Loading...
6.1e ERMUSR 03-10-2020UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Dave Ninow – Water Superintendent MEETING DATE: AGENDA ITEM NUMBER: March10, 2019 6.1e SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: Delivered threenew water meters. Sealed the water meter, installed an encoder receiver transmitter, and took curb stop ties from threewater services. Completed 15 BACTI/Total Chlorine Residual Samples o All confirmednegative for Coliform Bacteria o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH Completed 19 routine fluoride samples o All samples met MDH standards o Submitted MDH Fluoride Report o Completed one MDH validation fluoride sample Submitted Discharge Monitoring Report (DMR) for the Diesel Generation Plant to the Minnesota Pollution Control Agency. Submitted Tier II Annual Reports to Homeland Security for the Diesel Generation Plant and all the Water Treatment Plants. We extended two separate offers for the vacant Water Operator position which were both declined. Thereisanother interview scheduled for March 6. We met with Verizon Wireless to discuss the upgrades they will be doing in March to their antenna equipment on Johnson Street Water Tower. The water operators have spent much of their timeworking on annual preventive maintenance on the water treatment plants. ATTACHMENTS: February2020Pumping by Well ______________________________________________________________________________ Page 1 of 1 84 5% , 29% , 1.87 20% , , 11.81 , 8.11 , Well #2 Well #4 Well #3 85 6% , 2.537 , 9% , 15% Well #9 , 3.835 , February 2020 Monthly Pumping By Well 6.003 11% , , Well #8 5% , 4.319 , Well #5 Values Are Displayed in Millions of Gallons (Well #, Gallons Pumped, Percentage of Pumping) 2.115 , Well #7 Well #6