Loading...
7.1 PRSR 01-15-2020 Meeting HandoutHillside Park - Tyler Street Access CSAH 1.2 18 1 st Ave n u e 80 feel - 130feet = 80 spaces lop 4-J L- { 225 feet L v � �r H � 1 r r Y -- 4A6 N(\\DRAFT INFORMATION ONLY Park Driveway ® Parking Lot Mountain Bike Trail Hillside Park - Trott Brook Parkway Extension Access CSAH 12 (181st Avenue) 130 feet 80 spaces 4-J i 225feet Q� L fr rr r sf /, 4 1 � 1 k t DRAFT INFORMATION ONLY Park Driveway Parking Lot Mountain Bike Trail Hillside Park Access Access Comparison Page 1 Preferred Acceptable Not Preferred Item Restricted Access Tyler Street Access Trott Brook Ext. Access Design Access Right in, right out from EB CSAH 12 (181 st Avenue) Full Access off of Tyler Street Full Access at Trott Brook Parkway Ext. Parking Lot Parking lot remains in current condition Parking lot relocated to NW corner of park with Parking lot remains in current location with possible expansion possible expansion Parking Spaces Currently 42 spaces exist Parking lot could be expanded to 80 spaces Parking lot could be expanded to 80 spaces Traffic Impacts Traffic in adjacent neighborhoods will not Traffic in the Trout Brook Farms South neighorhood Traffic near the private driveway easement (across increase will increase city property) ex will increase Access in CSAH 12 to water (south side) and sanitary Future Water and Sewer Access in CSAH 12 to water (south side) and Access in Tyler Street to water (west side) and sanitary Connections sanitary sewer (north side) sewer (south of proposed access) sewer (north side) Water and Sewer Connections with Work could be completed with County project, no Work could be completed with County project, Work could be completed with County project, no County Project additional roadway patching needed additional roadway patching needed in Tyler additional roadway patching needed Land Control Property Acquisition -CSAH 12 (181st Ave County is currently determining County is currently determining County is currently determining Property Acquisition -Park Access None Permanent easement acquisition from parcel west of Update existing private driveway easements as Park needed No. of impacted properties 0 1 3 Park Experience Location and Accessibility Visible and accessible from CSAH 12 Limited visibility from CSAH 12 requires access Visible and accessible from CSAH 12 through a residential neighorhood Neighborhood Access Via trail along CSAH 12 Via trail along CSAH 12 and sidewalk along Tyler Via trail along CSAH 12 Street, direct access from Trout Brook Farms South Hillside Park Access Access Comparison Page 2 Preferred Acceptable Not Preferred Item Restricted Access (right in, right out) Tyler Street Access Trott Brook Ext. Access Park Experience (Cont.) Mountain Bike Trails No impact to current mountain bike trails Impacts mountain bike trails in the northwest quadrant of the park (Area 1) Impacts mountain bike trails along the north side of the park (Area 1 & 4) Back Parking Area Access Access remains the same Additional access point is needed to connect Access remains the same Project Costs Design $0 $27,000 $27,000 Right of Way $0 $28,000 for acquisition and impacts to property west of Park $8,000 for necessary changes to existing private driveway easements (3 total) Construction $0 $220,000 (includes asphalt driveway and parking lot) $265,000 (includes asphalt driveway and parking lot) Total Project Costs $0 $275,000 $300,000