8.2. SR 04-06-2020 Request for Action To Item Number Mayor and City Council 8.2 Agenda Section Meeting Date Prepared by General Business April 6, 2020 Ron Nierenhausen, Chief of Police Item Description Reviewed by Hire an Architectural Design Firm for Public Safety Mark Dickinson, Fire Chief Buildings and Third Fire Station Reviewed by Cal Portner, City Administrator Action Requested Direct staff, by motion, to engage BKV for architectural services for public safety building improvements. Background/Discussion In September of 2017, Council received a presentation from Five Bugles regarding a needs study for the Police and Fire Department building expansion. Areas addressed in the needs study included the completion of the upper level and garage expansion of the police department and the remodel and expansion of Fire Station 2 with a possible addition of a third station. In March of 2019, the Council gave approval to fund and seek an architectural design firm to complete the expansion project. An RFP was created with a deadline of August 30, 2019. The submitted proposals were reviewed by a committee and an architectural design firm was selected in early March of 2020. Seeking approval for the firm selected at a price of $558,000 with an additional reimbursable expense not to exceed $25,000. Financial Impact N/A Attachments  Public Safety Building and Fire Station No. 3 Design/Construction  Architectural Services Design Form The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Architecture Interior Design Landscape Architecture Engineering CITY OF ELK RIVERDECEMBER 31, 2019 CITY OF ELK RIVER, MN Architectural Design Services and Construction Support for the Expansion of the Elk River Public Safety Building and Fire Station No. 3 Design/Construction TABLE OF CONTENTS Cover Letter Signed Respondent Proposal (Attachment A) 1 References 2 Firm background and qualifications (Attachment B) 3 Project Experience 8 Project Team 30 Project Team - Subconsultants 42 Understanding of Project Scope & Project Approach 45 Building Information Modeling & Virtual Reality 54 Quality Assurance Process 56 Schedule Review 57 Sustainability 58 Award-Winning Design 59 December 31, 2019 Chief Dickinson / Chief Nierenhausen City of Elk River 13065 Orono Parkway NW Elk River, MN 55330 RE: Architectural Design Services and Construction Support for the Expansion of the Elk River Public Safety Building and Fire Station No. 3 Design/Construction Dear Chief Dickinson and Chief Nierenhausen , On behalf of BKV Group, we appreciate this opportunity to submit our proposal for the expansion and remodeling of the City of Elk River Public Safety Building and new Fire Station No. 3. Our team has thoroughly reviewed the Request for Proposal, we understand the scope of services requested and can deliver on the city’s needs. Our team has worked together on many fire, police, and law enforcement projects and understand current planning requirements associated with these areas. The team has also worked on many complex expansion and remodeling projects and understands the value in utilizing existing area to create operational efficient spaces. We have the experience and commitment that we know will be an asset to the city. Our core public safety team leaders have focused their careers on aspects dealing with design and operations of public safety facilities. I will be the lead architect for the project as well as the lead in all police design and planning activities. I have a strong background and understanding with law enforcement facility requirements and operations throughout the country with the majority located here in Minnesota. Most recently, I taught a national seminar on the issues and requirements associated with squad garages. In addition, our fire design expert, Craig Carter, continues to lecture and provide white papers on aspects associated with fire station planning and design, as well as issues the first responders are facing. Our public safety specialist, Greg Martin, is a retired fire chief who understands the operational and planning issues that first responders deal with on a daily basis and has participated in design efforts on numerous public safety facilities. Our lead designer, Mike Krych is frequently recognized for the quality of his design work. His practical approach in working with clients has led to outstanding designs that reflect the clients vision and the communities they serve. In addition to our in-house team members, we have two consultants with whom we regularly work on public safety projects in Minnesota: Wenck Associates for civil engineering and True North Consulting Group for A/V and security technology. The following are some of our specific qualifications: Law Enforcement Expertise. BKV Group has completed more than 100 police station projects, including studies, renovations and new facilities nationwide. We are experts in the intricacies of function, security, adaptability, cost- effectiveness, operational efficiency, and civic presence that are necessary for a successful police facility. Fire Station Expertise. We’ve gained our deep fire station expertise through the completion of more than 130 local and national fire projects, ongoing research into the future of the fire service, and participation in national fire service and fire station design conferences. Holistic Practice. The strength of our holistic practice is the collaboration and efficiency that we have created in having all services in our Minneapolis office. This enhanced collaboration among all design disciplines has created value in the coordination of our designs and benefits to our clients in our accountability and thoroughness. Our vetted project management process consistently delivers projects on-time and on-budget, through consistent communication, an in-house and third-party quality assurance process, and project team accountability. ARCHITECTURE INTERIOR DESIGN LANDSCAPE ARCHITECTURE ENGINEERING 222 N 2nd Street, Suite 101 | Minneapolis, MN 55401 | 612.339.3752 | www.bkvgroup.com Sustainability. As a firm, BKV Group has made a commitment to educate and mentor members of its staff with the goal of developing professionals who understand and value the impact that sustainable design can achieve. Having all disciplines in one office has supported this integrated approach and process. While many of our professionals are LEED accredited, we treat each project with common sense approaches, developing sound options to achieve our clients’ sustainability goals, and review with them enhanced options and their associated cost and paybacks. Team & Community Engagement. A large part of our project success is our collaboration and involvement of the client team as well as the community. We have found that projects best support the community and departments’ needs when there is involvement and input by all stakeholders. We have a number of approaches to involve all first responders, the city administration and council, as well as the community as a whole. I will be the lead architect and main point of contact for the project providing coordination among the team and with the city throughout the entire process. In addition to my experience in public safety projects I also bring understanding and leadership gained through over 39 years in the profession. The BKV Group team is committed to providing high-quality services to help the City of Elk River develop functional, practical, and durable public safety facilities that will serve the departments and the community well. If there is any additional information or clarification that you and/or the committee would like to know, please do not hesitate to contact me at 612.790.7605. Thank you for your consideration, and we look forward to talking to you soon. Sincerely, BKV Group Bruce Schwartzman, AIA Lead Architect 222 N 2nd Street, Suite 101 | Minneapolis, MN 55401 | 612.339.3752 | www.bkvgroup.com ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 1 Architectural Design Services and Construction Support for the Expansion of the Elk River Public Safety Building and Fire Station No. 3 Design/Construction _____________________________________________________________________________________ Attachment A RESPONDENT PROPOSAL The firm hereby proposes to provide Design Services and other Services as specified within the scope of service at the rates shown below. Based on the scope of work for this project, what is your fixed fee? What are your estimated total reimbursable expenses? Fixed fee: Reimbursable expenses: SShhaa dd ee dd aa rree aa wwii ll ll bbee rree dd aa cc ttee dd aa nndd rree pp llaa cc ee dd ww ii tthh aa RR ee ss ppoonn dd ee nntt ii dd ee nn ttii ffii cc aa ttii oonn cc oodd ee pprrii oorr ttoo ee vvaa ll uu aa ttii oonn .. Firm: Contact: Telephone: E-mail: Address: City/State/Zip: Authorized Signature X Date Name and Title: $558,000 $25,000 BKV Group Bruce Schwartzman 612.790.7605 bschwartzman@bkvgroup.com 222 North 2nd Street Suite 101 Minneapolis, MN 55401 Bruce Schwartzman, Lead Architect & Partner Our team’s compensation goals are to establish fees that fair and appropriate for the work required to achieve your project goals while assuring that both our client and firm feel they are treated fairly for the services and expertise provided. To meet this goal, we strive to establish a well-defined project understanding and scope of services so that an appropriate fee structure can be determined. We have established our fees based our experience in doing this type of work and the information in the RFP. We would urge the committee to select your team based on experience and qualifications. While we feel that the proposed fixed fee is in line with the work as stated in the RFP, our first task in working with the City of Elk River will be to meet to make sure that our assumption for the project scope and schedule aligns with the city’s expectations and goals. ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 2  REFERENCES Fridley Civic Campus Scott J. Hickok, AICP Community Development Director 6431 University Avenue NE Fridley, MN 55432 763.572.3590 Scott.Hickok@fridleymn.gov Brian Weierke Police Chief 6431 University Avenue Fridley, MN 55432 763.572.3625 John Berg Retired Fire Chief 763.572.9441 bergj3392@comcast.net Dayton Fire Station Jason Mickelson Fire Chief City of Dayton Fire Department 12260 S Diamond Lake Rd Dayton, MN 55327 612-751-8158 jmickelson@cityofdaytonmn.com Rochester Fire Station No. 2 Curt Pronk Administrative Services Manager Rochester Fire Department 201 4 St. SE Room 10 Rochester, MN 55904 507.328.2816 cpronk@rochestermn.gov Rochester Police Department Sgt. Jon Turk #2188 Patrol Division-Community Action Team (CAT) Supervisor Emergency Management Liaison Rochester Police Dept 507-328-6940 jturk@rochestermn.gov James L. Franklin Chief of Police City of Rochester 4001 West River Pkwy NW Rochester, MN 55901 507-328-6900 JFranklin@rochestermn.gov Wright County/FBI Joint Tactical Training Facility Alan Wilczek Wright County Facilities Services Director Government Center, Room 235 10 2nd Street NW Buffalo, MN 55313 763.682.7382 alan.wilczek@co.wright.mn.us Detroit Lakes Police Station Steven Todd Chief of Police Detroit Lakes Police Department 106 Holmes St. E. Detroit Lakes, MN 56501 218-847-4222 (Direct Line) stodd@cityofdetroitlakes.com Kelcey Klemm City Administrator City of Detroit Lakes 1025 Roosevelt Avenue Detroit Lakes, MN 56501 218-846-7123 (Direct Line) kklemm@cityofdetroitlakes.com ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 3 FIRM BACKGROUND & QUALIFICATIONS  FIRM INTRODUCTION ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 4 FIRM NAME BKV Group YEAR ESTABLISHED 1978 FIRM EMPLOYEES 209 PRACTICE AREAS Government Public Safety Housing Hospitality Education Commercial LOCATIONS Chicago Dallas Hanoi, Vietnam Minneapolis Washington DC OFFICE 222 N Second St, Suite 101 Minneapolis, MN 55401 612.339.3752 CONTACT Bruce Schwartzman Partner/Lead Architect 612.790.7605 bschwartzman@ bkvgroup.com FIRM INTRODUCTION BKV Group is a full-service architecture, engineering, interior design, landscape architecture and construction administration firm. Founded in Minnesota in 1978, BKV Group has grown from a sole proprietorship into a diverse partnership with offices in Washington DC, Minneapolis, Dallas, Chicago, and Hanoi, Vietnam serving clients locally and nationwide. Collectively we represent a practice whose expertise is team-focused and offers a client-centered approach to creating architectural solutions. As a result of our full-service structure, we offer our clients a single source for all aspects of design and construction administration services. BKV Group is an established leader in government, city, and county facilities planning and design. Each project is led by BKV Group partners who are recognized leaders in their respective design areas. Our firm’s culture is based on a highly collaborative design and operational efficiency model. We engage our clients, value their objectives and develop innovative design solutions that make meaningful contributions to the built environment.  WHAT WE PROVIDE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 5 BKV Group, through rigorous continuing education, provides design solutions at the leading edge of innovative technologies. A commitment to integrated design necessitates constant collaboration among all professional disciplines who share a common vision. Our multi-disciplinary approach allows us to serve the unique and diverse needs of each client through a fully-coordinated, single-source team. PROJECT MANAGEMENT • Goals and Objectives • Communication Protocols • Project Budget Management • Project Schedule Management • Quality Assurance PLANNING AND FEASIBILITY • Existing Condition Assessment • Functional Workflow Assessment • Health and Safety Assessment • Capital Improvement Planning • Phased Property Planning • Space Needs Analysis • Space Standard Diagrams • GIS Drive-time Analysis • Land Use and Zoning Analysis • Site Selection Study • Site Feasibility and Planning • Building Planning and Stacking • Project Master Planning • Total Project Cost Estimating • Total Cost of Ownership Analysis ARCHITECTURE • Visioning and Conceptual Design • Construction Documentation • CSI-format Specifications • Building Science/ Forensics • Cost Estimating and Value Engineering • Critical Path Scheduling • Building Information Modeling • Computer Rendering • Immersive 3D Visioning INTERIOR DESIGN • Space Planning • Interior Concept Renderings • Material Finish Selection • Durability Analysis • Infection Control Analysis • Furniture and Equipment Selection • Art & Accessories Staging • FF&E Budgeting and Procurement • Installation Monitoring MECHANICAL ENGINEERING • Energy Use/Conservation Analysis • HVAC System Lifecycle Analysis • Building Commissioning • System Operations and Training • Building Automation Controls Sequencing • Fire Protection Systems • Plumbing & Piping System Design ELECTRICAL ENGINEERING • Photometric Lighting Design • Power Distribution Design • Generator Load Analysis • Photovoltaic Integration • Data and A/V System Design • Security Hardware and Cameras • Fire Alarm System Specification • Alert Notification Design • Power and Systems Commissioning STRUCTURAL ENGINEERING • Structural Analysis and Design • Structural System Comparisons • Existing Structure Evaluations • Dynamic Vibration Analysis LANDSCAPE ARCHITECTURE • Land-Use and Zoning Analysis • Planting and Hardscape Design • Boundary/Screening Yard Design • Rainwater Collection and Irrigation • Tree Inventory and Analysis • Streetscape Design SUSTAINABLE DESIGN • Owners Project Requirements • Simple Box Analysis • Comprehensive Energy Modeling • Basic Commissioning • Daylight Modeling and Calculations • Custom Systems Analysis • Typical Meteorological Year Analysis • ASHRAE Calculations • LEED Project Tracking and Submissions ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 6  BENEFITS OF THE BKV GROUP TEAM We feel that there are a number of factors that would make the BKV team an excellent partner to assist the City of Elk River with your facility assessment and space needs analysis. The following items highlight some of our major attributes. HISTORY Our team of BKV Group, True North Consulting Group, and Wenck Associates, Inc. all have extensive experience in municipal government planning and design for cities within Minnesota. Municipal projects have been a focus of BKV Group since the firm was founded in 1978. PROJECT EXPERIENCE The team that will be working with you are some of the leading planners in our region for police and fire facilities. Members of our team understand the planning issues associated with these facilities to assure that city proper operational and planning efficiency. The team and the firm have been involved with more than 130 police station projects and more than 100 fire station projects. This experience is a valuable asset in understanding, planning and designing projects with specific requirements associated with public municipalities. SENIOR LEADERSHIP Part of the success of our assessments and projects is that we utilize our senior and most knowledgeable staff in these types of specialized projects. Their understanding of the issues associated with these types of facilities helps to ensure that the information developed is based on solid experience. We also promote continuity: The same team members will be involved in working with the city from beginning to end. This promotes continuity of communication, information and follow through. FULL-SERVICE FIRM By being an in-house full-service firm, we can provide all the services required to support our client’s project needs. This helps to ensure project coordination in an efficient and timely fashion. Our team members work together on numerous projects and have developed a solid relationship that ultimately translates into a successful process with our clients. SUSTAINABLE DESIGN + ENERGY EFFICIENCY Many of the professionals in our firm are LEED accredited. Our engineers are experienced in evaluating current energy cost and in developing energy models that demonstrate cost savings in proposed systems. Creating energy efficient buildings and utilizing energy saving approaches such as natural day lighting, and thermally enhanced shells has been a long-standing commitment of our firm before it was a fashionable approach. Our goal is to provide facilities that are well designed, promoting energy efficiency and reduce long-term operational cost. QUALITY CONTROL PROCESS Our multiple layers of internal review and coordination has assisted our team in producing the most comprehensive and thorough data and documents. This process has helped us achieve a reputation of meeting budgets with minimal change orders. ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 7  BENEFITS OF THE BKV GROUP TEAM FIRM SIZE It is sometimes over looked in an evaluation process however there is a value to the number of professionals in our company. BKV Group has more than130 design professionals on staff. Having multiple planners, architects and engineering staff assist us in maintaining schedules. While the core team will always be involved and active, having a large support staff to assist when needed helps assure quality and timeliness. It also provides peer reviews from other designers within the firm. DESIGN QUALITY Design is not about creating the most expensive building; it is about creating a building that best represents our client’s vision and values. At BKV Group we pride ourselves on creating lasting designs that are durable, functional and are symbols of the communities they serve. In the course of this focus we have won a number of awards on our government projects. We have done this while maintaining project budgets and schedule. ON SCHEDULE AND ON BUDGET There are a variety of factors that help us achieve these objectives, our experience, our senior leadership, the depth and volume of our support staff and our detailed processes of document development. Utilizing these strengths has produced projects where our change order percentages have been 1/2 of 1%, which we view as a demonstration of the accuracy of our process. COMMITMENT Most importantly we are committed to working closely with the City of Elk River and all stakeholders in a collaborative manner sharing our experience and knowledge to develop a project that will meet the city’s goals and expectations.  PROJECT ExPERIENCE BKV Group’s public safety and police facility experience includes space usage studies and facility master planning. Two main objectives fundamental to a these facilities are to serve the public and provide a safe and controlled environment for staff. Below is a sampling of our law enforcement projects. Albert Lea Police Department, Needs Assessment and New Facility, Albert Lea, MN • Andover City Hall and Police, Needs Assessment Study, Andover, MN • Baton Rouge Law Enforcement Training Facility, Needs Assessment and Master Plan, Baton Rouge, LA • Bedford Municipal Complex, New Facility, Bedford, OH • Bloomington Police Department, Needs Assessment, Phase I Communication Center, Bloomington, MN • Brooklyn Center Police Station, Needs Assessment and New Facility, Brooklyn Center, MN • Champlin Police Station, Needs Assessment, Addition and Reconstruction, Champlin, MN • Cloquet Police Station, Needs Assessment and Master Plan, Cloquet, MN• Coon Rapids City Center, Needs Assessment and New Facility, Coon Rapids, MN • Detroit Lakes Police Station, New, Detroit Lakes, MN• Detroit Lakes Police Station and City Hall, Study, Detroit Lakes, MN• Eagan Municipal Center, Addition and Remodeling, Eagan, MN • Eau Claire Police Department, Needs Assessment, Phase I: City/County, Communication Center, Eau Claire, WI • Edina City Hall and Police Station, Needs Assessment and New Facility, Edina, MN • Elko New Market, Public Facilities Master Plan, Elko New Market, MN • Emily Police and City Hall, Emily, MN • Forest Lake Public Safety and Municipal Center Master Plan, Forest Lake, MN • Fridley Civic Campus, New Facility, Fridley, MN • Fridley Police Station, Needs Assessment, Expansion and Remodeling, Fridley, MN • Front Royal Police Department, Study, Front Royal, VA • Gladstone Public Safety Building, Needs Assessment, Gladstone, MO • Golden Valley Public Safety, Needs Assessment, Expansion and Remodeling, Golden Valley, MN • Hermantown Public Safety, New Facility, Hermantown, MN • Inver Grove Heights Police Station, Inver Grove Heights, MN • Isanti County Law Enforcement Center, Cambridge, MN • Island Lake Police Station, Needs Assessment, Island Lake, IL • Lakeville Police Station, Needs Assessment, Expansion and Remodeling, Lakeville, MN • Lakewood Municipal Complex, Master Plan, Lakewood, IL• Leech Lake Band of Ojibwe Justice Center and Tribal Police, Cass Lake, MN • Maple Grove Government Center, Needs Assessment and New Facility, Maple Grove, MN • Melrose Police Station, Needs Assessment and New Facility, Melrose, MN • Minneapolis Community and Technical College/Metro State University, Law Enforcement Training Center, Brooklyn Park, MN • Minneapolis Precinct #2 & #3 Police Stations, Minneapolis, MN • Minnetrista Police Station, Needs Assessment and New Facility, Minnetrista, MN • Montgomery Public Safety Facility, Montgomery, MN • New Prague Police Station, Needs Assessment and Remodel, New Prague, MN • Orono Police Station, Needs Assessment and New Facility, Orono, MN • Parma Justice Center, New Facility, Parma, OH • Pennington County Sheriff’s Office, Master Plan, Rapid City, SD • Pennington County Sheriff’s Station, New Facility, Thief River Falls, MN • Plymouth Public Safety Building, Needs Assessment, Addition & Renovation, Plymouth, MN • Prior Lake Police Department, Needs Assessment, Addition and Remodel, Prior Lake, MN • Rapid City Police Department Master Plan, Rapid City, SD • Rapid City Police Evidence Facility Master Plan, Rapid City, SD • Ramsey Police Station, Needs Assessment and New Facility, Ramsey, MN • Richfield Public Safety Department, Needs Assessment, Richfield, MN • Rochester North Police Station & Service Center, Renovation & Addition, Rochester, MN • Rochester Police Department, Study, Rochester, MN • Rogers Police, Needs Assessment and Master Plan, Rogers MN • Rosemount Police Department, Needs Assessment, Rosemount, MN • Savage Police, Needs Assessment and Master Plan, Savage MN • Scott County Public Safety Training Academy, Master Planning and Programming, Scott County, MN • St. Louis Park Police Station, Needs Assessment Study and New Facility, St. Louis Park, MN • St. Cloud Police Headquarters, New Facility, St. Cloud, MN • Shakopee Police Station, Needs Assessment and New Facility, Shakopee, MN • Todd County Law Enforcement Center, Needs Assessment, Addition and Remodel, Long Prairie, MN • University of Texas M.D. Anderson Cancer Center Police Department, Facility Needs Assessment, Houston, TX • West Fargo Police Station, West Fargo, ND • West St. Paul Police Station, Needs Assessment, West St. Paul, MN • Woodbury Police, Needs Assessment, Woodbury, MN • Woodbury Public Safety, Remodel and Addition, Woodbury, MN • White Bear Lake Police Station, Needs Assessment, White Bear Lake, MN • Wyoming Public Safety Facility, Wyoming, MN Over Police Stations 100 ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 8  PROJECT ExPERIENCE Fire Stations are a unique building type that are very specialized in nature. At BKV Group we specialize in Fire Station and Public Safety design, providing you with an experienced team to ensure your project is customized to fit your needs. Below is a sampling of our fire station and public safety projects. Andover Fire Station, Needs Assessment Study, Andover, MN • Bedford Municipal Complex, Needs Assessment, New Fire Station and Municipal Campus, Bedford, OH • Belle Plaine Fire Station, New Facility, Belle Plaine, MN • Bloomington Fire Station, Needs Assessment, Addition to Station #3 and New Main Station #1, Bloomington, MN • Carrollton Fire Station Study, Carrollton, TX • Centennial Lakes Fire Station, Needs Assessment and New Facility, Circle Pines, MN • Champlin Fire Station, Needs Assessment Study, Addition and Remodeling, Champlin, MN • Chanhassen Fire Station, New Facility, Chanhassen, MN • Coon Rapids Fire Administration, Needs Assessment Study, Coon Rapids, MN • Coppell Fire Station Study, Coppell, TX • Eagan Fire Administration, Needs Assessment and New Facility, Eagan, MN • Eden Prairie Fire Station, Needs Assessment and New Facility, Eden Prairie, MN • Fridley Fire Station, Needs Assessment and Remodeling, Fridley, MN • Fridley Civic Complex, Fire, Police, City Hall, Public Works, Fridley, MN • Golden Valley Public Safety, Needs Assessment, Expansion and Remodeling, Golden Valley, MN • Grand Island Fire Station, Needs Assessment and Site Selection, Grand Island, NE • Henrico County Fire House #19, New Facility, Henrico, VA • Hermantown Public Safety, Needs Assessment and New Facility, Hermantown, MN • Key Largo Fire Department, space needs assessment and Expansion Planning, Fire Station 1, Key Largo FL • Lake Johanna Fire Station, Needs Assessment and New Facility, North Oaks, MN • Little Canada Fire Station, Needs Assessment and New Facility, Little Canada, MN • Long Lake Fire Department, Needs Assessment and New Facility, Long Lake, MN • Mahtomedi Fire Department & City Hall, Needs Assessment, Mahtomedi, MN • Maple Grove Fire Station, Needs Assessment and New Fire Station No 5, Maple Grove, MN • Maple Grove Fire Station, Needs Assessment and Renovation Fire Station No 1, Maple Grove, MN • Minneapolis Fire Station #27, Needs Assessment and New Facility, Minneapolis, MN Minneapolis Fire Station #28, Needs Assessment and New Facility, Minneapolis, MN • Minnetonka Fire Stations, #1, #3, #4, #5 Prototype Design, Minnetonka, MN • Navarre Fire Station, New Facility, Orono, MN • New Prague Fire Station, Main Station Remodeling, New Prague, MN • New Ulm Fire Station, Addition and Remodeling, New Ulm, MN • Penn Daw Fire Station 11, Renovation and Expansion, Fairfax County, VA • Pennington County Search and Rescue, Facility Space Needs Assessment and Master Planning, Rapid City, SD • Pennington County Fire Administration, Facility Space Needs Assessment and Master Planning, Rapid City SD • Plymouth Fire Station, Needs Assessment and New Facility Main Station, Plymouth, MN • Prior Lake Fire Station, Needs Assessment and New Main Fire Station, Prior Lake, MN • Ramsey Fire Department, Study, New Facility No. 2, Ramsey, MN • Red Wing Fire Department, Space Needs Assessment and Facility Planning, Fire Station 2, Red Wing, MN • Rochester Fire Station No. 2, Rochester, MN • Richfield Fire Department, Needs Assessment and Master Plan, Richfield, MN • Rosemount Fire Department, Needs Assessment, Rosemount, MN • Russell Township Fire Station, Feasibility Study, Needs Assessment and New Facility, Novelty, OH • Savage Fire Department, Needs Assessment, Savage, MN • Scott County Association For Leadership and Efficiency, County Wide Fire and Police Training Academy, Needs Assessment and New Facility, Shakopee, MN • Shakopee Fire Station, Needs Assessment and New Facility, Shakopee, MN • St. Louis Park Fire Administration, Needs Assessment, St. Louis Park, MN • White Bear Lake Fire Station, Needs Assessment, White Bear Lake, MN • Woodbury Fire Station, Needs Assessment, Woodbury, MN • Woodbury Fox Run, New Facility, Woodbury, MN • Woodbury Afton, New Facility, Woodbury, MN • Woodlawn Fire Station #24, Alexandria, VA • Wyoming Public Safety/Fire Facility, Wyoming, MN Over Fire Stations 130 ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 9  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 10 FRIDLEY CIVIC CAMPUS FRIDLEY, MINNESOTA Across University Avenue from the City of Fridley’s Community Park, and directly west of the wooded trails of Locke Park and Rice Creek, stands the recently completed Fridley Civic Campus. This municipal improvement project features a new City Hall/Public Safety facility and Public Works facility, organized around a central water feature and shared plaza. The building’s design responds to its urban and natural surroundings with a palate of materials that are both elemental and durable. Stone, brick, metal, wood, and glass create forms that emerge solid and straight, defining the building volumes on the site’s north and west boundaries. These forms are positioned to engage with the public water feature and provide views of the wooded landscape beyond to the south and east. The police and fire facility is located across the lobby from the City Hall. A separate public lobby, records, police administration, investigations, and patrol spaces are all located on the first floor. The lower level contains a squad garage, a small holding facility with attached vehicle sallyport, evidence processing and storage area, and a five -lane firing range. On the second floor, an EOC/training room and fitness room are accessible for employees. The fire station has administrative offices on the first floor and bunk rooms, a kitchen, and a dayroom for duty crews on the second floor. A fire pole provides direct access to the apparatus bays. There are dual three-bay drive- through apparatus rooms. In between these bays is the watch room and other apparatus bay support spaces. Above the support functions is a large room for mazes and props to provide on-site training opportunities. TYPE Police Station, Fire Station, City Hall, Public Works, SIZE 184,300 GSF Police station (1 sworn, 1 civilian), fire station (6 bays, 8 bunks, volunteer), city hall, and public works facility COST $48.8M SCOPE Programming, Planning, Design, Documentation, Architecture, Interior Design, Mechanical, Electrical, and Structural Engineering, Construction Administration OWNER’S CONTACT Scott J. Hickok, AICP 6431 University Avenue, Fridley, MN 55432 763.572.3590 Scott.Hickok@fridleymn.gov ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 11  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 12  PROJECT ExPERIENCE ST. CLOUD POLICE HEADQUARTERS ST. CLOUD, MINNESOTA BKV Group teamed with GLT Architects to create a 110,000 square foot police headquarters and includes space for administration, investigations, patrol, training, community meetings, evidence and forensics labs, and underground parking for 250 vehicles within a multi-story building. The design embraces the challenges of the constricted site, stacking the program vertically and underground parking. The brief for the St. Could Headquarters outlined the design of a significant work of public architecture incorporating a contemporary working environment and state of the art operations to meet staff and community expectations. The design vision was to create a meaningful building responding to its context, addressing the sites serious constraints and recognizing its important position as a gateway between major districts within the city. The site exists on the edge of the dense commercial center of town and an established residential district. The department had previously shared space with the county sheriff for the past 20 years outgrowing significantly this space while also lacking a distinct image and identity. The department was interested in fostering a sense of openness and transparency towards the public. It was also committed to providing a rich working environment for its staff. The design embraces the challenges of the constricted site, stacking the program vertically and placing the parking underground. The subterranean parking allows the confluence of commercial and residential pedestrian patterns resulting in a significant urban plaza that marks the threshold of the two districts. TYPE Police Headquarters SIZE 110,000 SF COST $36.1 M SCOPE Architecture, Interior Design, Mechanical and Electrical Engineering, Structural Engineering, Landscape Architecture OWNER’S CONTACT St. Cloud Police Headquarters 101 11th Avenue North St. Cloud, MN 56303 ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 13  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 14  PROJECT ExPERIENCE RAMSEY FIRE STATION NO. 2 RAMSEY, MINNESOTA BKV Group was hired by the City of Ramsey Fire Department to evaluate a proposed new site for a replacement station for their current Station #2. The city was approached by two separate developers interested in acquiring the land currently occupied by their current Station #2, and BKV Group was hired to assess whether a nearby city-owned site was adequate to house a new replacement station. The site planning process began by first analyzing the site to make sure all apparatus turning clearances could be met, and by assessing a proposed program for the replacement station. It was determined the program for the new station would require 12,000 SF, and the program analysis included options for either a single or two story building options. BKV Group also provided a preliminary cost estimate for the city to evaluate the feasibility of construction financing. After the original assessment in 2012, the fire department retained BKV Group to continue design development. This stage began with review of the program completed as part of the study, and program and area specifications, as the city finalized their financing strategy for the station. BKV developed the floor plan, as well as completed the exterior design and massing of the building using Revit and Building Information Modeling. TYPE Fire Station SIZE 11,850 SF 3 drive-through bays Volunteer COST $3.2 M SCOPE Programming, Site Feasibility, Planning, Design, Documentation, Architecture, Interior Design, Mechanical, Electrical, and Structural Engineering, Construction Administration OWNER’S CONTACT Ramsey Fire Department Fire Chief Matt Kohner 763.427.4452 mkohner@ci.ramsey.mn.us ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 15  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 16  PROJECT ExPERIENCE PLYMOUTH PUBLIC SAFETY AND CITY HALL PLYMOUTH, MINNESOTA The City of Plymouth had outgrown its public safety building: the department needed more space and an enclosed garage for police vehicles. After assessing the situation, the BKV team took a step back and master-planned the entire municipal site. This new plan incorporates both the public safety department and the city hall into one modern facility. Combining these programmatic elements into the existing city hall unifies the complex and supports the building’s natural setting. The secured squad garage is built into the natural bowl-shaped site, reserving additional city park area as well as providing a necessary security separation of police and staff vehicles. The landscape supports this gesture with native plantings and low stone walls. Plymouth Public Safety Building and City hall received a 2007 AIA Minnesota Honor Award, 2007–2008 Justice Facilities Review National AIA Academy for Justice Knowledge: Citation Award and 2007 Minnesota Pollution Control Agency Governor’s MNGreat! Award. TYPE Public Safety Facility and City Hall SIZE 68,850 SF SCOPE Architecture, Interior Design, Mechanical, Electrical, Structural Engineering, Construction Administration, Landscape Architecture COST $10.8 M OWNER’S CONTACT Michael Goldstein Police Chief Plymouth City Hall/Public Safety 763.509.5160 ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 17  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 18  PROJECT ExPERIENCE TYPE Police Station SIZE 26,000 SF Police Station COST $5.2 M (combined facility) SCOPE Architecture, Engineering, Interior Design, Landscape Architecture, Construction Administration OWNER’S CONTACT Dan Hughes Former Police Chief Shakopee Police Station 612.240.1714 SHAKOPEE POLICE STATION SHAKOPEE, MINNESOTA BKV Group has provided full-service design and construction administration services for multiple projects for the City of Shakopee over the past decade. This work includes a police station, fire station, library, and public utilities facility. The new 26,000 square foot police facility features a multi-purpose training room, drive-through sallyport, detention area, property and evidence storage, squad garage and support areas, investigations and patrol. The site master plan accommodates separate secured access and parking for police vehicles and a future two-level city hall and council chambers. The station received the 2006–2007 Justice Facilities Review Award from the AIA Committee on Architecture for Justice ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 19  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 20  PROJECT ExPERIENCE SHAKOPEE FIRE STATION SHAKOPEE, MINNESOTA From the early needs assessment meeting to the construction of the new 23,000 sf main station, BKV Group worked closely with the fire station task force. The sloped site dictated a multi-level facility with the main lobby, fire administration and training room accessible from the upper plateau. Fire operations and apparatus were designed to be accessible from the lower plateau. TYPE Fire Station SIZE 23,000 SF Fire Station COST $5.2 M (combined facility) SCOPE Architecture, Engineering, Interior Design, Landscape Architecture, Construction Administration OWNER’S CONTACT Marv Athman, Former Fire Chief 952.233.1502 129 Holmes Street South Shakopee, MN 55379 ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 21  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 22  PROJECT ExPERIENCE ROCHESTER NORTH SERVICE CENTER & POLICE STATION ROCHESTER, MINNESOTA BKV Group was hired to assist the Rochester Police Department with determining staffing and operational space needs for the next 15 years and prepared a series of planning options which addressed the department’s needs. The study was developed with continual involvement of the police department, city staff, and the members of the city council to ensure that all stakeholders were aware and well informed in the development of an ultimate solution that best achieved the city’s long-term vision. The preferred planning option called for a northern substation. The city adopted this approach and BKV Group conducted a site feasibility study on an existing building that was offered for sale. Upon completion of the study, the city purchased the property and worked with BKV Group to design renovations and a building addition to the existing structure. Currently under construction, this project has been phased with the sitework and Service Center planned to open in early Feb 2020. The new Police Station will open in summer 2020 providing much needed operational space for the department. TYPE Police Station and Service Center SIZE 61,000 GSF COST Est. $22M SCOPE Architecture, Engineering, Interior Design, Landscape Architecture, Construction Administration OWNER’S CONTACT Sgt. Jon Turk Patrol Division-Community Action Team (CAT) Supervisor Emergency Management Liaison Rochester Police Department 507.328.6920 jturk@rochestermn.gov ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 23  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 24  PROJECT ExPERIENCE ROCHESTER FIRE STATION #2 ROCHESTER, MINNESOTA The Rochester Fire Department’s Station No. 2 was too small and no longer appropriately located. It needed new, up-to-date facilities that would also allow for future growth. After studying the issues and researching the latest design trends, the Rochester Fire Department conducted a national search for a design team and selected BKV Group. The Fire Station has four double-deep drive-through apparatus bays and six dorm rooms with jack-and-jill bathrooms. The station features many training facilities, including a five-story training tower, and serves as an EMS supply depot and hose/ladder testing station for the entire department. BKV Group engaged the Firefighter’s Advisory group throughout the process by bringing them on tours of newly completed fire stations, involving them in the design visioning workshop, and soliciting comments on the size and equipment in each room as well as the preliminary building layouts. TYPE Fire Station SIZE 31,220 SF Four drive-through bays Six bunk rooms COST $7.8 M SCOPE Programming, Planning, Design, Architecture, Interior Design, Structural Engineering Documentation, Construction Administration OWNER’S CONTACT Curt Pronk Administrative Services Manager 507.328.2816 cpronk@rochestermn.gov ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 25  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 26  PROJECT ExPERIENCE HENRICO COUNTY FIREHOUSE #19 SHORT PUMP, VIRGINIA Henrico County selected BKV Group to design a fire station in a neighborhood northwest of Richmond. The County had been using a prototype station for several years, but recently reached the point where it no longer met their needs. In addition, the aesthetics of the prototype were unlikely to satisfy the well-to-do neighbors. BKV Group’s national expertise and innovative fire station planning were major deciding factors during the selection process. The fire station houses full-time staff, with 12 dorm rooms and three apparatus bays. It is LEED Gold certified with a particular sustainable focus on the quality of the interior environment for the firefighters and long-term energy efficiency (33% cost savings over a baseline building). A separate workshop behind the return apron houses the County’s Drone Workshop, where they store and maintain remote controlled equipment and practice using drones in search and rescue operations. Public engagement was very important to the client, as the project was the first for a newly elected County Supervisor. Key concerns of the neighbors included the aesthetic style of the firehouse, noise, landscape screening, and response paths. Subsequent presentations to the community focused on their key concerns with detailed landscape screening discussions and diagrams to show setbacks and response paths. BKV Group matched the materials and basic style of the surrounding neighborhood, taking special care to break up the massing, and brought physical samples of proposed materials to allow the neighbors to see firsthand how they matched those in their own houses. TYPE Fire Station SIZE 12,680 SF Three drive-through bays Twelve bunk rooms COST $5.01 M SCOPE Programming, Planning, Design, Documentation, Architecture, Interior Design, Mechanical, Electrical and Structural Engineering, Construction Administration OWNER’S CONTACT Henrico County, VA Chuck Phan Capital Projects Manager 804.501.4137 Pha002@henrico.us ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 27  PROJECT ExPERIENCE ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 28  PROJECT ExPERIENCE WRIGHT COUNTY/FBI JOINT TACTICAL TRAINING FACILITY BUFFALO, MINNESOTA Through a joint venture between the Federal Bureau of Investigation and Wright County, this new facility includes a variety of essential services to support proper training practices for law enforcement agencies. Four groups of outdoor firing ranges are provided each with appropriate ammunition traps. The new site accommodates a 300-yard sniper range, a 30-lane 50- yard pistol range, a 20-lane 50-yard pistol range, a control tower, and a three sided ‘primitive’ range. The new building includes an Emergency Operations Center, training/classrooms, a use of force training room, a backup dispatch center for the County, locker rooms, vehicle parking and other associated storage. Space is being planned for 6 lane indoor firing range to be added in the future. The second floor of the building provides reconfigurable tactical training space that can be arranged in different ways to accommodate a wide range of active training scenarios. Utilizing simple and durable materials inside and out and designed with security and longevity in mind, this tactical training center should serve both the FBI and County for many years to come with minimal maintenance needed. Construction is expected to commence in Spring of 2019 with expected opening date in 2020. TYPE Law Enforcement Training Facility SIZE 22,000 SF COST $7.39 M SCOPE Architecture, Interior Design, Mechanical and Electrical Engineering, Structural Engineering, Landscape Architecture OWNER’S CONTACT Alan Wilczek Wright County Facilities Services Director 10 2nd St. NW, Room 235 Buffalo, MN 55313 763.682.7382 ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 29  PROJECT ExPERIENCE DETROIT LAKES POLICE STATION DETROIT LAKES, MINNESOTA BKV Group worked previously with the City of Detroit Lakes on a facility assessment and space needs analysis to determine the projected space needs of the Police Department and examine several site options for a new station before being hired to provide architectural and engineering services for the new Detroit Lakes Police Station. The new Detroit Lakes Police Station will be constructed within the city’s downtown district and become an integral part of the City’s long-range master plan for the area. The Police Station will provide much needed office space for administration, investigations, and patrol, along with secure evidence processing and storage. TYPE Police Station SIZE 20,000 SF COST $6.7 M SCOPE Architecture, Interior Design and Specifications, Mechanical and Electrical Engineering, Structural Engineering, Landscape Architecture OWNER’S CONTACT Kelcey Klemm City Administrator City of Detroit Lakes 1025 Roosevelt Avenue Detroit Lakes MN 56501 218-846-7123 (Direct Line) ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 30  PROJECT TEAM BKV Group has assembled a team of key personnel who have the right experience and capabilities to meet your needs as expressed within your RFP and who have worked together frequently on projects of similar size, type, and scope. Our core government team includes Bruce Schwartzman, Mike Krych, Craig Carter, Michael Healy, Maggie Lafferty, Greg Martin, Kyle Olson, Akex Sawka, Chad Kurdi, and Brady Halverson. As a full-service architectural and engineering firm, BKV Group believes in a holistic approach to design services delivery. Our team of architects, engineers, and design professionals regularly work collaboratively, using an integrated technology platform to ensure that our work is well-coordinated and of the highest quality. Our integrated approach fosters strong partnering relationships across all design disciplines and open dialogue with our clients as well. Wenck Associates, Inc. (Wenck) will be on our team as well, providing comprehensive engineering and environmental services. Wenck is a 100% employee- owned Minnesota corporation. We are confident that their experience with land development, bidding assistance, and construction management is ideally suited to this project. Mike Krych Lead Designer Bruce Schwartzman Lead Architect & Police Planner Jared Ward Civil Engineer Wenck Associates Michael Healy, Project Architect Craig Carter Fire Station Planner Chad Kurdi Sr. Electrical EngineerGreg Martin Public Safety Specialist Kyle Olson Sr. Structural Engineer Brady Halverson Landscape Architect Alex Sawka Sr. Mechanical Engineer Margaret Lafferty Sr. Interior Designer Brandon Frazier Director, Security A/V Tech. True North Consulting Group DuWayne Jones Sr. Project Architect ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 31  PROJECT TEAM BRUCE SCHWARTZMAN, AIA LEAD ARCHITECT Bruce Schwartzman has more than 39 years of city and county governmental project experience, with an emphasis on law enforcement centers. Bruce brings his extensive experience in design and planning of public safety facilities. On the majority of his projects he is involved from the early planning process, through design, to owner occupancy – providing continuity from start to finish. Bruce has also been involved in many types of public safety projects involved detailed scheduling, phasing, and the coordination of multiple stakeholders. As a public safety planner, Bruce maintains a continual understanding of current trends and techniques associated with these types of facilities, assisting the client and design team to bring the best solutions to the table. As Lead Architect and Public Safety Planner, Bruce will coordinate communication among the project team and the city, and oversee the project process. EDUCATION // University of Arizona - Architecture REGISTRATIONS // Licensed Architect: MN #27026 YEARS OF EXPERIENCE // 39 PROFESSIONAL AFFILIATIONS // American Institute of Architects | AIA Committee on Architecture for Justice | Minnesota Sheriff’s Association SPEAKING SESSION // “The Need for Secure-Indoor Squad Parking”- 2019 Firehouse Station Design Conference  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), city hall, and public works facility, 184,300 GSF, $48.8M Dayton Fire Station, Dayton, MN – Conditions and Functionality assessment of Stations 1 and 2, Apparatus Assessment, Staffing Assessment, Station Location Study, Programming, Master Planning Detroit Lakes Police & City Hall Study, Detroit Lakes, MN Detroit Lakes Police Station, Detroit Lakes, MN – new, 18,000 GSF, est. 2021, $6.7M Henrico Fire House 19, Short Pump, VA – programming, planning, design, documentation, and CA for new 12,680 SF fire station (three bays, twelve bunks); Firehouse Station Design Awards 2018 Gold Award; LEED Gold Certified New Town Public Safety Feasibility Study, New Town, ND St. Cloud Police Headquarters, St. Cloud, MN – new construction, 110,000 SF, $28M Rochester North Police Station & Service Center, Rochester, MN – $22M, 61,000 GSF Rochester Police Station Study & Master Plan, Rochester, MN – 15,960 SF existing Montgomery Public Safety Building, Montgomery, MN – Programming, planning, design, documentation, and CA for new 23,070 sf fire/ems station (six bays, three bunks, volunteer) and police station, $7.8M estimated Mahtomedi City Hall and Fire Department Needs Assessment, Mahtomedi, MN – programming, existing conditions assessment, site feasibility, planning, and conceptual design for new 16,000 SF fire station (3 bays, volunteer) and city hall Cloquet Assessment and Master Plan, Cloquet, MN – Facilities Assessment and Master Plan of Fire Station, Police Station, City Hall, and Public Works Emily City Hall & Police Department, Emily, MN – feasibility study, renovation, 13,500 SF, $560k Alpena County Sheriff’s Office and Jail, Alpena, MI – new, $14M, 39,000 SF, 106-bed jail, Sheriff’s office, and Sheriff’s vehicle maintenance facility MSU/MCTC, Law Enforcement Training Facility, Center, MN – New Construction, 64,000 SF, $14M Wright County/FBI Joint Tactical Training Facility, Buffalo, MN – EOC, shooting ranges, control tower, backup dispatch, 22,000 SF of building area, $7.39M (est.) Forest Lake Public Safety and Municipal Facilities Master Plan, Forest Lake, MN – Master Plan for City Hall, Fire Station, Police Station, Library, and Public Works ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 32  PROJECT TEAM MIKE KRYCH, AIA LEAD DESIGNER With more than 30 years of experience, Mike Krych has developed a sizable and award-winning body of work. Mike earned the Architect of the Year Award in 2010 from the Minneapolis / St. Paul Business Journal. He has earned numerous design awards from the AIA, the Concrete and Masonry Design Association, the City of Minneapolis CUE Award for Design and Aesthetic Excellence. Mike is a Partner at BKV Group and is one of the firm’s leading designers. As design partner on numerous major projects including the Fridley Civic Campus, Edina City Hall and Police Station, and Rochester Fire Station #2, he has guided those facilities to function well and be sensitive to their neighborhoods and communities. He is dedicated to providing enduring, creative design that fulfills the needs of the client and user, and enriches our environment. EDUCATION // University of Minnesota, Bachelor of Architecture with Honors, Architecture Thesis Award REGISTRATIONS // Licensed Architect: MN #23555 YEARS OF EXPERIENCE // 30 PROFESSIONAL AFFILIATIONS // American Institute of Architects, Minneapolis Chapter, CALA Mentor Program, Minnesota Multi- Housing Association, Urban Land Institute AWARDS // 2010 Minneapolis/St. Paul Business Journal Best in Real Estate Architect of the Year  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), city hall, and public works, 184,300 GSF, $48.8M Rochester Fire Department Station #2, Rochester, MN – Programming, planning, design, documentation, and CA for new 31,220 sf fire station (four bays, six bunks), EOC and dispatch facility, Firehouse Station Design Awards 2015 Gold Award, 2015 FIERO Design Awards Honor Award Shakopee Police Station, Shakopee, MN – New Construction, 26,000 SF Shakopee Fire Station, Shakopee, MN – New Construction, 23,000 SF, $8M Ramsey Fire Station No. 2, Ramsey, MN – study & new construction, 11,540 SF fire station (3 bays, volunteer), $3.5M St. Louis Park Police Station and Firing Range, St. Louis Park, MN – New Construction, 26,000 SF Edina City Hall and Police Station, Edina, MN – New Construction, 87,000 SF, $10.5M Melrose City Hall, Police, Community Center & Library, Melrose, MN – Needs Assessment and New Facility, 2-story, 25,000 SF Minneapolis Second Precinct Police Station, MN – Addition and Remodel Bloomington Fire Station #3, Bloomington, MN Little Canada Fire Station, Little Canada, MN – New Construction, $1.1M Long Lake Fire Station, Long Lake, MN – New Construction, 26,000 SF Maple Grove Fire Station, Maple Grove, MN – New Construction, $1.6M Minneapolis Fire Station #27, Minneapolis, MN – New Construction, 17,500 SF, $1.6M Minnetonka Fire Stations #3, #4, #5, Minnetonka, MN – Prototype Design for three fire stations, 2-story, 7,500 SF each Minnetonka Fire Station #2, Minnetonka, MN Prior Lake Fire Station, Prior Lake, MN – New Construction, $1.7M Coon Rapids City Center, Coon Rapids, MN – City Hall, Police Department, Civic Center, 67,000 SF, $7.7M Eagan Fire Administration Building, Eagan, MN – Fire Administration, Ambulance Services, Training Center, 16,500 SF Eden Prairie Fire Station, Eden Prairie, MN – New Construction, 22,000 SF, $3.4M *Experience prior to BKV Group ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 33  PROJECT TEAM CRAIG CARTER, AIA, LEED AP BD+C FIREMATIC EXPERT Craig has 16 years of experience in architectural design, documentation, and construction administration, including 10 years focusing on public safety and government projects. Craig has worked on more than 40 fire station projects and has won several design awards celebrating the functionality and beauty of his projects. Craig is an expert in the detailed requirements that enable these buildings to be effective tools for their users and he writes and speaks nationally on the subject. He has strong working knowledge of NFPA, OSHA, and other relevant national standards and combines a deep knowledge of the history of fire station design with an up-to-date knowledge of the latest national trends EDUCATION // University of Illinois at Urbana-Champaign, BS in Architectural Studies, Master of Architecture REGISTRATIONS // Licensed Architect: MN #51130 // NCARB #75366 // GBCI #10048669 YEARS OF EXPERIENCE // 16 AWARDS // Henrico Firehouse #19: Firehouse SDA: 2018 Station Design Awards - Statellite Gold // Rochester Fire Station #2: 2015 Firehouse Station Design Awards – Gold Award, 2015 F.I.E.R.O. Design Awards – Honor Award, ENR Midwest Best of 2015 – Public/ Government Projects  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), city hall, and public works, 184,300 GSF, $48.8M Dayton Fire Station, Dayton, MN – Conditions and Functionality assessment of Stations 1 and 2, Apparatus Assessment, Staffing Assessment, Station Location Study, Programming, Master Planning Ramsey Fire Station No. 2, Ramsey, MN – study & new construction, 11,540 SF fire station (3 bays, volunteer), $3.5M Rochester Fire Station No. 2, Rochester, MN – new construction, 31,220 SF fire station (4 bays, 6 bunks), eoc and dispatch facility, $7.8M Henrico Fire House 19, Short Pump, VA – new construction, 12,500 SF fire station (3 bays, 12 bunks), $5.1M, LEED Gold Henrico Firehouse 20, Henrico, VA – Programming, planning, design, documentation, and CA for new 12,800 sf fire station (four bays, thirteen bunks); LEED Silver planned Penn Daw Fire Station 11 Master Plan, Fairfax DPWES Alexandria, VA – Programming, planning, and site feasibility for fire station addition & renovation, 2-story, 15,500 SF existing Woodlawn Fire Station #24, Fairfax DPWES, Alexandria, VA – Addition & Renovation, 15,000 SF, LEED Silver planned Hampstead Volunteer Fire Department Fire Station, Hampstead, MD – programming, planning, and conceptual design for new 35,000 SF fire station (8 bays, volunteer) Mahtomedi City Hall and Fire Department Needs Assessment, Mahtomedi, MN – programming, existing conditions assessment, site feasibility, planning, and conceptual design for new 16,000 SF fire station (3 bays, volunteer) and city hall Lake Zurich Fire Stations Master Plan, Lake Zurich, IL – programming, existing conditions assessment, site feasibility for 4 fire stations Cloquet Assessment and Master Plan, Cloquet, MN – Facilities Assessment and Master Plan of Fire Station, Police Station, City Hall, and Public Works Forest Lake Public Safety and Municipal Facilities Master Plan, Forest Lake, MN – Master Plan for City Hall, Fire Station, Police Station, Library, and Public Works Tucson Fire Department Fire Central, Tucson, AZ* – New 66,000 SF fire administration, fire prevention, and fire station (6 bays, 17 bunks) and 70,000 SF parking garage; LEED Gold certified, Station Style 2010 Bronze Award Green Valley Fire District Station #151, Green Valley, AZ* – New 15,600 SF fire station (four bays, eleven bunks); LEED Silver certified, Station Style 2010 Notable Design *Experience prior to BKV Group ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 34  PROJECT TEAM DUWAYNE JONES, AIA, LEED AP, GGP SENIOR PROJECT MANAGER DuWayne Jones has more than 24 years of experience, primarily with county and state government facilities. As a primary client liaison, his responsibilities include organizing, directing and executing work assignments, monitoring budget, scope and schedule for multiple projects at a time. DuWayne’s experience includes working closely with clients, often involving multiple stakeholders to understand their mission and unique project requirements, and develop architectural solutions that enhance their operational goals. DuWayne will be responsible for overseeing and supporting the production team and assisting in the development of project drawings. EDUCATION // Bachelor of Architecture, University of Minnesota REGISTRATIONS // Licensed Architect: MN #42169 YEARS OF EXPERIENCE // 24 AWARDS // 2019 Firehouse Station Design Awards - Mixed Use Bronze Award  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), city hall, and public works facility, 184,300 GSF, $48.8M Detroit Lakes Police & City Hall Study, Detroit Lakes, MN Detroit Lakes Police Station, Detroit Lakes, MN – new, 18,000 GSF, est. 2021, $6.7M Rochester North Police Station & Service Center, Rochester, MN – $22M, 61,000 GSF Rochester Police Station Study & Master Plan, Rochester, MN – 15,960 SF existing Montgomery Public Safety Building, Montgomery, MN – Programming, planning, design, documentation, and CA for new 23,070 sf fire/ems station (six bays, three bunks, volunteer) and police station, $7.8M estimated Cloquet Assessment and Master Plan, Cloquet, MN – Facilities Assessment and Master Plan of Fire Station, Police Station, City Hall, and Public Works Alpena County Sheriff’s Office and Jail, Alpena, MI – new, $14M, 39,000 SF, 106-bed jail, Sheriff’s office, and Sheriff’s vehicle maintenance facility MSU/MCTC, Law Enforcement Training Facility, Center, MN – New Construction, 64,000 SF, $14M Plymouth City Hall and Public Safety Building, Plymouth, MN – master plan, addition and renovation, 68,850 SF, $10.8M Ramsey Fire Station No. 2, Ramsey, MN – study & new construction, 11,540 SF fire station (3 bays, volunteer), $3.5M Albert Lea City-Wide Facilities Assessment & Master Plan, Albert Lea, MN – programming, existing conditions assessment, and site feasibility for new 28,100 SF fire station (6 bays, 5 bunks), 22,300 SF police station (33 sworn, 2 civilian), 88,300 SF public works, 19,300 SF library, 23,500 SF city hall, airport, PSAP, pool house, community center, ice arena, and park shelter Excelsior City Hall Space Needs Study & Renovation, Excelsior, MN – city hall, study and addition, 11,540 SF Albert Lea Public Works, Albert Lea, MN – Public Works Facility, Remodel, 6,200 SF, $1.4M Wright County Government Center and Courthouse, Buffalo, MN – new construction, 3-story, 155,000 SF, $45M courthouse and 205,000 SF, $48M government center Le Sueur County Justice Center, Le Center, MN – New $36M, 94,000 SF Justice Center including 80 bed jail, courthouse, and Sheriff’s office Carlton County Justice System Implementation and Master Plan, Carlton, MN – justice system analysis, courts case management analysis, judicial system planning, jail programming, jail bed projections, mental health assessments Aitkin County Government Center Study, Aitkin, MN – Courthouse, Jail, Sheriff Station, County Administration Pennington County Study and Justice Center, Thief River Falls, MN – study, new construction, courthouse (2 courtrooms), county jail (20 beds), work release facility (20 beds), and sheriff station (4 sworn, 4 civilian), 60,762 SF, $16M ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 35  PROJECT TEAM MICHAEL HEALY, AIA SENIOR PROJECT ARCHITECT Michael is a skilled technical design professional with more than 10 years of experience on a variety of projects including police, city hall, fire and county government facilities. Michael has a thorough understanding of the operational needs and spatial requirements for law enforcement facilities and their building assemblies. Michael works closely with the entire project team and stakeholders to ensure the project is functional, on budget, and ultimately responds to the client’s goals and operational needs. EDUCATION // University of Minnesota, Masters of Architecture // University of Minnesota, Bachelor of Science, Architecture Minor, Construction Management REGISTRATIONS // Licensed Architect: MN #55378 // OSHA 10-Hour Certification YEARS OF EXPERIENCE // 10  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), city hall, and public works, 184,300 GSF, $48.8M Detroit Lakes Police Station, Detroit Lakes, MN – new, 18,000 GSF, est. 2021, $6.7M Detroit Lakes Facilities Assessment & Space Needs Study, Detroit Lakes, MN Emily City Hall & Police Department, Emily, MN – Feasibility Study, Renovation, 13,500 SF Rochester North Police Station & Service Center, Rochester, MN – $22M, 61,000 GSF Rochester Police Station Study & Master Plan, Rochester, MN – 15,960 SF existing Excelsior City Hall Space Needs Study & Renovation, Excelsior, MN – City Hall, Study and Addition, 11,540 SF Shakopee City Hall, Shakopee, MN – Study and New Facility, 21,000 SF Cloquet Assessment and Master Plan, Cloquet, MN – Facilities Assessment and Master Plan of Fire Station, Police Station, City Hall, & Public Works Dakota County Empire Campus Public Works, Dakota County, MN – addition & Renovation of Public Works Facilities, $12.2M West St. Paul Facilities Needs Assessment, West St. Paul, MN – City Hall, Police Station Brooklyn Center Council Chambers Remodel, Brooklyn Center, MN Albert Lea City-Wide Facilities Assessment & Master Plan, Albert Lea, MN – Facilities Assessment and Master Plan of Airport, City Hall, Library, Fire, Police, PSAP, Public Works, Pool House, Community Center Howard Lake Feasibility Study, Howard Lake, MN – public works, city offices, library, historic city hall, police station Wright County/FBI Joint Tactical Training Facility, Buffalo, MN – EOC, shooting ranges, control tower, backup dispatch, 22,000 SF of building area, $7.39M (est.) Montgomery Public Safety Facility, Montgomery, MN – new 22,370 SF shared facility for the Fire, Police, and EMS Departments; shared spaces include the training room, break room, and locker room/shower area, apparatus bay and office space; police-only squad garage and secure office area, $7.8M estimated West Fargo City Hall and Police Station, West Fargo, ND – Addition & Renovation, 45,000 SF, $8.8M Hennepin County Southside Service Center, Minneapolis, MN – New Construction, $36M Leech Lake Justice Center and Tribal Police, Leech Lake Band of Ojibwe, Cass Lake, MN – New Construction of Tribal Courthouse (2 courtrooms) and Tribal Police, 30,000 SF, $6.3M Le Sueur County Courthouse and Jail, Le Center, MN – Courts, Justice, Master Plan, Addition and Renovation Le Sueur County Public Works Study, Le Center, MN – Master Plan MNSCU Moorhead - Livingston Lord Library, Moorhead, MN – renovation, 130,000 SF, $11M *Experience prior to BKV Group ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 36  PROJECT TEAM GREG MARTIN, EFO, CFOD PUBLIC SAFETY SPECIALIST / RETIRED FIRE CHIEF With more than 36 years of experience, Greg has been well exposed to all aspects of the fire service. He started his career in 1982 as a firefighter/EMT at the Vancouver, Wash. Fire Department. Since then he has been with five fire departments across the country. Prior to joining BKV Group, Greg spent 22 years as a Fire Chief. These include 10 years as the Fire Chief of the Rochester, Minn. Fire Department, two years as Fire Chief of the Sioux City, Iowa Fire Department and 10 years as the Fire Chief /Emergency Management Director for the Lansing, Mich. Fire Department. Greg is adept at budget and capital planning, operations and staffing, project management, labor relations and policy development. Throughout his career, he has been involved in the planning and implementation of 10 fire station remodels or new facilities in Minnesota, Michigan and Washington. Before retiring as Fire Chief of the Rochester Fire Department, Greg worked with BKV Group on the design of Rochester Fire Station No. 2, an award-winning facility completed in 2015. He also serves as an instructor for MN Fire to enhance firefighter health and safety. EDUCATION // Elementary Education, Bachelor of Arts, University of Montana, Missoula, MT // School Psychology, Master of Science, Lewis and Clark College, Portland, OR // Executive Fire Officer Graduate, National Fire Academy, Emmitsburg, MD REGISTRATIONS // Chief Fire Officer Designation (CFOD) from Commission on Fire Accreditation International // Certified HazMat Technician – Environmental Protection Agency // Minnesota Instructor IV // Minnesota Vocational Technical teaching certificate // State of Washington NFPA Level II instructor endorsement // Former National Fire Academy (NFA) Adjunct instructor // Washington State Emergency Medical Technician I YEARS OF EXPERIENCE // 36  RELEVANT EXPERIENCE PROJECTS Kirkland Fire Department, WA – Station 26, Station 24, Station 21 initial planning, Small dorms remodel Station 22, Small dorms remodel Station 27, EOC at Kirkland city hall Lansing Fire Department, MI – Station 44, Station 46, Station 41 major remodel, New EOC at Station 48 Rochester Fire Department, MN – Station 2, Kitchen remodel at Station 1 (minor involvement), Bell Tower Montgomery Public Safety Building, Montgomery, MN – Programming, planning, design, documentation, and CA for new 23,070 sf fire/ems station (six bays, three bunks, volunteer) and police station, $7.8M estimated Four Stations, City of Springfield, Springfield MO – Programming, planning, design, documentation, and CA for four new 7,000 sf fire stations (two bay, eight bunk) Dayton Fire Department Study, Dayton, MN – Conditions and Functionality assessment of Stations 1 and 2, Apparatus Assessment, Staffing Assessment, Station Location Study, Programming, Master Planning Spotsylvania Fire Station #6 Remodel and Addition, Spotsylvania VA WORK HISTORY* Rochester, MN Fire Department April 2008 to 2018 Fire Chief/Emergency Management Director January 1990 to September 1992 Deputy Chief of Training/Planning – Rochester Fire Department. Responsible for training, planning, hazardous materials, information management and safety. Sioux City, IA Fire Department June 2006 to March 2008 Fire Chief Lansing Fire Department May 1996 to June 2006 Fire Chief and City of Lansing Emergency Management Director Kirkland, Washington September 1992 to May 1996 Deputy Chief of Operations - Kirkland Fire Department Responsible for the management of the Operations Division, which delivers fire suppression and emergency medical services. Vancouver, Washington July 1985 to January 1990 Training Chief, Combined Training Division – Vancouver Fire department and Clark County Fire District #5 March 1982 to July 1985 Firefighter/EMT – Vancouver Fire Department Educator September 1976 to March 1982 ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 37  PROJECT TEAM MAGGIE LAFFERTY, CID, NCDIQ SENIOR INTERIOR DESIGNER Maggie has worked on multiple public safety facilities throughout her career. She is a proficient and skilled designer with extensive work experience in government, county, and city interior design and planning. She communicates with clients to develop programming and comprehensive concepts while exploring creative space planning solutions, finish and furnishing selections; and produces drawings, documents, and renderings to portray the intent of the interior spaces. She has worked on multiple Fire Station facilities nationally and locally. Her projects include award winning projects such as the new construction of Rochester Fire Station, and Henrico County’s Short Pump Firehouse 19 in VA. EDUCATION // Bachelor of Science, Interior Design, Brown College, Minnesota REGISTRATIONS // NCIDQ #C02481 // Minnesota Certified Interior Design #C02481 YEARS OF EXPERIENCE // 10 PROFESSIONAL AFFILIATIONS // IIDA, Northland Chapter // NEWH, North Central Chapter // USGBC  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), public works, and city hall, 184,300 GSF, $48.8M Detroit Lakes Police Station, Detroit Lakes, MN – new, 18,000 GSF, est. 2021, $6.7M Ramsey Fire Station No. 2, Ramsey, MN – study & new construction, 11,540 SF fire station (3 bays, volunteer), $3.5M Rochester Fire Station No. 2, Rochester, MN – new construction, 31,220 SF fire station (4 bays, 6 bunks), EOC and dispatch facility, $7.8M Rochester North Police Station & Service Center, Rochester, MN – $22M, 61,000 GSF Steger Village Hall and Police Department, Steger, IL – new construction, 23,000 SF police station (24 sworn, 3 civilian) and village hall, $7.2M Henrico Fire House 19, Short Pump, VA – new construction, 12,500 SF fire station (3 bays, 12 bunks), $5.1M, LEED Gold Henrico Firehouse 20, Henrico, VA – Programming, planning, design, documentation, and CA for new 12,800 sf fire station (four bays, thirteen bunks); LEED Silver planned Plymouth City Hall and Public Safety Building, Plymouth, MN – master plan, addition and renovation, 68,850 SF, $10.8M Cloquet Facilities Assessment and Master Plan, Cloquet, MN – programming, existing conditions assessment, and site feasibility for new 28,600 SF fire station (14 bays, 9 bunks), 24,200 SF police station (27 sworn, 4 civilian), 47,500 SF public works, 19,000 SF library, and 11,400 SF city hall Montgomery Public Safety Building, Montgomery, MN – Programming, planning, design, documentation, and CA for new 23,070 sf fire/ems station (six bays, three bunks, volunteer) and police station, $7.8M estimated Shakopee City Hall, Shakopee, MN – Study and New Facility 21,000 SF Little Canada foFire Station Remodeling, Little Canada, MN – programming, planning, and design for 17,200 SF addition/renovation (4 bays, volunteer) Albert Lea City-Wide Facilities Assessment & Master Plan, Albert Lea, MN – Facilities Assessment and Master Plan of Airport, City Hall, Library, Fire, Police, PSAP, Public Works, Pool House, Community Center, $134,330 Dakota County Empire Campus Public Works, Dakota County, MN – addition & Renovation of Public Works Facilities, $12.2M Four Stations, City of Springfield, Springfield MO – Programming, planning, design, documentation, and CA for four new 7,000 sf fire stations (two bay, eight bunk) Woodlawn Fire Station #24, Fairfax DPWES, Alexandria, VA – Addition & Renovation, 15,000 SF, LEED Silver planned Seven Corners Fire Station #28, Fairfax VA ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 38  PROJECT TEAM KYLE OLSON, PE SENIOR STRUCTURAL ENGINEER Kyle has worked on a broad range of projects throughout his career, with a focus on government facilities. He has done multiple fire station facilities for cities and counties. He is responsible for performing and directing others in the design, evaluation, and retrofit of metal, concrete, masonry, and wood structures. Kyle has design experience in the following industries: bio-fuels, chemical, consumer products, education, food processing, glass, government, pharmaceuticals, refining/terminals/energy, and warehouse/distribution. Duties include preparation of engineering studies, design documents, building and support structure layouts, technical correspondence, engineering and construction cost estimates, and construction bid documents. He is also responsible for supervision of design personnel, final project checking, and communication with clients pertaining to design and construction issues. EDUCATION // University of Minnesota, Bachelor of Civil Engineering REGISTRATIONS // Professional Engineer: MN #48667 // Model Law Structural Engineer // NCEES YEARS OF EXPERIENCE // 12  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), city hall, and public works, 184,300 GSF, $48.8M Detroit Lakes Police Station, Detroit Lakes, MN – new, 18,000 GSF, est. 2021, $6.7M Rochester North Police Station & Service Center, Rochester, MN – $22M, 61,000 GSF Ramsey Fire Station No. 2, Ramsey, MN – Fire Station, New Construction, 11,540 SF, $3.5M Henrico Fire House 19, Short Pump, VA – new construction, 12,500 SF fire station (3 bays, 12 bunks), $5.1M, LEED Gold Henrico Firehouse 20, Henrico, VA – Programming, planning, design, documentation, and CA for new 12,800 sf fire station (four bays, thirteen bunks); LEED Silver planned Montgomery Public Safety Building, Montgomery, MN – Programming, planning, design, documentation, and CA for new 23,070 sf fire/ems station (six bays, three bunks, volunteer) and police station, $7.8M estimated Dakota County Empire Campus Public Works, Dakota County, MN – addition & renovation of Public Works Facilities, $12.2M Lockport Facility Condition Assessment, Lockport IL – Conditions Assessment for Police Station, Public Works Building, and City Hall Shakopee City Hall, Shakopee, MN – Study and New Facility, 21,000 SF Wright County Government Center and Courthouse, Buffalo, MN – new construction, 3-story,120,000 SF, $30M courthouse and 145,000 SF, $42M (est) government center Woodlawn Fire Station #24, Fairfax DPWES, Alexandria, VA – Addition & Renovation, 15,000 SF, LEED Silver planned Penn Daw Fire Station 11 Master Plan, Fairfax DPWES Alexandria, VA – Programming, planning, and site feasibility for fire station addition & renovation, 2-story, 15,500 SF existing Four Stations, City of Springfield, Springfield MO – Programming, planning, design, documentation, and CA for four new 7,000 sf fire stations (two bay, eight bunk) Spotsylvania Fire Station #6 Remodel and Addition, Spotsylvania VA – In progress Steger Village Hall and Police Department, Steger, IL – Municipal, Village Hall, Police Department, Study, 24,000 SF + 6,900 SF Square Car Garage, $7.2M Pennington County Study and Justice Center, Thief River Falls, MN – study, new construction for courthouse (2 courtrooms), county jail (20 beds), work release facility (20 beds), and sheriff station (4 sworn, 4 civilian), 60,762 SF, $16M (in-progress) ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 39  PROJECT TEAM ALEx SAWKA, PE SENIOR MECHANICAL ENGINEER Throughout his 12 years experience as a Mechanical Engineer, Alex has focused on working on government facilities such as fire stations, police stations, city halls, and courts. He is skilled in offering innovative mechanical design solutions to projects and is highly motivated and resourceful individual who interacts productively with people from diverse backgrounds. Alex is a conscientious team player with excellent problem solving and troubleshooting skills. He is able to design innovative solutions that promote maximum efficiency while requiring minimal maintenance. He has experience with projects in many different markets, but his recent notable projects include the Fridley Civic Campus with 24,770 SF fire station and the award winning, newly constructed Henrico County Short Pump Firehouse 19. EDUCATION // Bachelor of Science, Mechanical Engineering, University of Minnesota REGISTRATIONS // Professional Engineer: MN #53200 YEARS OF EXPERIENCE // 12 PROFESSIONAL AFFILIATIONS // (ASHRAE) - American Society of Heating and Air-Conditioning Engineers  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), city hall, and public works, 184,300 GSF, $48.8M Detroit Lakes Police Station, Detroit Lakes, MN – new, 18,000 GSF, est. 2021, $6.7M Henrico Fire House 19, Short Pump, VA – new construction, 12,500 SF fire station (3 bays, 12 bunks), $5.1M, LEED Gold Wright County Courthouse, Buffalo, MN – New Construction, 3-story, 120,000 SF, $30M Plymouth City Hall and Public Safety Building, Plymouth, MN – master plan, addition and renovation, 68,850 SF, $10.8M Le Sueur County Justice Center, Le Center, MN – new, $36M, 94,000 SF Justice Center including 80 bed jail, courthouse, and Sheriff’s office Albert Lea City-Wide Facilities Assessment & Master Plan, Albert Lea, MN – Facilities Assessment and Master Plan of Airport, City Hall, Library, Fire Station, Police Station, PSAP, Public Works, Pool House, Community Center, Ice Arena, and Park Shelter, $134,330 Dayton Fire Department Study, Dayton, MN – Conditions and Functionality assessment of Stations 1 and 2, Apparatus Assessment, Staffing Assessment, Station Location Study, Programming, Master Planning Lincolnshire-Riverwoods Fire Protection District Station #51 Study, Lincolnshire, IL – Existing conditions assessment and space needs for fire station Woodlawn Fire Station #24, Fairfax DPWES, Alexandria, VA – Addition & Renovation, 15,000 SF, LEED Silver planned Henrico Firehouse 20, Henrico, VA – Programming, planning, design, documentation, and CA for new 12,800 sf fire station (four bays, thirteen bunks); LEED Silver planned Lockport Facilities Condition Assessment, Lockport, IL – Facility condition assessment and ADA study of City Hall, Police Department and Public Works Administration Facility Mary Riley Styles Public Library, Falls Church, VA – addition & renovation, 2-story, 6,600 SF addition, $5.2M budget Streamwood Space & Program Study, Streamwood, IL – Functional analysis, programming and master planning of the Village’s facilities including Police Department, Fire Stations, Village Hall, and Public Works Department Hennepin County Conciliation Court Study & Remodel, Minneapolis, MN – study, remodel, $1.97M (est) Seven Corners Fire Station #28, Fairfax VA – In progress ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 40  PROJECT TEAM CHAD KURDI, PE SENIOR ELECTRICAL ENGINEER Chad has 27 years of experience in the electrical industry, and he brings in-depth understanding of electrical to each of his projects. Over the years, he has worked as an electrical engineer, electrician, electrical trainer, and manager. His electrical engineering experience includes drafting, designing, and specifying and analyzing electrical engineering projects for law enforcement facilities, hospitals, data centers, sport arenas, and commercial buildings. Chad’s master electrician work has involved estimating, wiring, and installing and maintaining electrical systems for residential and commercial buildings. He is also an expert in NEC Code, drafting, designing, analyzing, estimating & managing engineering/ construction projects. EDUCATION // Bachelor of Electrical Engineering, Birzeit University // Master of Education, University of Minnesota REGISTRATIONS // Professional Engineer: MN #42678 YEARS OF EXPERIENCE // 27 PROFESSIONAL AFFILIATIONS // (NCEES) - National Council of Examiners for Engineering and Surveying // (IAEI) - International Association of Electrical Inspectors // (MEA) - Minnesota Electrical Association // (IEEE) - Institute of Electrical and Electronics Engineers // MN Board of Electricity  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), city hall, and public works, 184,300 GSF, $48.8M Detroit Lakes Police Station, Detroit Lakes, MN – new, 18,000 GSF, est. 2021, $6.7M Ramsey Fire Station No. 2, Ramsey, MN – study & new construction, 11,540 SF fire station (3 bays, volunteer), $3.5M Henrico Fire House 19, Short Pump, VA – New construction, 12,500 SF fire station (3 bays, 12 bunks), $5.1M, LEED Gold Wright County Courthouse, Buffalo, MN – New Construction, 3-story, 120,000 SF, $30M Le Sueur County Justice Center, Le Center, MN – new, $36M, 94,000 SF Justice Center including 80 bed jail, courthouse, and Sheriff’s office Leech Lake Justice Center and Tribal Police, Leech Lake Band of Ojibwe, Cass Lake, MN – new construction of tribal courthouse (2 courtrooms) and tribal police, 30,000 SF, $6.3M Shakopee City Hall, Shakopee, MN – Study and New Facility, 21,000 SF Albert Lea City-Wide Facilities Assessment & Master Plan, Albert Lea, MN – Facilities Assessment and Master Plan of Airport, City Hall, Library, Fire Station, Police Station, PSAP, Public Works, Pool House, Community Center, Ice Arena, and Park Shelter, $134,330 Dayton Fire Department Study, Dayton, MN – Conditions and Functionality assessment of Stations 1 and 2, Apparatus Assessment, Staffing Assessment, Station Location Study, Programming, Master Planning Lincolnshire-Riverwoods Fire Protection District Station #51 Study, Lincolnshire, IL – Existing conditions assessment and space needs for fire station Woodlawn Fire Station #24, Fairfax DPWES, Alexandria, VA – Addition & Renovation, 15,000 SF, LEED Silver planned Penn Daw Fire Station 11 Master Plan, Fairfax DPWES Alexandria, VA – Programming, planning, and site feasibility for fire station addition & renovation, 2-story, 15,500 SF existing Henrico Firehouse 20, Henrico, VA -Programming, planning, design, documentation, and CA for new 12,800 sf fire station (four bays, thirteen bunks); LEED Silver planned Cloquet Assessment and Master Plan, Cloquet, MN – Facilities Assessment and Master Plan of Fire Station, Police Station, City Hall, & Public Works Lockport Facilities Condition Assessment, Lockport, IL – Facility condition assessment and ADA study of City Hall, Police Department and Public Works Administration Facility *Experience prior to BKV Group ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 41  PROJECT TEAM BRADY HALVERSON, ASLA, RLA LANDSCAPE ARCHITECT Brady’s work includes a broad range of project types including site design, master planning, corridor and transit-oriented development studies, comprehensive and redevelopment planning and process facilitation, and new town planning for both public and private clients. A common thread in all of Brady’s work is an emphasis on sustainability and creation of meaningful places that offer unique design solutions specific to each client’s needs. EDUCATION // Master of Landscape Architecture, University of Minnesota // Bachelor of Arts, Journalism, University of Wisconsin REGISTRATIONS // Professional Landscape Architect: MN #41727 YEARS OF EXPERIENCE // 16  RELEVANT EXPERIENCE Fridley Civic Campus, Fridley, MN – Programming, planning, design, documentation, and CA for new 24,770 SF fire station (6 bays, 8 bunks, volunteer), police station (1 sworn, 1 civilian), city hall, and public works facility, 184,300 GSF, $48.8M Detroit Lakes Police & City Hall Study, Detroit Lakes, MN Rochester Police Station Study & Master Plan, Rochester, MN – 15,960 SF existing Montgomery Public Safety Building, Montgomery, MN – Programming, planning, design, documentation, and CA for new 23,070 sf fire/ems station (six bays, three bunks, volunteer) and police station, $7.8M estimated Alpena County Sheriff’s Office and Jail, Alpena, MI – new, $14M, 39,000 SF, 106-bed jail, Sheriff’s office, and Sheriff’s vehicle maintenance facility Plymouth City Hall and Public Safety Building, Plymouth, MN – master plan, addition and renovation, 68,850 SF, $10.8M Ramsey Fire Station No. 2, Ramsey, MN – study & new construction, 11,540 SF fire station (3 bays, volunteer), $3.5M Albert Lea City-Wide Facilities Assessment & Master Plan, Albert Lea, MN – programming, existing conditions assessment, and site feasibility for new 28,100 SF fire station (6 bays, 5 bunks), 22,300 SF police station (33 sworn, 2 civilian), 88,300 SF public works, 19,300 SF library, 23,500 SF city hall, airport, PSAP, pool house, community center, ice arena, and park shelter Excelsior City Hall Space Needs Study & Renovation, Excelsior, MN – city hall, study and addition, 11,540 SF Albert Lea Public Works, Albert Lea, MN – Public Works Facility, Remodel, 6,200 SF, $1.4M Wright County Government Center and Courthouse, Buffalo, MN – new construction, 3-story, 155,000 SF, $45M courthouse and 205,000 SF, $48M government center Le Sueur County Justice Center, Le Center, MN – New $36M, 94,000 SF Justice Center including 80 bed jail, courthouse, and Sheriff’s office Aitkin County Government Center Study, Aitkin, MN – Courthouse, Jail, Sheriff Station, County Administration Pennington County Study and Justice Center, Thief River Falls, MN – study, new construction, courthouse (2 courtrooms), county jail (20 beds), work release facility (20 beds), and sheriff station (4 sworn, 4 civilian), 60,762 SF, $16M Steger Village Hall and Police Department, Steger, IL – New Construction, 23,000 SF Police Station (24 sworn, 3 civilian) and Village Hall, $7.2M Dakota County Empire Campus Public Works, Dakota County, MN – addition & renovation of Public Works Facilities, $12.2M Leech Lake Justice Center and Tribal Police, Leech Lake Band of Ojibwe, Cass Lake, MN – New Construction of Tribal Courthouse (2 courtrooms) and Tribal Police, 30,000 SF, $6.3M Brookings County Jail, Brookings, SD – $12.8M new 16,275 SF, 80-bed jail addition and 4,800 SF remodeling of existing jail and Sheriff’s office Three Affiliated Tribes Master Plan, White Shield, ND – programming, planning, conceptual design of Elder’s Center, Veteran’s Center, & Community Market Place, 19.3M (est.) ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 42 FIRM INTRODUCTION - WENCK ASSOCIATES, INC. Wenck Associates, Inc. has emerged as a leader by combining civil, environmental, geotechnical, and geologic engineering when developing commercial, industrial, or municipal projects. Wenck is your partner on site development and capital improvement projects related to civil design. We guide you through the early permitting phases and complete the project with civil engineering, design, bidding, and construction management. The company was founded more than 30 years ago in Minneapolis, where it remains headquartered, and now features 14 branch offices in six states strategically located around the country. Today, we have 300+ passionate team members who are dedicated to delivering our public- and private-sector clients outcomes that meet their specific needs and exceed their expectations.  PROJECT TEAM - SUBCONSULTANTS FIRM INTRODUCTION - TRUE NORTH CONSULTING GROUP True North Consulting Group is a professional technology consulting firm serving clients with public and private sector projects, as well as architects and design professionals. The firm is comprised of several multi-disciplinary teams and a depth and experience in Audio/Video, Security, Data, Voice, and Telecommunication systems. TNCG’s consulting services include: • bond program assistance • feasibility studies • programming • needs assessments • conceptual / schematic design • detail design • construction documents • contract administration • professional development TNCG carefully tailors each project team to meet the specific technology and professional consulting needs of our clients. This helps to ensure the highest level of accountability and quality control for work designed, specified, and administered through implementation. Established in 1984 as Elert & Associates, TNCG has over 35 highly qualified consultants specializing in various aspects of technology. Our consultants operate out of eight office locations (Minnesota, Texas, Iowa, Illinois, Florida, South Carolina, Tennessee, and Connecticut) and serve clients throughout the United States. TNCG is privately held and maintains two million dollars of professional liability insurance. Principals include Shane Jacobus, Russ Johnson, and Tony Chojnowski. ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 43  PROJECT TEAM - SUBCONSULTANTS JARED T. WARD, PE SENIOR CIVIL ENGINEER Jared has served as the City Engineer for the City of Rockford since 2013 and has served as the Assistant City Engineer for several other communities. In the past thirteen years, he managed numerous projects for cities, private companies, and agencies. He has experience in the public processes and has been involved in several infrastructure planning, stormwater management, construction projects, and GIS mapping projects. Jared has led numerous infrastructure projects affecting the general public involving local, county, and state infrastructure. He delivers outcomes for clients through his commitment to understanding client goals, ability to apply technical expertise, and strong desire to see clients succeed. clients succeed. EDUCATION // University of Minnesota, Bachelor of Science, Civil Engineering REGISTRATIONS // Professional Engineer, Minnesota, Professional Engineer, Georgia YEARS OF EXPERIENCE // 13 PROFESSIONAL AFFILIATIONS // APWA // CEAM  RELEVANT EXPERIENCE PROJECT EXPERIENCE Wright County/FBI Joint Tactical Training Facility, Buffalo, MN Fridley Civic Complex, Fridley, MN Shakopee City Hall, Shakopee, MN Dakota County Empire Campus Public Works, Dakota County, MN Wright County Courthouse, Buffalo, MN Aitkin County Courthouse Expansion, Aitkin, MN Pennington County Justice Center, Thief River Falls, MN North Mandan Street Improvements Project District 161, Mandan, ND Sandy River Drive Grade Raise, Burleigh County, ND Leach Lake Band of Ojibwe Regional Justice Center, Leach Lake, MN Ramsey Fire Station No. 2, Ramsey, MN Wright County Government Center, Buffalo, MN PROFESSIONAL EXPERIENCE 2012 – Present Wenck Associates, Inc. Principal, Civil Engineer, City Engineer, Project Manager 2006 – 2012 Stantec Consulting Services, Inc./ Bonestroo Staff Engineer/Area Supervisor/Asst. City Engineer AREAS OF EXPERTISE Site Development and Design Street and Infrastructure Design Infrastructure Planning, Maintenance, and (Re)construction Project/Public Facilitation Development Review and Design Public Facility Infrastructure Design Storm Water Management (Quantity and Quality; flood control) *Experience prior to BKV Group ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 44  PROJECT TEAM - SUBCONSULTANTS BRANDON FRAZIER, CTS, DSCE DIRECTOR, SECURITY TECHNOLOGIES Over the past 15 years, Brandon has worked in structured cabling systems, multimedia systems and large venue public address systems before discovering his passion for physical security systems. Brandon specializes in large, complex security projects, full system migrations, master planning and specialty projects like correctional security systems. These include access control, video surveillance, intrusion detection, mass notification, correctional integrated PLC/HMI systems and intercom/public address. Brandon works closely with True North’s risk and vulnerability assessment partners to identify the risks in an assessment, mitigate those risks through design and specification, and to competitively bid and support construction administration and full commissioning. EDUCATION // Dunwoody College of Technology, Sound, Data and Alarm System Design TRAINING & CERTIFICATIONS // Avixia CTS certified, Digital Signage Experts Group DSCE Certified, Biamp Vocia Certified, Milestone XProtect Corporate Advanced Certified, Genetec Security Center Certified, Exacq Enterprise Certified, Axis Certified Professional YEARS OF EXPERIENCE // 15  RELEVANT EXPERIENCE PROJECT EXPERIENCE Wright County/FBI Joint Tactical Training Facility, Buffalo, MN Fridley Civic Complex, Fridley, MN Shakopee City Hall, Shakopee, MN Rochester Fire Station No. 2, Rochester, MN Detroit Lakes Police Department Facility, Detroit Lakes, MN Rochester North Police Station & Service Center, Rochester, MN St. Cloud Police Headquarters, St. Cloud, MN Hopkins Fire and Police Station, Hopkins, MN Grand Forks Public Safety Answering Point, Grand Forks, ND Douglas County, Law Enforcement Center & Dispatch, Alexandria, MN Emergency Management Training Center, Camp Ripley, MN PROFESSIONAL EXPERIENCE 2018 – Present True North Consulting Group Director, Security Technologies 2012 – 2018 Elert & Associates Senior Technology Consultant 2006 – 2012 KJWW Engineering Technology Designer 2005 – 2006 Uponor Wirsbo Residential Fire Protection Designer 2004 – 2005 Master Technology Group Project Manager AREAS OF EXPERTISE Correctional security systems: • Jail Programmable Logic Controllers (PLC) • Human Machine Interface (HMI) • Intercom • Advanced System Integration Command Center Planning and Design. Security Technologies Security Master Planning Security Migration and Cutover Premise physical security systems: • Enterprise Video Surveillance • Enterprise Electronic Access Control • Enterprise Intercom • Advanced System Integration Data and Video Cabling Infrastructure Fiber Optic Systems ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 45 PROJECT APPROACH ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 46  PROJECT APPROACH Understanding of Scope We understand that the City of Elk River is looking for turn-key design process to expand and remodel the existing public safety building for both fire and police operations, along with planning, design and construction of the new fire station. The BKV Group team will include all necessary services for this work including a site confirmation process for the new fire station. That confirmation will include reviewing with the city and fire department possible alternate sites, concept planning to see how a station might be located on the sites, as well as reviewing possible response time impacts based on intended locations. As stated in the RFP there are three distinct projects within the overall project, they are as follows: 1. New Fire Station 3 – construction of approximately a 17,500 SF, 3 bays, a satellite station on the east side of Highway 169. 2. Existing Fire Station 2, Public Safety Facility, add on approximately 3,800 SF for fire station personnel support spaces and expansion of the current training room used for the fire academy and upgrade of current office space, including the expansion and security of the front entrance. 3. Police Department expansion and remodeling in the Public Safety Facility, which will include expansion of indoor parking garage for 26-plus squad cars, as well as interior renovation, and expansion of a 4,000 SF second floor space to improve security and workspace efficiency. In addition, modifications to the main floor secured entrance and changes to existing work stations/roll call areas that were included in the study. The BKV Group team has extensive experience in doing similar work for MN fire stations. While the team has designed many fire stations on new sites, we have also completed a variety of projects that involved remodeling and expansions, while maintaining current public safety operations in place during construction. Currently the team is working on the Little Canada fire station remodeling as well as the Rochester North Police station, both projects involve careful planning with the clients to determine how the new construction needed to occur to minimize disruptions. We have reviewed the 2017 study in depth and are prepared to take the next steps to assist the city, police department and fire department in moving the project forward. We start by reviewing and confirming the information in the study. The team has local and national experience in planning and design of police and fire stations and will bring that expertise to the table to discuss trends and incorporate possible options into the project as appropriate. We will review with you any updates or adjustments in developing a final building program for both facilities. This will be carefully iterated at project workshops until all parties are satisfied that the program captures the current and long-term space requirements for the police and fire departments and can accommodate expected changes indicated by industry trends. The process of designing fire stations and police stations is one of the most specialized in the architecture profession. To be successful, these buildings must function under adverse conditions, provide a comfortable but professional working environment, provide security for the staff, and direct response paths. Perhaps most significantly, they must be designed to provide a high level of performance to the community for 50 years or more. Our senior team members will be involved in the project throughout all phases to maintain continuity and accountability of ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 47  PROJECT APPROACH the proposed project direction to meet these goals. The BKV Group team has designed more than 230 public safety facilities including several shared police/fire facilities. We have completed projects across the nation, ranging from rural station renovations to administration buildings for large urban departments. We also have experience working through a phased construction process while these essential facilities remain fully operational. Through this experience, our team has developed a deep knowledge of national standards and best practices, as well as an appreciation for the different skill sets and unique attributes that make each fire and police department a unique joy to work with. BUILDING A TEAM – MANAGING THE PROJECT – BKV GROUP TEAM APPROACH The BKV Group team measures the success of our projects based on our client’s satisfaction at the completion of the project. These will be your buildings, not ours. To achieve a successful result, we utilize an in-depth collaborative process with our clients, allowing all stakeholders to play an active role from start to finish. We start the process in the kickoff meeting by identifying your goals and expectations for the project. We will meet with each department to review the space program information that was developed in the study. We will confirm current and projected staff, required operational space, and department interactions that promote operational efficiency. This helps to ensure that the project accounts for all required spaces and their organization. It also starts the initial full compass collaboration with the city and staff. Throughout the design process, we schedule a series of workshops in each phase of development to engage the client and review every aspect of planning, design and construction. We review project information with the city’s project team and each department to adjust as needed and address the comments we receive. Requested changes are documented and issued to everyone associated with the project so that all requests are promptly and properly incorporated into the construction documents (CD). This iterative process continues through design development (DD) and into CDs with each aspect of the project discussed at least one workshop, including topics like power and data locations, built in casework requirements, furniture design and collaboration spaces, acoustical separations, light fixture selection, door hardware, etc. At regular intervals, presentations will be made to the city council to update them on the project process as well as to get their input. The community is also kept involved and aware of the activities and direction of the project process. This can be done through several methods including Town Hall meetings. Working in the public sector demands a diligence to schedule and budget compliance and a commitment to a high degree of transparency in decision- making. Without these elements, it is impossible to safeguard the public trust. As with all of our public sector projects, we recommend a five-pronged approach to Project Management for the City of Elk River. BUILD AN EFFECTIVE TEAM & PROJECT UNDERSTANDING We put a great deal of emphasis on establishing a trusting, committed relationship with each client. To build an effective team early in the project we use the kickoff meeting to establish overarching project goals, expectations, and vision. These goals and objectives always include “on-time” and “on-budget,” but also include things like “a building that is truly resilient,” “existing building to remain operational during construction,” or “enthusiastic buy-in from the staff.” Each member of ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 48  PROJECT APPROACH the design team will consciously adopt and internalize these goals, objectives, expectations, and visions so that every decision we make aligns with our client’s best interests. We clearly establish team member roles and responsibilities and publish a list of contact information that can be referenced throughout the project. Finally, we address schedule head-on by identifying all the project milestones and the critical path tasks to establish an overall schedule that does not have to shift out as new information arises. With these components in place, each individual should feel that the team has listened to their concerns and addressed them in a manner most appropriate for the good of the project. MANAGE THE SCHEDULE The schedule established during kickoff meeting an is reviewed at each workshop to update the client on progress and make sure the entire team is working on the precursors for the next critical milestones. Taking schedule a step further, BKV Group has developed a Project Management Plan (PMP), which lists and assigns a duration to each task the design team needs to complete for each phase. This document helps us define the number of staff members needed to complete the work within the project schedule. Based on actual task completion, the PMP is updated throughout the phase and staffing is adjusted if required. The PMPs for every project in the office link together to provide management with an overview of projected staffing trends for the next six months, which informs how we hire or adjust project schedules that are flexible. MANAGE THE BUDGET Our team has had a track record of developing projects that are on budget, we have been successful in doing this through collaboration with the City, Construction Manager and entire design team. Proactive review of the budget is most successful when the estimator can reference more detail in early stages. We utilize Building Information Modeling (BIM) even in the earliest phases. This results in accurate counts of doors, windows, equipment, etc. that tie into a cost estimate. Once a conceptual design and building assemblies are established during schematic design, we use our BIM model with assembly construction cost data to validate the estimate with the CM. The design is then checked in the DD and CD phases to confirm that the budget is maintained. We work with the CM to price what is shown in the construction documents, checking those numbers against material takeoffs from the BIM model and using any discrepancies to tighten our documentation. We also identify with the client and CM possible bid alternates, this allows for flexibility during bidding. This level of detail and strategy has allowed BKV Group to boast of our historic record of projects bidding between 0% and 5% below our estimates. PROVIDE CLEAR AND TIMELY COMMUNICATION Communication is critical to a successful project. We meet with the core team at the start to define a communication plan for the project that includes expectations for meeting frequency, meeting minute dispersal, project update emails, phase deliverables, and public outreach goals and strategies. The communication plan is followed through with the entire design team and reviewed on a regular basis. All phone calls, requests, and emails will receive a response within one business day of their receipt, and all members of the design team are committed to being directly accessible to the owner’s team throughout the project. We use agendas to keep meetings on track and to allow all participants to prepare beforehand, and we use minutes to track options, pros and cons, decisions and action items. The nature of architecture means that a change to any aspect of the project has repercussions for other systems. For each decision, the positives and negatives of each option with regards to cost, durability, energy ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 49  PROJECT APPROACH use, aesthetics, functionality, acoustics, sustainability, etc. will be clearly communicated to allow the project team to make data-driven decisions. The objective is for the client to understand every aspect of the plans, from size of the front door to color of tile, so that the project meets client expectations. COMPREHENSIVE QUALITY CONTROL REVIEW At BKV Group, we have integrated all disciplines for architecture, engineering and interior design – all are networked together on one computer system. Any modifications or changes made by one discipline are automatically communicated to the other disciplines by the system. This optimizes our internal communication and results in well-coordinated, complete sets of bidding documents. In addition, BKV Group uses a thorough inter-disciplinary checklist that identifies the deliverables in each design phase along with any agency submittals required. It lists items to be coordinated between disciplines, poses questions from owners, and structures our internal process. Technical reviews are conducted at the end of each phase by senior staff members unaffiliated with the project. They leverage their long experience to examine the clarity, completeness and technical quality, “construct-ability,” and “bid-ability” of the documents. Peer reviews are conducted within each discipline as a final coordination step. Review comments are integrated back into the BIM model through our software packages to seamlessly communicate to the entire design team. As a strict BKV Group policy, no construction documents are issued for bid until they have been scrutinized by our technical review process. Our success record speaks for itself; our historical record shows that we have held design-team change orders to less than 1% of construction cost. Approach to Design Process RESEARCH INTO YOUR ORGANIZATION BKV Group’s approach to police and fire station design, at its core, is defined by research. We understand that one size does not fit all, facilities need to be designed specifically to each client’s operations and site specifics. To provide a station design tailored for each particular location, we will research your organization in depth to understand your policies, procedures, and goals. We will tour the current station and potential sites to become familiar with the opportunities and challenges. Part of our approach is to tour newer police and fire stations in the area with the client team. This involvement and collaboration helps to see and identify aspects of projects that would or would not be desired in your projects. We take pictures and notes during the tours and debrief with the team to review that various aspects identified in the tours. Staff communication and involvement is another consideration during the process. Finding and retaining staff continues to be a challenge in most communities, we have found that this involving and communicating with all of the police and fire staff in the process has value. There are a variety of ways we can engage and involve your staff, some are; tour debrief meetings, electronic surveys to solicit input on the features, elements and amenities that are deemed necessary or desirable, as well as group meetings. ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 50  PROJECT APPROACH We will discuss with you any updates or adjustments we might recommend and jointly create a final building program. This will be carefully iterated at project workshops until all parties are satisfied that they capture the current needs of the police and fire departments and can accommodate the expected changes indicated by the industry trends. law enforcement and fire/EMS are natural partners for a co-located building. Both operate 24/7, both need resilient facilities, and both show up to many of the same calls for service. Many rooms and spaces can be shared, saving project cost. Some of these spaces are Lobby, Public Restrooms, Training Rooms, Conference Rooms, and Mechanical Spaces. In addition, the interactions between police and firefighters during the day helps to build camaraderie, which pays dividends when you are working together in the field under adverse conditions. There are several design considerations that are important in designing police and fire facilities. These include: • Design for Diverse Staff: Police and fire departments must continually adapt to the changing demographics of diverse religions, lifestyles, and gender among their staff. • Accessibility: Recent rulings by the Department of Justice have made it clear fire stations are expected to fully comply with the Americans with Disabilities Act (ADA). This raises many nuanced challenges and opportunities. • Renewed Focus on Camaraderie: To promote team building, our designs place a high value on communal spaces and a soothing environment to allow decompression after critical calls. • Health and Welfare: Making things as safe as possible for police and firefighters is the main priority in these facilities. This includes separating clean and dirty areas to minimize cross-contamination of carcinogens, an appropriate design to include state-of-the-art decontamination equipment, workout facilities, and a soothing environment for decompression after critical events. • Security: Making sure security is created on the exterior and interior of facilities is important. This is done through proper camera placement, door controls as well as security/defense type barriers at appropriate locations. • Reliability through Storms and Security Threats: It is critical that in times of disasters that police and fire facilities remain operational. In order to do so, we collaborate on a plan that among other things includes adequate back up power and storm safe areas. The goal is a resilient facility design can support the city and region in maintaining police and fire services • Built-in Training Opportunities: The incorporation of training opportunities can vary in scope from a dedicated training tower with a switchback stair and rappelling tie-off points, indoor shooting ranges to a just a simple reinforced section of parapet for laddering drills, we work to design what’s appropriate for your needs. Many of these built in training features can be utilized by both police and fire. DESIGN AND CONSTRUCTION PHASES SCHEMATIC DESIGN PHASE As the project moves into design, we will begin by analyzing the sites, looking at zoning restrictions, utility access, general topography and stormwater issues, ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 51  PROJECT APPROACH sustainable opportunities, proper squad and apparatus circulation, etc. We will devote a significant amount of energy to solving site circulation issues. Separating squad/apparatus circulation from the general population is a priority to avoid accidents that delay response times and to avoid damage to expensive vehicles. This requires an obvious entry/exit point for civilian cars and a self-evident building entry near any community-use spaces to assist in wayfinding. The topography of the sites and various storm water management options need to be analyzed to make sure the solution is cost-effective. A plan for building expansion can be accommodated if required. Finally, the locations of utility access points will be reviewed and an estimate of costs to extend them to the building will be provided for the project budget. We will present multiple options to the team, pointing out the strengths and weaknesses of each with regards to aesthetics, due diligence issues, functionality, constructability, sustainability, and financial feasibility. Through this process we will begin to arrange the program areas into a fit plan. Sometimes called a block diagram or an adjacency plan, the fit plan shows all the programmatic spaces, interior and exterior, on the site and adds walls and corridors to establish a conceptual plan that can be analyzed for internal response times, acoustic separations concerns, ease of distribution for mechanical engineering and plumbing (MEP) systems, optimal solar orientation, etc. Using our building information modeling (BIM) system, we can output some preliminary information on Energy Use Intensity (EUI) for the buildings and simulate how different massing or orientation approaches affect the long-term energy costs of the facility. The team will explore and present a variety of ways to organize the building to make sure we are achieving the optimal design for these specific projects. We will then discuss those options with the owner’s team, pointing out the strengths and weaknesses of each with regards to aesthetics, functionality, constructability, sustainability, and financial feasibility. As we make refinements to the plans to meet owner requests, we will begin to explore exterior design options. The program spaces can be grouped and shaped into a variety of different exterior designs, with styles ranging from very traditional to very modern; from very clean and simple to very detailed and complex. As always, the city will be presented with many options to review, and we will help to organize the discussion by pointing out the impacts to maintainability, constructability, sustainability, and financial feasibility. These schematic concepts will be updated and iterated through collaboration with the owner over multiple workshops until the optimal solution is reached and is estimated to be within budget. Cost estimating is made easier through our robust BIM model, which can output precise quantities for systems-based takeoffs. We will use our virtual reality system at intervals to communicate the character of the proposed spaces and the workflows the police officers and firefighters will be experiencing on a daily basis to make sure the owner’s project team is comfortable with the design. At the end of the phase, we can utilize the Virtual Reality system at a community open house or town hall meeting to communicate to the citizens exactly what is proposed. The schematic design deliverable will include grading and utility plans, stormwater plans, landscape plans, architectural site plans, floor plans, elevations, structural plans, narratives about MEP systems, 3D renderings, a cost estimate, and a code review. ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 52  PROJECT APPROACH DESIGN DEVELOPMENT PHASE Throughout the DD phase, BKV Group will conduct a series of workshops guiding the owner through the process of selecting mechanical systems, selecting finishes and equipment, planning all of the casework, picking plumbing and lighting fixtures, etc. At each workshop and for each topic we will discuss how the proposed options will impact police operations or fire operations and what specific workflows are supported. We will finish the building energy model and begin to output information about optimal insulation thicknesses, lifecycle savings from daylighting, anticipated energy costs, etc. Other sustainable approaches will be discussed and confirmed. We will finalize all of the engineering designs, including the integration of altering/ dispatching equipment, to conform with city standards and the latest code requirements. We will assemble product cut sheets of each proposed material and equipment to be clear about the design intent, and we will assemble a specification document for your review. Spaces with an elevated interior design, like a training room, or complicated integration of many building systems, like an apparatus bay, can be modeled in great detail and exported into a 3D spin around that the city can use to understand the fine-grained details proposed for the space. These code assessments will be reviewed in detail with the appropriate regulatory agents to ensure mutual interpretation. We will meet with Xcel Energy to help the city through the design assist process to make sure that the project can take full advantage of the rebates offered. We will update the city council and the residents about project progress. At the end of the phase, BKV Group’s in-house quality assurance (QA) team will review the design development deliverables just prior to the end of the phase to catch any discrepancies and ensure a well-coordinated set. We will meet with the owner’s project team to discuss any final comments before getting notice to proceed into construction documents. Our design development deliverable will include grading and utility plans, stormwater plans, landscape plans, irrigation plans, architectural site plans, floor plans, fixtures, furnishings and equipment (FF&E) plans, reflected ceiling plans, elevations, wall sections, interior elevations, door/window schedules, interior finish plans, foundation plans, roof framing plans, mechanical plans and schedules, plumbing plans and schedules, electrical plans and schedules, and communications plans and schedules. In addition, we will include a code review, up-to-date renderings, a detailed cost estimate, a description of potential cost- control alternates, cut sheets for all the equipment, materials, and products planned for the station, and a draft specification. Finally, BKV Group has a tremendous value-added feature to ensure that the design will serve the needs of police and firefighters. We utilize virtual reality software that allows a police officer of firefighter to “walk” through the designed facility to ensure that the design reflects the desires and needs of public safety personnel. CONSTRUCTION DOCUMENTS PHASE During this phase, we thoroughly develop the final drawings and specifications to illustrate in detail the requirements for construction. We will resolve the last few outstanding questions in workshops with the owner, but much of the time is ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 53  PROJECT APPROACH spent ensuring that the documents include all the details necessary to make the buildings truly functional. This is also the phase where the design team will work with the Construction Manager to create a strategy for bidding, including the inclusion of bid alternates and refining the phasing plans and narratives to make sure that the Public Safety building can stay operational during renovation. BKV Group will submit progress sets at 50% and 95% for review by the client team. All comments will be resolved and incorporated into the final deliverable. At 95% completion our last round of Quality Assurance will be conducted. This consists of in-depth review by our in-house QA team as well as a constructability review by our CA staff. Engineering designs and calculations will be peer-reviewed by senior staff unaffiliated with the project but familiar with Fire Station design. The exterior envelope will be analyzed by an outside specialist to confirm product compatibility, proper flashing, and overall system performance. BIDDING AND PERMITTING We will assist the city during the bid process by conducting a pre-bid meeting and site tour, answering contractor questions, reviewing substitution requests, and preparing Addenda. We will help the city and the CM evaluate the bids. Simultaneously we will diligently work through the permitting process so construction can commence promptly. CONSTRUCTION ADMINISTRATION AND CLOSE-OUT PHASE During construction, BKV Group will conduct bi-weekly site observations and prepare field reports documenting the progress and any issues that arise. We will diligently review the schedule at each meeting to head-off any issues before they compound into delayed occupancy. We will monitor special inspection and material testing reports to be able to quickly respond to any inconsistencies. We will also attend pre-construction meetings to represent the owner’s interests and ensure compliance with design intent. Many of the more sophisticated Construction Managers have the capability to take our BIM model and use it to improve their shop drawings and their coordination in the field. We would be happy to work with them to make that model available. BKV Group strives to maintain a cordial relationship with subcontractors so that all parties are working in the best interests of the project instead of trying to protect themselves from attack. Unsatisfactory work must be redone, but BKV Group will work with the subcontractor to minimize their cost impact and we maintain an open mind when the subcontractor offers suggestions or alternatives. The full design team will be available for ongoing communications and will participate in the review of submittals, substitution requests, and Requests for Information (RFI). We will review pay applications and lien waivers to make sure that the project is moving forward at the same rate that the money is being dispersed. Above-ceiling MEP punch lists, substantial completion, and final completion reviews will be conducted by key team members from each discipline. Project close-out tasks, including warranty reviews, as-built reviews, record drawings, an 11-month walkthrough, etc. will be completed with the same aggressive dedication to schedule and client service that the rest of the project receives. ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 54  BUILDING INFORMATION MODELING & VIRTUAL REALITY A TECHNOLOGY-INFUSED PROCESS Shared Information Modeling. BKV Group uses 3D building information modeling (BIM) as its default process to develop conceptual documents at the early planning stages through final construction documents for all our projects. As a fully integrated architectural/engineering team, our process includes structural, mechanical, plumbing and electrical using the same model. As our primary design tool, BIM offers our project team the ability to immediately see the implications of their decisions in 3D and to easily coordinate the various disciplines so ducts and steel beams aren’t occupying the same space, for instance. The result is that the project team has a much better opportunity to understand the project, weigh its pros and cons and evaluate the design. All BIM software is designed to include (or easily tie into) green building analysis tools that model energy usage against standard benchmarks, providing an early estimate of energy costs. By factoring in latitude and longitude and incorporating “typical meteorological year” data for weather estimates, these kinds of analyses provide energy use estimates precise down to the hour for the selection of mechanical equipment, baseline code approval, and verification for third-party certification organizations. These tools also allow the design team a way to “tune” the building for lifecycle optimization of strategies like shading devices or window transparency that have a positive effect during cooling season but a negative effect during the winter. Virtual Reality. We have incorporated in our design process a transformative technology - Virtual Reality. This tool utilizes the 3D BIM model we develop (no extra or parallel work/time) and allows us to better decipher a client’s expectations, everything from a building’s natural lighting to the choice of color or materials that can be actively assessed at any point in the design and construction process. This is particularly important for public safety projects – reviewing movement and flow of staff and equipment for efficiency – an invaluable tool. Construction Sequencing. BKV Group will share its BIM model with the owner’s construction manager to develop the construction sequencing schedule. This is especially important with the complexity of this project with multiple phases and maintaining operations of the existing facility. Working in this way is enormously helpful when it comes to planning work to ensure it is safely, logically and efficiently sequenced. Being able to prototype how assets come together before ground is broken on site allows for feedback at an early stage and avoids wasteful and costly on- site design co-ordination and rework. Cost. In conjunction with the construction manager, we will utilize the components of the information model to provide quantities to extract cost information. The benefits of a costing approach linked to a model include the ability to easily see costs in 3D form, get notifications when changes are made, and the automatic counting of components/systems attached to a project. The accuracy of any cost calculations is, of course, reliant on the data produced and shared within the common data environment. The CM’s quantity surveyors and estimators will check the accuracy of information and will help to interpret and fill information “gaps”. The benefit to extrapolating cost from the information model is the fact that the data can be queried at any time during a project and the information that feeds cost reports is regularly updated. This ‘“living” cost plan helps teams design to budget and because cost managers are engaged from the start of a project this allows for faster, more accurate reporting of costs at the early stages of a project. Compare this to a traditional approach where a cost manager’s report may be updated a few times during the early stages of a project with completed designs only fully costed at the end of the project team’s design process. BIM - Project Lifecycle Information. Owners and taxpayers have traditionally been focused on the upfront capital costs of construction. Shifting this focus to better understand the whole-life cost of assets, where most money is proportionately spent, should make for better decisions upfront in terms of both cost and sustainability. This is where ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 55  BUILDING INFORMATION MODELING & VIRTUAL REALITY 6D BIM comes in involving the inclusion of information to support facilities management and operation to drive better business outcomes. This data might include information on the manufacturer of a component, its installation date, required maintenance and details of how the item should be configured and operated for optimal performance, energy performance, along with lifespan and decommissioning data. If requested by the city, BKV Group would work with the city to help you turn the tool into a lifecycle management solution for your building. A variety of software tools such as Ecodomus, FM Systems, and Navistools directly tie into the BIM database and provide a system for running a building automation system, which will adjust the HVAC system based on temperature, CO2 levels and occupancy; coordinate light levels where daylight sensors are present; lock and unlock doors based on when the building or room is open to the public; raise and lower blinds to reduce glare; etc. These data points can be easily incorporated in an employee incentive program to help the municipality become more sustainable, or can even be published on a website to allow citizens or researchers access to building performance metrics. ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 56  QUALITY ASSURANCE PROCESS For BKV Group, quality assurance is more about a process than an applied program. We believe that a full-services approach to the design process and continuity of team leadership are fundamental principles to successful quality assurance. Having our engineers in-house provides a unique collaborative environment where the exchange of knowledge among design professionals occurs organically and is not limited to coordination meetings. Continuity of team leadership throughout the process supports our approach. Teams are organized horizontally among design disciplines, and vertically for team leadership roles, supporting interdisciplinary team cohesion and a continuous point of contact for the owner from programming through to post occupancy. Engineering Peer Review. BKV Group believes in the peer review process. All BKV projects integrate peer review for mechanical, electrical and structural designs. Peer review reports are distributed to the entire project team for review and comment. Peer review design recommendations are then considered holistically alongside potential cost impacts and life-cycle savings. First Level Quality Assurance. Since 1978, we have developed and continue to evolve a system of project checklists specific to each phase of project development. These lists have been developed by both success and failures and are organized based upon stage of development of the project with clearly identified task team member responsibility and cross coordination. Checklists are dispersed team wide and referenced weekly during the documentation phase for coordinated assessment of completed items. Checklists are included with the QA report provided with design submissions to our clients. Second Level Quality Assurance. Our managing architect logs all project related issues and design comments identified throughout the process and track the resolution. A Revizto project database is linked to the Revit models for each project and shared with the entire team through the cloud. All project team members are connected via Revizto which operates both inside or outside of the Revit platform. Clash detection reports generated at each CD phase are imported directly into Revizto project database. Comments specific to the BIM model are easily tracked and logged through Revizto with reports generated and reviewed and weekly coordination meetings. To engage our Client, Revizto supports virtual walk-throughs of the Revit model to ensure the Customer Agency has a visual understanding of exactly what building will entail. This benefits all parties and supports accountability. Third Level Quality Control. Prior to each milestone design submission, a quality assurance review is performed by our independent quality assurance team. Our team is led by Steve Singer AIA and includes a former builder and code official. The documents are reviewed for code compliance, life safety, technical quality, “construct-ability,” and “bid-ability.” Their quality assurance reports are provided to the managing architect for integration into the design and is included in our design report to the owner. Utilizing Bluebeam, all checklists, peer review and QA reviews are completed digitally. No document scanning! This allows posting and seamless sharing of QA documentation with clients and design partners. ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 57  SCHEDULE REVIEW Project Schedule There are different schedule approaches that can be taken to accomplish the work required for the remodeling & expansion of The City of Elk River’s Public Safety Facility and new Fire Station No. 3. One option would be to spend the 10 to 12 months completing all of the planning and design work, in that approach the preliminary schedule might be as follows: • Site & Program Confirmation – 4 to 6 weeks • Schematic Design – 9 to 12 weeks ◦Review Period – 2 weeks • Design Development – 10 to 14 weeks ◦Review Period – 2 weeks • Construction Documents – 12 to 16 weeks ◦Review Period – 2 weeks • Bidding & Award Phase – 6 to 8 weeks In this approach the project would be ready to issue documents for bidding in approximately 40 to 50 weeks, roughly in January or February 2021. FAST TRACK Another option would be a fast track approach, in which construction begins in the summer/fall of 2020, saving time and project cost. The BKV Group team has done many resent phased projects that have been done with construction managers using a fast track approach. Some resent projects have been Pennington County Justice Center, Le Sueur County Justice Center, and the Rochester North Police Station. In this approach the approximate schedule might be: • Site & Program Confirmation – 4 to 6 weeks • Schematic Design – 9 to 12 weeks ◦Review Period – 2 weeks • Design Development - 10 to 14 weeks ◦Review Period – 2 weeks • Construction Documents – 12 to 16 weeks ◦Issue site prep, foundation, structural system for bids – 4 to 6 weeks after start of the construction document phase ▪Review Period – 2 weeks • Bidding & Award Phase – 6 to 8 weeks • Construction Phase ◦Start construction of Fire Station No. 3 and foundation / structure for Public Safety Facility – starts around October 2020 The Fast Track approach could save approximately three to four months in the overall project schedule. The other aspect of scheduling your project that needs to be thoroughly reviewed will phasing construction and remodeling of the Public Safety Facility to maintain operations. For this work, based on our experience with similar projects we would anticipate the following: • Build new additions for fire & police • Move operations to new addition or adjacent areas to allow for remodeling • Remodel existing areas • Move into completed project Once final schematic plans are developed and approved, strategies for phasing can be better evaluated. Another topic that has schedule impacts is weather the Public Safety Facility and Fire Station No. 3 bid as one project, or based on locations are handled separately. There could be some economics of scale in bidding and construction all the work as one project. We will work with the city and Construction Manager in evaluating the options cost and time with each. However, as we start the project with you and the Construction Manager we will work with the team to identify which approaches would be best for the city and develop a detailed schedule identifying all deadlines, meetings, council meetings, etc. ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 58  SUSTAINABILITY Sustainable Design BKV Group recognizes the positive impact an environmentally-sensitive building can have on the people who work and visit it. We also know that an environmentally sensitive building can reduce operating costs and energy consumption, and position our clients as leaders in community responsibility. This type of development promotes buildings and facilities that are livable and supports a commitment to environmental stewardship and conservation. BKV Group has LEED-accredited professionals in the architectural, engineering, interiors and specification disciplines, including project leaders in each discipline. Numerous projects have been designed to LEED standards. Beyond designing sustainably as good standard practice, BKV Group has also designed projects following B3 guidelines, Enterprise Green Communities criteria, and the National Green Building Rating Standard among others. Sustainable design is a comprehensive strategy to create buildings and sites that minimize the use of resources and reduce harmful effects on occupants and the environment. It is an integrated and synergistic approach in which all phases of the facility lifecycle are considered. The result is an optimal balance of cost, environmental, societal and human benefits, which meet the owner’s mission and function for the facility. A successful holistic sustainable guideline prioritizes the strategies for an individual project on a case-by-case basis to reflect the community it serves and is not additive, but needs to be integral to the project. Our team provides detailed documentation that helps maintain strategies and overcome the challenges presented by a rapidly changing field of sustainable products, resources, suppliers, building science, and evolving energy & building codes. To further our commitment to sustainable design, education and implementation, BKV Group is a proud member of the United States Green Building Council (USGBC) and a signatory on AIA’s 2030 Commitment. We promote innovative and progressive designs that are environmentally responsible, profitable and healthy places to live and work. BENEFITS OF SUSTAINABLE DESIGN INCLUDE • Enhanced building durability • Enhanced occupant comfort • Energy and water savings • Reduced maintenance and operating costs • Conservation of natural resources • Minimization of waste and pollution • Prepared for future legislation • Positive public image • Improved climate resiliency ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 59  AWARD-WINNING DESIGN Awards & Recognition BKV Group has a long history of award-winning designs that meet budget and scheduling constraints while contributing to the community. We take pride in our work and the work of individual staff members that has achieved local and national recognition for excellence in design, historic preservation, and use of technology. Our designs are not copies of previous work, they are individual and represent each client’s specific goals and community. Good design does not mean increased project cost. Good design involves a creative design team that is committed to exploring more options with the client. As testimony to this, BKV Group has been the recipient of numerous local, regional and national awards for design excellence. Fridley Civic Campus 2019 Firehouse Magazine Station Design Awards, Bronze Award, Mixed Use Category Henrico County FireHouse #19 2018 Station Design Awards - Satellite Category Rochester Fire Station No. 2 2015 FIERO Fire Station Design Awards: Honor Award 2015 Firehouse Station Design Awards: Gold 2015 ENR Midwest Best Projects: Award of Merit Government/Public Building Pine County Justice Center, Pine City, MN 2012 AIA Academy of Architecture for Justice Publication in Justice Facilities Review and Display in Traveling Exhibit Ramsey Municipal Center, Ramsey, MN 2011 AIA/AAJ Justice Facilities Review, AIA Academy of Architecture for Justice One of 24 projects selected nationwide for publication MCTC/MSU Law Enforcement Training Center 2011 FAB Award for Government/Institutional St. Cloud Police Station 2008–2009 National AIA Academy for Justice Knowledge Honor Citation Plymouth City Hall and Public Safety Building 2007 American Institute of Architects, Minnesota Chapter Honor Award 2007–2008 National AIA Academy for Justice Knowledge Honor Citation 2007 Minnesota Pollution Control Agency Governor’s MNGreat! Award Shakopee Police Station 2006–2007 National AIA Academy for Justice Knowledge Honor Citation Edina City Hall and Police Station 2006–2007 National AIA Academy for Justice Knowledge Honor Citation 2006 Minnesota Concrete and Masonry Contractors Association 2006 Excellence in Concrete and Masonry Design and Construction 2005 International Interior Design Association Northland Chapter Honor Award 2005 American Institute of Architects Minneapolis Merit Award Freeborn County Government Center 2006–2007 National AIA Academy for Justice Knowledge Honor Citation 1994 City of Minneapolis Committee on Urban Environment 1994 CUE Award for Design and Aesthetic Excellence Minneapolis Second Precinct Police Station 1994 City of Minneapolis Committee on Urban Environment 1994 CUE Award for Design and Modification of a Historical Facility Fridley Municipal Center 1990 Minnesota Concrete and Masonry Contractors Association 1990 Honor Award for Excellence in Masonry Design and Construction Minneapolis Third Precinct Police Station 1986 City of Minneapolis Committee on Urban Environment 1986 CUE Award: Design & Aesthetic Excellence Architectural Design Services and Construction Evaluation Form (Must have a minimum of 2 facilities in the past 5 years) Evaluator:_______________________________________Graded on a scale from 1 to 5 Years of experience designing public Estimate of Preparation of safety facilitiesconstruction costsillustrated materials Overall presentation Firm NameFees $746,700 RE $21,100 Alliiance50 YearsNot included11 $558,000 RE $25,000 BKV Group42 YearsNot included18.5 $728,819 RE $1,200 Brunton Architects13 YearsNot included12 $598,000 RE $5,800 Buetow 2 Architects15 Years$8,600,00016 $636,250$636,250 RE $6,000RE $6,000 CNH ArchitectsNot included11 $300,000 RE $3,000 Collaborative Design Group45 YearsNot included11.5 Not listed, 6.9% of Five Bugles DesignNot completely listed8 $637,000 $$1,600 HMA Architects22 Years$9,300,00013 $486,000 RE $10,500 Kodet Architectural Group30 Years$7,200,00010 $558,203 RE $4,500 Leo A Daly20 Years$8,451,75216 $944,900$944,900 RE $27,400RE $27,400 TKDA110 years13 $463,500 RE $18,000 Wold Architects and Engineers52 Years$7,000,00012