9.1. SR 01-21-2020Request for Action
To
Item Number
Mayor and City Council
9.1
Agenda Section
Meeting Date
Prepared by
Work Session
January 21, 2020
Zack Carlton, Planning Manager
Item Description
Reviewed by
Joint Meeting with Parks and Recreation
Cal Portner, City Administrator
Commission to Discuss Park Dedication for River
Reviewed by
Walk Apartments
Action Requested
Discuss park dedication requirements for development of the former Saxon Motors site as high -density
residential.
Background/Discussion
On December 16, 2019, the City Council and Pat Briggs (representing the property owner Sun Rae
Apartments, LLC) discussed park dedication requirements for redeveloping the Saxon Motors property
and the two vacant lots to the north as a 200-unit high -density residential development. There is also the
possibility of incorporating climate -controlled storage as part of the project.
Mr. Briggs also submitted a proposal to dedicate 12.2 acres of land to satisfy the park dedication
requirements for the residential development. Around 80 percent the proposed land dedication is within
the floodplain along the Mississippi River as the buildable area outside of the floodplain is approximately
2.3 acres.
State statute states that only buildable land should qualify for dedication. Flood plain and steep slopes
(bluff areas) are not considered buildable land.
River Walk Project
A conceptual 200-unit residential development on the former Saxon Motor site would require payment of
a Park Dedication Fee. Previous direction from the Park and Recreation Commission and City Council
called for a trail easement and cash dedication. The trail easement is not required to count as land
dedication and it was not included as such during previous discussions. The cash dedication for this
project would account for the 200 units and discount what has been satisfied as an existing commercial
use.
200 units x $4,897.04 — ($35,392.00 credit for commercial use) _ $944,016.00
If the city chooses to accept land to satisfy park dedication requirements, ordinance requires 9.48 acres.
Council and the Parks and Recreation Commission may accept land to satisfy some or all the required
dedication, but the previous recommendation did not include direction for park land in the subject area,
which is also consistent with the Parks Master Plan.
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional,` 01 e
service, and community engagement that encourages and inspires pi ospei ly INAMIRE1
Financial Impact
Adjustments to the Park Dedication Fee will impact the Park Dedication Fund, of which designated
funds are eligible for park expansions and additions.
Attachments
City Council Packet and Minutes dated December 16, 2019
Agenda submitted by Pat Briggs dated December 16, 2019
N:APublic Bodies\Agenda Packets\01-21-2020\Fugal\9.1 sr Park Dedication.docx
Request for Action
To
Item Number
Mayor and City Council
9.2
Agenda Section
Meeting Date
Prepared by
Work Session
December 16, 2019
Zack Carlton, Planning Manager
Item Description
Reviewed by
Park Dedication
Cal Portner, City Administrator
Reviewed by
Action Requested
Receive information and provide staff with direction regarding park dedication requirements and future
development projects.
Background/Discussion
As part of the update the Park and Recreation Parks Master Plan, our consultant recommended review of
the city's Park Dedication Fee due to concerns with recent changes to the state statute governing
dedication of property for public purposes. Council directed staff to review the fee and explore options
for calculating the cash in lieu of land dedication.
That process and methodology used to update the fee is outlined in the attached Council Packets, and the
following per unit rates were added to the city's fee schedule:
Low Density (<4 DU/ acre) $1,425.93/dwelling unit
Medium Density (4 to <7 DU/ acre) $1,075.79/dwelling unit
High Density (>7 DU/ acre) $4,897.04/dwelling unit
Prior to updating the fee, park dedication for residential developments was a flat $3,712/unit regardless
of density. A survey of surrounding communities found the following cash dedication rates for residential
development:
Park Dedication Comparisons
City
Residential Cash Dedication Requirement
Ramsey
Base cash dedication rate
$3,500/unit
exceed 12+ units/acre
$2,775/unit
exceed 20+ units/acre
$2,550/unit
Rogers
fee for all densities
$3,500/unit
Otsego
fee for all densities
$1,968/unit
Big Lake
Min. fee or 10% land value
$2,500/unit
Monticello
% of land value (appraisal)
11%
St. Michael
fee for all densities
$3,200/unit
Dayton
fee for all densities
$3,156/unit
The Elk River Vision
A PehoMing cornrnunity �a itb revolutionary and spirited resourcefulness, exceptional P 01 W E H E 8 6 T
service, and community engagement that encourages and inspires prosperity INAMIRE1
River Walk Project
A conceptual 200-unit residential development on the former Saxon Motor site would require payment of
a Park Dedication Fee. Previous direction from the Park and Recreation Commission and City Council
called for a trail easement and cash dedication. The trail easement is not required to count as land
dedication and it was not included as such during previous discussions. The cash dedication for this
project would account for the 200 units and discount what has been satisfied as a commercial use.
200 units x $4,897.04 — ($35,392.00 credit for commercial use) _ $944,016.00
Council may discuss accepting land to satisfy a portion of the dedication, but the Park and Recreation
Commission recommendation did not include a desire for park land in the subject area, which is also
consistent with the Parks Master Plan. State statute notes that only buildable land should qualify for
dedication. Flood plain and steep slopes are not considered buildable land.
The city attorney will review statute guidance for Park Dedication Fees and staff will review how the
current fees were established.
Financial Impact
Adjustments to the Park Dedication Fee will impact the Park Improvement Fund.
Attachments
■ City Council agenda item October 19, 2015
■ City Council agenda item July 5, 2016
■ Park and Recreation agenda and Minutes from November 14, 2018
■ City Council agenda item and Minutes from February 19, 2019
N:APublic Bodies\Agenda Packets\12-16-2019\Final\9.2 sr Pork Dedication.docx
4�`-
ER
River
Request for Action
To
Item Number
Mayor and City Council
9.1
Agenda Section
Meeting Date
Prepared by
Work Session
October 19, 2015
Michael I Iecker, Parks and Recreation Director
Item Description
Reviewed by
Park Dedication Fees
Cal Portner, Cite Administrator
Reviewed by
Action Requested
Discussion of Park Dedication Ordinance language.
Background/Discussion
Fused on City Council direction in June 2015, staff worked with HKGi to update the city's Park
Dedication ordinance.
This work provided includes potential approaches for the determination of Park Dedication and
recommended revisions to the City Code.
HKGi Planner Rita Trapp will lead a presentation with City Council on recommendations and updates to
the city's Park Dedication {ordinance
Financial Impact
ti,',1
Attachments
■ I I ItiGi Update Memo on Park Dedication
P0WIAlo eY
Template Updated 4/ 14 INAWRE]
Hoisington Koegler Group Inc.
To: Elk River City Council and City Staff
From: Rita Trapp AICP
Subject: Update on Park Dedication Study
Date: October 14, 2015
As was directed at the June 15th City Council Work Session, HKGi has been working with City Staff on
evaluating potential approaches for the determination of park dedication and recommended revisions to
City Code Sections regarding park dedication.
Park Dedication Rates
Residential Dedication Rate
As was identified in the initial park dedication review, the City currently has one park dedication rate for all
residential densities. Given the difference in need and impact of the various types of residential development, it
is recommended that the City use a graduated system for its park dedication rate. As shown in the previous
PowerPoint presentation, the residential park dedication rates in other communities vary between 10% and
20%with a few outliers in some communities.
The following table was developed to illustrate the amount of park land needed to serve medium and high
density housing developments and the corresponding percentage of park dedication that would need to be
required to meet this need. The analysis uses the National Recreation and Park Association standard of 10 acres
per 1,000 people. It also assumes that medium density projects like town homes have 2.25 people per unit and
multifamily projects like apartments have 1.75 people per unit.
Staff recommends that the City establish a park dedication rate based on density ranges rather than zoning
districts. This is recommended because different densities can occur within the same zoning district. The
following chart shows Staff's recommendation based on the analysis and comparisons with other communities.
Density Units per Acre Park Dedication
Low Under 4 units/acre 10%
Medium 4to 7 units/acre 13%
High More than 7 units/acre 16%
123 North Third Street, Suite 100, Minneapolis, MN 55401-1659
Ph (612) 338-3800 Fx (612) 338-6838 www.hkgi.com
Page 2
Commercial and Industrial Dedication Rate
The City currently has a park dedication rate of ten (10) percent for commercial and industrial properties. As
was noted in at the June City Council Workshop, the park dedication survey HKGi completed this spring found
communities had park dedication rates ranging from two (2) to ten (10) percent with half using 10%. It is
recommended that the rate be maintained at 10%at this time.
Method of Cash in Lieu Dedication
The following table was developed to provide an overview, as well as the pros and cons of each potential
method for collecting cash in lieu of a land dedication.
OverviewMethod
Set based on
Use the fees set by other
&
Easy to implement
&
May not be reflective of real
neighboring
communities as the basis far
•
Ensures City is
estate market
communities
the fee in Elk River
competitive
•
Potential for legal challenge
as does not meet state
statute requirements
County Assessors
Use estimated market value of
&
Easy to identify
&
Lags behind marketplace so
Value
the land for fee collection
■
Generally accepted
may collect too much or too
method
little
Appraisal Study
Hire an appraisal firm to
■
More accurate to
■
Study estimated to cost
conduct a study evaluating the
market conditions
$5,000 to $15,000 depending
average market value of vacant
■
Established fee that
on the number of classes and
properties by class. The study
developers can be
firm selected
would take about 2 to 3
certain of
■
Potential for market lag
months to complete and could
depending on the frequency
be paid for from park
that City conducts study
dedication. This would be used
to set the fee amounts.
Require appraisal
Require that the developer
■
Establishes fee at
■
Adds time to development
at time of
submit an appraisal as part of
exact land value
process
development
the final platting process. Fee
•
Reflects each unique
•
Additional cost for developer
collection would then be based
situation
— one firm estimated an
on that value.
appraisal to cost $2,500+ for
commercial/multi-family
projects
Sale Price of
Require that the developer
•
Relatively simple to
■
May not include value gained
Property
provide the sale price of the
implement
through entitlement process
property and use that value for
■
Sale may have occurred a
fee collection.
significant time ago
•
Potential for developers to
manipulate
Negotiation
Require that each park
Uncertainty for
&
Potential to be challenging to
dedication fee be agreed to
developers
come to an agreement
through negotiation between
&
Starting point will still need
the developer and the City.
to be established
•
Staff time
•
Potential for legal challenge
Page 3
Mettiod
Overview
Prosr
Allow developer
Allow developer to select
■ Provides more legal
■ Will end up with lowest
to select from
whether they want to use the
protection as
amount of park dedication
options
park dedication fee or submit
developers have
possible. Impact depends on
an appraisal
opportunity to select
options provide.
preferred option
Require "higher"
List multiple options and
■ Best potential to
■ Potential for legal challenge
of multiple
require the one with the
maximize park
remains if options are not
options
highest park dedication
dedication with the
based on market realities
amount be selected
least amount of
Adds time and cost to
effort by City
developer
City Staff and HKGi did attempt to quantify the difference between the various methods. However, the City
does not have enough example appraisals to do such a comparison. If such a comparison is desired, the City
may want to consider conducting an appraisal study as was described in the third option. Such a study would
cost between $5,000 and $10,000 and take two to three months to complete.
City Staff has considered all of the options and recommends that the City Council use the County Assessors
Value to estimated market value of the land for the collection of cash in lieu of the land dedication. Staff
recommends this method as it is the easiest to administer and is generally accepted in the planning and
development community.
Recommended City Cade Revisions
Once direction is received from the City Council regarding the industrial park dedication, residential park
dedication, and methodology for the cash dedication, proposed ordinance amendments will be developed. City
Staff did review all of the references to park dedication to identify any additional changes needed. This review
identified the following needs:
1) As shown below the section regarding the use of the cash dedication specifically references the
payment of funds for trails. The City does not have a trail fee, nor does it intend to require fees
for trails. Thus, it is recommended that the sentence be struck to eliminate any confusion.
Sec. 30-327. - Dedication of land or contribution of cash for public purpose
jej Use of cash contributions. Any monies paid to the city in lieu of park dedication shall
be placed in a special fund and used only for the acquisition of land for parks,
playgrounds, trails, and public open space; for the development of such areas and sites;
and for debt retirement in connection with land previously acquired or developed for
such public purposes. Any monies specifically paid to the city for trails shall be used only
for the acquisition of land for trails and for the development of such land.
2) Currently the City Code requires that as part of the development process the Parks and
Recreation Commission advise the City Council on the acquisition of land. The vision identified in
the recent Parks and Recreation Master Plan is that the City will be emphasizing larger,
community parks rather than smaller, neighborhood parks over the next 20 years. To support
that vision, it is anticipated that more park dedication will be collected through the cash fee
rather than through land acquisition. Because the Parks and Recreation Master Plan provides
Page 4
clear direction regarding when park land is the preferred form of park dedication, Staff is
recommending that all references requiring Parks and Recreation Commission involvement in the
platting process be removed. Staff will continue to make a recommendation regarding park
dedication to the City Council and will use the Park and Recreation System Master Plan as a guide.
3) As shown below, the Open Space Preservation Plats requirements include specific provisions for
park dedication. Staff has reviewed that section and recommends that it be stricken. The
approach for park dedication for these plats will be the same as other residential plats.
Sec. 30-5I5
(4) Park dedication fee requirements. Park dedication fee requirements shall be based
upon the total number of house lots platted if fees are paid in lieu of land.
ELK RIVER PARKS &
RECREATION MASTER PLAN
City Council
Work Session
11
Park Dedication
Study Update &
Recommendation
October 19, 2015
L,
L
z
A
3
* K.-
? 00Ar
F _
{
A •• s % y
r 4 J _
Residential Park Dedication Rate
}} Currently City uses 10% for al residential densities
» Recommend City consider a graduated system as additional parkland
needed as project densities increase
>} Examples
• Uses National Recreation and Park Association standard of 10 acres per 1,000 people
• Assumes medium density projects have 2.25 people per unit while multifamily projects have 1.75
people per unit
ELK RIVER PARKS &RECREATION
MASTER PLAN
Residential Park Dedication
Rate
Park Dedication Survey found
densities in other communities range
from 10% to 20% (see examples)
Staff recommends the following
Densit
Units per Acre
Percent
Low
Under
10
Medium
4 to 7
13
High
,More than 7
16
Blaine & Coon Rapids
DU/A
Percent
0-1
5
Z-3
10
4-5
12
6-7
14
8-1 Z
16
13-16
18
Maple Grove
Dayton & Farmington
DU/A
Percent
0-2.5
11
2.5-5
12
5-7.5
13
7.5-10
14
10-12.5
15
12.5-16
16
Zoning District
Dedication Requirement
Less than 9
10
More than 9
11 plus 1% for each
additional unit over 9
Lakeville
Zoning District
DU/A
Percent
Low Density
Less than 3.0
12
Medium Density
3.0 to 9.0
14
,High Density
More than 9.0
17
HILLSIDE PARK RULE
NOTU TOALL atfl VAIN'RNERS
-General park hours arelam to 10pr
-Traits open to mountain biking, frail
running, hiking andsnowshoemg..
-helmets required for mounWn bikini
•Ride responsibly
Please be courteous of gthgr trail
Users
• Hiikerslield to frets by sleping 71
WK.
-Bikers-announce appproaeh to hiker:
and other bikers, ive off ball to
ahw tas16 biketto p s5,
• Leave no trac4 kiii on designMV
ATrIAHK
YOU
1
WNT#YAt7i
TMOim R�trd
7eail Hnxardf
�!
Or Repairs
ALL 0002
Vl �¢Lall
MU a? BE
76Y6Ys1150
LEA SHE"
tl'L...
u.F..
ELK RIVER PARKS &
RECREATION MASTER PLAN
Cash in Lieu Dedication
» Currently
$3,71 Z per residential unit
■ $7,444 per commercial acre
• $2,485 per industrial acre
D Historically established by
comparing to surrounding
communities -then updated
using inflation adjustment
» Minnesota Statutes -Cash
fee must be based on the
average fair market value of the
unplatted land no later than at
the time of final approval
L UIR iill OTILI-1901 IL Ile] NAT VI%wow., MIM
Potential Methods to Consider
Metkod
Overview
M
ros
Cons
Set based on
Use the fees set by other
* Easy to implement
* May not be reflective of real estate
neighboring
communities as the basis for the
* Ensures the City is
market
communities
fee in Elk River
competitive
* Potential for legal challenge as does
not meet state statute requirements
County
Use estimated market value of the
* Easy to identify
* Lags behind marketplace so may
Assessors
land for fee collection
* Generally accepted method
collect too much or too little
Value
Appraisal
Hire an appraisal firm to conduct
* More accurate to market
* Study estimated to cost $5,000 to
Study
a study evaluating the average
conditions
$15,000 depending on the number of
market value of vacant properties
* Established fee that
classes and firm selected
by class. The study would take
developers can be certain of
* Potential for market lag depending on
about 2 to 3 months to complete
the frequency that City conducts study
and could be paid for from park
dedication. This would be used to
set the fee amounts.
Require
Require that the developer submit
* Establishes fee at exact land
* Adds time to development process
appraisal
an appraisal as part of the final
value
* Additional cost for developer — one
at time of
platting process. Fee collection
* Reflects each unique
firm estimated an appraisal to cost
development
would then be based on that value.
situation
$2,500+ for commercial/multi-family
projects
L U19 iill Offil-1901 IL Ile] OAT V,%wow., MIM
Potential Methods to Consider
Metkod
Overview
M
ros
Cons
Sale Price of
Require that the developer provide
Relatively simple to
• May not include value gained through
Property
the sale price of the property and
implement
entitlement process
use that value for fee collection.
* Sale may have occurred a significant
time ago
• Potential for developers to manipulate
Negotiation
Require that each park dedication
Uncertainty for developers
• Potential to be challenging to come to
fee be agreed to through
an agreement
negotiation between the developer
• Starting point will still need to be
and the City.
established
• Staff time
• Potential for legal challenge
Allow
Allow developer to select
* Provides more legal
* Will end up with lowest amount of park
developer to
whether they want to use the
protection as developers
dedication possible. Impact depends
select from
park dedication fee or submit an
have opportunity to select
on options provide.
options
appraisal
preferred option
Require
List multiple options and require
• Best potential to maximize
. Potential for legal challenge remains
"higher"
the one with the highest park
park dedication with the
if options are not based on market
of multiple
dedication amount be selected
least amount of effort by City
realities
options
• Adds time and cost to developer
DEL
Cash in Lieu Dedication
>> Staff attempted to quantify the difference, however,
not enough appraisals are available
» An appraisal study could be done for additional
analysis. The cost wou Id be $5,000 to $10,000
depending on the complexity
>> Staff recommends the use of the County Assessors
Method
■ Easiest to administer
■ Generally accepted in planning and development
community
f�1�t7layt7W.R7�'P.It7rrt7� li[�l►�I������yt79If1�
Recommended City Code Revisions
>> Reviewed all references to park dedication
>> Recommend the following changes:
• Reference to payment of funds for trails be removed as City
does not have a trail fund
• Requirement of Bark and Recreation Commission to make
a recommendation for park dedication for each plat be
removed as the Park and Recreation {'master Plan provides
direction and most dedication in future will be cash rather
than land
• Remove specific clause in Open Space Preservation Plat
relating to park dedication and apply same density approach
as other residential developments.
ELK RIVER PARKS &RECREATION MASTER
PLAN
Direction Sought
» Next step will be to develop specific ordinance
revisions reflecting directions from City Council
on:
• Graduated Residential Dedication Rate
of 10% for low densit ,13% for medium
density, and 16% for high density
�' � y
• Industrial/Commercial Dedication Rate of 10%
■ Cash in Lieu Dedication Approach using County
Assessors Method
• Revisions to City Code regarding trail fund, Park
and Recreation Commission, and Open Space
Preservation Plats
Request for Action
To
Item Number
Mayor and City Council
7.1
Agenda Section
Meeting Date
1july5,
Prepared by
Public I learin
2016
Zack Carlton, Planning Manager
Item Description
Reviewed by
Ordinance Amendment Regarding Park Dedication
Peter Beck, Cig Attorney
Fees
Reviewed by
Cal Pormer, City Administrator
Action Requested
Adopt, by motion, an ordinance amendinent modifying the park dedication requirements described in
Section 30-327 of the City Code.
Background/Discussion
Staff has been working with a number of consultants over the past six -plus months to draft an
amendment to the city's park dedication ordinance. The need for the change ,,vas identified during the
Parks and Recreation Master Plan project, and this update is the final component of the larger master
plan. After a number of discussions with the City Council and outside consultants, the following changes
to the park dedication ordinance are recommended.
Residential Park Dedication
The current park dedication requirements require a dedication of 10% of land, or a per unit cash
dedication described in the city's fee schedule. Staff is recommending a change to both the land
dedication requirement and the current fee schedule. The new residential rates arc based to factors unique
to I T, liver, and do not rely on comparisons to peer cities generalizations. The land dedication rate is
based on the average acres of park land required per resident, as described in the Parks and Recreation
Master Plan, and the average household size for three residential land classes. The household size Was
calculated using information sourced from the latest census, and will be updated with future census data.
The results are shown in the table below:
Acres of land
Persons per
Acres of land
Land Use Desiimation
dedicated per
Household
dedicated per
person
dwelling unit
Low Density Residential
0.03
X 2.82 —
0.0846
Medium Density Residential
0.03
X 1.80 —
0.0540
High Density Residential
0.03
X 1.58 =
0.0474
The land dedication will be based on impacts to the park system created by each new dwelling unit, rather
than a flat 10% dedication rate.
NAWRE)
The cash dedication fee is established by multiplying the land dedication and the fair market value of the
land. The fair market value for the current update was established with an appraisal study from Patchin,
Messner, Dodd, & Brumm. The study identified the average fair market value of three residential land
classes in communities similar to Elk River. The fee, as included in the fee schedule, is described below:
Low Density (c4 DU/ acre) $1,425.93/dwelling unit
Medium Density (4 to c7 DU/ acre) $1,075.79/dwelling unit
High Density (>7 DU/ acre) $4,897.04/dwelling unit
The appraisal study will be completed every five years, or as market conditions warrant, to ensure
consistent application of a fair land valuation.
Specialized HousingUses
Staff recognizes and anticipates an increase in the development of facilities providing 24/7 care, such as
assisted living, nursing, or memory care facilities, and that the park dedication impacts resulting from
these facilities are not the same as other housing types. Staff views these types of facilities similar to
commercial (service) or office uses, and recommends using the commercial dedication rates for these
facilities.
The dedication rate for facilities with a mix of independent and 24/7 care units will dedicate the
proportionate share of the different uses. The same practice will be applied to other mixed -use facilities,
commercial and residential uses for example.
Commercial and Industrial Uses
Current land dedication rates for commercial and industrial rates utilize a flat 10%o rate, and cash rates are
established annually in the fee schedule. The current proposal modifies borli rates and is tied to the
county assessed value of the property. Commercial and office uses Nvill dedicate 8% of the buildable land,
or 8% of the county assessed value of the property. Industrial uses will dedicate G%o of the buildable land,
or G% of the county assessed value of the property. The fee, as included in the fee schedule, is described
below:
Commercial
Industrial
8% of county assessed value
G% of county assessed value
Financial Impact
The proposed changes to the cash dedication rate will result in an overall decrease in the total amount of
money collected. The goal of this update is to be in compliance with state statute, and reviews by the City
Attorney and others show that this goal has been met.
Attachments
Ordinance Amendment for Section 30-327 — Redlined Copy
Ordinance Amendment for Section 30-327 — Clean Copy
Residential Park Dedication Calculations
N:\Public Bodies\Agenda Packets\07-0 5-2016\ Final\ 7.1 sr Park Dedicadon.docx
City of
Elk
River
Ordinance 16 -
to be removed
Underlines to be added
An Ordinance Amending Section, 30-327, Dedication of Land or Contribution of
Cash for Public Purpose of the City of Elk River, Minnesota, City Code
The City Council of the City of 1 � Ik River does hereb\- ordain as follows:
SECTION 1. That § 30-327, Dedication of land or contribution of cash for public purpose of
the Cite of Llk River Code of Ordinances shall be amended to read as follows:
(a) Dedications forpa9k purposes iequiyed. In every plat, replat or subdivision of land to be developed for
residential, commercial, or industrial uses, or as a planned unit development which includes such
uses or any combination thereof, it is reasonable to require that, an amount of land
m ten percent (3f the unde-veloped land prc)posed to be subdivided —shall be set aside and
dedicated by the tract owner or owners to the city for parks, playgrounds, trails, or public open
space. The amount of land that shall be dedicated shall be in accordance with the follow'n�
standards:
(11) Residential uses
(a) The amount of land to be dedicated shall satisfy the parkland standard of 0.03 acres per
person as established, and as may be amended, in the Park and Recreation _S� stem Plan.
The total amount_ of land to be dedicated shall be calculated 12y multiply ing_the proposed
number of dwelling units in each land use designation by the required acres of land to be
dedicated per dwelling unit as shown below. The -acres of land dedicated per dwellinl;
unit has been determined bye multiplying the parkland standard of 0,03 acres per person
by the number of persons per dwelling unit, as determined by analyzing the most recent
census data specific to the City of E?lk River.
Last Updated hrarch 2014
Acres of land
Acres of land
I and Use
dedicated per
Persons per
dedicated per
Desioatio
12erson
Household
dwelling unit
Lose Density
0.03
X 2. ;2 —
0.0846
Residential
Medium
Densin-
0.03
1 1.80 =
0.0540
Residential
1-1 1 Th
Densi
0.03
x 1.58
0.0474
Residential
P 0 1 E 8 E 0 e r
NIATUREI
to be removed
Underlines to be added
fib] Specialized I Iousing Uses
1— Facilities providing 24 hour a day/7 dad a week care, such as assisted Hying or
nursing home facilities shall be subject to park dedication requirements cquivalent to
commercial uses.
2. facilities with a combination of senior independent living and 24/7 care shall 1111kc
the recluired dedication based on the number of units designared for each type of
use.
2]_ Commercial and industrial uses — the amount of land to be dedicated shall be a percentage of
the buildable land proposed to be subdiv idcd. The percentagc to be dedicated shall be ci
(W percent for commercial and office uses and six G percent for industrial uses.
{3] Xa-ed uses — the amount of land to be dedicated shall be calculated based can the perceampe
of land area devoted to each use, except in the case of mixed use projects within the same
buildi-rig where the amount_ of lauid to be dedicated shall be cAculated based on the
percciitage of square leet devoted to each use.
lb] Cash cotnti7butionill _Am of land dledicagon. If the city council, in its_sole discretion_ determines that all
or _a.portion of the land proposed to be dedicated is_unsuitable for parks, then the tract o��ner
shall contribute to the city prior to rcicasing the final subdivision, in lieu of park land dedication,
a cash contribution proportionate to the fair market value of the land, and set forth in -the city:s
fee schedule. If the applicant disputes the amount of the proposed cash contribution in lieu of
the land dedication, the appEcant, at their own expense, may obtain ail appraisal of the property.
The appraisal shall be made by approved members of the MAI, or equivalent real estate
appraisal societies. If the city- disputes such appraisal the city may. at the applicant's expense,
obtain an appraisal of the_ propert-- by a qualified real estate appraisal.
Nil
tci Bmildable laud. I'or the purposes of calculating the required dedication described in this section,
shal be defined as the gross acres less the area c)f wetlands, lakes, and streams below the
01 Ilk .
Last Updated hrarch 2014
NAWREJ
to be removed
Underlines to be added
M
ld1e latferl 7tZpea7. Previously subdivided property from which a park dedication has been
received being re -subdivided with the same number of lots, is exempt from park dedication
requirements. If, as a result of re -subdividing the property, the number of lots is increased, then
the park dedication or per -lot cash fee must apply- on4T to the net increase of lots.
(e) Use of cash contiiNvions. Any monies paid to the city in lieu of park dedication shall be placed in a
special fund and used only for the acquisition and development or improvement of lr"d fer
parks, recreational facilities, playgrounds, trails, wetlands, �or open space--� the
de-eelopmen based on the a r„p owed park systems plan. Cash paMents must not be used for
ongoing operation or maintenance of sueh areas and sites; na c. _ ' iefnent in c,neetion
with land pfeviatisly aequired or developed for stteh publie Purposes. Any monties speeifieMly
paid to the eity parks, recreational facilities, playgrounds, trails, shall b ttsed only r5~ `'-�
d wetlands, or open space.
q�*- maikel w1me 6�hmd For purposes of this section, the term "fitir mar4tet
of the undeveloped land" is defined as the fitir market value of the land Within such plat
replat, or subdivision as of +e dftte the plat, replat, or subdi-vision is presented to the eity
( Dedications for• purposes other than paarks: In addition, in every plat, replat, of subdivision of land, the
land required for public streets, regional stormwater holding ponds and wetlands shall be set
aside and dedicated on the psubdivision by the owners to the city for these purposes. These
areas will not be credited towards park dedication requirements.
(gh)Giierlla for determining suitability of land The suitability of land proposed to be dedicated for park
and recreational purposes shall be determined by reference to the following criteria:
(1) Whether the land is reasonably located and suited for its intended use.
(2) Whether the land has frontage on public or private roads as determined by the city.
(3) Size, shape, topography, geology, hydrology, tree cover, access, and location.
(4) Consistency with the goals and objectives of the master park and recreation plan.
(hi) Impimements to dedicated land As part of the subdivision or approval, the tract owner shall be
responsible for making certain improvements to land dedicated for park, trail and public open
space purposes, including, but not limited to, finish grading, ground cover, construction of trails
and clearly identifying park and trail boundaries with city -approved markers.
Last Updated March 2014
ld1e latferl 7tZpea7. Previously subdivided property from which a park dedication has been
received being re -subdivided with the same number of lots, is exempt from park dedication
requirements. If, as a result of re -subdividing the property, the number of lots is increased, then
the park dedication or per -lot cash fee must apply- on4T to the net increase of lots.
(e) Use of cash contiiNvions. Any monies paid to the city in lieu of park dedication shall be placed in a
special fund and used only for the acquisition and development or improvement of lr"d fer
parks, recreational facilities, playgrounds, trails, wetlands, �or open space--� the
de-eelopmen based on the a r„p owed park systems plan. Cash paMents must not be used for
ongoing operation or maintenance of sueh areas and sites; na c. _ ' iefnent in c,neetion
with land pfeviatisly aequired or developed for stteh publie Purposes. Any monties speeifieMly
paid to the eity parks, recreational facilities, playgrounds, trails, shall b ttsed only r5~ `'-�
d wetlands, or open space.
q�*- maikel w1me 6�hmd For purposes of this section, the term "fitir mar4tet
of the undeveloped land" is defined as the fitir market value of the land Within such plat
replat, or subdivision as of +e dftte the plat, replat, or subdi-vision is presented to the eity
( Dedications for• purposes other than paarks: In addition, in every plat, replat, of subdivision of land, the
land required for public streets, regional stormwater holding ponds and wetlands shall be set
aside and dedicated on the psubdivision by the owners to the city for these purposes. These
areas will not be credited towards park dedication requirements.
(gh)Giierlla for determining suitability of land The suitability of land proposed to be dedicated for park
and recreational purposes shall be determined by reference to the following criteria:
(1) Whether the land is reasonably located and suited for its intended use.
(2) Whether the land has frontage on public or private roads as determined by the city.
(3) Size, shape, topography, geology, hydrology, tree cover, access, and location.
(4) Consistency with the goals and objectives of the master park and recreation plan.
(hi) Impimements to dedicated land As part of the subdivision or approval, the tract owner shall be
responsible for making certain improvements to land dedicated for park, trail and public open
space purposes, including, but not limited to, finish grading, ground cover, construction of trails
and clearly identifying park and trail boundaries with city -approved markers.
Last Updated March 2014
to be removed
Underlines to be added
(ij) Credit for corrstmetion of recreational facilities. Park dedication credit shall not be granted for the
construction of recreational facilities unless specifically approved by the city council. The
submission for review by staff and the park acid recreation commission shall include an estimate
of installation costs, equipment specifications and a site plan. The park and recreation
commission shall review such improvements for appropriateness with the park and trail master
plan.
(}k) Co sr+ltatiotr iy rlwelaper a th city staff. As part of the application procedure at the time of submitting
the pfelitiiinaFy p6tsubdivision, the tract owner is encouraged to confer with city staff and the
park and recreation commission to secure a recommendation as to the location of any property
that should be dedicated to the public for park and recreation purposes.
(RI) Survey recquhrd. As part of any park dedication of land, a survey at a scale of one inch equals 50
feet shall be provided with topographic data, based on city datum, including contours at vertical
intervals of at least two feet, watercourses, wetlands, marshes, rock outcrops, easements, utilities
and vegetative data. This data shall also be provided in a format which is readable by Arc View"
GIS. Portions of any property dedicated to the public for park and recreation purposes to be
used for borrow and fill activities elsewhere in the development shall be clearly identified.
SECTION 2. That this ordinance shall take effect upon adoption and be published as provided by
law.
Passed and adopted by the City Council of the City of Elk River this 5th day of July, 2016.
John J. Dietz, Mayor
ATTEST:
Tina Allard, City Clerk
Last Upaatea nlarciz 2014
NA U
C : ci
Elk
River
Ordinance 16 -
mks to be removed
Underlines to be added
An Ordinance Amending Section, 30-327, Dedication of Land or Contribution of
Cash for Public Purpose of the City of Elk River, Minnesota, City Code
The City Council of the City of Elk River does hc;reby ordain as follows:
SECTION 1. That § 30-327, Dedication of land or contribution of cash for public purpose of
the City of Elk River Code of [ordinances shall be amended to read as follows:
(a) Dedications for park purposes required. In every subdivision of land to be developed for
residential, commercial, or industrial uses, or as a planned unit development which includes such
uses or any combination thereof, it is reasonable to require that an amount of land shall be set
aside and dedicated by the tract owner or owners to the city for parks, playgrounds, trails, or
public open space. The amount of land that shall be dedicated shall be in accordance with the
following standards:
(1) Residential uses
(a) The amount of land to be dedicated shall satisfy the parkland standard of 0.03 acres per
person as established, and as may be amended, in the Park and Recreation System Plan.
The total amount of land to be dedicated shall be calculated by multiplying the proposed
number of dwelling units in each land use designation by the required acres of land to be
dedicated per dwelling unit as shown below. The acres of land dedicated per duelling
unit has been determined by multiplying the parkland standard of 0.03 acres per person
by the number of persons per dwelling unit, as determined by analyzing the most recent
census data specific to the City of Elk River.
Acres of land Acres of land
Land Use dedicated per Persons per dedicated per
Designation person Househoid dwelling unit
Low Density 0.03 X 2.82 _ 0.0846
Residential
Medium
Densi Q x 1.80 0.0540
Residential
High
Densi LU X L-5a = 0.0474
Residential
(b) Specialized Housing Uses
1. Facilities providing 24 hour a day/7 day a week care, such as assisted living or
nursing home facilities, shall be subject to park dedication requirements equivalent to
commercial uses.
Last Updated Tfarch 2014
lik'V"IAI
alolir USE
to be removed
Underlines to be added
2. Facilities with a combination of senior independent living and 24/7 care shall make
the required dedication based on the number of units designated for each type of
use.
(2) Commercial and industrial uses — the amount of land to be dedicated shall be a percentage
of the buildable land proposed to be subdivided. The percentage to be dedicated shall be
eight (8) percent for commercial and office uses and six (6) percent for industrial uses.
(3) Mixed uses — the amount of land to be dedicated shall be calculated based on the percentage
of land area devoted to each use, except in the case of mixed use projects within the same
building where the amount of land to be dedicated shall be calculated based on the
percentage of square feet devoted to each use.
(b) Cash contribution in lieu of land dedication. If the city council, in its sole discretion, determines
that all or a portion of the land proposed to be dedicated is unsuitable for parks, then the tract
owner shall contribute to the city prior to releasing the final subdivision, in lieu of park land
dedication, a cash contribution proportionate to the fair market value of the land, and set forth
in the city's fee schedule. If the applicant disputes the amount of the proposed cash contribution
in lieu of the land dedication, the applicant, at their own expense, may obtain an appraisal of the
property. The appraisal shall be made by approved members of the MAI, or equivalent real
estate appraisal societies. 1 f the city disputes such appraisal the city may, at the applicant's
expense, obtain an appraisal of the property by a qualified real estate appraisal.
(c) Buildable land, for the purposes of calculating the required dedication described in this section,
shall be defined as the gross acres less the area of wetlands, lakes, and streams below the
QHWL.
(d) Previously subdivided property from which a park dedication has been received, being re -
subdivided with the same number of lots, is exempt from parr dedication requirements. If, as a
result of re -subdividing the property, the number of lots is increased, then the park dedication or
per -lot cash fee must apply only to the net increase of lots.
(e) Use of cash contributions. Any monies paid to the city in lieu of park dedication shall be placed
in a special fund and used only forthe acquisition and development or improvement of parks,
recreational facilities, playgrounds, trails, wetlands, or open space based on the approved park
systems plan. Cash payments must not be used for ongoing operation or maintenance of parks,
recreational facilities, playgrounds, trails, wetlands, or open space
(f) Dedications for purposes other than parks. In addition, in every subdivision of land, the land
required for public streets, regional stormwater holding ponds and wetlands shall be set aside
and dedicated in the subdivision by the owners to the city for these purposes. These areas will
not be credited towards park dedication requirements.
(g) Criteria for determining suitability of land. The suitability of land proposed to be dedicated for
park and recreational purposes shall be determined by reference to the following criteria:
(1) Whether the land is reasonably located and suited for its intended use.
(2) Whether the land has frontage on public or private roads as determined by the city.
(3) Size, shape, topography, geology, hydrology, tree cover, access, and location.
(4) Consistency with the goals and objectives of the master park and recreation plan.
Last Updated Tfarch 2014
p0NEREO 01
NATUREI
Stfilve�fotjghs to be removed
Underlines to be added
(h) Improvements to dedicated land. As part of the subdivision approval, ,the tract owner shall be
responsible for making certain improvements to land dedicated for park, trail and public open
space purposes, including, but not limited to, finish grading, ground cover, construction of trails
and clearly identifying park and trail boundaries with city -approved markers.
(i) Credit for construction of recreational facilities. Park dedication credit shall not be granted for
the construction of recreational facilities unless specifically approved by the city council. The
submission for review by staff and the park and recreation commission shall include an estimate
of installation costs, equipment specifications and a site plan. The park and recreation
commission shall review such improvements for appropriateness with the park and trail master
plan.
(}} Consultation by developer with city staff. As part of the application procedure at the time of
submitting the subdivision, the tract owner is encouraged to confer with city staff and the park
and recreation commission to secure a recommendation as to the location of any property that
should be dedicated to the public for park and recreation purposes.
(k) Survey required. As part of any park dedication of land, a survey at a scale of one inch equals 50
feet shall be provided with topographic data, based on city datum, including contours at vertical
intervals of at least two feet, watercourses, wetlands, marshes, rock outcrops, easements, utilities
and vegetative data. This data shall also be provided in a format which is readable by Arc ViewT"
CsIS. Portions of any property dedicated to the public for park and recreation purposes to be
used for borrow and fill activities elsewhere in the development shall be clearly identified.
SECTION 2. That this ordinance shall take effect upon adoption and be published as provided by
law.
Passed and adopted by the City Council of the City of Elk River this 5th day of July, 2016.
John J. Dietz, Mayor
ATTEST;
Tina Allard, City Clerk
Last Updated Tfarch 2014
pawEelo er
,i URE
Park Dedication Calculation
Assumptions for Park Dedication
2.82, 1.80, and 1.58 Average Household size for City of Elk River (based on 2014 AC5 Data)
0.03 Acres of park land per resident as identified by Parks and Rec Master Plan
16,855.00 Mean per acre value of low density residential land established by appraisal study
$ 19,922.00 Mean per acre value of medium density residential land established by appraisal study
$ 103,313.00 Mean per acre value of high density residential land established by appraisal study
Land dedication required
low density 2.82 x 0.03 = 0.0846 acres of land per residential unit
med density 1.80 x 0.03 = 0.054 acres of land per residential unit
high density 1.58 x 0.03 = 0.0474 acres of land per residential unit
Cash dedication required
low density 0.0846 x $ 16,855.00 = $ 1,425.93 cash dedication per residential unit
med density 0.0540 x $ 19,922.00 = $ 1,075.79 cash dedication per residential unit
high density 0.0474 x $ 103,313.00 = $ 4,897.04 cash dedication per residential unit
0
Parks and Recreation Commission
Agenda Section I Meeting Date
Action Item I November 14, 2018
Item Description
River Walk. Apartment - Park Dedication
Request for Action
Item Number
5.1
Prepared by
Chris Leeseberg, Senior Planner
Steve Benoit. Recreation
Michael Hecker, Parks and Recreation Director
Action Requested
Recommend, by motion, park dedication be paid in the form of cash for the number of units approved by the
City Council at the rate applicable when the subdivision is released for recording. ("I ds will be
$4,897.04/unit at the 2018 high density rate)
And a 50-foot trail easement from under the Highway 101 bridge to the southern property line of the site shall
be provided. The majority of the easement shall be located above and along the bluff line.
Background/Discussion
The subject property is located on Zane Street along the 174th Avenue
alignment (see red dot on Figure 1). It is between the previous Saxon site
and the Lodge (apartments).
The applicant has not provided the proposed park land acreage. It is
guessed to be approximately 12 acres in size.
The Parks and Recreation Master Plan.
The Parks and Recreation Master Plan indicates adding or protecting
prairie bluff lands that offer river views, as the opportunity arises in
this area.
The land the applicant is proposing to donate, in lieu of park
dedication, is below the bluff line and much of it is in the floodplain
(unbuildable). The limited areas that are not in floodplain are on steep
slopes.
Park Dedication - Cash
The submitted drawings for the September 12, 2018, Parks and
Recreation meeting had 103 units. This would require $504,395.12
in park dedication. This is calculated with the high density rate of
$4,897.04/dwelling unit.
The Elk River Vision
RR
► "i0
Figure I
welcoming community ttrith revolutionary and . pirited resourcefulness, exceptional
service, and community engagement that encourages and inspires prosperity
CR 33
92
¢A
NATURE
Park Dedication - Land
The submitted drawings for the September 12, 2018, Parks and Recreation meeting had 103 units. This
would require 4.88 acres of land. This is calculated with the high density rate of 0.0474 acres/dwelling
unit.
Section 30-327 (c) states: Buildable land. For the purposes of calculating the required dedication
described in this section, shall be defined as the gross acres less the area of wetlands, lakes, and streams
below the OHWL. The land can be donated but cannot be calculated toward required dedication.
Master Trail Plan
The Master Trail Plan shows a conceptual connection in this area. The location is not definitive and
could occur on a sidewalk or above the bluff line providing river views, achieving the goals of the Master
Plan in this area.
Parking Lot
It is unclear if the proposed driveway to the parking lot is feasible. Further detail on the grades in the
area will be needed. The DNR memo discusses this further.
The slopes will also need to be evaluated for ADA compliance before the proposed public park was
obtained. ADA slopes are more restrictive that those for vehicles.
Environmental
The applicant states in their narrative about working together to provide walkable paths, canoe racks,
fishing docks, and bathroom facilities.
The attached memo from the Environmental Coordinator & Stormwater Coordinator begins to discuss
the complexities of what can/cannot be completed in proposed park area. The DNR memo discusses
this further.
Parks and Recreation Commission Meeting
The Parks and Recreation Commission reviewed the project for park dedication requirements during
their September 12, 2018, regular meeting. They recommend a cash donation equal to the number of
units within the apartment building and a 50-foot trail easement from under the Highway 101 bridge to
the southern property line of the site. The majority of the easement shall be located above and along the
bluff line. The Commission had no interest in receiving any park land in the subject area.
Attachments
■ Location Map
■ Site Plan
■ Schematic Rendering
• Memo from the Environmental Coordinator & Stormwater Coordinator dated September G, 2018
■ Memo from the DNR dated August 31, 2018
Rive rwalk Apartments - Briggs Case N : P 18-15 4iUkI
EV 18-05 =
Plat, CLIP, EN; ZC ZC 18-05 River
I
1
Ix,
.I
GRAI9{IL gC,tL1T
MOTES:
'. BASE PLAT! USED IS A SURVEY PREPARED BY
BOCART, P17DERSON & ASSOCIAYF5.
Q
2, ALL EXISTING UTILITY LOCATIONS AM ELEVATIONS
SHOM ARE APPROXIMATE ONLY CONIRACTDR
SHALL CONFIRM ALL LOCATIONS AND ELEVATIONS
sy
PRIOR 10 CONS1RVCTION. CONTRACTOR SIIAU.
CONTACT UTILITY COMPANIES IAA GOPIWR STATE
ONF_-CALL ONLINE OR F]" CALLING EII a:Z
t-e0O-252-IIS6_
a
3. ALL CONSTRUCM/N SHALL CONFORM TO INE MOST
•
RESTRICTIVE OF THE PROJECT SPCMICATIONS, THE
STANDARD SPECIFICATIONS OF THE CITY OF ELK
RIVER AND ME LATEST EDITION OF MNOOT
i
r
STANDARD SPECFtCATIONS FOR CONSTRUCTION.
REVIEW PLAN
MOT FOR COMSTRU.....
Rim
A
-all
4410w
City of
Ells ....�.
River
To: Parks and Recreation Commission
Memorandum
From: Amanda Bednar, Environmental Coordinator & Brandon Wisner, Storrnwater Coordinator
Date: September G, 2018
Subject: Riverwalk Apartments shoreland and floodplain information
The proposed parking lot, driveway and park location on the River Walk Apartments is located
along the Mississippi River and very near to floodplain and wetland areas. Locating a parking lot at
or near the 100 year flood elevation could require meeting Sec. 30-1913 paragraph 5 and Sec. 30-
191.4 conditional uses of the city code. Vehicles could also be viewed as equipment that is
flammable, explosive or potentially hazardous to humans, animals or plant communities especially
near the floodplain area.
Additionally there are concerns in relation to the bluff area. The driveway and roadway would
require significant grading and manipulation to establish those structures. This would also cause
erosion issues and destabilize the bluff, altering stormwater runoff. City code requires all structures
including roads, parking lots and park structures be 30 feet from the top of the bluff Stairways and
landings are the only items exempt from the bluff and top of bluff setbacks. Stairways and lifts are
the preferred alternative to driveways in accessing land below the bluff and steep slopes. Specific
requirements for such access are outlined in the city code.
Intensive vegetation clearing within the shore and bluff impact zones and on steep slopes is not
allowed. Limited clearing is allowed to provide view of the water, stairways or landings, picnic areas
or access paths. Walking paths and park amenities may be permitted in this area. Roads, driveways,
and parking areas shall meet structure setbacks and shall not be placed within bluff and shore impact
zones. Documentation shall be provided by a qualified individual that all roads and parking areas are
designed and constructed to minimize and control erosion to public waters. Public and private roads
and parking areas shall be designed to take advantage of natural vegetation and topography to
achieve maximum screening from view from public waters. All plans would also require review and
possible permits from the Department of Natural Resources.
rvyDEPARTMENT OF
, NATURAL RESOURCES
August 31, 2018
City of Elk River Planning Commission
13065 Orono Parkway
Elk River MN 55330
Ecological and Water Resources Division
RE: MISSISSIPPI RIVER DEVELOPMENT CLIP for PID # 75-521-0110 and 75-521-0120
Dear City of Ella River Planning Commission,
1035 S Benton Dr.
Sauk Rapids, MN 56379
I have reviewed the submitted plans for a CUP to construct a multi -family development unit along the
Mississippi River, I have found the following issues.
The construction plans do not show the height of the building but the plans do show that the building will be a 4
story building. I do not know if this building will meet the height restriction of 30 feet per Sec 30-2022 (c). A
Height greater than 30 feet could alter the scenic, historical, natural value that was outlined in Minnesota
Statute 103F.315. Typically 4 story buildings are a greater height then 30 feet.
The location of the building along with subsequent water retention ponds and other infrastructure could
destabilize the bluff. The location of the retention pond is of concern as it will be placing head pressure on the
side slopes of the pond along with more water being placed in the pore spaces of the soil in this location which
could destabilize the bluff. The retention pond plans show that they removing what appears to be the top of the
bluff. I would advise having the applicant change the placement of the retention pond to the side of the building
and further away from the bluff.
In addition to the above mentioned structures, placing a parking lot at the 100 year flood elevation or slightly
above could require the applicant to meet sec 30-1913 paragraph 5. Vehicles could be viewed as equipment that
is flammable, explosive or potentially injurious to humans, animals or plant life. This would require a plan
approved by the city council. In addition to the flood plain concern placing a driveway roadway on the bluff is
not recommended due to the level of grading and manipulation required to establish said driveway/road. This
could also cause erosional issues and destabilize the bluff from having a smooth surface for the water run long
which would increase the velocity of this runoff. Since this is a semi-public space there are safety concerns for
vehicle and pedestrian traffic due to the slope. Creating a parking lot in this location could also conflict with you
clearcutting code.
Sincerely,
James Bedell
Area Hydrologist
11035 S Benton Dr.1 Sauk Rapids, MN 53379 1 (320) 223-7850 inn E a ri ii i;a ,,,: :•
Minnesota Department of Natural Resources • Division of Ecological and Water Resources
800 Oak Savanna Ln. SW Cambridge MN 55008
CC: Tim Crocker DNR EWR Region 3 North District Manager
Dan Petrik DNR EWR Land Use Specialist
Ceil Strauss DNR EWR Floodplain Hydrologist
Minnesota Department of Natural Resources • Division of Ecological and Water Resources
1035 S Benton Dr. Sauk Rapids, MN 56379
city 0'
Rive`r�
Members Present:
Council Liaison:
Meeting of the Elk River Parks and
Recreation Commission
Held at the Elk River City Hall
Wednesday, November 14, 2018
Chair Anderson, Commission members Ahlness, Holmgren, Niziolek,
Rathbun, Soltvedt, and Williams
Mr. Olsen
Staff Present: Parks and Recreation Director, Michael Hecker, Recreation Manager Steve
Benoit, Parks Superintendent Tim Sevcik, Senior Planner Chris Leeseberg,
Recreation Coordinator 'f onya Love, and Recreation Assistant Dawn Larson
I. Call Meeting to Order
Pursuant to due call and notice thereof, the meeting of the Elk River Parks and Recreation
Commission was called to order at 630 p.m. by Chair Anderson.
2. Consider I i! 14/18 Agenda
Moved by Commissioner Ahlness and seconded by Commissioner Soltvedt to approve
the November 14, 2018, Parks and Recreation Commission meeting agenda. Motion
carried 7-0.
3.1 Consider I013118 Regular PRC Minutes
Commissioner Ahlness requested the following change to Item 7.1; change
Commissioner Ahlness to Commissioner Rathbun for being on the Woodland Trails
Regional Park Committee.
Moved by Commissioner Niziolek and seconded by Commissioner Williams to
approve the following October 3, 2018 Parks and Recreation Commission Minutes with
the suggested changes. Motion carried 7-0.
4. Open Forum - None
5 Riverwalk Apartment Park Concept
Mr. Leeseberg presented his staff report.
Chair Anderson asked for clarification on what the different colored boundaries meant on the
floodplain map.
Mr. Leeseberg explained it was required setbacks.
Mr. Leeseberg also explained that the map that the Commission had seen two months prior
Parks & Recreation Commission Minutes
November 14, 2018
Page 2
did not have the current tnap's additional building with 67 units on the other side of the
proposed storage facility.
Chair Anderson asked the. Commission if the request could be approved next month or if it
had to be this month considering the change of plans and additional apartment units_ Also
asking if the new information presented would change the Commissions point of view from
the general consensus by the Commission at the September 12, 2018 meeting to receive cash
dedication for the property.
Dan Anderson, Briggs Companies, stated that the process does not make or break the project
of having park dedication and it is expected to have that. Their biggest concern is regarding
the transient action in the area with 28-30 reports a month to the police department The
vandalism is over the top and damage is overwhelming. Issue is more about when we put
people there that they are safe, creating a safe environment for them.
The commission discussed the proposed drive to the western portion of the property but
ultimately decided not to provide input on it as they recommended only cash dedication. They
discussed the need for a trail easement running north and south along the bluff line and how
to access this easement from Zane Street.
The commission also had a discussion on the need for a future location of a boat landing
(once Babcock closes) and did not think this property was a good location. They agreed the
city should focus on an area further south near the proximity of the proposed interchange of
1 G7d' Avenue and Highway 169.
Moved by Commissioner Niziolek and seconded by Commissioner Rathbun to accept
staff recommendation of park dedication to be paid in the form of cash for the number
of units approved by the City Council at the rate applicable when the subdivision is
released for recording. (This will be $4,897.02 f unit at the 2018 high density rate) A 50-
foot trail easement from under Highway 101 Bridge to the southern property line of the
site shall be provided with the majority of the easement being located above and along
the bluff Pane. The final location shall be approved by city staff.. Adding that a 30-foot
wide trail easement, connecting the 50-foot easement to Zane Street, shall be provided.
Motion carried 7-0.
6. Discussion Items — None
p I I I R E I IT
NAtUR
4�"-
ER
River
Request for Action
To
Item Number
Mayor and City Council
Agenda Section
Meeting Date
I
Prepared by
Public Hearin
February 19, 2019
Zack Carlton, Planning i Iaria er
Item Description
Reviewed by
Diver Walk Apartments — 17354 Zane Street NW
Chris L.eeseberg, Senior Planner
A. Right-of-way Vacation: Zane Street NW
Reviewed by
B. Simple flat: River Walk
Cal Portner, City Adiniiiistrator
C. Zone Change to PUD
D. Conditional Use Permit for PUD
Action Requested
A. Continue, by motion, the request to vacate a portion of the Zane Street Right -of -Way to the March
18, 2019, Council meeting.
B. Continue, by motion, the request for approval of a Simple Plat to the March 18, 2019, Council
meeting.
C. Continue, by motion, the request for approval of a Zone Change to the April 15, 2019, Council
meeting.
D. Continue, by motion, the request for approval of a
Conditional Use Permit establishing a Planned Unit
Development to the April 15, 2019, Council meeting.
Background/Discussion
The applicant submitted updated plans on February 14, 2019,
which include a cul-de-sac and work to address some of the
comments from staffs comment letter dated January 14, 2019,
and the feedback from the January 22, 2019, work session.
Parr Dedication
The updated plan includes a 15-foot trail easement along the
north edge of the project, but does not reflect the direction given
by the Parks and Recreation Commission on November 14, """ 10
2018. Prior to the motion to continue, the applicant would like to
discuss the park dedication and trail easement recommendations
as they further refine the plans. A representative from the Parks
Commission will be at the meeting.
The applicant has also submitted a written extension request for
all four of the applications associated with project. The extension
pushes the last date for a decision by the City Council to April
17, 2019.
The Elk River Vision Figure I
A rvelcornin,g tt�rxman y math ievolutsonag and spaded resoiprefulness, exceptiorrrrl
service, and cowmuni�y engagexanl that encourages and inspires piviperity
CR 33
a
RR
CR 12
•
�p
P69
p0WIAE0 eY
NAWREJ
Statutory Review Period
The applicant extended the review period, by written request, to April 17, 2019.
Attachments
■ Updated Plans received February 14, 2019
■ bark and Recreation Commission NEnutes from November 14, 2018
■ Written Extension Request to April 17, 2019
■ Staff Comment Letter dated January 14, 2019
N:\Public Bodies\Agenda Packets\02-19-2019\Final\x7.5 sr River Walk Apartments 2-19-2019.docx
!
r`1` -T _
1
Y
Y
I
II
6 1
I
I
k
I
'
! l
I
Y
1
l]
I
1
k
1
I
%7
i7
1
II
1
r,k-a,RHfr °t'SEF
1 ,
1 NOTES:
1 1 BASE PLAN USED IS A SURVEY PREPARED BY BOGART, PEDERSON
' & ASSOCIATES. I
i
' ] 2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE
+ APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS �$
gg
AND ELEVATIONS PRIOR TO CONSTRIJCTIOM. CONTRACTOR SHALL
CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE -CALL 5 ' 1p
ONLINE OR BY CALLING BIT OR 1-800-252-IT66,IN
l.E�{
,x 3. ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE
i OF THE PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS
` OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT
1 - STANDARD SPECIFICATIONS FOR CONSTRUCTION,
I
z
5J
0_
N
z
up
Z F_
tF:
Z
�~ W U
N
Y-
C
6
N
a - W
Q
a
y O
V
u)
4
Q
7 �
>
� � m
w W
O H
6E W
REVIEW FLAN
=-
NOT FOR CONSTRUCTION
1
4 '
r
i1
I`
1
k 1
14 Y I
1 r'
------------
I
0T
1
1
, Eiur's SE 16atckr i
IfA [i. SETBACK fxEm �� 1 1 f
1
1 E12vA�b1 BuwB�VBr
ff ff
I
i y
Yy
I
<<
1
`]L
I
C>
NOTES:
1. BASE PLAN USED IS A SURVEY PREPARED BY BOGART, PEDERSON
& ASSOCIATES.
2, ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE
APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS
AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE -CALL
ONLINE OR BY CALLING 811 OR 1-800-252-1166,
3, ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE
OF THE PROJECT SPECIFICATIONS. THE STANDARD SPECIFICATIONS
OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT
STANDARD SPECIFICATIONS FOR CONSTRUCTION.
4. EXISTING ZONING: FOCUSED AREA STUDY (FAST).
PROPOSED: PLANNED UNIT DEVELOPMENT (PUD).
IMPERVIOUS SURFACE AREA (SF)
RIVERWA K
APTS
RULER
PLAZA
TOTAL
EXISTING
60,711
130.009
19D,719
PERCENT
15.D%
63.67.
32.57.
PROPOSED
74,'S59
8:, Ng
161,?ei
PERCENT
19.5%
42.$7
_?.58
LOT AREA
3U.302
203.92fi
,m.229
PARKING STALL COUNTS
RIVER WALK
APTS
RIYER
PLAZA
COVERED
107
45
SURFACE
93
105
TOTAL
200
203
UNITS
103
85
RATIO
1.94
2-3
REVIEW PLAN
NOT FOR CONSTRUCTION
Z
4
o�
Z �
Qti
LF
L7 �
Q
N
d Q W
Q
LaO 4
Z U
U
u)
C?
Q 7 C4
tr
C,of m
[.i L
E L O
C-1
\;
TRACT
PRGPOSED
A_ST(WY
APARTMENT
TpAIlIINO
A-34.058 SF
FFE-880-00
GFE-879.50
I
I
Rm;..rc amuwc
rrr-as+ae
i
1 �i1
I
h
i PROPO$EO +STORY .a -
APARTMENT AWITION
y A7,22.Y91 Sr -
FFE+887.M GFE.877A0
M1
'k
Vt
1 a
1 � 1
1 CD
wn s.s
s f rv�+zy,
l
T ACT CJ
A
45,
NOTES:
1. BASE PLAN USED IS A SURVEY PREPARED BY BOGART, PEDERSON
& ASSOCIATES.
2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE �r
APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS BiR
AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE—CALL`d' s=
ONLINE OR BY CALLING BIT OR I-800-252-IT66, yE
3. ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE'SI
OF THE PROJECT SPECIFICATIONS. THE STANDARD SPECIFICATIONS a s
OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT s
STANDARD SPECIFICATIONS FOR CONSTRUCTION, t
F
4. THE FOLLOWING SEQUENCE AND PROTOCOLS SHALL BE FOLLOWED �m-v
FOR EROSION AND SEDIMENT CONTROL DURING THE SITE p
DEVELOPMENT PROCESS' -_
A. INSTALL PERIMETER CONTROLS (SILT FENCE & ROCK
CONSTRUCTION ENTRANCE) AS SHOWN ON THE PLANS PRIOR
TO START OF WORK.
B. SOIL STOCKPILES OR CONCRETE WASHOUTS ARE NOT ALLOWED
ON THE PROJECT SITE.
C. MAINTAIN ALL TEMPORARY EROSION CONTROL DEVICES IN PLACE Tn
UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN Ir Z
STABILIZED. INSPECT TEMPORARY EROSION CONTROL DEVICES w
ON A. WEEKLY BASIS AND AFTER EACH I/2" OR MORE RAIN ,d
EVENT, CLEAN OR MAINTAIN THESE DEVICES AS NEEDED TO BE Cy
EFFECTIVE REPLACE DETERIORATED. DAMAGED OR ROTTED z 0
EROSION CONTROL DEVICES IMMEDIATELY.
O. REMOVE ALL SOILS AND SEDIMENTS DEPOSITED ONTO PUBLIC ¢ z
AND/OR PRIVATE PAVEMENT AREAS WITHIN 24 HOURS OF Er 0.1
DEPOSITION. REMOVAL OF TRACKING MATERIALS SHALL BE
COMPLETED AT THE ENO OF EACII WORK DAY WIIEN IT '
OCCURS. SWEEPING MAY BE ORDERED AT ANY TIME IF
CONDITIONS WARRANT
E. PERFORM SITE REMOVALS, GRADING. EXCAVATION AND
EMBANKMENT. SEED AND MULCH ALL DISTURBED AREAS 0L
OUTSIDE OF PROPOSED PAVEMENT AND BUILDING AREAS WITHIN
72 HOURS OF THIS WORK, N
F INSTALL BUILDING AND BITUMINOUS PAVEMENT SECTION FINE
GRADE SITE AND RESTORE GREEN AREAS WITH PERMANENT ¢ w
VEGETATION PER LANDSCAPE PLANS.
G. STORMWATER BMP5 SHALL NOT BE EXCAVATED TO FINAL a 0
GRADE UNTIL CONTRIBUTING DRAINAGE AREA HAS BEEN w cn d
CONSTRUCTED AND FULLY STABILIZED.
H. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL Z d
DEVICES AFTER SITE HAS UNDERGONE FINAL STABILIZATION aS
AND PERMANENT VEGETATION HAS BEEN ESTABLISHED WITH AT IP
LEAST 70% COVERAGE
Q
❑7
;�..W
IY W d
REVIEW PLAN c z
NOT FOR CONSTRUCTION
UY of
River
Members Present:
Council Liaison:
Meeting of the Elk Rimer Parks and
Recreation Commission
Held at the Elk River City Hall
Wednesday, November 14, 2018
Chair Andersen, Commission members Ahlness, Holnagren, Niziolek,
Rathbun, Soltvedt, and Williams
Mr. Olsen
Staff Present: Parks and Recreation Director, Michael Hecker, Recreation Manager Steve
Benoit, Parks Superintendent Tim Sevcik, Senior Planner Chris Leeseberg,
Recreation Coordinator Tonya Love, and Recreation Assistant Dawn Larson
I. Call Meeting to Order
Pursuant to due call and notice thereof, the meeting of the Elk River Parks and Recreation
Commission was called to order at 6.30 p.m. by Chair Anderson.
2. Consider I 1 / 14/18 Agenda
Moved by Commissioner Ahlness and seconded by Commissioner Soltvedt to approve
the November 14, 2018, Parks and Recreation Commission meeting agenda. Motion
carried 7-0.
3.1 Consider 10l3/ 18 Regular PRC Minutes
Commissioner Ahlness requested the following change to Item 7.1; change
Commissioner Ahlness to Commissioner Rathbun for being on the Woodland Trails
Regional Park Committee.
Moved by Commissioner Niziolek and seconded by Commissioner Williams to
approve the following October 3, 2018 Parks and Recreation Commission Minutes with
the suggested changes. Motion carried 7-0.
4. Open Forum - None
5 Riverwalk Apartment Park Concept
Mr. Leeseberg presented his staff report.
Chair Anderson asked for clarification on what the different colored boundaries meant on the
floodphun map.
Mr. Leeseberg explained it was required setbacks.
Mr. Leeseberg also explained that the map that the Commission had seen two months prior
Parks & Recreation Commission Minutes
November 14, 2018
Page 2
did not have the current map's additional building with 67 units on the other side of the
proposed storage facility.
Chair Anderson asked the Commission if the request could be approved next Month or if it
had to be this month considering the change of plans and additional apartment units_ Also
asking if the new information presented would change the Commissions point of view from
the general consensus by the Commission at the September 12, 2018 meeting to receive cash
dedication for the property.
Dan Anderson, Briggs Companies, stated that the process does not make or break the project
of having park dedication and it is expected to have that. Their biggest concern is regarding
the transient action in the area with 28-30 reports a month to the police department. The
vandalism is over the top and damage is overwhelming. Issue is more about when we put
people there that they are safe, creating a safe environment for them.
The commission discussed the proposed drive to the western portion of the property but
ultimately decided not to provide input on it as they recommended only cash dedication. They
discussed the need for a trail easement running north and south along the bluff line and how
to access this easement from Zane Street.
The commission also had a discussion on the need for a future location of a boat landing
(once Babcock closes) and did not think this property was a good location. They agreed the
city should focus on an area fiuther south near the proximity of the proposed interchange of
1 G7d' Avenue and Highway 169.
Moved by Commissioner Nixiolek and seconded by Commissioner Rathbun to accept
staff recommendation of park dedication to be paid in the form of cash for the number
of units approved by the City Council at the rate applicable when the subdivision is
released for recording. (This will be $4,897.02/unit at the 2018 high density rate) A 50-
foot trail easement from under Highway 101 Bridge to the southern property line of the
site shall be provided with the majority of the easement being located above and along
the bluff line. The final location shall be approved by city staff. Adding that a 30-foot
wide trail easement, connecting the 50-foot easement to Zane Street, shall be provided
Motion carried 7-0.
b. Discussion Items — None
I x i R E I I T
NATUREI
Parks & Recreation Commission Minutes Page 3
November 14, 2018
7. Parks and Recreation Director Update
Mr. Hecker presented his staff report. Mr. Hecker also thanked Commissioner Williams for his
leadership and hard work over the past year in support of the Active Elk River campaign.
8.1 Recreation Manager's Update
Mr. Benoit presented his staff report. Mr. Benoit also presented his power point on the 19`h
Annual Family Spooktacular 2018 pointing out that this year's event had record attendance.
8.2 Street and Park Superintendent Update
Mr. Sevcik presented his staff report.
Chair Anderson asked if the group remembered the discussions in the past about the park
signs being horizontal instead of vertical signs Mr. Sevcik presented. He stated, that the
vertical signs were not the ones approved by the Commission and requested if he could get a
copy of the commission recommendations regarding the wayhnding project.
Mr. Hecker explained that the City Council approved the vertical ones and the process of
installation is already underway.
9. Announcements
10. Adjournment
There being no ftuther business, Chair Anderson adjourned the meeting of the Elk River
Parks and Recreation Commission work session at 7:52 p.m.
Minutes neevated bi/Dawn Larson.
Dave Anders(th. Chair
Tina Allard, City Clerk
FIIEIE1 11
NATM
Daniel J. Andersen
Briggs Companies
633 Upton Ave, Elk River MN
RE City of Elk River — Riverwalk Apartments
Case Numbers: EV 18-05, P 18-12, ZC 18-05, and CU 18-
15
To whom it may concern,
This letter is to request and consent to extension of the time
periods provided under Minnesota Statutes, section 15.99 and
section 462.358 for approval or denial of the four applications
listed above to April 17, 2019.
it is our intent to amend the applications to provide added
information per the site plan more in keeping of the
requirements allowed is this region and use.
Regards
Daniel J. Andersen
Briggs Companies
633 Upland Ave, Elk River MN
EL4k==:
River anft= -
13065 Orono Parkway
Elk River, MN 55330
January 14, 2019
Sun Rae Apartments, LLC
Attn: Dan Anderson
633 Upland Ave NSA, Suite C
Elk River, MN 55330
VIA EMAIL: dj(a thebriggscompanies.com
RE: Zone Change, Conditional Use Permit Application, Easement Vacation, and Plat.
Dear Applicant,
Thank you for submittal of updated plans and drawings on December 15, 2018. Staff reviewed the
updated drawings and has the following comments. Please note that many of the comments are
similar to the comments noted on August 15, 2018, and December 7, 2018. Many of the comments
have not been addressed and additional drawings are required to establish an understanding of the
project.
Please address these comments in a response letter and on future plans/submittals:
General Comments:
Submit an updated plat reflecting the lot lines shown on the submitted plans. The plat needs
to include all of the necessary drainage and utility easements.
The preliminary and final plats include the proposed dot lines sbown on the revised plans This information is
contained witbm with this submittal.
Drainage and utility easement vacations and proposed easements are not shown.
2. A cul-de-sac will be required at the north end of Zane Street. Update plans and the
easement vacation request to reflect the change.
The proposed driveway accesses and drive aisles for the Rwwalk Apartment site should be sufficient for
emergency vehicle tuma round at the nortb end of Zane Street. Afire /mck turningplan can be submitted
separately to verify vehicle movements through the site.
The cul-de-sac is required to ensure public (i.e. garbage trucks, buses, tractor/trailer) turn
around can occur within the public right-of-way and accommodate maintenance by public
works vehicles.
3. The Parks and Recreation Commission reviewed the project on November 14, 2018, and
recommends Park Dedication be satisfied through cash dedication and trail easements. The
trail easements must be included in the updated plat.
The revulsedplans and updated plat show a 30'trail easement beAveen the Riven alk Apartrrrent and the Lodge
sites.
Easement is not shown on either plat.
P0WfR10 8
Phone: 763.635.1000 INATUREE]
www.EE1kRiverMN.gov
4. What does the "lower drive" connect to? The plans show it leaving the site. Will this be
constructed as part of the project?
The `Power drive" has been removed firm the preliminag plans and a 30'trail easement has been added.
Easement has not been added to either plat.
Need a formal access agreement between the new 4-story apartment and the 4-story
apartment addition in order to share access point between them.
A formal access agreement between the Riverwalk Apartment site and this project frill be completed daring the
construction documents phase.
Access agreement can be a condition of approval — prior to recording plat.
b. Site plan does not match the renderings. Example, the south garage entrance on the 4-story
apartment addition building is shown in a different location.
The civil and archaecturalplans trill be coordinated to match. The south garage entrance as shorn on the
rendering sketch does not Bvork for the existing site conditions; hence the arcchitectural plans grill match the site plan
in this instance.
Updated elevations and rendering-. are required.
The minimum parking setback is 10' from property lines. If the deviation is to be a part of the
PUD, please specify a setback distance. Include the proof -of -parking locations for Elk River
Lodge in site plans for this project..
The minmium parking setback as shown on the plans is 5' and will be part of the PUD. The existing
parking stall counts far Elk Diver Lodge have not changed f vm prior submittals, a total of 67sta& (25
covered stalls and 42 surface stalls).
Parking setback and stall counts will be noted in required PUD agreements.
Plans identifying the portions of the Saxon building being removed should be submitted.
An existing conditions plan is included with this submittal that shorts the proposed removals.
Complete
Please submit floor plans for the Saxon Apartment building. The plans should show the
relationship between the storage area and apartments. Identify the square footage/unit
count for the storage portion of the building.
Fhorplans trill be submitted separately that trill shoo• the relationship between the storage area and
apartments with the square footage unit count for the storage portion of the building identified
Floor plans have not been submitted and are required for review.
10. Ordinance requires 2.5 parking stalls per unit, or 258 spaces for Riverwalk and 190 spaces
for Saxon Apartments. The parking requirements are not satisfied.
These projects are proposed as a PUD with a current ratio of 2.06 parking stalls per unit for the Riverwalk
Apartments and 2.26 parking stalls for River Playa (Saxon Apartments).
Parking deviations must be approved by City Council. Approved counts will be memorialized
in a PUD agreement.
11. Ordinance requires one covered parking stall per residential unit. The Riverwalk building
meets this requirement, but the Saxon Apartments do not.
Fiver PL a has been revised to Amp additional undergroundgarageparkung whin the pmposed building
addataon and a detachedgarage building
Approved parking counts will be memorialized in a PUD agreement.
12. The parking requirements do not include the storage component of the building.
Floorplans identifying square footage of the storage areas are required to review the parking
requirements.
The parking requirements for the storage component are included with the 8 parking stalls adjacent to that
area. With a storage area f 18,670 SF, this results in a ratio of 1 staflper 2,500 .IF of storage area
Submit floor plans identifiring residential and storage areas within the building.
13. Submit landscape plans for review and comment. This is a requirement for approval.
Landscape plans avill be submitted separately.
Landscape plans have not been submitted.
14. Submit lighting plans for review and comment. This is a requirement for approval.
.iae lightingplans wolf be submitted separately.
Lighting plans have not been submitted.
15. Submit colored architectural elevations identifying material and color selections for all
elevations. Facade improvements/modifications to the existing Saxon building must be
detailed. This is a requirement for approval.
Colored architectural elevations identifying material and color selections for all elevations are included with this
sulamittal
Architectural elevations have not been submitted.
16. include proposed sign -age on site plans and elevations.
Tiae proposed signage u shoran on the sate plans and building elevations
Building elevations have not been submitted.
17. The Saxon Apartments no longer provide emergency fire access to the rear of the building.
Please update the plans to demonstrate access for emergency vehicles.
The plans have been updated to show emergency fare access to the rear of the building ma a Grasspavae system
similar to the Rivenvalk Apartments
The updated site plan does not satisf r the minimum fire access requirements along the south
and west side of the building.
18. Additional comments will be provided upon receipt of referenced plans and changes.
So noted
19. Staff reserves the right to continue review of all site, grading and utility plans.
So noted
Public Works:
1. Identify all existing utilities and corresponding drainage easements on an updated survey
that includes the lot lines shown on the updated plans.
This information was included on the original Certificate of Surny, and is shown on the Prehminary Plat.
Plat documents continue to show existing easements running beneath proposed buildings
and revised stormwater plans outside of existing easements. Update plans to satisfy the
requirement.
2. A formal agreement for the proposed shared storm sewer system between the two
properties must be formalized in an easement and agreement.
A formal storm sewer system agreement Wirth easements between the two properties wll be completed during the
construction documentsphase.
Comment may be satisfied through condition of approval, prior to recording of the final plat.
3. Proposed lot lines must have standard drainage and utility easements dedicated.
Standard drainage and utility easements slang the proposed lot Braes air included in the ptrhminaay and final
pl,11Y.
Easements are not shown on the preliminary or final plat.
4. Parking bump -outs are not permitted on the public roadway in front of the proposed 4-
story apartment building.
According to City Code Sec 74-95 —Angle and parallelparking. Angle�iarking may be perr�ritted ors
any street by ordinance of the council. Can any such street, every vehicle parked shall be parked with the
front of the vehicle facing the curb or the edge of the traveled portion of the street at an angle of
approximately 45 degrees. C)n all other sheets, cars shall heparkedparallel to the curb or edge of the
roadway in accordance with law.
These parallel parking stalls arr requested as part of the PUD.
The request roust be approved by the City Council.
Sewer service shown off the north end of the 4-story apartment addition building extends off
of the proposed lot. All services (sewer and water) must remain within their own lot and
connect to the public system in the roadway adjacent to said lot.
The existing sanitary sewer service as shown of tl)e north end of the Saxon building ryas for the connection when it
bad a septic system. During the construction documents phase, it will be determined if this sanitary service is still
necessary. If it is, a new sanitary sewer will be installed within the proposed River Pla.Za lot
Plans need to be updated to include all proposed service lines.
6. Submit grading plans for the new 4-story apartment site.
The prelirrrinarygradingplan has been revised to shoran .spot elevations on the Riverwalk Apartmmentr site.
Additional spot elevations, prrposedgrades and contours will be included an the construction documents for both
projects
Fullgrading plans are required.
7. Proposed contours must be shown in all areas.
Additional spot elevations, prrposedgrades and contours will be included in the construction documents
for both projects
Full grading plans are required.
8. Further detail grades on the grass pave area and the entrance to it from the paved drive
lane.
Additional spot elevations for the Grafpave areas w1l be included in the construction documents for bath
projects; Curb andgutter in these areas u proposed to lie surmountable (MnDOT D412).
Full grading plans (with contours) are required.
Need to reestablish the capacity and functionality of the existing storm water pond below
bluff. It seems the proposed access drive is conflicting in location.
The existing storaavaterpond baton• the blsJrwill be expanded and redesigned to meet the City s current
stormwater requirements The proposed access drive has been remomd
Complete
10. Detail the design of the retaining walls along south side of project.
The proposed landscape retaining avails (less than 4' high) =11 be design -build and w1l be included in the
consftaion documentspbase.
Full grading plans (including construction details) are required.
11. Submit full updated civil/site plans for the proposed 4-story apartment building.
The preliminary plans have been revised to sbox the Riveravalk Apartments site aahng w1b the River Plaza
(Saxon Apartments) site. Construction documents for bothprojects wit be submitted separately after Pl]D
approval.
Updates required.
12. Show all proposed grades in dark solid lines.
Proposed spot elevations and pond contours are shown an dark solid lanes
Full grading plans (with contours) are required.
13. Additional comments will be provided upon receipt of referenced plans and changes.
So noted
14. Staff reserves the right to continue review of all site, grading and utilityplans.
So noted
Stormwater:
1. Stormwater management requirements need to be met as listed in Ordinance Sec.78-503.
- Stormwater and urban runoff control. and Sec. 78-504. - Post construction
stormwater management for proposed impervious surfaces. http://mn-\
elkriver.civicplus.com/Document Center/View/3180.
The preliminary plans and stormwater analysis, design and report have been reva`.sed to meet the current
stormuwer management requimwentr. Additional stormwater informa ion (MIDS results, storm server suing
calculations, etc.) ni11 be included in the construction documentspbase.
Complete stormwater plans have not been submitted for review. The review will be completed
once the all pertinent documents have been received.
2. Explain in detail the pre and post impervious surface is sq. ft. in the submitted stormwater
report. Also, separate the projects as phase 1 and phase 2 or explain the how the
stormwater infrastructure works together.
The preliminary plans haze been aspdated with pre and post hardcover calculations for both projects and the
stommater report has been revised to match. The proposed storrnwater basin will work together for both pra� jean
The existing/proposed hardcover calculations show a reduction. Staff cannot verif}, these
numbers. please the hardcover numbers.
Within the stormwater report, include pre and post for volume and water quality treatment.
The stormwater report has been revised to include this informa4ion.
The report does not match calculated hardcover existing proposed numbers. The discrepancies
need further explanation.
4. MnDNR will follow up with comments regarding requirements for state floodplain and
the Mississippi River Wild and Scenic and Recreational requirements.
So noted
DNR comments were received on January 11, 2019. See attached. Include a response to all of
their comments.
The project must meet all state and city ordinance requirements for the floodplain regulation.
No site improvements, including stormwater basin expansion and construction, are proposed within the
100 year base flood elevation boundary.
Any improvement within the floodplain will need approval prior to installation.
G. Submit soil borings and infiltrometer tests for all proposed infiltration basin areas.
Ageotechnical report ryas completed in 2017 for this site but does not include the area be%w the blu�f (where the
infiltration basin is proposed) or the area between the existing parking lot and the Elk Fiver Lodge site. This
rtport will be amended to include soil borings in these areas and submitted separately.
Staff will review these documents once they have been submitted.
Submit soil borings for the proposed infiltration basin (within proposed area) in order to
identify water baring soils. The infiltration basin details roust meet state requirements and
have a separation of 3' from the proposed bottom of the basin and water baring soils.
Please refer to the response to the previous plan review comment. The infiltration basin will be designed,
expanded and constructed to meet State and City requirements forgmundwater separation.
Staff will review these documents once they have been submitted.
8. Stormwater pre --treatment is required prior to any proposed infiltration basins.
Storarawaterpre-treatment will be provided rising manhole sum
ps and sued using the 141IDS calculator
during the construction documents phase.
Staff will review these documents once they have been submitted.
The plans show a basin bottom of 861.00 but the stormwater report lists 860.00. This needs
to be addressed.
The prr�posed infiltration basin will have a sloped bottom f vm elevation 863 down to elevation 862 but
with no area that the 862 elevation. A basin profile detail will be included in the construction documents
Staff will review these documents once they have been submitted.
10. The proposed 18" FES needs to discharge within the basin sidewall, not short of the basin
within the hillside, also, include energy dissipation according to city standards.
The prelirninag plans have been revised to show the proposed 18"FES discharging within the basin
sidewall and energy dissipation via a 4.2' invert drop in the upstream manhole (CB #7).
Ok
11. Will the existing 18" FES and stormwater system stay on-line or be abandoned? If so, Hydra
CAD needs to be included for this and the basin needs to be cleaned out to original design or
enlarged based on requirements.
The existing 18" FES and stormwater system will be removed and this it shown on the existing conditions
plan. As stated previously, the existing stormwater basin will be expanded based on the current City
requirements
Staff will review these documents once they have been submitted.
12. The proposed stormwater lines show it tying together at CB #8, provide detail of how this
will work.
CB #8 is proposed to be built over the &vshng storm sewer pape because there is insufficient depth within
the existing system to accommodate the proposed improvements A detail of CB #8 will be included in
the construction documents
Staff will review these documents once they have been submitted.
13. Provide pipe sizing chart report.
Storm sewer suing calculations will be corrrpleted during the construction documents phase.
Staff will review these documents once they have been submitted.
14. Show parking lot contours, direction of flow and grade percentages. Also, show pipe slope
percentages.
As stated previously, final contour, grades andflow arroms =11 be included in the construction documents
Pipe slopes are shown on the pre,6minary plans.
Staff will review these documents once they have been submitted.
15. Indicate where all roof drainage is being directed to, and not which CB #.
Existing andproposed roof drainage will be directed to locations of the Duna -Slope french connectiaras.
More detailed information will be included in the constmcdon documents for each prao jea..
Staff will review these documents once they have been submitted.
16. The city* was not able to review the proposed stormwater system for the `proposed 4-story
apartment building' because it is cut off on page C-2, update accordingly.
The proposed stoner sewer system for the Fjmiwalk Apartmentspm as inclarcled in the revised preliminary
plans
The plans do not match calculated hardcover existing/proposed numbers. The discrepancies
need further explanation.
17. Submit long term maintenance plan for all BMPS.
Long terra maintenance plans for allpmposed stormwater BMPs will be completed during the construction
documentsphase.
Staff will review these documents once they have been submitted.
18. Submit full M1DS report.
fI fullMIDS report will be corn feted during the constmaion doer ments pl e.
Staff will review these documents once they have been submitted.
19. Staff reserves the right to continue review of all site, grading and utllityplans.
So noted
Environmental:
1. MnDNR will follow up with comments regarding requirements for state floodplain and the
Mississippi River Wild and Scenic and Recreational requirements.
So rioted
Comments were received from MnDNR on January 11, 2019. Please review attached letter and
respond to their concerns.
2. Provide before and after hardcover calculations for the Saxon site. Ordinance limits impertrious
surfaces to 25010 or no net increase.
The preliminary plans have been updated with pre and post hardcover calculations for both
projects.
The plans show a 30.5% hardcover calculation, which does not meet city standards. Please
verify your hardcover calculations.
3. Section 30-2022 requires a 30 foot setback f nw the top -of -bluff. Move structures outside of the setback.
Both of these projects are proposed as a PUD which includes the flexibility of building
within the 30' setback from the top of bluff.
A deviation from the standard will require approval from the DNR and City Council. Any
approved deviations will be memorialized in a PUD agreement.
4. Submitted plans showing the hardcover calculations. Sketches indicate the area inside the
building, courtyard, will have impervious surfaces.
a. If land along the river is dedicated for park use, the hardcover calculations will change.
Updated plans will be required based on park recommendations.
The preliminary plans faave been updated with pre and past hardcover calculations for bath projects
The plans do not match calculated hardcover existing/proposed numbers. The discrepancies
need further explanation.
5. The proposed site does not meet setbacks from the Mississippi River, does not meet bluff
setbacks and potential grading plans are concerning from an environmental standpoint. Bluff
destabilization is the biggest concern overall for proposed project. There is no wetland
delineation on fate for this site. Any encroachment into the bluff setback or bluff area may
require approval from the Department of Natural Resources. As submitted previously, there
are height restriction concerns as well. Structures along the Mississippi like this may not be
higher than 30 feet tall.
The only proposed site improvements inthin the 100 foot setback, from the 100 year base flood elevation
boundary is the expansion of the existing stormmater basin below the bluff The existing bluff will be protected
and monitored by an independent testing company during constmaion, A awland detemaination was corrrpleted
for this site with no wetlands identi,erl Height restrictions for both fthe pmposed buildings wri11 be met.
If hardcover is proposed within 45 feet of a suspected wedand, a wedand delineation will be
required. Building elevations showing the proposed heights have not been received and will be
reviewed upon receipt. Please review the DNR comment letter dated January 11, 2019, and
provide additional responses to their comments.
The recommended environmentally beneficial practices listed in the City's plan review
comments will be considered as possible options within the PUD to offset any mutually
determined negative environmental impacts resulting from deviations to the City and
State regulations. These environmentally beneficial practices will be addressed in the
PUD and implemented accordingly.
Additional comments provided by MnDDT or MnDNR will need to be addressed as part of an
approved project. Unaddressed comments may be included as conditions for approval. Staff
reserves the right to continue review of all site, building, grading and utility plans
Thank you, and please let me know if you have any questions.
Sincerely,
Zack Carlton, Planning Manager
763.635.1035
DEPARTMENT OF
NATURAL RESOURCES
January 11, 2019
City of Elk River Planning Commission
13055 Orono Parkway
Elk River MN 55330
Ecological and Water Resources Division
1035 S Benton Dr.
Sauk Rapids, MN 56379
RE: MISSISSIPPI RIVER DEVELOPMENT CUP for PID # 75-521-0110, 75-521-0120, and 75-704-0205
Dear City of Elk River Planning Commission,
I have reviewed the newly submitted plans with the addition of the parcel to the south for a CUP to construct a
multi -family development unit along the Mississippi River. This letter is an addendum to the letter 1 sent on
August 31, 2018,1 have found the following issues in these new set of plans.
The construction plans do not show the height of the building, but the plans do show that the building will be a 4
story building. I do not know if this building will meet the height restriction of 30 feet per Sec 30-2022 (c). A
Height greater than 30 feet could alter the scenic, historical, natural value that was outlined in Minnesota
Statute 103F.315. Typically 4 story buildings are a greater height then 30 feet.
The plans show a line denoting the 30 foot set back from the top of the bluff. This setback line is found to bisect
both the first addition the second addition and the Northeast parking lot. Having these structures built here
would be in conflict with Sec 30-2022, 2024. Sec 30-2022 which requires a setback of 30 feet from the top of the
bluff. Sec 30-2024 states roads, driveways, and parking areas shall meet structure setbacks and shall not be
placed within bluff zones. This is again stated in Sec 30-2135. In addition Sec 30-2023 does not allow for
intensive vegetation clearing within the bluff impact zone. Which by placing a parking lot and structure would
require complete removal of vegetation. Having these structures located here will also require grading and
filling of the bluff area which could destabilize the bluff.
In addition to the structures being placed within the setback the plans show that there will be a parking lot
constructed to the west of the multi -family units. This parking structure is shown to be built into the side of the
bluff which could also further destabilize the bluff. This is in conflict with Sec 30-2135. The driveway that gives
access to this parking area is also down the bluff which would require manipulation of the bluff which could
destabilize the bluff. This parking structure could also be in conflict with Sec 30-2023 Intensive vegetation
clearing within the shore and bluff impact zone. As a parking structure would require the complete removal of
vegetation.
Sincerely,
James Bedell
Area Hydrologist
11035 S Benton Dr.I Sauk Rapids, MN 53379 1 (320) 223-7850 lames.bedeil@state.mn.us
Minnesota Department of Natural Resources • Division of Ecological and Water Resources
800 Oak Savanna Ln. SW Cambridge MN 55008
CC: Tim Crocker DNR EWR Region 3 North District Manager
Dan Petrik DNR EWR Land Use Specialist
Ceil Strauss DNR EWR Floodplain Hydrologist
Minnesota Department of Natural Resources • Division of Ecological and Water Resources
1035 S Benton Dr. Sauk Rapids, MN 56379
City Council ;Minutes
February 19, 2019
Page 4
Moved by Councilmember Westgaard and seconded by Councilmembet
Wagner to adopt Resolution 19-07 granting Final Plat of ER Ventures Second
Addition, with the condition that Variance No. V 19-01 is recorded with Lot 1,
Block 1, ER Ventures Second Addition. Motion carried 5-0.
7.5 River Walk Apartments — 17354 Zane Street
A. Right -of -wary Vacation: Zane Street
B. Simple Plat: River Walk
C. Zone Change to Planned Unit Development
D. Conditional Use Permit to Planned Unit Development
Mr. Leeseberg presented the staff report on behalf of Planning Manager Zack
Carlton.
Mayor piety opened the public hearing.
Dan Anderson, Briggs Company, 633 Upland Avenue — Asked for clarification
about park dedication stating the Parks and Recreation Commission provided
different feedback then Council. He stated he would prefer to give land fora park
versus giving cash or easements.
Dave Anderson, Parks and Recreation Commissioner -- Stated the commission
chose to preserve an easement for a trail and not take land. He stated the
commission further recommended taking cash for the park dedication. He stated
they want the easement because it is highlighted in the Park and Recreation Master
Plan as a river bluff trail heading from downtown Elk River to a City of Ramsey trail
connection.
Mayor Dietz asked Mr. Beck about the trail easement.
Mr. Beck sated when land is being platted, the city has the authority to obtain
easements. He stated it is a reasonable condition because it's in city plans.
Moved by Councilmember Westgaard and seconded by Councilmember
Wagner to continue the request to vacate a portion of the Zane Street Right -
of -Way and the Simple Plat to the March 18, 2019, Council meeting. Motion
carried 5-0.
Councilinember Wagner asked for further discussion of Council's desire for a trail
easement. She stated it is an important trail connection along the river that is a greai.
benefit to the residents of the community.
Councilmcmber Westgaard stated he supports the commission's recommendation
Moved by Councilmember Westgaard and seconded by Councilmember
Wagner to continue the request for approval of a Zone Change and the
NATURE
City Council Minutes
February 19, 2019
-----------------------------
I'age 5
Conditional Use Permit establishing a Planned Unit Development to the April
15, 2019, Council meeting. Motion carried 5-0.
8.1 Resolution for Finding of Fact: Conditional Use Permit Request by
ResCare Minnesota
Mr. Beck provided summary of the historyjtimelincs for this application. He
reviewed Council options for action. He expressed concern with having factually -
supported legal reasons to deny the application. He explained the Conditional Use
Permit process and how it is a legislative versus a discretionary decision. He stated
there are two key components 1) there has to be a legally -sufficient reason for which
there is a factual basis in the record to deny the application. He stated in this case
there are a lot of facts and impact to surrounding areas, but they are likely not
sufficient to support denial; 2) this case involves a protective class of people under
federal law. He explained how these lays apply to this application. Mr. Beck further
noted the exposure to the city is exponential and can include additional fees and
costly damages when federal rights are involved. He stated he consulted with
attorneys in our partnering law firm and the League of Minnesota Cities and they,
concurred.
Councilmember Christianson stated he spent many- hours on this and feels this type
of care facility is not appropriate at this location and his position hasn't changed can
die matter.
Councilmember Westgaard stated he felt the applicant met the conditions and
struggles to find reasons not to approve it.
Councilmember Dvall stated he reviewed this matter deeply and he thanked
everyone for their assistance. He stated initially this seemed like a straightforward
case for lum until he heard the evidence from the community. He stated he focused
on what he believed to be the facts of this case based on policing and local
neighborhood impact. He stated as he continued review and worked with multiple
groups for information, he learned a lot about the federal hair Housing .act. He
stated because Council can't consider police and neighborhood concerns, he feels
the conditions of the request are met and he would support the Conditional Use
Permit. He further stated he stands by his feelings this is not the best location for
this type of use but the application meets the terms of the ordinance as written.
Councilmember Wagner stated she will not be supporting the denial because there
are not any legal reasons to factually' support it.
Mayor Dietz stated this is an extremely difficult decision he has thought about a
great deal. He stated he is confident the Council will change the zoning in the
downtown district so ResCare could again consider the former school district
property. He urged ResCare to give the site strong consideration. He discussed the
Conditional Use Permit process and the legal reasons for denial. He felt there would
be a good chance ResCare would sue the citt° if their application is denied. He stated
'NATURE]
io
140-
...........
j69
jo
140.
1J.5 -
OZ
NVA
WW-
VA-Aw
'16
9S 6
r
if l
City Council Minutes Page 7
December 16, 2019
9.2 Park Dedication
Mr. Carlton presented the staff report.
Attorney Beck presented background on park dedication limits. He noted not many
cities have gone through the effort Elk River did to get to a number that complies
with constitutional requirements. He added in his experience our approach is as
development friendly as any other city with a few exceptions.
Pat Briggs, Briggs Companies, handed out and reviewed his development projects.
Mayor Dietz asked Parks and Recreation Commission Dave Anderson to weigh in
on how the city accepting Mr. Brigg's 12 acres of land to reduce his park dedication
would benefit the parks.
Chair Anderson indicated the Parks and Recreation Commission reviewed the
request twice and did not come up with a good enough use for the land and instead
requested the park dedication be paid in cash. He stated they could review the
request again but he's not sure the decision would change.
Councilmember Westgaard questioned how many of the 12 acres is floodplain. Mr.
Carlton stated 9.6 acres is in the flood plain.
The Council expressed concern with accepting flood plain as park dedication.
Mr. Briggs explained he envisions the area be used for a wild and scenic use and he is
not interested in bringing pedestrian traffic to private property.
Councilmember Christianson questioned what the city can do to work with the
developer to develop this vacant property.
Attorney Beck explained the Council can waive whatever requirements they wish but
in order to not set precedent, the Council should outline good, rational findings in a
resolution.
Mr. Briggs stated he is very interested in putting together a joint venture with the city
to create a win -win for everyone. He has concerns with ruining the wildlife area by
creating a walking path. He stated he is not interested in owning property with a trail
due to risk management and would like the city to own and police the property if
they insist on putting a trail in.
Council consensus was to schedule this item for an upcoming City Council meeting
night with a light agenda to allow ample time for discussion. Mr. Portner indicated
staff should be able to add to a January meeting.
AGENDA
12-16-19 6:30PM
Time & Place: City of Elk River
Subject: Deed land or dedicate easements in- lieu of Park Dedication Fee
Attendees:
Council
Pat Briggs with Briggs Companies represents Both Owners
1. Saxon Lot
Approximately 700 ft of Waterfront. 3.5 Acres
Sun Rae is open to giving up private ownership of land for benefit of the public
enjoyment. SunRae would consider Deeding land or dedicate easements in- lieu of
Park Dedication Fee of subject property.
2. Two Finger Lots
Approximately 300 ft of waterfront. 2.7 Acres
Sun Rae is open to giving up private ownership of land for benefit of the public
enjoyment. Sun Rae would consider Deeding land or dedicate easements in- lieu of
Park Dedication Fee of subject property.
3. Elk River Lodge Lot
Approximately 420 ft 6 Acres
ERL is open to giving up private ownership of land for benefit of the public enjoyment.
ERL would consider Deeding land or dedicate easements in- lieu of Park Dedication
Fee of subject property.
Easements are less desirable due to Risk Management and Policing of Domestic Issues
and remaining abuse of existing Private Property. Example would the city build a
fence. So public stays off private property? If an easement is granted the public will
stray onto private property. The private quiet environment will no longer be in
existence. Owners are not excited to engage in this kind of relationship. Think about it
this way. What would you want if it was in- your backyard?
Portner, Cal
From:
Westgaard, Matt
Sent:
Monday, January 20, 2020 7:30 PM
To:
Portner, Cal
Subject:
RE: 52339A18
Cal,
Could you please forward my comments for Tuesdays meeting on to the rest of the Council for their consideration
during Tuesday evenings discussions.
8.1: Naming Rights: As previously stated, I think the council should consider engaging one of these consultants to
develop the framework for securing opportunities for not only naming rights but all options of advertising etc. I don't
believe we have staff that is experienced with this type of promotion nor has the time to dedicate to developing and
maximizing our opportunity here. We have an opportunity to secure some funding for this facility to offset the expense
of operating. All three firms show specific experience with like and kind facilities. After review of the attached
proposals my instinct would be to lean favorably toward the Front Burner Sports Group based on their team, experience
and fee structure.
9.1: Park Dedication Fees: I believe our PD fee schedule is well substantiated in structure as to how we determined the
rates for each tier. I don't believe we should or are compelled to provide any concessions. The only area I feel we could
provide some relief would be on the High Density rate after a certain threshold was achieved or on a graduated scale or
a cap after a certain dollar amount. To be more specific; The impact of a 40-unit complex is vastly different than the fee
impact of a 300-unit complex. It's a drastically different dollar amount and can understand how it becomes significant
for a developer.
9.2: Religious uses in the FAST area: Based on my own contemplation without your dialogue, I am not in favor of
allowing them in the district. We made an exception several years ago for an educational use that has proven to be
more challenging than ever imagined and would strongly oppose allowing it again unless there was further dialogue and
discussion with Staff, Planning and Existing Businesses.
I hope this is helpful input for your discussion, and again my apologies for the scheduling error on my behalf and not
being able to attend.
Sincerely,
Matt
Park Dedication
Background
■ Park Dedication fees updated in 2016
■ State statue changes and recommendation
■ Created formula with city specific variables
■ An appraisal study identified per/unit values
(HH Size) x (acres park/person) =Acres of land for dedication
(Land Dedication) x (Average property value) _ $$ due per unit
Development Fees
■ Fund impacts/improvements resulting from an increased
demand on existing systems due to development.
■ SAC/WAC, Stormwater
■ Park Dedication — more users in the park system
■ Only pays for "new"
■ Cutting development fees directly impacts the city's ability to
fund increased demand for services.
Park Dedication Calculation Increased demand on system
Assumptions for Park Dedic n
2.82, 1.80, and 1.58 verage Household size for City of Elk River (based on 2014 ACS Data)
0.03 ores of park land per resident as identified by Parks and Rec Master Plan
$ 16,855.00 Mean per acre value of low density residential land established by appraisal study
$ 19,922.00 Mean per acre value of medium density residential land established by appraisal study
$ 103,313.00 Mean per acre value of high density residential land established by appraisal study
Land dedication required
low density 2.82 x 0.03
med density 1.80 x 0.03
high density 1.58 x 0.03
Cash dedication required
low density 0.0846 x $ 16,855.00
med density 0.0540 x $ 19,922.00
high density 0.0474 x $ 103,313.00
0.0846 acres of land per residential unit
0.054 acres of land per residential unit
0.0474 acres of land per residential unit
$ 1,425.93 cash dedication per residential unit
$ 1,075.79 cash dedication per residential unit
$ 4,897.04 cash dedication per residential unit
Previous rate $3,712/unit
RiverWalk Park Dedication
■ Assuming a 200 unit residential development (possible comm.)
■ Land Dedication — 9.48 acres
■ Cash Dedication — $944,016.00 (with credit for existing)
■ Park dedication not paid with previous plat/use
■ Park and Rec Commission recommended a trail easement.
■ Park plans do not identify a park in the development area
RiverWalk Park Dedication (cont.)
■ Owner proposed dedicating — 12.2 acres of land to satisfy
dedication requirements.
■ Approximately 80% of dedication proposal in floodplain
■ Dedicated land should be buildable —2.3 acres
■ Proposal by owner to reduce dedication by half and dedicate
trail easement.
■ Reduced from $944,016 to $472,008
■ Add tiered dedication schedule or a cap for multi -family
developments.
r11 �;\ �wrnr•n�awaro T \\
i aA n aK; i t1 TRACT B' "W\
en,w
I 1
\
i 3!25 yl 1 N, O ,
Fr. �reAw FRou aurr sc,PACR - , „m,
OFVAlDAP nocP
101, y\ Q `
3 r, l_.0 PROPOSED
�u:SHS� I I I APARTMEN
6NIDINO I
M34.038 , \
FFE-SWD.OD CO
OFc-M.SD
11
5ym 'ggg ' 0 \\ uow0' 1 y I 11 \\` • r
mSZ W Ir� m "'I
nO �DDf/Ef/� V ..........
• xa(RAwa� 1 .�/ �:•` 999 Y •� j �A
doh ERH 5 II
Wb� O
;fig �FP WOODED
g
N�� $2co A ` B-F`aieA° 1- �l TRACTRD
ZO•r, Nyo V \ lirI I Wte
ya.yo mo>fl \� a o uor �'�e•.�� 1� I i a
7_IO
nm
NC ADO j • \ �. 1' ' • * O
OQ,B so-z D I �� 1 i PROPOSED
4-510RF rw,
APARTMENT m
OO.�-jj A-M2M S r
JB9
o gas 4• ', 1'i I -
z Fwo '
yp y pF 5g.
N yr•1 • TM hF &Ufs� -1 �11 • al%M
S r
m ZF I 1
m
City Comparison
Residential Cash Dedication Requirement
Base cash dedication rate $3,500/unit
exceed 12+ units/acre
exceed 20+ units/acre
fee for all densities
fee for all densities
Min. fee or 10% land value
% of land value (appraisal)
fee for all densities
fee for all densities
$2,775/unit
$2,550/unit
$3,500/unit
$1,968/unit
$2,500/unit
11%
$31200/unit
$3,156/unit
Riverwalk Land Dedication Scenarios
Potential Sources of Land Dedication and Impact to Cash Dedication
Type
Acres
Park Dedication
Amount Due
Impact (Acres Due)
(dollars)
30' trail easement - approx. 50' x
850'
0.98
8.50
$
846,826.17
All land from 30 above bluff to
river
7
2.48
$
246,957.77
Area noted above less the flood
plain
2.6
6.88
$
685J08.66
Estimated useable area for
Park/trail
1.5
7.98
$
794,646.38