3.2. SR 07-11-2005 *Item 3.2.* MEMORANDUM TO: Mayor and City Council FROM: Lori johnson, Finance and Administrative Services Director DATE: july II, 2005 SUBJECT: Consider Westbound Bids for Finish Carpentry, Exterior Signage, and Low Voltage Systems Attached is an email from construction manager Steve Chuba with the results of the finish carpentry bids received on July 6 and exterior signage quotes. Also attached is a memo from IT Coordinator Bob Pearson with recommendations for the low voltage systems at Westbound. The finish carpentry bid is part of the original bid package ten that was rejected due to cost. The original budget for package ten is $155,000, and based on the new bids, without considering alternate number one, the total package ten revised cost will be $134,939.00. Mr. Chuba is recommending that the finish carpentry be awarded to George Cook Construction in the amount of $65,800. This recommendation includes alternate one which is a deduction of $6,700 to eliminate some of the finish work on the interior columns. The second recommendation is for exterior signage; it is recommended that this contract be awarded to Serigraphics Sign Systems in the amount of $18,969. The budget for signage is $25,000. Further, Bob Pearson as been working with Dave Potvin on selection of all of the low voltage systems at Westbound, and a memo with his recommendations is attached. Consideration was given to consistency of systems throughout the city when determining what type of system was the best fit and what quote would be accepted. Additional detail on each of the systems is included in the attached memo. S:\Council\Lori\2005\ Westbound bids fmal.doc Action Requested The Council is asked to consider awarding the following contracts Westbound: Contract Finish Carpentry Exterior Signage Low Voltage Wiring Closed Circuit TV Intrusion Detection Telephone System Intelligent Door Controllers Vendor Amount George Cook Construction $65,800.00 Serigraphics Sign Systems 18,959.00 (excluding bond costs of approximately $400.00) Cabling Services Corp. 4,145.00 Wellington Security Systems 11,495.00 Wellington Security Systems 2,995.00 Toshiba 2,000.00 (excluding installation) Pro- T ec Design 3,240.00 S:\Council\Lori\2005\ Westbound bids final.doc Johnson, Lori Page 1 of2 From: Steve Chuba [SChuba@greystoneconstruction.com] Sent: Thursday, July 07, 2005 9:46 AM To: Johnson, Lori Subject: Westbound Liquor finish carpentry, exterior signage Lori - Please see the following bid results for the finish carpentry package bid 7-6-05 and recent quotations received for the exterior signage at the Westbound Liquor project: The alternate price on the finish carpentry was for deleting the finish carpentry work at the four (4) interior columns. Finish Carpentry: Bid received from George Cook Construction Crossroad Construction Kellington Construction bid amount $73,400.00 $73,900.00 $82,650.00 alt. # 1 deduct $6700.00 deduct $2600.00 deduct $4300.00 We would like to recommend the finish carpentry package be awarded to George Cook Construction in the amount of $73,400.00 with consideration to the alt. deduct of $6700.00, which would result in a net contract amount of $65,800.00. Note - the end result of breaking down the original package no. 10 Carpentry is as follows: Original bid: $155,000.00 Revised bidding / quotes: Rough carpentry: Solatube skylights: Acoustical ceilings: Door and hardware material: Canvas Awnings: Window Blinds: Finish Carpentry: Total revised carpentry: $29,900.00 $10,415.00 $3880.00 $12,495.00* $3085.00 $1764.00 $73.400.00 $134,939.00 * The door and hardware amount was adjusted from $10,426.00 due to a calculating error in the total bid from Contract Hardware. Contract Hardware's quote was still the lowest amount after the adjustment. Exterior Signage: Quote received from Serigraphics Sign Systems Lawrence Sign Graphic Signs Sign Partners quote amount $18,959.00 $22,229.00 $30,201.00 $32,040.00 Note - the original exterior sign budget was $25,000.00 and the original single bid was $22,229.00 We recommend the exterior signage package be awarded to Serigraphics Sign Systems. None of the quotes included payment and performance bond costs. I have requested Serigraphics to quote on the bond costs, which I anticipate to be approx. $400.00. 7/8/2005 Page 2 of2 I will be updating the construction budget with all bids to-date, and presenting other proposal request pricing at our project meeting Wednesday 7/13. I will copy this information to you. The overall budget picture is favorable and the project is presently on schedule. Please call me with any questions or comments. Thank you. Steve Chuba Greystone Construction Co. 7/8/2005 MEMORANDUM TO: Lori Johnson FROM: Robert Pearson, I.T. Coordinator DATE: July II, 2005 SUBJECT: Vendor Recommendations for Westbound Liquor Project Lori, the purpose of this memo is to give you my analysis and recommendations for the awarding of work on a number of low voltage systems for the Westbound project. Dave, Steve and I have met and are in agreement on these recommendations. 1. For the low voltage wiring for phone, network, paging, and TV. a. We had four estimates ranging from $7846 to $4145 b. I recommend using Cabling Services Corporation with the low bid of$4145. c. We have not worked with Cabling Services in the past but they did provide references of extremely satisfied customers. 2. F or the CCTV portion of the security system: a. We had four estimates ranging from $19500 to $10,625. b. We are rejecting the low bid because it is built around a PC with a Microsoft Windows operating system. Our experience has been that this configuration requires more ongoing attention. ' c. I recommend using Wellington Security Systems proposal at $11,495. d. We have requested from Wellington pricing to upgrade their system to include point of sale information on the image. e. The following are the compelling reasons for using Wellington: i. Their digital video recording equipment is not PC based n. The equipment at Westbound would match that at Northbound which we are familiar with operating. 111. Vendor does have 7x24 support. IV. Vendor has experience in providing security systems for liquor stores. 3. For the Intrusion Detection portion of the security system: a. We had three estimates ranging from $5700 to $2375 b. I again recommend using Wellington Security Systems proposal at $2995 c. We are satisfied with their past work and they will be onsite for the CCTV portion of the security system. 4. For the phone system: a. We had four estimates ranging from $9860 to $1500 b. I am recommending that we purchase a refurbished Toshiba system and then contract with a vendor to have it installed. c. I have received a verbal estimate that this strategy would cost around $2000 for the system and 6 phones we anticipate needing at Westbound. d. We determined that we didn't need the integration between Westbound and the City's phone system that would have cost at least $6489. e. We will get voice mail from Northstar Access for around $7.50 per month. 5. For intelligent door controllers: a. We have one estimate from Pro-Tec Design for $3240. b. This is state contract pricing and this is the vendor that supplied the door access system used in Public Safety and City Hall facilities. c. Using Pro-Tec would enable us to integrate the Westbound location with the rest of the location using the same door access system. d. This initial estimate is just for the main employee access door, we are asking Pro-Tec for pricing that would include other doors on the premise. Action Requested: Approval to proceed in awarding work.