7.1 PRSR 01-15-2020 Meeting HandoutHillside Park - Tyler Street Access
CSAH 1.2 18 1 st Ave n u e
80 feel -
130feet
= 80 spaces lop
4-J
L- { 225 feet
L
v �
�r
H �
1
r
r
Y
-- 4A6
N(\\DRAFT
INFORMATION ONLY
Park Driveway
® Parking Lot
Mountain Bike Trail
Hillside Park - Trott Brook Parkway Extension Access
CSAH 12 (181st Avenue)
130 feet
80 spaces
4-J i
225feet
Q�
L
fr
rr r
sf /,
4
1 �
1
k
t
DRAFT
INFORMATION ONLY
Park Driveway
Parking Lot
Mountain Bike Trail
Hillside Park Access
Access Comparison
Page 1
Preferred
Acceptable
Not Preferred
Item
Restricted Access
Tyler Street Access
Trott Brook Ext. Access
Design
Access
Right in, right out from EB CSAH 12 (181 st
Avenue)
Full Access off of Tyler Street
Full Access at Trott Brook Parkway Ext.
Parking Lot
Parking lot remains in current condition
Parking lot relocated to NW corner of park with
Parking lot remains in current location with
possible expansion
possible expansion
Parking Spaces
Currently 42 spaces exist
Parking lot could be expanded to 80 spaces
Parking lot could be expanded to 80 spaces
Traffic Impacts
Traffic in adjacent neighborhoods will not
Traffic in the Trout Brook Farms South neighorhood
Traffic near the private driveway easement (across
increase
will increase
city property) ex will increase
Access in CSAH 12 to water (south side) and sanitary
Future Water and Sewer Access in CSAH 12 to water (south side) and
Access in Tyler Street to water (west side) and sanitary
Connections
sanitary sewer (north side)
sewer (south of proposed access)
sewer (north side)
Water and Sewer Connections with
Work could be completed with County project, no
Work could be completed with County project,
Work could be completed with County project, no
County Project
additional roadway patching needed
additional roadway patching needed in Tyler
additional roadway patching needed
Land Control
Property Acquisition -CSAH 12
(181st Ave
County is currently determining
County is currently determining
County is currently determining
Property Acquisition -Park Access
None
Permanent easement acquisition from parcel west of
Update existing private driveway easements as
Park
needed
No. of impacted properties
0
1
3
Park Experience
Location and Accessibility
Visible and accessible from CSAH 12
Limited visibility from CSAH 12 requires access
Visible and accessible from CSAH 12
through a residential neighorhood
Neighborhood Access
Via trail along CSAH 12
Via trail along CSAH 12 and sidewalk along Tyler
Via trail along CSAH 12
Street, direct access from Trout Brook Farms South
Hillside Park Access
Access Comparison
Page 2
Preferred
Acceptable
Not Preferred
Item
Restricted Access (right in, right out)
Tyler Street Access
Trott Brook Ext. Access
Park Experience (Cont.)
Mountain Bike Trails
No impact to current mountain bike trails
Impacts mountain bike trails in the northwest
quadrant of the park (Area 1)
Impacts mountain bike trails along the north side
of the park (Area 1 & 4)
Back Parking Area Access
Access remains the same
Additional access point is needed to connect
Access remains the same
Project Costs
Design
$0
$27,000
$27,000
Right of Way
$0
$28,000 for acquisition and impacts to property west
of Park
$8,000 for necessary changes to existing private
driveway easements (3 total)
Construction
$0
$220,000 (includes asphalt driveway and parking lot)
$265,000 (includes asphalt driveway and parking
lot)
Total Project Costs
$0
$275,000
$300,000