Loading...
2.6 ERMUSR 04-14-2020UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Tom Sagstetter Conservation & Key Accounts Manager MEETING DATE: AGENDA ITEM NUMBER: April 14, 2020 2.6 SUBJECT: 2019 Annual Distributed Generation & Cogeneration Report ACTION REQUESTED: Receive and file the 2019 Annual Distributed Generation & Cogeneration Report BACKGROUND: Compliance with Minnesota Statutes 216B.164 Cogeneration and Small Power Production, and Minnesota Statutes 216B.1611 Interconnection of On-Site Distributed Generation, requires the ERMU Commission to receive the Annual Distributed Generation & Cogeneration Report. DISCUSSION: Staff prepares and submits an annual update to the Minnesota Public Utilities Commission that details the Distributed Energy Resources (DER) and Cogeneration Systems activity within the ERMU service territory. The information provided in this filing includes utility contact information, number and types of existing systems, systems that have applied for interconnection, and systems that have been removed from service. The attached document summarizes the existing systems that are currently connected to the ERMU distribution system. ERMU does not have any applications pending for interconnection and no systems were removed in 2019. ATTACHMENTS: 2019 Distributed Generation & Cogeneration Report ______________________________________________________________________________ Page 1 of 1 50 2019 DISTRIBUTED GENERATION & COGENERATION SOLAR CUSTOMER FACILITY PRODUCTION CONSUMPTION NUMBERCAPACITY (kW)YEAR INTERCONNECTED(kWh)/year(kWh)/year Customer 352019 3,059 354,700 Customer 413.32017 13,250 13,655 Customer 552002 4,600 36,191 Customer 617.7552019 6,465 30,430 Customer 76.272016 6,998 8,068 Customer 811.42017 12,410 17,681 Customer 911.882019 4,778 15,821 Customer 105.132016 4,776 25,216 Customer 119.482008 7,913 15,390 Customer 1217.282017 15,745 2,018 Customer 137.52019 - 12,929 Customer 1552020 - 7,142 Total 79,994 539,241 WIND CUSTOMER FACILITY PRODUCTION NUMBERCAPACITY (kW)YEAR INTERCONNECTED(kWh)CONSUMPTION Customer 1430Prior to ERMU ServiceN/A 23,900 Total - 23,900 Wheeling CUSTOMER FACILITY DELIVERED NUMBERCAPACITY (kW)YEAR INTERCONNECTED(kWh) Customer 1 670.002001 640,200 Customer 2 3,200.002002 24,543,544 Total 25,183,744 51