utility (and, as applicable, the utility's wholesale supplier) and the owner of the qualifying facility will cooperate in the transition from the form of contract set forth in the utilityRules Governing Interconnection of Cogeneration and Small Power Production to a new form of contract appropriate to a qualifying facility with a capacity of 40 kW or greater. 18.Fully executed interconnection contracts for distributed energy resources may be canceled in the event the distributed energy resource fails to interconnect to the utility distribution system within twelve (12) months of signing of the interconnection contract by the qualifying facility and the utility. 4 75 E.12a Rules Governing the Interconnection of Cogeneration and Small Power Production Facilities with Elk River Municipal Utilities 76 Part A. DEFINITIONS Subpart 1. Applicability. For purposes of these rules, the following terms have the meanings given them below. Subp. 2. Average retail utility energy rate. "Average retail utility energy rate" means, for any class of utility customer, the quotient of the total annual class revenue from sales of electricity minus the annual revenue resulting from fixed charges, divided by the annual class kilowatt-hour sales. The computation shall use data from the most recent calendar year available. Subp. 3. Backup power. "Backup power" means electric energy or capacity supplied by the utility to replace energy ordinarily generated by a qualifying facility's own generation equipment during an unscheduled outage of the facility. Subp. 4. Capacity. "Capacity" means the capability to produce, transmit, or deliver electric energy, and is measured by the number of megawatts alternating current at the point of common coupling between a qualifying facility and the utility's electric system during a 15-minute interval period. Subp. 5. Capacity costs. "Capacity costs" means the costs associated with providing the capability to deliver energy. The utility capacity costs consist of the costs of facilities from the utility and the operating and maintenance costs of these facilities. Subp. 6. Customer. "Customer" means the person named on the utility electric bill for the premises. Subp. 7. Energy. "Energy" means electric energy, measured in kilowatt-hours. Subp. 8. Energy costs. "Energy costs" means the variable costs associated with the production of electric energy. They consist of fuel costs and variable operating and maintenance expenses. Subp. 9. Firm power. "Firm power" means energy delivered by the qualifying facility to the utility with at least a 65 percent on-peak capacity factor in the month. The capacity factor is based upon the qualifying facility's maximum metered capacity delivered to the utility during the on-peak hours for the month. Subp. 10. Governing body. Elk River Municipal Utilities Commission. Subp. 11. Interconnection costs. "Interconnection costs" means the reasonable costs of connection, switching, metering, transmission, distribution, safety provisions, and administrative costs incurred by the utility that are directly related to installing and maintaining the physical facilities necessary to permit interconnected operations with a qualifying facility. Costs are considered interconnection costs only to the extent that they exceed the costs the utility would incur in selling electricity to the qualifying facility as a nongenerating customer. Subp. 12. Interruptible power. "Interruptible power" means electric energy or capacity supplied by the utility to a qualifying facility subject to interruption under the provisions of the utility's tariff applicable to the retail class of customers to which the qualifying facility would belong irrespective of its ability to generate electricity. 1 77 Subp. 13. Maintenance power. "Maintenance power" means electric energy or capacity supplied by a utility during scheduled outages of the qualifying facility. Subp. 14. On-peak hours. "On-peak hours" means either those hours formally designated by the utility as on-peak for ratemaking purposes or those hours for which its typical loads are at least 85 percent of its average maximum monthly loads. Subp. 15. Point of distributed energy resource (DER) connection. "Point of DER connection" means the point where the qualifying facility's generation system, including the point of generator output, is connected to the on of IEEE 1547. Subp. 16. Purchase. "Purchase" means the purchase of electric energy or capacity or both from a qualifying facility by the utility. Subp. 17. Qualifying facility. "Qualifying facility" means a cogeneration or small power production facility which satisfies the conditions established in Code of Federal Regulations, title 18, part 292. The initial operation date or initial installation date of a cogeneration or small power production facility must not prevent the facility from being considered a qualifying facility for the purposes of this chapter if it otherwise satisfies all stated conditions. The qualifying facility must be owned by a Customer and located in the utility service area. Subp. 18. Sale. "Sale" means the sale of electric energy or capacity or both by the utility to a qualifying facility. Subp. 19a. Standby charge. "Standby charge" means the charge imposed by the utility upon a qualifying facility for the recovery of costs for the provision of standby services necessary to make electricity service available to the qualifying facility. Subp. 19b. Standby service. "Standby service" means the service to potentially provide electric energy or capacity supplied by the utility to a qualifying facility greater than 40 kW. Subp. 20. Supplementary power. "Supplementary power" means electric energy or capacity supplied by the utility which is regularly used by a qualifying facility in addition to that which the facility generates itself. Subp. 21. System emergency. "System emergency" means a condition on the utility's system which is imminently likely to result in significant disruption of service to customers or to endanger life or property. Subp. 22. Utility. "Utility" means Elk River Municipal Utilities. Part B. SCOPE AND PURPOSE The purpose of these rules is to implement certain provisions of Minnesota Statutes, §216B.164; the Public Utility Regulatory Policies Act of 1978, United States Code, title 16, §824a-3; and the Federal Energy Regulatory Commission regulations, Code of Federal Regulations, title 18, part 292. These rules shall be applied in accordance with their intent to give the maximum possible encouragement to cogeneration and small power production consistent with protection of the ratepayers and the public. 2 78 Part C. FILING REQUIREMENTS Annually the utility shall file for review and approval, a cogeneration and small power production tariff with the governing body. The tariff must contain schedules 1 4. SCHEDULE 1. Schedule 1 shall contain the calculation of the average retail utility energy rates to be updated annually. SCHEDULE 2. Schedule 2 shall contain all standard contracts to be used with qualifying facilities, containing applicable terms and conditions. SCHEDULE 3. Schedule 3 shall contain the utility's adopted interconnection process, safety standards, technical requirements for distributed energy resource systems, required operating procedures for interconnected operations, and the functions to be performed by any control and protective apparatus. SCHEDULE 4. Schedule 4 shall contain the estimated average incremental energy costs by seasonal, peak and off- Schedule 4 shall also contain the net annual avoided capacity costs, if any, stated per kilowatt-hour and averaged over the on- capacity purchases are first avoided. Both the average incremental energy costs and net annual avoided capacity costs shall be increased by a factor equal to 50 percent of the utility and the electric energy. Part D. AVAILABILITY OF FILINGS All filings shall be maintained at the utility's general office and any other offices of the utility where rate tariffs are kept. The filings shall be made available for public inspection during normal business hours. The utility sh interconnection procedures and application form on the utility website, if practicable, or at the utility office. Part E. REPORTING REQUIREMENTS Annually the utility shall report to the governing body for its review and approval an annual report including information in subparts 1-3. The utility shall still comply with other federal and state reporting of distributed generation to federal and state agencies expressly required by statute. Subpart 1. Summary of average retail utility energy rate. A summary of the qualifying facilities that are currently served under average retail utility energy rate. Subp. 2. Other qualifying facilities. A summary of the qualifying facilities that are not currently served under average retail utility energy rate. Subp. 3. Wheeling. A summary of the wheeling undertaken with respect to qualifying facilities. 3 79 Part F. CONDITIONS OF SERVICE Subpart 1. Requirement to purchase. The utility shall purchase energy and capacity from any qualifying facility which offers to sell energy and capacity to the utility and agrees to the conditions in these rules. Subp. 2. Written contract. A written contract shall be executed between the qualifying facility and the utility. Part G. ELECTRICAL CODE COMPLIANCE Subpart 1. Compliance; standards. The interconnection between the qualifying facility and the utility must comply with the requirements in the most recently published edition of the National Electrical Safety Code issued by the Institute of Electrical and Electronics Engineers. The interconnection is subject to subparts 2 and 3. Subp. 2. Interconnection. The qualifying facility is responsible for complying with all applicable local, state, and federal codes, including building codes, the National Electrical Code (NEC), the National Electrical Safety Code (NESC), and noise and emissions standards. The utility shall require proof that the qualifying facility is in compliance with the NEC before the interconnection is made. The qualifying facility must obtain installation approval from an electrical inspector recognized by the Minnesota State Board of Electricity. Subp. 3. Generation system. The qualifying facility's generation system and installation must comply with the American National Standards Institute/Institute of Electrical and Electronics Engineers (ANSI/IEEE) standards applicable to the installation. Part H. RESPONSIBILITY FOR APPARATUS The qualifying facility, without cost to the utility, must furnish, install, operate, and maintain in good order and repair any apparatus the qualifying facility needs in order to operate in accordance with schedule 3. Part I. TYPES OF POWER TO BE OFFERED; STANDBY SERVICE Subpart 1. Service to be offered. The utility shall offer maintenance, interruptible, supplementary, and backup power to the qualifying facility upon request. Subp. 2. Standby service. The utility shall offer a qualifying facility standby power or service at the Part J. DISCONTINUING SALES DURING EMERGENCY The utility may discontinue sales to the qualifying facility during a system emergency, if the discontinuance and recommencement of service is not discriminatory. 4 80 Part K. RATES FOR UTILITY SALES TO A QUALIFYING FACILITY Rates for sales to a qualifying facility are governed by the applicable tariff for the class of electric utility customers to which the qualifying facility belongs or would belong were it not a qualifying facility. Such rates are not guaranteed and may change from time to time at the discretion of the utility. Part L. STANDARD RATES FOR PURCHASES FROM QUALIFYING FACILITIES Subpart 1. Qualifying facilities with 100-kilowatt capacity or less. For qualifying facilities with capacity of 100 kilowatts or less, standard purchase rates apply. The utility shall make available four types of standard rates, described in parts M, N, O, and P. The qualifying facility with a capacity of 100 kilowatts or less must choose interconnection under one of these rates, and must specify its choice in the written contract required in part V. Any net credit to the qualifying facility must, at its option, be credited to its account with the utility or returned by check or comparable electronic payment service within 15 days of the billing date. The option chosen must be specified in the written contract required in part V. Qualifying facilities remain responsible for any monthly service charges and demand charges specified in the tariff under which they consume electricity from the utility. Subp. 2. Qualifying facilities over 100-kilowatt capacity. A qualifying facility with more than 100- kilowatt capacity has the option to negotiate a contract with the utility or, if it commits to provide firm power, be compensated under standard rates. Part M. AVERAGE RETAIL UTILITY ENERGY RATE Subpart 1. Applicability. The average retail utility energy rate is available only to customer-owned qualifying facilities with capacity of less than 40 kilowatts which choose not to offer electric power for sale on either a time-of-day basis, a simultaneous purchase and sale basis or roll-over credit basis. Subp. 2. Method of billing. The utility shall bill the qualifying facility for the excess of energy supplied by the utility above energy supplied by the qualifying facility during each billing period according to the utility's applicable retail rate schedule. Subp. 3. Additional calculations for billing. When the energy generated by the qualifying facility exceeds that supplied by the utility to the customer at the same site during the same billing period, the utility shall compensate the qualifying facility for the excess energy at the average retail utility energy rate. Part N. SIMULTANEOUS PURCHASE AND SALE BILLING RATE Subpart 1. Applicability. The simultaneous purchase and sale rate is available only to qualifying facilities with capacity of less than 40 kilowatts which choose not to offer electric power for sale on average retail utility energy rate basis, time-of-day basis or roll- over credit basis. Subp. 2. Method of billing. The qualifying facility must be billed for all energy and capacity it consumes during a billing period according to the utility's applicable retail rate schedule. 5 81 Subp. 3. Compensation to qualifying facility; energy purchase. The utility shall purchase all energy which is made available to it by the qualifying facility. At the option of the qualifying facility, its entire generation must be deemed to be made available to the utility. Compensation to the qualifying facility must be the energy rate shown on schedule 4. Subp. 4. Compensation to qualifying facility; capacity purchase. If the qualifying facility provides firm power to the utility, the capacity component must be the s net annual avoided capacity cost per kilowatt-hour averaged over all hours shown on schedule 4, divided by the number of hours in the billing period. If the qualifying facility does not provide firm power to the utility, no capacity component may be included in the compensation paid to the qualifying facility. Part O. TIME-OF-DAY PURCHASE RATES Subpart 1. Applicability. Time-of-day rates are required for qualifying facilities with capacity of 40 kilowatts or more and less than or equal to 100 kilowatts, and they are optional for qualifying facilities with capacity less than 40 kilowatts. Time-of-day rates are also optional for qualifying facilities with capacity greater than 100 kilowatts if these qualifying facilities provide firm power. Subp. 2. Method of billing. The qualifying facility must be billed for all energy and capacity it consumes during each billing period according to the utility's applicable retail rate schedule. Subp. 3. Compensation to qualifying facility; energy purchases. The utility shall purchase all energy which is made available to it by the qualifying facility. Compensation to the qualifying facility must be the energy rate shown on schedule 4. Subp. 4. Compensation to qualifying facility; capacity purchases. If the qualifying facility provides firm power to the utility, the capacity component must be the capacity cost per kilowatt shown on schedule 4 divided by the number of on-peak hours in the billing period. The capacity component applies only to deliveries during on-peak hours. If the qualifying facility does not provide firm power to the utility, no capacity component may be included in the compensation paid to the qualifying facility. Part P. ROLL-OVER CREDIT PURCHASE RATES Subpart 1. Applicability. The roll-over credit rate is available only to qualifying facilities with capacity of less than 40 kilowatts which choose not to offer electric power for sale on average retail utility energy rate basis, time-of-day basis or simultaneous purchase and sale basis. Subp. 2. Method of billing. The utility shall bill the qualifying facility for the excess of energy supplied by the utility above energy supplied by the qualifying facility during each billing period according to the utility Subp. 3. Additional calculations for billing. When the energy generated by the qualifying facility exceeds that supplied by the utility during a billing period, the utility shall apply the excess kilowatt hours as a credit to the next billing period kilowatt hour usage. Excess kilowatt hours that are not offset in the next billing period shall continue to be rolled over to the next consecutive billing period. Any excess kilowatt hours rolled over that are remaining at the end of each calendar year shall cancel with no additional compensation. 6 82 Part Q. CONTRACTS NEGOTIATED BY CUSTOMER A qualifying facility with capacity greater than 100 kilowatts must negotiate a contract with the utility setting the applicable rates for payments to the customer of avoided capacity and energy costs. Subpart 1. Amount of capacity payments. The qualifying facility which negotiates a contract under part Q must be entitled to the full avoided capacity costs of the the Minnesota Municipal Power Agency. The amount of capacity payments will be determined by Subp. 2. Full avoided energy costs. The qualifying facility which negotiates a contract under part Q must be entitled to the full avoided energy costs of the Minnesota Municipal Power Agency. The costs must be adjusted as appropriate to reflect line losses. Part R. WHEELING Qualifying facilities with capacity of 30 kilowatts or greater, are interconnected to the util distribution system and choose to sell the output of the qualifying facility to any other utility, must pay any appropriate wheeling charges to the utility. Within 15 days of receiving payment from the utility ultimately receiving the qualifying faci the payment less the charges it has incurred and its own reasonable wheeling costs. Part S. NOTIFICATION TO CUSTOMERS Subpart 1. Contents of written notice. Following each annual review and approval by the utility of the cogeneration rate tariffs the utility shall furnish in the monthly newsletter or similar mailing, written notice to each of its customers that the utility is obligated to interconnect with and purchase electricity from cogenerators and small power producers. Subp. 2. Availability of information. The utility shall make available to all interested persons upon request, the interconnection process and requirements adopted by the utility, pertinent rate schedules and sample contractual agreements. Part T. DISPUTE RESOLUTION In case of a dispute between a utility and a qualifying facility or an impasse in the negotiations between them, either party may request the governing body to determine the issue. Part U. INTERCONNECTION CONTRACTS Subpart 1. Interconnection standards. The utility shall provide a customer applying for and requirements. Subp. 2. Existing contracts. Any existing interconnection contract executed between the utility and a qualifying facility with capacity of less than 40 kilowatts remains in force until terminated by mutual agreement of the parties or as otherwise specified in the contract. The governing body has assumed 7 83 all dispute responsibilities as listed in existing interconnection contracts. Disputes are resolved in accordance with Part T. Subp. 3. Renewable energy credits; ownership. Generators own all renewable energy credits unless other ownership is expressly provided for by a contract between a generator and the utility. Part V. UNIFORM CONTRACT The form for uniform contract that shall be used between the utility and a qualifying facility having less than 40 kilowatts of capacity is as shown in subpart 1. Subpart 1. Uniform Contract for Cogeneration and Small Power Production Facilities. (See attached contract form.) 8 84 UNIFORM CONTRACT FOR COGENERATION AND SMALL POWER PRODUCTION FACILITIES THIS CONTRACT is entered into ___________________, ___, by _______________ _____________________, a municipal utility under Minnesota law, (hereafter called "Utility") and ________________________________________ (hereafter called "QF"). RECITALS The QF has installed electric generating facilities, consisting of ___________________ _____________________________ (Description of facilities), rated at ____kilowatts AC of electricity, on property located at _________________________________________ _____________________________________________________________________. The QF is a customer of the Utility located within the assigned electric service territory of the Utility. The QF is prepared to generate electricity in parallel with the Utility. The QF's electric generating facilities meet the requirements of the rules adopted by the Utility on Cogeneration and Small Power Production and any technical standards for interconnection the Utility has established that are authorized by those rules. The Utility is obligated under federal and Minnesota law to interconnect with the QF and to purchase electricity offered for sale by the QF. A contract between the QF and the Utility is required. AGREEMENTS The QF and the Utility agree: 1.The Utility will sell electricity to the QF under the rate schedule in force for the class of customer to which the QF belongs. 2.The Utility will buy electricity from the QF under the current rate schedule filed with the city council or city-appointed governing body of the utility. The QF elects the rate schedule category hereinafter indicated: 85 ____ a. Average retail utility energy rate. QF capacity must be less than 40 kW. ____ b. Simultaneous purchase and sale billing rate. QF capacity must be less than 40 kW. ____ c. Roll-over credits. QF capacity must be less than 40 kW. ____ d.Time-of-day purchase rates. QF capacity must be 40 kW or more and less than or equal to 100 kW. A copy of the presently approved rate schedule is attached to this contract. 3.The rates for sales and purchases of electricity may change over the time this contract is in force, due to actions of the Utility or the State of Minnesota, and the QF and the Utility agree that sales and purchases will be made under the rates in effect each month during the time this contract is in force. 4.The Utility will compute the charges and payments for purchases and sales for each billing period. Any net credit to the QF, other than kilowatt-hour credits under clause 2(c), will be made under one of the followingoptions as chosen by the QF. ____ a. Credit to the QF's account with the Utility. ____ b. Paid by check or electronic payment service to the QF within fifteen (15) days of the billing date. 5.Renewable energy credits associated with generation from the facility are owned by: ________________________________________________________________. 6.The QF must operate its electric generating facilities within any rules, regulations, and policies adopted by the Utility not prohibited by the rules governing reasonable technical connection and operating specifications for the QF and are and Small Power Production, as required under Minnesota Statutes §216B.164, subdivision 9. 7.The QF will not enter into an arrangement whereby electricity from the generating provide electric service in its service area under Minnesota Statutes, §216B.37-44. 86 8.The QF will operateits electric generating facilities so that they conform to the national, state, and local electric and safety codes, and will be responsible for the costs of conformance. 9.The QF is responsible for the actual, reasonable costs of interconnection which are estimated to be $___________. The QF will pay the Utility in this way: __________________________________________________________________ _________________________________________________________________. 10.The QF will give the Utility reasonable access to its property and electric generating facilities if the configuration of those facilities does not permit disconnection or testing from the Utility 's side of the interconnection. If the Utility enters the QF's property, the Utility will remain responsible for its personnel. 11.The Utility may stop providing electricity to the QF during a system emergency. The Utility will not discriminate against the QF when it stops providing electricity or when it resumes providing electricity. 12.The Utility may stop purchasing electricity from the QF when necessary for the Utility to construct, install, maintain, repair, replace, remove, investigate, or inspect any equipment or facilities within its electric system. The Utility may stop purchasing electricity from the QF in the event the generating facilities listed in this contract are documented to be causing power quality, safety or reliability issues to The Utility will notify the QF before it stops purchasing electricity in this way: _______________________________________________________________________ ______________________________________________________________________. 13.The QF will keep in force general liability insurance against personal or property damage due to the installation, interconnection, and operation of its electric generating facilities. The amount of insurance coverage will be $ ____________. (The amount must be consistent with the distributed generation tariff adopted by the Utility pursuant to Minnesota Statutes §216B.1611, subdivision 3, clause 2.) 14.The QF and the Utility agree to attempt to resolve all disputes arising hereunder promptly and in a good faith manner. 15.The city council or city-appointed body governing the Utility has authority to consider and determine disputes, if any, that arise under this contract in accordance with procedures in the rules it adopts implementing Minnesota Statute §216B.164, pursuant to §216B.164, subdivision 9. 87 16.This contract becomes effective as soon as it is signed by the QF and the Utility. This contract will remain in force until either the QF or the Utility gives written notice to the other that the contract is canceled. This contract will be canceled thirty (30) days after notice is given.I f the listed electric generating facilities are not contract being signed by the QF and the Utility, the contract terminates. The QF and the Utility may delay termination by mutual agreement. 17.Neitherthe QF nor the Utility will be considered in default as to any obligation if the QF or the Utility is prevented from fulfilling the obligation due to an act of God, labor disturbance, act of public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, an order, regulation or restriction imposed by governmental, military or lawfully established civilian Utility.However, the QF or Utility whose performance under this contract is hindered by such an event shall make all reasonable efforts to perform its obligations. 18.This contract can only be amended or modified by mutual agreement in writing signed by the QF and the Utility. 19.The QF must notify the Utility prior to any change in the electric generating process adopted by the Utility. 20.Termination of this contract is allowed (i) by the QF at any time without restriction; (ii) by Mutual Agreement between the Utilityand the QF; (iii) upon abandonment or removal of electric generating facilities by the QF; (iv) by the Utility if the electric generating facilities are continuously non-operational for any twelve (12) consecutive month period; (v) by the Utilityif the QF fails to comply with applicable interconnection design requirements or fails to remedy a violation of the interconnection process; or (vi) by the Utility upon breach of this contract by the QF unless cured with notice of cure received by the Utility prior to termination. 21.In the event this contract is terminated, the Utility shall have the rights to disconnect its facilities or direct the QF to disconnect its generating facilities. 22.This contract shall continue in effect after termination to the extent necessary to allow either the Utility or the QF to fulfill rights or obligations that arose under the contract. 23.Transfer of ownership of the generating facilities shall require the new owners and the Utility to execute a new contract. Upon the execution of a new contract with the new owners this contract shall be terminated. 88 24.The QF and the Utility shall at all times indemnify, defend, and save each other harmless from any and all damages, losses, claims, including claims and actions relating to injury or death of any person or damage to property, costs and obligations under this contract, except to the extent that such damages, losses or claims were caused by the negligence or intentional acts of the QF or the Utility. 25.The Utilityand the QF will each be responsible for its own acts or omissions and the results thereof to the extent authorized by law and shall not be responsible for the acts or omissions of any others and the results thereof. 26. under this contract shallbe limited to the amount of direct damage actually occurred. In no event, shall the QF or the Utility be liable to each other for any punitive, incidental, indirect, special, or consequential damages of any kind whatsoever, including for loss of business opportunity or profits, regardless of whether such damages were foreseen. 27.The Utility does not give any warranty, expressed or implied, to the adequacy, 28.This contract contains all the agreements made between the QF and the Utility. The QF and Utility are not responsible other than those stated in this contract. THE QF AND THE UTILITY HAVE READ THIS CONTRACT AND AGREE TO BE BOUND BY ITS TERMS. AS EVIDENCE OF THEIR AGREEMENT, THEY HAVE EACH SIGNED THIS CONTRACT BELOW ON THE DATE LISTED BY SIGNER. QF By:________________________________ PrintedName:_______________________ DATE: _____________________________ UTILITY By: ________________________________ PrintedName:_______________________ DATE: _____________________________ Contract Version:February 2019 89 CONGENERATION AND SMALL POWER PRODUCTION TARIFF 9͵ЊЋĬ /ƚŭĻƓĻƩğƷźƚƓ ğƓķ {ƒğƌƌ tƚǞĻƩ tƩƚķǒĭƷźƚƓ ğƩźŅŅ Pursuant to its Rules Governing the Interconnection of Cogeneration and Small Power Production Facilities, Elk River Municipal Utilities ĻƭƷğĬƌźƭŷĻƭ ğƓķΉƚƩ ǒƦķğƷĻƭ źƷƭ Cogeneration and Small Power Production Tariff for billing and sales transactions following the date of Tariff approval as follows. The Tariff shall consist of: {/I95 \[9 Њ͵ Calculation of average retail utility energy rates. {/I95 \[9 Ћ͵ Standard contracts to be used with qualifying facilities, containing applicable terms and conditions. {/I95 \[9 Ќ͵ Adopted interconnection process, safety standards, and technical requirements for distributed energy resource systems, required operating procedures for interconnected operations, and the functions to be performed by any control and protective apparatus. {/I95 \[9 Ѝ͵ Estimated average incremental energy costs by seasonal, peak and off-peak periods and annual avoided capacity costs from the uti 90 SCHEDULE 1 - AVERAGE RETAIL UTILITY ENERGY RATE Average Retail Utility Energy Rate: Available to any Qualifying Facility of less than 40 kW capacity that does not select either Roll Over Credits, Simultaneous Purchase and Sale Billing or Time of Day rates. Utility shall bill Qualifying Facilities for any excess of energy supplied by Utility above energy supplied by the Qualifying Facility during each billing period according to Utility applicable rate schedule. Utility shall pay the customer for the energy generated by the Qualifying Facility that exceeds that supplied by Utility of the total annual class revenue from sales of electricity minus the annual revenue resulting from fixed charges, divided by the annual class kilowatt-hour sales. Data from the most recent 12-month period available shall be used in the computation. A Customer Class Average Retail Utility Energy Rate Residential $0.1281 /kWh Commercial Non-Demand $0.1143 /kWh Commercial Demand $0.0629 /kWh 91 SCHEDULE 2 - STANDARD CONTRACTS ABSTRACT Interconnection agreement for net energy billing DER systems or DER systems up to 100 kW that are compensated at avoided cost. Minnesota Municipal Power Agency 5 kW Hometown Solar Shakopee, MN UNIFORM CONTRACT 92 SCHEDULE 2 - STANDARD CONTRACTS UNIFORM CONTRACTFOR COGENERATION AND SMALL POWER PRODUCTION FACILITIES THIS CONTRACT is entered into ___________________, ___, by _______________ _____________________, a municipal utility under Minnesota law,(hereafter called "Utility") and ________________________________________(hereafter called "QF"). RECITALS The QF has installed electric generating facilities, consisting of ___________________ _____________________________(Description of facilities), rated at ____kilowattsAC of electricity, on property located at_________________________________________ _____________________________________________________________________. The QF is a customer of the Utility located within the assigned electric service territory of the Utility. The QF is prepared to generate electricity in parallel with the Utility. The QF's electric generating facilities meet the requirements of the rulesadopted by the Utilityon Cogeneration and Small Power Production and any technical standards for interconnection the Utilityhas established that are authorized by those rules. The Utilityis obligated under federal and Minnesota law to interconnect with the QF and to purchase electricity offered for sale by the QF. A contract between the QF and theUtilityis required. AGREEMENTS The QF and the Utilityagree: 1.The Utilitywill sell electricity to the QF under the rate schedule in force for the class of customer to which the QF belongs. 2.The Utilitywill buy electricity from the QF under thecurrent rate schedule filed with the city council or city-appointed governing body of the utility.The QF elects the rate schedule category hereinafter indicated: ____ a. Average retail utilityenergy rate. QF capacity must be less than 40 kW. 1 93 SCHEDULE 2 - STANDARD CONTRACTS ____ b. Simultaneouspurchase and sale billing rate. QF capacity must be less than 40 kW. ____ c. Roll-over credits. QF capacity must be less than 40 kW. ____ d. Time-of-day purchase rates. QF capacity must be 40 kW or more and less than or equal to 100 kW. A copy of the presently approved rate schedule is attached to this contract. 3.The rates for sales and purchases of electricity may change over the time this contract is in force, due to actions of the Utility or the State of Minnesota, and the QF and the Utilityagree that sales and purchases will be made under the rates in effect each month during the time this contract is in force. 4.The Utilitywill compute the charges and payments for purchases and sales for each billing period. Any net credit to the QF, other than kilowatt-hour credits under clause 2(c), will be made under one of the following options as chosen by the QF. ____ a. Credit to the QF's account with the Utility. ____ b. Paid by check or electronic payment service to the QF within fifteen (15) days of the billing date. 5.Renewable energy credits associated with generation from the facility are owned by: ________________________________________________________________. 6.The QF must operate its electric generating facilities within any rules, regulations, and policies adopted by the Utility not prohibited by the rules governing Cogeneration and Small Power Production reasonable technical connection and operating specifications for the QF and are and Small Power Production, as required under MinnesotaStatutes §216B.164, subdivision 9. 7.The QF will not enter into an arrangement whereby electricity from the generating provide electric service in its service area under Minnesota Statutes, §216B.37-44. 8.The QF will operate its electric generating facilities so that they conform to the national, state, and local electric and safety codes, and will be responsible for the costs of conformance. 2 94 SCHEDULE 2 - STANDARD CONTRACTS 9.The QF is responsible for the actual, reasonable costs of interconnection which are estimated to be $___________. The QF will pay the Utilityin this way: __________________________________________________________________ _________________________________________________________________. 10.The QF will give the Utilityreasonable access to its property and electricgenerating facilities if the configuration of those facilities does not permit disconnection or testing from the Utility 's side of the interconnection. If the Utilityenters the QF's property, the Utilitywill remain responsible for its personnel. 11.The Utilitymay stop providing electricity to the QF during a system emergency. The Utilitywill not discriminate against the QF when it stops providing electricity or when it resumes providing electricity. 12.The Utilitymay stop purchasing electricity from the QF when necessary for the Utilityto construct, install, maintain, repair, replace, remove, investigate, or inspect any equipment or facilities within its electric system. The Utilitymay stop purchasing electricity from the QF in the event the generating facilities listed in this contract are documented to be causing power quality, safety or reliability issues to the Utility The Utilitywill notify the QF before it stops purchasing electricity in this way: __________________________________________________________________ _________________________________________________________________. 13.The QF will keep in force general liability insuranceagainst personal or property damage due to the installation, interconnection, and operation of its electric generating facilities. The amount of insurance coverage will be $ ____________. (The amount must be consistent with the distributed generation tariffadopted by the Utility pursuant to Minnesota Statutes §216B.1611, subdivision 3, clause 2.) 14.The QF and the Utilityagree to attempt to resolve all disputes arising hereunder promptlyand in a good faith manner. 15.The city council or city-appointed body governing the Utility has authority to consider and determine disputes, if any, that arise under this contract in accordance with procedures in the rules it adopts implementing Minnesota Statute §216B.164,pursuant to §216B.164, subdivision 9. 16.This contract becomes effective as soon as it is signed by the QF and the Utility. This contract will remain in force until either the QF or the Utilitygives written notice to the other that the contract is canceled.This contract will be canceled thirty (30) days after notice is given.I f the listed electric generating facilities are not 3 95 SCHEDULE 2 - STANDARD CONTRACTS interconnected to the s distribution system within twelve months of the contract being signed by the QF and the Utility,the contract terminates. The QF and the Utilitymay delay termination by mutual agreement. 17.Neither the QF nor the Utility will be considered in default as to any obligation if the QF or the Utility is prevented from fulfilling the obligation due to an act of God, labor disturbance, act of public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, an order, regulation or restriction imposed by governmental, military or lawfully established civilian Utility. However, the QF or Utility whose performance under this contract is hindered by such an event shall make all reasonable efforts to perform its obligations. 18.This contract can only be amended or modified by mutual agreement in writing signed by the QF and the Utility. 19.The QF must notify the Utilityprior to any change in the electric generating according to the interconnection processadopted by the Utility. 20.Termination of this contract is allowed (i) by the QF at any time without restriction; (ii) by Mutual Agreement between the Utilityand the QF; (iii) upon abandonment or removal of electric generating facilities by the QF; (iv) bythe Utility if the electric generating facilities are continuously non-operational for any twelve (12) consecutive month period; (v) by the Utilityif the QF fails to comply with applicable interconnection design requirements or fails to remedy a violation of the interconnection process; or (vi) by the Utility upon breach of this contract by the QF unless cured with notice of cure received by the Utility prior to termination. 21.In the event this contract is terminated, the Utility shall have the rights to disconnect its facilities or direct the QF to disconnect its generating facilities. 22.This contract shall continue in effect after termination to the extent necessary to allow either the Utility or the QF to fulfill rights or obligations that arose under the contract. 23.Transfer of ownership of the generating facilities shall require the new owners and the Utility to execute a new contract. Upon the execution of a new contract with the new owners this contract shall be terminated. 24.The QF and the Utilityshall at all times indemnify, defend, and save each other harmless from any and all damages, losses, claims, including claims and actions relating to injury or death of any person or damage to property, costs and court costs, arising out of or resulting Utilitycontract, 4 96 SCHEDULE 2 - STANDARD CONTRACTS except to the extent that such damages, losses or claims were caused by the negligence or intentional acts of the QF or the Utility. 25.The Utilityand the QF will each be responsible for its own acts or omissions and the results thereof to the extent authorized by law and shall not be responsible for the acts or omissions of any others and the results thereof. 26.Utility under this contract shall be limited to the amount of direct damage actually occurred. In no event, shall the QF or the Utilitybe liable to each other for any punitive, incidental, indirect, special, or consequential damages of any kind whatsoever, including for loss of business opportunity or profits, regardless of whether such damages were foreseen. 27.TheUtility does not give any warranty, expressed or implied, to the adequacy, safety, or 28.This contract contains all the agreements made between the QF and the Utility. The QF and Utility are not responsible other than those stated in this contract. THE QF AND THE UTILITYHAVE READ THISCONTRACT AND AGREE TO BE BOUND BY ITS TERMS. AS EVIDENCE OF THEIR AGREEMENT, THEY HAVE EACH SIGNED THIS CONTRACT BELOW ON THE DATE LISTED BY SIGNER. QF By:________________________________ PrintedName:_______________________ DATE: _____________________________ UTILITY By: ________________________________ PrintedName:_______________________ DATE: _____________________________ Contract Version:February2019 5 97 SCHEDULE 2 - STANDARD CONTRACTS ABSTRACT For use in lieu of Buffalo, MN INTERCONNECTION AGREEMENT 98 SCHEDULE 2 - STANDARD CONTRACTS Contents i. Contact Information .......................................................................................................................... 1 1 Scope and Limitations of Agreement ................................................................................... 2 2 Responsibilities of the Parties .............................................................................................. 3 3 Parallel Operation Obligations ............................................................................................. 4 4 Metering ............................................................................................................................... 4 5 Distributed Energy Resource Capabilities and Grid Reliability ............................................ 4 6 Equipment Testing and Inspection ....................................................................................... 5 7 Authorization Required Prior to Parallel Operation ............................................................. 5 8 Right of Access ...................................................................................................................... 5 9 Effective Date ....................................................................................................................... 6 10 Term of Agreement .............................................................................................................. 6 11 Termination .......................................................................................................................... 6 12 Temporary Disconnection .................................................................................................... 6 13 Cost Responsibility for Interconnection Facilities and Distribution Upgrades .................... 8 14 Cost Responsibility for Network Upgrades .......................................................................... 9 15 Billing, Payment, Milestones, and Financial Security ......................................................... 11 16 Assignment, Force Majeure, Consequential Damages, and Default.................................. 12 17 Limitations of Liability ........................................................................................................ 12 18 Non-Warranty ..................................................................................................................... 13 19 Indemnity ........................................................................................................................... 13 20 Consequential Damages ..................................................................................................... 14 21 Force Majeure .................................................................................................................... 14 22 Default ................................................................................................................................ 15 23 Insurance ............................................................................................................................ 15 24 Confidentiality .................................................................................................................... 16 25 Disputes .............................................................................................................................. 17 26 Taxes ................................................................................................................................... 17 27 Miscellaneous ..................................................................................................................... 17 28 Notices ................................................................................................................................ 20 i 99 SCHEDULE 2 - STANDARD CONTRACTS 31 Signatures ........................................................................................................................... 24 Attachment I: Glossary of Terms ............................................................................................... 25 Attachment II: Description and Costs of the Distributed Energy Resource, Interconnection Facilities, and Metering Equipment........................................................................................... 31 Attachment III: One-line Diagram Depicting the Distributed Energy Resource, Interconnection Facilities, and Metering Equipment, and Upgrades .................................................................. 32 Attachment IV: Milestones ........................................................................................................ 33 Attachment V: Additional Operating and Maintenance Requirements for the Area EPS ...................................................................................................................... 35 Good Faith Estimates of Upgrade Costs .................................................................................... 36 Attachment VII: Assignment of Interconnection Agreement ................................................... 37 ii 100 SCHEDULE 2 - STANDARD CONTRACTS i.Contact Information Contact information for each Party is listed below along with the basic information describing the Distributed Energy Resource (DER) system. Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: DER System Information Application Number: Type of DER System: Capacity Rating of System (AC): Limited Capacity Rating (AC): Address of DER System: Municipal Minnesota Interconnection Agreement _ January 2019 1 101 SCHEDULE 2 - STANDARD CONTRACTS THIS AGREEMENT is made and entered into this _____day of______________ 20___ by and municipal utility existing u In consideration of the mutual covenants set forth herein, the Parties agree as follows: 1Scope and Limitations of Agreement 1.1.This Agreement is intended to provide for the Interconnection Customer to interconnect at the Point of Common Coupling and operate a Distributed Energy Resource with a Nameplate Rating of 10 Megawatts (MW) or less in parallel with the Area EPS at the location identified above and in the Interconnection Application. 1.2.This Agreement shall be used for all Interconnection Applications submitted under the Municipal Minnesota Distributed Energy Resources Interconnection Process (M- MIP) except for those Interconnection Applications that qualify and choose for the Uniform Contract to replace the need for this Agreement. 1.3.This Agreement governs the terms and conditions under which the Interconnection stributed Energy Resource will interconnect with, and operate in 1.4.Capitalized terms used herein shall have the meanings specified in the Glossary of Terms in Attachment 1, the M-MIP, or the body of this Agreement. 1.5.This Agreement does not constitute an agreement to purchase or deliver the services that the Interconnection Customer may require will be covered under separate agreements, if any. The Interconnection Customer will be responsible for separately making all necessary arrangements (including scheduling) for delivery of electricity with the applicable Area EPS Operator. 1.6.Nothing in this Agreement is intended to affect any other agreement between the Area EPS Operator and the Interconnection Customer. Municipal Minnesota Interconnection Agreement _ January 2019 2 102 SCHEDULE 2 - STANDARD CONTRACTS 2Responsibilities of the Parties 2.1.The Parties shall perform all obligations of this Agreement in accordance with the M- MIP, Minnesota Technical Requirements, all Applicable Laws and Regulations, Operating Requirements, and Good Utility Practice. 2.2.The Interconnection Customer shall construct, interconnect, operate and maintain its Distributed Energy Resource and construct, operate, and maintain its Interconnection F recommended maintenance schedule and, in accordance with this Agreement, and with Good Utility Practice. 2.3.The Area EPS Operator shall construct, operate, and maintain its Distribution System and its Interconnection Facilities in accordance with this Agreement, and with Good Utility Practice. 2.4.The Interconnection Customer agrees to construct its facilities or systems in accordance with the Minnesota Technical Requirements and this Agreement; including, applicable specifications that meet or exceed those provided by the National Electrical Safety Code, the American National Standards Institute, Institute of Electrical and Electronics Engineers (IEEE) (UL), and Operating Requirements in effect at the time of construction and other applicable national and state codes and standards. The Interconnection Customer agrees to design, install, maintain, and operate its Distributed Energy Resource so as to reasonably minimize the likelihood of a disturbance adversely affecting or impairing the system or equipment of the Area EPS Operator and any Affected Systems. 2.5.Each Party shall operate, maintain, repair, and inspect, and shall be fully responsible for the facilities that it now owns or subsequently owns unless otherwise specified in the Attachments to this Agreement. Each Party shall be responsible for the safe installation, maintenance, repair and condition of their respective lines and appurtenances on their respective sides of the point of common coupling. The Area EPS Operator and the Interconnection Customer, as appropriate, shall provide Distribution System, personnel, and other persons from damage and injury. The allocation of responsibility for the design, installation, operation, maintenance and ownership of Interconnection Facilities shall be delineated in the Attachments to this Agreement. 2.6.The Area EPS Operator shall coordinate with all Affected Systems to support the interconnection. Municipal Minnesota Interconnection Agreement _ January 2019 3 103 SCHEDULE 2 - STANDARD CONTRACTS 3Parallel Operation Obligations 3.1.Once the Distributed Energy Resource has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Distributed Energy Resource in the applicable control area, including, but not limited to; 1) the rules and procedures concerning the operation of generation set forth by the applicable system bution System provided or referenced in an attachment to this Agreement and; 2) the Operating Requirements set forth in Attachment 5 of this Agreement. The Minnesota Technical Requirements for interconnection are covered in a separate document, a copy of which has been made available to the Interconnection Customer and incorporated and made part of this Agreement by this reference. 4Metering 4.1.As described in M-MIP Overview Process Section 9.1, the Interconnection Customer shall be responsible for the Area EP the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements. 5Distributed Energy Resource Capabilities and Grid Reliability 5.1.The Minnesota Technical Requirements outlines the Parties responsibilities consistent with IEEE 1547 Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces which provides requirements relevant to the interconnection and interoperability performance, operation and testing, and, to safety, maintenance and security considerations. 5.2.The Area EPS Operator may offer the Interconnection Customer the option to utilize required DER capabilities to mitigate Interconnection Customer costs related to Upgrades or Interconnection Facilities to address anticipated system impacts from the engineering review (i.e. Initial Review, Supplemental Review, or Study Process described in the M-MIP.) Municipal Minnesota Interconnection Agreement _ January 2019 4 104 SCHEDULE 2 - STANDARD CONTRACTS 6Equipment Testing and Inspection 6.1.As described in M-MIP Overview Process Section 9.3, the Interconnection Customer shall test and inspect its Distributed Energy Resource and Interconnection Facilities prior to interconnection pursuant to Minnesota Technical Requirements and this Agreement. 7Authorization Required Prior to Parallel Operation 7.1.As described in M-MIP Overview Process Section 9.5, the Area EPS Operator shall use Reasonable Efforts to list applicable parallel operation requirements by attaching the Minnesota Technical Requirements and/or including them in Attachment 5 to this Agreement. Additionally, the Area EPS Operator shall notify the Interconnection Customer of any changes to these requirements as soon as they are known. Pursuant to the M-MIP Overview Process Section 8.5, the Interconnection Customer shall not operate its Distributed Energy Resource in parallel with the Area EPS Operator. 8Right of Access 8.1.Upon reasonable notice, the Area EPS Operator may send a qualified person to the premises of the Interconnection Customer at or immediately before the time the Distributed Energy Resource first produces energy to inspect the interconnection, and observe the commissioning of the Distributed Energy Resource (including any required testing), startup, and operation for a period of up to three (3) Business Days after initial start-up of the unit. In addition, the Interconnection Customer shall notify the Area EPS Operator at least five (5) Business Days prior to conducting any on-site verification testing of the Distributed Energy Resource. 8.2.Following the initial inspection process described above, at reasonable hours, and upon reasonable notice, or at any time without notice in the event of an emergency or hazardous condition, the Area EPS Operator shall have access to the the performance of the obligations imposed on it by this Agreement or if necessary to meet its legal obligation to provide service to its customers. 8.3.Each Party shall be responsible for its costs associated with the interconnection of the DER system as outlined in M-MIP Overview Process Section 9.3 and the Minnesota Technical Requirements. Municipal Minnesota Interconnection Agreement _ January 2019 5 105 SCHEDULE 2 - STANDARD CONTRACTS 9Effective Date 9.1This Agreement shall become effective upon execution by the Parties. 10Term of Agreement 10.1.This Agreement shall become effective on the Effective Date and shall remain in effect from the Effective Date unless terminated earlier in accordance with Section 11 of this Agreement. 11Termination 11.1.No termination shall become effective until the Parties have complied with all Applicable Laws and Regulations applicable to such termination. 11.2.The Interconnection Customer may terminate this Agreement at any time by giving the Area EPS Operator twenty (20) Business Days written notice. 11.3.The Area EPS Operator may terminate this Agreement if the listed electric system within thirty-six (36) months of this Agreement signed by the Parties. The Parties may choose to delay termination by mutual agreement. 11.4.Either Party may terminate this Agreement after Default pursuant to Section 3. 11.5.Upon termination of this Agreement, the Distributed Energy Resource will be effectuate such disconnection shall be borne by the terminating Party, unless such termination resulted from the non-Agreement or such non-terminating Party otherwise is responsible for these costs under this Agreement. 11.6.The termination of this Agreement shall not relieve either Party of its liabilities and obligations, owed or continuing at the time of the termination. 11.7.The provisions of this article shall survive termination or expiration of this Agreement. 12Temporary Disconnection 12.1.Temporary disconnection shall continue only for so long as reasonably necessary under Good Utility Practice. Municipal Minnesota Interconnection Agreement _ January 2019 6 106 SCHEDULE 2 - STANDARD CONTRACTS 12.2.Emergency Conditions. Under emergency conditions, the Area EPS Operator may immediately suspend interconnection service and temporarily disconnect the Distributed Energy Resource. The Area EPS Operator shall use Reasonable Efforts to notify the Interconnection Customer promptly when it becomes aware of an Emergency Condition that may reasonably be expected to affect the Interconnection Customer shall use Reasonable Efforts to notify the Area EPS Operator promptly when it becomes aware of an Emergency Condition that may reasonably be expected extent information is known, the notification shall describe the Emergency Condition, the extent of the damage or deficiency, the expected effect on the operation of both corrective action. 12.3.Temporary Interruption. The Area EPS Operator may interrupt interconnection service or curtail the output of the Distributed Energy Resource and temporarily Distribution System when necessary for routine maintenance, construction, or repairs Reasonable Efforts to provide the Interconnection Customer with three (3) Business prior to such interruption. The Area EPS Operator shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer. 12.4.Forced Outage. During any forced outage, the Area EPS Operator may suspend interconnection service to effect immediate repair Distribution System. The Area EPS Operator shall use Reasonable Efforts to provide the Interconnection Customer with prior notice. If prior notice is not given, the Area EPS Operator shall, upon request, provide the Interconnection Customer written documentation after the fact explaining the circumstances of the disconnection. 12.5.Adverse Operating Effects. The Area EPS Operator shall notify the Interconnection Customer as soon as practicable if, based on Good Utility Practice, operation of the Distributed Energy Resource may cause disruption or deterioration of service to other customers served from the same electric system, or if operating the Distributed ystem or Affected Systems. Supporting documentation used to reach the decision to disconnect shall be provided to the Interconnection Customer upon request. If, after notice, the Interconnection Customer fails to remedy the adverse operating effect within a reasonable time, the Area EPS Operator may disconnect the Distributed Energy Resource. The Area EPS Operator shall provide the Interconnection Customer Municipal Minnesota Interconnection Agreement _ January 2019 7 107 SCHEDULE 2 - STANDARD CONTRACTS with five Business Day notice of such disconnection, unless the provisions of Section 12.2 apply. 12.6.Modification of the Distributed Energy Resource. The Interconnection Customer must receive written authorization from the Area EPS Operator before making any change to the Distributed Energy Resource that may have a material impact on the safety or reliability of the Distribution System. Such authorization shall not be unreasonably withheld if the modification is not a Material Modification. Material Modifications, including an increase Nameplate Rating or capacity, may require the Interconnection Customer to submit a new Interconnection Application as described in the M-MIP Overview Process Section 7. If the Interconnection Customer makes such modification without the Area EPS Operator shall have the right to temporarily disconnect the Distributed Energy Resource. 12.7.Reconnection. The Parties shall cooperate with each other to restore the Distributed Energy Resource, Interconnection Facilities, System to their normal operating state as soon as reasonably practicable following a temporary disconnection. 12.8.Treatment Similar to Other Retail Customers. If the Interconnection Customer receives retail electrical service at the same site as the Distributed Energy Resource, it may also be disconnected consistent with the rules and practices for disconnecting other retail electrical customer. 12.9.Disconnection for Default. If the Interconnection Customer is in Default of this Agreement, it may be disconnected after a sixty (60) day written notice is provided and the Default is not cured during this sixty (60) day notice. This provision does not apply to disconnection based on Sections 12.2, 12.3, 12.4 or 12.5 of this Agreement. 13Cost Responsibility for Interconnection Facilities and Distribution Upgrades 13.1Interconnection Facilities. The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The Area EPS Operator shall provide a good faith estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, and the Area EPS Operator. Municipal Minnesota Interconnection Agreement _ January 2019 8 108 SCHEDULE 2 - STANDARD CONTRACTS 13.2The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and (2) operating, Facilities. 13.3Distribution Upgrades. The Area EPS Operator shall design, procure, construct, install, and own the Distribution Upgrades described in Attachment 6 of this Agreement. The Area EPS Operator shall provide a good faith estimate cost, including overheads, for the purchase and construction of the Distribution Upgrades and provide a detailed itemization of such costs. If the Area EPS Operator and the Interconnection Customer agree, the Interconnection Customer may construct Distribution Upgrades that are located on land owned by the Interconnection Customer. The actual cost of the Distribution Upgrades, including overheads, shall be directly assigned to the Interconnection Customer. 14 Cost Responsibility for Network Upgrades 14.1.Applicability. No portion of Section 14 shall apply unless the interconnection of the Distributed Energy Resource requires Network Upgrades. 14.2.Network Upgrades. The Area EPS Operator or the Transmission Owner shall design, procure, construct, install, and own the Network Upgrades described in Attachment 6 of this Agreement. The Area EPS Operator shall provide a good faith estimate cost, including overheads, for the purchase and construction of the Network Upgrades and provide a detailed itemization of such costs. If the Area EPS Operator and the Interconnection Customer agree, the Interconnection Customer may construct Network Upgrades that are located on land owned by the Interconnection Customer. Unless the Area EPS Operator elects to pay for Network Upgrades, the actual cost of the Network Upgrades, including overheads, shall be borne initially by the Interconnection Customer. 14.3.Repayment of Amounts Advanced for Network Upgrades. The Interconnection Customer shall be entitled to a cash repayment, equal to the total amount paid to the Area EPS Operator and Affected System operator, if any, for Network Upgrades, including any tax gross-up or other tax-related payments associated with the Network Upgrades, and not otherwise refunded to the Interconnection Customer, to be paid to the Interconnection Customer on a dollar-for-dollar basis for the non- usage sensitive portion of transmission charges, as payments are made under the Area EPS Operato respect to the Distributed Energy Resource. Any repayment shall include interest Municipal Minnesota Interconnection Agreement _ January 2019 9 109 SCHEDULE 2 - STANDARD CONTRACTS calculated in accordance with the methodology set forth in Federal Energy Regulatory s) regulations at 18 C.F.R. § 35.19a(a)(2)(iii) from the date of any payment for Network Upgrades through the date on which the Interconnection Customer receives a repayment of such payment pursuant to this subparagraph. The Interconnection Customer may assign such repayment rights to any person. 14.4.Notwithstanding the foregoing, the Interconnection Customer, the Area EPS Operator, and any applicable Affected System operators may adopt any alternative payment schedule that is mutually agreeable so long as the Area EPS Operator and said Affected System operators take one of the following actions no later than five years from the Commercial Operation Date: (1) return to the Interconnection Customer any amounts advanced for Network Upgrades not previously repaid, or (2) declare in writing that the Area EPS Operator or any applicable Affected System operators will continue to provide payments to the Interconnection Customer on a dollar-for-dollar basis for the non-usage sensitive portion of transmission charges, or develop an alternative schedule that is mutually agreeable and provides for the return of all amounts advanced for Network Upgrades not previously repaid; however, full reimbursement shall not extend beyond 20 years from the commercial operation date. 14.5.If the Distributed Energy Resource fails to achieve commercial operation, but it or another Distributed Energy Resource is later constructed and requires use of the Network Upgrades, the Area EPS Operator and Affected System operator shall at that time reimburse the Interconnection Customer for the amounts advanced for the Network Upgrades. Before any such reimbursement can occur, the Interconnection Customer, or the entity that ultimately constructs the Distributed Energy Resource, if different, is responsible for identifying the entity to which reimbursement must be made. 14.6.Special Provisions for Affected Systems. Unless the Area EPS Operator provides, under this Agreement, for the repayment of amounts advanced to any applicable Affected System operators for Network Upgrades, the Interconnection Customer and Affected System operator shall enter into an agreement that provides for such repayment. The agreement shall specify the terms governing payments to be made by the Interconnection Customer to Affected System operator as well as the repayment by Affected System Operator. 14.7.Rights Under Other Agreements. Notwithstanding any other provision of this Agreement, nothing herein shall be construed as relinquishing or foreclosing any rights, including but not limited to firm transmission rights, capacity rights, transmission congestion rights, or transmission credits, that the Interconnection Municipal Minnesota Interconnection Agreement _ January 2019 10 110 SCHEDULE 2 - STANDARD CONTRACTS Customer shall be entitled to, now or in the future, under any other agreement or tariff as a result of, or otherwise associated with, the transmission capacity, if any, created by the Network Upgrades, including the right to obtain cash reimbursements or transmission credits for transmission service that is not associated with the Distributed Energy Resource. 15Billing, Payment, Milestones, and Financial Security 15.1.Billing and Payment Procedures and Final Accounting. The Area EPS Operator shall bill the Interconnection Customer for the design, engineering, construction, and procurement costs of Interconnection Facilities and Upgrades contemplated by this Agreement, and the Interconnection Customer shall pay each bill, pursuant to the M- MIP Interconnection Process documents, or as otherwise agreed to by the Parties. 15.2.Within 80 Business Days (approximately 4 calendar months) of completing the and/or Upgrades described in the Attachments to this Agreement, the Area EPS Operator shall provide the Interconnection Customer with a final accounting report, as described in the M-MIP Fast Track Process Section 9.4.3 and the Study Process Section 11.4.3. 15.3.Milestones. Pursuant to the M-MIP Fast Track Process Section 9.1 and the Study Process Section 11.1, the Parties shall agree on milestones for which each Party is responsible and list them in Attachment 4 of this Agreement. 15.4.Financial Security Arrangements. Pursuant to the M-MIP Fast Track Process Section 9.5 and the Study Process Section 11.5, the Interconnection Customer shall provide of credit or other form of security that is reasonably acceptable to the Area EPS Operator and is consistent with the Minnesota Uniform Commercial Code. Such security for payment shall be in an amount sufficient to cover the costs for constructing, designing, procuring, and installing the applicable portion of the Area ced on a dollar-for-dollar basis for payments made to the Area EPS Operator under this Agreement during its term. In addition: 15.4.1.The guarantee must be made by an entity that meets the creditworthiness requirements of the Area EPS Operator, and contain terms and conditions that guarantee payment of any amount that may be due from the Interconnection Customer, up to an agreed-to maximum amount. Municipal Minnesota Interconnection Agreement _ January 2019 11 111 SCHEDULE 2 - STANDARD CONTRACTS 15.4.2.The letter of credit must be issued by a financial institution or insurer reasonably acceptable to the Area EPS Operator and must specify a reasonable expiration not sooner than sixty (60) Business Days (three calendar months) after the due date for the issuance of the final bill. 16Assignment, Force Majeure, Consequential Damages, and Default 16.1.This Agreement may be assigned by either Party upon 15 Business Days prior written notice and opportunity to object by the other Party; provided that: 16.1.1.Either Party may assign this Agreement without the consent of the other Party to any affiliate of the assigning Party with an equal or greater credit rating and with the legal authority and operational ability to satisfy the obligations of the assigning Party under this Agreement, provided that the Interconnection Customer promptly notifies the Area EPS Operator of any such assignment. 16.1.2.Interconnection Customer shall have the right to assign this Agreement, without the consent of the Area EPS Operator, for collateral security purposes to aid in providing financing for the Distributed Energy Resource, provided that the Interconnection Customer will promptly notify the Area EPS Operator of any such assignment. 16.1.3.Any attempted assignment that violates this article is void and ineffective. obligations be enlarged, in whole or in part, by reason thereof. An assignee is responsible for meeting the same financial, credit, and insurance obligations as the Interconnection Customer. Where required, consent to assignment will not be unreasonably withheld, conditioned or delayed. 17Limitations of Liability 17.1. omission in its performance of this Agreement, shall be limited to the amount of direct damage actually incurred. In no event shall either Party be liable to the other Party for any indirect, special, consequential, or punitive damages, except as authorized by this Agreement. Municipal Minnesota Interconnection Agreement _ January 2019 12 112 SCHEDULE 2 - STANDARD CONTRACTS 18Non-Warranty 18.1.The Area EPS Operator does not give any warranty, expressed or implied, as to the adequacy, safety, or other characteristics of any structures, equipment, wires, appliances or devices owned, installed or maintained by the Interconnection Customer, including without limitation the Distributed Energy Resource and any structures, equipment, wires, appliances or devices not owned, operated or maintained by the Area EPS Operator. 19Indemnity 19.1.This provision protects each Party from liability incurred to third parties as a result of carrying out the provisions of this Agreement. Liability under this provision is exempt from the general limitations on liability found in Section 17. 19.2.The Parties shall at all times indemnify, defend, and hold the other Party harmless from, any and all damages, losses, claims, including claims and actions relating to injury to or death of any person or damage to property, demand, suits, recoveries, costs and expenses, court costs, attorney fees, and all other obligations by or to third obligations under this Agreement on behalf of the indemnifying Party, except in cases of gross negligence or intentional wrongdoing by the indemnified Party. 19.3.If an indemnified person is entitled to indemnification under this article as a result of a claim by a third party, and the indemnifying Party fails, after notice and reasonable opportunity to proceed under this article, to assume the defense of such claim, such indemnified person may at the expense of the indemnifying Party contest, settle or consent to the entry of any judgment with respect to, or pay in full, such claim. 19.4.If an indemnifying party is obligated to indemnify and hold any indemnified person harmless under this article, the amount owing to the indemnified person shall be the recovery. 19.5.Promptly after receipt by an indemnified person of any claim or notice of the commencement of any action or administrative or legal proceeding or investigation as to which the indemnity provided for in this article may apply, the indemnified person shall notify the indemnifying party of such fact. Any failure of or delay in such delay is materially prejudicial to the indemnifying party. Municipal Minnesota Interconnection Agreement _ January 2019 13 113 SCHEDULE 2 - STANDARD CONTRACTS 19.6.This indemnification obligation shall apply notwithstanding any negligent or intentional acts, errors or omissions of the Indemnified Party, but the Indemnifying the percentage by which the Indemnif or omissions caused damaged. 19.7.Neither Party shall be indemnified for its damages resulting from its sole negligence, intentional acts or willful misconduct. These indemnity provisions shall not be construed to relieve any insurer of its obligation to pay claims consistent with the provisions of a valid insurance policy. 20Consequential Damages 20.1.Other than as expressly provided for in this Agreement, neither Party shall be liable under any provision of this Agreement for any losses, damages, costs or expenses for any special, indirect, incidental, consequential, or punitive damages, including but not limited to loss of profit or revenue, loss of the use of equipment, cost of capital, cost of temporary equipment or services, whether based in whole or in part in contract, in tort, including negligence, strict liability, or any other theory of liability; provided, however, that damages for which a Party may be liable to the other Party under another agreement will not be considered to be special, indirect, incidental, or consequential damages hereunder. 21Force Majeure 21.1.If a Force Majeure Event prevents a Party from fulfilling any obligations under this Agreement, the Party affected by the Force Majeure Event (Affected Party) shall promptly notify the other Party, either in writing or via the telephone, of the existence of the Force Majeure Event. The notification must specify in reasonable detail the circumstances of the Force Majeure Event, its expected duration, and the steps that the Affected Party is taking to mitigate the effects of the event on its performance. The Affected Party shall keep the other Party informed on a continuing basis of developments relating to the Force Majeure Event until the event ends. The Affected Party will be entitled to suspend or modify its performance of obligations under this Agreement (other than the obligation to make payments) only to the extent that the effect of the Force Majeure Event cannot be mitigated by the use of Reasonable Efforts. The Affected Party will use Reasonable Efforts to resume its performance as soon as possible. Municipal Minnesota Interconnection Agreement _ January 2019 14 114 SCHEDULE 2 - STANDARD CONTRACTS 22Default 22.1.No Default shall exist where such failure to discharge an obligation (other than the payment of money) is the result of a Force Majeure Event as defined in this Agreement or the result of an act or omission of the other Party. Upon a Default, the non-defaulting Party shall give written notice of such Default to the defaulting Party. Except as provided in Section 21, the defaulting Party shall have sixty (60) calendar days from receipt of the Default notice within which to cure such Default; provided however, if such Default is not capable of cure within sixty (60) calendar days, the defaulting Party shall commence such cure within twenty (20) calendar days after notice and continuously and diligently complete such cure within six (6) months from receipt of the Default notice; and, if cured within such time, the Default specified in such notice shall cease to exist. 22.2.If a Default is not cured as provided in this article, or if a Default is not capable of being cured within the period provided for herein, the non-defaulting Party shall have the right to terminate this Agreement by written notice at any time until cure occurs, and be relieved of any further obligation hereunder and, whether or not that Party terminates this Agreement, to recover from the defaulting Party all amounts due hereunder, plus all other damages and remedies to which it is entitled at law or in equity. The provisions of this article will survive termination of this Agreement. 23Insurance 23.1.An Area EPS Operator may only require an Interconnection Customer to purchase insurance covering damages pursuant to the applicable M-MIP process document in which the distributed energy resource falls under. 23.2.The Area EPS Operator agrees to maintain general liability insurance or self-insurance - undertaken pursuant to this Agreement. 23.3.The Parties further agree to notify each other whenever an accident or incident occurs resulting in any injuries or damages that are included within the scope of coverage of such insurance, whether or not such coverage is sought. 23.4.Failure of the Interconnection Customer or Area EPS Operator to enforce the minimum levels of insurance does not relieve the Interconnection Customer from maintaining such levels of insurance or relieve the Interconnection Customer of any liability. Municipal Minnesota Interconnection Agreement _ January 2019 15 115 SCHEDULE 2 - STANDARD CONTRACTS 24 Confidentiality 24.1.Confidential Information shall mean any confidential and/or proprietary information provided by one Party to the other Party that is clearly marked or otherwise specifications, and metering data provided by the Interconnection Customer may be deemed Confidential Information regardless of whether it is clearly marked or otherwise designated as such. If requested by either Party, the other Party shall provide in writing the basis for asserting that the information warrants confidential treatment. Parties providing a Governmental Authority trade secret, privileged or otherwise not public data under Minnesota Government Data Privacy Act, Minnesota Statutes Chapter 13, must provide information consistent with th September 1, 1999 Revised Procedures for Handling Trade Secret and Privileged Data. 24.2.Confidential Information does not include information previously in the public domain with proper authorization, required to be publicly submitted or divulged by Governmental Authorities (after notice to the other Party and after exhausting any opportunity to oppose such publication or release), or necessary to be publicly divulged in an action to enforce this Agreement. Each Party receiving Confidential Information shall hold such information in confidence and shall not disclose it to any third party nor to the public without the prior written authorization from the Party providing that information, except to fulfill obligations under this Agreement, or to fulfill legal or regulatory requirements that could not otherwise be fulfilled by not making the information public. 24.3.Each Party shall hold in confidence and shall not disclose Confidential Information, to any person (except employees, officers, representatives and agents, who agree to be bound by this section). Confidential Information shall be clearly marked as such on each page or otherwise affirmatively identified. If a court, government agency or entity with the right, power, and authority to do so, requests or requires either Party, by subpoena, oral disposition, interrogatories, requests for production of documents, administrative order, or otherwise, to disclose Confidential Information, that Party shall provide the other Party with prompt notice of such request(s) or requirements(s) so that the other Party may seek an appropriate protective order or waive compliance with the terms of this Agreement. In the absence of a protective order or waiver the Party shall disclose such confidential information which, in the opinion of its counsel, the party is legally compelled to disclose. Each Party will use reasonable efforts to obtain reliable assurance that confidential treatment will be accorded any confidential information so furnished. Municipal Minnesota Interconnection Agreement _ January 2019 16 116 SCHEDULE 2 - STANDARD CONTRACTS 24.4.Critical infrastructure information or information that is deemed or otherwise designated by a Party as Critical Energy/Electric Infrastructure Information (CEII) pursuant to FERC regulation 18 C.F.R. §388.133, as may be amended from time to time, may be subject to further protections for disclosure as required by FERC or 24.5.Each Party shall employ at least the same standard of care to protect Confidential Information obtained from the other Party as it employs to protect its own Confidential Information. 24.6.Each Party is entitled to equitable relief, by injunction or otherwise, to enforce its rights under this provision to prevent the release of Confidential Information without bond or proof of damages, and may seek other remedies available at law or in equity for breach of this provision. 25Disputes The Parties agree in a good faith effort to attempt to resolve all disputes arising out of the interconnection process and associated study and Interconnection Agreements. The Parties agree to follow the established dispute resolution policy adopted by the Area EPS Operator. 26Taxes 26.1.The Parties agree to follow all applicable tax laws and regulations, consistent with Internal Revenue Service and any other relevant local, state and federal requirements. 26.2. It is incumbent on the Party seeking to maintain its tax status to provide formal written notice to the other Party detailing what exact cooperation it is seeking from the other Party well prior to any deadlines by which any such action would need to be taken. Nothing in this Agreement is intended to adversely affect, if applicable, the Area EPS tax-exempt status with respect to the issuance of bonds including, but not limited to, local furnishing bonds. 27Miscellaneous 27.1.Governing Law, Regulatory Authority, and Rules. The validity, interpretation and enforcement of this Agreement and each of its provisions shall be governed by the and the laws of the state of Minnesota, without regard to its conflicts of law principles. This Agreement is subject to all Municipal Minnesota Interconnection Agreement _ January 2019 17 117 SCHEDULE 2 - STANDARD CONTRACTS Applicable Laws and Regulations. Each Party expressly reserves the right to seek changes in, appeal, or otherwise contest any laws, orders, or regulations of a Governmental Authority. 27.2.Amendment. The Parties may amend this Agreement by a written instrument duly executed by both Parties, or under Section 27.12 of this Agreement. 27.3.No Third-Party Beneficiaries. This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and where permitted, their assigns. 27.4.Waiver. The failure of a Party to this Agreement to insist, on any occasion, upon strict performance of any provision of this Agreement will not be considered a waiver of any obligation, right, or duty of, or imposed upon, such Party. Any waiver at any time by either Party of its rights with respect to this Agreement shall not be deemed a continuing waiver or a waiver with respect to any other failure to comply with any other obligation, right, duty of this Agreement. Termination or default of this Agreement for any reason by Interconnection Customer shall not constitute a waiver Area EPS Operator. Any waiver of this Agreement shall, if requested, be provided in writing. 27.5.Entire Agreement. This Agreement, including all Attachments, constitutes the entire agreement between the Parties with reference to the subject matter hereof, and supersedes all prior and contemporaneous understandings or agreements, oral or written, between the Parties with respect to the subject matter of this Agreement. There are no other agreements, representations, warranties, or covenants which compliance with its obligations under this Agreement. This Agreement can only be amended or modified in writing signed by both Parties. 27.6.Multiple Counterparts. This Agreement may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument. Electronic signatures are acceptable if the Area EPS Operator has made such a determination pursuant to M-MIP Overview Process Section 4.1. 27.7.No Partnership. This Agreement shall not be interpreted or construed to create an association, joint venture, agency relationship, or partnership between the Parties or to impose any partnership obligation or partnership liability upon either Party. Municipal Minnesota Interconnection Agreement _ January 2019 18 118 SCHEDULE 2 - STANDARD CONTRACTS Neither Party shall have any right, power or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, the other Party. 27.8.Severability. If any provision or portion of this Agreement shall for any reason be held or adjudged to be invalid or illegal or unenforceable by any court of competent jurisdiction or other Governmental Authority, (1) such portion or provision shall be deemed separate and independent, (2) the Parties shall negotiate in good faith to restore insofar as practicable the benefits to each Party that were affected by such ruling, and (3) the remainder of this Agreement shall remain in full force and effect. 27.9.Security Arrangements. Infrastructure security of electric system equipment and operations and control hardware and software is essential to ensure day-to-day reliability and operational security. All public utilities are expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. 27.10.Environmental Releases. Each Party shall notify the other Party, first orally and then in writing, of the release of any hazardous substances, any asbestos or lead abatement activities, or any type of remediation activities related to the Distributed Energy Resource or the Interconnection Facilities, each of which may reasonably be expected to affect the other Party. The notifying Party shall (1) provide the notice as soon as practicable, provided such Party makes a good faith effort to provide the notice no later than 24 hours after such Party becomes aware of the occurrence, and (2) promptly furnish to the other Party copies of any publicly available reports filed with any governmental authorities addressing such events. 27.11.Subcontractors. Nothing in this Agreement shall prevent a Party from utilizing the services of any subcontractor as it deems appropriate to perform its obligations under this Agreement. Each Party shall require its subcontractors to comply with all applicable terms and conditions of this Agreement in providing such services and each Party shall remain primarily liable to the other Party for the performance of such subcontractor. 27.11.1.The creation of any subcontract relationship shall not relieve the hiring Party of any of its obligations under this Agreement. The hiring Party shall be fully responsible to the other Party for the acts or omissions of any subcontractor the hiring Party hires as if no subcontract had been made. In no event shall the Area EPS Operator be liable for the actions or inactions of the Interconnection Customer or its subcontractors with respect to obligations of the Interconnection Customer under this Municipal Minnesota Interconnection Agreement _ January 2019 19 119 SCHEDULE 2 - STANDARD CONTRACTS Agreement. Any applicable obligation imposed by this Agreement upon the hiring Party shall be equally binding upon, and shall be construed as having application to, any subcontractor of such Party. 27.11.2.The obligations under this article will not be limited in any way by any limitation of . 27.12.Inclusion of Area EPS Operator Tariff and Rules. The interconnection services provided under this Agreement shall at all times be subject to the terms and conditions set forth in the rate schedules and rules applicable to the electric service provided by the Area EPS Operator, which rate schedules and rules are hereby incorporated into this Agreement by this reference. 28Notices 28.1.General. Unless otherwise provided in this Agreement, any written notice, demand, be deemed properly given if delivered in person, delivered by recognized national currier service, or sent by first class mail, postage prepaid, to the person specified as follows: Municipal Minnesota Interconnection Agreement _ January 2019 20 120 SCHEDULE 2 - STANDARD CONTRACTS Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.2.Billing and Payment. Billing and payments shall be sent to the addresses set out below: Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Municipal Minnesota Interconnection Agreement _ January 2019 21 121 SCHEDULE 2 - STANDARD CONTRACTS Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.3.Alternative Forms of Notice. Any notice or request required or permitted to be given by either Party to the other and not required by this Agreement to be given in writing may be so given by telephone or e mail to the telephone numbers and e-mail addresses set out below: Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: Municipal Minnesota Interconnection Agreement _ January 2019 22 122 SCHEDULE 2 - STANDARD CONTRACTS 28.4.Designated Operating Representative. The Parties may also designate operating representatives to conduct the communications which may be necessary or convenient for the administration of this Agreement. This person will also serve as facilities. Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.5.Changes to Notification. Either Party may change this information by giving five Business Days written notice to the other Party prior to the effective date of the change. Municipal Minnesota Interconnection Agreement _ January 2019 23 123 SCHEDULE 2 - STANDARD CONTRACTS 31Signatures IN WITNESS THEREOF, the Parties have caused this Agreement to be duly executed by their duly authorized officers or agents on the day and year first above written. \[Insert name of Area EPS Operator\] \[Insert name of Interconnection Customer\] ___________________________________ _________________________________ Signed: ____________________________ Signed: __________________________ Name (Printed): Name (Printed): ___________________________________ ________________________________ Title: ______________________________ Title: __________________________ Municipal Minnesota Interconnection Agreement _ January 2019 24 124 SCHEDULE 2 - STANDARD CONTRACTS Attachment I: Glossary of Terms Affected System System, or Transmission System connected generation which may be affected by the proposed interconnection. Applicant Agent A person designated in writing by the Interconnection Customer to represent the interconnection process. Area EPS The electric power distribution system connected at the Point of Common Coupling. Area EPS Operator An entity that owns, controls, or operates the electric power distribution systems that are used for the provision of electric service in Minnesota. For this Interconnection Process the Area EPS Operator is \[NAME OF UTILITY\] Business Day Monday through Friday, excluding Holidays as defined by Minn. Stat. §645.44, Subdivision 5. Any communication to have been sent or received after 4:30 p.m. Central Prevailing Time or on a Saturday, Sunday or holiday shall be considered to have been sent on the next Business Day. Certified Equipment Certified equipment is equipment that has been tested by a national recognized lab meeting a specific standard. For DER systems, UL 1741 listing is a common form of DER inverter certification. Additional information is seen in the Certification Codes and Standards document. Confidential Information Any confidential and/or proprietary information provided by one procedures, design, operating specifications, and metering data provided by the Interconnection Customer may be deemed Confidential Information. See Overview Process Section 12.1 for further information. Distributed Energy Resource (DER) A source of electric power that is not directly connected to a bulk power system or central station service. DER includes both generators and energy storage technologies capable of exporting active power to an EPS. An interconnection system or a supplemental DER device that is necessary for compliance with this standard is part of a DER. For the purpose of the Interconnection Process and interconnection agreements, the DER Interconnection Facilities. Distribution System The Area EPS facilities which are not part of the Local EPS, Transmission System or any generation system. Municipal Minnesota Interconnection Agreement _ January 2019 25 125 SCHEDULE 2 - STANDARD CONTRACTS Distribution Upgrades The additions, modifications, and upgrades to the Distribution System at or beyond the Point of Common Coupling to facilitate interconnection of the DER and render the distribution service necessary to affect Distribution System. Distribution Upgrades do not include Interconnection Facilities. Electric Power System (EPS) The facilities that deliver electric power to a load. Fast Track Process The procedure as described in the Interconnection Process - Fast Track Process for evaluating an Interconnection Application for a DER that meets the eligibility requirements in the Overview Process Section 2.3. Force Majeure Event An act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, an order, regulation or restriction imposed by governmental, military or lawfully Event does not include an act of negligence or intentional wrongdoing. Good Utility Practice Any of the practices, methods and acts engaged in or approved by a significant portion of the electric industry during the relevant time period, or any of the practices, methods and act which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted in the region. Governmental Authority Any federal, state, local or other governmental regulatory or administrative agency, court, commission, department, board, or other governmental subdivision, legislature, rulemaking board, tribunal, or other governmental authority having jurisdiction over the Parties, their respective facilities, or the respective services they provide, and exercising or entitled to exercise any administrative, executive, police, or taxing authority or power; provided, however, that such term does not include the Interconnection Customer, the Area EPS Operator, or any Affiliate thereof. The local governing body is the authority governing interconnection requirements unless otherwise provided for in the Minnesota Technical Requirements. Interconnection Agreement The terms and conditions between the Area EPS Operator and Interconnection Customer (Parties). See Section 8 in the Overview Process Error! Reference source not found. for when the Uniform Contract or Interconnection Agreement applies. Interconnection Application or modified, as described in Section 4 of the Overview Process, DER. See Simplified Application Form and Interconnection Application Form. Municipal Minnesota Interconnection Agreement _ January 2019 26 126 SCHEDULE 2 - STANDARD CONTRACTS Interconnection Customer The person or entity, including the Area EPS Operator, whom will Distribution System. The Interconnection Customer is responsible for ensuring the DER(s) is designed, operated and maintained in compliance with the Minnesota Technical Requirements. Interconnection Facilities include all facilities and equipment between the DER and the Point of Common Coupling, including any modification, additions or upgrades that are necessary to physically and Customer Interconnection Facilities include: supplemental DER devices, inverters, and associated wiring and cables up to the Point of DER Connection. Some examples of Area EPS Operator Interconnection Facilities include sole use facilities; such as, line extensions, controls, relays, switches, breakers, transformers and shall not include Distribution Upgrades or Network Upgrades. Interconnection Process document. Material Modification A modification to machine data, equipment configuration or to the interconnection site of the DER at any time after receiving notification by the Area EPS Operator of a complete Interconnection Application that has a material impact on the cost, timing, or design of any Interconnection Facilities or Upgrades, or a material impact on the cost, timing or design of any Interconnection Application with a later Queue Position or the safety or 1 reliability of the Area EPS. MN Technical Requirements The term including all of the DER technical interconnection requirement documents for the state of Minnesota; including Attachment 2 Distributed Order in E-999/CI-01-1023) until superseded and upon Commission approval of updated 1 A Material Modification shall include, but may not be limited to, a modification from the approved Interconnection Application that: (1) changes the physical location of the point of common coupling; such that it is likely to have an impact on technical review; (2) increases the nameplate rating or output characteristics of the Distributed Energy Resource; (3) changes or replaces generating equipment, such as generator(s), inverter(s), transformers, relaying, controls, etc., and substitutes equipment that is not like-kind substitution in certification, size, ratings, impedances, efficiencies or capabilities of the equipment; (4) changes transformer connection(s) or grounding; and/or (5) changes to a certified inverter with different specifications or different inverter control settings or configuration. A Material Modification shall not include a modification from the approved Interconnection Application that: (1) changes the ownership of a Distributed Energy Resource; (2) changes the address of the Distributed Energy Resource, so long as the physical point of common coupling remains the same; (3) changes or replaces generating equipment such as generator(s), inverter(s), solar panel(s), transformers, relaying, controls, etc. and substitutes equipment that is a like-kind substitution in certification, size, ratings, impedances, efficiencies or capabilities of the equipment; and/or (4) increases the DC/AC ratio but does not increase the maximum AC output capability of the Distributed Energy Resource in a way that is likely to have an impact on technical review. Municipal Minnesota Interconnection Agreement _ January 2019 27 127 SCHEDULE 2 - STANDARD CONTRACTS Minnesota DER Technical Interconnection and Interoperability Requirements in E-999/CI-16- 521 (anticipated July 2019.) Nameplate Rating - nominal voltage (V), current (A), maximum active power (kWac), apparent power (kVA), and reactive power (kVar) at which a DER is capable of sustained operation. For a Local EPS with multiple DER units, the aggregate nameplate rating is equal to the sum of all DERs nameplate rating in the Local EPS. For purposes of the Attachment V in the I limited thought use of control systems, power relays or similar device settings or adjustments as identified in IEEE 1547. The nameplate ratings referenced in the Interconnection Process are alternating current nameplate DER ratings at the Point of DER Coupling. Network Upgrades Additions, modifications, and upgrades to the Transmission System required at or beyond the point at which the DER interconnects with the Network Upgrades do not include Distribution Upgrades. Operating Requirements Any operating and technical requirements that may be applicable Requirements, including those set forth in the Interconnection Agreement. Party or Parties The Area EPS Operator and the Interconnection Customer. Point of Common Coupling (PCC) The point where the Interconnection Facilities connect with as specified by the Area EPS Operator and described in the National Electrical Code and the National Electrical Safety Code. Municipal Minnesota Interconnection Agreement _ January 2019 28 128 SCHEDULE 2 - STANDARD CONTRACTS Figure 1: Point of Common Coupling and Point of DER Connection (Source: IEEE 1547) Point of DER Connection (PoC) When identified as the Reference Point of Applicability, the point where an individual DER is electrically connected in a Local EPS and meets the requirements of this standard exclusive of any load present in the respective part of the Local EPS (e.g. terminals of the inverter when no supplemental DER device is required.) For DER unit(s) that are not self-sufficient to meet the requirements without a supplemental DER device(s), the Point of DER Connection is the point where the requirements of this standard are met by DER in conjunction with a supplemental DER device(s) exclusive of any load present in the respective part of the Local EPS. Queue Position The order of a valid Interconnection Application, relative to all other pending valid Interconnection Applications, that is established based upon the date- and time- of receipt of the complete Interconnection Application as described in Section 4.7 of the Overview Process Error! Reference source not found.. Reasonable Efforts With respect to an action required to be attempted or taken by a Party under these procedures, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Municipal Minnesota Interconnection Agreement _ January 2019 29 129 SCHEDULE 2 - STANDARD CONTRACTS Reference Point of Applicability The location, either the Point of Common Coupling or the Point of DER Connection, where the interconnection and interoperability performance requirements specified in IEEE 1547 apply. With mutual agreement, the Area EPS Operator and Customer may determine a point between the Point of Common Coupling and Point of DER Connection. See Minnesota Technical Requirements for more information. Simplified Process The procedure for evaluating an Interconnection Application for a certified inverter-based DER no larger than 20 kW that uses the screens described in the Interconnection Process Simplified Process document. The Simplified Process includes simplified procedures. Study Process The procedure for evaluating an Interconnection Application that includes the scoping meeting, system impact study, and facilities study. Transmission Owner The entity that owns, leases or otherwise possesses an interest in the portion of the Transmission System relevant to the Interconnection. Transmission Provider The entity (or its designated agent) that owns, leases, controls, or operates transmission facilities used for the transmission of electricity. The term Transmission Provider includes the Transmission Owner when the Transmission Owner is separate from the Transmission Provider. The Transmission Provider may include the Independent System Operator or Regional Transmission Operator. Transmission System The facilities owned, leased, controlled or operated by the Transmission Provider or the Transmission Owner that are used to provide transmission service. See the Transmission from Generation and Distribution Assets in Docket No. E-999/CI-99-1261. Uniform Contract Production Facilities (Uniform Contract) that may be applied to all qualifying new and existing interconnections between the Area EPS Operator and an DER system having capacity less than 40 kilowatts. Upgrades or Distribution System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Municipal Minnesota Interconnection Agreement _ January 2019 30 130 SCHEDULE 2 - STANDARD CONTRACTS Attachment II: Description and Costs of the Distributed Energy Resource, Interconnection Facilities, and Metering Equipment Equipment, including the Distribution Energy Resource, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer or the Area EPS Operator. The Area EPS Operator will provide a good faith estimate itemized cost, including administrative overheads, of its Interconnection Facilities and metering equipment, and a good faith estimate itemized cost of the annual operation and maintenance expenses associated with the Interconnection Facilities and metering equipment. Municipal Minnesota Interconnection Agreement _ January 2019 31 131 SCHEDULE 2 - STANDARD CONTRACTS Attachment III: One-line Diagram Depicting the Distributed Energy Resource, Interconnection Facilities, and Metering Equipment, and Upgrades Municipal Minnesota Interconnection Agreement _ January 2019 32 132 SCHEDULE 2 - STANDARD CONTRACTS Attachment IV: Milestones The Milestones in line (1) below may be a calendar date. All other dates in this Attachment IV may be the number of Business Days from the calendar date in line (1) or from the completion of a different Milestone described in a specific number line. Similarly, the anticipated In-Service Date may be based on the number of Business Days from the completion of a specified line number. In-Service Date: __________________________________ Critical milestones and responsibilities as agreed to by the Parties: Milestone/Anticipated Date Responsible Party (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) Agreed to by: Municipal Minnesota Interconnection Agreement _ January 2019 33 133 SCHEDULE 2 - STANDARD CONTRACTS Area EPS Operator Date Transmission Owner (If Applicable) Date Interconnection Customer Date Municipal Minnesota Interconnection Agreement _ January 2019 34 134 SCHEDULE 2 - STANDARD CONTRACTS Attachment V: Additional Operating and Maintenance Requirements Affected Systems The Area EPS Operator shall also provide requirements that must be met by the Interconnection Distribution System. Additional operating and maintenance requirements for an Affected System need separate agreement described in Section 14.6. Municipal Minnesota Interconnection Agreement _ January 2019 35 135 SCHEDULE 2 - STANDARD CONTRACTS Attachment VI Network Upgrades and Good Faith Estimates of Upgrade Costs The Area EPS Operator shall describe Distribution and Network Upgrades and provide an itemized good faith estimate of the costs, including administrative overheads, of the Upgrade and annual operations and maintenance expenses associated with such Upgrades. The Area EPS Operator shall functionalize Upgrade costs and annual expenses as either transmission or distribution related. Additional Distribution or Network Upgrades required for an Affected System may be addressed in a separate agreement as described in Section 14.6. Municipal Minnesota Interconnection Agreement _ January 2019 36 136 SCHEDULE 2 - STANDARD CONTRACTS Attachment VII: Assignment of Interconnection Agreement There is an Interconnection Agreement, including any and all Attachments thereto including ______________________________ ________________________, a municipal utility existing under the laws of the State of Minnesota, Area EPS Operator Distributed Energy Resource (DER) described as follows: DER System Information Type of DER System: Capacity Rating of System (AC): Limited Capacity Rating (AC): Address of DER System: The Assignor intends to convey its interest in the above-referenced DER to _________________ __________________________ to the Assignee. Upon the execution of this Assignment by the Assignor, Assignee and the Area EPS Operator, agree as follows: 1.Capitalized Terms. Capitalized terms used but not defined herein shall have the meanings set forth in the Agreement. 2.Consent to Assignment. The Assignor hereby irrevocably assigns the Agreement in all respects to the Assignee and the Assignee accepts the assignment thereof in all respects. 3.Amendment to Agreement. The Area EPS Operator consents to this assignment and, as assigned, the Agreement is hereby amended so that wherever the name of the Assignor Municipal Minnesota Interconnection Agreement _ January 2019 37 137 SCHEDULE 2 - STANDARD CONTRACTS is used therein it shall mean the Assignee. It is further agreed that all terms and conditions of the Agreement, as amended by this Assignment, shall remain in full force and effect. 4.Payments by Area EPS Operator. Any and all payments made by Area EPS Operator under the Agreement to either the Assignor or the Assignee shall be deemed to have been made to both and shall discharge the Area EPS Operator from any further liability with regard to said payment. 5.Financial Obligations of Assignor and Assignee. Any and all financial liability, including but not limited to amounts due, from the Interconnection Customer to the Area EPS Operator, occurring or accruing under the Agreement on or before the date of the signature of the Area EPS Operator to this Assignment shall be deemed to be the obligation of both the Assignor and Assignee, and the Area EPS Operator may recover any such amounts jointly and severally from the Assignor and Assignee. 6.Contact information. The following information updates and replaces the designated information as set forth on page 1 of the Agreement, and in Section 28.1, 28.2, 28.3 and 28.4 of the Agreement. Page 1 Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.1 General Notices. Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: Municipal Minnesota Interconnection Agreement _ January 2019 38 138 SCHEDULE 2 - STANDARD CONTRACTS 28.2 Billing and Payment Notices. Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.3 Alternative Forms of Notices. Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.4 Designated Operating Representative. Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 7.Signatures. Facsimile or electronic signatures, or signatures to this Assignment sent electronically, shall have the same effect as original signatures. Photocopies, or electronically stored versions of this Assignment, shall have the same validity as the original. Municipal Minnesota Interconnection Agreement _ January 2019 39 139 SCHEDULE 2 - STANDARD CONTRACTS The Area EPS Operator, Assignor, and Assignee have executed this Assignment as of the dates as set forth below. Assignor \[Insert legal name of Assignor\] ___________________________________________________________________ Signed: _____________________________________________________________ Name (Printed): ______________________________________________________ Title: _______________________________________________________________ Date: ______________________________ Assignee \[Insert legal name of Assignee\] ___________________________________________________________________ Signed: _____________________________________________________________ Name (Printed): ______________________________________________________ Title: _______________________________________________________________ Date: ______________________________ Area EPS Operator \[Insert legal name of Area EPS Operator\] ___________________________________________________________________ Signed: _____________________________________________________________ Name (Printed): ______________________________________________________ Title: _______________________________________________________________ Date: ______________________________ Municipal Minnesota Interconnection Agreement _ January 2019 40 140 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 9ƌƉ wźǝĻƩ aǒƓźĭźƦğƌ ƷźƌźƷźĻƭ 5źƭƷƩźĬǒƷĻķ 9ƓĻƩŭǤ wĻƭƚǒƩĭĻƭ LƓƷĻƩĭƚƓƓĻĭƷźƚƓ tƩƚĭĻƭƭ ğĬƌĻ ƚŅ /ƚƓƷĻƓƷƭ 1.Booklets Anyone requesting interconnection information receives a Process Overview booklet and the appropriate Process booklet (b, c or d) a.Process Overview b.Simplified Process (under 20kW capacity) c.Fast Track Process (see applicability within) d.Study Process (see applicability within) 2.Initial Procedural Forms a.Pre-application Report Request b.Pre-application Report c.Simplified Interconnection Application d.Standard Interconnection Application (for Fast Track and Study processes) e.Energy Storage Application 3.Supplemental Agreement Forms a.Supplemental Review Offer b.System Impact Study Agreement c.Facility Study Agreement d.Transmission System Impact Study Agreement 4.Final Agreement Forms a.Uniform Contract (under 40kW capacity) b.Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request) c.Certificate of Completion 5.State of Minnesota Distributed Generation Interconnection Requirements 141 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ABSTRACT Information for interconnecting all Distributed Detroit Lakes kW Select Solar Energy Resources smaller than 10 megawatts in Community Solar Garden size to the utility distribution system. Detroit Lakes, MN INTERCONNECTION PROCESS Process Overview 142 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS /ƚƓƷĻƓƷƭ Foreword ....................................................................................................................................................... 1 1 Key Terminology .................................................................................................................. 2 1.1. Distributed Energy Resource ............................................................................................ 2 1.2. Point of Common Coupling (PCC) / Point of DER Connection (POC) ............................... 2 1.3. Capacity ............................................................................................................................ 2 2 Roles..................................................................................................................................... 2 2.1. Overview .......................................................................................................................... 2 2.2. DER Interconnection Coordinator .................................................................................... 3 2.3. Interconnection Customer ............................................................................................... 3 2.4. Application Agent ............................................................................................................. 3 2.5. Engineering Roles ............................................................................................................. 3 3 Processes ............................................................................................................................. 3 3.1. Overview .......................................................................................................................... 3 3.2. Importance of Process Timelines ..................................................................................... 4 3.3. Simplified Process ............................................................................................................ 5 3.4. Fast Track Process ............................................................................................................ 5 3.5. Study Process ................................................................................................................... 6 3.6. Process Assistance ............................................................................................................ 6 4 Interconnection Application ............................................................................................... 6 4.1. Overview .......................................................................................................................... 6 4.2. Availability of Information ............................................................................................... 7 4.3. Interconnection Application Process Fees ....................................................................... 7 4.4. Application Review Timelines .......................................................................................... 7 4.5. Comparability ................................................................................................................... 8 4.6. Changing Process Queues ................................................................................................ 8 4.7. Queue Position ................................................................................................................. 8 4.8. Site Control ....................................................................................................................... 9 5 Pre-Application Report ....................................................................................................... 9 5.1. Pre-Application Report Requests ..................................................................................... 9 i 143 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 5.2. Information Provided ....................................................................................................... 9 5.3. Pre-Application Report Components ............................................................................. 10 6 Capacity of the Distributed Energy Resources ................................................................. 11 6.1. Existing DER System Expansion ...................................................................................... 11 6.2. New DER Systems ........................................................................................................... 11 6.3. Limited Capacity ............................................................................................................. 11 7 Modification to Interconnection Applications ................................................................. 12 7.1. Procedures ..................................................................................................................... 12 8 Interconnection Agreements ............................................................................................ 12 8.1. Timelines ........................................................................................................................ 12 8.2. Types of Agreements...................................................................................................... 13 9 Interconnection ................................................................................................................. 13 9.1. Metering ......................................................................................................................... 13 9.2. Inspection, Testing and Commissioning ......................................................................... 13 9.3. Interconnection Costs .................................................................................................... 14 9.4. Technical Requirements ................................................................................................. 14 9.5. Authorization for Parallel Operations ............................................................................ 14 10 Extension of Timelines .................................................................................................. 15 10.1. Reasonable Efforts ...................................................................................................... 15 10.2. Extensions ................................................................................................................... 15 11 Disputes ......................................................................................................................... 15 11.1. Procedures .................................................................................................................. 15 12 Clauses ........................................................................................................................... 15 12.1. Confidentiality ............................................................................................................ 15 12.2. Non-Warranty ............................................................................................................. 17 12.3. Indemnification ........................................................................................................... 17 12.4. Limitation of Liability .................................................................................................. 18 13 Glossary .......................................................................................................................... 19 14 Certification of DER Equipment .................................................................................... 25 15 Certification Codes and Standards ................................................................................ 27 ii 144 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Foreword The State of Minnesota currently has interconnection process standards in effect to address the interconnection of distributed energy resources (DER) to the distribution grid. Under Minnesota Statute §216B.1611, cooperatives and municipals shall adopt an interconnection process that addresses the same issues as the interconnection process approved by the Minnesota Public Utilities Commission. The Elk River Municipal Utilities Distributed Energy Resources Interconnection Process (Interconnection Process) applies to any DER no larger than 10- megawatts (MW) AC interconnecting to and operating in parallel with Elk River Municipal distribution system in Minnesota. This interconnection process document is designed to be customer-centric when explaining the steps and details to interconnect DER systems to the distribution grid. The Interconnection Process is comprised of four manuals: 1) Process Overview, 2) Simplified Process, 3) Fast Track Process, and 4) Study Process and also contains several forms, including a final Interconnection Agreement. For the majority of DER interconnections, only the Process Overview and the Simplified Process manuals will apply. For larger and more complex DER interconnections, the Fast Track Process or the Study Process may apply. As part of the Interconnection Process, an Interconnection Agreement is to be executed prior to interconnecting a DER system to the utility distribution grid. For most DER interconnections, the Contract for Cogeneration and Small Power Production Facilities (Uniform Contract) will be used. For DER systems that do not fall under the terms of the Uniform Contract, the Municipal Minnesota Interconnection Agreement (MMIA) will apply. The process to interconnect a DER system to the distribution grid starts with the submission of an Interconnection Application. Each track has different information that is requested in the application and the non-refundable interconnection application fees will vary. Both the electric utility and the interconnecting customer have timelines that are enforced to ensure a timely application review, contract execution and interconnection commissioning. The key to a successful interconnection of a DER system is communication between all parties. Timely submission of the Interconnection Application prior to the purchase and installation of a DER system is strongly recommended. The Utility encourages customers to ask questions throughout the interconnection process. Interconnecting DER system to the distribution grid is not an effortless process, but it does not need to be a problematic process either. 1 145 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 1Key Terminology 1.1.Distributed Energy Resource Distributed Energy Resources, DER, were often referred to in past interconnection processes as Distributed Generation, DG, and on occasion also interchanged with the term Qualifying Facility, QF. This Interconnection Process uses the term DER to address all types of generation and energy resources that can be interconnected to the electric Distribution System. DER technologies can include photovoltaic solar systems, wind turbines, storage batteries or diesel generators and are not limited to renewable types of technologies. 1.2.Point of Common Coupling (PCC) / Point of DER Connection (POC) The meter is normally the point of demarcation between the utility-owned equipment and the customer-owned equipment. The term Point of Common Coupling, PCC, is the demarcation location between the utility and the customer. The Point of DER Connection, PoC, can be different from the PCC. The PoC is the location where a DER system would interconnect to the electrical system normally owned by the customer. For example, the PoC for a rooftop photovoltaic solar system may be 1.3.Capacity Throughout the Interconnection Process will be references to the capacity of the DER system. In most cases, the capacity listed is referring to the Nameplate Capacity of the DER system. All capacity references will be in alternating current, AC. There can be multiple DER systems with different PoCs that all have the same PCC submitted on a single interconnection application. The capacity for this type of interconnection would be the aggregate Nameplate Capacity of all DER systems at the individual PoCs. Additional examples of DER system arrangements can be seen in Section 13 under the definition of Point of Common Coupling. 2Roles 2.1.Overview During the interconnection process for a proposed DER system, there may be multiple entities involved in the application, approval and commissioning processes. The main entities that are involved during the Interconnection Process for a proposed DER system are the Interconnection Customer, the Application Agent and the DER 2 146 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Interconnection Coordinator. Official definitions of each entity are defined in the Glossary (Section 13). Additional details are explained in the subsections below. 2.2.DER Interconnection Coordinator The utility is referred to as the Area Electric Power Supply Operator in this Interconnection Process. The Area EPS Operator shall designate a DER Interconnection Coordinator to serve as a single point of contact from which general information on the application process may be obtained. The DER Interconnection Coordinator shall be available to provide coordination assistance with the Interconnection Customer but is not responsible for directly answering or resolving all of the issues involved in review and implementation of the interconnection process and standards. The contact information of the DER Interconnection Coordinator will be posted on the Area EPS Operators website if feasible, or available from the utility. 2.3.Interconnection Customer The owner of the proposed DER system and the entity requesting interconnection to the distribution system. 2.4.Application Agent The Interconnection Customer may designate, on the Interconnection Application or in writing after the application has been submitted, an Application Agent to serve as a single point of contact to coordinate with the DER Interconnection Coordinator on their behalf. Designation of an Application Agent does not absolve the Interconnection Customer from signing application documents and the responsibilities outlined in the Interconnection Process or in interconnection agreements. DER vendors, project managers or electricians are common entities that the Interconnection Customer may designate to perform this role. 2.5.Engineering Roles Either party may designate a specific person to be a single point of contact to provide technical expertise during the Interconnection Process for themselves or their organization. The person to supply engineering expertise may be a third party such as 3Processes 3.1.Overview The Interconnection Process applies to any DER no larger than 10 MW AC interconnecting to and operating in parallel with an Area EPS distribution system in 3 147 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Minnesota. Interested parties with plans to interconnect DER systems larger than 10 MW AC to the distribution system should contact the Area EPS Operator for a case- specific interconnection process. Fed interconnection process will supersede any interconnection process the Area EPS Operator has for DER system interconnections that fall under the jurisdiction of FERC. The Interconnection Process for DER is broken into three different tracks; the Simplified Process, the Fast Track Process, and the Study Process. The general classification of each track is summarized in Table 3.1 below. Table 3.1.Interconnection Process Tracks Size Track DER Technology Limitations Simplified Process Certified Inverter only 20 kW AC Fast Track Process All types 5 MW AC Study Process All types 10 MW AC If engineering screens are failed during the application process, a proposed DER interconnection may be moved into a different track. When a proposed DER interconnection is moved into a different track, additional information may be requested and additional fees may apply. 3.2.Importance of Process Timelines It is very important to pay attention to timelines listed for each process track. The timelines exist for an orderly and efficient process to interconnect DER systems to the Distribution System. If a timeline is missed by an Interconnection Customer, without the Interconnection Customer requesting a Timeline Extension explained in Section 10, the Interconnection Application will be deemed withdrawn by the Area EPS Operator. The Area EPS Operator also needs to abide by the timelines listed for each process track. The process for an Area EPS Operator to request Timeline Extensions is also addressed in Section 10. Unless otherwise stated, all time frames are measured in Business Days. For purpose of measuring these time intervals, the time shall be computed so as to exclude the first and include the last day of the prescribed duration of time. Any communication sent or received after 4:30 p.m. Central Prevailing Time or on a Saturday, Sunday or Holiday shall be considered to be sent on the next Business Day. 4 148 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 3.3.Simplified Process 1 An application to interconnect a certified, inverter-based DER system no larger than 20 kilowatts (kW) shall be evaluated under the Simplified Process. A common form of DER inverter certification is UL 1741. Proposed DER systems that require Area EPS system modifications to accommodate the interconnection do not qualify for the Simplified Process. A transformer change, fusing upgrades or line extensions are common examples of Area EPS system modification. Simplified Process eligibility does not imply or indicate the Interconnection Application will pass the initial review screens. Failure to pass the screens will route the Interconnection Application to the Fast Track Process. 3.4.Fast Track Process An application to interconnect a DER shall be evaluated under the Fast Track Process if the eligibility requirements are not exceeded in Table 3.2 and the application does not qualify for the Simplified Process. Fast Track eligibility for DERs is determined based upon the generator type, the size of the generator, voltage of the line, and the location and type of line at the Point of Common Coupling, (PCC). All synchronous and induction machines must be no larger than 2 MW to be eligible for Fast Track Process consideration. Table 3.2.Fast Track Eligibility for DER Fast Track Eligibility for certified, 2 Fast Track Eligibility 3 inverter-based DER on a Mainline Line Voltage Regardless of and 2.5 Electrical Circuit Miles from Location 4 Substation < 5 kV 5 kV and < 15 kV 1 MW 2 MW 15 kV and < 30 kV 2 MW meet the codes, standards and certification requirements found in Section 15 and Section 14. 1 Additional information regarding certified equipment is found in Sections 14 and 15. 2 Synchronous and induction machine eligibility is limited to no more than 2 MW even when line voltage is greater than 15 kV. 3 For purposes of this table, a Mainline is the three-phase backbone of a circuit. It will typically constitute lines with wire sizes of 4/0 American wire gauge, 266 kcmil, 336.4 kcmil, 397.5 kcmil, 477 kcmil and 795 kcmil. 4 An Interconnection Customer can determine this information about its proposed interconnection location in advance by requesting a pre-application report described in Section 5. 5 149 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 3.5.Study Process An application to interconnect a DER that does not meet the Simplified Process or Fast Track Process eligibility requirements or does not pass the review as described in either process, shall be evaluated under the Study Process. 3.6.Process Assistance Prior to submitting an Interconnection Application, the Interconnection Customer may DER Interconnection Coordinator which process track a proposed interconnection is subject to and about additional details regarding each process track. An Interconnection Customer can obtain, through an informal request, general information about the Interconnection Process and about potentially Affected System(s) for a proposed interconnection at a specific location. The existing electric system information provided to the Interconnection Customer should include relevant system study results, interconnection studies, and other materials useful to an System. Information will be provided to the extent such provision does not violate the privacy policies of the Area EPS Operator, confidentiality provisions of prior agreements or critical infrastructure requirements. The Area EPS Operator shall comply with reasonable requests for such information. 4Interconnection Application 4.1.Overview Each process track has different information that needs to be provided to the Area EPS Operator. Table 4.1 indicates which application is to be completed in its entirety and submitted to the Area EPS Operator to start the interconnection process for the proposed DER system. Table 4.1.Interconnection Application Process Track Application Simplified Simplified Interconnection Application Fast Track Standard Interconnection Application Study Standard Interconnection Application The Area EPS Operator will provide all necessary Interconnection Applications, Interconnection Process documents and sample interconnection agreements on its website if possible. The Area EPS Operator will also accept Interconnection Applications 6 150 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS submitted electronically either through a web portal or to an email address specified by the Area EPS Operator. The Area EPS Operator may allow the Interconnection Application to be submitted with an electronic signature. 4.2.Availability of Information The Area EPS Operator will provide all necessary Interconnection Applications, Interconnection Process documents and sample interconnection agreements on its website if possible. If a website is not available, the applicable documents will be readily avail The Area EPS Operator will establish a public queue of active interconnection applications on its website once the Area EPS Operator has received at least 40 completed Interconnection Applications in a year. The public queue will be updated, at minimum, on a monthly basis. 4.3.Interconnection Application Process Fees Each Interconnection Application submitted to the Area EPS Operator must include the appropriate interconnection application process fee prior to the Area EPS Operator reviewing the Interconnection Application. The required process fee for each process track is listed in Table 4.2. Table 4.2.Interconnection Application Process Fee Process Track Process Fee Simplified $100 5 Certified System $100 + $1/kW Fast Track Non-Certified System $100 + $2/kW $1,000 + $2/kW down payment. Study Additional study fees may apply. 4.4.Application Review Timelines The Interconnection Application shall be date- and time-stamped upon initial, and if necessary, resubmission receipt. The Area EPS Operator shall notify the Interconnection Customer if the Interconnection Application is deemed incomplete within ten (10) Business Days. This notification shall include a written list detailing all information that must be provided to complete the Interconnection Application. Depending on the process track the Interconnection Customer has between five (5) and ten (10) Business Days to provide the missing information unless additional time is 5 Additional information regarding certified equipment is found in Sections 14 and 15. 7 151 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS requested with valid reasons. Failure to submit the requested information within the stated timeline will result in the Interconnection Application being withdrawn. An Interconnection Application will be deemed complete upon submission to the Area EPS Operator when all documents, fees and information required with the Interconnection Application adhering to Minnesota Technical Requirements are included. The time- and date- stamp of the completed Interconnection Application shall be accepted as the qualifying date for purposes of establishing a queue position as described in Section 4.7. Depending on the process track the Area EPS Operator has either a total of twenty (20) Business Days or twenty-five (25) Business Days to complete the Interconnection Application review and submit notice back to the Interconnection Customer stating the proposed DER system may proceed with the interconnection process or the proposed DER system requires additional engineering studies. The period of time when waiting for the Interconnection Customer to provide missing information is not included in the Business Days or twenty-five (25) Business Days review timeline. 4.5.Comparability The Area EPS Operator shall receive, process and analyze all Interconnection Applications in a timely manner. The Area EPS Operator shall use the same Reasonable Efforts in processing and analyzing Interconnection Applications from all Interconnection Customers. 4.6.Changing Process Queues During the review of the initially submitted Interconnection Application for the proposed DER system, the Area EPS Operator may determine the proposed DER system should be in a different process track. For proposed DER systems that are moved into a different process track after submittal of the initial application, the difference between the originally submitted processing fee and the current process track processing fee will be assessed. In addition, the Area EPS Operator may request the Interconnection Customer to provide additional information regarding the proposed DER system. 4.7.Queue Position The Area EPS Operator shall maintain a single, administrative queue and may manage the queue by geographical region. The queue position of each completed Interconnection Application is used to determine the engineering review. The queue position is also used to determine the cost responsibility for system upgrades necessary to accommodate the interconnection. 8 152 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS An Interconnection Application will retain its queue number even when it is moved into a different process track. An Interconnection Application can lose its queue position if the Interconnection Customer misses timelines in the applicable process track. The Interconnection Customer and Area EPS Operator have the opportunity to request timeline extensions which are explained in detail in Section 10. 4.8.Site Control Documentation of site control must be submitted with the Interconnection Application. Site control may be demonstrated by any of the following: Ownership of, a leasehold interest in, or a right to develop a site for the purpose of constructing the DER system. An option to purchase or acquire a leasehold site for constructing the DER system. An exclusivity or other business relationship between the Interconnection Customer and the entity having the right to sell, lease, or grant to the Interconnection Customer the right to possess or occupy a site for constructing the DER system. For DER in the Simplified Process, proof of site control may be demonstrated by the site Simplified Interconnection Application. 5Pre-Application Report 5.1.Pre-Application Report Requests The Interconnection Customer may submit a Pre-Application Report Request, including a non-refundable fee of $300, for a Pre-Application Report on a proposed project at a specific site. The Interconnection Customer must fill out the Pre-Application Request form as completely as possible. The Area EPS Operator shall provide the readily available data listed in Section 5.3 within fifteen (15) Business Days of receipt of a completed request form and payment. The Pre-Application Report produced by the Area EPS Operator is non-binding, does not confer any rights, and does not preclude the Interconnection Customer from any interconnection process steps including submission of the Interconnection Application. 5.2.Information Provided Using the information provided in the Pre-Application Report Request form, the Area EPS Operator will identify the substation/area bus, bank or circuit likely to serve the proposed PCC. This selection by the Area EPS Operator does not necessarily indicate, after application of the screens and/or study, that this would be the circuit the project 9 153 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ultimately connects to. The Interconnection Customer must request additional Pre- Application Reports if information about multiple PCCs is requested. The Pre-Application Report will only include existing data. A request for a Pre- Application Report does not obligate the Area EPS Operator to conduct a study or other analysis of the proposed DER in the event that data is not readily available. The Area EPS Operator will provide the Interconnection Customer with the data that is available. The confidentiality provisions in Section 12.1 apply to Pre-Application Reports. 5.3.Pre-Application Report Components The Pre-Application Report shall include the following pieces of information provided the data currently exists and is readily available. Total capacity (in megawatts (MW)) of substation/area bus, bank or circuit based on normal or operating ratings likely to serve the proposed Point of Common Coupling. Existing aggregate generation capacity (in MW) interconnected to a substation/area bus, bank or circuit (i.e., amount of generation online) likely to serve the proposed Point of Common Coupling. Aggregate queued generation capacity (in MW) for a substation/area bus, bank or circuit (i.e., amount of generation in the queue) likely to serve the proposed Point of Common Coupling. Available capacity (in MW) of substation/area bus or bank and circuit likely to serve the proposed Point of Common Coupling (i.e., total capacity less the sum of existing aggregate generation capacity and aggregate queued generation capacity). Substation nominal distribution voltage and/or transmission nominal voltage if applicable. Nominal distribution circuit voltage at the proposed Point of Common Coupling. Approximate circuit distance between the proposed Point of Common Coupling and the substation. Relevant line section(s) actual or estimated peak load and minimum load data, including daytime minimum load and absolute minimum load, when available. Whether the Point of Common Coupling is located behind a line voltage regulator. 10 154 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Number and rating of protective devices and number and type (standard, bi- directional) of voltage regulating devices between the proposed Point of Common Coupling and the substation/area. Identify whether the substation has a load tap changer. Number of phases available on the Area EPS medium voltage system at the proposed Point of Common Coupling. If a single phase, distance from the three- phase circuit. Limiting conductor ratings from the proposed Point of Common Coupling to the distribution substation. Whether the Point of Common Coupling is located on a spot network, grid network, or radial supply. Based on the proposed Point of Common Coupling, existing or known constraints such as, but not limited to, electrical dependencies at that location, short circuit interrupting capacity issues, power quality or stability issues on the circuit, capacity constraints, or secondary networks. 6Capacity of the Distributed Energy Resources 6.1.Existing DER System Expansion If the Interconnection Application is for an increase in capacity to an existing DER system, the Interconnection Application shall be evaluated on the basis of the total new alternating current (AC) capacity of the DER. The maximum capacity for the DER shall be the aggregate maximum Nameplate Rating unless the conditions in Section 6.3 are met. 6.2.New DER Systems An Interconnection Application for a DER that includes multiple energy production devices, (i.e. solar and storage), at a site for which the Interconnection Customer seeks a simple Point of Common Coupling, shall be evaluated on the basis of the aggregated maximum Nameplate Rating unless the conditions in Section 6.3 are met. 6.3.Limited Capacity A DER system may include devices, (i.e. control systems, power relays or other similar device settings), that can limit the maximum capacity at which the DER system can capacity limited devices, the Interconnection Customer must obtain the Area EPS s agreement to consider the DER system with the Nameplate Rating as the 11 155 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS limited capacity. unreasonably withheld provided proper documentation is provided showing the effective limit active power output will not adversely affect the safety and reliability of the Area EPS Interconnection Application must be withdrawn or revised to specify the maximum capacity that the DER system is capab distribution system without such limitations. Nothing in this section shall prevent the Area EPS Operator from considering a higher output, (i.e. aggregate Nameplate Rating), if the limitations do not provide adequate assurance, when evaluating the system impacts. 7Modification to Interconnection Applications 7.1.Procedures At any time after the Interconnection Application is deemed complete, the Interconnection Customer or the Area EPS Operator may identify modifications to the proposed DER system that may improve costs and benefits (including reliability) of the proposed DER system and the ability for the Area EPS Operator to accommodate the proposed DER system. The Interconnection Customer shall submit to the Area EPS Operator in writing all proposed modifications to any information provided in the Interconnection Application. The Area EPS Operator cannot unilaterally modify the Interconnection Application. Additional information regarding modifications to interconnection applications is found in each process track document. 8Interconnection Agreements 8.1.Timelines After the Interconnection Application has been approved by the Area EPS Operator, the Area EPS Operator shall provide the Interconnection Customer with an executable Interconnection Agreement within five (5) Business Days. The Interconnection Customer shall have thirty (30) Business Days to sign and return the Interconnection Agreement to the Area EPS Operator. The Area EPS Operator shall sign the Interconnection Agreement within five (5) business days after receiving the signed Interconnection Agreement from the Interconnection Customer. If the Interconnection Customer fails to return a signed Interconnection Agreement to the Area EPS Operator within thirty (30) Business Days and fails to request an extension as explained in Section 10, the Interconnection Application will be deemed withdrawn. 12 156 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 8.2.Types of Agreements There are two main types of Interconnection Agreements that may be executed with an approved Interconnection Application. In general, Interconnection Customers with a proposed DER system that qualifies for the Simplified Process track will sign the Area EPUniform Contract for Cogeneration and Small Power Production Facilities (Uniform Contract). Proposed DER systems less than 100 kW that are under the Fast Track process may also sign the Uniform Contract. All other sized DER system will sign the Municipal Minnesota Interconnection Agreement (MMIA). Area EPS Operators who do not purchase the excess generation of the proposed DER system will also require the MMIA to be executed for any size of DER system. Table 8.1.Interconnection Agreements Process Track Interconnection Agreement Simplified Uniform Contract Qualifies for Net Energy Billing Uniform Contract Less than 100 kW & Area EPS Agrees Fast Track Uniform Contract to Purchase Excess Generation All Other DER systems MMIA Study MMIA Interconnection Customers may choose to sign the MMIA in lieu of the Uniform Contact. A separate power purchase agreement will also need to be executed if the Uniform Contract is not utilized. Interconnection of the proposed DER system will not occur until a signed Uniform Contract or the MMIA is returned to the Area EPS Operator no later than five (5) days prior to scheduled testing and inspection. 9Interconnection 9.1.Metering Any metering requirements necessitated by the use of the DER system shall be installed included in the final invoice of interconnection costs to the Interconnection Customer. The Interconnection Customer is also responsible for metering replacement costs not Operator may charge Interconnection Customers an ongoing metering-related charge for an estimate of ongoing metering-related costs specifically demonstrated. 9.2.Inspection, Testing and Commissioning The Interconnection Customer shall arrange for the inspection and testing of the DER 13 157 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS to Minnesota Technical Requirements. Commissioning tests of the Interconnection and Section 15. The Interconnection Customer shall notify the Area EPS Operator of testing and inspection no fewer than five (5) Business Days in advance, or as may be agreed to by the Parties. Depending on the process track, either a Certificate of Completion or a testing procedure shall be submitted to the Area EPS Operator prior to the testing and inspection date. The Area EPS Operator shall send qualified personnel to the DER site to inspect the interconnection and witness the testing. Testing and inspection shall occur on a Business Day at a mutually agreed upon time and date. The Area EPS Operator may waive the right to witness the testing. 9.3.Interconnection Costs The Interconnection Customer shall pay for the actual cost of the Interconnection commission the proposed DER system. An estimate of the interconnection costs shall be stated in the Uniform Contract or MMIA. 9.4.Technical Requirements The Area EPS Operator shall use Reasonable Efforts to provide the Interconnection Customer the Minnesota Technical Requirements by providing the document with the notice of approval of the interconnection application or by providing a website link to the document. Additionally, the Area EPS Operator shall notify the Interconnection Customer of any changes to these requirements as soon as they are known. Unless notified by the Area EPS Operator, the Interconnection Customer only needs to be in compliance with the current version of the Minnesota Technical Requirements at the time of interconnection. 9.5.Authorization for Parallel Operations The Interconnection Customer shall not operate its DER system in parallel with the tion system without prior written authorization from the Area EPS Operator. The Area EPS Operator shall provide such authorization within three (3) Business Days from when the Area EPS Operator receives notification that the Interconnection Customer has complied with all applicable parallel operations requirements; the completion of a successful testing and inspection of the DER system and all payments for issued bills related to the interconnection process that are past due have been paid in full. Such authorization shall not be unreasonably withheld, conditioned or delayed. 14 158 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 10Extension of Timelines 10.1.Reasonable Efforts The Area EPS Operator shall make Reasonable Efforts to meet all time frames provided in these procedures. If the Area EPS Operator cannot meet a deadline provided herein, it must notify the Interconnection Customer in writing within three (3) Business Days after the deadline to explain the reason for the failure to meet the deadline and provide an estimated time by which it will complete the applicable interconnection procedure in the process. 10.2.Extensions For applicable time frames described in these procedures, the Interconnection Customer may request, in writing, one extension equivalent to half of the time originally allotted (e.g., ten (10) Business Days for a twenty (20) Business Days original time frame) which the Area EPS Operator may not unreasonably refuse. No further extensions for the applicable time frame shall be granted absent a Force Majeure Event or other similarly extraordinary circumstance. 11Disputes 11.1.Procedures The Parties agree to make good faith efforts to attempt to resolve all disputes arising out of the interconnection process and associated study and Interconnection Agreements. The Parties agree to follow the established dispute resolution policy adopted by the Area EPS Operator. 12Clauses 12.1.Confidentiality Confidential Information shall mean any confidential and/or proprietary information provided by one Party to the other Party that is clearly marked or otherwise designated metering data provided by the Interconnection Customer may be deemed Confidential Information regardless of whether it is clearly marked or otherwise designated as such. If requested by either Party, the other Party shall provide in writing the basis for asserting that the information warrants confidential treatment. Parties providing a Governmental Authority trade secret, or privileged or otherwise not public or nonpublic data under Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, shall identify such data consistent 1999 Revised Procedures for Handling Trade Secret and Privileged Data available online at: https://mn.gov/puc/puc-documents/#4. 15 159 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Confidential Information does not include information previously in the public domain with proper authorization, required to be publicly submitted or divulged by Governmental Authorities (after notice to the other Party and after exhausting any opportunity to oppose such publication or release), or necessary to be publicly divulged in an action to enforce these procedures. Each Party receiving Confidential Information shall hold such information in confidence and shall not disclose it to any third party nor to the public without prior written authorization from the Party providing that information, except to fulfill obligations under these procedures, or to fulfill legal or regulatory requirements that could not otherwise be fulfilled by not making the information public. Each Party shall hold in confidence and shall not disclose Confidential Information, to any person (except employees, officers, representatives and agents, who agree to be bound by this section). Confidential Information shall be clearly marked as such on each page or otherwise affirmatively identified. If a court, government agency or entity with the right, power, and authority to do so, requests or requires either Party, by subpoena, oral disposition, interrogatories, requests for production of documents, administrative order, or otherwise, to disclose Confidential Information, that Party shall provide the other Party with prompt notice of such request(s) or requirements(s) so that the other Party may seek an appropriate protective order or waive compliance with the terms of this Agreement. In the absence of a protective order or waiver the Party shall disclose such confidential information which, in the opinion of its counsel, the party is legally compelled to disclose. Each Party will use reasonable efforts to obtain reliable assurance that confidential treatment will be accorded to any confidential information furnished. Critical infrastructure information or information that is deemed or otherwise designated by a Party as Critical Energy/Electric Infrastructure Information (CEII) pursuant to FERC regulation, 18 C.F.R. §388.133, as may be amended from time to time, may be subject to further protections for disclosure as required by FERC or FERC least the same standard of care to protect Confidential Information obtained from the other Party as it employs to protect its own Confidential Information. Each Party is entitled to equitable relief, by injunction or otherwise, to enforce its rights under this provision to prevent the release of Confidential Information without bond or proof of damages and may seek other remedies available at law or in equity for breach of this provision. 16 160 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 12.2.Non-Warranty The Area EPS Operator does not give any warranty, expressed or implied, as to the adequacy, safety, or other characteristics of any structures, equipment, wires, appliances or devices owned, operated, installed or maintained by the Interconnection Customer, including without limitation the DER and any structures, equipment, wires, appliances or devices not owned, operated or maintained by the Area EPS Operator. The Area EPS Operator does not guarantee uninterrupted power supply to the DER and will operate the Distribution System with the same reliability standards for the entire customer base. 12.3.Indemnification Each Party is protected from liability incurred to third parties as a result of carrying out the provisions of this interconnection process and subsequent interconnection agreements. The Parties shall at all times indemnify, defend, and save the other Party harmless from, any and all damages, losses, claims, including claims and actions relating to injury to or death of any person or damage to property, demand, suits, recoveries, costs and expenses, court costs, attorney fees, and all other obligations by or to third parties, arising out of or resulting of its obligations under this agreement on behalf of the indemnifying Party, except in cases of gross negligence or intentional wrongdoing by the indemnified Party. This indemnification obligation shall apply notwithstanding any negligent or intentional to indemnify the indemnified Party shall be reduced in proportion to the percentage by ent or intentional acts, errors or omissions caused the damages. Neither Party shall be indemnified for its damages resulting from its sole negligence, intentional acts or willful misconduct. These indemnity provisions shall not be construed to relieve any insurer of its obligation to pay claims consistent with the provisions of a valid insurance policy. If an indemnified person is entitled to indemnification under this article as a result of a claim by a third party, and the indemnifying Party fails, after notice and reasonable opportunity to proceed under this article, to assume the defense of such claim, such indemnified person may at the expense of the indemnifying Party contest, settle or consent to the entry of any judgment with respect to, or pay in full, such claim. If an indemnifying party is obligated to indemnify and hold any indemnified person harmless under this article, the amount owing to the indemnified person shall be the 17 161 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS recovery. Promptly after receipt by an indemnified person of any claim or notice of the commencement of any action or administrative or legal proceeding or investigation as to which the indemnity provided for in this article may apply, the indemnified person shall notify the indemnifying party of such fact. Any failure of or delay in such delay is materially prejudicial to the indemnifying party. 12.4. Limitation of Liability ct or omission in its performance of this Agreement, shall be limited to the amount of direct damage actually incurred. In no event shall either party be liable to the other party for an indirect, incidental, special, consequential, or punitive damages of any kind whatsoever, except as allowed under in Section 12.3. 18 162 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 13Glossary Affected System System, or Transmission System connected generation which may be affected by the proposed interconnection. Applicant Agent A person designated in writing by the Interconnection Customer to represent the interconnection process. Area EPS The electric power distribution system connected at the Point of Common Coupling. Area EPS Operator An entity that owns, controls, or operates the electric power distribution systems that are used for the provision of electric service in Minnesota. For this Interconnection Process the Area EPS Operator is Elk River Municipal Utilities. Business Day Monday through Friday, excluding Holidays as defined by Minn. Stat. §645.44, Subdivision 5. Any communication to have been sent or received after 4:30 p.m. Central Prevailing Time or on a Saturday, Sunday or holiday shall be considered to have been sent on the next Business Day. Certified Equipment Certified equipment is equipment that has been tested by a nationally recognized lab meeting a specific standard. For DER systems, a UL 1741 listing is a common form of DER inverter certification. Additional information is contained in Sections 14 and 15. Confidential Information Any confidential and/or proprietary information provided by one . All procedures, design, operating specifications, and metering data provided by the Interconnection Customer may be deemed Confidential Information. See Section 12.1 for further information. Distributed Energy Resource (DER) A source of electric power that is not directly connected to a bulk power system or central station service. DER includes both generators and energy storage technologies capable of exporting active power to an EPS. An interconnection system or a supplemental DER device that is necessary for compliance with this standard is part of a DER. For the purpose of the Interconnection Process and interconnection agreements, the DER Interconnection Facilities. Distribution System The Area EPS facilities which are not part of the Local EPS, Transmission System or any generation system. Distribution Upgrades The additions, modifications, and upgrades to the Distribution System at or beyond the Point of Common Coupling to facilitate interconnection of the DER and render Distribution System. Distribution Upgrades do not include Interconnection Facilities. 19 163 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Electric Power System (EPS) The facilities that deliver electric power to a load. Fast Track Process The procedure as described in the Interconnection Process - Fast Track Process for evaluating an Interconnection Application for a DER that meets the eligibility requirements of Section 3.4. Force Majeure Event An act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, an order, regulation or restriction imposed by governmental, military or lawfully established civilian Event does not include an act of negligence or intentional wrongdoing. Good Utility Practice Any of the practices, methods and acts engaged in or approved by a significant portion of the electric industry during the relevant time period, or any of the practices, methods and act which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted in the region. Governmental Authority Any federal, state, local or other governmental regulatory or administrative agency, court, commission, department, board, or other governmental subdivision, legislature, rulemaking board, tribunal, or other governmental authority having jurisdiction over the Parties, their respective facilities, or the respective services they provide, and exercising or entitled to exercise any administrative, executive, police, or taxing authority or power; provided, however, that such term does not include the Interconnection Customer, the Area EPS Operator, or any Affiliate thereof. The governing authority of the municipal utility is the authority governing interconnection requirements unless otherwise provided for in the Minnesota Technical Requirements. Interconnection Agreement The terms and conditions between the Area EPS Operator and Interconnection Customer (Parties). See Section 8 for when the Uniform Contract or Municipal Minnesota Interconnection Agreement applies. Interconnection Application The Standard or Simplified Interconnection Application, as applicable, pursuant to Section 4. Interconnection Customer The person or entity, including the Area EPS Operator, who will be the owner of the DER and who Distribution System. The Interconnection Customer is responsible for ensuring the DER(s) is designed, operated and maintained in compliance with the Minnesota Technical Requirements. Interconnection Facilities nection Facilities. Collectively, Interconnection Facilities 20 164 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS include all facilities and equipment between the DER and the Point of Common Coupling, including any modification, additions or upgrades that are necessary to physically and electrically intercon Customer Interconnection Facilities include supplemental DER devices, inverters, and associated wiring and cables up to the Point of DER Connection. Some examples of Area EPS Operator Interconnection Facilities include sole use facilities; such as, line extensions, controls, relays, switches, breakers, transformers and shall not include Distribution Upgrades or Network Upgrades. Interconnection Process standards in this document. Material Modification A modification to machine data, equipment configuration or to the interconnection site of the DER at any time after receiving notification by the Area EPS Operator of a complete Interconnection Application that has a material impact on the cost, timing, or design of any Interconnection Facilities or Upgrades, or a material impact on the cost, timing or design of any Interconnection Application with a later Queue Position or the safety or 6 reliability of the Area EPS. MN Technical Requirements The term including all of the DER technical interconnection requirement documents for the state of Minnesota; including Attachment 2 Distributed Generation Interconnection Requirements established in the Commissio Order in E-999/CI-01-1023) until superseded and upon Commission approval of updated Minnesota DER Technical Interconnection and Interoperability Requirements in E-999/CI-16- 521 (anticipated July 2019.) Nameplate Rating nominal voltage (V), current (A), maximum active power (kWac), apparent power (kVA), and reactive power (kVar) at which a DER is capable of sustained operation. For a Local EPS with multiple DER units, the aggregate nameplate rating is equal to the sum of all DERs nameplate rating in the Local EPS. For purposes of the Attachment V in the 6 A Material Modification shall include, but may not be limited to, a modification from the approved Interconnection Application that: (1) changes the physical location of the point of common coupling such that it is likely to have an impact on technical review; (2) increases the nameplate rating or output characteristics of the Distributed Energy Resource; (3) changes or replaces generating equipment, such as generator(s), inverter(s), transformers, relaying, controls, etc., and substitutes equipment that is not like-kind substitution in certification, size, ratings, impedances, efficiencies or capabilities of the equipment; (4) changes transformer connection(s) or grounding; and/or (5) changes to a certified inverter with different specifications or different inverter control settings or configuration. A Material Modification shall not include a modification from the approved Interconnection Application that: (1) changes the ownership of a Distributed Energy Resource; (2) changes the address of the Distributed Energy Resource, so long as the physical point of common coupling remains the same; (3) changes or replaces generating equipment such as generator(s), inverter(s), solar panel(s), transformers, relaying, controls, etc. and substitutes equipment that is a like-kind substitution in certification, size, ratings, impedances, efficiencies or capabilities of the equipment; and/or (4) increases the DC/AC ratio but does not increase the maximum AC output capability of the Distributed Energy Resource in a way that is likely to have an impact on technical review. 21 165 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS limited thought use of control systems, power relays or similar device settings or adjustments as identified in IEEE 1547. The nameplate ratings referenced in the Interconnection Process are alternating current nameplate DER ratings at the Point of DER Coupling. Network Upgrades Additions, modifications, and upgrades to the Transmission System Network Upgrades do not include Distribution Upgrades. Operating Requirements Any operating and technical requirements that may be applicable Requirements, including those set forth in the Interconnection Agreement. Party or Parties The Area EPS Operator and the Interconnection Customer. Point of Common Coupling (PCC) The point where the Interconnection Facilities connect with po the National Electrical Safety Code. Figure 1: Point of Common Coupling and Point of DER Connection (Source: IEEE 1547) 22 166 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Point of DER Connection (PoC) When identified as the Reference Point of Applicability, the point where an individual DER is electrically connected in a Local EPS and meets the requirements of this standard exclusive of any load present in the respective part of the Local EPS (e.g. terminals of the inverter when no supplemental DER device is required). For DER unit(s) that are not self-sufficient to meet the requirements without a supplemental DER device(s), the Point of DER Connection is the point where the requirements of this standard are met by DER in conjunction with a supplemental DER device(s) exclusive of any load present in the respective part of the Local EPS. Queue Position The order of a valid Interconnection Application, relative to all other pending valid Interconnection Applications, that is established based upon the date- and time- of receipt of the complete Interconnection Application as described in Section 4.7. Reasonable Efforts With respect to an action required to be attempted or taken by a Party under these procedures, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Reference Point of Applicability The location, either the Point of Common Coupling or the Point of DER Connection, where the interconnection and interoperability performance requirements specified in IEEE 1547 apply. With mutual agreement, the Area EPS Operator and Customer may determine a point between the Point of Common Coupling and Point of DER Connection. See Minnesota Technical Requirements for more information. Simplified Process The procedure for evaluating an Interconnection Application for a certified inverter-based DER no larger than 20 kW that uses the screens described in the Interconnection Process Simplified Process document. The Simplified Process includes simplified procedures. Study Process The procedure for evaluating an Interconnection Application that includes the scoping meeting, system impact study, and facilities study. Transmission Owner The entity that owns, leases or otherwise possesses an interest in the portion of the Transmission System relevant to the Interconnection. Transmission Provider The entity (or its designated agent) that owns, leases, controls, or operates transmission facilities used for the transmission of electricity. The term Transmission Provider includes the Transmission Owner when the Transmission Owner is separate from the Transmission Provider. The Transmission Provider may include the Independent System Operator or Regional Transmission Operator. Transmission System The facilities owned, leased, controlled or operated by the Transmission Provider or the Transmission Owner that are used to provide transmission service. See the Transmission from Generation and Distribution Assets in Docket No. E-999/CI-99-1261. 23 167 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Uniform Contract Production Facilities (Uniform Contract) that may be applied to all qualifying new and existing interconnections between the Area EPS Operator and a DER system having capacity less than 40 kilowatts. Upgrades or Distribution System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. 24 168 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 14Certification of DER Equipment Distributed Energy Resource (DER) equipment proposed for use in an interconnection system shall be considered certified for interconnected operation if the following criteria is met: 1)It has been tested in accordance with industry standards for continuous utility interactive operation in compliance with the appropriate codes and standards referenced below by any Nationally Recognized Testing Laboratory (NRTL) recognized by the United States Occupational Safety and Health Administration to test and certify interconnection equipment pursuant to the relevant codes and standards listed in the Overview Process, 2)It has been labeled and is publicly listed by such NRTL at the time of the interconnection application, and 3)Such NRTL makes readily available for verification all test standards and procedures it utilized in performing such equipment certification, and, with consumer approval, the test data itself. The NRTL may make such information available on its website and by accompanying the equipment. The Interconnection Customer must verify that the assembly and use of the equipment falls within the use or uses for which the equipment was tested, labeled, and listed by the NRTL. Certified equipment shall not require further type-test review, testing, or additional equipment to meet the requirements of this interconnection procedure; however, nothing herein shall preclude the need for a DER Design Evaluation or an on-site commissioning test by the parties to the interconnection as provided for in the Minnesota Technical Requirements. If the certified equipment package includes only interface components (switchgear, inverters, or other interface devices), then an Interconnection Customer must show that the generator or other electric source being utilized with the equipment package is compatible with the equipment package and is consistent with the testing and listing specified for this type of interconnection equipment. Provided the generator or electric source, when combined with the equipment package, is within the range of capabilities for which it was tested by the NRTL and does not violate the in-test review, testing or additional equipment on the customer side of the Point of Common Coupling shall be required to be considered certified for the purposes of this interconnection procedure; however, nothing herein shall preclude the need for a DER design evaluation or an on-site 25 169 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS commissioning test by the parties to the interconnection as provided for in the Minnesota Technical Requirements. An equipment package does not include equipment provided by the Area EPS. 26 170 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 15Certification Codes and Standards The existing Minnesota Technical Requirements and the following standards shall be used in conjunction with the Interconnection Process. The process has started to update the Technical Requirements to meet IEEE 1547-2018. Once that process is completed, the updated DER Technical Interconnection and Interoperability Requirements will supersede this section. When the stated version of the following standards is superseded by an approved revision then that revision shall apply: IEEE 1547-2003 IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems IEEE 1547a-2014 IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems Amendment 1 IEEE 1547.1-2005 IEEE Standard Conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems IEEE 1547.1a-2015 (Amendment to IEEE Std 1547.1-2005) IEEE Standard Conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems Amendment 1 UL 1741 Inverters, Converters, Controllers, and Interconnection System Equipment for Use in Distributed Energy Resources (2010) NFPA 70 (2017), National Electrical Code IEEE Std C37.90.1 (2012) (Revision of IEEE Std C37.90.1-2002), IEEE Standard for Surge Withstand Capability (SWC) Tests for Protective Relays and Relay Systems Associated with Electric Power Apparatus IEEE Std C37.90.2 (2004) (Revision of IEEE Std C37.90.2-1995), IEEE Standard for Withstand Capability of Relay Systems to Radiated Electromagnetic Interference from Transceivers IEEE Std C37.108-20021989 (Revision of C37.108-19892002), IEEE Guide for the Protection of Network Transformers IEEE Std C57.12.44-2014 (Revision of IEEE Std C57.12.44-2005), IEEE Standard Requirements for Secondary Network Protectors 27 171 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS IEEE Std C62.41.2-2002, IEEE Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits IEEE Std C62.41.2-2002_Cor 1-2012 (Corrigendum to IEEE Std C62.41.2-2002) IEEE Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits Corrigendum 1: Deletion of Table A.2 and Associated Text IEEE Std C62.45-2002 (Revision of IEEE Std C62.45-1992) IEEE Recommended Practice on Surge Testing for Equipment Connected to Low-Voltage (1000 V and less) AC Power Circuits ANSI C84.1-(2016) Electric Power Systems and Equipment Voltage Ratings (60 Hertz) IEEE Standards Dictionary Online, \[Online\] NEMA MG 1-2016, Motors and Generators IEEE Std 519-2014, IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems 28 172 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ABSTRACT Information for interconnecting Distributed Energy Resources of up to 20 kilowatts in size to the ЊЉ Ɖ‘ 5ĻƒƚƓƭƷƩğƷźƚƓ {ƚƌğƩ utility distribution system. hǞğƷƚƓƓğͲ ab INTERCONNECTION PROCESS {źƒƦƌźŅźĻķ tƩƚĭĻƭƭ 173 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS /ƚƓƷĻƓƷƭ 1 Applicability ......................................................................................................................... 1 1.1. Capacity Limit ................................................................................................................... 1 1.2. Certified Inverters ............................................................................................................ 1 2 Application Submission ....................................................................................................... 1 2.1. Simplified Process Application ......................................................................................... 1 2.2. Battery Storage ................................................................................................................ 1 2.3. Site Control ....................................................................................................................... 2 3 Application Review ............................................................................................................. 2 3.1. Timelines .......................................................................................................................... 2 3.2. Initial Review Screens ....................................................................................................... 3 3.3. Notification of Approval of Application ........................................................................... 4 3.4. Failure of Review Screens ................................................................................................ 4 4 Interconnection Agreement................................................................................................ 5 4.1. Uniform Contract ............................................................................................................. 5 4.2. Municipal Minnesota Interconnection Agreement ......................................................... 5 4.3. Completion of Agreement ................................................................................................ 5 5 Insurance ............................................................................................................................. 6 5.1. Insurance Requirements .................................................................................................. 6 5.2. Self-Insurance ................................................................................................................... 6 5.3. Proof of Insurance ............................................................................................................ 6 6 Timeline Extensions ............................................................................................................ 7 6.1. Reasonable Efforts ........................................................................................................... 7 6.2. Extensions ........................................................................................................................ 7 7 Modifications to Application .............................................................................................. 7 7.1. Procedures ....................................................................................................................... 7 7.2. Timelines .......................................................................................................................... 7 8 Interconnection ................................................................................................................... 8 8.1. Metering ........................................................................................................................... 8 8.2. Construction ..................................................................................................................... 8 i 174 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 8.3. Inspection, Testing and Commissioning ........................................................................... 8 8.4. Interconnection Costs ...................................................................................................... 9 8.5. Authorization for Parallel Operation .............................................................................. 10 8.6. Continual Compliance .................................................................................................... 10 8.7. Disconnection of DER ..................................................................................................... 10 ii 175 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 1Applicability 1.1.Capacity Limit The Simplified Process only is applicable to certified inverter-based Distributed Energy Resource (DER) systems with the capacity of 20 kW AC or less. The capacity is determined by the aggregated summation of the Nameplate Rating of the inverters that make up the DER system. Additional information regarding the capacity limits can be seen in Section 6 of the Process Overview document. 1.2.Certified Inverters A certified inverter will have certification of meeting the current version of the IEEE standard 1547. A common inverter certification is UL 1741. Note that certified inverters may still need to have a setting adjusted to meet the technical requirements of the Area EPS Operator. Additional information regarding certified equipment is found in Section 14 and Section 15 of the Process Overview document. 2Application Submission 2.1.Simplified Process Application The Interconnection Customer shall complete the Simplified Interconnection Application and submit it to the Area EPS Operator to initialize the Interconnection Process. A completed Simplified Interconnection Application will include the following: A completed Simplified Interconnection Application signed by the Interconnection Customer, A non-refundable processing fee of $100, An aerial site layout drawing of the proposed DER system, A one-line diagram of the proposed DER system showing the point of common coupling, PCC, Distribution System, and All certified equipment manufacturer specification sheets. 2.2.Battery Storage An inverter-based DER system may include battery storage. DER systems that include battery storage must also complete the Energy Storage Application with the Simplified Interconnection Application. 1 176 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 2.3.Site Control By signing the Simplified Interconnection Application, the Interconnection Customer is indicating that the proposed DER system is being located where the Interconnection Customer has site control. Site control includes ownership of, a leasehold interest in, or a right to develop a site for the purpose of construction of a DER. Additional information regarding Site Control can be reviewed in the Process Overview document in Section 4.8. 3Application Review 3.1.Timelines The Interconnection Application shall be date- and time-stamped upon initial, and if necessary, resubmission receipt. The Interconnection Customer shall be notified of receipt by the Area EPS Operator within ten (10) Business Days of receipt of the Interconnection Application. The Area EPS Operator shall notify the Interconnection Customer if the Interconnection Application is deemed incomplete within ten (10) Business Days and provide a written list detailing all information that must be provided to complete the Interconnection Application. The Interconnection Customer has five (5) Business Days to provide the missing information unless additional time is requested with valid reasons. Failure to submit the requested information within the stated timeline will deem the Interconnection Application withdrawn. The Area EPS Operator has an additional five (5) Business Days to review the additionally provided information for completeness. An Interconnection Application will be deemed complete upon submission to the Area EPS Operator provided all documents, fees and information required with the Interconnection Application adhering to Minnesota Technical Requirements is included. The time- and date- stamp of the completed Interconnection Application shall be accepted as the qualifying date for the purpose of establishing a queue position as described in Section 4.7 of the Overview Process document. The Area EPS Operator has a total of twenty (20) Business Days to complete the Interconnection Application review from the receipt of a completed Interconnection Application and submit notice back to the Interconnection Customer stating the proposed DER system may proceed with the interconnection process or the proposed DER system has been moved into a different process track. The time during which the Interconnection Customer provides missing information is not included in the Area EPS 2 177 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 3.2.Initial Review Screens The Area EPS Operator shall determine if the DER can be interconnected safely and reliably using Initial Review Screens and without the construction of facilities by the Area EPS Operator. The Initial Review screens include the following engineering screens: PCC must be on a portion of t Distribution System. For interconnection of a proposed DER to a radial distribution circuit, the aggregated generation, including the proposed DER, on the circuit shall not exceed 15% of the line section annual peak load as most recently measured or 100% of the substation aggregated minimum load. A line section is that portion automatic sectionalizing devices or the end of the distribution line. The Area EPS Operator may consider 100% of applicable loading (i.e. daytime minimum load for solar), if available, instead of 15% of line section peak load. For interconnection of a proposed DER to the load side of network protectors, the proposed DER must utilize an inverter-based equipment package and, together with the aggregated other inverter-based DERs, shall not exceed the 1 The proposed DER, in aggregation with other DERs on the distribution circuit, current at the point on the high voltage (primary) level nearest the proposed PCC. The proposed DER, in aggregate with other Distributed Energy Resources on the distribution circuit, shall not cause any distribution protective devices and equipment (including, but not limited to, substation breakers, fuse cutouts, and line reclosers), or Interconnection Customer equipment on the system to exceed 87.5% of the short circuit interrupting capability; nor shall the interconnection be proposed for a circuit that already exceeds 87.5% of the short circuit interrupting capability. 1 Network protectors are protective devices used on secondary networks (spot and grid networks) to automatically disconnect their associated transformers when reverse power flow occurs. Secondary networks are most often used in densely populated downtown areas. 3 178 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Using the table below, determine the type of interconnection to a primary distribution line. This screen includes a review of the type of electrical service provided to the Interconnecting Customer, including line configuration and the transformer connection to limit the potential for creating over-voltages on the er system due to a loss of ground during the operating time of any anti-islanding function. Primary Distribution Type of Interconnection to Results Line Type Primary Distribution Line Three-Phase, three wire Three-phase or single-phase, Pass Screen phase-to-phase Three-phase, four wire Effectively-grounded three-phase Pass Screen or single-phase, line-to-neutral If the proposed DER is to be interconnected on single-phase shared secondary, the aggregate generation capacity on the shared secondary, including the proposed DER, shall not exceed 20 kW or 65% of the transformer nameplate rating. If the proposed DER is single-phase and is to be interconnected on a center tap neutral of a 240-volt service, its addition shall not create an imbalance between the two sides of the 240-volt service of more than 20% of the nameplate rating of the service transformer. The technical screens listed shall not preclude the Area EPS Operator from using tools that perform screening functions using different methodologies given the analysis is aimed at preventing the voltage, thermal and protection limitations as the listed screen. 3.3.Notification of Approval of Application Provided the Simplified Interconnection Application passes the initial screens, or if the proposed interconnection fails the screens but the Area EPS Operator determines that the DER may never the less be interconnected consistent with safety, reliability and power quality standards, the Area EPS Operator shall provide notice to the Interconnection Customer that their Simplified Interconnection Application has been approved. 3.4.Failure of Review Screens If the proposed interconnection fails the screens the Interconnection Customer will be notified by the Area EPS Operator that the Simplified Interconnection Application has 4 179 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS been moved to the Fast Track Process. The Area EPS Operator shall provide the Interconnection Customer the opportunity to attend a customer options meeting. Additional information regarding the customer options meeting is found in Section 3.5 of the Fast Track Process document. The Interconnection Customer will need to provide a completed Interconnection Application to the Area EPS Operator prior to, or at the customer options meeting. The Area EPS Operator shall notify the Interconnection Customer of the determination and provide copies of all directly pertinent data and analyses underlying its conclusion, subjected to confidentiality provisions in Section 12.1 of the Overview Process document. 4Interconnection Agreement 4.1.Uniform Contract The Area EPS Operator shall provide the Interconnection Customer with an executable Contract for Cogeneration and Small Power Production Facilities (Uniform Contract) within five (5) Business Days of notice of approval of the Simplified Interconnection Application. 4.2.Municipal Minnesota Interconnection Agreement The Interconnection Customer may request on the Simplified Interconnection Municipal Minnesota Interconnection Agreement (MMIA) in lieu of signing the Uniform Contract. If the MMIA is requested, the Area EPS Operator shall provide an executable copy of the MMIA within five (5) Business Days of notice of approval of the Simplified Interconnection Application. 4.3.Completion of Agreement The Interconnection Customer must return a signed Uniform Contract or MMIA at least thirty (30) Business Days prior to a requested in-service date of the propose DER. The Area EPS Operator shall sign and return a copy of the fully executed Uniform Contract or the MMIA back to the Interconnection Customer. The Interconnection Customer may update the requested in-service date submitted on the Simplified Interconnection Application to a date thirty (30) Business Days or later from the date on which the Interconnection Customer submits a signed Uniform Contract or MMIA and payment, if required, unless the Area EPS Operator agrees to an earlier date. 5 180 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Upon receipt of the signed Uniform Contract or MMIA, the Area EPS Operator may schedule appropriate metering replacements and construction of facilities, if necessary. 5Insurance 5.1.Insurance Requirements At minimum, the Interconnection Customer shall maintain, for the duration the DER Distribution System, $300,000 of general liability insurance from a qualified insurance agency with a B+ or better rating . Such general liability insurance shall include coverage against claims for damages resulting from (i) bodily injury, including wrongful death; and (ii) property damage arising out of the Inte the DER under this agreement. Evidence of the insurance shall state that coverage provided is primary and is not excess to or contributing with any insurance or self- insurance by the Area EPS Operator. 5.2.Self-Insurance The Interconnection Customer may choose to be self-insured provided there is an established record of self-insurance. The Interconnection Customer shall supply the Area EPS Operator at least twenty (20) days prior to the date of initial operation, evidence of an acceptable plan to self-insure to a level of coverage equivalent to that required in Section 5.1. Failure of the Interconnection Customer or the Area EPS Operator to enforce the minimum levels of insurance does not relieve the Interconnection Customer from maintaining such levels of insurance or relieve the Interconnection Customer of any liability. 5.3.Proof of Insurance Prior to initial operation of the DER, the Interconnection Customer shall furnish the documenting insurance of the DER, if applicable or other insurance certificates and endorsements documenting insurance. Thereafter, the Area EPS Operator shall have the right to periodically inspect or obtain a copy of the original policy or polices of insurance. Additionally, the Area EPS Operator may request to be additionally listed as an interested third party on the insurance certificates and endorsements to meet the right to periodically obtain a copy of the policy or policies of insurance. 6 181 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 6Timeline Extensions 6.1.Reasonable Efforts The Area EPS Operator shall make Reasonable Efforts to meet all time frames provided in these procedures. If the Area EPS Operator cannot meet a deadline provided herein, it must notify the Interconnection Customer in writing within three (3) Business Days after the deadline to explain the reason for the failure to meet the deadline and provide an estimated time by which it will complete the applicable interconnection procedure in the process. 6.2.Extensions For applicable time frames described in these procedures, the Interconnection Customer may request in writing one extension equivalent to half of the time originally allotted (e.g., ten (10) Business Days for a twenty (20) Business Days original time frame) which the Area EPS Operator may not unreasonably refuse. No further extensions for the applicable time frame shall be granted absent a Force Majeure Event or other similarly extraordinary circumstance. 7Modifications to Application 7.1.Procedures At any time after the Interconnection Application is deemed complete, the Interconnection Customer or the Area EPS Operator may identify modifications to the proposed DER system that may improve costs and benefits (including reliability) of the proposed DER system and the ability for the Area EPS Operator to accommodate the proposed DER system. The Interconnection Customer shall submit to the Area EPS Operator in writing all proposed modifications to any information provided in the Interconnection Application. The Area EPS Operator cannot unilaterally modify the Interconnection Application. 7.2.Timelines Within ten (10) Business Days of receipt of the proposed modification, the Area EPS Operator shall evaluate whether the proposed modification to the Interconnection Application constitutes a Material Modification. The definition in Section 13 Glossary of the Process Overview document includes examples of what does and does not constitute a Material Modification. The Area EPS Operator shall notify the Interconnection Customer in writing of the final determination of the proposed modification. For proposed modifications that are 7 182 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS determined to be a Material Modification the Interconnection Customer may choose to either: 1) withdraw the proposed modification; or 2) proceed with a new Interconnection Application. The Interconnection Customer shall provide its determination in writing to the Area EPS Operator within ten (10) Business Days after being provided the Material Modification determination. If the Interconnection Customer does not provide its determination within the timeline, the Interconnection Application shall be considered withdrawn. If the proposed modification is not determined to be a Material Modification, then the Area EPS Operator shall notify the Interconnection Customer in writing that the modification has been accepted and the Interconnection Customer shall retain its eligibility for interconnection, including its place in the queue. 8Interconnection 8.1.Metering Any metering requirements necessitated by the use of the DER system shall be installed at the Interco included in the final invoice of interconnection costs to the Interconnection Customer. The Interconnection Customer is also responsible for metering replacement costs not covered in the I The Area EPS Operator may charge Interconnection Customers an ongoing metering-related charge for an estimate of ongoing metering-related costs specifically demonstrated. 8.2.Construction The Interconnection Customer may proceed to construct (including operational testing not to exceed two hours) the DER system when the Area EPS Operator has approved the Simplified Interconnection Application. Upon receipt of a signed Uniform Contract or MMIA the Area EPS Operator shall schedule and execute appropriate construction of facilities, if necessary, which shall be completed prior to the Interconnection Customer returning the Certification of Completion. The Area EPS Operator will notify the Interconnection Customer when construction of the distribution facilities is completed. 8.3.Inspection, Testing and Commissioning Upon completing construction of the DER system, the Interconnection Customer will cause the DER system to be inspected or otherwise certified by the appropriate local electrical wiring inspector with jurisdiction. The Interconnection Customer shall then Interconnection Facilities prior to interconnection pursuant to Minnesota Technical 8 183 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS equipment shall be performed pursuant to applicable codes and standards of The Interconnection Customer shall provide the Area EPS Operator with a Certificate of Completion after completion of the DER installation. Prior to parallel operation, the Area EPS Operator may inspect the DER for compliance with standards, which may include a witness test, and schedule appropriate metering replacements, if necessary. The Area EPS Operator shall send qualified personnel to the DER site to inspect the interconnection and witness the testing but bears no liability for the results of the test. The Area EPS Operator is obligated to complete the witness test, if required, within ten (10) Business Days of receipt of the Certification of Completion. If the Area EPS Operator does not inspect within ten (10) Business Days, the witness test is deemed waived unless upon mutual agreement of both Parties to extend the timeline for the witness test. Within three (3) Business Days of satisfactory inspection or waiver of inspection, the Area EPS Operator shall provide the Interconnection Customer written acknowledgment that the DER has permission to operate. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the Area EPS Operator of the safety, durability, suitability, or reliability of the DER or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the DER. If the witness test is not satisfactory, the Area EPS Operator has the right to disconnect the DER. The Interconnection Customer has no right to operate in parallel, except for optional testing not to exceed two hours, until permission to operate is granted by the Area EPS Operator. 8.4.Interconnection Costs The Interconnection Customer shall pay for the actual cost of the Interconnection Facilities and Distribution Upgrades commission the proposed DER system. An estimate of the interconnection costs shall be stated in the Uniform Contract or MMIA. The Area EPS Operator shall render the final interconnection cost invoice to the Interconnection Customer within thirty (30) Business Days after the proposed DER system has been commissioned by the Area EPS Operator, or upon the commissioning being waived by the Area EPS Operator. The Interconnection Customer shall make payment to the Area EPS Operator within 9 184 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS twenty-one (21) Business Days of receipt, or as otherwise stated in the Uniform Contract. The Area EPS Operator does not give any warranty, expressed or implied, as to the adequacy, safety, or other characteristics of any structures, equipment, wires, appliances or devices owned, operated, installed or maintained by the Interconnection Customer, including without limitation the DER and any structures, equipment, wires, appliances or devices not owned, operated or maintained by the Area EPS Operator. 8.5.Authorization for Parallel Operation The Interconnection Customer shall not operate its DER system in parallel with the Area EPDistribution System without prior written authorization from the Area EPS Operator. The Area EPS Operator shall provide such authorization within three (3) Business Days from when the Area EPS Operator receives the Certificate of Completion and notification the Interconnection Customer has complied with all applicable parallel operations requirements. Such authorization shall not be unreasonably withheld, conditioned or delayed. 8.6.Continual Compliance The Interconnection Customer shall be fully responsible for operating, maintaining, and repairing the DER as required to ensure that it complies at all times with the interconnection standards to which it has been certified. The Interconnection Customer shall also operate its DER system in technical requirements as referred to in the executed Uniform Contract or MMIA. The Area EPS Operator may periodically inspect, at its own expense, the operation of DER system as it relates to power quality, thermal limits and reliability. Failure by the Interconnection Customer to remain in compliance with the technical requirements will result in the DER system disconnection Distribution System. 8.7.Disconnection of DER The Area EPS Operator has the right to disconnect the DER in the event the Interconnection Customer: Does not continue to follow and maintain IEEE 1547 settings approved by the Area EPS Operator as indicated by the adopted technical requirements. Does not meet all the requirements of the Simplified Process. 10 185 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Uniform Contract. The Area EPS Operator may temporarily disconnect the DER upon the following conditions: For scheduled outages upon reasonable notice. For unscheduled outages or emergency conditions. If the DER does not operate in a manner consistent with the Simplified Process. The Area EPS Operator shall inform the Interconnection Customer in advance of any scheduled disconnections, or as reasonable, after an unscheduled disconnection. 11 186 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ABSTRACT Energy Resources smaller than 4 megawatts St. Cloud, MN INTERCONNECTION PROCESS Fast Track Process 187 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS /ƚƓƷĻƓƷƭ 1 Applicability ..................................................................................................................... 1 1.1. Capacity Limit ................................................................................................................... 1 1.2. Codes, Standards and Certification Requirements .......................................................... 1 2 Application Submission ................................................................................................... 2 2.1. Fast Track Process Application ......................................................................................... 2 2.2. Professional Licensed Engineer Signature ....................................................................... 2 2.3. Processing Fee.................................................................................................................. 2 2.4. Battery Storage ................................................................................................................ 3 2.5. Site Control ...................................................................................................................... 3 3 Application Review ......................................................................................................... 3 3.1. Timelines .......................................................................................................................... 3 3.2. Initial Review Screens ...................................................................................................... 4 3.3. Notification of Approval of Application ........................................................................... 6 3.4. Failure of Review Screens ................................................................................................ 6 3.5. Customer Options Meeting ............................................................................................. 6 4 Supplemental Review ..................................................................................................... 7 4.1. Acceptance of Supplemental Review .............................................................................. 7 4.2. Supplemental Review Costs ............................................................................................. 7 4.3. Supplemental Review Timelines ...................................................................................... 7 4.4. Supplemental Review Screens ......................................................................................... 8 4.5. Identification of Construction of Facilities ..................................................................... 10 4.6. Supplemental Review Results ........................................................................................ 10 5 Interconnection Agreement.......................................................................................... 11 5.1. Uniform Contract ........................................................................................................... 11 5.2. Municipal Minnesota Interconnection Agreement ....................................................... 11 5.3. Completion of Agreement ............................................................................................. 11 6 Insurance ....................................................................................................................... 12 6.1. Insurance Requirements ................................................................................................ 12 6.2. Self-Insurance ................................................................................................................ 12 i 188 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 6.3. Proof of Insurance .......................................................................................................... 13 7 Timeline Extensions ...................................................................................................... 13 7.1. Reasonable Efforts ......................................................................................................... 13 7.2. Extensions ...................................................................................................................... 13 8 Modifications to Application ........................................................................................ 13 8.1. Procedures ..................................................................................................................... 13 8.2. Timelines ........................................................................................................................ 14 9 Interconnection ............................................................................................................. 14 9.1. Interconnection Milestones ........................................................................................... 14 9.2. Metering ........................................................................................................................ 15 9.3. Construction ................................................................................................................... 15 9.4. Inspection, Testing and Commissioning ........................................................................ 15 9.5. Interconnection Costs .................................................................................................... 16 9.6. Security of Payment ....................................................................................................... 17 9.7. Non-Warranty ................................................................................................................ 18 9.8. Authorization for Parallel Operation ............................................................................. 18 9.9. Continual Compliance .................................................................................................... 19 9.10. Disconnection of DER ..................................................................................................... 19 ii 189 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 1Applicability 1.1.Capacity Limit The Fast Track Process is available to an Interconnection Customer proposing to interconnect a Distributed Energy Resource (DER) Distribution System if the DER capacity does not exceed the size limits in Table 1.1 and does not qualify for the Simplified Process. The capacity is determined by the aggregated summation of the Nameplate Rating of all components that make up the DER system. Additional information regarding the capacity limits can be seen in Section 6 of the Process Overview document. Table 1.1.Fast Track Eligibility for DER Fast Track Eligibility for certified, 1 Fast Track Eligibility 2 inverter-based DER on a Mainline Line Voltage Regardless of and 2.5 Electrical Circuit Miles from Location 3 Substation < 5 kV 5 kV and < 15 kV 1 MW 2 MW 15 kV and < 30 kV Fast Track eligibility for DERs is determined based upon the generator type, the size of the generator, voltage of the line, and the location of and the type of line at the Point of Common Coupling. All synchronous and induction machines must be no larger than 2 MW to be eligible for Fast Track Process consideration. Fast Track eligibility does not imply or indicate that a DER will pass the engineering screens or be exempt from the proposed DER Interconnection being placed into the Study Process. 1.2.Codes, Standards and Certification Requirements The Interconnection Customer proposed DER must meet the codes, standards and certification requirements listed in Section 14 and Section 15 of the Overview Process document. The Area EPS Operator may allow DER systems that do not meet codes, standards and certification only if the DER system design is reviewed and tested and determined that it is safe to operate in parallel with the Distribution System. 1 Synchronous and induction machine eligibility is limited to no more than 2 MW even when line voltage is greater than 15 kV. 2 For purposes of this table, a Mainline is the three-phase backbone of a circuit. It will typically constitute lines with wire sizes of 4/0 American wire gauge, 266 kcmil, 336.4 kcmil, 397.5 kcmil, 477 kcmil and 795 kcmil. 3 An Interconnection Customer can determine this information about its proposed interconnection location in advance by requesting a pre-application report described in the Overview Process document. 1 190 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 2Application Submission 2.1.Fast Track Process Application The Interconnection Customer shall complete the Standard Interconnection Application and submit it to the Area EPS Operator to initialize the Interconnection Process. A completed Interconnection Application will include the following: A completed Interconnection Application signed by the Interconnection Customer. A non-refundable processing fee indicated in Section 2.3. A site layout drawing of the proposed DER system. A one-line diagram of the proposed DER system showing the point of common Distribution System. All equipment manufacturer specification sheets. Documentation of site control indicated in Section 2.5. 2.2.Professional Licensed Engineer Signature The one-line diagram submitted with the Interconnection Application will require a signature from a professional engineer licensed in the State of Minnesota certifying the DER was designed in conformance to the Minnesota Technical Requirements for the following conditions: 4 Certified equipment is greater than 250 kW. Non-certified equipment is greater than 20 kW. 2.3.Processing Fee The processing fee will differ for a Fast Track Interconnection Application depending on the type of equipment utilized as seen in Table 2.1. 4 Additional information regarding certified equipment is found in Section 14 and Section 15 of the Process Overview document. 2 191 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Table 2.1.Interconnection Application Process Fee Equipment Type Process Fee Certified System $100 + $1/kW Non-Certified System $100 + $2/kW 2.4.Battery Storage An inverter-based DER system may include battery storage. DER systems that include battery storage should complete the Energy Storage Application along with the Interconnection Application. 2.5.Site Control Documentation of site control must be submitted with the Interconnection Application. Site control may be demonstrated by any of the following: Ownership of, a leasehold interest in, or a right to develop a site for the purpose of constructing the DER system. An option to purchase or acquire a leasehold site for constructing the DER system. An exclusivity or other business relationship between the Interconnection Customer and the entity having the right to sell, lease, or grant the Interconnection Customer the right to possess or occupy a site for constructing the DER system. 3Application Review 3.1.Timelines The Interconnection Application shall be date- and time-stamped upon initial, and if necessary, resubmission receipt. The Interconnection Customer shall be notified of receipt by the Area EPS Operator within ten (10) Business Days of receipt of the Interconnection Application. The Area EPS Operator shall notify the Interconnection Customer if the Interconnection Application is deemed incomplete within ten (10) Business Days and provide a written list detailing all information that must be provided to complete the Interconnection Application. The Interconnection Customer has ten (10) Business Days to provide the missing information unless additional time is requested with valid reasons. Failure to submit the requested information within the stated timeline will result in the Interconnection Application being deemed withdrawn. The Area EPS Operator has an 3 192 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS additional five (5) Business Days to review the additionally provided information for completeness. An Interconnection Application will be deemed complete upon submission to the Area EPS Operator provided all documents, fees and information required with the Interconnection Application adhering to Minnesota Technical Requirements is included. The time- and date- stamp of the completed Interconnection Application shall be accepted as the qualifying date for the purpose of establishing a queue position as described in Section 4.7 in the Overview Process document. The Area EPS Operator has a total of twenty-five (25) Business Days to complete the Interconnection Application review and submit notice back to the Interconnection Customer stating the proposed DER system may proceed with the interconnection process or a supplemental review offer is to be made or the proposed DER system has been moved into a different process track. The period of time when waiting for the Interconnection Customer to provide missing information is not included in the Area -five (25) Business Days review timeline. 3.2.Initial Review Screens The Area EPS Operator shall determine if the DER can be interconnected safely and reliably without the construction of facilities by the Area EPS Operator by using a set of Initial Review Screens. The Initial Review screens include the following engineering screens: The proposed For interconnection of a proposed DER to a radial distribution circuit, the aggregated generation, including the proposed DER, on the circuit shall not exceed 15% of the line section annual peak load as most recently measured or 100% of the substation aggregated minimum load. A line section is that portion automatic sectionalizing devices or the end of the distribution line. The Area EPS Operator may consider 100% of applicable loading (i.e. daytime minimum load for solar), if available, instead of 15% of line section peak load. For interconnection of a proposed DER to the load side of network protectors, the proposed DER must utilize an inverter-based equipment package and, 4 193 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS together with the aggregated other inverter-based DERs, shall not exceed the 5 The proposed DER, in aggregation with other DERs on the distribution circuit, current at the point on the high voltage (primary) level nearest the proposed Point of Common Coupling. The proposed DER, in aggregate with other Distributed Energy Resources on the distribution circuit, shall not cause any distribution protective devices and equipment (including, but not limited to, substation breakers, fuse cutouts, and line reclosers), or Interconnection Customer equipment on the system to exceed 87.5% of the short circuit interrupting capability; nor shall the interconnection be proposed for a circuit that already exceeds 87.5% of the short circuit interrupting capability. Using the table below, determine the type of interconnection to a primary distribution line. This screen includes a review of the type of electrical service provided to the Interconnecting Customer, including line configuration and the transformer connection to limit the potential for creating over-voltages on the operating time of any anti-islanding function. Table 3.1.Type of Primary Distribution Line Interconnections Primary Distribution Type of Interconnection to Results Line Type Primary Distribution Line Three-Phase, three wire Three-phase or single-phase, Pass Screen phase-to-phase Three-phase, four wire Effectively-grounded three-phase Pass Screen or single-phase, line-to-neutral If the proposed DER is to be interconnected on single-phase shared secondary, the aggregate generation capacity on the shared secondary, including the proposed DER, shall not exceed 20 kW or 65% of the transformer nameplate rating. If the proposed DER is single-phase and is to be interconnected on a center tap neutral of a 240-volt service, its addition shall not create an imbalance between 5 Network protectors are protective devices used on secondary networks (spot and grid networks) to automatically disconnect associated transformers when reverse power flow occurs. Secondary networks are most often used in densely populated downtown areas. 5 194 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS the two sides of the 240-volt service of more than 20% of the nameplate rating of the service transformer. The technical screens listed shall not preclude the Area EPS Operator from using tools that perform screening functions using different methodologies provided the analysis is targeted to maintain the voltage, thermal and protection objectives as the listed screen. 3.3.Notification of Approval of Application Provided the Interconnection Application passes the initial screens, or if the proposed interconnection fails the screens but the Area EPS Operator determines that the DER may nevertheless be interconnected consistent with safety, reliability and power quality standards, the Area EPS Operator shall provide notice to the Interconnection Customer that their Interconnection Application has been approved. The Area EPS Operator shall provide the Interconnection Customer with an Interconnection Agreement as outlined in Section 5. 3.4.Failure of Review Screens If the proposed interconnection fails the screens, and the Area EPS Operator does not or cannot determine from the Initial Review that the DER may nevertheless be interconnected consistent with safety, reliability, and power quality standards, unless the Interconnection Customer is willing to consider minor modifications or further study, the Area EPS Operator shall provide the Interconnection Customer the opportunity to attend a customer options meeting. The Area EPS Operator shall notify the Interconnection Customer of the determination and provide copies of all directly pertinent data and analyses underlying its conclusion, subject to confidentiality provisions in Section 12.1 of the Overview Process document. 3.5.Customer Options Meeting Within ten (10) Bu Interconnection Customer of the proposed interconnection failure of the engineering screens, the Area EPS Operator and the Interconnection Customer shall schedule a customer options meeting to review possible facility modification, screen analysis and related results to determine what further steps are needed to permit the DER to be interconnected safely and reliably to the Distribution System. At the customer options meeting the Area EPS Operator shall: Offer to perform a supplemental review in accordance with Section 4 and provide a non-binding good faith estimate of the cost of such review; or 6 195 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Obtain Interconnection Application under the Study Process track. 4 Supplemental Review 4.1.Acceptance of Supplemental Review To accept the offer of a supplemental review, the Interconnection Customer shall agree in writing and submit a deposit for the estimated costs of the supplemental review in good faith estimate of the costs of such review within fifteen (15) Business Days once the supplemental review offer is made by the Area EPS Operator. If the written agreement and deposit have not been received by the Area EPS Operator within that timeframe, the Interconnection Application can only continue being evaluated under the Study Process or it can be withdrawn by the Interconnection Customer. The Interconnection Customer may specify within the written agreement the order in which the Area EPS Operator will complete the supplemental review screens listed in Section 4.4. 4.2.Supplemental Review Costs costs for conducting the supplemental review. The Interconnection Customer shall pay any review costs that exceed the deposit within twenty (20) Business Days of receipt of the invoice or resolution of any dispute. If the deposit exceeds the invoiced costs, the Area EPS Operator will return such excess within twenty (20) Business Days of the invoice without interest. 4.3.Supplemental Review Timelines Within thirty (30) Business Days following the receipt of the deposit for a supplemental review, the Area EPS Operator shall: Perform the supplemental review using the screens in Section 4.4. Notify the Interconnection Customer of the results in writing. Include copies of analysis under the screens with the written notification. 7 196 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Unless the Interconnection Customer provides instruction for how to respond to a failure of any of the supplemental review screens in the written acceptance of supplemental review, the Area EPS Operator shall notify the Interconnection Customer within two (2) Business Days if a supplemental review screen is failed or if the Area EPS Operator is unable to perform the supplemental review screen. The Area EPS Operator to either: Continue evaluating the proposed interconnection using the supplemental review screens in Section 4.4. Terminate the supplemental review and continue evaluating the Interconnection Application in the Study Process track. Terminate the supplemental review upon withdrawal of the Interconnection Application by the Interconnection Customer. The Interconnection Customer shall respond with its choice within five (5) Business Days of notification from the Area EPS Operator. 4.4.Supplemental Review Screens The three supplemental review screens are the Minimum Load screen, the Voltage and Power Quality screen and the Safety and Reliability screen. 4.4.1.Minimum Load Screen The aggregate DER capacity on the line section is less than 100% of the minimum load for all line sections bounded by automatic sectionalizing devices upstream of the proposed DER. If minimum load data is not available, or cannot be calculated, estimated or determined, the Area EPS Operator shall include the reason(s) that it is unable to calculate, estimate or determine minimum load in its supplemental review results notification under Section 4.3. The line section minimum load data shall include onsite load but not station service load served by the proposed DER in this screen. The type of generation used by the proposed DER will be considered when calculating, estimating, or determining circuit or line section minimum load relevant for the application of this screen. Solar photovoltaic (PV) generation systems with no battery storage use daytime minimum load (i.e., 10 a.m. to 4 p.m. for fixed panel systems and 8 a.m. to 6 p.m. for PV systems utilizing tracking systems), while all other generation uses absolute minimum load. 8 197 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS When this screen is being applied to a DER that serves some station service load, only the net injection into the Area EP be considered as part of the aggregate generation. The Area EPS Operator will not consider as part of the aggregate generation for purposes of this screen DER capacity known to be already reflected in the minimum load data. 4.4.2.Voltage and Power Quality Screen In aggregate with existing generation on the line section the following conditions shall be met for the screen to be passed: The voltage regulation on the line section can be maintained in compliance with relevant requirements under all system conditions. The voltage fluctuation is within acceptable limits as defined by Institute of Electrical and Electronics Engineers (IEEE) Standard 1453, or utility practice similar to IEEE Standard 1453. The harmonic levels meet IEEE Standard 519 limits. 4.4.3.Safety and Reliability Screen The location of the proposed DER and the aggregate generation capacity on the line section do not create impacts to safety or reliability that cannot be adequately addressed without application of the Study Process. The Area EPS Operator shall give due consideration to the following and other factors in determining potential impacts to safety and reliability in applying this screen. Whether the line section has significant minimum loading levels dominated by a small number of customers (e.g., several large commercial customers). Whether the loading along the line section is uniform or even. Whether the proposed DER is located in close proximity to the substation (i.e., less than 2.5 electrical circuit miles), and whether the line section from the substation to the Point of Common Coupling is a main line rated for normal and emergency ampacity. 9 198 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Whether the proposed DER incorporates a time delay function to prevent reconnection of the generator to the system until system voltage and frequency are within normal limits for a prescribed time. Whether operational flexibility is reduced by the proposed DER, such that transfer of the line section(s) of the DER to a neighboring distribution circuit/substation may trigger overloads or voltage issues. Whether the proposed DER employs equipment or systems certified by a recognized standards organization to address technical issues such as, but not limited to, islanding, reverse power flow, or voltage quality. 4.5.Identification of Construction of Facilities If the proposed interconnection requires the construction of any distribution or transmission facilities, the Area EPS Operator shall notify the Interconnection Customer of the requirement when it provides the supplemental review results. The Area EPS Operator may include a non-binding good faith estimate to construct the facilities included with the supplemental review results. In lieu of providing a non-binding good faith estimate to construct the necessary facilities, the Area EPS Operator may require the proposed interconnection to move to the Study Process for a facility study instead. Upon being presented with either the non-binding good faith estimate or the requirement for a facility study, the Interconnection Customer has five (5) Business Days to inform the Area EPS Operator to proceed with the proposed interconnection or withdraw the Interconnection Application. 4.6.Supplemental Review Results If the proposed interconnection passes the supplemental review screens in Section 4.4 and does not require construction of distribution or transmission facilities by the Area EPS on its own system, the Area EPS Operator shall provide an executable Interconnection Agreement within five (5) Business Days after the supplemental review screens are completed. Information regarding the Interconnection Agreement is detailed in Section 5. If the proposed interconnection passes the supplemental review screens in Section 4.4 and the Interconnection Customer agrees to the non-binding good faith estimate of construction of any distribution or transmission facilities by the Area EPS Operator, the Area EPS Operator shall provide an executable Interconnection Agreement within twenty (20) Business Days. Included with the Interconnection Agreement shall be non- 10 199 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS binding good faith estimate of construction costs and a construction schedule for the facilities. Information regarding the Interconnection Agreement is detailed in Section 5. If the proposed interconnection does not pass the supplemental review screens in Section 4.4 the Area EPS Operator shall provide the Interconnection Customer with the option of commencing the Study Process. The Interconnection Customer shall notify the Area EPS Operator within fifteen (15) Business Days if they wish to proceed with the Study Process to retain their queue position or the Interconnection Application will be deemed withdrawn. 5Interconnection Agreement 5.1.Uniform Contract For a proposed interconnection that meets the conditions of being classified as a qualifying facility less than 40 kW, the Area EPS Operator shall provide the Interconnection Customer with an executable copy of the Area EPS OperatoUniform Contract for Cogeneration and Small Power Production Facilities (Uniform Contract). 5.2.Municipal Minnesota Interconnection Agreement For proposed interconnections that do not meet the conditions of being classified as a qualifying facility less than 40 kW or if requested by the Interconnection Customer in lieu of signing the Uniform Contract, the Area EPS Operator shall provide an executable copy of the Municipal Minnesota Interconnection Agreement (MMIA). 5.3.Completion of Agreement The Interconnection Customer must return a signed Interconnection Agreement at least thirty (30) Business Days prior to the requested in-service date of the proposed DER. The Area EPS Operator shall sign and return a copy of the fully executed Interconnection Agreement back to the Interconnection Customer. The Interconnection Customer may update the requested in-service date submitted on the Interconnection Application to a date thirty (30) Business Days or later from the date on which the Interconnection Customer submits a signed Interconnection Agreement and payment if required unless the Area EPS Operator agrees to an earlier date. Upon receipt of the signed Interconnection Agreement, the Area EPS Operator may schedule appropriate metering replacements and construction of facilities, if necessary. 11 200 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 6Insurance 6.1.Insurance Requirements At minimum, the Interconnection Customer shall maintain, for the duration the DER Distribution System, general liability ins with a combined single limit of not less than those described in Table 6.1. Such general liability insurance shall include coverage against claims for damages resulting from (i) bodily injury, including wrongful death; and (ii) property damage arising out of the under this agreement. Evidence of the insurance shall state that coverage provided is primary and is not excess to or contributing with any insurance or self-insurance by the Area EPS Operator. Table 6.1.Liability Insurance Requirements DER System Size Liability Insurance Requirement < 40 kW AC $300,000 $1,000,000 $2,000,000 $3,000,000 For all proposed DER systems, except those that are qualifying systems less than 40 kW AC, the general liability insurance shall, by endorsement to the policy or polices: Include the Area EPS Operator as additionally insured. Contain severability of interest clause or cross-liability clause. Provide that the Area EPS Operator shall not by reason incur liability to the insurance carrier for the payment of premiums for such insurance if the Area EPS Operator is included as an additionally insured. 6.2.Self-Insurance The Interconnection Customer may choose to be self-insured provided there is an established record of self-insurance. The Interconnection Customer shall supply the Area EPS Operator at least 20 days prior to the date of initial operation, evidence of an acceptable plan to self-insure to a level of coverage equivalent to that required in Section 6.1. Failure of the Interconnection Customer or the Area EPS Operator to enforce the minimum levels of insurance does not relieve the Interconnection Customer from maintaining such levels of insurance or relieve the Interconnection Customer of any liability. 12 201 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 6.3.Proof of Insurance The Interconnection Customer shall furnish the required insurance certificates and endorsements to the Area EPS Operator prior to the initial operation of the DER. A copy an insurance certificate. Thereafter, the Area EPS Operator shall have the right to periodically inspect or obtain a copy of the original policy or polices of insurance. Additionally, the Area EPS Operator may request to be additionally listed as an interested third part on the insurance certificates and endorsements for qualifying facilities less than 40 kW AC to meet the right to periodically obtain a copy of the policy or policies of insurance. 7Timeline Extensions 7.1.Reasonable Efforts The Area EPS Operator shall make Reasonable Efforts to meet all time frames provided in these procedures. If the Area EPS Operator cannot meet a deadline provided herein, it must notify the Interconnection Customer in writing within three (3) Business Days after the deadline to explain the reason for the failure to meet the deadline and provide an estimated time by which it will complete the applicable interconnection procedure in the process. 7.2.Extensions For applicable time frames described in these procedures, the Interconnection Customer may request in writing one extension equivalent to half of the time originally allotted (e.g., ten (10) Business Days for a twenty (20) Business Days original time frame) which the Area EPS Operator may not unreasonably refuse. No further extensions for the applicable time frame shall be granted absent a Force Majeure Event or other similarly extraordinary circumstance. 8Modifications to Application 8.1.Procedures At any time after the Interconnection Application is deemed complete, the Interconnection Customer or the Area EPS Operator may identify modifications to the proposed DER system that may improve costs and benefits (including reliability) of the proposed DER system and the ability for the Area EPS Operator to accommodate the proposed DER system. The Interconnection Customer shall submit to the Area EPS Operator in writing all proposed modifications to any information provided in the Interconnection Application. The Area EPS Operator cannot unilaterally modify the Interconnection Application. 13 202 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 8.2.Timelines Within ten (10) Business Days of receipt of the proposed modification, the Area EPS Operator shall evaluate whether the proposed modification to the Interconnection Application constitutes a Material Modification. The definition in the Section 13 Glossary of the Process Overview document includes examples of what does and does not constitute a Material Modification. The Area EPS Operator shall notify the Interconnection Customer in writing of the final determination of the proposed modification. For proposed modifications that are determined to be a Material Modification the Interconnection Customer may choose to either: 1) withdraw the proposed modification; or 2) proceed with a new Interconnection Application. The Interconnection Customer shall provide its determination in writing to the Area EPS Operator within ten (10) Business Days after being provided the Material Modification determination. If the Interconnection Customer does not provide its determination within the timeline, the Interconnection Application shall be considered withdrawn. If the proposed modification is not determined to be a Material Modification, then the Area EPS Operator shall notify the Interconnection Customer in writing that the modification has been accepted and the Interconnection Customer shall retain its eligibility for interconnection, including its place in the queue. 9Interconnection 9.1.Interconnection Milestones For DER systems that are not a qualifying facility less than 40 kW AC, the Interconnection Customer and the Area EPS Operator shall agree on milestones for which each Party is responsible and list them in Attachment IV of the MMIA. To the greatest extent possible, the Parties will identify all design, procurement, installation and construction requirements associated with the project, and clear associated timelines, at the beginning of the design, procurement, installation and construction phase, or as early within the process as possible. anticipates that it will be unable to meet a milestone for any reason other than a Force Majeure Event, it shall immediately notify the other Party of the reason(s) for not meeting the milestone, propose the earliest reasonable alternative date in which this and future milestones will be met, and request appropriate amendments to the MMIA and its attachments. The Party affected by the failure to meet a milestone shall not unreasonably withhold agreement to such an amendment unless: 14 203 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS The Party will suffer significant uncompensated economic or operational harm from the delay, or Attainment of the same milestone has previously been delayed, or The Party has reason to believe the delay in meeting the milestone is intentional or unwarranted notwithstanding the circumstance explained by the Party proposing the amendment. If the Party affected by the failure to meet a milestone disputes the proposed extension, the affected Party may pursue dispute resolution as described in the Overview Process document. 9.2.Metering Any metering requirements necessitated by the use of the DER system shall be installed ng requirement costs will be included in the final invoice of interconnection costs to the Interconnection Customer. The Interconnection Customer is also responsible for metering replacement costs not mer charge. The Area EPS Operator may charge Interconnection Customers an ongoing metering-related charge for an estimate of ongoing metering-related costs specifically demonstrated. 9.3.Construction The Interconnection Customer may proceed to construct (including operational testing not to exceed two hours) the DER system when the Area EPS Operator has approved the Interconnection Application. Upon receipt of a signed Uniform Contract or Interconnection Agreement the Area EPS Operator shall schedule and execute appropriate construction of facilities. 9.4.Inspection, Testing and Commissioning Upon completing construction of the DER system, the Interconnection Customer will cause the DER system to be inspected or otherwise certified by the appropriate local electrical wiring inspector with jurisdiction. The Interconnection Customer shall then Interconnection Facilities prior to interconnection pursuant to Minnesota Interconnection Technical Requirements. Commissioning tests of the Interconnection and Section 15 in the Overview Process. 15 204 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS The Interconnection Customer shall notify the Area EPS Operator of testing and inspection no fewer than five (5) Business Days in advance, or as may be agreed to by the Parties. The Interconnection Customer shall provide to the Area EPS Operator a testing procedure that will be followed on the day of testing and inspection no fewer than ten (10) Business Days prior to the testing and inspection date. The testing procedure should include tests and/or inspections to confirm the DER system will meet the technical requirements of interconnection. The Area EPS Operator shall review the testing procedure for completeness and shall notify the Interconnection Customer if the testing procedure fails to address components of the technical requirements for interconnection. The Area EPS Operator shall send qualified personnel to the DER site to inspect the interconnection and witness the testing. Testing and inspection shall occur on a Business Day at a mutually agreed upon date and time. The Area EPS Operator may waive the right to witness the testing. 9.5.Interconnection Costs 9.4.1 Estimation of Interconnection Costs The Interconnection Customer shall pay for the actual cost of the Interconnection Facilities and Distribution Upgrades along with the Area EPS interconnection costs shall be stated in the Uniform Contract or in the MMIA in Attachment II as a detailed itemization of such costs. If Network Upgrades are required, the actual cost of the Network Upgrades, including overheads, shall be borne by the Interconnection Customer pursuant to the Transmission Provider and associated agreements. 9.4.2 Progressive Payment of Interconnection Costs The Area EPS Operator shall bill the Interconnection Customer for the design, engineering, construction and procurement costs of the Interconnection Facilities and Upgrades described in the MMIA Attachment II on a monthly basis or other basis agreed upon by both Parties in the MMIA, or Uniform Contract. The Interconnection Customer shall pay each bill within twenty-one (21) Business Days or as agreed to in the MMIA, or Uniform Contract. 9.4.3 Final Accounting of Interconnection Facilities and Upgrade Costs If distribution or transmission facilities required upgrades to accommodate the proposed DER system, the Area EPS Operator shall render the final interconnection cost invoice to the Interconnection Customer within eighty (80) Business Days (approximately four calendar months) of completing the 16 205 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Facility and Upgrades. The Area EPS Operator shall provide the Interconnection Customer with a final accounting report identifying the difference between the actual EPS Operator for the specific DER system interconnection. Upon the final accounting submitted to the Interconnection Customer, the balance between the actual cost and previously aggregated payments shall be paid to the Area EPS Operator within twenty (20) Business Days. If the balance between the actual cost and previously aggregated payments is a credit, the Area EPS Operator shall refund the Interconnection Customer within twenty (20) Business Days. 9.4.4 Final Interconnection Costs without Facilities and Upgrades Needed Within thirty (30) Business Days the final invoice for the interconnection costs shall be rendered to the Interconnection Customer once the proposed DER system has been commissioned by the Area EPS Operator, or upon the commissioning being waived by the Area EPS Operator. The Interconnection Customer shall make payment to the Area EPS Operator within twenty-one (21) Business Days of receipt, or as otherwise stated in the Uniform Contract or MMIA. 9.6.Security of Payment At ment of interconnection cost. Under the Traditional Security method, the Interconnection Customer shall provide reasonable, adequate assurances of credit, including a letter of credit or personal guaranty of payment and performance from a creditworthy entity acceptable under the Area EPS Operator credit policy. The letter of credit shall also include procedures for the unpaid balance of the estimated amount shown in the Interconnection Agreement for the totality of all anticipated work or expense incurred by the Area EPS Operator associated with the Interconnection Application. The payment for these estimated costs shall be as follows: 1/3 of estimated costs shall be due no later than when the Interconnection Customer signs the Interconnection Agreement. 17 206 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS An additional 1/3 of estimated costs shall be due prior to initial energization of the DER with the Area EPS Operator. Remainder of actual costs, incurred by Area EPS Operator, shall be due within thirty (30) Business Days from the date the bill is mailed by the Area EPS Operator after project completion. Under the Modified Security method, at least twenty (20) Business Days prior to the commencement of the design, procurement, installation, or construction of a discrete Interconnection Facilities and Upgrades, the Interconnection Customer shall provide the Area EPS Operator, at the Interconnection guaranty, letter of credit or other form of security that is reasonably acceptable to the Area EPS Operator and is consistent with the Minnesota Uniform Commercial Code. Such security for payment shall be in an amount sufficient to cover the costs for constructing, designing, procuring, and installing the applicable nnection Facilities and Upgrades and shall be reduced on a dollar-for-dollar basis for payments made to the Area EPS Operator under the Interconnection Agreement during its term. The guaranty must be made by an entity that meets the creditworthiness requirements of the Area EPS Operator and contain terms and conditions that guarantee payment of any amount that may be due from the Interconnection Customer, up to an agreed-to maximum amount. The letter of credit must be issued by a financial institution or insurer reasonably acceptable to the Area EPS Operator and must specify a reasonable expiration date not sooner than sixty (60) Business Days (three calendar months) after the due date of the final accounting report and bill described in Section 9.5 9.7.Non-Warranty Area EPS Operator does not give any warranty, expressed or implied, as to the adequacy, safety, or other characteristics of any structures, equipment, wires, appliances or devices owned, operated, installed or maintained by the Interconnection Customer, including without limitation the DER and any structures, equipment, wires, appliances or devices not owned, operated or maintained by the Area EPS Operator. The Area EPS Operator does not guarantee uninterrupted power supply to the DER and will operate the Distribution System with the same reliability standards for the entire customer base. 9.8.Authorization for Parallel Operation The Interconnection Customer shall not operate its DER system in parallel with the Distribution System without prior written authorization from the 18 207 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Area EPS Operator. The Area EPS Operator shall provide such authorization within three (3) Business Days from when the Area EPS Operator receives notification that the Interconnection Customer has complied with all applicable parallel operations requirements and commissioning has been successfully completed. Such authorization shall not be unreasonably withheld, conditioned or delayed. 9.9.Continual Compliance The Interconnection Customer shall be fully responsible to operate, maintain, and repair the DER as required to ensure that it complies at all times with the interconnection standards to which it has been certified. The Interconnection Customer shall also technical requirements referred to in the executed Interconnection Agreement. The Area EPS Operator may periodically inspect, at its own expense, the operation of the DER system as it relates to power quality, thermal limits and reliability. Failure by the Interconnection Customer to remain in compliance with the technical requirements will result in the disconnection of the Distribution System. 9.10.Disconnection of DER The Area EPS Operator has the right to disconnect the DER in the event of the following: Does not continue to follow and maintain IEEE 1547 settings approved by the Area EPS Operator as indicated by the adopted technical requirements. Does not meet all the requirements of the Fast Track Process. Refuses to sign either the MMIA Contract. The Area EPS Operator may temporarily disconnect the DER upon the following conditions: For scheduled outages upon reasonable notice. For unscheduled outages or emergency conditions. If the DER does not operate in the manner consistent with the Fast Track Process. The Area EPS Operator shall inform the Interconnection Customer in advance of any scheduled disconnections, or as reasonable, after an unscheduled disconnection. 19 208 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ABSTRACT to the utility distribution system Distributed Energy Resources larger than 4 megawatts in size or in need of additional studies. 5 MW Lemond Solar Station Owatonna, MN INTERCONNECTION PROCESS Study Process 209 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS /ƚƓƷĻƓƷƭ 1 Applicability ..................................................................................................................... 1 1.1. Applicability ...................................................................................................................... 1 1.2. Codes, Standards and Certification Requirements .......................................................... 1 2 Application Submission ................................................................................................... 1 2.1. Initial Interconnection Application for the Study Process ............................................... 1 2.2. Professional Licensed Engineer Signature ....................................................................... 2 2.3. Battery Storage ................................................................................................................ 2 2.4. Site Control ....................................................................................................................... 2 2.5. Interconnection Applications from Other Processes ....................................................... 2 3 Initial Steps ...................................................................................................................... 3 3.1. Completeness Review and Queue Position ..................................................................... 3 3.2. Scoping Meeting ............................................................................................................... 3 4 System Impact Study ....................................................................................................... 4 4.1. Electric System Impacts .................................................................................................... 4 4.2. System Impact Study Agreement ..................................................................................... 4 4.3. System Impact Study Costs .............................................................................................. 4 4.4. System Impact Study Timelines ....................................................................................... 4 5 Transmission System Impact Study ................................................................................ 5 5.1. Transmission System Impacts .......................................................................................... 5 5.2. Transmission System Impact Study Timelines ................................................................. 6 5.3. Regional Transmission Operator Jurisdiction .................................................................. 6 6 Facilities Study ................................................................................................................. 6 6.1. Construction of Facilities .................................................................................................. 6 6.2. Facilities Study Agreement ............................................................................................... 6 6.3. Facilities Study Timeline ................................................................................................... 7 6.4. Identification of Construction of Facilities ....................................................................... 7 6.5. Facilities Study Report Timeline ....................................................................................... 8 7 Interconnection Agreement ............................................................................................ 9 7.1. Uniform Contract ............................................................................................................. 9 i 210 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 7.2. Municipal Minnesota Interconnection Agreement ......................................................... 9 7.3. Completion of Agreement ................................................................................................ 9 8 Insurance ........................................................................................................................ 10 8.1. Insurance Requirements ................................................................................................ 10 8.2. Self-Insurance ................................................................................................................. 10 8.3. Proof of Insurance .......................................................................................................... 11 9 Timeline Extensions ....................................................................................................... 11 9.1. Reasonable Efforts ......................................................................................................... 11 9.2. Extensions ...................................................................................................................... 11 10 Modifications to Application ......................................................................................... 11 10.1. Procedures ..................................................................................................................... 11 10.2. Timelines ........................................................................................................................ 12 11 Interconnection ............................................................................................................. 12 11.1. Interconnection Milestones ........................................................................................... 12 11.2. Metering ......................................................................................................................... 13 11.3. Inspection, Testing and Commissioning ......................................................................... 13 11.4. Interconnection Costs .................................................................................................... 14 11.5. Security of Payment ....................................................................................................... 15 11.6. Non-Warranty ................................................................................................................ 16 11.7. Authorization for Parallel Operation .............................................................................. 16 11.8. Continual Compliance .................................................................................................... 17 11.9. Disconnection of DER ..................................................................................................... 17 ii 211 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 1Applicability 1.1.Applicability The Study Process is applicable to an Interconnection Customer proposing to interconnect a Distributed Energy Resource (DER) with the Area Electrical Power System (Area EPS) , if the DER capacity is larger than 4 MW or is identified through the engineering screening process to need additional studies. The majority of proposed DER interconnections will initially apply for interconnection under the Simplified or Fast Track Processes. Initial and supplemental screening results are to be considered throughout the Study Process. 1.2.Codes, Standards and Certification Requirements The Interconnection Customer proposed DER must meet the codes, standards and certification requirements listed in Section 13, 14 and Section 15 of the Process Overview document. The Area EPS Operator may allow DER systems that do not meet codes, standards and certification only if the DER system design is reviewed, tested and determined to be safe to operate in parallel with the Distribution System. 2Application Submission 2.1.Initial Interconnection Application for the Study Process For proposed DER interconnections that are not initially applied for under the Fast Track Process, the Interconnection Customer shall complete the Standard Interconnection Application and submit it to the Area EPS Operator to initiate the Interconnection Process. A completed Interconnection Application will include the following: A completed Interconnection Application signed by the Interconnection Customer. A process fee not to exceed $1,000, plus $2.00 per kW, toward the deposit of the study(s) indicated in Section 4. A site layout drawing of the proposed DER system. A one-line diagram of the proposed DER system showing the Point of Common CDistribution System. All equipment manufacturer specification sheets. Documentation of site control as indicated in Section 2.4. 1 212 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 2.2.Professional Licensed Engineer Signature The one-line diagram submitted with the Interconnection Application will require a signature from a professional engineer licensed in the State of Minnesota certifying the DER was designed in conformance to the Minnesota Technical Requirements for the following conditions: 1 Certified equipment is greater than 250 kW. Non-certified equipment is greater than 20 kW. 2.3.Battery Storage An inverter-based DER system may include battery storage. DER systems that include battery storage should complete the Energy Storage Application along with the Interconnection Application. 2.4.Site Control Documentation of site control must be submitted with the Interconnection Application. Site control may be demonstrated by any of the following: Ownership of, a leasehold interest in, or a right to develop a site for the purpose of constructing the DER system; An option to purchase or lease a site for constructing the DER system; An exclusivity or other business relationship between the Interconnection Customer and the entity having the right to sell, lease, or grant the Interconnection Customer the right to possess or occupy a site for constructing the DER system. 2.5.Interconnection Applications from Other Processes Some Interconnection Applications submitted under the Fast Track Process may be moved into the Study Process due to issues with the DER interconnection identified by engineering screens. An Area EPS Operator cannot request a new Interconnection Application submission if the Interconnection Application has already been submitted through the Fast Track Process. The Interconnection Customer who had already paid a processing fee for the Fast Track Process is still responsible to make a deposit toward the applicable studies address in Section 4, 5 and 6, but does not need to submit an additional processing fee. 1 Additional information regarding certified equipment is found in Sections 14 and 15 of the Process Overview document. 2 213 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 3Initial Steps 3.1.Completeness Review and Queue Position The Interconnection Application originally submitted under the Study Process shall be date- and time-stamped upon initial receipt, and if necessary, resubmission receipt. The Interconnection Customer shall be notified of receipt by the Area EPS Operator within ten (10) Business Days after receipt. The Area EPS Operator shall notify the Interconnection Customer, within ten (10) Business Days, if the Interconnection Application is deemed incomplete, and provide a written list detailing all information that must be provided to complete the Interconnection Application. The Interconnection Customer has ten (10) Business Days, to provide the missing information, unless additional time is requested with a valid reason. Failure to submit the requested information, within the stated timeline, will result in the Interconnection Application being deemed withdrawn. The Area EPS Operator has an additional five (5) Business Days to review the additionally provided information for completeness. An Interconnection Application will be deemed complete upon submission to the Area EPS Operator, provided all documents, fees and information required with the Interconnection Application, adhering to Minnesota Technical Requirements, is included. The date- and time-stamp of the completed Interconnection Application shall be accepted as the qualifying date for the purpose of establishing a queue position, as described in Section 4.7 of the Overview Process document. Interconnection Applications already screened in the Simplified Process or Fast Track Process shall retain their original queue position in the Study Process provided all applicable timelines were met. 3.2.Scoping Meeting A scoping meeting shall be held within ten (10) Business Days after the Interconnection Application submitted under the Study Process is deemed complete. For Interconnection Applications that were submitted under or put through the Fast Track Process, the scoping meeting will occur within ten (10) Business Days after the Interconnection Customer has elected to continue with the Study Process. The scoping meeting timeline may be extended upon mutual agreement of both Parties. The scoping meeting may also be omitted by mutual agreement. The purpose of the scoping meeting is to discuss the Interconnection Application and review existing study results relevant to the Interconnection Application. The Parties shall further discuss whether the Area EPS Operator should perform a System Impact 3 214 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Study or Studies, or proceed directly to a Facilities Study or an Interconnection Agreement. If the Area EPS Operator determines there is no potential for Transmission System or Distribution System adverse system impacts, the Interconnection Application shall proceed directly to a Facilities Study or an executable Interconnection Agreement, as agreed to by the Parties. 4System Impact Study 4.1.Electric System Impacts A System Impact Study shall identify and detail the electric system impacts that would result if the proposed DER(s) were interconnected without project modifications or electric system modifications. The System Impact Study is also to study the potential impacts, including but not limited to, those identified in the scoping meeting. A System Impact Study shall evaluate the impacts of the proposed interconnection on the reliability of the electric system. 4.2.System Impact Study Agreement If the Parties agree at the scoping meeting that a System Impact Study should be performed, the Area EPS Operator shall provide the Interconnection Customer a System Impact Study Agreement, not later than five (5) Business Days after the scoping meeting. If the scoping meeting was omitted by mutual agreement, the Area EPS Operator shall provide the Interconnection Customer a System Impact Study Agreement within ten (10) Business Days after the Interconnection Customer waives the scoping meeting. The System Impact Study Agreement shall include an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study. If applicable, the System Impact Study Agreement shall list any additional and reasonable technical data on the DER needed to perform the study. The scope and cost responsibilities are to be described in the System Impact Study Agreement. 4.3.System Impact Study Costs A deposit of the good faith estimated cost for each System Impact Study shall be provided by the Interconnection Customer with the return of a signed System Impact Study Agreement. 4.4.System Impact Study Timelines Both the Area EPS Operator and the Interconnection Customer has timeline responsibilities under the System Impact Study. 4 215 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 4.4.1.Interconnection Customer Timelines In order to remain in consideration for interconnection, an Interconnection Customer who has requested a System Impact Study shall meet the following conditions within twenty (20) Business Days of being provided a System Impact Study Agreement: Return a signed System Impact Study Agreement. Provide to the Area EPS Operator any requested additional and reasonable technical data on the DER needed to perform the System Impact Study. Pay the required study deposit. a time frame extension as described in Section 9.29.2, if additional technical data is requested. 4.4.2Area EPS Operator Timelines A System Impact Study shall be completed within thirty (30) Business Days after the System Impact Study Agreement has been signed by both Parties and delivered with the deposit and requested technical information to the Area EPS Operator. The results of the System Impact Study shall be delivered to the Interconnection Customer within five (5) Business Days of completion of the System Impact Study. Upon request, the Area EPS Operator shall provide the Interconnection Customer supporting documentation developed in the preparation of the System Impact Study, subjected to confidentiality arrangements consistent with Section 12.1 of the Overview Process and terms of the System Impact Study Agreement. 5Transmission System Impact Study 5.1.Transmission System Impacts In instances where the System Impact Study shows potential for Transmission System adverse system impacts, the Area EPS Operator shall contact the appropriate Transmission Provider within five (5) Business Days following the identification of such impacts. The Area EPS Operator shall coordinate with Transmission Provider to have the necessary studies to determine if the DER causes any adverse transmission impacts. The appropriate Transmission Provider shall provide a Transmission System Impact Study Agreement for the Interconnection Customer. Included in the Transmission System Impact Study Agreement will be a non-binding, 5 216 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS good faith estimate of cost for the study, along with a scope outline of the study and any additional technical data required to complete the Transmission System Impact Study. 5.2.Transmission System Impact Study Timelines In order to remain in consideration for interconnection, an Interconnection Customer must return the executed Transmission System Impact Study Agreement, along with the study deposit, within fifteen (15) Business Days. The Transmission System Impact Study shall be completed and the results provided to the Interconnection Customer in as timely a manner as possible, after the Transmission System Impact Study Agreement is signed by the Parties. The Area EPS Operator shall be responsible for coordination with the Transmission Provider as needed. Affected Systems shall participate in the study and provide all information necessary to prepare the study. 5.3.Regional Transmission Operator Jurisdiction In certain circumstances the Transmission Provider may not be able to study a proposed DER system if there is a possible affect to the bulk Transmission System. In these situations, the Area EPS Operator will coordinate with the Transmission Provider to inform the Interconnection Customer that the proposed DER system will need to follow the Regional Transmission Operator is Midcontinent Independent System Operator (MISO). 6Facilities Study 6.1.Construction of Facilities If construction of facilities is required, a Facility Study may be necessary to specify and estimate the cost of the equipment, engineering, procurement and construction work. A Facility Study is identified by an Initial Review, Supplemental Review or the Study Process to provide interconnection and interoperability of the DER with the Area EPS as required by Minnesota Technical Requirements. At the determination of the Area EPS Operator, Interconnection Applications reviewed in the Simplified Process or the Fast Track Process that require construction of facilities may forgo a Facilities Study. 6.2.Facilities Study Agreement The Area EPS Operator shall provide the Interconnection Customer a Facilities Study Agreement either: 6 217 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS System Impact Study, or in tandem with a Transmission System Impact Study, or if no System Impact Study is required, within five (5) Business Days after the scoping meeting, or within ten (10) Business Days after the Interconnection Application is deemed complete and approved through the Simplified Process or Fast Track Process. The Facilities Study Agreement shall be accompanied by an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the Facilities Study. The scope of and cost responsibilities for the Facilities Study are to be described in the Facilities Study Agreement. A deposit of the good faith estimated costs for the Facilities Study shall be provided by the Interconnection Customer at the time it returns the Facilities Study Agreement. 6.3.Facilities Study Timeline In order to remain under consideration for interconnection, the Interconnection Customer must return the executed Facilities Study Agreement and pay the required study deposit within fifteen (15) Business Days. 6.4.Identification of Construction of Facilities The Facilities Study shall specify and estimate the cost of the equipment, engineering, procurement and construction work (including overheads), needed to implement the conclusions of the System Impact Study(-ies). Design for any required Interconnection Facilities and/or Upgrades shall be performed under the Facilities Study Agreement unless the Facilities Study Agreement was deemed unnecessary by the Area EPS Operator. However, in the event that the Interconnection Customer did not provide the Area EPS Operator all required Conditional Use Permits at the time of entering into the Facilities Study Agreement, any such Design and/or Upgrades by the Area EPS Operator may be delayed until after the Interconnection Customer has provided to the Area EPS Operator all required Conditional Use Permits or provides a final design. The information in the Conditional Use Permits, or changes to the design, may result in significant modifications to the planned design and/or Upgrades. The Interconnection Customer may send to the Area EPS Operator a redacted version of the Conditional Use Permit(s) to ensure confidentiality, but any and all information that the Area EPS Operator would reasonably need to perform an accurate Facilities Study shall not be redacted. If necessary to comply with these requirements, a confidential version of the 7 218 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Conditional Use Permit(s) may be provided to the Area EPS Operator, with the confidential information being clearly marked and subjected to Confidentiality provisions in the Overview Process document Section 12.1. The Area EPS Operator may contract with consultants to perform activities required under the Facilities Study Agreement. The Interconnection Customer and the Area EPS Operator may agree to allow the Interconnection Customer to separately arrange for the design of some of the Interconnection Facilities. In such cases, facilities design will be reviewed and/or modified prior to acceptance by the Area EPS Operator, under the provisions of the Facilities Study Agreement. The Area EPS Operator shall make sufficient information available to the Interconnection Customer, in accordance with confidentiality and critical infrastructure requirements, to permit the Interconnection Customer to obtain an independent design and cost estimate for any necessary facilities. 6.5.Facilities Study Report Timeline In cases where Upgrades are required, the Facilities Study must be completed within forty-five (45) Business Days of the receipt of the executed Facilities Study Agreement and deposit. In cases where no Upgrades are necessary, and the required facilities are limited to Interconnection Facilities, the Facilities Study must be completed within thirty (30) Business Days of the receipt of the executed Facilities Study Agreement and deposit. Once the Facilities Study is completed, a draft Facilities Study Report shall be prepared and transmitted to the Interconnection Customer. Upon request, the Area EPS Operator shall provide the Interconnection Customer supporting documentation developed in the preparation of the Interconnection Facilities Study, subject to confidentiality arrangements consistent with these procedures and the Facilities Study Agreement. Within ten (10) Business Days of providing a draft Facilities Study Report to the Interconnection Customer, the Area EPS Operator and Interconnection Customer shall meet to discuss the results of the Facilities Study. This meeting may be omitted by mutual agreement. The Interconnection Customer may, within twenty (20) Business Days after receipt of the draft report, provide written comments to the Area EPS Operator, which the Area EPS Operator shall address in the final report. The Area EPS Operator shall issue the final Facilities Study Report within fifteen (15) Business Days of receiving the Interconnection Customer, or promptly upon receiving the they will not provide comments. The Area EPS Operator may reasonably extend the time frame, upon notice 8 219 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS to the Interconnection Customer, if the Interconnection Custome additional analyses or lead to significant modifications by the Area EPS Operator prior to issuance of the final Facilities Study Report. 7Interconnection Agreement 7.1.Uniform Contract For a proposed interconnection that meets the conditions of being classified as a qualifying facility less than 40 kW, the Area EPS Operator shall provide the Contract for Cogeneration and Small Power Production Facilities (Uniform Contract), within five (5) Business Days after the completion of the applicable study(-ies). 7.2.Municipal Minnesota Interconnection Agreement For proposed interconnections that do not meet the conditions of being classified as a qualifying facility less than 40 kW or if requested by the Interconnection Customer in lieu of signing the Uniform Contract, the Area EPS Operator shall provide the Interconnection Customer an executable Municipal Minnesota Interconnection Agreement (MMIA) within five (5) Business Days after the completion of the applicable study(-ies). 7.3.Completion of Agreement The Interconnection Customer must return a signed Interconnection Agreement at least thirty (30) Business Days prior to the requested in-service date of the propose DER. The Area EPS Operator shall sign and return a copy of the fully executed Interconnection Agreement, back to the Interconnection Customer. The Interconnection Customer may update the requested in-service date submitted on the Interconnection Application to a date thirty (30) Business Days or later from the date on which the Interconnection Customer submits a signed Interconnection Agreement and payment if required unless the Area EPS Operator agrees to an earlier date. Upon receipt of the signed Interconnection Agreement, the Area EPS Operator may schedule appropriate metering replacements and construction of facilities, if necessary. 9 220 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 8Insurance 8.1.Insurance Requirements At minimum, the Interconnection Customer shall maintain, for the duration the DER Distribution System, general liability insurance from a qualified insurance agency with a B+ or better , with a combined single limit of not less than those described in Table 8.1. Such general liability insurance shall include coverage against claims for damages resulting from (i) bodily injury, including wrongful death; and (ii) property damage arising out of the under this agreement. Evidence of the insurance shall state that coverage provided is primary and is not excess to or contributing with any insurance or self-insurance by the Area EPS Operator. Table 8.1 Liability Insurance Requirements DER System Size Liability Insurance Requirement < 40 kW AC $300,000 $1,000,000 $2,000,000 $3,000,000 For all proposed DER systems, except those that are qualifying systems less than 40 kW AC, the general liability insurance shall, by endorsement to the policy or polices: Include the Area EPS Operator as additionally insured. Contain severability of interest clause or cross-liability clause. Provide that the Area EPS Operator shall not by reason incur liability to the insurance carrier for the payment of premiums for such insurance if the Area EPS Operator is included as an additionally insured. 8.2.Self-Insurance The Interconnection Customer may choose to be self-insured provided there is an established record of self-insurance. The Interconnection Customer shall supply the Area EPS Operator at least twenty (20) Business Days prior to the date of initial operation, evidence of an acceptable plan to self-insure to a level of coverage equivalent to that required in Section 8.1. Failure of the Interconnection Customer or the Area EPS Operator to enforce the minimum levels of insurance does not relieve the Interconnection Customer from maintaining such levels of insurance or relieve the Interconnection Customer of any liability. 10 221 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 8.3.Proof of Insurance The Interconnection Customer shall furnish the required insurance certificates and endorsements to the Area EPS Operator prior to the initial operation of the DER. A copy of the Declaration page of the insurance policy is a common example of an insurance certificate. Thereafter, the Area EPS Operator shall have the right to periodically inspect or obtain a copy of the original policy or polices of insurance. Additionally, the Area EPS Operator may request to be additionally listed as an interested third party on the insurance certificates and endorsements for qualifying facilities less than 40 kW AC, to meet the right to periodically obtain a copy of the policy or policies of insurance. 9Timeline Extensions 9.1.Reasonable Efforts The Area EPS Operator shall make Reasonable Efforts to meet all the time frames provided in these procedures. If the Area EPS Operator cannot meet a deadline provided herein, it must notify the Interconnection Customer in writing within three (3) Business Days after the deadline, explaining the reason for the failure to meet the deadline and providing an estimated time by which it will complete the applicable interconnection procedure in the process. 9.2.Extensions For applicable time frames described in these procedures, the Interconnection Customer may request in writing one extension equivalent to half of the time originally allotted (e.g., ten (10) Business Days for a twenty (20) Business Days original time frame), which the Area EPS Operator may not unreasonably refuse. No further extensions for the applicable time frame shall be granted, absent a Force Majeure Event or other similarly extraordinary circumstance. 10Modifications to Application 10.1.Procedures At any time after the Interconnection Application is deemed complete, the Interconnection Customer or the Area EPS Operator may identify modifications to the proposed DER system that may improve costs and benefits. This includes reliability of the proposed DER system and the ability for the Area EPS Operator to accommodate the proposed DER system. The Interconnection Customer shall submit to the Area EPS Operator, in writing, all proposed modifications to any information provided in the Interconnection Application. The Area EPS Operator cannot unilaterally modify the Interconnection Application. 11 222 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 10.2.Timelines Within ten (10) Business Days of receipt of the proposed modification, the Area EPS Operator shall evaluate whether the proposed modification to the Interconnection Application constitutes a Material Modification. The definition in the Section 13 Glossary of the Process Overview document includes examples of what does and does not constitute a Material Modification. The Area EPS Operator shall notify the Interconnection Customer in writing of the final determination of the proposed modification. For proposed modifications that are determined to be a Material Modification the Interconnection Customer may choose to either: 1) withdraw the proposed modification; or 2) proceed with a new Interconnection Application. The Interconnection Customer shall provide its choice in writing to the Area EPS Operator within ten (10) Business Days after being provided the Material Modification determination. If the Interconnection Customer does not provide its choice within the timeline, the Interconnection Application shall be considered withdrawn. If the proposed modification is not determined to be a Material Modification, then the Area EPS Operator shall notify the Interconnection Customer in writing that the modification has been accepted and the Interconnection Customer shall retain its eligibility for interconnection, including its position in the queue. 11Interconnection 11.1.Interconnection Milestones For DER systems that are not a qualifying facility less than 40 kW AC, the Interconnection Customer and the Area EPS Operator shall agree on milestones for which each Party is responsible and list them in Attachment IV in the Interconnection Agreement. To the greatest extent possible, the Parties will identify all design, procurement, installation and construction requirements associated with the project while also clearly identifying associated timelines, at the beginning, or as early within the process as possible, of the design, procurement, installation and construction phase. anticipates that they will be unable to meet a milestone for any reason other than a Force Majeure Event, they shall immediately notify the other Party of the reason(s) for not meeting the milestone, then propose the earliest reasonable alternative date in which this and future milestones will be met and request appropriate amendments to the Interconnection Agreement and its attachments. The Party affected by the failure to meet a milestone shall not unreasonably withhold agreement to such an amendment unless: 12 223 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS The Party will suffer significant uncompensated economic or operational harm from the delay, or Attainment of the same milestone has previously been delayed, or The Party has reason to believe the delay in meeting the milestone is intentional or unwarranted notwithstanding the circumstance explained by the Party proposing the amendment. If the Party affected by the failure to meet a milestone disputes the proposed extension, the affected Party may pursue dispute resolution as described in the Overview Process document. 11.2.Metering Any metering requirements necessitated by the use of the DER system shall be installed -related costs will be included in the final invoice of interconnection costs to the Interconnection Customer. The Interconnection Customer is also responsible for metering replacement costs not The Area EPS Operator may charge Interconnection Customers an ongoing metering-related charge for an estimate of ongoing metering-related costs specifically demonstrated. 11.3.Inspection, Testing and Commissioning Upon completing construction of the DER system, the Interconnection Customer will cause the DER system to be inspected or otherwise certified by the appropriate local electrical wiring inspector with jurisdiction. The Interconnection Customer shall then Interconnection Facilities prior to interconnection pursuant to Minnesota Technical Requirements. Commissioning tests of the Interconnection Cus equipment shall be performed pursuant to applicable codes and standards of The Interconnection Customer shall notify the Area EPS Operator of testing and inspection no fewer than five (5) Business Days in advance, or as may be agreed to by the Parties. The Interconnection Customer shall provide to the Area EPS Operator a testing procedure that will be followed on the day of testing and inspection no fewer than ten (10) Business Days prior to the testing and inspection date. The testing procedure should include tests and/or inspections to confirm the DER system will meet the technical requirements of interconnection. The Area EPS Operator shall review the testing procedure for completeness and notify the Interconnection Customer if the 13 224 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS testing procedure fails to address components of the technical requirements for interconnection. The Area EPS Operator shall send qualified personnel to the DER site to inspect the interconnection and witness the testing. Testing and inspection shall occur on a Business Day at a mutually agreed upon date and time. The Area EPS Operator may waive the right to witness the testing. 11.4.Interconnection Costs 11.4.1Estimation of Interconnection Costs The Interconnection Customer shall pay for the actual cost of the Interconnection Facilities and Distribution Upgrades along with the Area EPS interconnection costs shall be stated in the Uniform Contract or in the MMIA in Attachment II, Interconnection Facilities and Upgrades, as a detailed itemization of such costs. If Network Upgrades are required, the actual cost of the Network Upgrades, including overheads, shall be borne by the Interconnection Customer pursuant to the Transmission Provider and associated agreements. 11.4.2Progressive Payment of Interconnection Costs The Area EPS Operator shall invoice the Interconnection Customer for the design, engineering, construction and procurement costs of the Interconnection Facilities and Upgrades described in the MMIA Attachment II, on a monthly basis, or other manner agreed upon by both Parties in the MMIA, or as described in the Uniform Contract. The Interconnection Customer shall pay each invoice within twenty-one (21) Business Days or as agreed to in the MMIA or Uniform Contract. 11.4.3Final Accounting of Interconnection Facilities and Upgrade Costs If distribution or transmission facilities required upgrades to accommodate the proposed DER system, the Area EPS Operator shall render the final interconnection cost invoice to the Interconnection Customer within eighty (80) Business Days (approximately four calendar months) of completing the and Upgrades. The Area EPS Operator shall provide the Interconnection Customer with a final accounting report identifying the difference between the actual and the Interconnection specific DER system interconnection. Upon the final accounting submitted to the Interconnection Customer, the balance between the actual cost and previously 14 225 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS aggregated payments shall be paid to the Area EPS Operator within twenty (20) Business Days. If the balance between the actual cost and previously aggregated payments is a credit, the Area EPS Operator shall refund the Interconnection Customer within twenty (20) Business Days. 11.4.4Final Interconnection Costs without Facilities and Upgrades Needed Within thirty (30) Business Days the final invoice for the interconnection costs shall be rendered to the Interconnection Customer once the proposed DER system has been commissioned by the Area EPS Operator, or upon the commissioning being waived by the Area EPS Operator. The Interconnection Customer shall make payment to the Area EPS Operator within twenty-one (21) Business Days of receipt, or as otherwise stated in the Uniform Contract or MMIA. 11.5.Security of Payment At payment of interconnection cost. Under the Traditional Security method, the Interconnection Customer shall provide reasonable, adequate assurances of credit, including a letter of credit or personal guaranty of payment and performance from a creditworthy entity acceptable under the Area EPS Operator credit policy. The letter of credit shall also include procedures for the unpaid balance of the estimated amount shown in the Interconnection Agreement for the totality of all anticipated work or expense incurred by the Area EPS Operator associated with the Interconnection Application. The payment for these estimated costs shall be as follows: One-third of estimated costs, shall be due no later than when the Interconnection Customer signs the Interconnection Agreement. An additional one-third of estimated costs, shall be due prior to initial energization of the DER with the Area EPS Operator. After the project completion, the remainder of actual costs, incurred by Area EPS Operator, shall be due within thirty (30) Business Days from the date the invoice is mailed. Under the Modified Security method, at least twenty (20) Business Days prior to the commencement of the design, procurement, installation, or construction of a discrete 15 226 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS portion of the Area EPS Interconnection Customer shall provide the Area EPS Operator, at the Interconnection y, letter of credit or other form of security that is reasonably acceptable to the Area EPS Operator and is consistent with the Minnesota Uniform Commercial Code. Such security for payment shall be in an amount sufficient to cover the costs for constructing, designing, procuring, and installing the applicable portion of the Area EPS Operator reduced on a dollar-for-dollar basis for payments made to the Area EPS Operator under the Interconnection Agreement during its term. The guaranty must be made by an entity that meets the creditworthiness requirements of the Area EPS Operator and contain terms and conditions that guarantee payment of any amount that may be due from the Interconnection Customer, up to an agreed-to maximum amount. The letter of credit must be issued by a financial institution or insurer reasonably acceptable to the Area EPS Operator and must specify a reasonable expiration date not sooner than sixty (60) Business Days, (three calendar months), after the due date of the final accounting report and invoice described in Section 11.4. 11.6.Non-Warranty Area EPS Operator does not give any warranty, expressed or implied, as to the adequacy, safety, or other characteristics of any structures, equipment, wires, appliances or devices owned, operated, installed or maintained by the Interconnection Customer, including without limitation the DER and any structures, equipment, wires, appliances or devices not owned, operated or maintained by the Area EPS Operator. The Area EPS Operator does not guarantee uninterrupted power supply to the DER and will operate the Distribution System with the same reliability standards for the entire customer base. 11.7.Authorization for Parallel Operation The Interconnection Customer shall not operate its DER system in parallel with the Area Distribution System without prior written authorization from the Area EPS Operator. The Area EPS Operator shall provide such authorization within three (3) Business Days from when the Area EPS Operator receives notification that the Interconnection Customer has complied with all applicable parallel operations requirements and commissioning has been successfully completed. Such authorization shall not be unreasonably withheld, conditioned or delayed. 16 227 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 11.8.Continual Compliance The Interconnection Customer shall operate its DER system in compliance with the Area referred to in the executed Interconnection Agreement. The Area EPS Operator may periodically inspect, at its own expense, the operation of DER system as it relates to power quality, thermal limits and reliability. Failure by the Interconnection Customer to remain in compliance with the technical requirements will result in the disconnection of the DER system from the Area EPS Distribution System. 11.9.Disconnection of DER The Area EPS Operator has the right to disconnect the DER in the event of the following: Does not continue to follow and maintain IEEE 1547 settings approved by the Area EPS Operator as indicated by the adopted technical requirements. Does not meet all the requirements of the Study Process. Uniform Contract. The Area EPS Operator may temporarily disconnect the DER upon the following conditions: For scheduled outages upon reasonable notice. For unscheduled outages or emergency conditions. If the DER does not operate in the manner consistent with the Study Process. The Area EPS Operator shall inform the Interconnection Customer in advance of any scheduled disconnections, or as reasonable, after an unscheduled disconnection. 17 228 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Pre-Application Report Request Persons interested in finding out the additional information regarding the interconnection of a -Application Report Request. The pre-application report request is to be filled out as completely as possible by the applicant. The Utility will provide the applicant with a Pre-Application Report within 15 business days once the completed Pre-Application Report Request and a $300 fee is submitted to the Utility. Distributed Energy Resource Information Project Address: City: State: Zip Code: GPS Coordinates: Nearby Cross Streets: Location of the Proposed Point of Common Coupling (e.g. meter number or pole number): DER Type (Check all that apply): Solar Photovoltaic Wind Battery Storage Combined Heat and Power Solar Thermal Other (please specify) Total Aggregate Nameplate Rating of Proposed DER System (kW AC): Phase Configuration of Proposed DER System Single Three Service Voltage of Proposed DER System Volts Will this be a stand-alone generator not interconnected to onsite load Yes No (not including station service)? Please attach copy of site map for proposed project and any additional information that may be helpful in fulfilling the pre-application request. Site map should include true north, proposed project location including general layout, proposed service point location and major roadways. For Office Use Only Date Received: Application Fee Received: Yes No Date Completed Pre-Application Report Sent to Applicant: ELK RIVER MUNICIPAL UTILITIES 1 229 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Point of Interconnection Additional Information Is the proposed interconnection to an existing service? (If no, applicant is Yes No to skip to the next section.) Customer Name: Customer Account Number: Existing loads at site (kW AC): List future additional loads planned for at site (in kW AC): Project Contact Information Full Name: Name of Business: Street Address: City: State: Zip Code: Email: Phone: Payment and Agreement There is a non-refundable $300 fee for the construction of a pre-application report. By signing this document, I acknowledge and understand that: Neither review of this application nor construction of any report shall begin until the full amount of the fee has been paid to Elk River Municipal Utilities. The Utility shall provide a report with only the available information on the proposed point of interconnection. The information provided by the Utility may become outdated and not useful at the time of submission of a complete Interconnection Application. The confidentiality provision as listed in Section 12.1 of the Overview Process of the Municipal Minnesota Distributed Energy Resource Interconnection Process apply. Upon receipt of the report no guarantee is made by the Utility that a future Interconnection Application will be approved for this proposed site. ___________________________________________ ________________________ Applicant Signature: Date: ***Please print clearly or type and return completed along with any additional documentation*** ELK RIVER MUNICIPAL UTILITIES 2 230 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Pre-Application Report This report summarizes information available to the Utility regarding an interconnection of a distributed The report includes only information that is readily available to the Utility. This report is not a guarantee by the Utility that a future interconnection application will be approved for the proposed site. Information provided in this report is subjected to change as modifications are made to Pre-Application Request Pre-Application ID: Project Address: DER Size: kW AC DER Type: Project Contact: Email: Phone: Electric Distribution System Information Info Not Available Total capacity of the circuit based on normal conditions likely to MW AC serve the proposed PCC Existing aggregate generation capacity interconnected to the MW AC circuit likely to serve the proposed PCC Aggregate queued generation capacity for the circuit likely to MW AC serve the proposed PCC Available capacity of the circuit most likely to serve the proposed MW AC PCC Estimated peak load of relevant line sections kW AC Estimated minimum load of relevant line sections (daytime kW AC minimum load to be specified for solar DER if available.) Substation Voltage (Nominal Distribution) kV Substation Voltage (Nominal Transmission) kV Nominal distribution circuit voltage at proposed PCC kV t//ʹ tƚźƓƷ ƚŅ /ƚƒƒƚƓ /ƚǒƦƌźƓŭ ELK RIVER MUNICIPAL UTILITIES 1 231 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Electric Distribution System Information - Continued Info Not Available Approximate circuit distance between the proposed PCC and the Miles substation: Distance to three phase circuit (if not already located on a three-phase Miles circuit): Amps Limiting conductor ratings from the proposed PCC to the substation Phases Number of available phases on the area EPS at the proposed PCC Is the proposed point of common coupling located on a spot network, Yes No grid network, or radial supply? Is the proposed PCC located behind a line voltage regulator? Yes No Type of voltage regulating devices between substation and proposed Device A PCC Device B Device C Number and type of protection devices between substation and Device A proposed PCC Device B Device C Any additionally known distribution system constraints? Yes No Additional known constraints that could affect installation or operation of the DER or Area EPS at the proposed PPC are attached to this report. Constraints may include, but are not limited to, electrical dependencies at that location, short circuit interrupting capacity issues, power quality or stability issues on the circuit, capacity constraints, or secondary networks. Utility Information Report Completed By: Company: Project Contact: Email: Phone: ELK RIVER MUNICIPAL UTILITIES 2 232 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Simplified Interconnection Application Persons interested in applying for the interconnection of a distributed energy resource (DER) to the through the Simplified Process are to fill out this Simplified Interconnection Application. The Simplified Interconnection Application is to be used for inverter-based DER technologies with the capacity of 20 kW AC or less and is to be filled out completely by the Applicant. The Simplified Application shall be returned to the Utility with the requested material information and a non-refundable $100 application fee. Proposed DER interconnections be moved into the Fast Track Process if engineering screens are failed during the Simplified Interconnection Application review. Timeline for review of the Simplified Application is as follows: Upon receipt of a Simplified Interconnection Application the Utility has 10 business days to review the application for completeness. If the application is deemed incomplete, the Utility shall notify the Applicant of what additional information material is required. The Applicant has 5 business days to return the missing information material or their application may lose its queue position and be deemed withdrawn. The Utility shall have a total of 20 business days to review the Simplified Interconnection Application, not including time waiting for additional information material to deem the application completed. The Utility will notify the Application if the proposed DER system is preliminary approved for interconnection or if the proposed DER system will need to be moved in the Fast Track Process. Checklist for Submission to Utility The items below shall be included with submittal of the Simplified Application to the Utility. Failure to include all items will deem the Simplified Application incomplete. Included $100 Non-Refundable Simplified Application Fee Yes One-line diagram Details required on one-line diagram specified at the end of Yes the interconnection application. All Certified Equipment Manufacturer Specification Sheets Yes Site Layout Drawing Yes Copy of Insurance Declaration page or other acceptable proof of insurance Yes Possible Additional Documentation If an Application Agent is being used for this project, the Site Layout Drawing must be signed by the Interconnection Customer indicating Site Control of the DER interconnection location. If the DER export capacity is limited, include information material explaining the limiting capabilities. If Energy Storage is included with the proposed DER system include the Energy Storage Application. ELK RIVER MUNICIPAL UTILITIES 233 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Simplified Interconnection Application Interconnection Customer Full Name (must match the name of the existing service account): Account Number: Meter Number: Mailing Address: City: State: Zip Code: Email: Phone: Application Agent Is the Customer using an Application Agent for this application? Yes No If Interconnection Customer is not using an Application Agent, please skip to the next section. Application Agent: Company Name: Email: Phone: For Office Use Only Application ID: Queue Number: Date Received: Application Fee Received: Yes No Date Preliminary Approval Provided to Applicant: ELK RIVER MUNICIPAL UTILITIES 234 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Distributed Energy Resource Information Location (if different from mailing address of Interconnection Customer): Will the Proposed DER system be interconnected to an existing electric service? Yes No Is the Distributed Energy Resource a single generating unit or multiple? Single Multiple DER Type (Check all that apply): Solar Photovoltaic Wind Energy Storage Combined Heat and PowerSolar Thermal Other (please specify) DER systems with Energy Storage must also submit the Energy Storage Application to the Utility. Inverter Manufacturer: Model: Phase Configuration of Proposed DER System: Single Three Aggregate Inverter(s) Nameplate Rating: Is the export capability of the DER limited? Yes No If the DER export capacity is limited, include information material explaining the limiting capabilities. Aggregate DER Capacity (the sum of nameplate capacity of all generation and storage devices at the PCC): Installed DER System Cost (before incentives): $ Estimated Installation Date: Equipment Certification 1 Is the DER equipment certified? Yes No Please list all certified IEEE 1547 equipment below. Include all certified equipment manufacturer specification sheets with the Simplified Application submission. Equipment Type Certifying Entity 1 2 3 1 Information regarding certified equipment can be found in Section 14 and Section 15 of the Overview Process document. ELK RIVER MUNICIPAL UTILITIES 235 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Interconnection Agreement Proposed DER interconnections that are also deemed Qualifying Facilities under Minnesota Statutes §Uniform Contract for Cogeneration and Small Power Production Facilities. Included in this agreement are payment terms for excess power generated by the proposed DER system the Utility may purchase Cogeneration and Small Power Production Facilities, the Interconnection Customer may choose to instead sign the Municipal Minnesota Interconnection Agreement (MMIA). The Interconnection Customer requests an MMIA to be executed in lieu of the Yes No Facilities. Disclaimers Must be completed by Interconnection Customer Initials The Interconnection Customer has opportunities to request a timeline extension during the interconnection process. Failure by the Interconnection Customer to meet or request an extension for a timeline outlined in the Interconnection Process could result in a withdrawn queue position and the need to re-apply. Simplified Process may be moved into the Fast Track Process if engineering screens are failed during the Simplified Application review. Application Signature Must be completed by Interconnection Customer I designate the individual or company listed as my Application Agent to serve as my agent for the purpose of coordinating with the Area EPS Operators on my behalf __________ throughout the interconnection process. Initials I hereby certify that, to the best of my knowledge, the information provided in this Application is true, and that I have appropriate Site Control in conformance with the Interconnection Process. I agree to abide by the Municipal Minnesota Distributed Energy Resource Interconnection Process (M-MIP) and return the Certificate of Completion when the DER has been installed. ___________________________________________ ________________________ Applicant Signature: Date: ***Please print clearly or type and return completed along with any additional documentation*** ELK RIVER MUNICIPAL UTILITIES 236 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Information Required on One-Line Diagram An Interconnection Application must include a site electrical one-line diagram showing the configuration of all Distributed Energy Resource equipment, current and potential circuits, and protection and control schemes. The one-line diagram shall include: Applicant name. Application ID. Installer name and contact information. Address where DER system will be installed - must match application address. Be sure to list the address for the protective interface equipment if the protective interface equipment is located at a different address than the DER system. Correct positions of all equipment, including but not limited to panels, inverter, and DC/AC disconnect. Include distances between equipment, and any labeling found on equipment. ELK RIVER MUNICIPAL UTILITIES 237 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Interconnection Application Persons interested in applying for the distribution system through the Fast Track or Study Processes are to fill out this Interconnection Application. The Interconnection Application is to be filled out completely by the applicant or as noted in each section of the application. The Utility will contact the applicant within 10 business days once the Interconnection Application and the corresponding processing fee is submitted to the Utility. The Utility will then notify the applicant of the completeness of their application. If the application is deemed incomplete by the Utility, the Utility will provide the applicant with a list of missing material. The applicant will then have 10 business days to provide the Utility with this information or request an extension, otherwise the application will be deemed incomplete and the applicant will lose their place in the queue. Section that are noted with * are required to be filled out. Checklist for Submission to Utility The items below shall be included with submittal of the Interconnection Application to the Utility. Failure to include all items will deem the Interconnection Application incomplete. Included Non-Refundable Processing Fee Fast Track $100 + $1/kW for Certified Systems Yes $100 + $2/kW for Non-Certified Systems Study Process $1,000 + $2/kW down payment. Additional study fees may apply. One-line diagram This one-line diagram must be signed and stamped by a Professional Engineer licensed in Minnesota if the DER is uncertified greater than 20 kW Yes AC or if certified system is over 250 kW. Details required on one-line diagram specified at the end of the interconnection application. Schematic drawings for all protection and control circuits, relay current circuits, Yes relay potential circuits, and alarm/monitoring circuits Inverter Specification Sheet(s) (if applicable) Yes Documentation that describes and details the operation of protection and control Yes schemes Documentation showing site control Yes Aerial map showing DER system layout including major roadways and true north Yes Possible Additional Documentation If the DER export capacity is limited, include information material explaining the limiting capabilities. If Energy Storage is included with the proposed DER system include the Energy Storage Application. ELK RIVER MUNICIPAL UTILITIES 1 238 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS General * Select Review Process: Fast Track Process Study Process New Distribution Energy Capacity Addition or Material Modification Application is for: Resource to Existing Distributed Energy Resource If Capacity Addition or Material Modification to existing facility, please describe: Distributed Energy Resource will be used for what reason? (Check all that apply): Net MeteringSupply Power to Interconnection Customer Supply Power to Area EPS Installed DER System Cost (before incentives):$ Interconnection Customer * Full Name (must match the name of the existing service account): Account Number: Meter Number: Mailing Address: City: State: Zip Code: Email: Phone: * Indicates section must be completed. ELK RIVER MUNICIPAL UTILITIES 2 239 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Application Agent * Is the Customer using an Application Agent for this application? Yes No If Interconnection Customer is not using an Application Agent, please skip to the next section. Application Agent: Company Name: Email: Phone: Distributed Energy Resource Information * Estimated Installation Date: Location (if different from mailing address of Interconnection Customer): Will the Proposed DER system be interconnected to an existing electric service? Yes No Is the Distributed Energy Resource a single generating unit or multiple? Single Multiple DER Type (Check all that apply): Solar Photovoltaic Wind Energy Storage Combined Heat and PowerSolar Thermal Other (please specify) DER systems with Energy Storage must also submit the Energy Storage Application to the Utility. Total Number of Distributed Energy Resources to be interconnected pursuant to this Interconnection Application: Single Phase Three Phase Phase configuration of Distributed Energy Resource(s): Type of Generator: Inverter Synchronous Induction Aggregate DER Capacity (the sum of nameplate capacity of all generation and storage devices at the PCC): kW kVA ac ac * Indicates section must be completed. ELK RIVER MUNICIPAL UTILITIES 3 240 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Export Capacity Limitation* Is the export capability of the DER limited? Yes No If the DER export capacity is limited, complete the following sections and include information material explaining the limiting capabilities. Maximum Physical Export Capacity Requested: kW ac If Yes, please provide additional details describing method of export limitation: Load Information * -sited Load: kW ac Typical Reactive Load (if known): Equipment Certification * Is the DER equipment certified? Yes No Please list all IEEE 1547 certified equipment below. Include all certified equipment manufacturer specification sheets with the Interconnection Application submission. Equipment Type Certifying Entity 1 2 3 4 * Indicates section must be completed. ELK RIVER MUNICIPAL UTILITIES 4 241 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Prime Mover* Please indicate the prime mover: Solar Photovoltaic Microturbine Fuel Cell Reciprocating Engine Gas Turbine Other (please specify) Is the prime mover compatible with certified protection equipment package? Yes No DER Manufacturer: Model Name & Number: Version: List of Adjustable Set Points for Protection Equipment or Software: Summer Name Plate Rating: kW Summer Name Plate Rating: kW acac Winter Name Plate Rating: kVA Winter Name Plate Rating: kVA acac Rated Power Factor: Leading: Lagging: A completed Power System Load Flow data sheet must be supplied with the Interconnection Application. Only appropriate sections beyond this point until the signature page are to be completed. Distributed Energy Resource Characteristic Data (for Inverter-based machines) Max design fault contribution current: Is your response to the previous field an Instantaneous or RMS Instantaneous RMS measurement? Harmonic Characteristics: Start-up Requirements: * Indicates section must be completed. ELK RIVER MUNICIPAL UTILITIES 5 242 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Distributed Energy Resource Characteristic Data (for Synchronous machines) RPM Frequency:Neutral Grounding Resistor: Direct Axis Synchronous Reactance, : Zero Sequence Reactance, : Direct Axis Transient Reactance, : KVA Base: Direct Axis Subtransient Reactance, : Field Volts: Negative Sequence Reactance, : Field Amperes: Please provide the appropriate IEEE model block diagram of excitation system, governing system and power system stabilizer (PSS) in accordance with the regional reliability council criteria. A PSS may be be submitted. Distributed Energy Resource Characteristic Data (for Induction machines) RPM Frequency: Neutral Grounding Resistor: Motoring Power (kW): Exciting Current: Heating Time Constant: Temperature Rise: Rotor Resistance, : Frame Size: Stator Resistance, : Design Letter: Stator Reactance, : Reactive Power Required In Vars (No Load): Rotor Reactance, : Reactive Power Required In Vars (Full Load): Magnetizing Reactance, : Total Rotating Inertia, H: Short Circuit Reactance, : ELK RIVER MUNICIPAL UTILITIES 6 243 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Interconnection Facilities Information Will a transformer be used between the DER and the Point of Yes No Common Coupling? Will the transformer be provided by the Interconnection Customer? Yes No If yes, please fill in the fields below. Proposed location of protective interface equipment on property: Transformer Data (For Interconnection Customer-Owned Transformer) What is the phase configuration of the transformer? Single Phase Three Phase Size (kVA): Transformer Impedance (%): On kVA Base: Transformer Volts: Delta: Wye: Wye Grounded: (Primary) Transformer Volts: Delta: Wye: Wye Grounded: (Secondary) Transformer Volts: Delta: Wye: Wye Grounded: (Tertiary) Transformer Fuse Data (For Interconnection Customer-Owned Fuse) Manufacturer: Type: Size: Speed: Interconnecting Circuit Breaker (For Interconnection Customer-Owned Circuit Breaker) Manufacturer: Type: Load Rating (in Amps): Interrupting Rating (In Amps): Trip Speed (Cycles): Interconnection Protective Relays (For Microprocessor Controlled Relays) Setpoint Function Minimum Maximum ELK RIVER MUNICIPAL UTILITIES 7 244 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Interconnection Protective Relays (For Relays with Discrete Components) Manufacturer: Type: Style/Catalog No.: Proposed Setting: Manufacturer: Type: Style/Catalog No.: Proposed Setting: Manufacturer: Type: Style/Catalog No.: Proposed Setting: Manufacturer: Type: Style/Catalog No.: Proposed Setting: Manufacturer: Type: Style/Catalog No.: Proposed Setting: Current Transformer Data: Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: Potential Transformer Data: Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: For Office Use Only Application ID: Date Received: Application Fee Received: Yes No Date Completed: ELK RIVER MUNICIPAL UTILITIES 8 245 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Interconnection Agreement* Proposed DER interconnections that are also deemed Qualifying Facilities less than 40 kW AC under Minnesota Statutes §Uniform Contract for Cogeneration and Small Power Production Facilities. Included in this agreement are payment terms for excess power generated by the proposed DER system the Utility may purchaseUniform Contract for Cogeneration and Small Power Production Facilities, the Interconnection Customer may choose to instead sign the Municipal Minnesota Interconnection Agreement (MMIA). The Interconnection Customer requests an MMIA to be executed in lieu of the Yes No Uniform Contract for Cogeneration and Small Power Production Facilities. Disclaimers Must be completed by Interconnection Customer * Initials The Interconnection Customer has opportunities to request a timeline extension during the interconnection process. Failure by the Interconnection Customer to meet or request an extension for a timeline outlined in the Interconnection Process could result in a withdrawn queue position and the need to re-apply. on submitted under the Fast Track Process may be moved into the Study Process if engineering screens are failed during the Interconnection Application review. Application Signature Must be completed by Interconnection Customer * I designate the individual or company listed as my Application Agent to serve as my agent for the purpose of coordinating with the Area EPS Operators on my behalf __________ throughout the interconnection process. Initials I hereby certify that, to the best of my knowledge, the information provided in this Application is true, and that I have appropriate Site Control in conformance with the Interconnection Process. I agree to abide by the Municipal Minnesota Distributed Energy Resource Interconnection Process (M-MIP) and will inform the Utility if the proposed DER system changes from the details listed in this Interconnection Application. ___________________________________________ ________________________ Applicant Signature: Date: ***Please print clearly or type and return completed along with any additional documentation*** ELK RIVER MUNICIPAL UTILITIES 9 246 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Information Required on One-Line Diagram An Interconnection Application must include a site electrical one-line diagram showing the configuration of all Distributed Energy Resource equipment, current and potential circuits, and protection and control schemes. The one-line diagram shall include: Applicant name. Application ID. Installer name and contact information. Address where DER system will be installed - must match application address. Be sure to list the address for the protective interface equipment if the protective interface equipment is located at a different address than the DER system. Correct positions of all equipment, including but not limited to panels, inverter, and DC/AC disconnect. Include distances between equipment, and any labeling found on equipment. This one-line diagram must be signed and stamped by a Minnesota licensed Professional Engineer if the Distributed Energy Resource is larger than 20 kW (if uncertified) and 250 kW (if certified.) ELK RIVER MUNICIPAL UTILITIES 10 247 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Storage Application This form is required in addition to a completed Interconnection Application form for any DER with an energy storage component. An application to interconnect energy storage is only required for storage designed to operate in parallel with the distribution system. Electric vehicles and backup generators do not need to apply. Energy Storage Application for: Stand-alone storage as DER Storage as component of DER Customer Account Number: Address of Generating Facility: City: State: Zip Code: Equipment Manufacturer: Equipment Model: Max Continuous Real Power (In kW): Max Continuous Apparent Power (In kVA): Power Factor range of adjustability: Peak AC Energy (In kWh): Is the equipment UL 1741 listed? ağƓǒŅğĭƷǒƩĻƩ ƭƦĻĭźŅźĭğƷźƚƓ Yes No ƭŷĻĻƷΛƭΜ ğƩĻ ƩĻƨǒźƩĻķ Ʒƚ ĬĻ ğƷƷğĭŷĻķ Ʒƚ Ʒŷźƭ ğƦƦƌźĭğƷźƚƓ͵ Is the storage 100% charged by a net energy metering eligible Yes No energy source? Source charging the storage Λ/ŷĻĭƉ ğƌƌ ƷŷğƷ ğƦƦƌǤΜ: Utility Wind Solar Diesel Other (please specify) Is the storage configured to export energy to the Area EPS? Yes No Are the settings accessible to the end user? Yes No For Office Use Only Application ID: Queue Number: Date Received: ELK RIVER MUNICIPAL UTILITIES 248 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Energy Storage Available control operating modes: Control modes being enabled for interconnection: For non-export, how does the system determine the magnitude of customer load? What is the process for changing operational modes of the energy storage? tƌĻğƭĻ ğƷƷğĭŷ ğƓǤ ğķķźƷźƚƓğƌ ƒğƷĻƩźğƌƭ͵ ELK RIVER MUNICIPAL UTILITIES 249 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS {ǒƦƦƌĻƒĻƓƷğƌ wĻǝźĻǞ hŅŅĻƩ The Distributed Energy Resource (DER) Interconnection Application in the name of _______(Interconnection Customer)____________ for a DER system described as _______________(description of DER System)________ and proposed to be located at _________________(Address or Legal Description)___________________________ has failed one or more of the initial engineering screens. To continue with the Interconnection Process, the Interconnection Customer may choose to continue with a Supplemental Review or may choose the Interconnection Application to be evaluated under the Study Process track. The Interconnection Customer has fifteen (15) Business Days to indicate to the Area Electrical Power System (EPS) Operator, the next step in the Interconnection Process and return this Supplemental Review Offer or the Interconnection Application will only continue to be evaluated under the Study Process track or be deemed withdrawn. Interconnection Customer agrees that the Area EPS Operator shall: ______ Proceed with a Supplemental Review of the Interconnection Application. ______ Continue evaluation of the Interconnection Application under the Study Process track. ______ Deem the Interconnection Application withdrawn. If the Interconnection Customer chooses to proceed with the Supplemental Review, the Interconnection Customer shall note the order in which the Supplemental Review screens should be performed and indicate the action the Area EPS Operator should take if a Supplement Review screen has failed. {ǒƦƦƌĻƒĻƓƷğƌ hƩķĻƩ Ʒƚ /ƚƭƷ 9ƭƷźƒğƷĻ ƚŅ wĻǝźĻǞ {ĭƩĻĻƓ tĻƩŅƚƩƒ {ĭƩĻĻƓƭ wĻǝźĻǞ {ĭƩĻĻƓ Minimum Load Voltage & Power Quality Safety & Reliability ƚƷğƌ 5ĻƦƚƭźƷ wĻƨǒźƩĻķ Upon failure of a Supplemental Review screen or upon notification the Area EPS Operator is unable to complete a Supplemental Review screen, the Interconnection Customer agrees that the Area EPS Operator shall: ______ Proceed with the remaining Supplemental Review screens. ______ Stop the Supplemental Review screens and continue evaluation of the Interconnection Application under the Study Process track. ______ Stop the Supplemental Review screens and contact the Interconnection Customer for further instructions. ______ Deem the Interconnection Application withdrawn. M-MIP Supplemental Review Offer January 2019 250 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS The Area EPS Operator has indicated a good faith estimate of the cost for each Supplemental Review screen. The full estimate is due as a deposit prior to the start of any Supplemental Review. Upon completion of the Supplemental Review or termination of the Supplemental Review by the Interconnection Customer, the balance of the actual Supplemental Review costs will be billed or credited to the Interconnection Customer. The balance shall be paid in full to the respective party within twenty (20) Business Days of receipt of the final Supplemental Review invoice from the Area EPS Operator. The Area EPS Operator shall have thirty (30) Business Days to complete the Supplemental Review upon receipt of a signed copy of this Supplemental Review Offer and the deposit required. The Area EPS Operator shall provide the Interconnection Customer with a written report indicating the Supplemental Review results and the underlying analysis performed. The Interconnection Customer agrees to terms and conditions specified in this Supplemental Review Offer and in the Fast Track Process document. The Interconnection Customer understands the Supplemental Review screens will not start until the deposit is received by the Area EPS Operator. Interconnection Customer Signature Date CƚƩ hŅŅźĭĻ ƭĻ hƓƌǤ Application ID: Date Offer Received: Date Deposit Received: Date Supplement Review Results Provided to Interconnection Customer: 251 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 5 kW Hometown ABSTRACT Solar Agreement outlining the scope, timeline and Olivia, MN impact to the distribution system INTERCONNECTION PROCESS System Impact Study Agreement 252 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS System Impact Study Agreement THIS AGREEMENT is made and entered into this _____day of______________ 20___ by and between_____________________________________________________, municipal utility existing under RECITALS WHEREAS, the Interconnection Customer is proposing to develop a Distributed Energy Resource (DER) or generating capacity addition to an existing DER consistent with the Interconnection Application completed by the Interconnection Customer on________________________(date); and WHEREAS, the Interconnection Customer desires to interconnect the DER with the Area EPS Electric System; S WHEREAS, the Interconnection Customer has requested the Area EPS Operator to perform a System Impact Study to assess the impact of interconnecting the DER with the Area EPS Electric System, and potential Affected System(s); NOW, THEREFORE, in consideration of, and subject to, the mutual covenants contained herein the Parties agreed as follows: 1.When used in this Agreement, with initial capitalization, the terms specified shall have the meanings indicated, or the meanings specified, in the Municipal Minnesota Distributed Energy Resources Interconnection Process (M-MIP). 2.The Interconnection Customer elects and the Area EPS Operator shall cause to be performed a System Impact Study consistent with the M-MIP. The scope of a System M-MIP System Impact Study Agreement _ January 2019 1 253 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Impact Study shall be subject to the assumptions set forth in this Agreement; including Attachment A. 3.A System Impact Study will be based upon the technical information provided by Interconnection Customer in the Interconnection Application. The Area EPS Operator reserves the right to request additional technical information from the Interconnection Customer as may reasonably become necessary consistent with Good Utility Practice during the course of the System Impact Study. 4.A System Impact Study may, as necessary, consist of a short circuit analysis, a stability analysis, a power flow analysis, voltage drop and flicker studies, protection and set point coordination studies, and grounding reviews. A System Impact Study shall state the assumptions upon which it is based, state the results of the analyses, and provide the requirement or potential impediments to providing the requested interconnection service, including a preliminary indication of the cost and length of time that would be necessary to correct any problems identified in those analyses and implement the interconnection. A System Impact Study shall provide a list of facilities that are required as a result of the Interconnection Application and non-binding good faith estimates of cost responsibility and time to construct. A Facilities Study may be required to identify all possibilities of facility upgrades, cost estimates and estimate of construction time. 5.A distribution System Impact Study shall incorporate a distribution load flow study, an analysis of equipment interrupting ratings, protection coordination study, voltage drop and flicker studies, protection and set point coordination studies, grounding reviews, and the impact on electric system operation, as necessary. 6.If the System Impact Study determines Affected Systems may be affected, a separate Transmission System Impact Study may be required. All Affected Systems shall be M-MIP System Impact Study Agreement _ January 2019 2 254 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS afforded an opportunity to review and comment upon a System Impact Study that indicates potential adverse system impacts on their electric systems. 7.If the Area EPS Operator uses a queuing procedure for sorting or prioritizing projects and their associated cost responsibilities for any required Network Upgrades, the System Impact Study shall consider all Distributed Energy Resources (and with respect to Section 7.3 below, any identified Upgrades associated with such higher queued interconnection) that, on the date the System Impact Study is commenced. 7.1.Electric System; or 7.2.Are interconnected with Affected Systems and may have an impact on the proposed interconnection; and 7.3.Have a pending higher queued Interconnection Application to interconnect with Electric System. 8.A deposit of the equivalent of the good faith estimated cost of a System Impact Study shall be required from the Interconnection Customer when the signed Agreement is provided to the Area EPS Operator. 9.include a summary of professional time. An invoice shall be sent to the Interconnection Customer within twenty (20) Business Days after the study is completed and delivered. 10.The Interconnection Customer must pay any study costs that exceed the deposit without interest, within twenty (20) Business Days, on receipt of the invoice or resolution of any dispute. If the deposit exceeds the invoiced fees, the Area EPS M-MIP System Impact Study Agreement _ January 2019 3 255 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Operator shall refund such excess within twenty (20) Business Days of the invoice without interest. 11.Governing Law, Regulatory Authority, and Rules The validity, interpretation and enforcement of this Agreement and each of its provisions, shall be governed by the laws of the State of Minnesota. This Agreement is subject to all Applicable Laws and Regulations. Each Party expressly reserves the right to seek changes in, appeal, or otherwise contest any laws, orders, or regulations of a Governmental Authority. 12.Amendment The Parties may amend this Agreement by a written instrument duly executed by both Parties. 13.No Third-Party Beneficiaries This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and where permitted, their assigns. 14.Waiver 14.1.The failure of a Party to this Agreement to insist, on any occasion, upon strict performance of any provision of this Agreement, will not be considered a waiver of any obligation, right, or duty of, or imposed upon, such Party. 14.2.Any waiver at any time by either Party of its rights with respect to this Agreement shall not be deemed a continuing waiver or a waiver with respect to any other failure to comply with any other obligation, right, duty of this Agreement. Termination or default of this Agreement for any reason by the M-MIP System Impact Study Agreement _ January 2019 4 256 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Interconnection Customer, shall not constitute a waiver of the Interconnection ction from the Area EPS Operator. Any waiver of this Agreement shall, if requested, be provided in writing. 15.Multiple Counterparts This Agreement may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument. 16.No Partnership This Agreement shall not be interpreted or construed to create an association, joint venture, agency relationship, or partnership between the Parties, or to impose any partnership obligation or partnership liability upon either Party. Neither Party shall have any right, power or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, the other Party. 17.Severability If any provision or portion of this Agreement shall for any reason be held or adjudged to be invalid or illegal or unenforceable by any court of competent jurisdiction or other Governmental Authority, (1) such portion or provision shall be deemed separate and independent, (2) the Parties shall negotiate in good faith to restore, insofar as practicable, the benefits to each Party that were affected by such ruling, and (3) the remainder of this Agreement shall remain in full force and effect. 18.Subcontractors 18.1.Nothing in this Agreement shall prevent a Party from utilizing the services of any subcontractor as it deems appropriate to perform its obligations under this Agreement; provided, however, that each Party shall require its subcontractors to comply with all applicable terms and conditions of this Agreement, in M-MIP System Impact Study Agreement _ January 2019 5 257 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS providing such services and each Party shall remain primarily liable to the other Party for the performance of such subcontractor. 18.2.The creation of any subcontract relationship shall not relieve the hiring Party of any of its obligations under this Agreement. The hiring Party shall be fully responsible to the other Party for the acts or omissions of any subcontractor the hiring Party hires, as if no subcontract had been made; provided, however, that in no event shall the Area EPS Operator be liable for the actions or inactions of the Interconnection Customer or thier subcontractors with respect to obligations of the Interconnection Customer under this Agreement. Any applicable obligation imposed by this Agreement, upon the hiring Party, shall be equally binding upon, and shall be construed as having application to, any subcontractor of such Party. 18.3.The obligations under this article will not be limited in any way by any limitation 19.Inclusion of Area EPS Operator Tariffs and Rules The interconnection services provided under this Agreement, shall at all times, be subject to the terms and conditions set forth in the tariff schedules and rules applicable to the electric service provided by the Area EPS Operator, which tariff schedules and rules are hereby incorporated into this Agreement by this reference. Notwithstanding any other provisions of this Agreement, the Area EPS Operator shall have the right to unilaterally change rates, charges, classification, service, tariff, or rule or any agreement relating thereto. The Interconnection Customer shall have the right to protest any such change through the Area EPS Opera, pursuant to the Area EPS Opes rules and regulations. M-MIP System Impact Study Agreement _ January 2019 6 258 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS IN WITNESS THEREOF, the Parties have caused this Agreement to be duly executed by their duly authorized officers or agents on the day and year first above written. \[Insert Name of Area EPS Operator\] \[Insert Name of Interconnection Customer\] (Signature) (Signature) (Title) (Title) M-MIP System Impact Study Agreement _ January 2019 7 259 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Attachment A Assumptions Used in Conducting the System Impact Study The System Impact Study shall be based upon the following assumptions: 1) Designation of Point of Common Coupling and configuration to be studied. 2) Designation of alternative Points of DER Interconnection and configuration. 1) and 2) are to be completed by the Interconnection Customer. Other assumptions (attached to this Agreement) are to be provided by the Interconnection Customer and the Area EPS Operator. The Area EPS Operator shall use the Reference Point for Applicability which is either the Point of Common Coupling or the Point(s) of DER Interconnection as described in IEEE 1547. Additional DER Technical Data Required for System Impact Study If applicable, the Area EPS Operator shall provide a list of any additional technical data that is required to adequately perform the System Impact Study. This list of required technical data shall be attached to this Agreement. As indicated in Section 4 of the Study Process document of the M-MIP, this information is to be returned with the signed System Impact Study Agreement and deposit. Data to Be Provided by the Area EPS Operator with the System Impact Study Agreement Estimate Cost of System Impact Study $ Time duration to complete System Impact Study Business Days M-MIP System Impact Study Agreement _ January 2019 8 260 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ABSTRACT Agreement outlining the scope, timeline and facility changes to the distribution system Buffalo, MN INTERCONNECTION PROCESS Facility Study Agreement 261 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Facilities Study Agreement THIS AGREEMENT is made and entered into this _____day of______________ 20___ by and between_____________________________________________________, a municipal utility Cust RECITALS WHEREAS, the Interconnection Customer is proposing to develop a Distributed Energy Resource (DER) or generating capacity addition to an existing DER consistent with the Interconnection Application completed by the Interconnection Customer on________________________(date); and WHEREAS, the Interconnection Customer desires to interconnect the DER with the Area EPS Electric System; WHEREAS, the Area EPS Operator has completed Initial Review, Supplemental Review, and/or a System Impact Study, and provided the results of said review to the Interconnection Customer, or determined none was required; and WHEREAS, the Interconnection Customer has requested the Area EPS Operator to perform a Facilities Study(s) to specify, and estimate the cost of, the equipment, engineering, procurement and construction work, needed to implement the conclusions of the above noted review in accordance with Good Utility Practice, to physically and electrically connect the DER NOW, THEREFORE, in consideration of, and subject to, the mutual covenants contained herein the Parties agreed as follows: M-MIP Facility Study Agreement _January 2019 1 262 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 1.When used in this Agreement, with initial capitalization, the terms specified shall have the meanings indicated, or the meanings specified, in the Municipal Minnesota Distributed Energy Resources Interconnection Process (M-MIP). 2.The Interconnection Customer elects and the Area EPS Operator shall cause a Facilities Study consistent with the standard M-MIP to be performed. The scope of the Facilities Study shall be subject to data provided in Section 17 to this Agreement. 3.The Facilities Study shall specify and estimate the cost of the equipment, engineering, procurement and construction work (including overheads), needed to implement the conclusions of the System Impact Study(s). The Facilities Study shall also identify: 1) the electrical switching configuration of the equipment, including, without limitation, transformer, switchgear, meters, and other station equipment, 2) the nature and estimated , necessary to accomplish the interconnection, and 3) an estimate of the time required to complete the construction and installation of such facilities. 4.The Area EPS Operator may propose to group facilities required for more than one Interconnection Customer in order to minimize facilities costs through economies of scale. Any Interconnection Customer may require the installation of facilities required for its own Distributed Energy Resource, if they are willing to pay the costs of those facilities. 5.A deposit of the equivalent of the good faith estimated cost of a distribution Facility Study shall be required from the Interconnection Customer when the signed Agreement is provided to the Area EPS Operator. 6.Ainclude a summary of professional time. An invoice shall be sent to the Interconnection Customer within twenty (20) Business Days after the study is completed and delivered. M-MIP Facility Study Agreement _January 2019 2 263 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 7.The Interconnection Customer must pay any study costs that exceed the deposit without interest, within twenty (20) Business Days, on receipt of the invoice or resolution of any dispute. If the deposit exceeds the invoiced fees, the Area EPS Operator shall refund such excess within twenty (20) Business Days of the invoice without interest. 8.Governing Law, Regulatory Authority, and Rules The validity, interpretation and enforcement of this Agreement and each of its provisions, shall be governed by the laws of the State of Minnesota. This Agreement is subject to all Applicable Laws and Regulations. Each Party expressly reserves the right to seek changes in, appeal, or otherwise contest any laws, orders, or regulations of a Governmental Authority. 9.Amendment The Parties may amend this Agreement by a written instrument duly executed by both Parties. 10.No Third-Party Beneficiaries This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and where permitted, their assigns. 11.Waiver 11.1.The failure of a Party to this Agreement to insist, on any occasion, upon strict performance of any provision of this Agreement, will not be considered a waiver of any obligation, right, or duty of, or imposed upon, such Party. 11.2.Any waiver at any time by either Party of its rights with respect to this Agreement shall not be deemed a continuing waiver or a waiver with respect to any other failure M-MIP Facility Study Agreement _January 2019 3 264 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS to comply with any other obligation, right, duty of this Agreement. Termination or default of this Agreement for any reason by the Interconnection Customer, shall not interconnection from the Area EPS Operator. Any waiver of this Agreement shall, if requested, be provided in writing. 12.Multiple Counterparts This Agreement may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument. 13.No Partnership This Agreement shall not be interpreted or construed to create an association, joint venture, agency relationship, or partnership between the Parties, or to impose any partnership obligation or partnership liability upon either Party. Neither Party shall have any right, power or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, the other Party. 14.Severability If any provision or portion of this Agreement shall for any reason be held or adjudged to be invalid or illegal or unenforceable by any court of competent jurisdiction or other Governmental Authority, (1) such portion or provision shall be deemed separate and independent, (2) the Parties shall negotiate in good faith to restore, insofar as practicable, the benefits to each Party that were affected by such ruling, and (3) the remainder of this Agreement shall remain in full force and effect. 15.Subcontractors 15.1.Nothing in this Agreement shall prevent a Party from utilizing the services of any subcontractor as it deems appropriate to perform its obligations under this Agreement; provided, however, that each Party shall require its subcontractors to M-MIP Facility Study Agreement _January 2019 4 265 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS comply with all applicable terms and conditions of this Agreement, in providing such services and each Party shall remain primarily liable to the other Party for the performance of such subcontractor. 15.2.The creation of any subcontract relationship shall not relieve the hiring Party of any of its obligations under this Agreement. The hiring Party shall be fully responsible to the other Party for the acts or omissions of any subcontractor the hiring Party hires, as if no subcontract had been made; provided, however, that in no event shall the Area EPS Operator be liable for the actions or inactions of the Interconnection Customer or their subcontractors with respect to obligations of the Interconnection Customer under this Agreement. Any applicable obligation imposed by this Agreement, upon the hiring Party, shall be equally binding upon, and shall be construed as having application to, any subcontractor of such Party. 15.3.The obligations under this article will not be limited in any way by any limitation of 16.Inclusion of Area EPS Operator Tariffs and Rules The interconnection services provided under this Agreement, shall at all times, be subject to the terms and conditions set forth in the tariff schedules and rules applicable to the electric service provided by the Area EPS Operator, which tariff schedules and rules are hereby incorporated into this Agreement by this reference. Notwithstanding any other provisions of this Agreement, the Area EPS Operator shall have the right to unilaterally change rates, charges, classification, service, tariff, or rule or any agreement relating thereto. The Interconnection Customer shall have the right to protest any such change through the Area , pursuant to the s rules and regulations. 17.Data to be Provide by Interconnection Customer with Facilities Agreement M-MIP Facility Study Agreement _January 2019 5 266 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 17.1.The Interconnection Customer shall be available to meet on site with the Area EPS Operator within five (5) Business Days of signing the Facilities Study Agreement. The personnel furnished by the Interconnection Customer for this site visit shall bring detailed information on the site layout. The Area EPS Operator may request the Interconnection Customer physically places stakes at the locations of major components. 17.2.The Interconnection Customer shall furnish a final site plan detailing the location of major equipment at the time this agreement is returned. The Point of Common Coupling (PCC) and Point of Distributed Resource Connection (PoC) shall be clearly marked. The site plan shall depict any nearby roads and be labeled with the road name. Accurate dimensions shall be included on the site plan. The proper emergency (911) address, corresponding to the site, shall be labeled on the site plan. 17.3.The Interconnection Customer shall furnish a final one-line diagram detailing the electrical connections between major components. The one-line shall be returned with the signed Facilities Study Agreement. 17.4.Technical cut sheets on all equipment related to metering shall be provided by the Interconnection Customer along with the signed Facilities Study Agreement. 17.5.If available, copies of the Conditional Use Permits(s) from all necessary authorities shall be returned by the Interconnection Customer with the signed Facilities Study Agreement. 17.6.The Interconnection Customer shall secure any necessary easements from private land owners prior to signing the Facilities Study Agreement. Documentation of any such agreements shall be provided to the Area EPS Operator. M-MIP Facility Study Agreement _January 2019 6 267 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 17.7.In the event that the Area EPS Operator determines a site survey is necessary in order to complete a Facilities Study, the Interconnection Customer shall make good faith efforts to complete the survey in a timely manner. 17.8.The Facilities Study assumes all land use permits required for the interconnection will be approved by the proper authorities. Permits are submitted after Interconnection Agreement is signed and may impact project costs (i.e. overhead to underground requirements.) 17.9.The Interconnection Customer and Area EPS Operator shall provide a single point of contact for design and construction related matters. The Interconnection Customer questions during the Facilities Study. 17.10.In the event that an Interconnection Customer does not provide the necessary information described in this Agreement, or if the Interconnection Customer takes more than five (5) Business Days to respond to a question during the Facilities Study, the Facilities Study timeframe shall pause until the question is resolved. M-MIP Facility Study Agreement _January 2019 7 268 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS IN WITNESS THEREOF, the Parties have caused this Agreement to be duly executed by their duly authorized officers or agents on the day and year first above written. \[Insert Name of Area EPS Operator\] \[Insert Name of Interconnection Customer\] (Signature) (Signature) (Title) (Title) Data to Be Provided by the Area EPS Operator with the Facilities Study Agreement Estimate Cost of Facility Study $ Time duration to complete Facility Study Business Days M-MIP Facility Study Agreement _January 2019 8 269 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ABSTRACT Agreement outlining the scope, timeline and system impact to the transmission system Minnesota Municipal Power Agency Oak Glen Wind Turbine Blooming Prairie, MN INTERCONNECTION PROCESS Transmission System Study Impact Agreement 270 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Transmission System Impact Study Agreement THIS AGREEMENT is made and entered into this _____day of______________ 20___ by and between_____________________________________________________, municipal utility , and ______________________________, a transmission system owner existing under the laws of the State of Minnesota. Interconnection Customer, Area EPS Operator and Transmission Provider RECITALS WHEREAS, the Interconnection Customer is proposing to develop a Distributed Energy Resource or generating capacity addition to an existing DER, (in either case referred to herein the Interconnection Application completed by the Interconnection Customer and submitted to the Area EPS Operator on________________________; and WHEREAS, the Interconnection Customer has requested the Area EPS Operator to work with the Transmission Provider to perform a Transmission System Impact Study to assess the impact of interconnecting the DER with the Electric System, and to determine if there are potential Affected System(s) system; NOW, THEREFORE, in consideration of, and subject to, the mutual covenants contained herein the Parties agreed as follows: M-MIP Transmission System Impact Study Agreement - February 2019 1 271 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 1.When used in this Agreement, with initial capitalization, the terms specified shall have the meanings indicated, or the meanings specified, in the Municipal Minnesota Distributed Energy Resources Interconnection Process (M-MIP). 2.The Interconnection Customer requests and the Area EPS Operator and its Transmission Provider agrees to perform a Transmission System Impact Study consistent with the M- MIP. The Interconnection Customer understands and acknowledges that each of the Area EPS Operator and the Transmission Provider may perform separate system impact studies. The scope of a Transmission System Impact Study shall be subject to the assumptions set forth in this Agreement; including Attachment A. 3.A Transmission System Impact Study will be based upon the technical information provided by Interconnection Customer in the Interconnection Application. Each of the Area EPS Operator and Transmission Provider reserve the right to request additional technical information from the Interconnection Customer as may reasonably become necessary consistent with Good Utility Practice during the course of the System Impact Study. Neither the Area EPS Operator nor the Transmission Provider will be obligated to commence the Transmission System Impact Study until each has received adequate technical information from the Interconnection Customer. 4.In the event that the applicable bulk transmission system generation interconnection process, (such as the Midcontinent Independent System Operator or MISO, or Southwest Power Pool or SPP), supersedes the M-MIP, the Transmission Provider will so notify the Interconnection Customer and this Agreement will be deemed terminated. 5.A Transmission System Impact Study may, as determined by the Area EPS Operator and/or the Transmission Provider, consist of a short circuit analysis, a stability analysis, a power flow analysis, voltage analysis and flicker studies, protection and set point coordination studies, and grounding reviews. A Transmission System Impact Study shall M-MIP Transmission System Impact Study Agreement - February 2019 2 272 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS state the assumptions upon which it is based, indicate the applicable Local Planning Criteria used, state the results of the analyses, and provide the requirement or potential impediments to providing the requested interconnection service, including a preliminary indication of the cost and length of time that would be necessary to correct any problems identified in those analyses and provide for the interconnection. A Transmission System Impact Study shall provide a list of transmission facilities that are required as a result of the Interconnection Application and non-binding good faith estimates of cost responsibility and time to construct such transmission facilities. A Facilities Study may be required to identify all possibilities of facility upgrades, cost estimates and estimate of construction time. 6.If the Transmission Provider determines there are any potential Affected System(s), the Affected System(s) will be asked to participate in or review/comment on the Transmission System Impact Study. The Affected System(s) will be entitled to determine in their sole discretion the extent of their participation or review/comment, and will be entitled to apply their respective Local Planning Criteria. The Transmission Provider will participation in or review/comment on the Transmission System Impact Study. 7.The Transmission System Impact Study will be scheduled for completion taking in consideration for prior-queued projects in the applicable bulk transmission generation interconnection queue . The Transmission Provider and/or the Area EPS Operator shall notify the Interconnection Customer if such condition exists. 8.The Area EPS Operator and/or the Transmission Provider shall provide an estimate of the cost of the Transmission System Impact Study to the Interconnection Customer. At the time that the Interconnection Customer executes this Agreement, the Interconnection Customer shall provide a deposit of the estimated cost(s) of the M-MIP Transmission System Impact Study Agreement - February 2019 3 273 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Transmission System Impact Study to the Area EPS Operator and/or Transmission Provider, as applicable. 9.The Interconnection Customer shall be responsible for the actual costs incurred by the Area EPS Operator and/or the Transmission Provider to perform the Transmission System Impact Study. An invoice documenting the actual costs shall be sent by the Area EPS Operator and/or Transmission Provider to the Interconnection Customer within twenty (20) Business Days after the study is completed and delivered. 10.The Interconnection Customer shall pay the invoice amount less the deposit amount, within twenty (20) Business Days, on receipt of the invoice. If the deposit exceeds the actual cost of the study, the Transmission Provider shall refund such excess amount within twenty (20) Business Days of the date of the invoice. 11.Governing Law, Regulatory Authority, and Rules The validity, interpretation and enforcement of this Agreement and each of its provisions, shall be governed by the laws of the State of Minnesota. This Agreement is subject to all Applicable Laws and Regulations. Each Party expressly reserves the right to seek changes in, appeal, or otherwise contest any laws, orders, or regulations of a Governmental Authority. 12.Amendment The Parties may amend this Agreement by a written instrument duly executed by both Parties. 13.No Third-Party Beneficiaries This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities M-MIP Transmission System Impact Study Agreement - February 2019 4 274 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and where permitted, their assigns. 14.Waiver 14.1.The failure of a Party to this Agreement to insist, on any occasion, upon strict performance of any provision of this Agreement, will not be considered a waiver of any obligation, right, or duty of, or imposed upon, such Party. 14.2.Any waiver at any time by either Party of its rights with respect to this Agreement shall not be deemed a continuing waiver or a waiver with respect to any other failure to comply with any other obligation, right, duty of this Agreement. Termination or default of this Agreement for any reason by the Interconnection Customer, shall not constitute a waiver of the Interconnection Any waiver of this Agreement shall, if requested, be provided in writing. 15.Multiple Counterparts This Agreement may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument. 16.No Partnership This Agreement shall not be interpreted or construed to create an association, joint venture, agency relationship, or partnership between the Parties, or to impose any partnership obligation or partnership liability upon a Party. No Party shall have any right, power or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, any other Party. 17.Severability If any provision or portion of this Agreement shall for any reason be held or adjudged to be invalid or illegal or unenforceable by any court of competent jurisdiction or other M-MIP Transmission System Impact Study Agreement - February 2019 5 275 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Governmental Authority, (1) such portion or provision shall be deemed separate and independent, (2) the Parties shall negotiate in good faith to restore, insofar as practicable, the benefits to each Party that were affected by such ruling, and (3) the remainder of this Agreement shall remain in full force and effect. 18.Subcontractors 18.1.Nothing in this Agreement shall prevent a Party from utilizing the services of any subcontractor as it deems appropriate to perform its obligations under this Agreement; provided, however, that each Party shall require its subcontractors to comply with all applicable terms and conditions of this Agreement, in providing such services and each Party shall remain primarily liable to the other Party for the performance of such subcontractor. 18.2.The creation of any subcontract relationship shall not relieve the hiring Party of any of its obligations under this Agreement. The hiring Party shall be fully responsible to the other Parties for the acts or omissions of any subcontractor the hiring Party hires, as if no subcontract had been made; provided, however, that in no event shall the Area EPS Operator or the Transmission Provider be liable for the actions or inactions of the Interconnection Customer or its subcontractors with respect to obligations of the Interconnection Customer under this Agreement. Any applicable obligation imposed by this Agreement, upon the hiring Party, shall be equally binding upon, and shall be construed as having application to, any subcontractor of such Party. 18.3.The obligations under this article will not be limited in any way by any limitation M-MIP Transmission System Impact Study Agreement - February 2019 6 276 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 19.Inclusion of Area EPS Operator Tariffs and Rules The interconnection services provided under this Agreement, shall at all times, be subject to the terms and conditions set forth in the tariff schedules and rules applicable to the electric service provided by the Area EPS Operator, which tariff schedules and rules are hereby incorporated into this Agreement by this reference. Notwithstanding any other provisions of this Agreement, the Area EPS Operator shall have the right to unilaterally change rates, charges, classification, service, tariff, or rule or any agreement relating thereto. The Interconnection Customer shall have the right to protest any such , pursuant to the Area EPS Opes rules and regulations. IN WITNESS THEREOF, the Parties have caused this Agreement to be duly executed by their duly authorized officers or agents on the day and year first above written. \[Insert Name of Area EPS Operator\] \[Insert Name of Interconnection Customer\] (Signature) (Signature) (Title) (Title) \[Insert Name of Transmission Provider\] (Signature) (Title) M-MIP Transmission System Impact Study Agreement - February 2019 7 277 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Attachment A Assumptions Used in Conducting the Transmission System Impact Study The Transmission System Impact Study shall be based upon the following assumptions: 1) Designation of Point of Common Coupling and configuration to be studied. 2) Designation of alternative Points of DER Interconnection and configuration. 1) and 2) are to be completed by the Interconnection Customer. Other assumptions (listed below) are to be provided by the Interconnection Customer, the Area EPS Operator and the Transmission Provider. The Area EPS Operator and Transmission Provider shall use the Reference Point for Applicability which is either the Point of Common Coupling or the Point(s) of DER Interconnection as described in IEEE 1547. Additional DER Technical Data Required for Transmission System Impact Study If applicable, the Transmission Provider shall attach a list to this Agreement any additional technical data that is required to adequately perform the Transmission System Impact Study. As indicated in Section 4 of the Study Process document of the M-MIP, this information is to be returned with the signed Transmission System Impact Study Agreement and deposit. Data to Be Provided by the Area EPS Operator and Transmission Provider with the Transmission System Impact Study Agreement Estimate Cost of Transmission System Impact Study $ Time duration to complete Transmission System Impact Study Business Days M-MIP Transmission System Impact Study Agreement - February 2019 8 278 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ABSTRACT Interconnection agreement for net energy billing DER systems or DER systems up to 100 kW that are compensated at avoided cost. Minnesota Municipal Power Agency 5 kW Hometown Solar Shakopee, MN UNIFORM CONTRACT 279 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS UNIFORM CONTRACTFOR COGENERATION AND SMALL POWER PRODUCTION FACILITIES THIS CONTRACT is entered into ___________________, ___, by _______________ _____________________, a municipal utility under Minnesota law,(hereafter called "Utility") and ________________________________________(hereafter called "QF"). RECITALS The QF has installed electric generating facilities, consisting of ___________________ _____________________________(Description of facilities), rated at ____kilowattsAC of electricity, on property located at_________________________________________ _____________________________________________________________________. The QF is a customer of the Utility located within the assigned electric service territory of the Utility. The QF is prepared to generate electricity in parallel with the Utility. The QF's electric generating facilities meet the requirements of the rulesadopted by the Utilityon Cogeneration and Small Power Production and any technical standards for interconnection the Utilityhas established that are authorized by those rules. The Utilityis obligated under federal and Minnesota law to interconnect with the QF and to purchase electricity offered for sale by the QF. A contract between the QF and theUtilityis required. AGREEMENTS The QF and the Utilityagree: 1.The Utilitywill sell electricity to the QF under the rate schedule in force for the class of customer to which the QF belongs. 2.The Utilitywill buy electricity from the QF under thecurrent rate schedule filed with the city council or city-appointed governing body of the utility.The QF elects the rate schedule category hereinafter indicated: ____ a. Average retail utilityenergy rate. QF capacity must be less than 40 kW. 1 280 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ____ b. Simultaneouspurchase and sale billing rate. QF capacity must be less than 40 kW. ____ c. Roll-over credits. QF capacity must be less than 40 kW. ____ d. Time-of-day purchase rates. QF capacity must be 40 kW or more and less than or equal to 100 kW. A copy of the presently approved rate schedule is attached to this contract. 3.The rates for sales and purchases of electricity may change over the time this contract is in force, due to actions of the Utility or the State of Minnesota, and the QF and the Utilityagree that sales and purchases will be made under the rates in effect each month during the time this contract is in force. 4.The Utilitywill compute the charges and payments for purchases and sales for each billing period. Any net credit to the QF, other than kilowatt-hour credits under clause 2(c), will be made under one of the following options as chosen by the QF. ____ a. Credit to the QF's account with the Utility. ____ b. Paid by check or electronic payment service to the QF within fifteen (15) days of the billing date. 5.Renewable energy credits associated with generation from the facility are owned by: ________________________________________________________________. 6.The QF must operate its electric generating facilities within any rules, regulations, and policies adopted by the Utility not prohibited by the rules governing Cogeneration and Small Power Production reasonable technical connection and operating specifications for the QF and are and Small Power Production, as required under MinnesotaStatutes §216B.164, subdivision 9. 7.The QF will not enter into an arrangement whereby electricity from the generating provide electric service in its service area under Minnesota Statutes, §216B.37-44. 8.The QF will operate its electric generating facilities so that they conform to the national, state, and local electric and safety codes, and will be responsible for the costs of conformance. 2 281 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 9.The QF is responsible for the actual, reasonable costs of interconnection which are estimated to be $___________. The QF will pay the Utilityin this way: __________________________________________________________________ _________________________________________________________________. 10.The QF will give the Utilityreasonable access to its property and electricgenerating facilities if the configuration of those facilities does not permit disconnection or testing from the Utility 's side of the interconnection. If the Utilityenters the QF's property, the Utilitywill remain responsible for its personnel. 11.The Utilitymay stop providing electricity to the QF during a system emergency. The Utilitywill not discriminate against the QF when it stops providing electricity or when it resumes providing electricity. 12.The Utilitymay stop purchasing electricity from the QF when necessary for the Utilityto construct, install, maintain, repair, replace, remove, investigate, or inspect any equipment or facilities within its electric system. The Utilitymay stop purchasing electricity from the QF in the event the generating facilities listed in this contract are documented to be causing power quality, safety or reliability issues to the Utility The Utilitywill notify the QF before it stops purchasing electricity in this way: __________________________________________________________________ _________________________________________________________________. 13.The QF will keep in force general liability insuranceagainst personal or property damage due to the installation, interconnection, and operation of its electric generating facilities. The amount of insurance coverage will be $ ____________. (The amount must be consistent with the distributed generation tariffadopted by the Utility pursuant to Minnesota Statutes §216B.1611, subdivision 3, clause 2.) 14.The QF and the Utilityagree to attempt to resolve all disputes arising hereunder promptlyand in a good faith manner. 15.The city council or city-appointed body governing the Utility has authority to consider and determine disputes, if any, that arise under this contract in accordance with procedures in the rules it adopts implementing Minnesota Statute §216B.164,pursuant to §216B.164, subdivision 9. 16.This contract becomes effective as soon as it is signed by the QF and the Utility. This contract will remain in force until either the QF or the Utilitygives written notice to the other that the contract is canceled.This contract will be canceled thirty (30) days after notice is given.I f the listed electric generating facilities are not 3 282 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS interconnected to the s distribution system within twelve months of the contract being signed by the QF and the Utility,the contract terminates. The QF and the Utilitymay delay termination by mutual agreement. 17.Neither the QF nor the Utility will be considered in default as to any obligation if the QF or the Utility is prevented from fulfilling the obligation due to an act of God, labor disturbance, act of public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, an order, regulation or restriction imposed by governmental, military or lawfully established civilian Utility. However, the QF or Utility whose performance under this contract is hindered by such an event shall make all reasonable efforts to perform its obligations. 18.This contract can only be amended or modified by mutual agreement in writing signed by the QF and the Utility. 19.The QF must notify the Utilityprior to any change in the electric generating according to the interconnection processadopted by the Utility. 20.Termination of this contract is allowed (i) by the QF at any time without restriction; (ii) by Mutual Agreement between the Utilityand the QF; (iii) upon abandonment or removal of electric generating facilities by the QF; (iv) bythe Utility if the electric generating facilities are continuously non-operational for any twelve (12) consecutive month period; (v) by the Utilityif the QF fails to comply with applicable interconnection design requirements or fails to remedy a violation of the interconnection process; or (vi) by the Utility upon breach of this contract by the QF unless cured with notice of cure received by the Utility prior to termination. 21.In the event this contract is terminated, the Utility shall have the rights to disconnect its facilities or direct the QF to disconnect its generating facilities. 22.This contract shall continue in effect after termination to the extent necessary to allow either the Utility or the QF to fulfill rights or obligations that arose under the contract. 23.Transfer of ownership of the generating facilities shall require the new owners and the Utility to execute a new contract. Upon the execution of a new contract with the new owners this contract shall be terminated. 24.The QF and the Utilityshall at all times indemnify, defend, and save each other harmless from any and all damages, losses, claims, including claims and actions relating to injury or death of any person or damage to property, costs and court costs, arising out of or resulting Utilitycontract, 4 283 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS except to the extent that such damages, losses or claims were caused by the negligence or intentional acts of the QF or the Utility. 25.The Utilityand the QF will each be responsible for its own acts or omissions and the results thereof to the extent authorized by law and shall not be responsible for the acts or omissions of any others and the results thereof. 26.Utility under this contract shall be limited to the amount of direct damage actually occurred. In no event, shall the QF or the Utilitybe liable to each other for any punitive, incidental, indirect, special, or consequential damages of any kind whatsoever, including for loss of business opportunity or profits, regardless of whether such damages were foreseen. 27.TheUtility does not give any warranty, expressed or implied, to the adequacy, safety, or 28.This contract contains all the agreements made between the QF and the Utility. The QF and Utility are not responsible other than those stated in this contract. THE QF AND THE UTILITYHAVE READ THISCONTRACT AND AGREE TO BE BOUND BY ITS TERMS. AS EVIDENCE OF THEIR AGREEMENT, THEY HAVE EACH SIGNED THIS CONTRACT BELOW ON THE DATE LISTED BY SIGNER. QF By:________________________________ PrintedName:_______________________ DATE: _____________________________ UTILITY By: ________________________________ PrintedName:_______________________ DATE: _____________________________ Contract Version:February2019 5 284 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS ABSTRACT For use in lieu of Buffalo, MN INTERCONNECTION AGREEMENT 285 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Contents i. Contact Information .......................................................................................................................... 1 1 Scope and Limitations of Agreement ................................................................................... 2 2 Responsibilities of the Parties .............................................................................................. 3 3 Parallel Operation Obligations ............................................................................................. 4 4 Metering ............................................................................................................................... 4 5 Distributed Energy Resource Capabilities and Grid Reliability ............................................ 4 6 Equipment Testing and Inspection ....................................................................................... 5 7 Authorization Required Prior to Parallel Operation ............................................................. 5 8 Right of Access ...................................................................................................................... 5 9 Effective Date ....................................................................................................................... 6 10 Term of Agreement .............................................................................................................. 6 11 Termination .......................................................................................................................... 6 12 Temporary Disconnection .................................................................................................... 6 13 Cost Responsibility for Interconnection Facilities and Distribution Upgrades .................... 8 14 Cost Responsibility for Network Upgrades .......................................................................... 9 15 Billing, Payment, Milestones, and Financial Security ......................................................... 11 16 Assignment, Force Majeure, Consequential Damages, and Default.................................. 12 17 Limitations of Liability ........................................................................................................ 12 18 Non-Warranty ..................................................................................................................... 13 19 Indemnity ........................................................................................................................... 13 20 Consequential Damages ..................................................................................................... 14 21 Force Majeure .................................................................................................................... 14 22 Default ................................................................................................................................ 15 23 Insurance ............................................................................................................................ 15 24 Confidentiality .................................................................................................................... 16 25 Disputes .............................................................................................................................. 17 26 Taxes ................................................................................................................................... 17 27 Miscellaneous ..................................................................................................................... 17 28 Notices ................................................................................................................................ 20 i 286 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 29 Signatures ........................................................................................................................... 24 Attachment I: Glossary of Terms ............................................................................................... 25 Attachment II: Description and Costs of the Distributed Energy Resource, Interconnection Facilities, and Metering Equipment........................................................................................... 31 Attachment III: One-line Diagram Depicting the Distributed Energy Resource, Interconnection Facilities, and Metering Equipment, and Upgrades .................................................................. 32 Attachment IV: Milestones ........................................................................................................ 33 Attachment V: Additional Operating and Maintenance Requirements for the Area EPS ...................................................................................................................... 35 Good Faith Estimates of Upgrade Costs .................................................................................... 36 Attachment VII: Assignment of Interconnection Agreement ................................................... 37 ii 287 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS i.Contact Information Contact information for each Party is listed below along with the basic information describing the Distributed Energy Resource (DER) system. Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: DER System Information Application Number: Type of DER System: Capacity Rating of System (AC): Limited Capacity Rating (AC): Address of DER System: Municipal Minnesota Interconnection Agreement _ January 2019 1 288 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS THIS AGREEMENT is made and entered into this _____day of______________ 20___ by and municipal utility existing u In consideration of the mutual covenants set forth herein, the Parties agree as follows: 1Scope and Limitations of Agreement 1.1.This Agreement is intended to provide for the Interconnection Customer to interconnect at the Point of Common Coupling and operate a Distributed Energy Resource with a Nameplate Rating of 10 Megawatts (MW) or less in parallel with the Area EPS at the location identified above and in the Interconnection Application. 1.2.This Agreement shall be used for all Interconnection Applications submitted under the Municipal Minnesota Distributed Energy Resources Interconnection Process (M- MIP) except for those Interconnection Applications that qualify and choose for the Uniform Contract to replace the need for this Agreement. 1.3.This Agreement governs the terms and conditions under which the Interconnection stributed Energy Resource will interconnect with, and operate in 1.4.Capitalized terms used herein shall have the meanings specified in the Glossary of Terms in Attachment 1, the M-MIP, or the body of this Agreement. 1.5.This Agreement does not constitute an agreement to purchase or deliver the services that the Interconnection Customer may require will be covered under separate agreements, if any. The Interconnection Customer will be responsible for separately making all necessary arrangements (including scheduling) for delivery of electricity with the applicable Area EPS Operator. 1.6.Nothing in this Agreement is intended to affect any other agreement between the Area EPS Operator and the Interconnection Customer. Municipal Minnesota Interconnection Agreement _ January 2019 2 289 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 2Responsibilities of the Parties 2.1.The Parties shall perform all obligations of this Agreement in accordance with the M- MIP, Minnesota Technical Requirements, all Applicable Laws and Regulations, Operating Requirements, and Good Utility Practice. 2.2.The Interconnection Customer shall construct, interconnect, operate and maintain its Distributed Energy Resource and construct, operate, and maintain its Interconnection F recommended maintenance schedule and, in accordance with this Agreement, and with Good Utility Practice. 2.3.The Area EPS Operator shall construct, operate, and maintain its Distribution System and its Interconnection Facilities in accordance with this Agreement, and with Good Utility Practice. 2.4.The Interconnection Customer agrees to construct its facilities or systems in accordance with the Minnesota Technical Requirements and this Agreement; including, applicable specifications that meet or exceed those provided by the National Electrical Safety Code, the American National Standards Institute, Institute of Electrical and Electronics Engineers (IEEE) (UL), and Operating Requirements in effect at the time of construction and other applicable national and state codes and standards. The Interconnection Customer agrees to design, install, maintain, and operate its Distributed Energy Resource so as to reasonably minimize the likelihood of a disturbance adversely affecting or impairing the system or equipment of the Area EPS Operator and any Affected Systems. 2.5.Each Party shall operate, maintain, repair, and inspect, and shall be fully responsible for the facilities that it now owns or subsequently owns unless otherwise specified in the Attachments to this Agreement. Each Party shall be responsible for the safe installation, maintenance, repair and condition of their respective lines and appurtenances on their respective sides of the point of common coupling. The Area EPS Operator and the Interconnection Customer, as appropriate, shall provide Distribution System, personnel, and other persons from damage and injury. The allocation of responsibility for the design, installation, operation, maintenance and ownership of Interconnection Facilities shall be delineated in the Attachments to this Agreement. 2.6.The Area EPS Operator shall coordinate with all Affected Systems to support the interconnection. Municipal Minnesota Interconnection Agreement _ January 2019 3 290 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 3Parallel Operation Obligations 3.1.Once the Distributed Energy Resource has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Distributed Energy Resource in the applicable control area, including, but not limited to; 1) the rules and procedures concerning the operation of generation set forth by the applicable system bution System provided or referenced in an attachment to this Agreement and; 2) the Operating Requirements set forth in Attachment 5 of this Agreement. The Minnesota Technical Requirements for interconnection are covered in a separate document, a copy of which has been made available to the Interconnection Customer and incorporated and made part of this Agreement by this reference. 4Metering 4.1.As described in M-MIP Overview Process Section 9.1, the Interconnection Customer shall be responsible for the Area EP the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements. 5Distributed Energy Resource Capabilities and Grid Reliability 5.1.The Minnesota Technical Requirements outlines the Parties responsibilities consistent with IEEE 1547 Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces which provides requirements relevant to the interconnection and interoperability performance, operation and testing, and, to safety, maintenance and security considerations. 5.2.The Area EPS Operator may offer the Interconnection Customer the option to utilize required DER capabilities to mitigate Interconnection Customer costs related to Upgrades or Interconnection Facilities to address anticipated system impacts from the engineering review (i.e. Initial Review, Supplemental Review, or Study Process described in the M-MIP.) Municipal Minnesota Interconnection Agreement _ January 2019 4 291 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 6Equipment Testing and Inspection 6.1.As described in M-MIP Overview Process Section 9.3, the Interconnection Customer shall test and inspect its Distributed Energy Resource and Interconnection Facilities prior to interconnection pursuant to Minnesota Technical Requirements and this Agreement. 7Authorization Required Prior to Parallel Operation 7.1.As described in M-MIP Overview Process Section 9.5, the Area EPS Operator shall use Reasonable Efforts to list applicable parallel operation requirements by attaching the Minnesota Technical Requirements and/or including them in Attachment 5 to this Agreement. Additionally, the Area EPS Operator shall notify the Interconnection Customer of any changes to these requirements as soon as they are known. Pursuant to the M-MIP Overview Process Section 8.5, the Interconnection Customer shall not operate its Distributed Energy Resource in parallel with the Area EPS Operator. 8Right of Access 8.1.Upon reasonable notice, the Area EPS Operator may send a qualified person to the premises of the Interconnection Customer at or immediately before the time the Distributed Energy Resource first produces energy to inspect the interconnection, and observe the commissioning of the Distributed Energy Resource (including any required testing), startup, and operation for a period of up to three (3) Business Days after initial start-up of the unit. In addition, the Interconnection Customer shall notify the Area EPS Operator at least five (5) Business Days prior to conducting any on-site verification testing of the Distributed Energy Resource. 8.2.Following the initial inspection process described above, at reasonable hours, and upon reasonable notice, or at any time without notice in the event of an emergency or hazardous condition, the Area EPS Operator shall have access to the the performance of the obligations imposed on it by this Agreement or if necessary to meet its legal obligation to provide service to its customers. 8.3.Each Party shall be responsible for its costs associated with the interconnection of the DER system as outlined in M-MIP Overview Process Section 9.3 and the Minnesota Technical Requirements. Municipal Minnesota Interconnection Agreement _ January 2019 5 292 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 9Effective Date 9.1This Agreement shall become effective upon execution by the Parties. 10Term of Agreement 10.1.This Agreement shall become effective on the Effective Date and shall remain in effect from the Effective Date unless terminated earlier in accordance with Section 11 of this Agreement. 11Termination 11.1.No termination shall become effective until the Parties have complied with all Applicable Laws and Regulations applicable to such termination. 11.2.The Interconnection Customer may terminate this Agreement at any time by giving the Area EPS Operator twenty (20) Business Days written notice. 11.3.The Area EPS Operator may terminate this Agreement if the listed electric system within thirty-six (36) months of this Agreement signed by the Parties. The Parties may choose to delay termination by mutual agreement. 11.4.Either Party may terminate this Agreement after Default pursuant to Section 3. 11.5.Upon termination of this Agreement, the Distributed Energy Resource will be effectuate such disconnection shall be borne by the terminating Party, unless such termination resulted from the non-Agreement or such non-terminating Party otherwise is responsible for these costs under this Agreement. 11.6.The termination of this Agreement shall not relieve either Party of its liabilities and obligations, owed or continuing at the time of the termination. 11.7.The provisions of this article shall survive termination or expiration of this Agreement. 12Temporary Disconnection 12.1.Temporary disconnection shall continue only for so long as reasonably necessary under Good Utility Practice. Municipal Minnesota Interconnection Agreement _ January 2019 6 293 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 12.2.Emergency Conditions. Under emergency conditions, the Area EPS Operator may immediately suspend interconnection service and temporarily disconnect the Distributed Energy Resource. The Area EPS Operator shall use Reasonable Efforts to notify the Interconnection Customer promptly when it becomes aware of an Emergency Condition that may reasonably be expected to affect the Interconnection Customer shall use Reasonable Efforts to notify the Area EPS Operator promptly when it becomes aware of an Emergency Condition that may reasonably be expected extent information is known, the notification shall describe the Emergency Condition, the extent of the damage or deficiency, the expected effect on the operation of both corrective action. 12.3.Temporary Interruption. The Area EPS Operator may interrupt interconnection service or curtail the output of the Distributed Energy Resource and temporarily Distribution System when necessary for routine maintenance, construction, or repairs Reasonable Efforts to provide the Interconnection Customer with three (3) Business prior to such interruption. The Area EPS Operator shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer. 12.4.Forced Outage. During any forced outage, the Area EPS Operator may suspend interconnection service to effect immediate repair Distribution System. The Area EPS Operator shall use Reasonable Efforts to provide the Interconnection Customer with prior notice. If prior notice is not given, the Area EPS Operator shall, upon request, provide the Interconnection Customer written documentation after the fact explaining the circumstances of the disconnection. 12.5.Adverse Operating Effects. The Area EPS Operator shall notify the Interconnection Customer as soon as practicable if, based on Good Utility Practice, operation of the Distributed Energy Resource may cause disruption or deterioration of service to other customers served from the same electric system, or if operating the Distributed ystem or Affected Systems. Supporting documentation used to reach the decision to disconnect shall be provided to the Interconnection Customer upon request. If, after notice, the Interconnection Customer fails to remedy the adverse operating effect within a reasonable time, the Area EPS Operator may disconnect the Distributed Energy Resource. The Area EPS Operator shall provide the Interconnection Customer Municipal Minnesota Interconnection Agreement _ January 2019 7 294 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS with five Business Day notice of such disconnection, unless the provisions of Section 12.2 apply. 12.6.Modification of the Distributed Energy Resource. The Interconnection Customer must receive written authorization from the Area EPS Operator before making any change to the Distributed Energy Resource that may have a material impact on the safety or reliability of the Distribution System. Such authorization shall not be unreasonably withheld if the modification is not a Material Modification. Material Modifications, including an increase Nameplate Rating or capacity, may require the Interconnection Customer to submit a new Interconnection Application as described in the M-MIP Overview Process Section 7. If the Interconnection Customer makes such modification without the Area EPS Operator shall have the right to temporarily disconnect the Distributed Energy Resource. 12.7.Reconnection. The Parties shall cooperate with each other to restore the Distributed Energy Resource, Interconnection Facilities, System to their normal operating state as soon as reasonably practicable following a temporary disconnection. 12.8.Treatment Similar to Other Retail Customers. If the Interconnection Customer receives retail electrical service at the same site as the Distributed Energy Resource, it may also be disconnected consistent with the rules and practices for disconnecting other retail electrical customer. 12.9.Disconnection for Default. If the Interconnection Customer is in Default of this Agreement, it may be disconnected after a sixty (60) day written notice is provided and the Default is not cured during this sixty (60) day notice. This provision does not apply to disconnection based on Sections 12.2, 12.3, 12.4 or 12.5 of this Agreement. 13Cost Responsibility for Interconnection Facilities and Distribution Upgrades 13.1Interconnection Facilities. The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The Area EPS Operator shall provide a good faith estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, and the Area EPS Operator. Municipal Minnesota Interconnection Agreement _ January 2019 8 295 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 13.2The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and (2) operating, Facilities. 13.3Distribution Upgrades. The Area EPS Operator shall design, procure, construct, install, and own the Distribution Upgrades described in Attachment 6 of this Agreement. The Area EPS Operator shall provide a good faith estimate cost, including overheads, for the purchase and construction of the Distribution Upgrades and provide a detailed itemization of such costs. If the Area EPS Operator and the Interconnection Customer agree, the Interconnection Customer may construct Distribution Upgrades that are located on land owned by the Interconnection Customer. The actual cost of the Distribution Upgrades, including overheads, shall be directly assigned to the Interconnection Customer. 14 Cost Responsibility for Network Upgrades 14.1.Applicability. No portion of Section 14 shall apply unless the interconnection of the Distributed Energy Resource requires Network Upgrades. 14.2.Network Upgrades. The Area EPS Operator or the Transmission Owner shall design, procure, construct, install, and own the Network Upgrades described in Attachment 6 of this Agreement. The Area EPS Operator shall provide a good faith estimate cost, including overheads, for the purchase and construction of the Network Upgrades and provide a detailed itemization of such costs. If the Area EPS Operator and the Interconnection Customer agree, the Interconnection Customer may construct Network Upgrades that are located on land owned by the Interconnection Customer. Unless the Area EPS Operator elects to pay for Network Upgrades, the actual cost of the Network Upgrades, including overheads, shall be borne initially by the Interconnection Customer. 14.3.Repayment of Amounts Advanced for Network Upgrades. The Interconnection Customer shall be entitled to a cash repayment, equal to the total amount paid to the Area EPS Operator and Affected System operator, if any, for Network Upgrades, including any tax gross-up or other tax-related payments associated with the Network Upgrades, and not otherwise refunded to the Interconnection Customer, to be paid to the Interconnection Customer on a dollar-for-dollar basis for the non- usage sensitive portion of transmission charges, as payments are made under the Area EPS Operato respect to the Distributed Energy Resource. Any repayment shall include interest Municipal Minnesota Interconnection Agreement _ January 2019 9 296 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS calculated in accordance with the methodology set forth in Federal Energy Regulatory s) regulations at 18 C.F.R. § 35.19a(a)(2)(iii) from the date of any payment for Network Upgrades through the date on which the Interconnection Customer receives a repayment of such payment pursuant to this subparagraph. The Interconnection Customer may assign such repayment rights to any person. 14.4.Notwithstanding the foregoing, the Interconnection Customer, the Area EPS Operator, and any applicable Affected System operators may adopt any alternative payment schedule that is mutually agreeable so long as the Area EPS Operator and said Affected System operators take one of the following actions no later than five years from the Commercial Operation Date: (1) return to the Interconnection Customer any amounts advanced for Network Upgrades not previously repaid, or (2) declare in writing that the Area EPS Operator or any applicable Affected System operators will continue to provide payments to the Interconnection Customer on a dollar-for-dollar basis for the non-usage sensitive portion of transmission charges, or develop an alternative schedule that is mutually agreeable and provides for the return of all amounts advanced for Network Upgrades not previously repaid; however, full reimbursement shall not extend beyond 20 years from the commercial operation date. 14.5.If the Distributed Energy Resource fails to achieve commercial operation, but it or another Distributed Energy Resource is later constructed and requires use of the Network Upgrades, the Area EPS Operator and Affected System operator shall at that time reimburse the Interconnection Customer for the amounts advanced for the Network Upgrades. Before any such reimbursement can occur, the Interconnection Customer, or the entity that ultimately constructs the Distributed Energy Resource, if different, is responsible for identifying the entity to which reimbursement must be made. 14.6.Special Provisions for Affected Systems. Unless the Area EPS Operator provides, under this Agreement, for the repayment of amounts advanced to any applicable Affected System operators for Network Upgrades, the Interconnection Customer and Affected System operator shall enter into an agreement that provides for such repayment. The agreement shall specify the terms governing payments to be made by the Interconnection Customer to Affected System operator as well as the repayment by Affected System Operator. 14.7.Rights Under Other Agreements. Notwithstanding any other provision of this Agreement, nothing herein shall be construed as relinquishing or foreclosing any rights, including but not limited to firm transmission rights, capacity rights, transmission congestion rights, or transmission credits, that the Interconnection Municipal Minnesota Interconnection Agreement _ January 2019 10 297 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Customer shall be entitled to, now or in the future, under any other agreement or tariff as a result of, or otherwise associated with, the transmission capacity, if any, created by the Network Upgrades, including the right to obtain cash reimbursements or transmission credits for transmission service that is not associated with the Distributed Energy Resource. 15Billing, Payment, Milestones, and Financial Security 15.1.Billing and Payment Procedures and Final Accounting. The Area EPS Operator shall bill the Interconnection Customer for the design, engineering, construction, and procurement costs of Interconnection Facilities and Upgrades contemplated by this Agreement, and the Interconnection Customer shall pay each bill, pursuant to the M- MIP Interconnection Process documents, or as otherwise agreed to by the Parties. 15.2.Within 80 Business Days (approximately 4 calendar months) of completing the and/or Upgrades described in the Attachments to this Agreement, the Area EPS Operator shall provide the Interconnection Customer with a final accounting report, as described in the M-MIP Fast Track Process Section 9.4.3 and the Study Process Section 11.4.3. 15.3.Milestones. Pursuant to the M-MIP Fast Track Process Section 9.1 and the Study Process Section 11.1, the Parties shall agree on milestones for which each Party is responsible and list them in Attachment 4 of this Agreement. 15.4.Financial Security Arrangements. Pursuant to the M-MIP Fast Track Process Section 9.5 and the Study Process Section 11.5, the Interconnection Customer shall provide of credit or other form of security that is reasonably acceptable to the Area EPS Operator and is consistent with the Minnesota Uniform Commercial Code. Such security for payment shall be in an amount sufficient to cover the costs for constructing, designing, procuring, and installing the applicable portion of the Area ced on a dollar-for-dollar basis for payments made to the Area EPS Operator under this Agreement during its term. In addition: 15.4.1.The guarantee must be made by an entity that meets the creditworthiness requirements of the Area EPS Operator, and contain terms and conditions that guarantee payment of any amount that may be due from the Interconnection Customer, up to an agreed-to maximum amount. Municipal Minnesota Interconnection Agreement _ January 2019 11 298 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 15.4.2.The letter of credit must be issued by a financial institution or insurer reasonably acceptable to the Area EPS Operator and must specify a reasonable expiration not sooner than sixty (60) Business Days (three calendar months) after the due date for the issuance of the final bill. 16Assignment, Force Majeure, Consequential Damages, and Default 16.1.This Agreement may be assigned by either Party upon 15 Business Days prior written notice and opportunity to object by the other Party; provided that: 16.1.1.Either Party may assign this Agreement without the consent of the other Party to any affiliate of the assigning Party with an equal or greater credit rating and with the legal authority and operational ability to satisfy the obligations of the assigning Party under this Agreement, provided that the Interconnection Customer promptly notifies the Area EPS Operator of any such assignment. 16.1.2.Interconnection Customer shall have the right to assign this Agreement, without the consent of the Area EPS Operator, for collateral security purposes to aid in providing financing for the Distributed Energy Resource, provided that the Interconnection Customer will promptly notify the Area EPS Operator of any such assignment. 16.1.3.Any attempted assignment that violates this article is void and ineffective. obligations be enlarged, in whole or in part, by reason thereof. An assignee is responsible for meeting the same financial, credit, and insurance obligations as the Interconnection Customer. Where required, consent to assignment will not be unreasonably withheld, conditioned or delayed. 17Limitations of Liability 17.1. omission in its performance of this Agreement, shall be limited to the amount of direct damage actually incurred. In no event shall either Party be liable to the other Party for any indirect, special, consequential, or punitive damages, except as authorized by this Agreement. Municipal Minnesota Interconnection Agreement _ January 2019 12 299 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 18Non-Warranty 18.1.The Area EPS Operator does not give any warranty, expressed or implied, as to the adequacy, safety, or other characteristics of any structures, equipment, wires, appliances or devices owned, installed or maintained by the Interconnection Customer, including without limitation the Distributed Energy Resource and any structures, equipment, wires, appliances or devices not owned, operated or maintained by the Area EPS Operator. 19Indemnity 19.1.This provision protects each Party from liability incurred to third parties as a result of carrying out the provisions of this Agreement. Liability under this provision is exempt from the general limitations on liability found in Section 17. 19.2.The Parties shall at all times indemnify, defend, and hold the other Party harmless from, any and all damages, losses, claims, including claims and actions relating to injury to or death of any person or damage to property, demand, suits, recoveries, costs and expenses, court costs, attorney fees, and all other obligations by or to third obligations under this Agreement on behalf of the indemnifying Party, except in cases of gross negligence or intentional wrongdoing by the indemnified Party. 19.3.If an indemnified person is entitled to indemnification under this article as a result of a claim by a third party, and the indemnifying Party fails, after notice and reasonable opportunity to proceed under this article, to assume the defense of such claim, such indemnified person may at the expense of the indemnifying Party contest, settle or consent to the entry of any judgment with respect to, or pay in full, such claim. 19.4.If an indemnifying party is obligated to indemnify and hold any indemnified person harmless under this article, the amount owing to the indemnified person shall be the recovery. 19.5.Promptly after receipt by an indemnified person of any claim or notice of the commencement of any action or administrative or legal proceeding or investigation as to which the indemnity provided for in this article may apply, the indemnified person shall notify the indemnifying party of such fact. Any failure of or delay in such delay is materially prejudicial to the indemnifying party. Municipal Minnesota Interconnection Agreement _ January 2019 13 300 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 19.6.This indemnification obligation shall apply notwithstanding any negligent or intentional acts, errors or omissions of the Indemnified Party, but the Indemnifying the percentage by which the Indemnif or omissions caused damaged. 19.7.Neither Party shall be indemnified for its damages resulting from its sole negligence, intentional acts or willful misconduct. These indemnity provisions shall not be construed to relieve any insurer of its obligation to pay claims consistent with the provisions of a valid insurance policy. 20Consequential Damages 20.1.Other than as expressly provided for in this Agreement, neither Party shall be liable under any provision of this Agreement for any losses, damages, costs or expenses for any special, indirect, incidental, consequential, or punitive damages, including but not limited to loss of profit or revenue, loss of the use of equipment, cost of capital, cost of temporary equipment or services, whether based in whole or in part in contract, in tort, including negligence, strict liability, or any other theory of liability; provided, however, that damages for which a Party may be liable to the other Party under another agreement will not be considered to be special, indirect, incidental, or consequential damages hereunder. 21Force Majeure 21.1.If a Force Majeure Event prevents a Party from fulfilling any obligations under this Agreement, the Party affected by the Force Majeure Event (Affected Party) shall promptly notify the other Party, either in writing or via the telephone, of the existence of the Force Majeure Event. The notification must specify in reasonable detail the circumstances of the Force Majeure Event, its expected duration, and the steps that the Affected Party is taking to mitigate the effects of the event on its performance. The Affected Party shall keep the other Party informed on a continuing basis of developments relating to the Force Majeure Event until the event ends. The Affected Party will be entitled to suspend or modify its performance of obligations under this Agreement (other than the obligation to make payments) only to the extent that the effect of the Force Majeure Event cannot be mitigated by the use of Reasonable Efforts. The Affected Party will use Reasonable Efforts to resume its performance as soon as possible. Municipal Minnesota Interconnection Agreement _ January 2019 14 301 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 22Default 22.1.No Default shall exist where such failure to discharge an obligation (other than the payment of money) is the result of a Force Majeure Event as defined in this Agreement or the result of an act or omission of the other Party. Upon a Default, the non-defaulting Party shall give written notice of such Default to the defaulting Party. Except as provided in Section 21, the defaulting Party shall have sixty (60) calendar days from receipt of the Default notice within which to cure such Default; provided however, if such Default is not capable of cure within sixty (60) calendar days, the defaulting Party shall commence such cure within twenty (20) calendar days after notice and continuously and diligently complete such cure within six (6) months from receipt of the Default notice; and, if cured within such time, the Default specified in such notice shall cease to exist. 22.2.If a Default is not cured as provided in this article, or if a Default is not capable of being cured within the period provided for herein, the non-defaulting Party shall have the right to terminate this Agreement by written notice at any time until cure occurs, and be relieved of any further obligation hereunder and, whether or not that Party terminates this Agreement, to recover from the defaulting Party all amounts due hereunder, plus all other damages and remedies to which it is entitled at law or in equity. The provisions of this article will survive termination of this Agreement. 23Insurance 23.1.An Area EPS Operator may only require an Interconnection Customer to purchase insurance covering damages pursuant to the applicable M-MIP process document in which the distributed energy resource falls under. 23.2.The Area EPS Operator agrees to maintain general liability insurance or self-insurance - undertaken pursuant to this Agreement. 23.3.The Parties further agree to notify each other whenever an accident or incident occurs resulting in any injuries or damages that are included within the scope of coverage of such insurance, whether or not such coverage is sought. 23.4.Failure of the Interconnection Customer or Area EPS Operator to enforce the minimum levels of insurance does not relieve the Interconnection Customer from maintaining such levels of insurance or relieve the Interconnection Customer of any liability. Municipal Minnesota Interconnection Agreement _ January 2019 15 302 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 24 Confidentiality 24.1.Confidential Information shall mean any confidential and/or proprietary information provided by one Party to the other Party that is clearly marked or otherwise specifications, and metering data provided by the Interconnection Customer may be deemed Confidential Information regardless of whether it is clearly marked or otherwise designated as such. If requested by either Party, the other Party shall provide in writing the basis for asserting that the information warrants confidential treatment. Parties providing a Governmental Authority trade secret, privileged or otherwise not public data under Minnesota Government Data Privacy Act, Minnesota Statutes Chapter 13, must provide information consistent with th September 1, 1999 Revised Procedures for Handling Trade Secret and Privileged Data. 24.2.Confidential Information does not include information previously in the public domain with proper authorization, required to be publicly submitted or divulged by Governmental Authorities (after notice to the other Party and after exhausting any opportunity to oppose such publication or release), or necessary to be publicly divulged in an action to enforce this Agreement. Each Party receiving Confidential Information shall hold such information in confidence and shall not disclose it to any third party nor to the public without the prior written authorization from the Party providing that information, except to fulfill obligations under this Agreement, or to fulfill legal or regulatory requirements that could not otherwise be fulfilled by not making the information public. 24.3.Each Party shall hold in confidence and shall not disclose Confidential Information, to any person (except employees, officers, representatives and agents, who agree to be bound by this section). Confidential Information shall be clearly marked as such on each page or otherwise affirmatively identified. If a court, government agency or entity with the right, power, and authority to do so, requests or requires either Party, by subpoena, oral disposition, interrogatories, requests for production of documents, administrative order, or otherwise, to disclose Confidential Information, that Party shall provide the other Party with prompt notice of such request(s) or requirements(s) so that the other Party may seek an appropriate protective order or waive compliance with the terms of this Agreement. In the absence of a protective order or waiver the Party shall disclose such confidential information which, in the opinion of its counsel, the party is legally compelled to disclose. Each Party will use reasonable efforts to obtain reliable assurance that confidential treatment will be accorded any confidential information so furnished. Municipal Minnesota Interconnection Agreement _ January 2019 16 303 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 24.4.Critical infrastructure information or information that is deemed or otherwise designated by a Party as Critical Energy/Electric Infrastructure Information (CEII) pursuant to FERC regulation 18 C.F.R. §388.133, as may be amended from time to time, may be subject to further protections for disclosure as required by FERC or 24.5.Each Party shall employ at least the same standard of care to protect Confidential Information obtained from the other Party as it employs to protect its own Confidential Information. 24.6.Each Party is entitled to equitable relief, by injunction or otherwise, to enforce its rights under this provision to prevent the release of Confidential Information without bond or proof of damages, and may seek other remedies available at law or in equity for breach of this provision. 25Disputes The Parties agree in a good faith effort to attempt to resolve all disputes arising out of the interconnection process and associated study and Interconnection Agreements. The Parties agree to follow the established dispute resolution policy adopted by the Area EPS Operator. 26Taxes 26.1.The Parties agree to follow all applicable tax laws and regulations, consistent with Internal Revenue Service and any other relevant local, state and federal requirements. 26.2. It is incumbent on the Party seeking to maintain its tax status to provide formal written notice to the other Party detailing what exact cooperation it is seeking from the other Party well prior to any deadlines by which any such action would need to be taken. Nothing in this Agreement is intended to adversely affect, if applicable, the Area EPS tax-exempt status with respect to the issuance of bonds including, but not limited to, local furnishing bonds. 27Miscellaneous 27.1.Governing Law, Regulatory Authority, and Rules. The validity, interpretation and enforcement of this Agreement and each of its provisions shall be governed by the and the laws of the state of Minnesota, without regard to its conflicts of law principles. This Agreement is subject to all Municipal Minnesota Interconnection Agreement _ January 2019 17 304 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Applicable Laws and Regulations. Each Party expressly reserves the right to seek changes in, appeal, or otherwise contest any laws, orders, or regulations of a Governmental Authority. 27.2.Amendment. The Parties may amend this Agreement by a written instrument duly executed by both Parties, or under Section 27.12 of this Agreement. 27.3.No Third-Party Beneficiaries. This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and where permitted, their assigns. 27.4.Waiver. The failure of a Party to this Agreement to insist, on any occasion, upon strict performance of any provision of this Agreement will not be considered a waiver of any obligation, right, or duty of, or imposed upon, such Party. Any waiver at any time by either Party of its rights with respect to this Agreement shall not be deemed a continuing waiver or a waiver with respect to any other failure to comply with any other obligation, right, duty of this Agreement. Termination or default of this Agreement for any reason by Interconnection Customer shall not constitute a waiver Area EPS Operator. Any waiver of this Agreement shall, if requested, be provided in writing. 27.5.Entire Agreement. This Agreement, including all Attachments, constitutes the entire agreement between the Parties with reference to the subject matter hereof, and supersedes all prior and contemporaneous understandings or agreements, oral or written, between the Parties with respect to the subject matter of this Agreement. There are no other agreements, representations, warranties, or covenants which compliance with its obligations under this Agreement. This Agreement can only be amended or modified in writing signed by both Parties. 27.6.Multiple Counterparts. This Agreement may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument. Electronic signatures are acceptable if the Area EPS Operator has made such a determination pursuant to M-MIP Overview Process Section 4.1. 27.7.No Partnership. This Agreement shall not be interpreted or construed to create an association, joint venture, agency relationship, or partnership between the Parties or to impose any partnership obligation or partnership liability upon either Party. Municipal Minnesota Interconnection Agreement _ January 2019 18 305 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Neither Party shall have any right, power or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, the other Party. 27.8.Severability. If any provision or portion of this Agreement shall for any reason be held or adjudged to be invalid or illegal or unenforceable by any court of competent jurisdiction or other Governmental Authority, (1) such portion or provision shall be deemed separate and independent, (2) the Parties shall negotiate in good faith to restore insofar as practicable the benefits to each Party that were affected by such ruling, and (3) the remainder of this Agreement shall remain in full force and effect. 27.9.Security Arrangements. Infrastructure security of electric system equipment and operations and control hardware and software is essential to ensure day-to-day reliability and operational security. All public utilities are expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. 27.10.Environmental Releases. Each Party shall notify the other Party, first orally and then in writing, of the release of any hazardous substances, any asbestos or lead abatement activities, or any type of remediation activities related to the Distributed Energy Resource or the Interconnection Facilities, each of which may reasonably be expected to affect the other Party. The notifying Party shall (1) provide the notice as soon as practicable, provided such Party makes a good faith effort to provide the notice no later than 24 hours after such Party becomes aware of the occurrence, and (2) promptly furnish to the other Party copies of any publicly available reports filed with any governmental authorities addressing such events. 27.11.Subcontractors. Nothing in this Agreement shall prevent a Party from utilizing the services of any subcontractor as it deems appropriate to perform its obligations under this Agreement. Each Party shall require its subcontractors to comply with all applicable terms and conditions of this Agreement in providing such services and each Party shall remain primarily liable to the other Party for the performance of such subcontractor. 27.11.1.The creation of any subcontract relationship shall not relieve the hiring Party of any of its obligations under this Agreement. The hiring Party shall be fully responsible to the other Party for the acts or omissions of any subcontractor the hiring Party hires as if no subcontract had been made. In no event shall the Area EPS Operator be liable for the actions or inactions of the Interconnection Customer or its subcontractors with respect to obligations of the Interconnection Customer under this Municipal Minnesota Interconnection Agreement _ January 2019 19 306 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Agreement. Any applicable obligation imposed by this Agreement upon the hiring Party shall be equally binding upon, and shall be construed as having application to, any subcontractor of such Party. 27.11.2.The obligations under this article will not be limited in any way by any limitation of . 27.12.Inclusion of Area EPS Operator Tariff and Rules. The interconnection services provided under this Agreement shall at all times be subject to the terms and conditions set forth in the rate schedules and rules applicable to the electric service provided by the Area EPS Operator, which rate schedules and rules are hereby incorporated into this Agreement by this reference. 28Notices 28.1.General. Unless otherwise provided in this Agreement, any written notice, demand, be deemed properly given if delivered in person, delivered by recognized national currier service, or sent by first class mail, postage prepaid, to the person specified as follows: Municipal Minnesota Interconnection Agreement _ January 2019 20 307 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.2.Billing and Payment. Billing and payments shall be sent to the addresses set out below: Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Municipal Minnesota Interconnection Agreement _ January 2019 21 308 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.3.Alternative Forms of Notice. Any notice or request required or permitted to be given by either Party to the other and not required by this Agreement to be given in writing may be so given by telephone or e mail to the telephone numbers and e-mail addresses set out below: Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: Municipal Minnesota Interconnection Agreement _ January 2019 22 309 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 28.4.Designated Operating Representative. The Parties may also designate operating representatives to conduct the communications which may be necessary or convenient for the administration of this Agreement. This person will also serve as facilities. Area EPS Operator Information Area EPS Operator: Attention: Address: Phone: Email: Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.5.Changes to Notification. Either Party may change this information by giving five Business Days written notice to the other Party prior to the effective date of the change. Municipal Minnesota Interconnection Agreement _ January 2019 23 310 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 29 Signatures IN WITNESS THEREOF, the Parties have caused this Agreement to be duly executed by their duly authorized officers or agents on the day and year first above written. \[Insert name of Area EPS Operator\] \[Insert name of Interconnection Customer\] ___________________________________ _________________________________ Signed: ____________________________ Signed: __________________________ Name (Printed): Name (Printed): ___________________________________ ________________________________ Title: ______________________________ Title: __________________________ Municipal Minnesota Interconnection Agreement _ January 2019 24 311 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Attachment I: Glossary of Terms Affected System System, or Transmission System connected generation which may be affected by the proposed interconnection. Applicant Agent A person designated in writing by the Interconnection Customer to represent the interconnection process. Area EPS The electric power distribution system connected at the Point of Common Coupling. Area EPS Operator An entity that owns, controls, or operates the electric power distribution systems that are used for the provision of electric service in Minnesota. For this Interconnection Process the Area EPS Operator is Elk River Municipal Utilities. Business Day Monday through Friday, excluding Holidays as defined by Minn. Stat. §645.44, Subdivision 5. Any communication to have been sent or received after 4:30 p.m. Central Prevailing Time or on a Saturday, Sunday or holiday shall be considered to have been sent on the next Business Day. Certified Equipment Certified equipment is equipment that has been tested by a national recognized lab meeting a specific standard. For DER systems, UL 1741 listing is a common form of DER inverter certification. Additional information is seen in the Certification Codes and Standards document. Confidential Information Any confidential and/or proprietary information provided by one Party to the other Party and is clearly marked procedures, design, operating specifications, and metering data provided by the Interconnection Customer may be deemed Confidential Information. See Overview Process Section 12.1 for further information. Distributed Energy Resource (DER) A source of electric power that is not directly connected to a bulk power system or central station service. DER includes both generators and energy storage technologies capable of exporting active power to an EPS. An interconnection system or a supplemental DER device that is necessary for compliance with this standard is part of a DER. For the purpose of the Interconnection Process and interconnection agreements, the DER Interconnection Facilities. Distribution System The Area EPS facilities which are not part of the Local EPS, Transmission System or any generation system. Municipal Minnesota Interconnection Agreement _ January 2019 25 312 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Distribution Upgrades The additions, modifications, and upgrades to the Distribution System at or beyond the Point of Common Coupling to facilitate interconnection of the DER and render the distribution service necessary to affect Distribution System. Distribution Upgrades do not include Interconnection Facilities. Electric Power System (EPS) The facilities that deliver electric power to a load. Fast Track Process The procedure as described in the Interconnection Process - Fast Track Process for evaluating an Interconnection Application for a DER that meets the eligibility requirements in the Overview Process Section 2.3. Force Majeure Event An act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, an order, regulation or restriction imposed by governmental, military or lawfully Event does not include an act of negligence or intentional wrongdoing. Good Utility Practice Any of the practices, methods and acts engaged in or approved by a significant portion of the electric industry during the relevant time period, or any of the practices, methods and act which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted in the region. Governmental Authority Any federal, state, local or other governmental regulatory or administrative agency, court, commission, department, board, or other governmental subdivision, legislature, rulemaking board, tribunal, or other governmental authority having jurisdiction over the Parties, their respective facilities, or the respective services they provide, and exercising or entitled to exercise any administrative, executive, police, or taxing authority or power; provided, however, that such term does not include the Interconnection Customer, the Area EPS Operator, or any Affiliate thereof. The is the authority governing interconnection requirements unless otherwise provided for in the Minnesota Technical Requirements. Interconnection Agreement The terms and conditions between the Area EPS Operator and Interconnection Customer (Parties). See Section 8 in the Overview Process Error! Reference source not found. for when the Uniform Contract or Interconnection Agreement applies. Interconnection Application or modified, as described in Section 4 of the Overview Process, DER. See Simplified Application Form and Interconnection Application Form. Municipal Minnesota Interconnection Agreement _ January 2019 26 313 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Interconnection Customer The person or entity, including the Area EPS Operator, whom will Distribution System. The Interconnection Customer is responsible for ensuring the DER(s) is designed, operated and maintained in compliance with the Minnesota Technical Requirements. Interconnection Facilities Interconnection Facilities. Collectively, Interconnection Facilities include all facilities and equipment between the DER and the Point of Common Coupling, including any modification, additions or upgrades that are necessary to physically and electrically Customer Interconnection Facilities include: supplemental DER devices, inverters, and associated wiring and cables up to the Point of DER Connection. Some examples of Area EPS Operator Interconnection Facilities include sole use facilities; such as, line extensions, controls, relays, switches, breakers, transformers and shall not include Distribution Upgrades or Network Upgrades. Interconnection Process onnection standards in this document. Material Modification A modification to machine data, equipment configuration or to the interconnection site of the DER at any time after receiving notification by the Area EPS Operator of a complete Interconnection Application that has a material impact on the cost, timing, or design of any Interconnection Facilities or Upgrades, or a material impact on the cost, timing or design of any Interconnection Application with a later Queue Position or the safety or 1 reliability of the Area EPS. MN Technical Requirements The term including all of the DER technical interconnection requirement documents for the state of Minnesota; including Attachment 2 Distributed Generation Interconnection Requirements established in the Order in E-999/CI-01-1023) until superseded and upon Commission approval of updated 1 A Material Modification shall include, but may not be limited to, a modification from the approved Interconnection Application that: (1) changes the physical location of the point of common coupling; such that it is likely to have an impact on technical review; (2) increases the nameplate rating or output characteristics of the Distributed Energy Resource; (3) changes or replaces generating equipment, such as generator(s), inverter(s), transformers, relaying, controls, etc., and substitutes equipment that is not like-kind substitution in certification, size, ratings, impedances, efficiencies or capabilities of the equipment; (4) changes transformer connection(s) or grounding; and/or (5) changes to a certified inverter with different specifications or different inverter control settings or configuration. A Material Modification shall not include a modification from the approved Interconnection Application that: (1) changes the ownership of a Distributed Energy Resource; (2) changes the address of the Distributed Energy Resource, so long as the physical point of common coupling remains the same; (3) changes or replaces generating equipment such as generator(s), inverter(s), solar panel(s), transformers, relaying, controls, etc. and substitutes equipment that is a like-kind substitution in certification, size, ratings, impedances, efficiencies or capabilities of the equipment; and/or (4) increases the DC/AC ratio but does not increase the maximum AC output capability of the Distributed Energy Resource in a way that is likely to have an impact on technical review. Municipal Minnesota Interconnection Agreement _ January 2019 27 314 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Minnesota DER Technical Interconnection and Interoperability Requirements in E-999/CI-16- 521 (anticipated July 2019.) Nameplate Rating - nominal voltage (V), current (A), maximum active power (kWac), apparent power (kVA), and reactive power (kVar) at which a DER is capable of sustained operation. For a Local EPS with multiple DER units, the aggregate nameplate rating is equal to the sum of all DERs nameplate rating in the Local EPS. For purposes of the Attachment V in the limited thought use of control systems, power relays or similar device settings or adjustments as identified in IEEE 1547. The nameplate ratings referenced in the Interconnection Process are alternating current nameplate DER ratings at the Point of DER Coupling. Network Upgrades Additions, modifications, and upgrades to the Transmission System Network Upgrades do not include Distribution Upgrades. Operating Requirements Any operating and technical requirements that may be applicable Requirements, including those set forth in the Interconnection Agreement. Party or Parties The Area EPS Operator and the Interconnection Customer. Point of Common Coupling (PCC) The point where the Interconnection Facilities connect with poi the National Electrical Safety Code. Municipal Minnesota Interconnection Agreement _ January 2019 28 315 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Figure 1: Point of Common Coupling and Point of DER Connection (Source: IEEE 1547) Point of DER Connection (PoC) When identified as the Reference Point of Applicability, the point where an individual DER is electrically connected in a Local EPS and meets the requirements of this standard exclusive of any load present in the respective part of the Local EPS (e.g. terminals of the inverter when no supplemental DER device is required.) For DER unit(s) that are not self-sufficient to meet the requirements without a supplemental DER device(s), the Point of DER Connection is the point where the requirements of this standard are met by DER in conjunction with a supplemental DER device(s) exclusive of any load present in the respective part of the Local EPS. Queue Position The order of a valid Interconnection Application, relative to all other pending valid Interconnection Applications, that is established based upon the date- and time- of receipt of the complete Interconnection Application as described in Section 4.7 of the Overview Process Error! Reference source not found.. Reasonable Efforts With respect to an action required to be attempted or taken by a Party under these procedures, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Municipal Minnesota Interconnection Agreement _ January 2019 29 316 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Reference Point of Applicability The location, either the Point of Common Coupling or the Point of DER Connection, where the interconnection and interoperability performance requirements specified in IEEE 1547 apply. With mutual agreement, the Area EPS Operator and Customer may determine a point between the Point of Common Coupling and Point of DER Connection. See Minnesota Technical Requirements for more information. Simplified Process The procedure for evaluating an Interconnection Application for a certified inverter-based DER no larger than 20 kW that uses the screens described in the Interconnection Process Simplified Process document. The Simplified Process includes simplified procedures. Study Process The procedure for evaluating an Interconnection Application that includes the scoping meeting, system impact study, and facilities study. Transmission Owner The entity that owns, leases or otherwise possesses an interest in the portion of the Transmission System relevant to the Interconnection. Transmission Provider The entity (or its designated agent) that owns, leases, controls, or operates transmission facilities used for the transmission of electricity. The term Transmission Provider includes the Transmission Owner when the Transmission Owner is separate from the Transmission Provider. The Transmission Provider may include the Independent System Operator or Regional Transmission Operator. Transmission System The facilities owned, leased, controlled or operated by the Transmission Provider or the Transmission Owner that are used to provide transmission service. See the Transmission from Generation and Distribution Assets in Docket No. E-999/CI-99-1261. Uniform Contract Production Facilities (Uniform Contract) that may be applied to all qualifying new and existing interconnections between the Area EPS Operator and an DER system having capacity less than 40 kilowatts. Upgrades or Distribution System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Municipal Minnesota Interconnection Agreement _ January 2019 30 317 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Attachment II: Description and Costs of the Distributed Energy Resource, Interconnection Facilities, and Metering Equipment Equipment, including the Distribution Energy Resource, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer or the Area EPS Operator. The Area EPS Operator will provide a good faith estimate itemized cost, including administrative overheads, of its Interconnection Facilities and metering equipment, and a good faith estimate itemized cost of the annual operation and maintenance expenses associated with the Interconnection Facilities and metering equipment. Municipal Minnesota Interconnection Agreement _ January 2019 31 318 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Attachment III: One-line Diagram Depicting the Distributed Energy Resource, Interconnection Facilities, and Metering Equipment, and Upgrades Municipal Minnesota Interconnection Agreement _ January 2019 32 319 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Attachment IV: Milestones The Milestones in line (1) below may be a calendar date. All other dates in this Attachment IV may be the number of Business Days from the calendar date in line (1) or from the completion of a different Milestone described in a specific number line. Similarly, the anticipated In-Service Date may be based on the number of Business Days from the completion of a specified line number. In-Service Date: __________________________________ Critical milestones and responsibilities as agreed to by the Parties: Milestone/Anticipated Date Responsible Party (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) Agreed to by: Municipal Minnesota Interconnection Agreement _ January 2019 33 320 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Area EPS Operator Date Transmission Owner (If Applicable) Date Interconnection Customer Date Municipal Minnesota Interconnection Agreement _ January 2019 34 321 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Attachment V: Additional Operating and Maintenance Requirements Affected Systems The Area EPS Operator shall also provide requirements that must be met by the Interconnection Distribution System. Additional operating and maintenance requirements for an Affected System need separate agreement described in Section 14.6. Municipal Minnesota Interconnection Agreement _ January 2019 35 322 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Attachment VI Network Upgrades and Good Faith Estimates of Upgrade Costs The Area EPS Operator shall describe Distribution and Network Upgrades and provide an itemized good faith estimate of the costs, including administrative overheads, of the Upgrade and annual operations and maintenance expenses associated with such Upgrades. The Area EPS Operator shall functionalize Upgrade costs and annual expenses as either transmission or distribution related. Additional Distribution or Network Upgrades required for an Affected System may be addressed in a separate agreement as described in Section 14.6. Municipal Minnesota Interconnection Agreement _ January 2019 36 323 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Attachment VII: Assignment of Interconnection Agreement There is an Interconnection Agreement, including any and all Attachments thereto including ______________________________ ________________________, a municipal utility existing under the laws of the State of Minnesota, Area EPS Operator Distributed Energy Resource (DER) described as follows: DER System Information Type of DER System: Capacity Rating of System (AC): Limited Capacity Rating (AC): Address of DER System: The Assignor intends to convey its interest in the above-referenced DER to _________________ __________________________ to the Assignee. Upon the execution of this Assignment by the Assignor, Assignee and the Area EPS Operator, agree as follows: 1.Capitalized Terms. Capitalized terms used but not defined herein shall have the meanings set forth in the Agreement. 2.Consent to Assignment. The Assignor hereby irrevocably assigns the Agreement in all respects to the Assignee and the Assignee accepts the assignment thereof in all respects. 3.Amendment to Agreement. The Area EPS Operator consents to this assignment and, as assigned, the Agreement is hereby amended so that wherever the name of the Assignor Municipal Minnesota Interconnection Agreement _ January 2019 37 324 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS is used therein it shall mean the Assignee. It is further agreed that all terms and conditions of the Agreement, as amended by this Assignment, shall remain in full force and effect. 4.Payments by Area EPS Operator. Any and all payments made by Area EPS Operator under the Agreement to either the Assignor or the Assignee shall be deemed to have been made to both and shall discharge the Area EPS Operator from any further liability with regard to said payment. 5.Financial Obligations of Assignor and Assignee. Any and all financial liability, including but not limited to amounts due, from the Interconnection Customer to the Area EPS Operator, occurring or accruing under the Agreement on or before the date of the signature of the Area EPS Operator to this Assignment shall be deemed to be the obligation of both the Assignor and Assignee, and the Area EPS Operator may recover any such amounts jointly and severally from the Assignor and Assignee. 6.Contact information. The following information updates and replaces the designated information as set forth on page 1 of the Agreement, and in Section 28.1, 28.2, 28.3 and 28.4 of the Agreement. Page 1 Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.1 General Notices. Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: Municipal Minnesota Interconnection Agreement _ January 2019 38 325 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 28.2 Billing and Payment Notices. Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.3 Alternative Forms of Notices. Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 28.4 Designated Operating Representative. Interconnection Customer Information Interconnection Customer: Attention: Address: Phone: Email: 7.Signatures. Facsimile or electronic signatures, or signatures to this Assignment sent electronically, shall have the same effect as original signatures. Photocopies, or electronically stored versions of this Assignment, shall have the same validity as the original. Municipal Minnesota Interconnection Agreement _ January 2019 39 326 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS The Area EPS Operator, Assignor, and Assignee have executed this Assignment as of the dates as set forth below. Assignor \[Insert legal name of Assignor\] ___________________________________________________________________ Signed: _____________________________________________________________ Name (Printed): ______________________________________________________ Title: _______________________________________________________________ Date: ______________________________ Assignee \[Insert legal name of Assignee\] ___________________________________________________________________ Signed: _____________________________________________________________ Name (Printed): ______________________________________________________ Title: _______________________________________________________________ Date: ______________________________ Area EPS Operator \[Insert legal name of Area EPS Operator\] ___________________________________________________________________ Signed: _____________________________________________________________ Name (Printed): ______________________________________________________ Title: _______________________________________________________________ Date: ______________________________ Municipal Minnesota Interconnection Agreement _ January 2019 40 327 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Certification of Completion The Interconnection Customer should complete the Distributed Energy Resource Certification of Completion for a proposed DER interconnection in the Simplified Process Track. As a condition of interconnection, a completed copy of this form must be returned to the Utility. Distributed Energy Resource Information Interconnection Customer: DER Project Address: City: State: Zip Code: Application ID: Meter Number: Yes No (If no please completed Is the DER system owner-installed? Installer Information) Installer Information Contact Name: Name of Business: Email: Phone: Electrician Name License # Electrical Permitting Authority ŷĻ 59w ŷğƭ ĬĻĻƓ źƓƭƷğƌƌĻķ ğƓķ źƓƭƦĻĭƷĻķ źƓ ĭƚƒƦƌźğƓĭĻ ǞźƷŷ ƷŷĻ ƌƚĭğƌ ĻƌĻĭƷƩźĭğƌ ƦĻƩƒźƷƷźƓŭ ğǒƷŷƚƩźƷǤ ğƭ ǝĻƩźŅźĻķ ĬǤ ƷŷĻ ƭźŭƓğƷǒƩĻ ĬĻƌƚǞ ƚƩ ƷŷĻ ğķķźƷźƚƓğƌƌǤ ğƷƷğĭŷĻķ ķƚĭǒƒĻƓƷ͵ Inspector Signature: Date: Inspector Name: Authority Having Jurisdiction (city/county)ʹ ***Please print clearly or type and return completed along with any additional documentation*** For Office Use Only Date Received: ELK RIVER MUNICIPAL UTILITIES 1 328 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS STATE OFMINNESOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS Foreword 2 1.Introduction 3 2.References 6 3.Types of Interconnections 7 4.Interconnection Issues and Technical Requirements 10 5.Generation Metering, Monitoring and Control 13 Table 5A Metering, Monitoring and Control Requirements 14 6.Protective Devices and Systems 17 Table 6A Relay Requirements 19 7.Agreements 20 8.Testing Requirements 21 Attachments: System Diagrams Figure 1 Open Transition 25 Figure 2 Closed Transition 26 Figure 3 Soft Loading Transfer With Limited Parallel Operation 27 Figure 4 Soft Loading Transfer With Limited Parallel Operation 28 Figure 5 Extended Parallel With Transfer-Trip 29 329 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS Foreword Electric distribution system connected generation units span a wide range of sizes and electrical characteristics. Electrical distribution system design varies widely from that required to serve the rural customer to that needed to serve the large commercial customer. With so many variations possible, it becomes complex and difficult to create one interconnection standard that fits all generation interconnection situations. In establishing a generation interconnection standard there are three main issues that must be addressed; Safety, Economics and Reliability. The first and most important issue is safety; the safety of the general public and of the employees working on the electrical systems. This standard establishes the technical requirements that must be met to ensure the safety of the general public and of the employees working with the Area EPS. Typically designing the interconnection system for the safety of the general public will also provide protection for the interconnected equipment. The second issue is economics; the interconnection design must be affordable to build. The interconnection standard must be developed so that only those items, that are necessary to meet safety and reliability, are included in the requirements. This standard sets the benchmark for the minimum required equipment. If it is not needed, it will not be required. The third issue is reliability; the generation system must be designed and interconnected such that the reliability and the service quality for all customers of the electrical power systems are not compromised. This applies to all electrical systems not just the Area EPS. Many generation interconnection standards exist or are in draft form. The IEEE, FERC and many states have been working on generation interconnection standards. There are other standards such as the National Electrical Code (NEC) that, establish requirements for electrical installations. The NEC requirements are in addition to this standard. This standard is designed to document the requirements where t standards. requirements in this document do not apply to small, 40kW or less generation installations. As an aid to the small, distributed generation customer, these small unit interconnection requirements have been extracted from this full standard and are available as a separate, simplified document titled: 330 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 1.Introduction This standard has been developed to document the technical requirements for the interconnection standard covers 3 phase Generation Systems with an aggregate single phase Generation Systems with an aggregate capacity of 40kW or less at the Point of Common Coupling. This standard covers Generation Systems that are interconnected with the Area andard does not cover Generation Systems that are directly Transmission System interconnection standards. While, this standard provides the technical requirements for interconnecting a Generation System with a typical radial distribution system, it is important to note that there are some unique Area EPS, which have special interconnection needs. One example of a unique Area EPS would be one tem. This standard does not cover the additional special requirements of those systems. The Interconnection Customer must contact the Owner/operator of the Area EPS with which the interconnection is intended, to make sure that the Generation System is not proposed to be interconnected with a unique Area EPS. If the planned interconnection is with a unique Area EPS, the Interconnection Customer must obtain the additional requirements for interconnecting with the Area EPS. The Area EPS operator has the right to limit the maximum size of any Generation System or number of Generation Systems that, may want to interconnect, if the Generation System would reduce the reliability to the other customers connected to the Area EPS. This standard only covers the technical requirements and does not cover the interconnection process from the planning of a project through approval and construction. Please read the companion document for the description of the procedure to follow and a generic version of the forms to submit. It is important to rates, costs and standard interconnection agreements. The earlier the Interconnection Customer gets the Area EPS operator involved in the planning and design of the Generation System interconnection the smoother the process will go. 331 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS A)Definitions The definitions defined in the for Interconnecting Distributed Resources with (1547 Draft Ver. 11) apply to this document as well. The following definitions are in addition to the ones defined in IEEE 1547, or are repeated from the IEEE 1547 standard. i) has primary access to public rights-of-way, priority crossing of property boundaries, etc. ii) any device producing electrical energy, i.e., rotating generators driven by wind, steam turbines, internal combustion engines, hydraulic turbines, solar, fuel cells, etc.; or any other electric producing device, including energy storage technologies. iii) the interconnected Distributed Generation(s), controls, relays, switches, breakers, transformers, inverters and associated wiring and cables, up to the Point of Common Coupling. iv) the party or parties who are responsible for meeting the requirements of this standard. This could be the Generation System applicant, installer, designer, owner or operator. v) an electric power system (EPS) contained entirely within a single premises or group of premises. vi) the point where the Local EPS is connected to an Area EPS. vii) are those facilities as defined by using the guidelines established by the Minnesota State Public Utilities Commission; Developing Statewide Jurisdictional Boundary Guidelines for Functionally Separating Interstate Transmission from Generation and Local Distribution Functions E-015/M-99-1002. viii)- Generation paralleling equipment that is listed by an OSHA listed national testing laboratory as having met the applicable type testing requirement of UL 1741. At the time is document was prepared this was the only national standard available for certification of generation transfer switch equipment. This definition does not preclude other forms of type- certification if agreeable to the Area EPS operator. B)Interconnection Requirements Goals This standard defines the minimum technical requirements for the implementation of the electrical interconnection between the Generation System and the Area EPS. It does not define the overall requirements for the Generation System. The requirements in this standard are intended to achieve the following: i)Ensure the safety of utility personnel and contractors working on the electrical power system. ii)Ensure the safety of utility customers and the general public. iii) property. iv)Ensure proper operation to minimize adverse operating conditions on the electrical power 332 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS system. C)Protection The Generation System and Point of Common Coupling shall be designed with proper protective devices to promptly and automatically disconnect the Generation from the Area EPS in the event of a fault or other system abnormality. The type of protection required will be determined by: i)Size and type of the generating equipment. ii)The method of connecting and disconnecting the Generation System from the electrical power system. iii)The location of generating equipment on the Area EPS. D)Area EPS Modifications Depending upon the match between the Generation System, the Area EPS and how the Generation System is operated, certain modifications and/or additions may be required to the existing Area EPS with the addition of the Generation System. To the extent possible, this standard describes the modifications which could be necessary to the Area EPS for different types of Generation Systems. For some unique interconnections, additional and/or different protective devices, system modifications and/or additions will be required by the Area EPS operator; in these cases the Area EPS operator will provide the final determination of the required modifications and/or additions. If any special requirements are necessary they will be identified by the Area EPS operator during the application review process. E)Generation System Protection The Interconnection Customer is solely responsible for providing protection for the Generation System. Protection syste electrical power system and the public. The Generation System Protection is not provided for in this standard. Additional protection equipment may be required to ensure proper operation for the Generation System. This is especially true while operating disconnected, from the Area EPS. The Area EPS does not assume responsibility for protection of the Generation System equipment or of any portion Local EPS. F)Electrical Code Compliance Interconnection Customer shall be responsible for complying with all applicable local, independent, state and federal codes such as building codes, National Electric Code (NEC), National Electrical Safety Code (NESC) and noise and emissions standards. As required by Minnesota State law, the Area EPS will require proof of complying with the National Electrical Code before the interconnection is made, through installation approval by an electrical inspector recognized by the Minnesota State Board of Electricity. revisions of the ANSI/IEEE standards applicable to the installation, especially IEEE 1547; reference section in this document for a partial list of the standards which apply to the generation installations covered by this standard. 333 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 2.References The following standards shall be used in conjunction with this standard. When the stated version of the following standards is superseded by an approved revision then that revision shall apply. IEEE Std 100- IEEE Std 519-IEEE Recommended Practices and Requirements for Harmonic Control in Electric Power Systems IEEE Std 929-. IEEE Standard for Interconnecting Distributed Resources with Electric Power IEEE Std C37.90.1-IEEE Standard Surge Withstand Capability (SEC) Tests for . IEEE Standard Withstand Capability of Relay Systems to Radiated Electromagnetic . IEEE Std C62.41.2-IEEE Recommended Practice on Characterization of Surges in Low IEEE Std C62.42-IEEE Recommended Practice on Surge Testing for Equipment Co ANSI C84.1-Electric Power Systems and Equipment Voltage Ratings (60 Hertz ANSI/IEEE 446-Recommended Practice for Emergency and Standby Power Systems for Industrial and Commercial . ANSI/IEEE Standard 142-IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems , NEC National Electrical Code-70-2002. NESC National Electrical Safety Code-2000, Published by the Institute of Electrical and Electronics Engineers, Inc. 334 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 3.Types of Interconnections A)The manner in which the Generation System is connected to and disconnected from the Area EPS can vary. Most transfer systems normally operate using one of the following five methods of transferring the load from the Area EPS to the Generation System. B)If a transfer system is installed which has a user accessible selection of several transfer modes, the transfer mode that has the greatest protection requirements will establish the protection requirements for that transfer system. i)Open Transition (Break-Before-Make) Transfer Switch With this transfer switch, the load to be supplied from the Distributed Generation is first disconnected from the Area EPS and then connected to the Generation. This transfer can be relatively quick, but voltage and frequency excursions are to be expected during transfer. Computer equipment and other sensitive equipment will shut down and reset. The transfer switch typically consists of a standard UL approved transfer switch with mechanical interlocks between the two source contactors that drop the Area EPS source before the Distributed Generation is connected to supply the load. (1) To qualify as an Open Transition switch and the limited protective requirements, mechanical interlocks are required between the two source contacts. This is required to ensure that one of the contacts is always open and the Generation System is never operated in parallel with the Area EPS. If the mechanical interlock is not present, the protection requirements are as if the switch is a closed transition switch. (2) As a practical point of application, this type of transfer switch is typically used for loads less than 500kW. This is due to possible voltage flicker problems created on the Area EPS, when the load is removed from or returned to the Area EPS source. Depending up the Area stiffness this level may be larger or smaller than the 500kW level. (3) Figure 1 at the end of this document provides a typical one-line of this type of installation. ii)Quick Open Transition (Break-Before-Make) Transfer Switch The load to be supplied from the Distributed Generation is first disconnected from the Area EPS and then connected to the Distributed Generation, similar to the open transition. However, this transition is typically much faster (under 500 ms) than the conventional open transition transfer operation. Voltage and frequency excursions will still occur, but some computer equipment and other sensitive equipment will typically not be affected with a properly designed system. The transfer switch consists of a standard UL approved transfer switch, with mechanical interlocks between the two source contacts that drop the Area EPS source before the Distributed Generation is connected to supply the load. (1) Mechanical interlocks are required between the two source contacts to ensure that one of the contacts is always open. If the mechanical interlock is not present, the protection requirements are as if the switch is a closed transition switch (2) As a practical point of application this type of transfer switch is typically used for loads less than 500kW. This is due to possible voltage flicker problems created on the Area EPS, when the load is removed from or returned to the Area EPS source. Depending up the Area stiffness this level may be larger or smaller than the 500kW level. (3) Figure 2 at the end of this document provides a typical one-line of this type of installation and shows the required protective elements. 335 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS iii) Closed Transition (Make-Before-Break) Transfer Switch The Distributed Generation is synchronized with the Area EPS prior to the transfer occurring. The transfer switch then parallels with the Area EPS for a short time (100 msec. or less) and then the Generation System and load is disconnected from the Area EPS. This transfer is less disruptive than the Quick Open Transition because it allows the Distributed Generation a brief time to pick up the load before the support of the Area EPS is lost. With this type of transfer, the load is always being supplied by the Area EPS or the Distributed Generation. (1) As a practical point of application this type of transfer switch is typically used for loads less than 500kW. This is due to possible voltage flicker problems created on the Area EPS, when the load is removed from or returned to the Area EPS source. Depending up the Area stiffness this level may be larger or smaller than the 500kW level. (2) Figure 2 at the end of this document provides a typical one-line of this type of installation and shows the required protective elements. The closed transition switch must include a separate parallel time limit relay, which is not part of the generation control PLC and trips the generation from the system for a failure of the transfer switch and/or the transfer switch controls. iv)Soft Loading Transfer Switch (1) With Limited Parallel Operation The Distributed Generation is paralleled with the Area EPS for a limited amount of time (generally less than 1-2 minutes) to gradually transfer the load from the Area EPS to the Generation System. This minimizes the voltage and frequency problems, by softly loading and unloading the Generation System. (a) The maximum parallel operation shall be controlled, via a parallel timing limit relay (62PL). This parallel time limit relay shall be a separate relay and not part of the generation control PLC. (b) Protective Relaying is required as described in section 6. (c) Figure 3 at the end of this document provide typical one-line diagrams of this type of installation and show the required protective elements. (2) With Extended Parallel Operation The Generation System is paralleled with the Area EPS in continuous operation. Special design, coordination and agreements are required before any extended parallel operation will be permitted. The Area EPS interconnection study will identify the issues involved. (a) Any anticipated use in the extended parallel mode requires special agreements and special protection coordination. (b) Protective Relaying is required as described in section 6. (c) Figure 4 at the end of this document provides a typical one-line for this type of interconnection. It must be emphasized that this is a typical installations only and final installations may vary from the examples shown due to transformer connections, breaker configuration, etc. v)Inverter Connection This is a continuous parallel connection with the system. Small Generation Systems may utilize inverters to interface to the Area EPS. Solar, wind and fuel cells are some examples of Generation which typically use inverters to connect to the Area EPS. The design of such inverters shall either contain all necessary protection to prevent unintentional islanding, or the Interconnection Customer shall install conventional protection to affect the same protection. All required protective elements for a soft-loading transfer switch apply toan inverter 336 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS connection. Figure 5 at the end of this document, shows a typical inverter interconnection. (1) Inverter Certification Prior to installation, the inverter shall be Type-Certified for interconnection to the electrical power system. The certification will confirm its anti- islanding protection and power quality related levels at the Point of Common Coupling. Also, utility compatibility, electric shock hazard and fire safety are approved through UL listing of the model. Once this Type Certification is completed for that specific model, additional design review of the inverter should not be necessary by the Area EPS operator. (2) For three-phase operation, the inverter control must also be able to detect and separate for the loss of one phase. Larger inverters will still require custom protection settings, which must be calculated and designed to be compatible with the specific Area EPS being interconnected with. (3) A visible disconnect is required for safely isolating the Distributed Generation when connecting with an inverter. The inverter shall not be used as a safety isolation device. (4) When banks of inverter systems are installed at one location, a design review by the Area EPS must be performed to determine any additional protection systems, metering or other needs. The issues will be identified by the Area EPS during the interconnection study process 337 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 4.Interconnection Issues and Technical Requirements A)General Requirements - The following requirements apply to all interconnected generating equipment. The Area EPS shall be interconnection requirements. i)Visible Disconnect - A disconnecting device shall be installed to electrically isolate the Area EPS from the Generation System. The only exception for the installation of a visible disconnect is if the generation is interconnected via a mechanically interlocked open transfer switch and installed per the NEC (702.6) prevent the inadvertent interconnection of normal and alternate sources of supply in any operation of the transfer The visible disconnect shall provide a visible air gap between Interconne Generation and the Area EPS in order to establish the safety isolation required for work on the Area EPS. This disconnecting device shall be readily accessible 24 hours per day by the Area EPS field personnel and shall be capable of padlocking by the Area EPS field personnel. The disconnecting device shall be lockable in the open position. approved, manual safety disconnect switch of adequate ampere capacity. The visible disconnect shall not open the neutral when the switch is open. A draw-out type circuit breaker can be used as a visual open. The visible disconnect shall be labeled, as required by the Area EPS Operator to inform the Area EPS field personnel. ii)Energization of Equipment by Generation System The Generation System shall not energize a de- energized Area EPS. The Interconnection Customer shall install the necessary padlocking (lockable) devices on equipment to prevent the energization of a de-energized electrical power system. Lock out relays shall automatically block the closing of breakers or transfer switches on to a de-energized Area EPS. iii) Power Factor - The power factor of the Generation System and connected load shall be as follows; (1) Inverter Based interconnections shall operate at a power factor of no less than 90%.at the inverter terminals. (2) Limited Parallel Generation Systems, such as closed transfer or soft-loading transfer systems shall operate at a power factor of no less than 90%, during the period when the Generation System is parallel with the Area EPS, as measured at the Point of Common Coupling. (3) Extended Parallel Generation Systems shall be designed to be capable of operating between 90% lagging and 95% leading. These Generation Systems shall normally operate near unity power factor (+/-98%) or as mutually agreed between the Area EPS operator and the Interconnection Customer. iv)Grounding Issues (1) Grounding of sufficient size to handle the maximum available ground fault current shall be IEEE Guide for Safety in AC Substation , ANSI/IEEE Standard 80. (2) It is the responsibility of the Interconnection Customer to provide the required grounding for the Generation System. A good standard for this is the IEEE Std. 142-1991 338 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS (3) All electrical equipment shall be grounded in accordance with local, state and federal electrical and safety codes and applicable standards v)Sales to Area EPS or other parties Transportation of energy on the Transmission system is regulated by the area reliability council and FERC. Those contractual requirements are not included in this standard. The Area EPS will provide these additional contractual requirements during the interconnection approval process. B)For Inverter based, closed transfer and soft loading interconnections - The following additional requirements apply: i)Fault and Line Clearing - The Generation System shall be removed from the Area EPS for any faults, or outages occurring on the electrical circuit serving the Generation System ii)Operating Limits in order to minimize objectionable and adverse operating conditions on the electric service provided to other customers connected to the Area EPS, the Generation System shall meet the Voltage, Frequency, Harmonic and Flicker operating criteria as defined in the IEEE 1547 standard during periods when the Generation System is operated in parallel with the Area EPS. If the Generation System creates voltage changes greater than 4% on the Area EPS, it is the responsibility of the Interconnection Customer to correct these voltage sag/swell problems caused by the operation of the Generation System. If the operation of the interconnected interconnected to the Area EPS, the Interconnection Customer is responsible for correcting the problem. iii) Flicker - The operation of Generation System is not allowed to produce excessive flicker to adjacent customers. See the IEEE 1547 standard for a more complete discussion on this requirement. The stiffer the Area EPS, the larger a block load change that it will be able to handle. For any of the transfer systems the Area EPS voltage shall not drop or rise greater than 4% when the load is added or removed from the Area EPS. It is important to note, that if another interconnected customer complains about the voltage change caused by the Generation responsibility to correct or pay for correcting the problem. Utility experience has shown that customers have seldom objected to instantaneous voltage changes of less than 2% on the Area EPS, so most Area EPS operators use a 2% design criteria iv)Interference - The Interconnection Customer shall disconnect the Distributed Generation from the Area EPS if the Distributed Generation causes radio, television or electrical service interference to other customers, via the EPS or interference with the operation of Area EPS. The Interconnection Customer shall either effect repairs to the Generation System or reimburse the Area EPS Operator for the cost of any required Area EPS modifications due to the interference. 339 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS v)Synchronization of Customer Generation- (1) An automatic synchronizer with synch-check relaying is required for unattended automatic quick open transition, closed transition or soft loading transfer systems. (2) To prevent unnecessary voltage fluctuations on the Area EPS, it is required that the synchronizing equipment be capable of closing the Distributed Generation into the Area EPS within the limits defined in IEEE 1547. Actual settings shall be determined by the Registered Professional Engineer establishing the protective settings for the installation. (3) Unintended Islanding Under certain conditions with extended parallel operation, it would be possible for a part of the Area EPS to be disconnected from the rest of the Area EPS and have the Generation System continue to operate and provide power to a portion of the isolated circuit. This condition is calle isolated circuit to the rest of the Area EPS since there are no synchronizing controls associated with all of the possible locations of disconnection. Therefore, it is a requirement that the Generation System be automatically disconnected from the Area EPS immediately by protective relays for any condition that would cause the Area EPS to be de-energized. The Generation Generation System must also be blocked from closing back into the Area EPS until the Area EPS is reenergized and the Area EPS voltage is within Range B of ANSI C84.1 Table 1 for a minimum of 1 minute. Depending upon the size of the Generation System it may be necessary to install direct transfer trip equipment from the Area EPS source(s) to remotely trip the generation interconnection to prevent islanding for certain conditions vi)Disconnection the Area EPS operator may refuse to connect or may disconnect a Generation System from the Area EPS under the following conditions: (1) Lack of approved Standard Application Form and Standard Interconnection Agreement. (2) Termination of interconnection by mutual agreement. (3) Non-Compliance with the technical or contractual requirements. (4) System Emergency or for imminent danger to the public or Area EPS personnel (Safety). (5) Routine maintenance, repairs and modifications to the Area EPS. The Area EPS operator shall coordinate planned outages with the Interconnection Customer to the extent possible. 340 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 5.Generation Metering, Monitoring and Control Metering, Monitoring and Control Depending upon the method of interconnection and the size of the Generation System, there are different metering, monitoring and control requirements Table 5A is a table summarizing the metering, monitoring and control requirements. Due to the variation in Generation Systems and Area EPS operational needs, the requirements for metering, monitoring and control listed in this document are the expected maximum requirements that the Area EPS will apply to the Generation System. It is important to note that for some Generation System installations the Area EPS may wave some of the requirements of this section if they are not needed. An example of this is with rural or low capacity feeders which require more monitoring then larger capacity, typically urban feeders. Another factor which will affect the metering, monitoring and control requirements will be the tariff under which the Interconnection Customer is supplied by the Area EPS. Table 5A has been written to cover most application, but some Area EPS tariffs may have greater or less metering, monitoring and control requirements then, as shown in Table 5A. . 341 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS TABLE 5A Metering, Monitoring and Control Requirements Generation System Generation Generation Remote Metering Capacity at Point of Remote Monitoring Common CouplingControl Bi-Directional metering at the point None RequiredNone Required Area EPSof common coupling >40 kW Determined by engineering studyDetermined by Determined by engineering study engineering study 342 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS A)Metering i)As shown in Table 5A the requirements for metering will depend up on the type of generation and the type of interconnection. For most installations, the requirement is a single point of metering at the Point of Common Coupling. The Area EPS Operator will install a special meter that is capable of measuring and recording energy flow in both directions, for three phase installations or two detented meters wired in series, for single phase installations. A dedicated - direct dial phone line may be required to read the metering. Some monitoring may be done through the meter and the dedicated direct dial phone line, so in many installations the remote monitoring and the meter reading can be done using the same dial-up phone line. ii) additional metering requirements may result. Contact the Area EPS for tariff requirements. In some cases, the direct dial-phone line requirement may be waived by the Area EPS for smaller Generation Systems. iii) transformers (VT) and current transformers (CT), used for revenue metering shall be approved and/or location and wiring shall be followed for the revenue metering. iv)For Generation Systems that sell power and are greater than 40kW in size, separate metering of the generation and of the load is required. A single meter recording the power flow at the Point of Common Coupling for both the Generation and the load is not allowed by the rules under which the area transmission system is operated. The Area EPS is required to report to the regional reliability council (MAPP) the total peak load requirements and is also required to own or have contracted for, accredited generation capacity of 115% of the experienced peak load level for each month of the year. Failure to meet this requirement results in a large monetary penalty for the Area EPS operator. v)For Generation Systems which are less then 40kW in rated capacity and are qualified facilities under PURPA (Public Utilities Regulatory Power Act Federal Gov. 1978), net metering is allowed and provides the generation system the ability to back feed the Area EPS at some times and bank that energy for use at other times. Some of the qualified facilities under PURPA are solar, wind, hydro, and biomass. For these net-metered installations, the Area EPS may use a single meter to record the bi- directional flow or the Area EPS Operator may elect to use two detented meters, each one to record the flow of energy in one direction. B)Monitoring (SCADA) is required as shown in table 5A. The need for monitoring is based on the need of the system control center to have remote monitoring is especially important during periods of abnormal and emergency operation. The difference in Table 5A between remote monitoring and SCADA is that SCADA typically is a system that is in continuous communication with a central computer and provides updated values and status, to the Area EPS operator, within several seconds of the changes in the field. Remote monitoring on the other hand will tend to provide updated values and status within minutes of the change in state of the field. Remote monitoring is typically less expensive to install and operate. i)Where Remote Monitoring or SCADA is required, as shown in Table 5A, the following monitored and control points are required: (1) Real and reactive power flow for each Generation System (kW and kVAR). Only required if separate metering of the Generation and the load is required, otherwise #4 monitored at the point of Common Coupling will meet the requirements. 343 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS (2) Phase voltage representative of the Area service to the facility. (3) Status (open/close) of Distributed Generation and interconnection breaker(s) or if transfer switch is used, status of transfer switch(s). (4) Customer load from Area EPS service (kW and kVAR). (5) Control of interconnection breaker - if required by the Area EPS operator. When telemetry is required, the Interconnection Customer must provide the communications ated phone circuit or other form of communication. If a telephone circuit is used, the Interconnection Customer must also provide the telephone circuit protection. The Interconnection Customer shall coordinate the RTU (remote terminal unit) addition with the Area EPS. The Area EPS may require a specific RTU and/or protocol to match their SCADA or remote monitoring system. 344 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 6.Protective Devices and Systems A)Protective devices required to permit safe and proper operation of the Area EPS while interconnected with degree of protection is required for increased Distributed Generation size. This is due to the greater magnitude of short circuit currents and the potential impact to system stability from these installations. Medium and large installations require more sensitive and faster protection to minimize damage and ensure safety. If a transfer system is installed which has a user accessible selection of several transfer modes, the transfer mode which has the greatest protection requirements will establish the protection requirements for that transfer system. The Interconnection Customer shall provide protective devices and systems to detect the Voltage, Frequency, Harmonic and Flicker levels as defined in the IEEE 1547 standard during periods when the Generation System is operated in parallel with the Area EPS. The Interconnection Customer shall be responsible for the purchase, installation, and maintenance of these devices. Discussion on the requirements for these protective devices and systems follows: i)Relay settings (1) If the Generation System is utilizing a Type-Certified system, such as a UL listed inverter a Professional Electrical Engineer is not required to review and approve the design of the interconnecting system. If the Generation System interconnecting device is not Type- Certified or if the Type-Certified Generation System interconnecting device has additional design modifications made, the Generation System control, the protective system, and the interconnecting device(s) shall be reviewed and approved by a Professional Electrical Engineer, registered in the State of Minnesota. (2) A copy of the proposed protective relay settings shall be supplied to the Area EPS operator for review and approval, to ensure proper coordination between the generation system and the Area EPS. ii)Relays (1) All equipment providing relaying functions shall meet or exceed ANSI/IEEE Standards for protective relays, i.e., C37.90, C37.90.1 and C37.90.2. (2) - installed to permit field testing and maintenance of the relay without unwiring or disassembling the equipment. Inverter based protection is excluded from this requirement for Generation Systems <40kW at the Point of Common Coupling. (3) Three phase interconnections shall utilize three phase power relays, which monitor all three phases of voltage and current, unless so noted in the appendix one-lines. (4) All relays shall be equipped with setting limit ranges at least as wide as specified in IEEE 1547 , and meet other requirements as specified in the Area EPS interconnect study. Setting limit ranges are not to be confused with the actual relay settings required for the proper operation of the installation. At a minimum, all protective systems shall meet the requirements established in IEEE 1547. (a) Over-current relays (IEEE Device 50/51 or 50/51V) shall operate to trip the protecting breaker at a level to ensure protection of the equipment and at a speed to allow 345 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS proper coordination with other protective devices. For example, the over-current relay monitoring the interconnection breaker shall operate fast enough for a fault on the 51V is a voltage restrained or controlled over-current relay and may be required to provide proper coordination with the Area EPS. (b) Over-voltage relays (IEEE Device 59) shall operate to trip the Distributed Generation per the requirements of IEEE 1547. (c) Under-voltage relays (IEEE Device 27) shall operate to trip the Distributed Generation per the requirements of IEEE 1547 (d) Over-frequency relays (IEEE Device 81O) shall operate to trip the Distributed Generation off- line per the requirements of IEEE 1547. (e) Under-frequency relay (IEEE Device 81U) shall operate to trip the Distributed Generation off- line per the requirements of IEEE 1547. For Generation Systems with an aggregate capacity greater then 30kW, the Distribution Generation shall trip off-line when the frequency drops below 57.0-59.8 Hz. typically this is set at 59.5 Hz, with a trip time of 0.16 seconds, but coordination with the Area EPS is required for this setting. The Area EPS will provide the reference frequency of 60 Hz. The Distributed Generation control system must be used to match this reference. The protective relaying in the interconnection system will be expected to maintain the frequency of the output of the Generation. (f) Reverse power relays (IEEE Device 32) (power flowing from the Generation System to the Area EPS) shall operate to trip the Distributed Generation off-line for a power flow to the system with a maximum time delay of 2.0 seconds. (g) Lockout Relay (IEEE Device 86) is a mechanically locking device which is wired into the close circuit of a breaker or switch and when tripped will prevent any close signal from closing that device. This relay requires that a person manually resets the lockout relay before that device can be reclosed. These relays are used to ensure that a denergized system is not reenergized by automatic control action, and prevents a failed control from auto-reclosing an open breaker or switch. (h) Transfer Trip All Generation Systems are required to disconnect from the Area EPS when the Area EPS is disconnected from its source, to avoid unintentional islanding. With larger Generation Systems, which remain in parallel with the Area EPS, a transfer trip system may be required to sense the loss of the Area EPS source. When the Area EPS source is lost, a signal is sent to the Generation System to separate the Generation from the Area EPS. The size of the Generation System vs the capacity and minimum loading on the feeder will dictate the need for transfer trip installation. The Area EPS interconnection study will identify the specific requirements. If multiple Area EPS sources are available or multiple points of sectionalizing on the Area EPS, then more than one transfer trip system may be required. Area EPS interconnection study will identify the specific requirements. For some installations the alternate Area EPS source(s) may not be utilized except in rare occasions. If this is the situation, the Interconnection Customer may elect to have the Generation System locked out when the alternate source(s) are utilized, if agreeable to the Area EPS operator. (i) Parallel limit timing relay (IEEE Device 62PL) set at a maximum of 120 seconds for 346 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS soft transfer installations and set no longer then 100ms for quick transfer installations, shall trip the Distributed Generation circuit breaker on limited parallel interconnection systems. Power for the 62 PL relay must be independent of the transfer switch control power. The 62PL timing must be an independent device from the transfer control and shall not be part of the generation PLC or other control system. TABLE 6A SUMMARY OF RELAYING REQUIREMENTS Over-Reverse Parallel Sync- Voltage Frequency Lockout Transfer Type of current Power Limit Check (27/59)(81 0/U)(86)Trip Interconnection(50/51)(32)Timer(25) YesYesYesYes Determined Determined by Determined by Determined by Determined by Determined by Determined Determined by >40 kW by Engineering Engineering StudyEngineering Engineering Engineering by Engineering Engineering StudyStudyStudyStudyEngineering Study StudyStudy 347 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 7.Agreements A)Interconnection Agreement This agreement is required for all Generation Systems that parallel with the interconnection agreements depending upon the size and type of Generation System. This agreement contains the terms and conditions upon which the Generation System is to be connected, constructed and maintained, when operated in parallel with the Area EPS. Some of the issues covered in the interconnection agreement are as follows; i)Construction Process ii)Testing Requirements iii) Maintenance Requirements iv)Firm Operating Requirements such as Power Factor v)Access requirements for the Area EPS personnel vi)Disconnection of the Generation System (Emergency and Non-emergency) vii) Term of Agreement viii) Insurance Requirements ix) Dispute Resolution Procedures B)Operating Agreement For Generation Systems that normally operate in parallel with the Area EPS, an y created. This agreement is created for the benefit of both the Interconnection Customer and the Area EPS operator and will be agreed to between the Parties. This agreement will be dynamic and is intended to be updated and reviewed annually. For some smaller systems, the operating agreement can simply be a letter agreement for larger and more intergraded Generation Systems the operating agreement will tend to be more involved and more formal. The operating agreement covers items that are necessary for the reliable operation of the Local and Area EPS. The items typically included in the operating agreement are as follows; i)Emergency and normal contact information for both the Area EPS operations center and for the Interconnection Customer ii)Procedures for periodic Generation System test runs. iii) Procedures for maintenance on the Area EPS that affect the Generation System. iv)Emergency Generation Operation Procedures 348 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 8.Testing Requirements A)Pre-Certification of equipment The most important part of safety. One of the key components of ensuring the safety of the public and employees is to ensure that the design and implementation of the elements connected to the electrical power system operate as required. To meet this goal, all of the electrical wiring in a business or residence, is required by the State of Minnesota to be listed by a recognized testing and certification laboratory, for its intended purpose. Typically we see this as Generation Systems have tended to be uniquely designed for each installation they have been designed and approved by Professional Engineers. As the number of Generation Systems installed increase, vendors are working towards creating equipment packages which can be tested in the factory and then will only require limited field testing. This will allow us to move -tion System equipment packages that will help streamline the design and installation process. An equipment package shall be considered certified for interconnected operation if it has been submitted by a manufacture, tested and listed by a nationally recognized testing and certification laboratory (NRTL) for continuous utility interactive operation in compliance with the applicable codes and standards. Presently generation paralleling equipment that is listed by a nationally recognized testing laboratory as having met the applicable type-testing requirements of UL 1741 and IEEE 929, shall be acceptable for interconnection without additional protection including switchgear, inverters, or other interface devices and may include an integrated generator or electric source. If the equipment package has been tested and listed as an integrated package which includes a generator or other electric source, it shall not require further design review, testing or additional equipment to meet the certification requirements for interconnection. If the equipment package includes only the interface components (switchgear, inverters, or other interface devices), then the Interconnection Customer shall show that the generator or other electric source being utilized with the equipment package is compatible with the equipment package and consistent with the testing and listing specified for the package. Provided the generator or electric source combined with the equipment package is consistent with the testing ad listing performed by the nationally recognized testing and certification laboratory, no further design review, testing or additional equipment shall be required to meet the certification requirements of this interconnection procedure. A certified equipment package does not include equipment provided by the Area EPS. The use of Pre-Certified equipment does not automatically qualify the Interconnection Customer to be interconnected to the Area EPS. An application will still need to be submitted and an interconnection review may still need to be performed, to determine the compatibility of the Generation System with the Area EPS. B)Pre-Commissioning Tests i)Non-Certified Equipment (1) Protective Relaying and Equipment Related to Islanding (a) Distributed generation that is not Type-Certified (type tested), shall be equipped with protective hardware and/or software designed to prevent the Generation from being connected to a de-energized Area EPS. (b) The Generation may not close into a de-energized Area EPS and protection provided 349 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS to provide a final design and to install the protective measures required by the Area EPS. The Area EPS will review and approve the design, the types of relays specified, and the installation. Mutually agreed upon exceptions may at times be necessary and desirable. It is strongly recommended that the Interconnection Customer obtain Area EPS written approval prior to ordering protective equipment for parallel operation. The Interconnection Customer will own these protective measures installed at their facility. (c) The Interconnection Customer shall obtain prior approval from the Area EPS for any revisions to the specified relay calibrations. C)Commissioning Testing The following tests shall be completed by the Interconnection Customer. All of the required tests in each section shall be completed prior to moving on to the next section of tests. The Area EPS operator has the right to witness all field testing and to review all records prior to allowing the system to be made ready for normal operation The Area EPS shall be notified, with sufficient lead time to allow the opportunity for Area EPS personnel to witness any or all of the testing. i)Pre-testing The following tests are required to be completed on the Generation System prior to energization by the Generator or the Area EPS. Some of these tests may be completed in the factory if no additional wiring or connections were made to that component. These tests are marked with a (1) Grounding shall be verified to ensure that it complies with this standard, the NESC and the NEC. (2) protection, shall be tested to ensure correct polarity, ratio and wiring (3) removed where required. (4) Breaker / Switch tests Verify that the breaker or switch cannot be operated with interlocks in place or that the breaker or switch cannot be automatically operated when in manual mode. Various Generation Systems have different interlocks, local or manual modes etc. The intent of this section is to ensure that the breaker or switches controls are operating properly. (5) * Relay Tests All Protective relays shall be calibrated and tested to ensure the correct operation of the protective element. Documentation of all relay calibration tests and settings shall be furnished to the Area EPS operator. (6) Trip Checks - Protective relaying shall functionally tested to ensure the correct operation of the complete system. Functional testing requires that the complete system is operated by the injection of current and/or voltage to trigger the relay element and proving that the relay element trips the required breaker, lockout relay or provides the correct signal to the next control element. Trip circuits shall be proven through the entire scheme (including breaker trip) For factory assembled systems, such as inverters the setting of the protective elements may occur at the factory. This section requires that the complete system including the wiring and the device being tripped or activated is proven to be in working condition through the injection of current and/or voltage. 350 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS (7) Remote Control, SCADA and Remote Monitoring tests All remote control functions and remote monitoring points shall be verified operational. In some cases, it may not be possible to verify all of the analog values prior to energization. Where appropriate, those points may be verified during the energization process (8) Phase Tests the Interconnection Customer shall work with the Area EPS operator to complete the phase test to ensure proper phase rotation of the Generation and wiring. (9) Synchronizing test The following tests shall be done across an open switch or racked out breaker. The switch or breaker shall be in a position that it is incapable of closing between the Generation System and the Area EPS for this test. This test shall demonstrate that at the moment of the paralleling-device closure, the frequency, voltage and phase angle are within the required ranges, stated in IEEE 1547. This test shall also demonstrate that is any of the parameters are outside of the ranges stated; the paralleling-device shall not close. For inverter-based interconnected systems this test may not be required unless the inverter creates fundamental voltages before the paralleling device is closed. ii)On-Line Commissioning Test the following tests will proceed once the Generation System has completed Pre-testing and the results have been reviewed and approved by the Area EPS operator. For smaller Generation Systems the Area EPS may have a set of standard interconnection tests that will be required. On larger and more complex Generation Systems the Interconnection Customer and the Area EPS operator will get together to develop the required testing procedure. All on-line commissioning tests shall be based on written test procedures agreed to between the Area EPS operator and the Interconnection Customer. Generation System functionally shall be verified for specific interconnections as follows: (1) Anti-Islanding Test For Generation Systems that parallel with the utility for longer than 100msec. (a) The Generation System shall be started and connected in parallel with the Area EPS source (b) The Area EPS source shall be removed by opening a switch, breaker etc. (c) The Generation System shall either separate with the local load or stop generating (d) The device that was opened to remove the Area EPS source shall be closed and the Generation System shall not re-parallel with the Area EPS for at least 5 minutes. iii) Final System Sign-off. (1) To ensure the safety of the public, all interconnected customer owned generation systems which do not utilize a Type-Certified system shall be certified as ready to operate by a Professional Electrical Engineer registered in the State of Minnesota, prior to the installation being considered ready for commercial use. iv)Periodic Testing and Record Keeping 351 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS (1) Any time the interface hardware or software, including protective relaying and generation control systems are replaced and/or modified, the Area EPS operator shall be notified. This notification shall, if possible, be with sufficient warning so that the Area EPS personnel can be involved in the planning for the modification and/or witness the verification testing. Verification testing shall be completed on the replaced and/or modified equipment and systems. The involvement of the Area EPS personnel will depend upon the complexity of the Generation System and the component being replaced and/or modified. Since the Interconnection Customer and the Area EPS operator are now operating an interconnected system. It is important for each to communicate changes in operation, procedures and/or equipment to ensure the safety and reliability of the Local and Area EPSs. (2) All interconnection-related protection systems shall be periodically tested and maintained, by the Interconnection Customer, at intervals specified by the manufacture or system integrator. These intervals shall not exceed 5 years. Periodic test reports and a log of inspections shall be maintained, by the Interconnection Customer and made available to the Area EPS operator upon request. The Area EPS operator shall be notified prior to the period testing of the protective systems, so that Area EPS personnel may witness the testing if so desired. (a) Verification of inverter connected system rated 15kVA and below may be completed as follows; The Interconnection Customer shall operate the load break disconnect switch and verify the Generator automatically shuts down and does not restart for at least 5 minutes after the switch is close (b) Any system that depends upon a battery for trip/protection power shall be checked and logged once per month for proper voltage. Once every four years the battery(s) must be either replaced or a discharge test performed. Longer intervals are possible through the use approval. 352 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 353 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 354 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 355 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 356 SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS 357 SCHEDULE 4 - AVERAGE INCREMENTAL COSTS 2019 MMPA Distributed Generation Payment Rates Summer Months (Jun - Sep)Energy ($/kWh)Capacity ($/kWh)REC ($/kWh) On Peak0.032500 Off Peak0.021200 All Hours0.026400 Winter Months (Oct - May) On Peak0.030800 Off Peak0.023000 All Hours0.026700 Annual (Jan - Dec)0.026600 358 W.2Water Distribution System Maintenance Program 1.0Water Map A.Up-date for new developments (Level of detail Tee, Elbow, Distance to property line, Depth). B.Locate all past leaks and trouble areas. C.Develop and maintain Pressure / Flow model. D.Maintain State of Minnesota annual inspection forms. E.Distribution leak survey every 5 years if water losses justify. F.Locate and maintain water service location records. 2.0 Wells A. Inspect wells & filter plants daily. B. Test one well per year for all SDWA listed contaminants. C. Read drawdown monthly for each well. D. Pull and inspect pump and motor on each well no later than every eight years (10,000 hours) or one every other year. E. System sampling for bacteria and fluoride concentrations on a regular schedule. F. Maintain daily pumping records with chemicals used. 3.0 Valves A. Locate valves on valve cards with manufacturer, date, type, and GPS location. B. Chart showing valve size versus number of turns to open. C. Annual maintenance check condition of road box or manhole exercise valve. 4.0 Hydrants A. Number all hydrants per quadrants of Elk River. B. List number, location, type, manufacturer, date, valve size and type, static pressure, residual pressure, flow, flow @ 20 psi. C. Last painted. D. Inspected for frozen barrel. E. Annually flush all hydrants, flush dead ends three times per year. 359 5.0 Water Towers / Filter Plants A. Back-flush schedules and filter maintenance. B. Inspect Towers for external damage. C. Inspect Towers for Internal damage annually. 6.0 Booster Stations A. Inspect weekly. B. Run pumps monthly. C. Adjust PRV per system requirements. 7.0 Meters A. Meter number with size, type, manufacturer, date, meter index, location. B. Large meter testing program, once every five years. C. Small meter change out program, no meter older than 25 years. D. Inspect and seal new water meter installations. 8.0 Backflow Prevention Program A. Continue implementation of established written program with City Building Official. 9.0Telemetry System SCADA A. Inspect instrumentation annually. B. Inspect radio w/Battery back-up monthly. C. Spare parts list from System Control Services. D. Keep pumping and tower level information for future reference. 360 W.3Customer Contact for Water Meter Change-Out 1.0Customer Contact for Water Meter Change-Out A.Procedure to make appointments to change water meters: a.Two phone calls, each during business hours and weekday evenings to arrange an nse b. c. d.Mail second letter that includes loss of service. 361 W.4Fire Hydrant Use and Maintenance Section 508 of the state fire code requires inspection, testing and maintenance of fire protection water supplies which include water lines and fire hydrant systems. Fire hydrant systems shall be subject to periodic tests, maintained in an operative condition at all times and shall be repaired where defective. Additions, repairs, alterations and servicing shall comply with approved standards. Section 101 of the state fire code authorizes the city to adopt rules to implement the fire code. Elk River Municipal Utilities (ERMU) finds that it is in the best interest of ERMU and the City of Elk River to outline the policy and procedures for the maintenance and use of public and private fire hydrants. It is in the public interest that both public and private hydrants are inspected and maintained by qualified personnel and are repaired and maintained in good working order to protect life and property. Define standard responsibilities, maintenance, inspection procedures and restrictions on the use of public and private fire hydrants within the City of Elk River. Fire hydrants within the City of Elk River are for the exclusive use of ERMU and the City. Hydrants shall only be used for emergencies and any activities approved by ERMU. This policy applies to: A.Public and privately owned hydrants within the City of Elk River; B.Individuals, groups, or companies that use municipal water within the city; and C.ERMU and the City of Elk River. W.4Fire Hydrant Use and Maintenance Page 1of 4Adopted July 2, 2013 362 The ERMU Water Department shall: A.Direct and schedule all public and private hydrant maintenance and inspection activities. B.Contract as necessary for maintenance and repair services. C.Ensure all new hydrants installed in the City meet specifications. D.Inspect and exercise all hydrants in the City. E.Document hydrants needing repairs and make repairs as necessary. A.Companies and/or individuals wishing to use fire hydrants must gain approval from ERMU before using fire hydrants and pay the fees published in the ERMU Fee Schedule. B.Companies and/or individuals needing city water for projects will be required to complete ERMU application for service prior to obtaining access to water. C.All water obtained directly from fire hydrants will be billed at the rate specified in the ERMU Fee Schedule. D.Isolation valves for well hydrants will be left in the off position. A section of PVC pipe will be placed inside the valve box as a reminder that the valve is off. Any inspection, maintenance, or repair of these hydrants is only at the direction of the Water Superintendent. Annually, all public and private fire hydrants directly or indirectly connected to the municipal water system shall be inspected either by ERMU personnel or a qualified contractor engaged by ERMU to do inspections, unless ERMU has granted the owner of a private hydrant(s) permission to use a different approved licensed plumber. This inspection shall include testing of the operation and flow of the hydrants. Should a private hydrant owner be granted permission to use a different contractor, the owner shall provide ERMU with written verification in advance of the inspection. Contact information for the contractor performing the inspection and date of the scheduled inspection are required. A.ERMU staff will document any problems found during the annual inspection. Any hydrants taken out of service will be marked at the hydrant and its location provided to the Fire Department. B.Repairs to the hydrant will be prioritized based on ERMU and/or City needs. Every attempt will be made to return non-working hydrants to service within one business day. C.Hydrants that do not drain will be pumped dry each fall to prevent freezing and possible damage to the hydrant. D.Fire hydrants will be painted periodically to maintain their appearance and visibility to the fire department. The following items will be accomplished during annual fire hydrant maintenance: W.4Fire Hydrant Use and Maintenance Page 2of 4Adopted July 2, 2013 363 A.An inventory of the hydrant will be accomplished to ensure that the hydrant is not missing any parts (flag, caps, chains, etc.) on an annual basis. B.The hydrant will be exercised andflushed on an annual basis. C.The hydrant isolation valve will be exercised periodically. D.All nozzles will be lubricated with food grade anti-seize to prevent rusting periodically. E.The oil reservoir will be topped off with hydrant oil periodically. F.The hydrant will be painted periodically. G.All fire hydrants will be painted fire hydrant red. H.Hydrants that are plugged and do not drain will have the pumper nozzle painted black. I.Well hydrants will have the pumper nozzle painted blue. J.Private hydrants will have the pumper nozzle painted yellow. Private fire hydrants are defined as hydrants that are located on privately owned property. These properties are generally commercial, industrial, apartment, townhome, and condominium properties. A.All private hydrants will be inspected by ERMU personnel or contractors as provided in Section 7.0 of this Policy. B.ERMU will charge an annual inspection fee per the ERMU Fee Schedule for each privately owned fire hydrant. The cost of the inspection will be spread out evenly over a 12 month period. In the event that an ERMU inspection of a private hydrant indicates that repairs are required, ERMU will notify the owner of the hydrant in writing of the repairs that are needed. The repairs are the responsibility of the owner. A.The owner may choose to have the repairs completed bya qualified contractor or by ERMU. If a contractor is selected the owner must notify ERMU as soon as the repairs are completed. B.If the owner chooses ERMU to complete the repairs ORif repairs are not made within (30) days of initial notification, the necessary repairs will be made by ERMU or its contractor. The cost of any materials, equipment, and labor will be billed directly to the property owner. Fees for equipment and labor are set forth in the ERMU Fee Schedule. A.There shall horizontal clearance on all sides of the hydrant. B.All hydrants are to be free of obstacles sothat the hydrant may be seen by approaching fire trucks at a minimum distance of 200 feet. C.Posts, fences, vehicles, brush, trash, flowers, or any other items may not be placed or kept near fire hydrants. W.4Fire Hydrant Use and Maintenance Page 3of 4Adopted July 2, 2013 364 D.ERMU will not be responsible for items or landscaping hydrant. E.In the event an excavation needs to be accomplished in order to repair the hydrant, ERMU will fill in the excavation and level out the soil. ERMU will restore any turf with either seed or sod, but will not be responsible for restoring any type of decorative landscaping (flowers beds, rocks, shrubs, etc.) to its previous condition. F.The fire department shall not be hindered fromgaining immediate access to a hydrant. W.4Fire Hydrant Use and Maintenance Page 4of 4Adopted July 2, 2013 365 W.5Looping of Water Mains 1.0Looping of Water Mains All watermains shall be looped or, in the case of phasing of developments, that provisions be made to loop them in the future. 366 367 368 CITY OF ELK RIVER POLICY FOR PAYMENT AND ASSESSMENT OF THE COSTS TO REPAIR PRIVATE UTILITY LINES Adopted: April 2, 2012 The City of Elk River has adopted an ordinance which provides for payment and assessment of the costs to repair private utility lines. As detailed in the ordinance, the following policy has been developed to detail (i) projects eligible for this program; (ii) petitions which may be accepted by the City Administrator; (iii) petitions which may only be accepted by the City Council; (iv) the number of annual installments over which amounts paid and assessed will be levied; and (v) the interest rate applicable to unpaid installments. Policy 1.Eligible Projects Eligible sewer or water service repairs projects include those specific cases that pose a direct risk to public health and safety. These include but are not limited to the following examples: A)The repair of a leaking sewer or water service that has created a public health, or safety hazard on the property or to improvements within the public right-of-way, or on a neighboring property. B)The separation of a shared sewer or water service line. C)The proper abandoning or disconnection of a sewer or water service line that has been disconnected from a building. D)The reconnection of a private sewer or water service line if modifications to the public mains has caused the property owner to no longer have service in the existing location. Other eligible projects will be considered by the City on an individual basis. All work shall be contracted between the Property owner and their Contractor. The City will reimburse eligible costs in accordance with the terms listed below, but shall not warrant or be involved in any claims that arise from the work. 2.Eligible Project Costs Eligible expenses include costs that are directly related to the repair of said service line and restoration of disturbed areas that have resulted from the construction. Expenses related to plumbing on the interior of a building will only be covered if the plumbing work is required to facilitate proper repair with the external sewer or water service line work. 369 3.Initiation of Project Projects shall be initiated by the submission of a Petition, Waiver and Agreement, on a form supplied by the City, which has been signed by the Property Owner. Eligible project costs shall be detailed on Exhibit B of the signed Petition, Waiver Agreement and be approved by City Staff or the City Council prior to any work being completed. Any expenses that are determined, by City staff or the City Council, that are not required to facilitate the service connection or repair, will be deducted from the requested amount. All permit fees and any escrow money required by said permits will not be eligible for reimbursement. 4.Approval and Terms of the Assessment Petitions shall be limited to a minimum request of $3,000 and a maximum request of $20,000. The City Administrator shall have the authority to approve all petitions up to $5,000. Those petitions above $5,000 will require the approval of the City Council. All qualified expenses, reimbursed by the City, will be levied as a special assessment against the property, pursuant to the Petition, at the current bonding interest rate available to the City plus a 1.5% administrative fee. The final rate will be determined at the time of improvement. The term of the assessment will be as follows: Single Family Residential $3,000 to $5,000 Up to 3-years Single Family Residential $5,001 to $10,000 Up to 5-years Single Family Residential $10,001 to Max Up to 10-years All Other Properties $3,000 to Max Up to 3-years All Petitions are subject to final approval by the City Administrator or the City Council. The City retains the right to reject any Petition submitted for consideration. 370 ORDINANCE NO. 12- CITY OF ELK RIVER AN ORDINANCE OF THE CITY OF ELK RIVER AMENDING CHAPTER 78, ARTICLE I OF THE ELK RIVER CODE OF ORDINANCES TO ADD NEW DIVISION 1, PROVIDING FOR PAYMENT AND ASSESSMENT OF THE COSTS TO REPAIR PRIVATE UTILITY LINES The City Council of the City of Elk River hereby ordains as follows: Section 1. That Chapter 78, Article I of the City of Elk River Code of Ordinances shall be amended to add new Division 1, which shall read as follows: Division 1. Payment and Assessment of Costs to Repair Private Utility Lines. Section 78-1. Finding of Public Health and Safety Hazard. a)The City Council finds that failure to maintain in good, operable condition private water andsanitary sewer utility lines creates public health and safety hazards on private property which must be eliminated. b)In addition to the provisions of chapter 46, article II of this code, which declares defective sewage systems and plumbin health and authorizes the City to abate such nuisances and to assess the costs therefor to the affected properties, the City Council finds that it is necessary and in the public interest to provide a mechanism for costs incurred by private property owners to eliminate such public health and safety hazards on private property to be assessed against the property as a special assessment. Section 78-2. Petition Authorized. Property owners who have private water and/or sanitary sewer lines which have failed, and such failure has been determined by City land development staff to be a public health or safety hazard, may petition the City, on a form provided by the City, to pay the costs to repair the private utility lines and to assess amounts paid as a special charge under Minnesota Statutes, Section 429.101. The City may accept or reject such petitions in its sole discretion, and may impose such conditions and requirements to acceptance as it deems appropriate. Section 78-3. Work to be Completed by Property Owner. If a petition to pay and assess the costs of repair is accepted by the City, installation of the required repairs to private utility lines on private property shall be the responsibility of the 371 property owner, shall be contracted for by the property owner, shall be completed by the property owner as required by the policies and ordinances of the City of Elk River and Elk River Municipal Utilities, and shall be inspected and accepted by the city building official before payment of costs is made. Section 78-4. Payment and Assessment of Costs Authorized. a)Upon completion and acceptance by the City of all work required, the City will make payment to the party or parties who performed the work in an amount not to exceed that set forth in the petition accepted by the City. Such payment by the City shall constitute a special charge against the affected property pursuant to Minnesota Statutes, Section 429.101 and shall be specially assessed against the property by the City pursuant to the provisions of Minnesota Statutes, Section 429.101. Special assessments levied under this Section shall be payable in a single installment, or by up to 10 equal annual installments, as provided by the City Council. b)The City Council shall establish, and may amend from time to time, policies regarding: (i) projects eligible for this program; (ii) petitions which may be accepted by the City Administrator; (iii) petitions which may only be accepted by the City Council; (iv) the number of annual installments over which amounts paid and assessed will be levied; and (v) the interest rate applicable to unpaid installments. Section 2. That this Ordinance shall be published and take effect as provided by law. Passed and adopted by the City Council of the City of Elk River this day of , 2012. John J. Dietz Mayor Attest: Tina Allard City Clerk 372 PETITION, WAIVER AND AGREEMENT FOR PAYMENT OF THE COST OF REPAIRS TO PRIVATE UTILITY LINES AND ASSESSMENT OF AMOUNTS PAID AS A SPECIAL CHARGE UNDER MINNESOTA STATUTES, SECTION 429.101 TO: City Council of the City of Elk River (the Owners), owners of the property located at and legally described on Exhibit A attached hereto (the Property), Petition the City of Elk River (the City) to pay the costs of certain repairs (the Repairs) to private utility lines located on the Property or in the Right-of-Way directly adjacent to the Property, including: Repair of private water service line(s) currently connected to the City System Repair of private sanitary sewer service line(s) currently connected to the City System In an amount not to exceed that set forth on Exhibit B attached hereto (the Cost of Repairs), And to levy a special assessment against the Property in the amount of the Cost of Repairs as an unpaid special charge pursuant to Minnesota Statutes, Section 429.101. Owners acknowledge and agree: 1) that there has been a failure of the private utility lines on the Property; 2) that the existing services are connected to the public system; 3)that the failure of the utility lines has created a public health and safety hazard near the failure; 4) that the Work identified on Exhibit B is reasonable and necessary to eliminate the public health and safety hazard on the Property; 5) that the Cost of the Work identified on Exhibit B is reasonable and necessary to affect the Work and is the responsibility of Owners; and 6) that Owners have been elected, instead, to petition the City to pay the Cost of the Work and to assess the full amount of the Cost of the Work to the Property. Owners acknowledge that the City may accept or reject this Petition, Waiver and Agreement in its sole discretion, for any reason, including, but not limited to, the availability of City funds to pay the Costs of the Work and agree, if the City accepts this Petition, Waiver and Agreement: 1) to have the Repairs identified on Exhibit B completed as required by the policies and ordinances of the City; 2) that the Repairs performed shall be privately contracted by the Owners; 3) that the City shall bear no responsibility for or liability related to the performance of the Repairs; 4) that Owners shall hold harmless and indemnify the City from any claims related to the performance of the Repairs; 5) to procure and pay the cost of all permits required for the Repairs; 6) to submit evidence to the City that the Repairs have been inspected and accepted by 373 the City Building Official; 7) that, upon completion and acceptance of the Repairs, City shall make payment to th not to exceed the Cost of the Work identified on Exhibit B; 8) that payment by the City of the Cost of the Work shall create an unpaid special charge against the Property; 9) that this unpaid special charge shall be specially assessed against the Property by the City pursuant to Minnesota Statutes, Section 429.101; and 10) that the special assessment shall be payable in _____ equal annual installments with interest accruing on unpaid installments at the rate of _____%. Owners expressly waive the right to a hearing on assessments levied pursuant to this petition; expressly waive objection to any irregularity with regard to the assessment of the Property for the Cost of Repairs; expressly agree that the amount assessed is reasonable; expressly waive any claim that the amount assessed is excessive; expressly waive all rights of appeal, including any rights under Chapter 429, Minnesota Statutes, from the assessment by the City of the Cost of Repairs; and expressly agree to pay when due all assessments levied for the Cost of Repairs. Owners represent and warrant that they are the sole fee Owners of the Property; agree to make payment of all assessments levied pursuant to this Petition, Waiver and Agreement for Payment of the Cost of Repairs; agree that they shall be personally liable for payments not made; that all assessments levied pursuant to this petition shall be paid in full prior to or at the time of transfer of the Property to a subsequent owner; and agree that this Agreement may be recorded against the title to the Property. Dated this _____ day of , 20___. OWNER By: Its: 374 EXHIBIT A Legal Description 375 EXHIBIT B Repairs: Cost of Repairs: GP:3135369 v1 376 W.7Side Lot Easements The Water Department has a requirement to loop water mains, to ensure good water quality and increase fire flow. Many new developments utilize cul-de-sacs, requiring the looped water mains to be located in side lot easements. Adopted 5-18-98 377 WATER SHUT-OFF REQUEST I, ______________________________, whose address is ___________________________________, request that Elk -off the water service at _____________________________________, Elk River, Minnes I understand and agree: 1.I declare that I am the owner of the Property and have full and complete authority to request the shut-off of the water service to the Property. 2.I agree that ERMU, its agents or employees shall not be liable to me or those claiming through or under me for any injury or property damage occurring in, on or about the Property as the result of the shut-off of water service. 3.This shut-off is available only during times when the ground is not frozen. 4.I understand that there is a $600.00 non-refundable fee for the water service shut-off. The payment will be processed electronically and work will not be performed until funds have cleared through the financial institution. 5.I agree to indemnify and hold harmless ERMU from and against all costs, expenses and liabilities, including water service shut-off and defense thereof. 6.I understand that turning off the water simply limits the source of water to the Property; it does not prevent damage to the Property from water due to mold or frozen plumbing fixtures or internal piping. 7.I understand and agree that the scope of work is limited to shutting off the water service at the curb stop and replacement of the curb stop, if necessary, including limited restoration of the Property (seeding or sod) and sidewalk repair. Restoration does not include replacement of trees, shrubs, or driveways, which are my responsibility. 8.I acknowledge that shutting off the water service does not eliminate the possibility of damage to the Property either before or after shut-off of the water service. 9.In emergencies where a water service line has failed before the main shut off valve, the Elk River Municipal Utilities will loan the property owner or their agent a curb box key so they can operate the curb box. 10.In emergencies where a failed service line remains unrepaired and resulting running water creates a public nuisance or public hazard, Elk River Municipal Utilities has the right to shut off the water at the service line and assess the property for the cost incurred. Date: _________________________ Owner: _____________________________________________ Name Telephone Number: ____________________________ Fax Number: __________________________________ 378 - CODE OF ORDINANCES Chapter 78 - UTILITIES ARTICLE II. - WATER SYSTEM DIVISION 3. DISCONTINUANCE OF SERVICE DIVISION 3. DISCONTINUANCE OF SERVICE Sec. 78-31. Notice and hearing procedures for discontinuance of service. Sec. 78-32. Shut-off procedures. Sec. 78-33. Recovery of costs for shut-offs. Sec. 78-34. Reconnections. Secs. 78-3578-40. Reserved. Sec. 78-31. Notice and hearing procedures for discontinuance of service. (a) Delinquent accounts. Elk River Municipal Utilities (ERMU) shall mail written notice to all accounts 30 days delinquent stating that water service will be shut off unless the account is brought current or a hearing is requested within ten days. If the account is not brought current and no hearing is requested, ERMU shall inspect the property to determine if it is vacant and shall post notice on the property that water service will be shut off in 15 days unless the account is brought current or a hearing is requested within ten days. ERMU shall shut off water service to the address no earlier than 15 days from the date of the posted notice (unless an emergency shut-off is warranted). If a hearing is requested, it shall be held pursuant to subsection (c) below. (b) Properties vacant or with other utilities shut off. (1) April 15 to October 15. If ERMU shuts off electrical service to a property, receives notice that electric service or gas to a property has been shut off, or receives information that a property is vacant, between April 15 and October 15, and there is no delinquency on the water account, then ERMU shall mail notice to the account holder and shall post notice on the property stating that water service to the property will be shut off on October 15 unless the account holder provides evidence that electric and/or gas service has been restored or the account holder requests a hearing within ten days of the notice. If a hearing is requested, it shall be held pursuant to subsection (c) below. If no hearing is requested, water shall be shut off on or about October 15, pursuant to the procedures set forth in this article. (2) October 15 to April 15. If ERMU shuts off electrical service to a property, receives notice that electric service or gas to a property has been shut off, or receives information that a property is vacant, between October 15 and April 15, ERMU may proceed to shut off water as an emergency shut-off under subsection78-32(b) below. (c) Hearing procedure. If a hearing is requested, ERMU shall hold a hearing no sooner than 20 days after the request for a hearing is received. Written notice of the hearing date shall be given to the account holder at least ten days before the hearing date. The hearing shall be held before the ERMU commission or a committee of the commission or a hearing officer, as determined by the commission. The hearing board/officer shall make findings of facts regarding whether the account is delinquent or if shut-off is warranted for other reasons. If a finding is made that shut-off is warranted, the hearing board/officer shall set a date for water shut-off, and ERMU shall shut the water off no earlier than that date. (Ord. No. 09-02, § 1, 3-2-2009) Elk River, Minnesota, Code of Ordinances Page 1 379 - CODE OF ORDINANCES Chapter 78 - UTILITIES ARTICLE II. - WATER SYSTEM DIVISION 3. DISCONTINUANCE OF SERVICE Sec. 78-32. Shut-off procedures. (a) Nonemergency shut-offs. Water shut-offs shall be done by ERMU personnel or by contractors engaged by ERMU. Water will always be shut off at the street unless the stop-valve cannot be located. ERMU shall have the right to take reasonable measures, including the excavation and removal of existing landscaping, driveways, sidewalks and other improvements as necessary, to locate the stop-valve. If the stop-off valve cannot be located, written notice of the date that ERMU needs access to the property to shut off water will be posted on the property and mailed to the account holder and any lender(s) that can be identified. On the date that water is to be shut off, the Elk River Police Department shall accompany ERMU personnel to the property. If the property is not vacant, the police will advise the occupant to allow ERMU personnel to enter the property to shut off water. If the property is vacant, a locksmith will be brought along to gain entry to the property and Elk River Police Department will accompany ERMU into the property to shut off the water. (b) Emergency shut-offs. ERMU shall have the right to make an emergency shut-off if there is visible or other evidence that water is running and the property is either vacant or there is no response from the occupant; if ERMU receives notice that electric or gas has been shut off to a property between October 15 and April 15 and the property is either vacant or there is no response from the occupant; or if ERMU determines, upon inspection, that a property is vacant and that there is a danger of the water service freezing. ERMU personnel shall attempt to give notice to the owner or occupant prior to an emergency shut-off. Water will be shut off immediately from the stop-valve in the street if the stop-valve can be located. If the stop-off valve cannot be located and the property needs to be entered to shut off the water, ERMU personnel will contact the Elk River Police Department for assistance in entering the property and ERMU will attempt to get a locksmith to enter the property. If it is necessary to force entry, ERMU personnel will do so only with the Elk River Police Department's assistance. Neither ERMU, nor the City of Elk River, nor any employee or contractor employed by ERMU or the city, shall be liable to the property owner or other person or entity for any damage to the property as a result of the need to force entry into the property. A notice will be mailed and posted on any property where water has been shut off without prior written notice advising that the owner or occupant may request a post shut-off hearing to contest the shut-off. The post shut-off hearing will follow the procedures set forth in subsection78-31(c). (Ord. No. 09-02, § 1, 3-2-2009) Sec. 78-33. Recovery of costs for shut-offs. ERMU shall recover its costs for water shut-offs. If water is shut off from the stop-valve in the street, there shall be a $100.00 shut-off fee which must be paid before service will be restored. There will be no additional fee to restore water service if service can be restored from the stop-valve. If it is necessary to excavate to search for the stop-valve, there shall be added to the $100.00 shut-off fee an amount equal to ERMU's total costs to locate and excavate the stop-valve, including appropriate charges for the use of ERMU equipment and personnel and/or all costs for third party contractors. If it is necessary to enter a property to shut off the water, there shall be added to the $100.00 shut-off fee an amount equal to ERMU's total costs to shut off the water, including appropriate charges for the use of ERMU equipment and personnel and/or all costs for third party contractors. In situations where a break in a water service line between the street and the water meter serving a property has resulted in significant loss of water, ERMU shall charge the property for the estimated amount of water lost. All shut-off fees and related costs charged to a property which remain unpaid for 30 days may be certified by the city clerk to the county for collection with real estate taxes. Elk River, Minnesota, Code of Ordinances Page 2 380 - CODE OF ORDINANCES Chapter 78 - UTILITIES ARTICLE II. - WATER SYSTEM DIVISION 3. DISCONTINUANCE OF SERVICE Sec. 78-34. Reconnections. No property which has been disconnected from the water service shall be reconnected unless and until ERMU and/or the city has inspected the property to ensure that the water lines are in working order and all fees and costs charged to the property under this article have been paid in full. (Ord. No. 09-02, § 1, 3-2-2009) Secs. 78-3578-40. Reserved. Elk River, Minnesota, Code of Ordinances Page 3 381 W.9Water Use Restrictions 1.0Procedure A.Until further notice, a sprinkling ban has been declared in Elk River. No sprinkling is allowed from 10:00 A.M. to 6:00 P.M. B.Those with even addresses may sprinkle before 10:00 A.M. and after 6:00 P.M. on the even days and those with odd numbered addresses may sprinkle before 10:00 A.M. and after 6:00 P.M. on odd numbered days. Adopted 5-19-1998 382 - CODE OF ORDINANCES Chapter 78 - UTILITIES ARTICLE II. - WATER SYSTEM DIVISION 5. RESTRICTIONS AND ENFORCEMENT DIVISION 5. RESTRICTIONS AND ENFORCEMENT Sec. 78-51. Water use restrictions. Sec. 78-52. Penalties. Sec. 78-53. Enforcement. Secs. 78-5478-70. Reserved. Sec. 78-51. Water use restrictions. The public utility commission of the city is hereby authorized to invoke water use restrictions in cases of emergency to ensure adequate water supplies to meet the health, safety, and welfare needs of the city and its residents. Such water use restrictions shall be invoked by resolution of the public utility commission, and shall take effect immediately upon adoption of such resolution. The public utility commission may designate its general manager or water superintendent authority to impose temporary water use restrictions until the commission can meet to consider a resolution. The penalties imposed below in section 78-52 may be invoked upon publication of the resolution imposing restrictions. (Ord. No. 09-02, § 1, 3-2-2009; Ord. No. 10-20, § 1, 10-18-2010) Sec. 78-52. Penalties. The first violation of the restrictions contained in this article shall subject the offending person, firm, corporation or association to a written warning. A second violation of the restrictions shall be a petty misdemeanor with a penalty of $50.00 and shall increase to the sum of $100.00 for the third violation. A fourth violation shall result in water shut-off with the reconnection fee to be paid by the offending property owner according to the policies of the public utilities commission. No penalty can be imposed unless a person had, or should have had, prior knowledge of the ordinance restrictions. This may be shown by the fact that prior warning was delivered to the person or to an occupant of the premises to be assessed. (Ord. No. 09-02, § 1, 3-2-2009) Sec. 78-53. Enforcement. This article shall be enforced by appropriate ERMU or city personnel in accordance with city ordinances. (Ord. No. 09-02, § 1, 3-2-2009) Secs. 78-5478-70. Reserved. Elk River, Minnesota, Code of Ordinances Page 1 383 WELLHEAD PROTECTION PLAN FOR THE ERMU City of Elk River This plan is in effect from: January 8, 2013 384 Forward - This document presents the WHP plan for the Elk River Municipal Utilities that will help provide for an adequate and safe drinking water supply for community residents. It contains the following components - Assessment of the data elements used to prepare the plan Delineation of the wellhead protection area, Delineation of the drinking water supply management area, Assessments of well and drinking water supply management area vulnerability, Impact of changes on the public water supply well(s) used by the water supplier Issues, Problems, and Opportunities affecting the well(s), well water, and the drinking water supply management area; Wellhead protection goals for this plan; Objectives and plan of action for achieving the wellhead protection goals; Evaluation program for assessing the effectiveness of this plan; and Contingency strategy to address an interruption of the water supply. Water Supply Wells Included in This Plan 1 Unique NumberWell Name or NumberUse/Status 271176Well #2P 2211176Well #3P 481794Well #4P 537682Well #5P 580320Well #6P 664852Well #7P 694499Well #8P 757624Well #9P 1 P = Primary Water Supply Well E = Emergency Backup Well S=Seasonal Well WHP Plan Manager Ms. Angela Hauge, Water Operator 13069 Orono Parkway, P.O. Box 430 Elk River, Minnesota 55330-0430 Phone: 763.441.2020 Email: ahauge@elkriverutilities.com Dave Berg, Water Superintendent 13069 Orono Parkway, P.O. Box 430 Elk River, Minnesota 55330-0430 Phone: 763.441.2020 Email: dberg@elkriverutilities.com ii 385 WHP Team Members Angela Hauge, Water Operator, Elk River Utilities Dave Berg, Water Superintendent, Elk River Utilities Robyn Hoerr, Planner Tom Sagstetter, Co-Manager Conservation & Key Accounts Manager Bill Bronder, SWCD Manager Written By Teri Osterman, MRWA Hydrologist Gail Haglund, MDH/SWP Unit iii 386 Table of Contents Page Executive Summary .................................................................................................................................vi Chapter 1.0 Introduction ........................................................................................................................... 1 Chapter 2.0 Identification and Assessment of the Data Elements Used to Prepare the Plan ................... 1 Chapter 3.0 Delineation of the Wellhead Protection Area, Drinking Water Supply Management Area, and Vulnerability Assessments .................................................................................... 4 Chapter 4.0 Assigning Risk to Potential Contamination Sources............................................................. 5 Chapter 5.0 Impact of Land- and Water- Use Changes on the Public Water Supply Well(s) .................. 6 Chapter 6.0 Issues, Problems, and Opportunities ..................................................................................... 7 Chapter 7.0 Existing Authority and Support Provided by Local, State, and Federal Governments ......... 9 Chapter 8.0 Goals.................................................................................................................................... 12 Chapter 9.0 Objectives and Plan of Action ............................................................................................. 14 Chapter 10.0 Evaluation Program ........................................................................................................... 19 Chapter 11.0 Contingency Strategy ........................................................................................................ 19 Chapter 12.0 Glossary of Terms ............................................................................................................. 20 Chapter 13.0 List of Acronyms ............................................................................................................... 21 Chapter 14.0 References ......................................................................................................................... 22 Chapter 15.0 Figures ............................................................................................................................... 23 List of Figures Figure 1: Regional Location Map................................................................................................... 24 Figure 2: ERMU Municipal Well Location Map ........................................................................... 25 Figure 3: Groundwater Flow Field Map ......................................................................................... 26 Figure 4: Groundwater Flow Field Map ......................................................................................... 27 Figure 5: Wellhead Protection Areas Map ..................................................................................... 28 Figure 6: Drinking Water Supply Management Area .................................................................... 29 Figure 7: ERMU DWSMA Map .................................................................................................... 30 Figure 8: Surficial Geology of the DWSMA ................................................................................. 31 Figure 9: DWSMA Vulnerability ................................................................................................... 32 Figure 10: Sherburne County Map ................................................................................................... 33 Figure 11: Anoka County Map ......................................................................................................... 34 Figure 12: Wright County Map ........................................................................................................ 35 Figure 13: Otsego City Map ............................................................................................................. 36 Figure 14: Elk River Land Use Map ................................................................................................ 37 Figure 15: Elk River Zoning Map .................................................................................................... 38 Figure 16 Well 5 IWHPZ Map ........................................................................................................ 39 Figure 17 Well 5 Sewer/Sanitary Map ............................................................................................ 40 iv 387 List of Tables Table 1: Assessment Results for the Data Elements ............................................................................ 2 Table 2: Potential Contamination Sources and Assigned Risk for the IWMZ ................................... 6 Table 3: Point Sources of Potential Contamination and Assigned Risk for the Remainder of the DWSMA .......................................................................................................................... 6 Table 4: Expected Land and Water Use Changes ............................................................................... 7 Table 5: Issues, Problems and Opportunities ....................................................................................... 8 Table 6: Controls and Programs of the Public Water Supplier ........................................................... 9 Table 7: Local Agency Controls and Programs ................................................................................... 10 Table 8: State and Federal Agency Controls and Programs ................................................................ 11 Table 9: WHP Plan of Action .............................................................................................................. 14 Table 10: Cooperating Agencies .......................................................................................................... 19 List of Appendices Appendix I: WHPA and DWSMA Delineations and Vulnerability Assessments ........................ 41 Appendix II: Inventory of Potential Contamination Sources ......................................................... 65 Appendix III: DNRWater Supply Approval Letter ...................................................................... 124 Appendix IV: Ordinance Chapter 78, Connection to Water System ............................................. 125 v 388 Executive Summary The wellhead protection (WHP) plan for the ERMU of the City of Elk River presents the actions that will be taken to manage potential contamination sources that may present a risk to the Minnesota Department of Health (MDH) under authority granted by Minnesota Statutes, section 1031.101, subdivision 5 and through Minnesota Rules Chapter 4720.5100 to 4720.5590 relating to WHP planning. The ERMU is located in the City of Elk River, county of Sherburne and relies on nine primary wells that draw water from the Eau Claire- Mt. Simon- Hinckley aquifers. Water Supply Wells Included in This Plan Unique Well Name or Total Depth Aquifer Well Vulnerability NumberNumber(ft)Formation(s) Utilized Eau Claire-Mt. Not Vulnerable 271176Well #2290 Simon Mt. Simon NotVulnerable 2211176Well #3315 Mt. Simon Not Vulnerable 481794Well #4225 Mt. Simon 537682Well #5406Vulnerable Mt. Simon Not Vulnerable 580320Well #6300 Mt. Simon Not Vulnerable 664852Well #7341 Mt. Simon Not Vulnerable 694499Well #8390 Mt.Simon - Not Vulnerable 757624Well #9454 Hinckley Potential Contamination Sources and Assigned Risk Total Number within Number Within Potential Source NumberEmergency Response Remainder of the TypeArea and Level of DWSMA and Level Riskof Risk City Wells88HN/AN/A Non CityWells 22112H209H High Priority Non City Wells Intermediate 801M79L Priority High Capacity 10N/A1H Wells Storage Tanks7H 261H 18L *H=High Risk *M=Moderate Risk *L= Low Risk vi 389 The Drinking Water Supply Management Area (DWSMA) is shown in Figure 1 and is the focus of this plan. The vulnerability of the DWSMA to contamination is based upon an assessment of the 1) geologic protection covering the aquifer, 2) rate at which the aquifer is recharged, and 3) groundwater chemistry including the presence of contaminants of human origin. The ERMU has assigned priorities for managing potential contaminant sources that have been inventoried within its DWSMA. The inventory was based on 1) the DWSMA vulnerability, 2) the information contained in various state agency databases, and 3) information that the ERMU collected about current and historical land uses. Potential contamination sources that were assigned a high risk were given priority for inventory in the highly vulnerable portion of the DWSMA. The risk assigned to the potential source was based on 1) evidence that contaminants are present in the water supply, 2) the potential health impacts of the contaminant and (30) the quantity of potential contaminant attributed to the sou Wellhead Protection Goals for the ERMU Maintain a safe and adequate drinking water supply for community residents that health, safety and general welfare of the community Educate the general public regarding the principals and importance of water conservation and collecting additional data to support future delineation in order to promote the proper use of drinking water resources and monitor the geologic condition of Well # 5. The following table illustrates action items that the ERMU has identified to meet the goals of its WHP plan. Further discussion of them and those of state and local government are presented in the Objectives and Plan of Action section of this plan. Summary of Wellhead Protection Actions Wellhead Protection Action Item Descriptions 2012201320142015201620172018201920202021 Provide ERMU residents with a pamphlet or bill stuffer that explains the importance of WHP and the need to seal priority unused wells and the Annually assistance from MRWA. Distribute materials to property owners in and outside of the ERMU limits within the DWSMA relating to the proper management of wells xx Continue to provide tours of the water plant to educate school children on the importance of WHP, conservation and protection Annually vii 390 In the next two years, create and present a mobile display for agencies around the DWSMA in order to educate the public visually. Example locations: xx YMCA, City Library, Elk River Municipal Unities and City offices, Senior Activity Center. In the next year, we will take footage of a local well sealing and create a x This will show the importance of well maintenance and well sealing cost- share availability Keep local city channel (Channel 12) ERTV12 well and water footage up to date with any changes in DWSMA area. Currently demonstrate: Water xx system incite, water meter change outs details, wellhead protection importance, water conservation/SMART irrigation information, etc. Annually mail Consumer Confidence Reports so citizens are aware of the water quality Annually Contact Sherburne County annually to see what monies are available through the county for education and well sealing Annually Present Kids themed information on WHP/water conservation for Earth Day school visit and other kid activity days with schools, girl scouts, scouts, home school kids. Attempt to gain additional audiences each year to reach a Annually variable age range There are known wells on the PCSI inventory without complete data fields. x parcel identification numbers, status of wells or other applicable information on the wells in order to complete the PCSI ERMU, City , and Sherburne SWCD will conduct MDH nitrate well water testing clinic x Distribute and post educational materials related to the maintenance of above and below ground storage tanks to property owners with tanks as it relates to xx the protection of the ERMU drinking water supply. Place information on website immediately. The ERMU, and the Sherburne SWCDwill apply for grant funds to help seal unused wells located in the DWSMA. If they are successful they will use the xxx money to seal the wells. If unsuccessful they will work cooperatively with the local units of government to provide as much cost share as possible to help seal wells Provide an on-site visit to the property with the tanks identified during the inventory, that is within the 1 year time of travel to provide the property x owner with a map of the DWSMA and information about tank maintenance as it relates to the protection of the ERMU drinking water supply viii 391 Notify MDH if a Class V well is identified and provide management materials to the Class V well owner As Occurs Meet with Sherburne County SWCD to discuss areas where they can work cooperatively on water and land use management issues with the DWSMA and on grant funding. Annually Work with all entities involved in the DWSMA on land use issues. As Needed Meet with Elk River Planning and Zoning to incorporate the map in the city land use and incorporate the WHP Plan into the city Comprehensive Plan x Have Well #5 sampled for stable isotopes of oxygen (180) and deuterium (2H) and several general chemistry parameters on water produced to assess the degree to which surface waters may be contributing to the well. Have x MDH staff and MDH hydro geologist assist in the collection and evaluation of the sampling of surface waters up-gradient of Well #5 as needed. Apply for a SWP grant to help pay associated costs. Contact MDH as to availability of grant Programs Evaluate reasons for younger water being produced at Well #5. Evaluate the downward groundwater leakage from shallower aquifers and overlying x surface bodies into the Mount Simon-Hinckley aquifer. Implement measures that are specified in the IWMZ PCSI report Annually Monitor and maintain the 200 ft. radius around the wells to ensure that setback distances for new potential contamination sources are met. Annually Assist MDH staff in updating the IWMZ inventory for the public water supply wells. Contact your MDH Planner if changes to the locations or x construction of potential contaminant sources are proposed in the IWMZ. Develop policies and procedures for an Emergency Water Plan dealing with derailment as to the proximity of the Railroad and Hwy #10 to Wells # 1 and x Well #2 ix 392 Document all wells that have been sealed by keeping track of the property owners name, address and parcel number of the well location, and share with Sherburne County. If possible, request a well sealing log from the property As Needed owner or well driller who sealed the well. Prepare an assessment ofWHP plan implementation efforts every 2 ½ years. Request assistance from MDH Planner and MRWA. xxx Summarize all WHP Plan implementation efforts in a report to MDH in the th 8year. x Review and update the Water Supply and Management Plan every 2 ½ years. xxx Make entire ERMU and City staff aware of the Contingency Plan. Where it is located and how to use it. Annually The ERMU will prepare an internal assessment of plan implementation every two and one half years and will summarize its progress with plan implementation in the eighth year when the plan amendment process begins. Emphasis in the ninth year will be to prepare an amended plan for submittal to the MDH at the beginning of the tenth year. The amended plan must be approved by the end of the tenth year to ensure that the ERMU always has an approved WHP plan in place. The MDH, MRWA, Federal and State agencies, Sherburne SWCD, and Sherburne County will provide support to the ERMU to implement various actions that are listed above. Refer to the Support provided by Local, State and Federal Governments section of this report to identify the types of outside support that will be provided to the ERMU. The ERMU will serve as the contact for enlisting support that is provided by other local governments. Generally, the MDH will serve as the contact for enlisting the support of other state agencies and from federal agencies on a case-by-case basis regarding technical or regulatory support that may be applied to the management of potential contamination sources. Also, MDH will provide technical support to the ERMU for assessing the impacts that contamination releases may present to drinking water quality and for further data collection that is summarized in the preceding table.Participation by other agencies, federal agencies, and local governments is based on legal authority granted to them and resource availability. x 393 viii 394 Chapter 1 - Introduction 1.1 Background The wellhead protection (WHP) plan for the Elk River Municipal Utilities was prepared in cooperation with the Minnesota Department of Health (MDH). It contains specific actions that the ERMU will take to fulfill WHP requirements that are specified under Minnesota Rules 4720.5510 to 4720.5590. Also, the support that Minnesota state agencies, federal agencies, and SherburneCounty will provide is presented to identify their roles in protecting the ERMU drinking water supply. The plan is effective for 10 years after the approval date specified by the MDH and the ERMU is responsible for implementing its WHP plan of action as described in Table 9 of this report. Furthermore, the ERMU will evaluate the status of plan implementation at least every two and one half years to identify whether its WHP plan is being implemented on schedule. 1.2 Plan Appendices Much of the technical information that was used to prepare this plan is contained in the appendices but is summarized in the main body of this plan. In particular Appendix I contains the first part of the plan, consisting of the delineation of the wellhead protection area (WHPA), the drinking water supply management area (DWSMA), and the vulnerability assessments for the public water supply wells and the DWSMA. This part of the plan is summarized in Chapter 3. Appendix II contains the inventory of potential contamination sources that may present a risk to the ERMU terms of assigning risk to the ERMUroblems or opportunities summarized in Chapter 6. Appendix III contains the contingency strategy to provide for an alternate water supply if there is a disruption caused by contamination or mechanical failure. This part of the plan is discussed in Chapter 11. Chapter 2 - Identification and Assessment of the Data Elements Used to Prepare the Plan The data elements that are included in this plan document the need for the WHP measures that will be implemented to help protect the ERMU potential sources of contamination. The ERMU met with representatives from the MDH on two occasions to discuss the data elements that are specified in MR 4720.5400 for preparing a WHP plan. The first scoping meeting that was held on November 10, 2009 addressed the data elements that were needed to support the delineation of the WHPA, the DWSMA, and the well and DWSMA vulnerability assessments. The second scoping meeting that was held on August 1, 2011 1 395 discussed the data elements required to 1) identify potential risks to the public water supply and 2) develop effective management strategies to protect the public water supply in relation to the well and DWSMA vulnerability. The results of each meeting were communicated to the ERMU by the MDH through a formal scoping decision notice The following table presents the data element assessment results relative to the overall impact that each data element has on the four items listed. Table 1 - Assessment of Data Elements Definitions High (H) - the data element has a direct impact Moderate (M)- the data element has an indirect or marginal impact Low (L)- the data element has little if any impact Shaded Areathe data element was not required by MDH for preparing the WHP plan. Present and Future Implications Data ElementData Source Use in Well (s) Criteria DWSMA Land and Use of the Delineation Quantity of Well Water Quality and Groundwater Precipitation Geology Maps and geologic MGS, DNR, USGS, Consultant HHHH descriptionsReports Subsurface data HHHH MGS, MDH, MPCA, DNR, MDA Borehole geophysics HHHH MGS, Consultant Reports Surface geophysics HHHH DNR, MPCA, Consultant Reports Maps and soil descriptions Eroding lands Water Resources Watershed units Listof public waters Shoreland classifications Wetlands map Floodplain map Land Use ERMU, County, Met Council (Metro Parcel boundaries map LHLL area only) MGIO, ERMU, watershed unit (need Political boundaries map LHLL to define) PLS map LHLL MGIO Sanborn Fire Maps, Historical Society, Land use map and inventory MHMH ERMURecords, County Comprehensive land use LLMH ERMU, County map 2 396 Present and Future Implications Data ElementData Source Use in Well (s) Criteria DWSMA Land and Use of the Delineation Quantity of Well Water Quality and Groundwater Zoning map LLLH ERMU, County Public Utility Services Transportation routes and LLMM MGIO corridors Storm/sanitary sewers and NoneNoneNoneNone MGIO PWS system map Oil and gas pipelines mapMGIO NoneNoneNoneNone Public drainage systems NoneNoneNoneNone MGIO, County ditches map or list Records of well construction, maintenance, HHHH ELK River Municipal Utilities, CWI, and useMDH files Surface Water Quantity Stream flow data Ordinary high water mark data Permitted withdrawals Protected levels/flows Water use conflicts Groundwater Quantity Permitted withdrawalsDNR HHHH Groundwater use conflicts DNR HHHH Water levelsDNR, MPCA, MDA, MDH, ERMU HHHH Surface Water Quality Stream and lake water quality management classification Monitoring data summary Groundwater Quality Monitoring dataMPCA, MDH. MDA, USGS HHHH MPCA, MDH. MDA, USGS, County, HHHH Isotopic data UMN Tracer studiesDNR, MPCA HHHH Contamination site data MMMM MPCA, MDA Property audit data from LHHL MPCA, MDA, property owner contamination sites MPCA and MDA LHHL MPCA, MDA spills/release reports The availability of the information relating to each data element that is used in this plan was evaluated by the Minnesota Department and the Elk River Municipal Utilities. Actions that are 3 397 needed to address deficiencies in either the quality or the amount of data are included in the plan of action (Chapter 9). Chapter 3 - Delineation of the Wellhead Protection Area, Drinking Water Supply Management Area and Vulnerability Assessments A detailed description of the process used for 1) delineating the WHPA and the DWSMA, and 2) preparing the vulnerability assessments of the ERMU water supply well(s) and DWSMA is presented in Part 1 ERMU WHP Plan, Appendix I. The Public work was performed by a geoscientist licensed by the State of Minnesota and employed by Bolton & Menk Engineering. 3.1 WHPA and DWSMA Delineation Figure 1 shows the boundaries of the WHPA and the DWSMA.The WHPA was delineated by using computer simulations of groundwater movement to generate the underground capture zones for ERMU eight wells. The DWSMA boundaries were designated using the following criteria Center-lines of highways, streets, roads, or railroad rights-of-ways; Public Land Survey coordinates; Property or fence lines; 3.2 Well Vulnerability Assessment - The construction and water quality obtained from the wells that are used by the Public Water Supplier is included in the assessment of well vulnerability. All ERMU public water supplies are completed in the Mt. Simon-Hinckley formation and seems to exhibit confined aquifer conditions in most of the Elk River area. Tritium tests were performed on all ERMU wells, and only samples from Well 5 showed an indication of younger (post-1953) groundwater and is classified as vulnerable. It is hypothesized that either the Eau Claire Formation is thinner at the Well 5 location and potentially absent east of the well where buried bedrock valley ispresent. Or, it is possible that the integrity of the well casing itself has been compromised to allow infiltration of water from the upper aquifers into the water from the well. 3.3 DWSMA Vulnerability Assessment-The vulnerability of the DWSMA (Figure 1) was determined using geologic, soils, and groundwater chemistry information. Vulnerability is variable (moderate and low) in the area. While there is good protection provided over the Mt. Simon aquifer in the area of the ERMU DWSMA by the shale-rich, low-permeability Eau Claire formation, there is speculation that in the vicinity of Well 5 the protective shale Eau Claire layer may thin out and allow the infiltration of water from more shallow aquifers. Therefore, the recharge area around Well 5 is vulnerable (moderate), while the remaining portion of the DWSMA for all other wells is not vulnerable. 4 398 Chapter 4 - Assigning Risk to Potential Contamination Sources The types of potential contamination sources that may exist within the DWSMA were derived from the information collected to satisfy the data element requirements (Chapter 2). The impact assigned to each data element as part of the assessment process (Table 1) was used to assess the types of potential contamination sources that may present a risk to the ERMU supply. Generally, the ERMU considers all types of land- and water-uses as presenting a possible risk to groundwater quality where the source water aquifer exhibits a high or very high vulnerability. Where the source water aquifer exhibits a moderate vulnerability, certain types of potential contamination sources that may release contaminants to the subsurface must be included in addition to wells, excavations that may reach the source water aquifer and certain types of Environmental Protection Agency Class V wells. These additional types include above ground and buried chemical and fuel storage tanks, underground waste disposal practices, pipelines and fuel/chemical spills. Where the source water aquifer exhibits a low or very low vulnerability, certain types of potential contamination sources that may release contaminants to the subsurface must be included in addition to wells, excavations that may reach the source water aquifer and certain types of Environmental Protection Agency Class V wells. 4.1 Contaminants of Concern None of the contaminants that are regulated under the federal Safe Drinking Water Act have been detected in the ERMU water supply wells. However, the vulnerable nature of the aquifer requires that potential contamination sources that may release them be inventoried. These potential sources likely reflect those that could present a threat to drinking water if a contaminant release were to occur because the contaminants have a known impact on public health. 4.2 Inventory Results and Risk Assessment The ERMU Wellhead Protection Team conducted the inventory of potential contaminant sources. The MDH provided the team with a listing of potential contamination sources from state agency databases and team members provided knowledge about other potential sources that are not addressed under state regulatory programs. Most of the work was accomplished at meetings of team members although this was supplemented with driving throughout the DWSMA to confirm some of the information. The inventory began with updating the locations of potential contamination sources in the area that is located within 200 feet of each city well and is referred to as the IMWZ. A description of the locations of potential contamination sources is presented in Appendix II. A summary of the results for the IWMZ is listed in Table 2 and complete IWMZ PCSI reports are presented in Figure 6, and for the remainder of the DWSMA in Table 3. The priority assigned to each type of potential contamination source addresses 1) the number inventoried, 2) its proximity to an ERMU well, 3) the capability of local geologic conditions to absorb a contaminant, 4) the effectiveness of existing regulatory controls, and 5) the time required for the ERMU to obtain cooperation from governmental agencies that regulate it. A high (H) risk potential implies that the potential source type has the greatest likelihood to negatively impact the ERMU 5 399 supply and should receive highest priority for management. A low (L) risk potential implies that a lower priority for implementing management measures is assigned. Table 2 Potential Contamination Sources and Assigned Risk for the IWMZ Total Source TypeLevel of Risk Wells (Non-City)2H Above Ground Storage Tanks1H Sewer Lines1H Table 3 Point Sources of Potential Contamination and Assigned Risk for the Remainder of the DWSMA Total Number within Number Within Potential Source NumberEmergency Response Remainder of the TypeArea and Level of DWSMA and Level Riskof Risk City Wells88HN/AN/A Non CityWells 22112H209H High Priority Non City Wells Intermediate 801M79L Priority High Capacity 10N/A1H Wells Storage Tanks7H 261H 18L *H=High Risk *M=Moderate Risk *L= Low Risk Chapter 5 - Impact of Land- and Water- Use Changes on the Public Water Supply Well(s) The ERMU estimates that the following changes to the physical environment, land use, surface water, and groundwater may occur over the ten-year period that the WHP plan is in effect. This is needed to determine whether new potential sources of contamination may be introduced in the future and to identify future actions for addressing these anticipated sources. Land- and water- use changes may introduce new contamination sources or result in changes to groundwater use and quality.The anticipated changes may occur within the jurisdictional authority of the ERMU although some may not. The following table describes the anticipated changes to the physical environment, land use, and surface water or groundwater in relationship to their 1) the influence that existing governmental land and water programs and regulations may have on the anticipated change, and 2) the administrative, technical, and financial considerations of the public water supplier and property owners within the DWSMA. 6 400 Table 4-Expected Land and Water Use Changes Impact of the Influence of Existing Administrative, Expected Change Expected Change Government Programs Technical, and Financial, (Physical Environment, Land Use, Surface Water, Ground On the Source and Regulations on the Considerations due to the Water) Water AquiferExpected ChangeExpected Change Physical Environment : Does not applyDoes not applyDoes not apply No change is anticipated. Land Use: ERMUThe ERMUexpects expects light commercial moderate growth over the The Mount Simon-Hinckley growth. The ERMUnext 10 years, although aquifer is highly regulated expects light residential and currently is capable of Do not see any changes due to growth in established water users which would sustaining several high this expected change subdivisionscause significant changes capacity ERMUwells in the in the amount of water Elk River area. pumped. No changes in DWSMA Surface Water:Evaluate downward ground Well # 5 is producing Well #5Does not applywater leakage from shallower younger water aquifers Ground Water:ERMUChanges in the Does not applyDoes notapply wells have historically groundwater supply are provided groundwater of unlikely to occur excellent quality and quantity Chapter 6 - Issues, Problems, and Opportunities 6.1 Identification of Issues, Problems and Opportunities - The ERMU has identified water- and land-use issues, problems and opportunities related to 1) the aquifer used by the ERMU water supply wells, 2) the quality of the well water, or 3) land- or water-use within the DWSMA. The ERMU assessed 1) input from public meetings and written comments that it received, 2) the data elements identified by the MDH during the scoping meetings, and 3) and the status and adequacy of the ERMU of local, state, and federal government programs. The results of this effort are presented in the following table which defines the nature and magnitude of contaminant source management issues in the ERMU resource needs enables the ERMU to: 1) take advantage of opportunities that may be available to make effective use of existing resources, 2) set meaningful priorities for source management and 3) solicit support for implementing specific source management strategies. 6.2 Comments Received There have been several occasions for local governments, state agencies and the general public to identify issues and comment on the ERMU the beginning of the planning process, local units of government were notified that the ERMU was going to develop its WHP plan and were given the opportunity to identify issues as well as to comment. A public information meeting was held to review the results of the delineation of 7 401 the WHP area, DWSMA, and the vulnerability assessments and the meetings of the WHP protection team were open to the public. Also, a public hearing was held before the completed WHP plan was sent to MDH for state agency review and approval. The following issues were identified during comment periods Table 5Issues, Problems and Opportunities Problem Associated Adequacy of Impacted Opportunity Associated Issue Identified with the Identified Existing Controls to Featurewith the Identified Issue IssueAddress the Issue The ERMUcan partner with The ERMUdoes not There are likely AquiferThe ERMUneeds to Sherburne County & SWCD to have authority to require numerous unused Well Water assess which wells help property owners pay for that unused wells be and unsealed wells Qualitypresent a threat to the the costs of properly sealing properly sealed. on residential DWSMA aquifer based upon their unused wells. & commercial (Select all depth, construction, and The MDH has grant programs The MDH has authority propertiesthat apply.) state of repairavailable to assist with the to require well sealing sealing of wells No jurisdiction for a ERMUwill work closely with County presently has Aquifer DWSMA small number of the numerous jurisdictions on zoning and building DWSMA boundaries extend properties located within land use decisions outside permit jurisdiction over Well Water past ERMUlimitsand outside the ERMU.the DWSMA located Quality DWSMA.outside ERMUlimits. At the present timethe ERMU, local and state governments have existing controls in place The ERMU to address most issues as recognizes this is a they occur. Some issues 10 year plan and The ERMUhas the are uncontrollable and that issues, AquiferThe ERMUneeds to opportunity to work with other unforeseen and problems, and DWSMAhave the flexibility to local units of government to additional controls might opportunities can Well Water address changing address those issues, problems need to be considered to change from today Qualitysituationsand opportunities that may address new issues. The which can impact change over the next 10 years. ERMU, local and state the implementation governments are strategies continually updating land use controls as new issues, new problems and new opportunities occur. The ERMUhas With limited resources ERMUwill form working ERMUhas limited time limited resources to theimplementation of partnerships with local units of and resources for implement all of the the WHP Plan will be a government and state agencies implementation. management DWSMA challenge to the ERMU.that have regulatory authority strategies contained and/or programs to help with within this WHP implementation. plan New high capacityAquiferThe ERMUhas no The ERMUwill keep updating The ERMUwill need to wells drilled within DWSMAauthority over the land use controls to allow the work closely with MDH the DWSMA or one Well Water construction and ERMUthe authority over the and the MN Dept of mile of the Qualitypumping rates for newly construction of high capacity Natural Resources of 8 402 DWSMA might constructed high ERMUwells within the Water in the alter the WHPA capacity wellslocated corporate boundaries and work identification of high boundary and outside of the with the appropriate agencies capacitywells which provide a pathway jurisdictionon those outside of their mightbe drilled within for pollutants to jurisdiction.the DWSMA or one mile enter into the of the DWSMA aquiferboundaries and their potential impact on the WHPA boundaries. The ERMU has authority The ERMUis AquiferERMU regulates domestic and Local citizens have over the construction of continually updating land DWMAirrigation wells through the opportunity to domestic use private use controls as new Well Water Ordinance Chapter 78, Article drill irrigation wellswells. The ERMU issues, new problems and QualityII, Division 2. allows irrigation wellsnew opportunities occur Work with MDH to Continue to evaluate Well # 5 AquiferWell # 5 is producing develop a process for for downward groundwater DWSMAyounger water and could evaluating Well # 5 for Well # 5leakage from shallower Well Water have some leakage from groundwater leakage and aquifers and overlying surface Qualityshallower aquifers.surface water. bodies. Tank was discovered during AquiferIf the tank isnot ERMU will provide tank Above ground the PCSI and the owner is DWSMAmaintained and properly information and storage tank located cooperative with the city in Well Water sealed some leakage educational materials to in the IWMZ.making sure the tank does not Qualitycould occur.the owner of the tank cause contamination issues. Chapter 7- Existing Authority and Support Provided by Local, State, and Federal Governments In addition to its own controls, the ERMU will have to rely upon partnerships formed with local units of government, state agencies, and federal agencies with regulatory controls or resource management programs in place to help implement its WHP plan. The level of support that a local, state, and federal agency can provide to help offset the risk that is presented by a potential contamination source will depend up on its legal authority as well as the resources that are available to local governments. 7.1 Existing Controls and Programs of the Public Water Supplier - The ERMU has identified the following legal controls and/or programs that it has in place that can be used to support the management of potential contamination sources within the DWSMA. Table 6Controls and Programs of the Public Water Supplier Type of Control Program Description Building PermitsProvides an opportunity to require performance standards to offset potential risks posed by a land use. Ordinance Requiring Hookup Requires private land owners to connect to ERMU to ERMUServicesservices when available. Zoning Ordinance and Provides oversight and control to make sure orderly Conditional Use Permits (CUP)growth occurs with the ERMU. Specifies performance standards needed to offset potential risks 9 403 posed by land use. Comprehensive PlanEstablishes ERMUwide goals and priorities towards orderly growth and protecting water resources. Domestic Well OrdinanceControls the drilling of wells in the water supply area. 7.2 Local Government Controls and Programs - The following departments or programs within SherburneCounty may be able to assist the ERMUwith issues relating to potential contamination sources that 1) have been inventoried or 2) may result from changes in land and water use within the DWSMA: Table 7-Local Agency Controls and Programs Government Name of Program Description UnitControl/Program Sherburne Land Use PermitsRegulates land-uses to comply with zoning County Planning ordinances. and Zoning CUP/IUP PermitsSpecifies performance standards needed to offset Departmentenvironmental risk presented by a proposed land use. Sherburne Water PlanningEstablishes county wide goals and priorities towards County Soil and protecting water resources. Water Administration for grant The Sherburne County SWCD promotes the Conservation programs for local protection of water and soil resources in the County District (SWCD)governments.through educational programs, collaboration with other local, state and federal agencies.Administers local comprehensive water plans for the county. Elk River Joint PowersWorks to improve the quality of Elk River Watershed Watershed District through education, conservation and district.responsible use of resources. City of Elk RiverOrdinanceRegulates connections to water system with ERMUordinances. 7.3 State Agency and Federal Agency Support - The MDH will serve as the contact for enlisting the support of other state agencies on a case-by-case basis regarding technical or regulatory support that may be applied to the management of potential contamination sources. Participation by other state agencies and the federal government is based on legal authority granted to them and resource availability. Furthermore, the MDH 1) administers state regulations that affect specific potential sources of contamination and 2) can provide technical assistance for property owners to comply with these regulations. The following table identifies specific regulatory programs or technical assistance that state and federal agencies may provide to the ERMU to support implementation of its WHP plan. It is likely that other opportunities for assistance may be available over the ten-year period that the plan is in effect due to changes in legal authority or increases in funding granted to state and 10 404 federal agencies. Therefore, the table references opportunities available when the ERMU WHP plan was first approved by MDH. Table 8-State and Federal AgencyControls and Programs Government Type of ProgramProgram Description Unit MN Dept. of State Well Code MDH has authority over the construction of new Health(MR Chapter 4725)wells and sealing of wells. MDH staffin the Well Management Program offers technical assistance for enforcing well construction, maintaining setback distances for certain contamination sources, and well sealing. MN. Dept. of WHPMDH has staff that will assist the ERMUwith Healthidentifying technical or financial support that other governmental agencies can provide to assist with managing potential contamination sources. MDH administers SWP grant program. MN Dept. of Water Appropriation PermittingDNRcan require that anyone requesting an increase Natural (MR Chapter 6115)in existing permitted appropriations or to pump Resourcesgroundwater must address concerns of the impacts to drinking water if these concerns are include in a WHP plan. EPAClass V WellsAutomatic closure of Class Vautomotive waste disposal wells within the WHP Area. Inventory of all Class V Wells. MPCAHazardous waste generators and MPCA identifies, regulates clean up spills, leaks and storage tanksother hazardous material that can affect health and environment 7.4 Support Provided by Non-profit Organizations The Minnesota Rural Water Association (MRWA) has provided technical assistance to the ERMU of Elk River throughout the development of this WHP Plan and will assist the ERMU with implementing its WHP Plan by providing: 1) referenced educational and outreach materials for land owners, 2) technical assistance for implementing individual WHP action items listed in the Plan, and 3) support to the ERMU for assessing the results of Plan implementation. 11 405 Chapter 8 Goals Goals define the overall purpose for the WHP plan as well as the end points for implementing objectives and their corresponding actions. The WHP team identified the following goals after considering the impacts that 1) changing land- and water-use changes over time have presented to drinking water quality and 2) future changes that need to be addressed to protect the Maintain a safe and adequate drinking water supply for community residents that continues to meet thealth, safety and general welfare of the community Educate the general public regarding the principals and importance of water conservation and collecting additional data to support future delineation in order to promote the proper use of drinking water resources and monitor the geologic condition of Well # 5. Chapter 9 - Objectives and Plan of Action Objectives provide the focus for ensuring that the goals of the WHP plan are met and that priority is given to specific actions that support multiple outcomes of plan implementation. Both the objectives and the wellhead protection measures (actions) that support them are based on assessing 1) the data elements (Chapter 3), 2) the potential contaminant source inventory (Chapter 5), 3) the impacts that changes in land- and water-use present (Chapter 6) and 4) issues, problems, andopportunities referenced to administrative, financial, and technical considerations (Chapter 7). 9.1 Objectives - The following objectives have been identified to support the goals of the WHP plan for the ERMU 1.Create awareness and general knowledge about the importance of WHP in the Elk River Community and the ERMU DWSMA. 2.Properly inventory and manage potential contaminant sources to protect the drinking water supply for the ERMU. 3.Gather additional information within the DWSMA in order to better understand the size and vulnerability of the DWSMA 4.Effectively track and report the implementation efforts and wellhead protection plan progress to all governing authorities. 5.Manage the Inner Wellhead Management Zone to prevent contamination of the aquifer near the public supply wells. 6.Effectively prepare the ERMU for disruptions to the water distribution system. 9.2 WHP Measures and Action Plan - Based upon the factors, the WHP team has identified WHP measures that will be implemented by the ERMU over the 10-year period that its WHP plan is in effect. The objective that each measure supports is noted as well as 1) the lead party and any cooperators, 2) the anticipated cost for implementing the measure and 3) the year or years in which it will be implemented. 12 406 The following categories are used to further clarify the focus that each WHP measure provides as well as help to organize the measures listed in the action plan: Data Collection IWMZ Management Land Use Management Potential Contamination Source Management Public Education and Outreach Reporting and Evaluation Water Use and Contingency Strategy 9.3 Establishing PrioritiesWHP measures reflect the administrative, financial, and technical requirements needed to address the risk to water quality or quantity presented by each type of potential contamination source. Not all of these measures can be implemented at the same time, so the WHP team assigned priority to each. A number of factors must be considered when WHP action items are selected and prioritized (part 4720.5250, subpart 3): 1.Contamination of the public water supply wells by substances that exceed federal drinking water standards 2.Quantifiable levels of contamination resulting from human activity 3. The location of potential contaminant sources relative to the wells. 4. The number of each potential contaminant source identified and the nature of the potential contaminant associated with each source 5. The capability of the geologic material to absorb a contaminant 6. The effectiveness of existing controls 7. The time required to get cooperation from other agencies and cooperators 8. The resources needed: staff, money, time, legal, and technical The ERMU defines priority for implementing a WHP measure as an action that directly addresses a Potential Contaminant Source (PCS) which protects their drinking water supply from contamination from the potential contaminant source.The following table lists each measure that it will implement over the ten year period that the ERMU priority that it has assigned to each measure. 13 407 Table 9-WHP Plan of Action Public Education and Outreach ERMU Action Alone Implementation time frame Unless Cooperator is Description Cost Noted Priority Measure 345678912 Objective Addressed 2022 201201201201201201201202020 Provide ERMU residents with a pamphlet or bill stuffer that ERMU, explains the importance of WHP and the need to seal priority Staff 1SWCD, H Annually time MRWA find funding available. Request assistance from MRWA. 1000 Measure 1 $ Distribute materials to property owners in and outside of the ERMUlimits within the DWSMA relating to the proper ERMU, 1 management of wells xx H MRWA $300 Measure 2 Continue to provide tours of the water plant to educate school children on the importance of WHP, conservation and protection. 1ERMU Educate the Energy City tour groups on WHP and water topics to xxx M $300 globalize water protection information. Measure 3 In the next two years, create and present a mobile display for agencies around the DWSMA in order to educate the public 1ERMU visually. Example locations: YMCA, City Library, Elk River xx H $650 Municipal Unities and City offices, Senior Activity Center. Measure 4 In the next year, we will take footage of a local well sealing and create a video presentation to display on ERMU website, You 1ERMU x M $300 maintenance and well sealing cost-share availability Measure 5 Keep local city channel (Channel 12) ERTV12 well and water 6 footage up to date with any changes in DWSMA area. Currently 00 Ldemonstrate: Water system incite, water meter change outs 1ERMU xx $1 details, wellhead protection importance, water Measure conservation/SMART irrigation information, etc. Annually mail Consumer Confidence Reports so citizens are 7 aware of the water quality 1ERMU H Annually $800 Measure Contact Sherburne County annually to see what monies are 8 available through the county for education and well sealing 1ERMU H Annually Staff time Measure 14 408 Public Education and Outreach Continued Implementation time frame ERMU Action Alone Unless Description Cost Cooperator is Priority Objective Addressed 2013201420152016201720182019202020212022 Noted Measure Present Kids themed information on WHP/water conservation for Earth Day school visit and other kid activity days with schools, 1ERMU xxx H $550 additional audiences each year to reach a variable age range Measure 9 ERMU, City , and Sherburne SWCD will conduct MDH nitrate well water testing clinicERMU CITY 1 x H SWCD $2,000 MDH Measure 10 Distribute and post educational materials related to the maintenance of above and below ground storage tanks to property 4ERMU xx Howners with tanks as it relates to the protection of the ERMU $2,200 drinking water supply. Place information on website immediately. Measure 11 Potential Contamination Source Management ERMUImplementation time frame Action Alone Unless Description Cost Cooperator is 2013201420152016201720182019202020212022 Priority Measure Objective Addressed Noted There are known wells on the PCSI inventorywithout complete 2 1 data fields. ERMU names, addresses, parcel identification numbers, status of wells or 2ERMU H x $900 other applicable information on the wells in order to complete the Measure PCSI The ERMUwill apply for grant funds to help seal unused wells 3 1 located in the DWSMA. If they are successful they will use the ERMU, money to seal the wells. If unsuccessful they will work 2 H x MDH, SWCD cooperatively with the local units of government to provide as $40,000 Measure much cost share as possible to help seal wells 15 409 Provide an on-site visit to the property with the tanks identified during the inventory, that is within the 1 year time of travel to provide the property owner with a map of the DWSMA and 4ERMU H x information about tank maintenance as it relates to the protection $1,000 Measure 14of the ERMU drinking water supply Notify MDH if a Class V well is identified and provide 5 management materials to the Class V well owner 2ERMU M As Occurs Staff time Measure 1 Land Use Management ERMU Action Alone Implementation time frame Unless Cooperator is Noted Description Cost Priority Measure 2013201420152016201720182019202020212022 Objective Addressed Meet with Sherburne County SWCD to discuss areas where they can work cooperatively on water and land use management issues ERMU, with the DWSMA and on grant funding. 2 M Annually SWCD Staff Time Measure 16 Work with all entities involved in the DWSMA on land use issues. ERMU, SWCD, 2Sherburne Co. M As Needed Planning Staff Time Measure 17 /Zoning Meet with Elk River Planning and Zoning to incorporate the map in the city land use and incorporate the WHP Plan into the city Comprehensive Plan 2ERMU H x Staff Time Measure 18 16 410 Data Collection ERMUImplementation time frame Action Alone Unless Description Cooperator is Cost 2013201420152016201720182019202020212022 Priority Measure Noted Objective Addressed Have Well #5 sampled for stable isotopes of oxygen (180) and deuterium (2H) and several general chemistry parameters on water 9 produced to assess the degree to which surface waters may be 1 contributing to the well. Have MDH staff and MDH hydro ERMU, 3 x M geologist assist in the collection and evaluation of the sampling of MDH Staff Time surface waters up-gradient of Well #5 as needed. Apply for a Measure SWP grant to help pay associated costs.Contact MDH as to availability of grant Programs Evaluate reasons for younger water being produced at Well #5. Evaluate the downward groundwater leakage from shallower ERMU, aquifers and overlying surface bodies into the Mount Simon- 3 x M MDH Hinckley aquifer. Measure 20 IWMZ Management ERMUImplementation time frame Action Alone ive Unless Description Cost Cooperator is 2013201420152016201720182019202020212022 Priority Measure Object Addressed Noted Implement measures that are specified in the IWMZ PCSI report 21 5ERMU M Annually Staff Time Measure Monitor and maintain the 200 ft. radius around the wells to ensure 22 that setback distances for new potential contamination sources are re met. 5ERMU M Annually Staff Time Measu 17 411 Assist MDH staff in updating the IWMZ inventory for the public 23 water supply wells. Contact your MDH Planner if changes to the locations or construction of potential contaminant sources are L5ERMU, MDH x proposed in the IWMZ. Staff Time Measure Develop policies and procedures for an Emergency Water Plan dealing with derailment as to the proximity of the Railroad and Hwy #10 to Wells # 2 and Well #3 H5ERMU x Staff Time Measure 24 Reporting and Evaluation ERMUImplementation time frame Action Alone Unless Description Cooperator is Cost 2013201420152016201720182019202020212022 Priority Measure Noted Objective Addressed Document all wells that have been sealed by keeping track of the 5 2 property owners name, address and parcel number of the well location, and share with Sherburne County. If possible, request a 4ERMU M As Needed well sealing log from the property owner or well driller who Staff Time sealed the well. Measure Prepare an assessment of WHP plan implementation efforts every 6 2 2 ½ years.Request assistance from MDH Planner and MRWA. ERMU, L 4MDH, xxx MRWA Staff Time Measure Summarize all WHP Plan implementation efforts in a report to 7 th MDH in the 8year. ERMU, L4MDH, x MRWA Staff Time Measure 2 18 412 Water Use and Contingency Strategy ERMUImplementation time frame Action Alone Unless rity Description Cooperator is Cost 2013201420152016201720182019202020212022 Prio Measure Noted Objective Addressed Review and update the Water Supply and Management Plan every 8 2 2 ½ years. L6ERMU xxx Staff Time Measure Make entire ERMU and City staff aware of the Contingency Plan. 9 Where it is located and how to use it. 6ERMU M Annually Staff Time Measure 2 9.4 Commitments from cooperators The following agencies that are listed in Table 10 have indicated that they will support the Public Water Supplier with the implementing the WHP measure(s) in which they are identified. Table 10 - Cooperating Agencies List Agency Name Measure NumberActions Agency Will Take Measure Number 10,13,18,19,20,23,26,27 Minnesota Department of Technical Assistance and WHP Rule Health(MDH) 17 Sherburne County Technical Assistance and Land Use and Zoning Planning and ZoningOversight. 1,10,13,16,17 Sherburne County SWCDTechnical Assistance with well sealing, grant administration and Water Plan Coordination. 1,2,26,27 Minnesota Rural Water Technical Assistance with WHP plan writing and Association (MRWA)implementation. 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16, ERMUCity of Elk River Elk River Municipal Utilities Staff 17,18,19,20,21,22,23,24,25,26,27,28,29 Chapter 10 - Evaluation Program Plan evaluation is specified under objective 4and provides the mechanism for determining whether WHP action items are achieving the intended result or whether they need to be modified to address changing administrative, technical, or financial resource conditions within the DWSMA. Evaluation is used to support plan implementation and is required under MR 4720.5270 prior to amending the ERMUThe ERMUhas identified the following procedures that it will use to evaluate the success with implementing its WHP plan. 19 413 1.A annual briefing to the ERMU council will provide the basis for documenting whether each action step for that year was implemented; 2.The WHP team will meet at a minimum every two and one half years to assess the status of plan implementation and to identify issues that impact implementation of action steps throughout the DWSMA; 3.The ERMU will assess the results of each action item that has been taken annually to determine whether the action item has accomplished its purpose or whether modification is needed. Assessment results will be presented in the annual report to the ERMU council. 4.The ERMUwill prepare a written report that documents how it has assessed plan implementation and the action items that were carried out. The report will be presented to MDH at the first scoping meeting that it will hold with the ERMU to begin amending the WHP plan. Chapter 11 - Contingency Strategy The WHP plan must include a contingency strategy that addresses disruption of the water supply that is caused either by contamination or mechanical failure. The ERMU has a water supply plan in effect that was approved by the Minnesota Department of Natural Resources and it fulfills the contingency planning requirements for wellhead protection. A copy of this plan is available for public review during regular business hours at the ERMU offices and is referenced in this section. Chapter 12 - Glossary of Terms Conjunctive Delineation means a WHP area that is defined by two components consisting of 1) the capture zone for a well that is based on generating flow path lines within the subsurface area(s) of contribution and 2) a surface area that may contribute recharge to the capture zone. Data Element means a specific type of information that is required by the Minnesota Department of Health to prepare a wellhead protection plan. Drinking Water Supply Management Area (DWSMA)means the surface and subsurface areas surrounding a public water supply well, including the WHP area, that must be managed by the entity identified in the WHP plan. (MR4720.5100, subpart 13). This area is delineated using identifiable landmarks that reflect the scientifically calculated WHPA boundaries as closely as possible. Emergency Response Area (ERA)means the part of the WHP area that is defined by a one- year time of travel within the aquifer that is used by the public water supply well (MR4720.5250, Subpart 3). It is used to set priorities for managing potential contamination sources within the DWSMA. 20 414 Emergency Standby Wellmeans a well that is pumped by a public water supply system only during emergencies such as when an adequate water supply cannot be achieved because one or more primary or seasonal water supply well cannot be used. Inner Wellhead Management Zone (IWMZ)means the land that is within 200 feet of a public water supply well (MR4720.5100, subpart 19). The public water supplier must manage the IWMZ to help protect it from sources of pathogen or chemical contamination that may cause an acute health effect. Non-point Source Contaminationrefers to contamination of the drinking water aquifer that is caused by polluted runoff or pollution sources that cannot be attributed to a well-defined origin, e.g., runoff from agricultural fields, feedlots or urban areas. Point Source Contamination refers to contamination of the drinking water aquifer that is attributed to pollution arising from a well-defined origin, such as discharge from a leaking fuel tank, a solid waste disposal site, or an improperly constructed or sealed well. Primary Water Supply Wellmeans a well that is regularly pumped by a public water supply system to provide drinking water. Seasonal Water Supply Well means a well that is only used to provide drinking water during certain times of the year either when pumping demand cannot be met by the primary water supply well(s) or for a facility, such as a resort, that is closed to the public on a seasonal basis. Vulnerabilityrefers to the likelihood that one or more contaminants of human origin may enter either 1) a water supply well that is used by the public water supplier or 2) an aquifer that is a source of public drinking water. WHP Area (WHPA) is the surface and subsurface area surrounding a well or well field that supplies a public water system, through which contaminants are likely to move toward and reach the well or well field (Minnesota Statutes, Part 103I.005, subdivision 24). WHP Plan Goal means an overall outcome of implementing the WHP plan, e.g., Providing for a safe and adequate drinking water supply. WHP Measure means a method adopted and implemented by a public water supplier to prevent contamination of a public water supply, and approved by the Minnesota Department of Health under Minnesota Rules parts 4720.5110 to 4720.5590. WHP Plan Objective means a capability that is needed to achieve one or more WHP goals, e.g., implementing WHP measures to address high priority potential contamination sources within 5 years. 21 415 Chapter 13 - List of Acronyms List of Acronyms DWSMA - Drinking Water Supply Management Area ERA - Emergency Response Area ERMU - Elk River Municipal Utilities IWMZ - Inner Wellhead Management Zone LUG - Local Unit of Government MDH - Minnesota Department of Health MRWA - Minnesota Rural Water Association SWCD - Soil and Water Conservation District SWPA - Source Water Protection Area WHP - Wellhead Protection WHPA - Wellhead Protection Area Chapter 14 References 22 416 Chapter 15 FIGURES Figure 1: Regional Location Map Figure 2: ERMU Municipal Well Location Map Figure 3: Groundwater Flow Field Figure 4: Groundwater Flow Field Figure 5: Wellhead Protection Areas Figure 6: Drinking Water Supply Management Area Figure 7: ERMU DWSMA Figure 8: Surficial Geology of the DWSMA Figure 9: DWSMA Vulnerability Figure 10: Sherburne County Map Figure 11: Anoka County Map Figure 12: Wright County Map Figure 13: Otsego City Map Figure 14: Elk River Land Use Map Figure 15: Elk River Zoning Map Figure 16: Well 5 IWHPZ Map Figure 17: Well 5 Sewers/Sanitary Map 23 417 Figure 1: Regional Location Map 24 418 Figure 2: ERMU Municipal Well Location Map 25 419 Figure 3: Groundwater Flow Field 26 420 Figure 4: Groundwater Flow Field 27 421 Figure 5: Wellhead Protection Areas 28 422 Figure 6: Drinking Water Supply Management Area 29 423 Figure 7: ERMU DWSMA 30 424 Figure 8: Surficial Geology of the DWSMA 31 425 Figure 9: DWSMA Vulnerability 32 426 Figure 10 Sherburne County Map 33 427 Figure 11 Anoka County Map 34 428 Figure 12 Wright County 35 429 Figure 13 Ostego City 36 430 Figure 14 Elk River Land Use Map 37 431 Figure 15Elk River Zoning Map 38 432 Figure 16 Well 5 IWHPZ 39 433 Figure 17 Well 5 Sewer/Sanitary 40 434 APPENDIX I Well Head Protection Plan Part 1 41 435 42 436 43 437 44 438 45 439 46 440 47 441 48 442 49 443 50 444 51 445 52 446 53 447 54 448 55 449 56 450 57 451 58 452 59 453 60 454 61 455 62 456 63 457 64 458 APPENDIX II Inventory of Potential Contamination Sources **A large map is available at ERMU for review** 65 459 66 460 67 461 68 462 69 463 70 464 71 465 72 466 73 467 74 468 75 469 76 470 77 471 78 472 79 473 80 474 81 475 82 476 83 477 84 478 85 479 86 480 87 481 88 482 89 483 90 484 91 485 92 486 93 487 94 488 95 489 96 490 97 491 98 492 99 493 100 494 101 495 102 496 103 497 104 498 105 499 106 500 107 501 108 502 109 503 110 504 111 505 112 506 113 507 114 508 115 509 116 510 117 511 118 512 119 513 120 514 121 515 122 516 123 517 APPENDIX III DNR Water Supply Plan Approval Letter **Water Supply Plan is available at ERMU for review** 124 518 125 519 APPENDIX IV Ordinance Chapter 78 **Connection to Water System** 126 520 DIVISION 2. -CONNECTION TO WATER SYSTEM Sec. 78-21. -Connection required. Sec. 78-22. -Notice to connect; installation of connection bycity. Sec. 78-23. -Location of and access to stop valves. Sec. 78-24. -Location of and access to meters. Sec. 78-25. -Disconnection from water system. Sec. 78-26. -Private wells for domestic use. Secs. 78-2778-30. -Reserved. Sec. 78-21. -Connection required. The following buildings shall be required to be connected to the city water utility: (1)All buildings connected to the water utility on the date of adoption of the ordinance from which this article is derived shall remain connected to the water utility for so long as the building is occupied or used for any purpose. (2)All buildings constructed after such date on property to which water utility service is available at the time a certificate of occupancy is issued for the building shall be required to connect to the water utility prior to occupancy. (3)All buildings constructed after such date on property to which water utility service becomes available following legal occupancy of the building shall be required to connect to the water utility as follows: a.All residential buildings with one or two residential units shall be required to connect to the water utility within two years from the date water utility service becomes available to the property or the date the property is assessed for water utility improvements, whichever is later. b.All other buildings shall be required to connect to the water utility within 90 days from the date water utility service becomes available to the property. (4)All buildings existing on the date of adoption of the ordinance from which this article is derived on property to which water utility service becomes available after such date shall be required to be connected to the water utility as follows: a.All residential buildings with one or two residential units shall be required to connect to the water utility within two years from the date water utility service becomes available to the property or the date the property is assessed for water utility improvements, whichever is later. b.All other buildings shall be required to connect to the water utility within 90 days from the date water utility service becomes available to the property. (5)All buildings existing on the date of adoption of the ordinance from which this article is 127 521 derived on property to which water utility service is available but which has not been assessed for water utility improvements shall be required to connect to the water utility as follows: a. All residential buildings with one or two residential units shall be required to connect to the water utility within two years from the date water utility service becomes available to the property or the property is assessed for water utility improvements, whichever is later. b. All other buildings shall be required to connect to the water utility within 90 days from the date water utility service becomes available to the property. (6) All buildings existing on the date of adoption of the ordinance from which this article is derived on property to which water utility service is available and which has been assessed for water utility improvements, but which are not connected to the water utility, shall be required to connect to the water utility as follows: a. All residential buildings with one or two residential units shall not be required to connect to the water utility unless and until the city council determines on a case-by-case basis that connection to the water utility is necessary to protect the public health, safety and welfare or to otherwise comply with applicable law. b. All other buildings shall be required to connect to the water utility within two years of the date of adoption of the ordinance from which this article is derived. (Ord. No. 09-02, § 1, 3-2-2009) Sec. 78-22. - Notice to connect; installation of connection by city. The owner of any building required by section 78-21 to be connected to the city water utility shall cause the building to be connected to the water utility at the owner's expense as required. If connections to the water utility are not being made pursuant to this section, the city shall serve written notice on the affected property owner stating that if connection is not made within 90 days after the date of the notice, the connection will be made by the city at the expense of the owner and that, if unpaid, the charge for such work will be made a special assessment against the property concerned. Such assessment, including interest at the legal rate for local improvements, shall be certified to the county auditor and collected and remitted to the city in the same manner as assessments for local improvements. The rights of the city under this section shall be in addition to other remedial or enforcement rights provided by this Code or other applicable law. (Ord. No. 09-02, § 1, 3-2-2009) Sec. 78-23. - Location of and access to stop valves. All water service lines connecting a building to the facilities of the water utility shall have 128 522 a stop valve installed. The stop valve shall meet specifications established from time to time by the city department of public works. The stop valve shall be located in the public right-of-way immediately adjacent to or in the curb, unless another location is approved in writing by the department of public works. The property owner shall not remove, obstruct or cover the stop valve in any way, including by covering it with soil, landscaping, concrete or asphalt. (Ord. No. 09-02, § 1, 3-2-2009) Sec. 78-24. - Location of and access to meters. Water meters shall be installed and located as required by applicable building codes and ERMU rules and regulations. Property owners shall provide ERMU with access to water meters for the purposes of reading, checking, repairing or replacing meters. ERMU shall give written notice to property owner when it needs to access a meter. If no response to the notice is received within 30 days, ERMU shall give a second notice advising that water service will be shut-off if there is no response within 15 days. If there is no response, ERMU shall inspect the property to see if it is vacant and shall post a notice on the property that water service will be shut-off in 15 days unless access is provided to the meter within that time period. If no response is received, ERMU may shut off water service to the property no earlier than 15 days from the date of the posted notice, pursuant to the shut-off procedures set forth in section 78-32, and may recover its costs as provided in section 78-33. (Ord. No. 09-02, § 1, 3-2-2009) Sec. 78-25. - Disconnection from water system. (a) Except in emergency situations or as provided in division 3 below, no building shall be disconnected from the water system without the prior written approval of ERMU, and no approval shall be granted to disconnect any building which is occupied or used for any purpose. Requests to disconnect from the water system shall be accompanied by a certification from the owner of the property that the building is vacant and unused for any purpose. (b) If ERMU grants approval for a property to be disconnected from the water service, it shall be the property owner's responsibility to have the water service shut off at the stop-valve by a licensed plumber. ERMU will assist in locating the stop-valve if requested. (c) Temporary, emergency disconnections are allowed, provided that ERMU is advised as soon as is practical of the emergency and the schedule for reconnecting the building to the water system. (d) ERMU may establish fees to review and approve requests to disconnect from the water service, and shall be entitled to recover all of its costs to assist in disconnections, including emergency disconnections, as provided in 78-33 below. (Ord. No. 09-02, § 1, 3-2-2009) 129 523 Sec. 78-26. - Private Wells for domestic use. (a) The installation of new private wells for domestic use on any property to which city water utility service is available, other than wells which serve a single buildable lot (as defined in this Code), is prohibited, subject to the exceptions set forth in subsection 78- 26(c). (b) Private wells for domestic use in existence on October 18, 2010, and private wells for domestic use installed subsequent to October 18, 2010, on properties to which city water utility service is not available at the time of installation, may remain in use provided they comply with all applicable regulations, including but not limited to 42 USCS § 300f300j-26 and Minn. Stats. §§ 144.381 to 144.387. (c) "Private wells for domestic use" shall mean any well not owned by the city water utility which is drilled or installed for potable water or irrigation purposes. "Private Wells for domestic use" shall not include wells drilled for such purposes as dewatering, groundwater monitoring, heating or cooling, elevator borings or environmental bore holes. (Ord. No. 10-21, § 1, 10-18-2010) Secs. 78-2778-30. - Reserved. 130 524