8.1. SR 02-03-2020City of Qk*' River Request for Action To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business February 3, 2020 Amanda Erickson, Environmental Coordinator Item Description Reviewed by Lake Orono drawdown requirement for the Lake Brandon Wisner, Stormwater Coordinator Reviewed by Orono Restoration and Enhancement (LORE) project. Cal Portner, City Administrator Action Requested Approve, by motion, the resolution of support to pursue drawdown approval for Lake Orono from the Minnesota DNR Commissioner for direct lake drawdown approval or the option for an opt -out direct mail petition to each adjacent property owner on Lake Orono. Background/Discussion The LORE project continues to move forward as staff works with WSB & Associates to design plans and engage the Technical Advisory Panel (TAP) members for feedback. TAP members include members from the city, DNR, U.S. Army Corps of Engineers, Sherburne Soil and Water Conservation District and two lakeshore property owners. The TAP met in December to review preliminary 50% plans. Comments were submitted in mid January for review and are incorporated into the plans that will be shared the city council. Many of the comments pertain to the dredging location and the incorporated habitat improvements. Staff and the consultant continue to balance the desires of lakeshore property owners with project budgetary limitsadn realistic plans permitted by the DNR. The plans will be further updated and again shared with the TAP for review in the coming weeks. With many stakeholders involved, consensus is requested of the council for the overall goal of the project. Next steps include: A public open house (March), lake drawdown approval, submission of applications for regulatory permits (February), 100% plans/drafting of construction documents and specifications for the public bid process with an anticipated start date of an August 2020 lake drawdown. Per Minnesota State Statue 103G.408 -Temporary Drazvdozvn of Public fFateis, either direct approval from the DNR Commissioner or the support of 75% of riparian landowners by petition is required. A letter was sent in August of 2019 to Commissioner Strommen requesting approval necessary for the drawdown. No response has been received. Our local DNR contact stated the 75% support is standard practice, even for their projects. OLID and LOIA would like to again pursue direct commissioner approval or request the option for an opt - out mailing directly to lakeshore property owners, rather than gaining signatures for support. City staff would be responsible for again contacting the DNR Commissioner in request for direct approval or requesting this additional opt -out option. The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional,` 01 e service, and community engagement that encourages and inspires prosperity INAMIRE1 Financial Impact 2020 Budgeted Item Attachments ■ OLID and LOIA Letter dated January 28, 2020 ■ Resolution 19-XX Request for Lake Orono Drawdown Approval N:APublic Bodies\Agenda Packets\02-03-2020\x8.1 sr LORE Project Update and Drawdown.docx January 28, 2020 City of Elk River 13065 Orono Parkway Elk River, MN 55330 Dear Mayor Dietz and City Council Members, One of the major tasks associated with the Lake Orono Restoration and Enhancement (LORE) project is conducting a drawdown of the lake. This approach has been determined to be the most cost-effective method to access and remove the large amount of sediment required to address current severe navigation and safety issues. At the same time, due to winter freezing, it is the most cost-effective method of eliminating the abundance on Curly -leaf Pondweed in the western part of Upper Lake Orono. Further, although a majority of the current sediment sources are upstream, a drawdown provides an opportunity for property owners to work in collaboration with the LORE project team and make improvements to their shoreline to target erosion. Since 2009, MN Stat. 103G.408 Temporary Drawdown of Public Waters (attached as Exhibit A) requires a permit from the MN DNR for a drawdown to be conducted. There are two methods of permit approval — it can be directly issued by the commissioner or the public entity must obtain permission from at least 75% of riparian landowners. In our experience we know that a signature collection process is very time and labor intensive. In 2009 and 2010 Lake Orono Improvement Association volunteers gathered the signatures needed to request a drawdown to control Curly -leaf Pondweed; this took 18 months. In 2018 and 2019 association volunteers gathered the 50%+1 signatures required to request the creation of the Orono Lake Improvement District in a shorter time; this still took 8 months. Since LORE is 46% funded by the state, we feel that the MN DNR should reduce the cost and burden to the City of Elk River in obtaining the permit either by the commissioner granting approval or at least allowing an alternate method to be used to meet the 75% approval. In 2018 the MN DNR conducted a public hearing regarding a drawdown associated with its own state -funded project for Little Rock Lake in Benton County. The goals of the project, which are similar to some of LORE's, were to improve water quality by removing excess nutrients, stabilize shoreline erosion and improve habitat for fish and wildlife. Instead of conducting a signature gathering campaign, the MN DNR used an "opt out" method. We understand that a postcard was mailed to each Little Rock Lake riparian property owner notifying them of the proposed drawdown and outlining a method for them to "vote no" if they did not agree with the drawdown occurring. If 25% of those impacted disagreed, the requirement would not be met. That did not happen and the project advanced. Page 1 Besides reducing the time and cost in meeting the permit requirement, we believe it is significant to mention the fact that the LORE project was one of two primary discussion topics at six well -attended Lake Orono riparian property owner meetings. Those included four lake association information sessions, a City of Elk River public hearing and the Orono Lake Improvement District annual meeting. Not one concern about conducting the drawdown was expressed during any of those very detailed discussions. Further, our goal in the future is to reduce drawdown needs by proactively working with our Elk River watershed partners to reduce sediment reoccurrence from upstream sources, annually managing weed or nuisance plant concerns and consider the possibility of using hydraulic sediment removal in more frequent mini -projects. Finally, please ask the MN DNR commissioner to either directly approve a drawdown permit or allow the use of an opt out permit method for riparian property owner approval. If it would be helpful in making this request of the MN DNR, we believe that if asked both local legislators and other officials would lend their support. Respectfully, Christy Cox President, Lake Orono Improvement Association Patrick Plant Chair, Orono Lake Improvement District Board of Directors Attachments MN STAT. 103G.408 TEMPORARY DRAWDOWN OF PUBLIC WATERS (Exhibit A) Page 2 Exhibit A: 103G.408 TEMPORARY DRAWDOWN OF PUBLIC WATERS MINNESOTA STATUTES 2019 103G.408 103G.408 TEMPORARY DRAWDOWN OF PUBLIC WATERS. (a) The commissioner, upon consideration of recommendations and objections as provided in clause (2), item (iii), and paragraph (c), may issue a public -waters -work permit for the temporary drawdown of a public water when: (1) the public water is a shallow lake to be managed for fish, wildlife, or ecological purposes by the commissioner and the commissioner has conducted a public hearing presenting a comprehensive management plan outlining how and when temporary drawdowns under this section will be conducted; or (2) the permit applicant is a public entity and: (i) the commissioner deems the project to be beneficial and makes findings of fact that the drawdown is in the public interest; and (ii) the permit applicant has obtained permission from at least 75 percent of the riparian landowners; (iii) the permit applicant has conducted a public hearing according to paragraph (d). (b) In addition to the requirements in section 103G.301, subdivision 6, the permit applicant shall serve a copy of the application on each county, municipality, and watershed management organization, if one exists, within which any portion of the public water is located and on the lake improvement district, if one exists. (c) A county, municipality, watershed district, watershed management organization, or lake improvement district required to be served under paragraph (b) or section 103G.301, subdivision 6, may file a written recommendation for the issuance of a permit or an objection to the issuance of a permit with the commissioner within 30 days after receiving a copy of the application. (d) The hearing notice for a public hearing under paragraph (a), clause (2), item (iii), must: (1) include the date, place, and time for the hearing; (2) include the waters affected and a description of the proposed proj ect; (3) be mailed or electronically transmitted to the director, the county auditor, the clerk or mayor of a municipality, the lake improvement district if one exists, the watershed district or water management organization, the soil and water conservation district, and all riparian owners of record affected by the application; and (4) be published in a newspaper of general circulation in the affected area. (e) Periodic temporary drawdowns conducted under paragraph (a) are not considered takings from riparian landowners. (f) This section does not apply to public waters that have been designated for wildlife management under section 97A.101. History: 2009 c 48 s 1; 2012 c 277 art 1 s 80; 1Sp2019 c 4 art 3 s 93 Page 3 City of Elk River City of Elk River City Council Resolution 20- A Resolution of the City Council of the City of Elk River Support a Request to the Department of Natural Resources Commissioner regarding the drawdown of Lake Orono WHEREAS, the City of Elk River Minnesota (the "City') is home to Lake Orono, a shallow 300-acre lake that captures runoff from a large watershed. Sediment has accumulated over time, diminishing aquatic health. In 1998, the lake was drawn down and sediment was removed by dredging; and WHEREAS, the City has collaborated with the Lake Orono Improvement Association (the "LOIA") for over five years to improve the overall health of Lake Orono and develop the recently approved Lake Orono Management Plan; and WHEREAS, the City began design plans for the Lake Orono Restoration and Enhancement (the LORE) project with the goal of removing accumulated sediment and improving overall aquatic health and wildlife habitat, utilizing state funding and other local funding sources; and WHEREAS, on March 5, 2019, Governor Tim Walz signed bill (HF 80) which included $1.5 million in grant funding to assist with the LORE project. Additionally, $1 million of funding was secured through a local option sales tax which was approved via referendum in November of 2018 and subsequently by the State Legislature. Securing these funding sources shows strong state support; and WHEREAS, the City was petitioned for the creation of the Lake Orono Improvement District (the "OLID") on April 10, 2019, and Established by Order on July 21, 2019; and WHEREAS, the City desires to drawdown the water level of Lake Orono for the purpose of removing accumulated sediment by means of the LORE project. Drawdowns require approval from the Minnesota Department of Natural Resources (the "DNR") pursuant with Minnesota State Statue 103G.408 either via direct Commissioner approval or by obtaining permission from at least 75% of riparian landowners; and WHEREAS, it is the understanding of the OLID and LOIA that an opt -out option has been utilized by the DNR in the past. Collecting signatures for support is often labor and time intensive; and WHEREAS, the LORE project has received funding directly from the state and illustrated wide support from local officials for the overall goal of the project. The LORE project will U improve water quality, stabilize shoreline erosion, improve fish and wildlife habitat and improve navigation in the lake; and WHEREAS, Numerous public meetings and open house events have been held to inform residents about the LORE project and benefits to the community. There have been no formal concerns regarding the drawdown of the lake for this project; and WHEREAS, the OLID and LOIA have submitted a letter of support to City Council seeking direct approval from the DNR Commissioner for the drawdown or for an opt out direct mail option. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota, as follows: the City seeks approval from the DNR Commissioner for approval for a drawdown of Lake Orono or the option for an opt out method of approval, as utilized by the DNR in other projects. Passed and adopted this day of 2020. John J. Dietz, Mayor ATTEST: Tina Allard, City Clerk i LAKE ORONO IMPROVEMENTS GOVERNING SPECIFICATIONS LEGEND PROPERTY LINES/RIGHT-OF-WAY EXISTING CONTOUR LINE -MAJOR --910-- EXISTINGCONTOURLINE-MINOR — — —913- — — PROPOSEDCONTOURLINE - MAJOR 910 PROPOSED CONTOUR LINE - MINOR 913 POTENTIAL ACCESS LOCATIONS - EXCAVATION NOTICE SYSTEM A CALL TO GOPHER STATE ONE (651-454-0002) IS REQUIRED A MINIMUM OF 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION. PROJECT LOCATION COUNTY: SHERBURNE CITY OF ELK RIVER PROJECT LOCATION MAP UTILITY INFORMATION THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL D. THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF Cl/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." GOPHER ONE CALL TICKET NUMBER: XXXXXXXXXX UTILITY COORDINATION MEETING HELD ON: XXXXXXXXXXXX mLk 0 500 1000 SCALE IN FEET PLAN REVISIONS DATE SHEET NO. APPROVED BY THE 2018 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. PLAN SET INDEX Sheet List Table Sheet Number Sheet Title 1 TITLE SHEET 2 GENERAL LAYOUT 3 CONSTRUCTION DETAILS 4 CONSTRUCTION DETAILS 5 EXISTING CONDITIONS-1 6 EXISTING CONDITIONS-2 7 EXISTING CONDITIONS-3 8 PROPOSED SITE PLAN-1 9 PROPOSED SITE PLAN-2 10 PROPOSED SITE PLAN-3 11 EROSION CONTROL PLAN-1X 12 EROSION CONTROL PLAN-2 13 EROSION CONTROL PLAN-3 14 STORM WATER POLLUTION PREVENTION PLAN 15 STORM WATER POLLUTION PREVENTION PLAN 16 STORM WATER POLLUTION PREVENTION PLAN 17 STORM WATER POLLUTION PREVENTION PLAN THIS PLAN SET CONTAINS 17 SHEETS THIS PLAN SET HAS BEEN PREPARED FOR: CITY OF ELK RIVER 13065 ORONO PARKWAY ELK RIVER, MN 55330 (763) 635-1000 ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT. wsb I HEREBY CERTIFY THAT THIS PLAN WAS P D Y ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM ENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE S� INNESOTA. AMYAN P.E. DATE: XX/XX/2019 <tO LICENSE NUMBER: 50820 SHEET WSB PROJ. NO. 015125-000 1 OF 17 LAKE ORONO LOCATION LEGEND PROPERTY LINES/RIGHT-OF-WAY EXISTING CONTOUR LINE - MAJOR EXISTING CONTOUR LINE - MINOR PROPOSED CONTOUR LINE - MAJOR PROPOSED CONTOUR LINE - MINOR COBBLES ROCK RIFFLE TOEWOOD FISH STICKS A,.. �I 5 s No All N�� 8 �m 0 913 — -913 — 855 852 SEE SHEET 3 -1 SEE SHEET 6 68 868 868 867 g6a369- m i pVENW JT NG CONDITIONS-2 SEE N 0 400 800 H: SCALE IN FEET PROPOSED CONDITIONS-2 SEE SHEET 7 867 8 70 a- o IL .ie f; �; 867 R. �o T & rvo anaK / 866 ° 9 � ell, - EXISTING CONDITIONS-3 SEE SHEET 5 PROPOSED CONDITIONS-3 SEE SHEET 8 868 a ir_ R7i�%I �e LSH 64 6 Yt11J a - °° a NW M\SS55\PP\H City of Elk �- 1- River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA U) Z e W c z zoo w Uz NO'yZ W Q Norwz Xw AP mw"o a � w¢w ioa�ia~ w=ww3 moo, 0 10L O Z Z LU � � O > J Lu Lu O Y L.L O J � � U GENERAL LAYOUT SHEET 2 OF 17 DEFLECTOR PLATE OVERFLOW 1 — CENTER OF FILTER ASSEMBLY WIRE MESH REINFORCEMENT (as needed) OVERFLOW 2 — TOP OF GEOTEXTILE FABRIC POST SPACING —SEE NOTE CURB BOX FABRIC ANCHORAGE TRENCH. BACKFILL WITH TAMPED 10" FILTER ASSMEBLY z NATURAL SOIL io Q TO G 6" MIN. DIRECTION OF N (LOP 70, PGA, qR 0, RUNOFF FLOW TT , z F \G O/� NUM N(T Mqk� �Z N 6" MIN. 6" MIN. yd NOTE: SILT FENCE DETAIL 1. SILT FENCES CONSTRUCTED WITH SUPPORT FENCES, POSTS SHALL BE SPACED AT 10' OR LESS, AND DRIVEN AT LEAST 2' INTO THE GROUND. 2. SILT FENCES CONSTRUCTED WITHOUT SUPPORT FENCES, POST SHALL BE SPACED AT 4' OR LESS, AND DRIVEN AT LEAST 3' INTO THE GROUND. 1 1/2" TO 2" WASHED ROCK WIMCO MODEL# CG 3067 HIGH FLOW FABRIC OR EQUAL NOTE: ROCK ENTRANCE NEEDS TO BE INPLACE (MIN 10' IN LENGTH) WITH ENOUGH MATERIAL ON HAND AT SITE TO COMPLETE TO GARAGE AFTER BACKFILL IN ORDER TO PASS INITIAL INSPECTION. REV: 7/2007 REV: 7/2007 REV: 3/2006 STANDARD STANDARD STANDARD cl STANDARD SILT FENCE PLATE NO. ��-{,"1 ROCK CONSTRUCTION ENTRANCE BUILDING PERMIT PLATE NO. 1� CATCH BASIN INLET PROTECTION PLATE NO. 2009 2015 2511 River R1Ver River J City of EIk --- River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA Z s O 5 w 0 0 Z o> w UZ7p NOa zw¢ 0 ^ aYQ y o= W z ON J d z Q W a a w �¢ma" x YiRwwo w�wW3 w =00L3 0 L.1_ O Z >>N Z L.I..I L.1_ LU W O _ j Lu O Y cj� LL O J a- � U MISCELLANEOUS DETAILS SHEET 3 OF 17 BANK TOE HABITAT RESTORATION STANDARD DETAIL PLATE-WSB402-BTH REVISED 4 IW1 ] WTTO SCA EXISTING STREAMBANK (TYPICAL) I _ _ NORMAL WATER LEVEL (TYPICAL / 2 3 EXISTING STR/EAMBED (TYPICAL) NOTES 1.THIS STANDARDIZED DESIGN MUST BE ADAPTED TO THE SITE AS CONDITIONS DICTATE. 2. IRREGULARLY PLACE ROCK AT TOE OF BANK TO CREATE SMALL GAPS AND OVERHANGS FOR FISH AND INVERTEBRATE HABITAT 3. 5:1 SLOPES ARE TYPICALIOPTIMAL FOR BANK SHAPING, BUT SHALL BEA MAXIMUM OF 2:1 SLOPES 4. TOP OF TOE ROCK SHALL BE 0.75' - T ABOVE NORMAL WATER LEVEL 5.PRESERVE EXISTING STREAMBANK VEGETATION WHENEVER POSSIBLE. 6. DURING GRADING, SEPARATE ORGANIC RICH TOPSOIL FOR SEED BED PREPARATION 7. SEEDING AND STABILIZATION TO OCCUR WITHIN 24HRS OF COMPLETION DURING APPLICABLE FISH SPAWNING PERIODS 8. MATERIAL FOR ROCK WIERS, J-HOOKS, DEFLECTORS AND BANK TOE HABITAT SHALL CONFORM TO THE FOLLOWING SIZE, SHAPE AND GRADATION: 1 ROCK A -AXIS B-AXIS C-AXIS WSB MIN. SIZE 30" 24" T211.'.MAX.512E46" TOE ROCK RESTORATION DETAIL SCALE: NOT TO SCALE a L CD TOE WOOD CONSTRUCTION NOTES 1. FOOTER LOGS AND CROSS LOGS SHALL BE HARDWOOD SPECIES AND FREE FROM DECAY OR ROT. 2, FOOTER LOGS AND CROSS LOGS SHALL BE A MINIMUM OF 10 INCHES IN DIAMETER. 3. CROSS LOGS SHALL HAVE ROOT BALLS INTACT AND HAVE A MINIMUM DIAMETER OF 3 FEET. ALL CROSS LOGS SHALL HAVE A SHARPENED END AND BE DRIVEN INTO THE BANK. IF CROSS LOG IS LONGER THAN 15 FEET, IT SHALL BE ANGLED INTO FLOW. IF CROSS LOG IS 10-15 FEET, IT SHALL BE PERPENDICULAR TO FLOW. 4. CLASS I RIPRAP SHALL BE USED AS BEDDING AND BACKFILL OVER TOP OF THE CROSS LOG. BEDDING SHALL EXTEND A MINIMUM OF 4 FEET SHOREWARD FROM THE BACK OF THE FOOTER LOGS AND BACKFILL SHALL EXTEND A MINIMUM OF 7 FEET SHOREWARD FROM THE ROOT BALL. BEDDING AND BACKFILL SHALL BE A MINIMUM OF 1 FOOT THICK. 5. BRUSH MATTRESS MATERIAL SHALL CONSIST OF SMALL LOGS, LIMBS, AND TREE TOPS LESS THAN 6 INCHES IN DIAMETER. BRUSH MATTRESS MATERIAL SHALL BE WORKED INTO THE ROOT BALL. 6. BACKFILL MATERIAL SHALL CONSIST OF COMPACTED SOIL GENERATED FROM ON -SITE EXCAVATION WITH A MINIMUM THICKNESS OF 2 FEET. 7. THE EXPOSED FRONT FACE OF THE BACKFILL MATERIAL SHALL BE RESTRAINED AND PROTECTED BY WRAPPING AND STAKING WITH GEOCOIR/DEKOWE 700 OR APPROVED EQUAL. BLANKET SHALL BE STAKED WITH 24" DEAD STOUT STAKES. 8. THE TOP LAYER OF THE TOE WOOD STRUCTURE SHALL BE SOD MAT GENERATED FROM ON -SITE EXCAVATION AREAS AND STOCKPILED UNTIL INSTALLED. SOD MAT SHALL BE A MINIMUM OF 6 INCHES THICK. NOTES: A MINIUM OF TWO CROSS LOGS PER FOOTER LOG IS REQUIRED TO ANCHOR FOOTER LOG. 1 Plan View� ROOT WAD DETAIL SCALE: NOT TO SCALE ;ROBS LOG FOOTERLOGS 10 FT. MIN. LENGTH INSTALL LIVE STAKES PER DETAIL #6 SOD MAT EL. 876 1:1 MIN. 10' BANKFILL BENCH SODMAT & SEED MULCH 2o:t 3' = I=11 III=II�III=II�III=11 � � I �5' CLASS IRIPRAP FOOTER LOGS CROSS LOG BACKFILL L.870 MIN. 10' 2 Profile View PLAN VIEW B Benchmark EL ------ Description: T Y C O oao � r FLOW NOT TO SCALE oa O O � o Rock Riprap 0 0 A A 0 0 4:1 Slope __:1 0 �o O 00� J C Y B 4' NOTES: 1. Rock gradation shall meet MNDOT requirement for GRAD. N0. A/5 riprap, quality designation "A", or as designated by engineer. 2. Use largest individual stones from available material as shown for the emergent boulders and crest stone. 3. Riffle slope shall be 20:1 or flatter where fish passage is required. � STREAM BANK NRCS b 0 STABILIZATION ROCK RIFFLE DETAILS � o.a.�� a ro�• ssw>1.a SEED HYDROMULCH /-3:1 OR4:1 G GROUND :TED SOIL MAT J City OL River 0 C Opi, , A Cf,. w wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA Z s W 0 d o> w UZ7p w�oz NOa zw¢ ^ ayQ i,z m o= W z ON J �ZQ� w ¢Ma� x ro�D,°Ow w�wW3 � =00L)3 0 ry U) oz w > Z w � L1J O LLI W Q Y cj� LL Q J a- � U MISCELLANEOUS DETAILS SHEET 4 OF 17 LAKE ORONO LEGEND PROPERTY LINES/RIGHT-OF-WAY EXISTING CONTOUR LINE - MAJOR — —910— — EXISTING CONTOUR LINE - MINOR — — —sta- — — n_� N 0 200 400 H: SCALE IN FEET LOCATION �►►5�w—SEE SHEET 6 SEE SHEET 7 fL,3 ORONO PARK City of River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA U) Z zo O W a 0 z O> w Uzjp mOa 0 Z W 0(5 Norwz � a�a OK�af > O w w w �� W 2fn IL w �w3 r Oz > zw O � J Lu W O Y LL- O J � � U EXISTING SITE PLAN-1 SHEET 5 OF 17 J City of EIk --- River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA U) Z s O U Lu 0 0 Z o> W UZ7p < 00 Z L _ J DR,<AF Y ONWW wc�WW3 w =oaL) 0 ry Cn W O z > Zry W O L w W W p LL- Y cj� O J a- � U EXISTING SITE PLAN-2 SHEET 6 OF 17 LAKE ORONO LOCATION LEGEND PROPERTY LINES/RIGHT-OF-WAY EXISTING CONTOUR LINE - MAJOR — —910— — EXISTING CONTOUR LINE - MINOR - — —ets- — - \ \ �— ----- 867--� 868 / 869 870— \ — — — — — — — - 869 868 867 - - e67 — — 866 - - 866 - ORONO PARK US HIGHWAY 10 NW �r 1 cb c - 0 240 H: SCALE IN FEET I `l 869 \ 868 867- \ 869 --870, 871 866 —� \`-868 -865- ---- 865— CIO `C —866 — V// 867 I I lI/������ ��� / / Il \ \\\✓/jj� �V CEMETERY ISLAND --- LAKE ORC1N0 \\\ \ \\ \ \ X \ \� \\ \ �I LAKE ORONO / 6 J City of EIk --- River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA z o o L W 0 zz zo, w UzIp w�mz 00 Q <2Q 0^ aYQ m o F W z ON J =w°P`f. a� w YONa~ x ma °ww w0�wzw w THLI 0 O z > Z Z L o Lu w w O Y tY LL O J a- � U EXISTING SITE PLAN-3 SHEET 7 OF 17 LEGEND PROPERTY LINES/RIGHT-OF-WAY EXISTING CONTOUR LINE - MAJOR EXISTING CONTOUR LINE - MINOR PROPOSED CONTOUR LINE - MAJOR PROPOSED CONTOUR LINE - MINOR COBBLES FISH STICKS ROCK RIFFLES n`� ---913--- - - -913 - - 855 852 LAKE ORONO N 0 200 400 H: SCALE IN FEET ORONO PARK City of 1- River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA U) Z zo O w a 0 0 z o> W U Z0 C jp o mOa Z W N orwz � a�a � w¢w OK�af > O w w w �� W 2fn IL W 19w3 r =.0, 0 Oz > zw � � O � J Lu W O Y LL- O J � � U PROPOSED SITE PLAN-1 SHEET 8 OF 17 City of Elk �- P iver wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA U) Z zo O w 0 0 Z o> w U zjp mOa Z W z ly N orwz � a�a � w¢w OK�af > O w w0 M�� w K w W 2 n L w =0M �w3 r ry U) Oz LU % Z w � � O � J Lu W O Y LL- O J � � U )POSED SITE PLAN-2 SHEET 9 OF 17 LAKE ORONO LOCATION LEGEND PROPERTY LINES/RIGHT-OF-WAY EXISTING CONTOUR LINE - MAJOR - - - 913- - - N EXISTING CONTOUR LINE - MINOR - — -913 — - PROPOSED CONTOUR LINE - MAJOR 855 k PROPOSED CONTOUR LINE - MINOR 852— TOEWOOD ® 0 120 240 H: TOE ROCK 17,71 SCALE IN FEET COBBLES FISH STICKS 869 -ass L 870- -� 871- - US HIGHWAY 10 NW 871 -----� / \ ' -870- s - ?� f / ��� -ass— 868 8—__-7� - / / 867 - - 867 866- -866 lam/ ORONO PARK 'o / r oo 1 I I / �� � \� ,v \ � -870 868s��� sy 869 � CPO \ O '- - 868 870 \ ---867- g 8 -87p 877 866 - v — v - � \ - 868 - - J I - 8 6 5- \ -- \ CP — 865- �6'�, ' — — 866 — \ \ ✓�/ co" / - - 867 - \ \ \\� _jA\� { I I f f 4pJ // \ \ \ \✓//j // (`\ CEMETERY ISLAND LAKE ORONO / / 6 I � �I II � I LAKE ORONO City of 1- River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA Z zo oQ W 0 0 W QK � UZjp .0. 0% Z W Q z NW Z 0 a�a ioa�ia~ W��w3 OM pz Lu > Z Z LU � � O � J Lu Lu p Y LL O J � � U PROPOSED SITE PLAN-3 SHEET 10 OF 17 LAKE ORONO LEGEND PROPERTY LINES/RIGHT-OF-WAY BOULDERS (SEE DETAIL) N EXISTING CONTOUR LINE - MAJOR — —910 FISH STICKS (SEE DETAIL) - EXISTING CONTOUR LINE - MINOR — — 913- — ROOT WAD (SEE DETAIL) �\ PROPOSED CONTOUR LINE - MAJOR 910 CANOE/KAYAK LAUNCH GRAVEL (SEE DETAIL) PROPOSED CONTOUR LINE - MINOR 913 CANOE KAYAK LAUNCH 0 200 400 SHORELINE RESTORATION (SEE TOE ROCK DETAIL) — — — — — TURF (SEE DETAIL) H SCALE IN FEET OHW (ORDINARY HIGH WATER ELEVATION = XXX.XX) - — — — — — — — - ROCK VANE (SEE DETAIL) CONSTRUCTION LIMITS - — — — — — - COBBLES CONSTRUCTION ENTRANCE n1 J City of EIk --- River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA U) Z s O 55 0 0 Z p> w Uz7p NOa zw¢ ^ z ayQ i, m o= W z ON J d z Q W a a w p K 7 a H X YO�nWLL w�ww3 w =00�3 0 olf O z > Z w rr L O w W w0 Y cj� w O J a- � 0 EROSION CONTROL PLAN-1 SHEET 11 OF 17 LAKE ORONO 873 873 / / 867 —870- 869 868 \ $6 � 8]� \ 86, d6l 868 \ 871 LOCATION LEGEND PROPERTY LINES/RIGHT-OF-WAY EXISTING CONTOUR LINE - MAJOR — —910— — EXISTING CONTOUR LINE - MINOR — — —913- — — PROPOSED CONTOUR LINE - MAJOR 910 PROPOSED CONTOUR LINE - MINOR 913 BOULDERS (SEE DETAIL) FISH STICKS (SEE DETAIL) ROOT WAD (SEE DETAIL) CANOE/KAYAK LAUNCH GRAVEL (SEE DETAIL) CANOE KAYAK LAUNCH TURF (SEE DETAIL) ROCK VANE (SEE DETAIL) COBBLES CONSTRUCTION ENTRANCE N 0 60 120 H: SCALE IN FEET wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA Z s O L LU z zoo w E5 w�oz Noa 0 zw< ^ a>m i, z m o F W z ON J d z Q W a a w p K 7 a H X YO�nWLL 0 w�ww3 =00�3 0 Cn W oz > Z o W O L w W W 0 LL- Y cj� 0 J a- � U EROSION CONTROL PLAN-2 SHEET 12 OF 17 LAKE ORONO LOCATION LEGEND PROPERTY LINES/RIGHT-OF-WAY BOULDERS (SEE DETAIL) EXISTING CONTOUR LINE - MAJOR — —9to— — FISH STICKS (SEE DETAIL) - EXISTING CONTOUR LINE - MINOR — — —913- — — ROOT WAD (SEE DETAIL) PROPOSED CONTOUR LINE - MAJOR 910 CANOE/KAYAK LAUNCH GRAVEL (SEE DETAIL) PROPOSED CONTOUR LINE - MINOR 913 CANOE KAYAK LAUNCH SHORELINE RESTORATION (SEE TOE ROCK DETAIL) — — — — — TURF (SEE DETAIL) ROCK VANE (SEE DETAIL) OHW (ORDINARY HIGH WATER ELEVATION = XXX.XX) - — — — — — — — - CONSTRUCTION LIMITS - — — — — — - COBBLES CONSTRUCTION ENTRANCE \ — — — — — — — — — — — - - III I=1 I �II�\III�I� I 6 ORONO PARK US HIGHWAY 10 NW r N 0 120 240 H: SCALE IN FEET 41 870 /// Z, 1 / \ �III �\\I I \,J�____y�� I LAKE ORC1N0 fl LAKE ORONO J City of EIk --- River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA z o O L55 C 0 W UZ7p W � ❑ Z 00 Q Z W Q ^ ayQ i,z fA 0 W Z ° VV J Q a YONa~ x ma °wLL w�WW3 � =ooLg o O z> Lu Z o w L O w w w0 Y cj� LL O J a- � 0 EROSION CONTROL PLAN-3 SHEET 13 OF 17 Ji City of Elk River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA Z s O U w 0 0 z p> w ul U 27p NOa zw¢ 0 ^ aYQZ. y o= W z ON J �zQ� w a a w p K 7 a H X Y ONWw wC�wzw w =00L3 0 ry Cn Oz W > Z W 0' Ow W w W O Y LL. O J H U STORM WATER POLLUTION PREVENTION PLAN SHEET 14 OF 17 Ji City of Elk River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA Z s O U w 0 0 z p> w ul U 27p NOa zw¢ 0 ^ aYQZ. y o= W z ON J �zQ� w a a w p K 7 a H X Y ONWw wC�wzw w =00L3 0 ry Cn Oz W > Z W 0' Ow W w W O Y LL. O J H U STORM WATER POLLUTION PREVENTION PLAN SHEET 15 OF 17 Ji City of Elk River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA Z s O U w 0 0 z p> w ul U 27p NOa zw¢ 0 ^ aYQZ. y o= W z ON J �zQ� w a a w p K 7 a H X Y ONWw wC�wzw w =00L3 0 ry Cn Oz W > Z W 0' Ow W w W O Y LL. O J H U STORM WATER POLLUTION PREVENTION PLAN SHEET 16 OF 17 Ji City of Elk River wsb WSB PROJECT NO.: 015125-000 SCALE: DESIGN BY: AS SHOWN LC PLAN BY: CHECK BY: CKJ ARA Z s O U w 0 0 z p> w ul U 27p NOa zw¢ 0 ^ aYQZ. y o= W z ON J �zQ� w a a w p K 7 a H X Y ONWw wC�wzw w =00L3 0 ry Cn Oz W > Z W 0' Ow W w W O Y LL. O J H U STORM WATER POLLUTION PREVENTION PLAN SHEET 17 OF 17