Loading...
4.8. SR 04-06-2020Request for Action To Item Number Mayor and City Council 4.8 Agenda Section Meeting Date Prepared by Consent Aril 6, 2020 Brandon Wisner, Stormwater Coordinator Item Description Reviewed by Owner Cost Contracts for the Multipurpose Facility Lori Ziemer, Finance Director and Lion John Weicht Park Improvement Projects Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, contracts with the following vendors: ■ Marco Technologies, LLC for information technology network systems - $19,429.20 ■ Marco Technologies, LLC for security cameras and associated hardware - $36,478.40 ■ All State Communications (state contract) for low voltage wiring at multipurpose facility - $64,556.00 ■ All State Communications for low voltage wiring at the Lion John Weicht Park concession facility - $5,000.00 ■ Helix Solutions for fiber installation to the Lion John Weicht Park concession facility - $11,830.00. ■ Automated Industrial Maintenance DBA AIM Electronics Inc. (Resource Training & Solutions AEPA Cooperative) for scoreboards and associated items - $254,445.00. Background/Discussion Consistent with the approved multipurpose facility and Lion John Weicht Park improvement projects, as the owner, the city is responsible for procuring contracts for various items, most of which are on state and federal joint purchasing contracts. The joint purchasing contracts provide pricing at lower costs than the contractors typically get and as a tax- exempt entity, the city does not pay state sales tax. Other owner cost items include information technology components, furniture/concession equipment, SAC/WAC fees, scoreboards and dasher boards/flooring. Financial Impact These items were approved by the City Council on 7/01/19 with the multipurpose facility and Lion John Weicht improvement project contract. They have been carried in the project budget as "Owner Costs." For the scoreboards - $105,373 will be paid from the Hockey Day MN Fund. Attachments ■ Marco - City of Elk River - IT Network ■ Marco - Camera and associated hardware ■ All State Communications Multipurpose Facility ■ All State Communications LP ■ Helix Solutions for fiber work ■ Automated Industrial Maintenance DBA AIM Electronics Inc. - Scoreboards The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional,` 01 e service, and community engagement that encourages and inspires pi ospei ly INAWRE1 taking technology further MANAGED SERVICES CLOUD SERVICES BUSINESS IT SERVICES COPIERS & PRINTERS March 24, 2020 A Proposal for Prepared By Adam Schefers Technology Advisor 320.259.3001 x1879 adam.t.schefers@marconet.com Document Number: 071464 MOT -co marconet.com mclrco. CITY OF ELK RIVER - Networking Proposal - Multi Purpose Facility Prepared by. Marco - St. Cloud Adam Schefers 320.259.3001 x1879 adam.t.schefers@marconet.com Products Prepared iu, . CITY OF ELK RIVER 13065 ORONO PKWY ELK RIVER, MN 55330 BOB PEARSON 763.635.1266 bpearson@elkrivermn.gov Quote Information: Quote #: 071464 Version: 2 Date Issued: 03/24/2020 Expiration Date: 03/29/2020 Special Pricing Program: [PLEASE SELECT] Description One -Time Qty Ext. One -Time Cisco Catalyst 9200L - Network Essentials - switch - L3 - managed - 8 x 100/1000/2.5G/5G/10GBase-T + 16 x 10/100/1000 (PoE+) x 10 Gigabit SFP+ (uplink) - rack -mountable - PoE+ (740 W) $2,774.47 1 $2,774.47 SNTC-8X5X4 C9200L 24-p 8xmGig 16x1G 4x $562.40 3 $1,687.20 Duration: 36 Cisco Digital Network Architecture Essentials - Term License (3 years) - 24 ports - foi Catalyst 9200L $251.10 1 $251.10 Cisco Catalyst 9200L - Network Essentials - switch - L3 - managed - 48 x 10/100/1000 (PoE+) + 4 x 10 Gigabit SFP+ - rack -mountable - PoE+ $2,994.69 1 $2,994.69 Cisco Smart Net Total Care - Extended service agreement - replacement - 8x5 - response time: 4 h - for P/N: C9200L-48P-4X-E, C9200L-48P-4X-E++, C9200L-48P-4X E=, C9200L-48P-4X-E-RF $608.00 3 $1,824.00 Duration: 36 Cisco Digital Network Architecture Essentials - Term License (3 years) - 48 ports - foi Catalyst 9200L $461.03 1 $461.03 Cisco - SFP (mini-GBIC) transceiver module - GigE - 1000Base-LX, 100013ase-LH - LC/PC single -mode - up to 6.2 miles - 1310 nm - for Cisco 38XX, 39XX, 4451, 892; Catalyst 29XX, 3650; ME 3600; Supervisor Engine 8; UCS 62XX $422.34 3 $1,267.02 Cisco - SFP (mini-GBIC) transceiver module - GigE - 1000Base-SX - LC/PC multi- mode - up to 0.6 miles - 850 nm $213.23 3 $639.69 Cisco Catalyst 9200L - Network Essentials - switch - L3 - 24 x 10/100/1000 (PoE+) + 4 x Gigabit SFP (uplink) - rack -mountable - PoE+ (740 W) $938.98 1 $938.98 Cisco Smart Net Total Care - Extended service agreement - replacement - 8x5 - response time: NBD - for P/N: C9200L-24P-4G-E, C9200L-24P-4G-E++, C9200L-24P- 4G-E=, C9200L-24P-4G-E-RF $158.40 3 $475.20 Duration: 36 Cisco Digital Network Architecture Essentials - Term License (3 years) - 24 ports - foi Catalyst 9200E $251.10 1 $251.10 Cisco Catalyst 9200L - Network Essentials - switch - L3 - 48 x 10/100/1000 (PoE+) + 4 x Gigabit SFP (uplink) - rack -mountable - PoE+ (1440 W) $2,389.58 1 $2,389.58 Page: 2 of 5 Quote #071464 v2 Job #: CONFIDENTIAL I MARCO mclr-co. Cisco Smart Net Total Care - Extended service agreement - replacement - 8x5 - response time: NBD - for P/N: C9200L-48P-4G-E, C9200L-48P-4G-E++, C9200L-48P- 4G-E=, C9200L-48P-4G-E-RF $334.40 3 $1,003.20 Duration: 36 Cisco Digital Network Architecture Essentials - Term License (3 years) - 48 ports - foi Catalyst 9200L $461.03 1 $461.03 Cisco - SFP (mini-GBIC) transceiver module - GigE - 1000Base-LX, 1000Base-LH - LC/PC single -mode - up to 6.2 miles - 1310 nm - for Cisco 38XX, 39XX, 4451, 892; Catalyst 29XX, 3650; ME 3600; Supervisor Engine 8; UCS 62XX $422.34 3 $1,267.02 Cisco IP Phone 8841- VolP phone - SIP, RTCP, RTP, SRTP, SDP - 5 lines $211.99 1 $211.99 Cisco IP Phone 7811 - VolP phone - SIP, SRTP $80.26 1 $80.26 Cisco IP Phone 7821- VolP phone - SIP, SRTP - 2 lines $104.97 1 $104.97 Cisco Spare - Telephone wall mount kit - for IP Phone 7821, 7841 $29.75 1 $29.75 Cisco Unified Communications Manager Business Edition 6000 Enhanced User Connect License - License - 1 user $86.44 3 $259.32 Cisco SMARTnet Software Support Service - Technical support - for UCM-10X-ENH- UCL - phone consulting - 1 year - 240 $19.20 3 $57.60 Duration: 12 $19,429.20 Page: 3 of 5 Quote #071464 v2 Job #: CONFIDENTIAL I MARCO mclrc� Quote Summary - One -Time Expenses Description Amount Products $19,429.20 $19,429.20 Payment Options Description Payments Interval Amount Marco Payment & Financing Options One -Time Payment 1 One -Time $19,429.20 Summary of Selected Payment Options Description Amount Marco Payment & Financing Options: One -Time Payment Page: 4 of 5 Quote #071464 v2 Job #: CONFIDENTIAL I MARCO mclrco. Approval . Client represents that it has reviewed and agrees to be legally bound by this Schedule of Products. . Client represents that it has reviewed and agrees to be legally bound by the Relationship Agreement, Product Agreement(s), and applicable policy(s) ("Terms and Conditions") located at www.marconet.com/legal for the products it is obtaining as identified in this Schedule of Products. . Client agrees to use electronic signatures, electronic communications, and electronic records to transact business under the above documents. . The pricing above does not include taxes. Taxes, fees and surcharges shall be paid by Client and will be shown on invoices to Client. Marco Technologies, LLC Signature Name Date CITY OF ELK RIVER Prepared for: BOB PEARSON Signature: Signed by: Title: Date: PO Number: Email Address: Page: 5 of 5 Quote #071464 v2 Job #: CONFIDENTIAL I MARCO taking technology further MANAGED SERVICES CLOUD SERVICES BUSINESS IT SERVICES COPIERS & PRINTERS March 31, 2020 A Proposal for Jeremy Kirt Technology Advisor 320.259.3001 x3024 jeremyk@marconet.com Document Number: 044234 MOT -co marconet.com mclrc�a City of Elk River - New Elk River Ice Arena , epared by. Prepared for: Marco - St. Cloud CITY OF ELK RIVER Jeremy Kirt 13065 ORONO PKWY 320.259.3001 x3024 ELK RIVER, MN 55330 jeremyk@marconet.com BOB PEARSON 763.635.1260 bpearson@elkrivermn.gov Ice Arena Cameras Quote Information: Quote #: 044234 Version: 3 Date Issued: 03/31/2020 Expiration Date: 03/06/2020 Description One -Time Qty Ext. One -Time Equipment March Networks - SE4 IR MicDome - 4-Megapixel HDR - 2688 x 1520 - 2.8mm Fixed $366.43 18 $6,595.74 Lens with 100-degree FOV - Built-in Microphone - Dynamic IR with 15m Range - Flush Surface Mount - IP66 Weatherproof & IK10 Vandal -Resistant Enclosure - 12VDC or PoE Power Wall Bracket for SE4 IR MicDome $50.14 8 $401.12 March Networks 1.5" NPT Mount Adaptor $57.86 10 $578.60 Winic - 8MP WDR Varifocal Network Dome Camera - 3840 x 2160 Resolution - $443.20 2 $886.40 Motorized 2.8-12mm Varifocal Lens - IR up to 30 meters - True WDR - 12V DC or PoE Power Liberty - Cat6 Patch Cable - Green - 5ft $2.79 22 $61.38 Liberty - Cat6 Patch Cable - Green - 7ft $3.34 22 $73.48 Miscellaneous Parts $642.86 1 $642.86 Professional Installation Services $4,200.00 1 $4,200.00 Professional CES Config. Services $2,600.00 1 $2,600.00 Installation Notes: . CatSe or cat6 cable and cabling installation to be provided by General Contractor (GC) or Low Voltage Contractor (LVC) . Marco will mount, aim, and focus cameras . Lobby and hallways are assumed to be drop ceiling $16,039.58 NVR Recording Description One -Time Qty Ext. One -Time 9264 - All IP NVR supporting up to 64 camera channels. 400Mb/s recording rate, 3x8TB (24TB) of internal storage. I $11,855.45 1 $11,855.45 $11,855.45 Page: 2 of 5 Quote #044234 v3 Job #: CONFIDENTIAL I MARCO mclr-co. Lions Park Cameras Description One -Time Qty Ext. One -Time Lions Park Equipment March Networks - SE4 IR MicDome - 4-Megapixel HDR - 2688 x 1520 - 2.8mm Fixed $366.43 2 $732.86 Lens with 100-degree FOV - Built-in Microphone - Dynamic IR with 15m Range - Flush Surface Mount - IP66 Weatherproof & IK10 Vandal -Resistant Enclosure - 12VDC or PoE Power Winic - 81VIP HD Network Bullet IR Camera - 3840 x 2160 Resolution - Motorized 2.8 $548.96 6 $3,293.76 -12mm Varifocal Lens - IR up to 30 meters - True WDR - IP66 Rated All -in -One Housing - 12V DC or PoE Power MARCH NETWORKS COMMAND ENTERPRISE CRS CAMERA CHANNEL LICENSE (EDI) $135.00 8 $1,080.00 MARCH NETWORKS ADV SUPPORT SOFTWARE MAINTENANCE AGREEMENT 1 YR $20.25 8 $162.00 (EDI) Liberty - Cat6 Patch Cable - Green - 5ft $2.79 8 $22.32 Liberty - Cat6 Patch Cable - Green - 7ft $3.34 8 $26.72 Miscellaneous Parts $535.71 1 $535.71 Professional Installation Services $2,730.00 1 $2,730.00 Installation Notes: . CatSe or cat6 cable and cabling installation to be provided by General Contractor (GC) or Low Voltage Contractor (LVC) . Marco will mount, aim, and focus cameras . Lobby and hallways are assumed to be drop ceiling $8,583.37 Page: 3 of 5 Quote #044234 v3 Job #: CONFIDENTIAL I MARCO mclrco. Quote Summary - One -Time Expenses Description Amount Ice Arena Cameras $16,039.58 NVR Recording $11,855.45 Lions Park Cameras $8,583.37 $36,478.40 Page: 4 of 5 Quote #044234 v3 Job #: CONFIDENTIAL I MARCO mclrco. Approval . Marco's standard Payment Terms, Warranty, and Return Policy ("Terms") can be found at: https://www.marconet.com/terms- conditions/. . In the event of a conflict between those Terms and the Proposal and Agreement documents in this document package "Package Documents," the terms in the Package Documents shall control. . Taxes, shipping, handling and other fees may apply where applicable. We reserve the right to cancel orders arising from pricing or other errors. Marco Technologies, LLC Signature Name Date CITY OF ELK RIVER Prepared for: BOB PEARSON Signature: Signed by: Title: Date: PO Number: Email Address: Page: 5 of 5 Quote #044234 v3 Job #: CONFIDENTIAL I MARCO ALL STATE COMMUIVICATIOIVS March 05, 2020 Brandon Wisner City of Elk River Re: Adjusted budget proposal for low voltage cabling at the multipurpose building Material price $29,775.00 Labor price $34,781.00 Total price $64,556.00 Scope of work includes: • Install 1 cat 6 plenum rated cable to each of the 52 new WAP locations • Install 1 cat 6 plenum rated cable to each of the 49 new camera locations • Install 1 cat 6 plenum rated cable to each of the 14 single locations • Install 2 cat 6 plenum rated cables to each of the 61 dual locations • Install 2 cat 6 plenum rated cables to the elevator equipment room • Install 1 RG6 coax and 1 cat 6 cable to each of the 7 television locations o Upper lobby, lower lobby, and above fire place in the senior center • Install of cabling between score boards and score keepers table (type to be determined) • Terminate cables with a jack and biscuit box at all WAP and camera locations • Terminate wall locations with jacks and faceplates • Install a 2 post rack with vertical and horizontal wire management in the main closet • Install a wall mount cabinet in storage room • Install 6 strand single mode fiber and RG- I I backbone cabling between data closets • Re-route existing city owned fiber to new main closet • Terminate fiber with LC connectors • Terminate cables on new patch panels in the data closets • Testing of new cabling included • Patch cords and installation them is not included If you have any further questions on this pricing let me know, Pete Helmin All State Communications 320-333-8130 800 Industrial Drive • Suite 204 • Sauk Rapids, MN 56379 Business (320) 203-1511 • Fax (320) 203-1510 ALL STATE COMMUIVICATIOIVS February 26, 2020 Brandon Wisner City of Elk River Re: Budget proposal for low voltage cabling at the Lion John Weicht Park Material price $2,100.00 Labor price $4,900.00 Total price $5,000.00 Scope of work includes: • Install 1 cat 6 plenum rated cable to each of the 8 new camera locations • Install 2 cat 6 plenum rated cables to each of the 2 dual locations • Install 4 cat 6 plenum rated cables to the quad location • Install a wall mount cabinet in mechanical room • Terminate cables on new patch panels in the data closets • Testing of new cabling included • Patch cords and installation them is not included If you have any further questions on this pricing let me know, Pete Helmin All State Communications 320-333-8130 800 Industrial Drive • Suite 204 • Sauk Rapids, MN 56379 Business (320) 203-1511 • Fax (320) 203-1510 &(mL HeLIXS0LUGIOU superior service. Proven ResuL6s. March 10, 2020 City of Elk River Attn: Bob Pearson & Jake Walz 13077 Orono Pkwy Elk River, MN 55330 RE: Quote for 2-1.25" conduit installation at Lions Park new facility Dear Mr. Pearson & Mr. Walz: Helix Solutions would like to thank you for the opportunity to bid on the above mentioned project. The bid is as follows: • Provide and place 2-1.25" conduits from each end of existing 1.25" conduits (crossing School St. & going south to new Lions Park Building) approx. 495' total • Provide and place 1-30"x36"x36" storage vault • Provide and place approx. 1,200' 12F fiber thru new and existing conduit (from existing splice case on School St to D-mark in new Lions Park building) • Delash/Relash existing aerial splice case & slack loop • Terminate 16 total fibers (4 in existing case, 12 in building in City provided FTP) • City of Elk River/Elk River Schools to locate all private utilities • No permitting fee's included in pricing Labor total: $9,730.00 Material total: $2,100.00 Project total: $11,830.00 Please feel free to give me a call if you have any questions or require additional information, at (763) 310-5505. We look forward to hearing from you. Sincerely, Eric Graning President/Owner Helix Solutions eric@helixsolutions.us info@helixsolutions.us l♦�e� Ft1 Automated Industrial Maintenance ELECTRONICS irrc. 7655 Washington Ave. So. Z Phone: 952-941-9830 Edina, MN 55439 Fax: 952-941-7139 www.aimele.corn Rich Czech, Elk River Tee Arena Resource Training & Solutions AEPA Cooperative Price Quotation February 25, 2020 Daktronics Deluxe DVN Video Hockey Scoreboards Description uant. Price Total _ I. Daktronics DVN-240x432-6mm (LED) @a 3 1 $174,682.00 $174,682.00 Sided video/1 side illuminated sponsor panel 6'H x 10'w four sided hockey scoreboard. Includes floor frame with shrouding, single Input video system, hockey animation, sponsor Animation, camera kit, computer, RTD, fiber And horn. (Size CH x 12'-8"W x 12'-8"D) 2. Canvas floor artwork 10'x10' 1 630.00 630.00 3. Corner shroud artwork 4 135.00 540.00 4. Daktronics H-2104-13 Hockey scoreboard 2 6,741.00 13,482.00 Includes wireless console, horn and border Stripe. (Size 5'H x 10'W x 6"D) 5. Daktronics H-2106-13 Hockey scoreboard 2 6,467.00 12,934.00 Includes wireless console, horn and border Stripe. (Size 5'H x 10'W x 6"D) 6. Daktronics MS-2002-11 Multisport scoreboard 2 6,935.00 13,870.00 Includes RC200 wireless control, horn and Border stripe. (Size 4'-6"H x 16'W x 8"D) 7. Daktronics TI-2101-13 Four digit timer/clock 3 3,285.00 9,855.00 Display. Includes AS 1600 wireless controller. (Size 2'14 x 4' W x 6"D) 8. Daktronics TI-2031-13 Locker room clock 4 563.00 2,252.00 9. Netting protection 2 sides 1 3,400.00 3,400.00 Estimated Freight 3,250.00 Installation and Training* 19,550.00 Total $254,445.00 Automated Industrial Maintenance ELECTR�NlCS inc. 7655 Washington Ave. So. Phone: 952-941-9830 Edina, MN 55439 Fax: 952-941-7139 www.aimele.com *Includes assembly frame and mounting of 4 side suspended video scoreboard, mounting scoreboards to railing in rink A, mounting scoreboard in rink B, mounting scoreboards in turf field, mounting clocks in rinks, mounting locker room clocks and install wireless control. Rink A video scoreboard install new sling, follow up adjustment to sling, control room set up, camera set up, RTD frames, fiber terminations and operator training. Electrical installation and fiber/signal wire install must be provided by customer and be installed by licensed electrician, AIM will provide an airlift for installation. Options ID panels 24"h x 12'-8"W (quant 4) non backlit includes artwork $TBD Other Information. Warranty (1) One year parts Lead time (8) eight weeks Payment 30% with order, 60% prior to shipping, balance due net (30) thirty days Prices valid (60) sixty days Prices do not include MN State and City Sales Taxes Prices reflect Resource Training & Solutions AEPA Cooperative Pricing IFB# 016-I Brian Grandstrand AIM Electronics, Inc. Rich Czech Elk River Ice Arena