Loading...
4.7. SR 04-06-2020 Request for Action To Item Number Mayor and City Council 4.7 Agenda Section Meeting Date Prepared by Consent April 6, 2020 Gary Lore, Building Maintenance Supervisor Item Description Reviewed by City Hall Carpet Replacement Project Justin Femrite, P.E. Public Works Director Reviewed by Cal Portner, City Administrator Action Requested Award, by motion, the Contract for Carpet Replacement at City Hall to Hiller Commercial Floors in the amount of $124,796, plus $13,160, for labor to move file cabinets/desks etc. for a total of $137,956 Background/Discussion The 2019 Building Maintenance Division Capital Improvement Plan identified $150,000 for carpet replacement throughout city hall, however the project was pushed to 2020. Staff received three quotes for the requested Pure Attitude carpet. Three quotes were received as follows:  St. Paul Linoleum and Carpet - $154,652.00 (not include moving file cabinets/etc.)  Rivers Edge Flooring - $144,661.50 (not include moving file cabinets/etc.)  Hiller Commercial Floors - $141,478.00 (not include moving file cabinets/etc.) Upon establishing the low quote for the requested carpet was from Hiller, staff met with their representative and reviewed the original requested Pure Attitude carpet and an alternative option in which they had provided pricing for in their quote. The alternative carpet carries less cost but is a higher quality, better looking option and carries a lifetime warranty. After review, staff recommends going with the revised option. Financial Impact The total cost for the project is $137,956. The projected budget carried in the Building Maintenance Division Capital Improvement Plan was $150,000 Attachments  Hiller Flooring Proposal  Rivers Edge Proposal  St. Paul Linoleum & Carpet Proposal The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity IfILLER: Commercial Floors 2909 South Broadway Rochester, MN 55904 P: 888-724-1766 F: 507-288-8877 Flooring Proposal for the City of Elk River City Hall Cost per Metro Service Co-op Contract 17.5 Flooring Revised March 23, 2020 Up Grade Pure Attitude Live Circuit Emphatic Raised Area of Council 40yd @$25.00/yd $ 1,000.00 $ 1,000.00 Emphatic @ $15.64/yd 156yd $ 2,439.00 $ 2,439.00 Pure Attitude @$39.00/yd Installed 2630yd $102,570.00 $ 85.888.00 Take-up/haul old carpet @$4.00 2339yd $ 9,356.00 $ 9,356.00 Remove old glue @ $.35/sf $ 7,367.00 $ 7,367.00 Upholstery work at chambers 3hr @$94.00 $ 282.00 $ 282.00 12ft Reducer @ $7.00 $ 84.00 $ 84.00 35W Bind & Install 4 Y" Carpet Base @$2.50/ft $ 8,750.00 $ 8,750.00 Lift work stations 64 units @$140/each $ 8,960.00 $ 8,960.00 Floor fill allowance 5 bags 5 670.00 S 670.00 $ 141,478.00 $124,796.00 Option: Move & reset balance of desks/files etc. add $13,160.00 Submitted By: r'�"/3a,1� Dave Bahr Hiller Commercial Floors March 23, 2020 DB/lib Upgrade Product List Offices/Meeting Rooms Colorfield Patina "Bark" Common Areas Backbeat SWSU OR02015024 Council Chambers raised area Emphatic Weather Vane 56583 Carpet base Emphatic 56595 Sandy Taupe Page 1 HIK!UComm Nylon Warranty Stain Static Colorfast Edge Ravel Taff Bind Delamination Dimensional Stability High Moisture Concrete High Ph Concrete Life of Style Backing 2909 South Broadway Rochester, MN 55904 P: 888-724-1766 F: 507-288-8877 Pure Attitude Type 6 Lifetime Acid based only Lifetime Lifetime Lifetime Lifetime Lifetime Lifetime No Warranty No Warranty Limited Hard Vinyl Live Circuit Type 6,6 Commercial Yarn Lifetime All Stains Lifetime Lifetime Lifetime Lifetime Lifetime Lifetime Lifetime Lifetime Never Discontinued *Cushioned Milliken *Cushioned back prevents cowtrails by cushioning footsteps from grind the carpet surface into the concrete underneath. Carpet wears 40% longer. Also less fatigue and helps reduce sound transmission. Stain treatment is state of the art needing just hot water extraction — no detergent. Installations include Rochester City Hall, Olmsted County Courthouse, St Cloud Civic Center, Minneapolis Civic Center, St Paul Civic Center, Faribault Library, Hopkins High School and all schools, Minnetonka Schools. Page 2 Nylon Warranty Stain Static Colorfast Edge Ravel Taff Bind Delamination Dimensional Stability High Moisture Concrete High Ph Concrete Life of Style Backing 2909 South Broadway Rochester, MN 55904 P: 888-724-1766 F: 507-288-8877 Pure Attitude Type 6 Lifetime Acid based only Lifetime Lifetime Lifetime Lifetime Lifetime Lifetime No Warranty No Warranty Limited Hard Vinyl Live Circuit Type 6,6 Commercial Yarn Lifetime All Stains Lifetime Lifetime Lifetime Lifetime Lifetime Lifetime Lifetime Lifetime Never Discontinued *Cushioned Milliken *Cushioned back prevents cowtrails by cushioning footsteps from grind the carpet surface into the concrete underneath. Carpet wears 40% longer. Also less fatigue and helps reduce sound transmission. Stain treatment is state of the art needing just hot water extraction — no detergent. Installations include Rochester City Hall, Olmsted County Courthouse, St Cloud Civic Center, Minneapolis Civic Center, St Paul Civic Center, Faribault Library, Hopkins High School and all schools, Minnetonka Schools. Page 2 RIVERSEDGE FLOORING, INC. Yes, someone still cares 15480 9661 ST NE ELK RIVER, MN 55330 Phone 612-840-3398 To: GARY LORE CITY OF ELK RIVER DESCRIPTION MATERIAL: 100% ECO Q SOLUTION DYED NYLON STYLE: TBD COLOR: TBD WEIGHT: 26 OZ. / 95 OZ SQ YD SUPPLY MATERIAL: PROPOSAL PROPOSAL # 98618 DATE: MAY 29, 2018 FOR: CARPET REPLACEMENT - CARPET TILES ELK RIVER CITY HALL YARDS J RATE I AMOUNT B AREA 2,330 $ 33.00 $ 76,890.00 C AREA 781 $ 33.00 $ 25,773.00 INSTALL MATERIAL: CARPET TILES ON CONCRETE 3,111 $ 7.00 $ 21,777.00 METAL: NA REMOVAL / DISPOSAL OF EXISTING CARPET AND ADHESIVE ( EXISTING ADHESIVE MUST BE REMOVED TO A SMOOTH SURFACE) 3,111 $ 6.50 $ 20,221.50 TOTAL 1 $ 144,661.50 Make all checks payable to RIVERSEDGE FLOORING, INC. TOTAL DUE UPON COMPLETION. Overdue accounts subject to a service charge of 5% per month. ANY CONCERNS OR COMMENTS REGARDING THIS INVOICE CONTACT Toby Kilby 612-840-3398 Thank you for the opportunity to earn your business! Lore, Gary From: Andy Murzyn <andym@splino.com> Sent: Tuesday, February 4, 2020 1:59 PM To: Lore, Gary Subject: [EXTERNAL] Elk River City Hall carpet replacement Follow Up Flag: Follow up Flag Status: Flagged Hi Gary, Price to provide a lifting service, Book carts, removal/disposal of existing flooring and install new carpet tile, wall base and broadloom carpet in the Elk River City hall during 15 consecutive phases (about 180sy per phase) is as follows, Materials=$89,852.00 Lifting Services=$21,882.00 Installation =$42 918.00 Total=$154,652.00 Let me know if you have any questions. Thank you, Andy Andy Murzyn Project Manager St. Paul Linoleum & Carpet Co. 12956 Center Court, Eagan MN 55121 Direct: 651.393.2942 1 Main: 651.686.7770 1 Mobile: 763-226-8705