4.7. SR 04-06-2020
Request for Action
To Item Number
Mayor and City Council 4.7
Agenda Section Meeting Date Prepared by
Consent April 6, 2020 Gary Lore, Building Maintenance Supervisor
Item Description Reviewed by
City Hall Carpet Replacement Project Justin Femrite, P.E. Public Works Director
Reviewed by
Cal Portner, City Administrator
Action Requested
Award, by motion, the Contract for Carpet Replacement at City Hall to Hiller Commercial Floors in the
amount of $124,796, plus $13,160, for labor to move file cabinets/desks etc. for a total of $137,956
Background/Discussion
The 2019 Building Maintenance Division Capital Improvement Plan identified $150,000 for carpet
replacement throughout city hall, however the project was pushed to 2020.
Staff received three quotes for the requested Pure Attitude carpet. Three quotes were received as follows:
St. Paul Linoleum and Carpet - $154,652.00 (not include moving file cabinets/etc.)
Rivers Edge Flooring - $144,661.50 (not include moving file cabinets/etc.)
Hiller Commercial Floors - $141,478.00 (not include moving file cabinets/etc.)
Upon establishing the low quote for the requested carpet was from Hiller, staff met with their representative
and reviewed the original requested Pure Attitude carpet and an alternative option in which they had
provided pricing for in their quote. The alternative carpet carries less cost but is a higher quality, better
looking option and carries a lifetime warranty. After review, staff recommends going with the revised
option.
Financial Impact
The total cost for the project is $137,956. The projected budget carried in the Building Maintenance
Division Capital Improvement Plan was $150,000
Attachments
Hiller Flooring Proposal
Rivers Edge Proposal
St. Paul Linoleum & Carpet Proposal
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires prosperity
IfILLER:
Commercial
Floors
2909 South Broadway
Rochester, MN 55904
P: 888-724-1766
F: 507-288-8877
Flooring Proposal for the City of Elk River
City Hall
Cost per Metro Service Co-op Contract 17.5 Flooring
Revised March 23, 2020
Up Grade
Pure Attitude
Live Circuit
Emphatic Raised Area of Council 40yd @$25.00/yd
$ 1,000.00
$ 1,000.00
Emphatic @ $15.64/yd 156yd
$ 2,439.00
$ 2,439.00
Pure Attitude @$39.00/yd Installed 2630yd
$102,570.00
$ 85.888.00
Take-up/haul old carpet @$4.00 2339yd
$ 9,356.00
$ 9,356.00
Remove old glue @ $.35/sf
$ 7,367.00
$ 7,367.00
Upholstery work at chambers 3hr @$94.00
$ 282.00
$ 282.00
12ft Reducer @ $7.00
$ 84.00
$ 84.00
35W Bind & Install 4 Y" Carpet Base @$2.50/ft
$ 8,750.00
$ 8,750.00
Lift work stations 64 units @$140/each
$ 8,960.00
$ 8,960.00
Floor fill allowance 5 bags
5 670.00
S 670.00
$ 141,478.00
$124,796.00
Option: Move & reset balance of desks/files etc. add $13,160.00
Submitted By:
r'�"/3a,1�
Dave Bahr
Hiller Commercial Floors
March 23, 2020
DB/lib
Upgrade Product List
Offices/Meeting Rooms Colorfield Patina "Bark"
Common Areas Backbeat SWSU OR02015024
Council Chambers raised area Emphatic Weather Vane 56583
Carpet base Emphatic 56595 Sandy Taupe
Page 1
HIK!UComm
Nylon
Warranty
Stain
Static
Colorfast
Edge Ravel
Taff Bind
Delamination
Dimensional Stability
High Moisture Concrete
High Ph Concrete
Life of Style
Backing
2909 South Broadway
Rochester, MN 55904
P: 888-724-1766
F: 507-288-8877
Pure Attitude
Type 6
Lifetime Acid based only
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
No Warranty
No Warranty
Limited
Hard Vinyl
Live Circuit
Type 6,6 Commercial Yarn
Lifetime All Stains
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Never Discontinued
*Cushioned
Milliken
*Cushioned back prevents cowtrails by cushioning footsteps from grind the carpet
surface into the concrete underneath. Carpet wears 40% longer. Also less fatigue and helps reduce
sound transmission. Stain treatment is state of the art needing just hot water extraction — no detergent.
Installations include Rochester City Hall, Olmsted County Courthouse, St Cloud Civic Center, Minneapolis
Civic Center, St Paul Civic Center, Faribault Library, Hopkins High School and all schools, Minnetonka
Schools.
Page 2
Nylon
Warranty
Stain
Static
Colorfast
Edge Ravel
Taff Bind
Delamination
Dimensional Stability
High Moisture Concrete
High Ph Concrete
Life of Style
Backing
2909 South Broadway
Rochester, MN 55904
P: 888-724-1766
F: 507-288-8877
Pure Attitude
Type 6
Lifetime Acid based only
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
No Warranty
No Warranty
Limited
Hard Vinyl
Live Circuit
Type 6,6 Commercial Yarn
Lifetime All Stains
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Lifetime
Never Discontinued
*Cushioned
Milliken
*Cushioned back prevents cowtrails by cushioning footsteps from grind the carpet
surface into the concrete underneath. Carpet wears 40% longer. Also less fatigue and helps reduce
sound transmission. Stain treatment is state of the art needing just hot water extraction — no detergent.
Installations include Rochester City Hall, Olmsted County Courthouse, St Cloud Civic Center, Minneapolis
Civic Center, St Paul Civic Center, Faribault Library, Hopkins High School and all schools, Minnetonka
Schools.
Page 2
RIVERSEDGE FLOORING, INC.
Yes, someone still cares
15480 9661 ST NE
ELK RIVER, MN 55330
Phone 612-840-3398
To:
GARY LORE
CITY OF ELK RIVER
DESCRIPTION
MATERIAL: 100% ECO Q SOLUTION DYED NYLON
STYLE: TBD
COLOR: TBD
WEIGHT: 26 OZ. / 95 OZ SQ YD
SUPPLY MATERIAL:
PROPOSAL
PROPOSAL # 98618
DATE: MAY 29, 2018
FOR:
CARPET REPLACEMENT - CARPET TILES
ELK RIVER CITY HALL
YARDS J RATE I AMOUNT
B AREA
2,330
$ 33.00
$ 76,890.00
C AREA
781
$ 33.00
$ 25,773.00
INSTALL MATERIAL: CARPET TILES ON CONCRETE
3,111
$ 7.00
$ 21,777.00
METAL: NA
REMOVAL / DISPOSAL OF EXISTING CARPET AND ADHESIVE
( EXISTING ADHESIVE MUST BE REMOVED TO A SMOOTH SURFACE)
3,111
$ 6.50
$ 20,221.50
TOTAL 1 $ 144,661.50
Make all checks payable to RIVERSEDGE FLOORING, INC.
TOTAL DUE UPON COMPLETION. Overdue accounts subject to a service charge of 5% per month.
ANY CONCERNS OR COMMENTS REGARDING THIS INVOICE CONTACT Toby Kilby 612-840-3398
Thank you for the opportunity to earn your business!
Lore, Gary
From: Andy Murzyn <andym@splino.com>
Sent: Tuesday, February 4, 2020 1:59 PM
To: Lore, Gary
Subject: [EXTERNAL] Elk River City Hall carpet replacement
Follow Up Flag: Follow up
Flag Status: Flagged
Hi Gary,
Price to provide a lifting service, Book carts, removal/disposal of existing flooring and install new carpet tile, wall base
and broadloom carpet in the Elk River City hall during 15 consecutive phases (about 180sy per phase) is as follows,
Materials=$89,852.00
Lifting Services=$21,882.00
Installation =$42 918.00
Total=$154,652.00
Let me know if you have any questions.
Thank you,
Andy
Andy Murzyn
Project Manager
St. Paul Linoleum & Carpet Co. 12956 Center Court, Eagan MN 55121
Direct: 651.393.2942 1 Main: 651.686.7770 1 Mobile: 763-226-8705