Loading...
8.2 SR 04-20-2020City of Qk*l River Request for Action To Item Number Mayor and City Council 8.2 Agenda Section Meeting Date Prepared by General Business April 20, 2020 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Professional Services for Orono Park and Youth Cal Portner, City Administrator Reviewed by Athletic Complex Projects Action Requested Award, by motion, the Agreement for Professional Services to hire SRF Consulting Group (SRF) to complete the design and construction services for the Orono Park and the Youth Athletic Complex (YAC) projects. Background/Discussion The Orono Park and YAC park improvements are part of a major investment in the quality -of -life for Elk River residents which was made possible by a 2018 voter -approved $35 million Local Option Sales Tax Referendum. Staff solicited a Request for Proposal (RFP) for professional design and construction services for the Orono Park and YAC projects on the League of Minnesota Cities and the City of Elk River websites. We received eight proposals and interviewed two firms. Staff recommends awarding the work to SRF. Upon the approval by the City Council, staff will work with the firm to finalize a professional services contract and begin work on the preliminary design of both projects with priority to evaluating the existing concessions building at YAC with the intent to update the council on the proposed solution (remodel or rebuild) in May. Financial Impact The total financial impact for the design and construction services associated with this approval will be $367,172 and will been included in the Active Elk River budget for these projects. Attachments ■ Agreement of Professional Services ■ SRF Proposal (Exhibit A) ■ Request for Proposals Active Elk River Park Improvements ■ Proposal Costing The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional,` 01 e service, and community engagement that encourages and inspires pi ospei ly INAMIRE1 City of Elk -�- River Standard Agreement for Professional Services THIS AGREEMENT ("Agreement") is made this 20th day of April, 2020, between the City of Elk River, Minnesota ("City'), whose business address is 13065 Orono Parkway, Elk River, MN 55330 and SRF Consulting Group ("Consultant") whose business address 1 Carlson Parkway North, Suite 150, Minneapolis, MN 55447-4443, registered as a Limited Liability Company in the State of Minnesota. Preliminary Statement The City has adopted a policy regarding the selection and hiring of consultants to provide a variety of professional services for City projects. That policy requires that persons, firms, or corporations providing such services enter into written agreements with the City. The purpose of this Agreement is to set forth the terms and conditions for the professional services Consultant will provide in connection with the Active Elk River Park Improvements Orono Park and Youth Athletic Complex AQ, herein referred to as the "Work." The City and Consultant agree as follows: 1. Work. The Consultant agrees to provide the professional services described in Exhibit "A" - Proposal to the City of Elk River Active Park Improvements submitted April 6, 2020, b`T SRF Consulting Group. Exhibit A is attached and herein referred to as (the "Work"). 2. Time for Performance of Services. The Consultant shall perform the work set forth in Exhibit A according to the schedule provided. Compensation for Services. City agrees to pay the Consultant up to $367,172 for the Work as outlined in Exhibit A. Any changes in the scope of the Work which may result in additional compensation due to the Consultant shall require prior written approval by an authorized representative of the City or by the City Council. The City will not pay additional compensation for services that do not have prior written authorization. 4. The City agrees to provide the Consultant with the information required to complete the Work. Method of Payment. The Consultant shall submit itemized bills for professional services performed under this Agreement on a monthly basis. Bills submitted shall be paid in the same manner as other claims made to the City. Project Manager and Staffing. The Consultant has designated the individuals identified in Exhibit A as the Project Manager to serve on the Project. The Project Manager shall be assisted by other staff members as necessary to facilitate the completion of the Project in accordance with the terms established herein. Consultant may not remove or replace the Project Manager without the approval of the City. Standard Agreement for Professional Services Standard of Care. Standard of Care. Consultant shall exercise the same degree of care, skill and diligence in the performance of the Work as is ordinarily exercised by members of the profession under similar circumstances in Minnesota. Consultant shall be liable to the fullest extent permitted under applicable law, without limitation, for any injuries, loss, or damages proximately caused by Consultant's breach of this standard of care. Consultant shall put forth reasonable efforts to complete its duties in a timely manner. Consultant shall not be responsible for delays caused by factors beyond its control or that could not be reasonably foreseen at the time of execution of this Agreement. Consultant shall be responsible for costs or damages arising from unreasonable delays in the completion of the Work. 8. Audit Disclosure. The Consultant shall allow the City or its duly authorized agents reasonable access to such of the Consultant's books and records as are pertinent to the work performed under this Agreement. Any reports, information, data, etc. given to, or prepared or assembled by, the Consultant under this Agreement which the City requests to be kept confidential shall not be made available to any individual or organization without the City's prior written approval. All finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs, and reports prepared by the Consultant shall become the property of the City upon termination of this Agreement, but Consultant may retain copies of such documents as records of the services provided. Term. The term of the Agreement shall be from April 21, 2020 through October 1, 2021 the date of signature by the parties notwithstanding. This Agreement may be extended upon the written mutual consent of the parties for such additional period as they deem appropriate, and upon the terms and conditions as herein stated. 10. Termination. This Agreement may be terminated by the Consultant effective upon sixty (60) days' written notice delivered to the City at the address written above. The City may terminate this Agreement effective immediately, upon written notice to the consultant. Upon termination under this provision, the Consultant shall be paid for services rendered and reimbursable expenses until the effective date of termination. If, however, the City terminates this Agreement because the Consultant has failed to perform in accordance with this Agreement, no further payment shall be made to the Consultant, and the City may retain another consultant to undertake or complete the Work. 11. Independent Consultant. At all times and for all purposes herein, the Consultant is an independent contractor and not an employee of the City. No statement herein shall be construed so as to find the Consultant an employee of the City. 12. Non -Discrimination. During the performance of this Agreement, the Consultant shall not discriminate against any employee or applicant for employment because of race, color, creed, religion, national origin, sex, marital status, status with regard to public assistance, disability, or age. The Consultant shall post in places available to employees and applicants for employment, notices setting forth the provision of this non-discrimination clause and stating that all qualified applicants will receive consideration for employment. The Consultant shall incorporate the foregoing requirements of this paragraph in all of its subcontracts for program work, and will require all of its subcontractors for such work to incorporate such requirements in all subcontracts for program work. Standard Agreement for Professional Services 13. Assignment. Neither party shall assign this Agreement, nor any interest arising herein, without the prior written consent of the other party. 14. Services Not Provided For. No claim for services furnished by the Consultant not specifically provided for in Exhibit A shall be honored by the City. 15. Severability. The provisions of this Agreement are severable. If any portion hereof is, for any reason, held by a court of competent jurisdiction to be contrary to law, such decision shall not affect the remaining provisions of this Agreement. 16. Entire Agreement. The entire agreement of the parties is contained herein. This Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the parties relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the provisions of this Agreement shall be valid only when expressed in writing and duly signed by the parties, unless otherwise provided herein. 17. Compliance with Laws and Regulations. In providing services hereunder, the Consultant shall abide by all statutes, ordinances, rules and regulations pertaining to the provision of services to be provided. The Consultant and City, together with their respective agents and employees, agree to abide by the provisions of the Minnesota Data Practices Act, Minnesota Statutes, Chapter 13, as amended, and the Minnesota Rules promulgated pursuant to Chapter 13. Any violation of statutes, ordinances, rules and regulations pertaining to the services to be provided shall constitute a material breach of this Agreement and entitle the City to immediately terminate this Agreement. 18. Waiver. Any waiver by either party of a breach of any provision of this Agreement shall not affect, in any respect, the validity of the remainder of this Agreement. 19. Indemnification. Consultant agrees to defend, indemnify and hold harmless the City and its officials, employees and agents from any liability, claims, damages, costs, losses judgments, or expenses, including reasonable attorney's fees, resulting directly or indirectly from a negligent act or omission (including without limitation professional errors or omissions) of the Consultant, its agents, employees, or subcontractors in the performance of the services provided by this Agreement and against all losses by reason of the failure of said Consultant fully to perform, in any respect, all obligations under this Agreement. 20. Insurance. a. General Liability. Prior to starting the Work, Consultant shall procure, maintain and pay for such insurance as will protect against claims for bodily injury or death, or for damage to property, including loss of use, which may arise out of operations by Consultant or by any subcontractor or by anyone employed by any of them or by anyone for whose acts any of them may be liable. Such insurance shall include, but not be limited to, minimum coverages and limits of liability specified in this Paragraph, or required by law. The policy(ies) shall name the City as an additional insured for the services provided under this Agreement and shall provide that the Consultant's coverage shall be primary and noncontributory in the event of a loss. b. Consultant shall procure and maintain the following minimum insurance coverages and Emits of liability on this Project: Standard Agreement for Professional Services Workers Compensation Employer's Liability Comprehensive General Liability Statutory Limits $500,000 each accident $500,000 disease policy limit $500,000 disease each employee $1,500,000 property damage and bodily injury per occurrence $2,000,000 general aggregate $2,000,000 Products — Complete Operations Aggregate $100,000 fire legal liability each occurrence $5,000 medical expense Comprehensive Automobile Liability $1,000,000 combined single limit each accident (shall include coverage for all owned, hired and non -owned vehicles. Umbrella or Excess Liability $1,000,000 c. The Comprehensive General/Commercial General Liability policy(ies) shall be equivalent in coverage to ISO form CG 0001, and shall include the following: 1. Premises and Operations coverage with no explosions, collapse, or underground damage exclusion (XCU). 2. Products and Completed Operations coverage. Consultant agrees to maintain this coverage for a minimum of two (2) years following completion of its work. Said coverage shall apply to bodily injury and property damage arising out of the products -completed operations hazard. 3. Personal injury with Employment Exclusion (if any) deleted. 4. Broad Form CG 0001 0196 Contractual Liability coverage, or its equivalent. 5. Broad Form Property Damage coverage, including completed operations, or its equivalent. 6. Additional Insured Endorsement(s), naming the "City of Elk River" as an Additional Insured, on ISO form CG 20 10 07 04 or such other endorsement form as is approved by the City. If the Work to be performed is on an attached community, there shall be no exclusion for attached or condominium projects. "Stop gap" coverage for work in those states where Workers' Compensation Insurance is provided through a state fund if Employer's liability coverage is not available. Standard Agreement for Professional Services 9. Severability of Insureds provision. d. Professional Liability Insurance. The Consultant agrees to provide to the City a certificate evidencing that they have in effect, with an insurance company in good standing and authorized to do business in Minnesota, a professional liability insurance policy. Said policy shall insure payment of damage for legal liability arising out of the performance of professional services for the City. Said policy shall provide an aggregate limit of $2,000,000. Said policy shall not name the City as an insured. e. Consultant shall maintain in effect all insurance coverages required under this Agreement at Consultant's sole expense and with insurance companies licensed to do business in the state in Minnesota and having a current A.M. Best rating of no less than A-, unless specifically accepted by City in writing. In addition to the requirements stated above, the following applies to the insurance policies required under this Paragraph: 1. All policies, except the Professional Liability Insurance policy, shall be written on an "occurrence" form ("claims made" and "modified occurrence" forms are not acceptable); 2. All policies, except the Professional Liability Insurance policy, shall be applied on a "per project" basis; 3. All policies, except the Professional Liability Insurance and Worker's Compensation Policies, shall contain a waiver of subrogation naming "the City of Elk River"; 4. All policies, except the Professional Liability Insurance and Worker's Compensation Policies, shall name "the City of Elk River" as an additional insured; 5. All policies, except the Professional Liability Insurance and Worker's Compensation Policies, shall insure the defense and indemnity obligations assumed by Consultant under this Agreement; and 6. All policies shall contain a provision that coverages afforded thereunder shall not be canceled or non -renewed, nor shall coverage limits be reduced by endorsement, without thirty (30) days prior written notice to the City. A copy of the Consultant's Certificate of Insurance which evidences the compliance with this Paragraph 20, must be filed with City prior to the start of Consultant's Work. Upon request, a copy of the Consultant's insurance declaration page, Rider and/or Endorsement, as applicable shall be provided. Such documents evidencing Insurance shall be in a form acceptable to City and shall provide satisfactory evidence that Consultant has complied with all insurance requirements. Renewal certificates shall be provided to City prior to the expiration date of any of the required policies. City will not be obligated, however, to review such Certificate of Insurance, declaration page, Rider, Endorsement or certificates or other evidence of insurance, or to advise Consultant of any deficiencies in such documents and receipt thereof shall not relieve Consultant from, nor be deemed a waiver of, City's right to enforce the terms of Consultant's obligations hereunder. City reserves the right to examine any policy provided for under this paragraph. f. Effect of Consultant's Failure to Provide Insurance. If Consultant fails to provide the specified insurance, then Consultant will defend, indemnify and hold harmless the City, the City's officials, agents and employees from any loss, claim, liability and expense (including reasonable attorney's fees and expenses of litigation) to the extent necessary to afford the same protection as would have been provided by the specified insurance. Except to the extent prohibited by law, this indemnity applies regardless of any strict liability or negligence attributable to the City (including sole negligence) and regardless of the extent to which the underlying occurrence (i.e., the event giving rise to a claim which would have been covered by the specified insurance) is attributable to the negligent or otherwise wrongful act or omission (including breach of contract) of Consultant, its subcontractors, agents, employees, Standard Agreement for Professional Services or delegates. Consultant agrees that this indemnity shall be construed and applied in favor of indemnification. Consultant also agrees that if applicable law limits or precludes any aspect of this indemnity, then the indemnity will be considered limited only to the extent necessary to comply with that applicable law. The stated indemnity continues until all applicable statutes of limitation have run. If a claim arises within the scope of the stated indemnity, the City may require Consultant to: 1. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing performance of the indemnity obligation; or 2. Furnish a written acceptance of tender of defense and indemnity from Consultant's insurance company. Consultant will take the action required by the City within fifteen (15) days of receiving notice from the City. 21. Records Access. The Consultant shall provide the City access to any books, documents, papers, and records which are directly pertinent to the specific contract, for the purpose of making audit, examination, excerpts, and transcriptions, for three years after final payments and all other pending matters related to this contract are closed. 22. Ownership of Documents. All plans, diagrams, analyses, reports and information generated in connection with the performance of the Agreement ("Information") shall become the property of the City. The City may use the Information for its purposes and the Contractor also may use the Information for its purposes. Reuse of the Information for the purposes of the project contemplated by this Agreement ("Pro)ect") does not relieve any liability on the part of the Contractor, but any reuse of the Information by the City or the Contractor beyond the scope of the Project is without liability to the other, and the party reusing the Information agrees to defend and indemnify the other from any claims or liability resulting therefrom. 23. Subcontractor. The Consultant shall not enter into subcontracts for services provided under this Agreement except as noted in Exhibit A, without the express written consent of the City. The Consultant shall pay any subcontractor involved in the performance of this Agreement within ten (10) days of the Consultant's receipt of payment by the City for undisputed services provided by the subcontractor. If the Consultant fails within that time to pay the subcontractor any undisputed amount for which the Consultant has received payment by the City, the Consultant shall pay interest to the subcontractor on the unpaid amount at the rate of 1.5 percent per month or any part of a month. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. For an unpaid balance of less than $100, the Consultant shall pay the actual interest penalty due to the subcontractor. A subcontractor who prevails in a civil action to collect interest penalties from the Consultant shall be awarded its costs and disbursements, including attorney's fees, incurred in bringing the action. In addition, no subcontractor can file alien against the City. 24. Dispute Resolution/Mediation. Each dispute, claim or controversy arising from or related to this Agreement or the relationships which result from this Agreement shall be subject to mediation as a condition precedent to initiating arbitration or legal or equitable actions by either party. Unless the parties agree otherwise, the mediation shall be in accordance with the Commercial Mediation Procedures of the American Arbitration Association then currently in effect. A request for mediation shall be filed in writing with the American Arbitration Association and the other party. Standard Agreement for Professional Services No arbitration or legal or equitable action may be instituted for a period of ninety (90) days from the filing of the request for mediation unless a longer period of time is provided by agreement of the parties. Cost of mediation shall be shared equally between the parties. Mediation shall be held in the City of Elk River unless another location is mutually agreed upon by the parties. The parties shall memorialize any agreement resulting from the mediation in a Mediated Settlement Agreement, which Agreement shall be enforceable as a settlement in any court having jurisdiction thereof. 25. Conflicts. No salaried officer or employee of the City and no member of the City Council of the City shall have a financial interest, direct or indirect, in this Agreement. The violation of this provision renders the Agreement void. Any federal regulations and applicable state statutes shall not be violated. 26. Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be considered an original. 27. Entire Agreement. This Agreement constitutes the entire agreement of the parties and supersedes all prior communications, understandings and agreements relating to the subject matter hereof, whether oral or written. 28. Governing Law. This Agreement shall be controlled by laws of the State of Minnesota. Executed as of the day and year first written above. City of Elk River Mayor City Clerk Firm Name Its: Standard Agreement for Professional Services �,, .� — �. *�wv:. ,� �, �;n 4 �4}n. .�a4�i.S _.. .... _. ..... I 7:,;'�:"�rt`"„� -� ary.�.fy;'-i•m.,�:> �+. 4 nq� �iS,,<h '� r 6�,e�,gR. +..,. �w�: --'� „aa,^.o..�. a., "� F x'� ✓r•' ..+iv 7 as dye '�ir"� > '+ '��; < 4 ! � N'' - , �y� .� � '���� " .. _ � �. .. ," � _ p 1 �i' G.� �l��l'ar��19 ,�sppa,, � ^ � i Y .,L � ' ��� r-, yr, _ �`': LIN 4 1 t TABLE OF CONTENTS 1 General Information...........................................2 + 2 1 Project Understanding......................................3 3 Project Approach...............................................4 41 Project Team and Experience ............................7 5 I Schedule..........................................................19 61 Why SRF...........................................................19 71 Total Consultant Cost ...................................... 20 8 1 Insurance........................................................ 20 Appendix.............................................................. A-1 Ll Oki I April 6, 2020 Michael Hecker, CPRP Parks and Recreation Director City of Elk River 13065 Orono Parkway Elk River, MN 55330 mhecker@ElkRiverMN.gov Subject: City of Elk River Active Park Improvements - Orono Park and Youth Athletic Complex Dear Mr. Hecker and Members of the Selection Committee: SRF Consulting Group is excited and ready to assist the City of Elk River to level develop initiatives and construction plans for implementing improvements at Orono Park and the Youth Ahtletic Complex (YAC) to further transform these facilities into signature destinations. We have a strong background in developing park and public use facilities and understand how they should function to meet both the needs of user groups, including understanding the needs of operations and maintenance staff. SRF is also recognized for our ability to develop design solutions that will be seamlessly integrated with the physical characteristics of the site, and be constructed within the budget established for the project. Our proposal outlines several key reasons that the SRF team will contribute to this project's success: COMMITMENT OF SENIOR STAFF. Serving as project principal, Ken Grieshaber will provide seasoned leadership to the team. Ken has over 30 years of specialized experience in the planning and development of parks, open space, and recreation facilities. Tim Wold will serve as project manager. Tim has 20 years of experience in park planning and design, developing and renovating numerous regional park facilities within sensitive natural resource areas. Our team also includes Tim Mcllwain of HCM Architects who brings specialized park building design experience to the project. SRF and HCM have collaborated together on many park improvement projects together including Lakeside Commons Park in Blaine and Harmon Park in West Saint Paul. DEMONSTRATED EXPERIENCE. SRF's park, open space, and trail experience spans comprehensive planning, master planning, design, implementation, and in -construction services. As noted in our proposal, we have successfully assisted numerous agencies planning and developing regional park and trail facilities in a wide variety of natural resource and waterfront environments. MULTIDISCIPLINARY SKILLS. Our team offers comprehensive park planning and design services, which is critical to developing and implementing integrated and technically sound design solutions. Our key staff members include experienced landscape architects, civil, and water resource engineers needed to evaluate and undertake the scope of work identified for the City. PROCESS AND COMMUNICATION. We are committed to working closely with City staff during all phases of the project — communication is the key to every assignment, reinforcing the trust and support needed to successfully design and implement park improvement projects. Our team is excited about the potential both of these projects present for creating new and updated park experiences to better serve the needs of all user groups. We look forward to meeting with you to discuss in more detail our design and implementation approach for implementing site and building improvements at Orono Park and the Youth Athletic Complex. If you have any questions regarding our proposal, please contact Tim Wold at 763.452.4755 or twold@srfconsulting.com. Sincerely, /� I a Timothy Wold, PLA, ASLA Project Manager Ken Grieshaber, PLA, ASLA Principal www.srfconsulting.com 11 Carlson Parkway North, Suite 150 1 Minneapolis, MN 55447-4443 1763.475.0010 11 General Information SRF CONSULTING GROUP I PARK LEAD LIP]MI Founded in 1961, SRF CONSULTING GROUP offers abroad base of engineering, planning, and design services. Over the past 57 years and with over 300 talented employee owners, SRF offers comprehensive services, outstanding stakeholder engagement, established agency rapport, and a focus on implementable, creative solutions. Our full - service approach melds engineering, landscape architecture, environmental documentation, drainage, right of way acquisition, surveying, and construction administration, with a strong emphasis on innovation, quality, and collaboration. SRF's award -winning landscape architecture studio has the diverse skills and depth of knowledge to provide Washington County with complete design services for the Pine Point Regional Park Master Plan. Our award -winning park, open space, and trail services include: • Comprehensive system planning • Environmental permits • Master planning • Natural resource management and planning • Trails and bicycle system planning . Funding applications • Preliminary and detail design • Construction services 58 C365':0 300+ • 8 10k+ 100+ YEARS OF EMPLOYEE OFFICES IN WI, SUCCESSFUL AWARDS ACHIEVEMENTS OWNERS MN, ND, NE, ID PROJECTS DELIVERED HCM ARCHITECTS I ARCHITECTURE Hagen, Christensen & MclLwain Architects (HCM Architects) is a fourteen -person Minnesota based S-Corporation founded in 1998 providing professional architectural, planning and design services for recreational, corporate, institutional and commercial projects. Our firm is based on a foundation of common values, friendship and a singular vision on how we want to practice architecture. A major focus of our professional design work has been parks and recreational facilities. We have worked on numerous projects with Dakota County, Ramsey County, Anoka County, Washington County, St. Paul Division of Parks and Recreation, Minneapolis Parks and Recreation, the Minnesota DNR, Foss Swim Schools, Three River Park District, church camps and with the cities of Woodbury, Plymouth, Arden Hills, Blaine, Shoreview, Shakopee, West St. Paul, Roseville, South St. Paul, Coon Rapids, as well as White Bear Township. We feel that we have created a design team that has the experience, knowledge base and a passion for park and recreation projects. We are a registered Small Business Enterprise (SBE) and are recognized as a preferred consultant with the State of Minnesota, Hennepin County and the cities of Minneapolis and St. Paul. HCM Architects maintains the highest credit rating from Dun and Bradstreet. WATAB I SEPTIC SYSTEM Watab guides clients through the septic system design and compliance inspection process. The team has extensive knowledge of state and county regulations and works with, and can recommend septic system maintainers (pumpers), installers, surveyors and engineers throughout Minnesota. NTI I GEOTECHNICAL Founded in 1996, the professional staff at Northern Technologies, LLC (NTI) is well -respected and experienced in providing geotechnical engineering, materials engineering and testing, forensic engineering and environmental consulting. NTI is committed to quality, value added engineering design, exemplary customer service, professional ethics and innovation. SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 2 s, . Orono Par; Playground Ce6m:eC Jme 2013 Noya JoM DZ 2 1 Project Understanding The implementation of site and building improvements at the Youth Athletic Complex and Orono Park provides the opportunity to improve the quality of the recreational experience in both parks and provide new amenities which can better serve the needs of youth, teens, seniors, and families. Based on outcomes of the master planning process, moving forward with the detailed design of improvements provides the opportunity to create a new and updated identity for both parks. It also provides the opportunity to promote how public investment in parks can contribute towards improving the quality of life for all Elk River residents. The following issues will be key to address for designing and implementing improvements at each park. CREATING A NEW AND UNIFIED IDENTITY FOR THE PARK The implementation of new site and building improvements at each park should strive to create a unified appearance through the use of matching site furnishings, lighting, and a strong building vocabulary which reflects the identity of Elk River and the surrounding community. Providing other high demand park amenities like shade provisions, electrical plug ins and serving counters for picnicking, and convenient access to drinking water will contribute towards creating a high quality park experience for visitors. INCORPORATING SUSTAINABLE PARK DESIGN PRINCIPLES The development of new park amenities should strive to implement sustainable design solutions for treating storm water runoff from hard surface areas, minimizing the use of high maintenance site and building materials, and implementing turf and landscape improvements which can be easily maintained by park and operations staff. the incorporation of a recirculation system for the splash pad facility will also be a big contributor towards minimizing water consumption in the park, and a good public demonstration project for promoting being good stewards of the cities water and land resources. UTILITIES AND SUBSURFACE SOIL INVESTIGATION The alignment and capacities of utility services at each park should be evaluated to ensure any needed upgrades are integrated into overall construction costs. Assessing existing water, storm, sanitary, and electrical services early in the design and cost estimating process will ensure no delays are encountered redesigning site and building improvements because of unforeseen utility or soil correction costs. ACCESS AND CONNECTIVITY With new parking facilities being constructed at Orono Park, evaluating how new trail circulation can be organized to provide access to the play and splash areas, beach, and picnic facilities, will create a better sense of arrival and wayfinding for the park. Accessibility issues should also be evaluated and addressed to ensure physically challenged user groups can gain access to all areas of the park. Safety and security needs should also be considered in the design process utilizing crime prevention through environmental design (CPTED) principles to implement all site and building improvements within each park property. BUILDING FACILITIES The design for a new pavilion and restroom building at Orono Park offers many possibilities for best serving the needs of park visitors. Size and space configurations for these building uses for covered picnicking, flush toilets, and watercraft rental should all be evaluated to determine if any of these uses should be separated or combined to maximize the function and accessibility to all these issues. Maintaining good sight lines to restroom building entries from the play and splash pad area, allowing for flexibility in how the picnic shelter and surrounding lawn space can be used for small and large group gatherings, should all be considered for how the building is configured on the site. Evaluation of the existing concession and storage building should consider how the existing footprint can be remodeled, repurposed, or expanded to better serve the needs of park user groups. A preliminary feasibility study for constructing a new building should also be considered as well as how additional forms of revenue or funding can be secured to help offset costs for a new concession and restroom facility. SRF CONSULTING GROUP CITY OF ELK RIVER // Active Elk River Park Improvements 3 3 1 Scope of Services The SRF team will work closely with City staff, partner agencies, and policy makers to integrate comment and feedback throughout the park design and decision -making process. Effective project management is the cornerstone of a successful project process when engaging all stakeholders in the design process. The included schedule identifies timelines for completing each identified work task and corresponding meetings to be held to review and discuss key decisions to be made on a timely basis to keep the project on schedule to be ready for construction. One of the most important project management functions is promoting communication. Project communication will be maintained through regular meetings, phone calls, e-mail, correspondence and site visits as necessary with the design team and City staff. SRF will maintain a high level of communication with city staff through weekly check -in calls and monthly project status reports to ensure all aspects of the project are tracking on the established schedule. To ensure clear communication is maintained throughout the project process, the SRF Team will prepare meeting notes for each design team meeting and distribute them to attendees. Notes will include meeting discussions, action items, party responsible for action and required action date. This will ensure all responsibilities for providing information and feedback to the design team can easily be understood and communicated between design team members and City staff. The following approach and associated tasks are proposed to be undertaken to guide the design process for completing the improvements at Orono Park and Youth Athletic Complex: 1. SITE SURVEY SRF will undertake the following survey work: • Prepare topographic and boundary survey for Orono Park. • Prepare topographic survey for building locations within Youth Athletic Complex. 2. MEETINGS Soliciting input from all project stakeholders in an open and transparent engagement process will ensure the best possible design outcomes will be achieved for all park improvements. SRF is anticipating the following meetings will be conducted with stakeholder groups for comment and feedback throughout the design process: • Up to eight City staff work session meetings including kick-off meeting. • Two meetings with the Parks & Recreation Commission Based on the current challenges of COVID-19, SRF recommends that some meetings be held on-line early in the project meeting process. SRF uses Zoom and can readily host meetings for small and large groups of people. 3. PROJECT START-UP A kick-off meeting with City staff and the consultant team is an important springboard to beginning the schematic design effort. SRF will initiate a project kick-off meeting that will provide the opportunity for all team members to become acquainted with project objectives and schedule and affirm communication and coordination protocol. A stakeholder engagement strategy will also be discussed to ensure there is a good understanding of how all comment and feedback will be solicited and integrated into the design process. We anticipate this meeting will occur in mid to late April. • Conduct one kick-off meeting • Gather all available background, base -mapping, and survey information for the park property • Conduct a site visit with City staff to assess preliminary issues and opportunities for the park properties. • Identify preliminary issues and opportunities to be addressed based on review of the existing park master plans. • Review schedule and budget requirements to be met for the project. CITY OF ELK RIVER H Active Elk River Park Improvements 4 4. SCHEMATIC DESIGN Prior to beginning schematic design for the project, all background information available for the park property will be reviewed by the project team, including existing survey and utility information, right-of-way, and property boundaries. After receiving preliminary input from City staff, SRF will begin to explore developing concept plans for improving the entrance drive, parking facilities, trail circulation, and addressing storm water runoff and erosion issues. The following tasks will be completed by the SRF Team: • Conduct two working project team meetings with City staff. • Affirm park issues to be addressed as part of the proposed improvements. • Identify strategies for incorporating sustainable site design strategies as part of the preliminary design process. • Identify accessibility improvement needs. • Develop program for all proposed buildings. • Complete a preferred overall schematic layout and grading plan for Orono Park with proposed park pavilion with concessions, restrooms, picnic area, and personal watercraft rental space. • Investigate potential for repurposing existing concessions/ storage building at Youth Athletic Complex to meet current needs. • Prepare schematic building plans, sections, and elevations. • Develop preliminary cost estimate. 5. DESIGN DEVELOPMENT Based on outcomes of the schematic design process, additional design detail will be added to park site layout and grading plans and drafted into AutoCAD format drawings. The SRF Team will complete the following tasks as part of the preliminary engineering process: • Attend up to two working project team meetings with City staff to review and discuss design development plans. Modify plans as needed based on comment and feedback. • Develop refined layout, grading, utility and detail plans for layout of the parking lots, and trail circulation. • Design a lighting system for Orono Park trails and parking lots with lights matching those recently installed on the TH 10 trail project. • Identify stormwater treatment systems required to support new park improvements. . Identify water, electrical, and other miscellaneous utility service needs. • Design an independent septic system for restroom/concessions buildings at Youth Athletic Complex. • Coordinate with the skate park designer to ensure seamless integration with other park amenities. • Coordinate mechanical design with splash pad designer to ensure adequate space is provided within the Orono Park pavilion mechanical room to operate and maintain the recirculating system. • Assemble draft specification index. • Complete preliminary review of agency permitting requirements and identify all City, State, and Federal permits and protocols to be followed for implementing proposed park improvements. • Coordinate completion of geotechnical investigation (as needed) • Develop refined itemized cost estimate. • Attend Park and Recreation Commission meeting to review current design status. 6. CONSTRUCTION DOCUMENTS Based on outcomes of the preliminary engineering phase of work, the SRF Team will prepare a comprehensive construction plan set and specifications based on final approval of all park design and natural resource restoration components of the project. Interim 60%, 90%, and 100% complete draft plan sets will be presented to City staff for review and comment. City staff comments will be incorporated into the plan sets within seven days of being submitted to the consultant team. The following scope of work will be undertaken for this phase of work: • Attend up to three working project team meetings with City staff to review 60%, 90%, and 100% complete construction documents. • Attend Park and Recreation Commission meeting to review 90% complete construction documents. • Plan sets will be organized to be bid as three independent bid packs. • Prepare a final itemized cost estimate and identify potential alternates to be included for bidding • Prepare Mn DOT format specifications. • Coordinate approvals with all reviewing agencies. • Obtain required external permits, such as MPCA NPDES permits (SWPPP). • Submit bidding documents to City for advertisement, including signed plan sheets and signed specifications (PDF) for uploading to QuestCDN. Plan sheets will include City and MnDOT title and approval blocks including file and requisition numbers as applicable. • Provide digital files compatible with AutoCAD/Civil 3D software SRF CONSULTING GROUP CITY OF ELK RIVER // Active Elk River Park Improvements 5 7. BIDDING SRF will assist the City with the bidding process by notifying contractors about the project and gauging their interest and availability for undertaking the work. This will help ensure a good bid climate is created prior to bidding. The following scope of work will be undertaken for this phase of work: • Assist the City with preparation of advertisement for bid. • Attend the pre -bid conference (if needed). • Issue addenda and respond to contractor questions during the bidding period. • Prepare bid tabulation and assist in the review, evaluation and award recommendation of the bids received. 8. CONSTRUCTION SERVICES SRF recognizes the importance of providing quality in -construction services to ensure adherence to the contract documents and the implementation of high -quality outcomes for the project. In addition to providing certified inspectors to oversee the implementation of site and building improvements, staff assigned to the project will stay engaged from the beginning to the end of the project to ensure efficient communication and coordination with City Staff and the consultant team. • Facilitate pre -construction meeting. • Provide construction staking services. Assumes up to ten days (ten trips) of staking with a two -person crew during construction. • Respond to owner and contractor RFI's, review and approve shop drawing and product submittals, prepare proposal requests, and review responses. Advise the City on any contractor change order items. • Conduct bi-weekly site visits to observe work for compliance with contract documents, prepare written field reports, and attending construction meetings, as noted above. Assumes 13 site visits for 26 weeks of construction. • Review and approve contractor's monthly payment requests and final payment request. • Monitor contractor testing and start-up of new systems to ensure compliance with contract documents, and provide reports indicating acceptance and approval. • Conduct one site visit/punch-list inspection at substantial completion of construction. • Conduct one site visit at final completion of construction verifying completion of punch -list items. • Conduct one pre -warranty inspection at the site 10 months after substantial completion of construction. • Provide hard copy and electronic as -built drawings. • Provide hard and electronic copies of operations and maintenance manuals prepared by the Contractor. • Prepare and coordinate submittal of IC134 withholding affidavit for contractors and certificate of substantial completion forms. Optional Services Optional services noted in the request for proposal and subsequent addendum are outlined below. These services and associated fees are not included in the baseline scope of services. 1. GEOTECHNICAL INVESTIGATION If accepted, geotechnical investigation will be completed by Northern Technologies, LLC. Based on the proposed improvements outlined in the request for proposal, this scope of work is based on the assumptions listed below. If deemed necessary, additional soil borings can be undertaken at a fee to be negotiated at the time of request. • Assumes 4 total 14.5' depth soil borings at proposed building sites. • Assumes 6 total 8' depth soil borings at proposed parking areas or other features. 2. CONSTRUCTION TESTING/SPECIAL INSPECTIONS If accepted, construction testing and special inspections will be completed by Northern Technologies, LLC. Based on the proposed improvements outlined in the request for proposal, this scope of work is based on the assumptions listed below. • Assumes 13 total visits for excavation observations and testing for earthwork. • Assumes 41 total visits for special inspection and testing services for concrete construction. • Assumes 6 total visits for special inspection and testing services for structural masonry. • Assumes 2 total visits for special inspection and testing services for structural steel construction. • Assumes 20 total visits for special inspection and testing services for parking lots. SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 6 4 1 Proposed Project Team & Experience TEAM ORGANIZATION City of Elk River City Council Parks & Recreation Commission ............................. • Sherburne County Soil and Water Conservation District Parks and Recreation Director • Minnesota Department Michael Hecker City Staff of Natural Resources ,,,,,,,,,,,,,,,,,,,, Senior Advisor / QA,QC Project Manager Architecture Ken Grieshaber, PLA, ASLA Tim Wold, Wold, PLA, ASLA Tim Mcllwain, AIA HCM Architects Survey, ROW Title Site Design Federal Funding Dean Duscheck, LS Rachel Burand, PLA, ASLA Oversight Stewart Crosby, PLA, ASLA Septic Design Tim Haeg WoTob Inc. Civil Engineering/Utilities Mike Aaron, PE Geotechnical Engineering Northern Technologies, LLC RELEVANT PROJECT EXPERIENCE - REFERENCES City of Plymouth Diane Evans Director of Parks & Recreation 3400 Plymouth Boulevard Plymouth, MN 55447-1482 Phone: (763) 509-5201 Email: devans@plymouthmn.gov City of Saint Michael Marc J. Weigle Community Development Director 11800 Town Center Drive, Suite 300 Saint Michael, MN 55376-1600 Phone: (763) 497-2041 Email: mweigle@ci.st-michael.mn.us Electrical/Lighting Steve McHenry, PE City of Blaine Jerome Krieger Program Supervisor 10801 Town Square Drive NE Blaine, MN 55449-8101 Phone: (763) 785-6161 Email: jkrieger@ci.blaine.mn.us SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 7 TIM WOLD, PLA I PROJECT MANAGER Tim has been practicing landscape architecture and urban design for 21 years. He has a wide range of project experience that includes neighborhood and community park planning and design, athletic complexes, trail system planning, site design, urban streetscapes and plazas, and natural resource -based state and regional parks. Tim has successfully managed a number of multi -million dollar park and athletic complex projects, leading multidisciplinary teams from the initial planning stages through construction. He works with a wide variety of clients and enjoys collaborating with design professionals from other disciplines. As our project manager, Tim will be the City's main point of contact, be responsible for managing project delivery and the team, and lead construction observation. Project Experience City of Otsego Parks, Minnesota. Tim has assisted the City with development of numerous park properties including several neighborhood parks, a splash pad within Prairie Park, and development of a boat launch within a special use park on the Mississippi River. Services spanned programming and development of concepts, stakeholder engagement, design development, preparation of construction documents, to construction oversight. City of St. Michael Town Center Park, Minnesota. SRF is working with the City of St. Michael on the planning and development of their civic gathering and special event campus. Key program elements include a large multi -purpose open lawn space, splash pad with restroom/changing room building, destination play area, and picnic shelters which can be reserved for small group gatherings. Tim provided conceptual design, public engagement, and cost estimation services. City of Otsego Northwood Park, Otsego, MN. The City of Otsego commissioned SRF to prepare a master plan and construction documents for this neighborhood park. Amenities within the park include K-5 and pre-K play areas, a picnic pavilion, a basketball court that is convertible to pickleball, and a 200' ballfield with backstop, players benches, and limited spectator seating. Avonlea Community Park, Lakeville, Minnesota. The City of Lakeville commissioned SRF to prepare concepts, schematic grading plan, cost estimates, and assist with community engagement for this 40 acre community park. Key amenities include several grass multi -use green fields, an artificial turf multi- use field, a premier baseball field, pickleball courts, a destination play area and splash pad, and restroom/concessions buildings. Other features include a youth challenge course, adult fitness equipment, and a lighted loop trail system. The site, located on Cedar Avenue, provides a central location within the city for youth tournaments and offers good access for vehicular and pedestrian circulation. Based on feedback received from staff, community members, the Park and Recreation Commission, and City Council, SRF prepared a preferred master plan for the park. Three Rivers Park District French Regional Park Creative Play Area, Plymouth, Minnesota. SRF worked closely with Three Rivers Park District staff and a diverse group of stakeholders, including a fourth -grade class from a local elementary school, in developing a new destination play area within this extremely popular regional park. The play area site afforded opportunities to use grade changes to provide accessible circulation to the upper level of the play structure via walls and elevated ramps. Key features of the play area include a three -level tower with slides and climbers, an extensive system of climbing nets, multi-user swings, a sand/water play node, mist towers, and a playhouse for younger children. City of Roseville Parks Renewal, Minnesota. SRF collaborated closely with City staff and a multidisciplinary consultant team to renovate twelve neighborhood and community parks within a citywide parks renewal program. Projects ranged from complete renovations to reconstruction of individual tennis courts and fields. SRF provided landscape architecture, water resource, and electrical design services from design development through preparation of construction documents, including permitting and cost estimation. City of West St. Paul Harmon Park, Minnesota. West St. Paul commissioned SRF to develop a master plan for the redevelopment of Harmon Park, the city's oldest park. As project manager, Tim led the design process, oversaw preparation of construction documents, and provided in -construction services. Washington County Lake Elmo Winter Recreation Facility, Minnesota. SRF collaborated with an architect, construction manager, and County staff to develop a new trailhead facility, cross country ski trails and trail lighting system for evening cross country skiing. A second phase of development included improving pedestrian and vehicular circulation, developing a new parking lot to serve users of the trailhead facility, and providing a patio with stone fire pit and seating. SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 8 KEN GRIESHABER, PLA, ASLA I SENIOR ADVISOR / QUALITY CONTROL Ken has 30 years of landscape architecture and urban design experience, with an emphasis on park and trail improvements. He has been involved in the planning and design of more than 60 neighborhood, community, and regional parks. Ken's skills include project management, conceptual and detailed design, and preparation of construction drawings and cost estimates. His work is mindful of operations and maintenance considerations and emphasizes sustainability. In addition, Ken is known for his skill in fostering an open, collaborative design process that includes residents, city officials, and design professionals. Project Experience Three Rivers Park District Silverwood Park. Developed within a old Salvation Army Camp, the facility offers scenic views of Silver Lake within a wide diversity of natural resource areas including upland forest, prairie, and wetland areas. As project manager, Ken oversaw a multidisciplinary team. Sustainable site initiatives were integrated throughout the site for the treatment and reuse of stormwater for irrigation, and harvesting removed trees for interior finishes of the visitor center. Three Rivers Park District French Regional Park Creative Play Area, Plymouth, Minnesota. SRF worked closely with Three Rivers Park District staff and a diverse group of stakeholders, including a fourth -grade class from a local elementary school, in developing a new destination play area within this extremely popular regional park. The play area site afforded opportunities to use grade changes to provide accessible circulation to the upper level of the play structure via walls and elevated ramps. Key features of the play area include a three -level tower with slides and climbers, an extensive system of climbing nets, multi-user swings, a sand/water play node, mist towers, and a playhouse for younger children. Washington County Big Marine Park Reserve. Working with many stakeholders to create a vision for this new regional park reserve, SRF developed a master plan addressing programming and site improvements to be integrated within this 1,700 acre facility. Uneven terrain and a wide variety of sensitive natural resource areas provided many challenges for integrating roadway and trail circulation, a new beach facility, and picnic facilities as part of the first phase of constructed park improvements. Washington County Ravine Regional Park Master Plan, Cottage Grove. SRF worked with Washington County Parks to amend the master plan to provide the County with a plan that prepares the park for future growth in the area and addresses the impacts to recreation and natural resources of a proposed stormwater conveyance system through the park. The master plan includes updates of the developed areas around the south shore of Ravine Lake including park road circulation, lake access, picnic facilities a 4-season building and a summer trailhead facility, and a new park entrance from County Road 19. The park's network of soft and paved trails have been updated and include lighted trails for winter use. Dakota County Thompson County Park Site Improvements. New site improvements were studied and integrated into this unique county park facility to respond to current user group activities desired by the local community. Improvements include a new natural play area and splash water feature, large group picnic facilities with a new pavilion and restroom facility, and reconfigured trail circulation to provide convenient access to all park amenities and natural resource areas within the park. City of Blaine Lakeside Commons Park, Minnesota. This new lakefront community park facility was designed to accommodate many recreational amenities, including a swimming beach and changing room facility; a boathouse for paddle boat, canoe, and kayak rentals; playground equipment; and a picnic shelter for large group and family events. City of Plymouth Zachary Park Ballfield Renovations, Minnesota. Converted adult softball facility in to a premier Little League baseball facility. City of Brooklyn Park Signature Event Area (SEA) Park, Brooklyn Park, MN. SRF worked with the City of Brooklyn Park on the development of a park systems plan that includes exploring programming and design ideas for their new signature event area park located in the northwest quadrant of the City at the terminus of the planned light rail transit line. Park amenities explored for the site include large group picnic facilities, water recreation features and play areas, a multi -purpose lawn and performance area, parking facilities, roadway, and trail circulation. City of Eden Prairie Purgatory Creek Recreation Area, Minnesota. As the lead designer and project manager, Ken was responsible for developing this new community park facility. This seven -acre park is connected to a three-mile trail system circulating around an adjacent wetland system. A multipurpose green space was created to host small concert performances as well larger community events. Other elements include a large picnic shelter and stage area, an annual and perennial demonstration garden, a Veterans Memorial, and a waterfront boardwalk overlook and art bridge along the wetland trail system. The park also fronts an open water diversion channel for Purgatory Creek that collects sediments from the creek before outleting into the adjacent wetland complex. SRF CONSULTING GROUP CITY OF ELK RIVER // Active Elk River Park Improvements 9 STEWART CROSBY I FEDERAL FUNDING OVERSIGHT Stewart has 18 years of experience in landscape architecture and urban design, including conceptual design, design development construction document preparation, and I p1m, construction administration. He brings innovative design solutions to a variety of projects that include park and trail master plans and youth camp site design. Stewart has also conducted visual impact assessments for roads and trails and has worked on urban streetscape projects. Stewart excels at managing park planning and design projects, while fostering an open, collaborative design process that includes agencies, residents, design professionals, and other interested stakeholders. His work is mindful of operations and maintenance considerations and emphasizes sustainability. Project Experience Kensington Rune Stone County Park, Douglas County. Stewart served as the project manager for the development of a master plan that was prepared to garner support and approval of the Greater Minnesota Parks and Recreation Commission, which provides for extended funding options for park development. The park master plan focused on identifying a site and concept for a new visitor center and updating the pedestrian a vehicular circulation throughout the park. The park had doubled in size over the last decade so additional design and planning was needed to incorporate the new property into the park plan. Washington County Cottage Grove Ravine Regional Park Lake Elmo Segment Master Plan. Stewart served as project manager for the trail master plan. In this role, he worked closely with Washington County staff on developing alignment alternatives, meeting with special interest groups, making public presentations and facilitating public outreach events including pop-up meetings and open houses. Stewart also oversaw the development of the master plan document and coordinated internal reviews and agency reviews of the draft document. YMCA Camp Widjiwagan Site Design, Ely. Stewart led a team of landscape architects and civil engineers who designed a natural stone amphitheater that utilized an existing slope in the center of Camp Widjiwagan with views of adjacent Burntside Lake. The amphitheater was designed to use local materials and was installed by local contractors who took great pride in the finished product. Stewart coordinated with Camp staff throughout the design process to ensure the appropriate materials were included in the design. Barnesville Trail and Streetscape Plan. Stewart was the project manager for the city-wide trail plan that looked closely at existing pedestrian and bicycle facilities and developed a plan to integrate trails and on -street bike facilities into the existing street network and park system. A separate task developed streetscape concepts for Highway 9 through downtown to incorporate more pedestrian and bicycle facilities in advance of a MnDOT construction project that will reconstruct the entire streetscape. Stewart led the public process including open house meetings and pop-up meetings at local and regional events including the County Fair. Carver County Minnesota River Bluffs LRT Regional Trail. Stewart was Project Manager for the design and construction of two phases of trail development that included a prefabricated trail bridge over a creek in the historic City of Carver and a trailhead with a parking lot and a trail system kiosk. Stewart also managed the MnDOT Delegated Contract Process (DCP) for Local Agency Federal Aid Projects since this project utilized federal funds. City of Plymouth Park and Trail Plan. To update to the City's Comprehensive Park and Trail System Plan, Stewart created analysis maps of all parks, trails, sidewalks and on -road bike routes. Additional data was incorporated to show deficient roadway crossings and movement barriers, such as rail lines. Using the analysis mapping, Stewart developed a comprehensive trail and sidewalk plan to identify gaps in the trail and sidewalk system, future connections to City parks and regional trails. The map and data were incorporated into the Comprehensive Park and Trail System Plan. M.B. Johnson Regional Park Master Plan, Moorhead. Stewart served as the project manager for the development of a master plan for M.B. Johnson Regional Park, the largest park in the City of Moorhead. Stewart led a team of designers who worked with Moorhead staff to develop a layout for park facilities, a network of soft -surface and paved trails, park roads and parking facilities, as well as developing a plan for bringing city services to the site including sanitary sewer and new power service. Stewart provided guidance to the team's architect for the siting, scale and size of the park's new visitor center and warming but and the new large group picnic shelter. MIKE AARON I CIVIL ENGINEERING & UTILITIES Mike has more than 25 years of experience in site planning, municipal engineering, highway and trail design, hydraulic analysis and stormwater management. His municipal and site development expertise includes project management, feasibility, predesign, demolition, layout, drainage, utilities, grading, detailing, and supporting specifications as well as permitting and contract administration. He has demonstrated his outstanding civil/site skills on many of SRF's well-known municipal facilities, commercial, and retail site development projects. Project Experience Three Rivers Park District Silverwood Park. Provided civil engineering services for this park development. Prepared demolition construction documents and design development - level plans for park improvements along with final construction documents. Mike also performed in -construction services for the demolition portion of the project. SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 10 Washington County Big Marine Park Reserve. Civil engineering design and coordination for this project including preliminary design, preparation of civil construction documents, and provided in -construction services during the construction phase of the project. He worked closely with the owner, contractor, and permitting agencies to help make this a successful project. MnDNR Tettegouche State Park Visitor Center and Rest Area. Mike provided site civil engineering design and coordination for this project including preliminary design, preparation of civil construction documents, and construction -related services. City of Saint Paul Samuel Morgan Regional Trail. Provided all civil engineering services for this 1.5-mile-long regional trail along the Mississippi River, including storm sewer design, grading, parking lot design, utility and erosion control design, and permitting. He also provided bidding and in -construction services. RACHEL BURAND I SITE DESIGN Rachel is an experienced landscape architect, with completed work ranging from plaza design to park system master plans to riverfront landscape restoration. She has provided site !� design, parks and trail planning, and community input analysis on projects. Rachel is skilled at working collaboratively with clients from initial sketch concepts through the process to final construction. Her expertise in GIS site analysis and inventory lends a detail -oriented and pragmatic approach to design evident in many of her projects. Project Experience City of St. Michael Town Center Park. Assisted with the park design, graphics, and public engagement on the planning and development of a new signature park. Park programming elements will include a large multi -purpose open lawn space to be used for special City events and large group picnicking, a water splash pad and destination play area, a restroom and changing room building, and picnic shelters which can be reserved for small group gatherings. City of Plymouth Meadows Park. Provided park design, construction document support, facilitated group discussions, and assisted at public open house meetings. Dakota County Mississippi River Regional Trail Pine Bend Bluffs Trailhead. SRF worked closely with Dakota County and Minnesota DNR staff to design a trailhead that was both aesthetically pleasing and function for trail users and visitors. It was also important that it met the requirements of the DNR for establishing a trail facility within the boundaries of an SNA. Rachel provided graphics and construction document support for the project. Douglas County Kensington Rune Stone County Park Master Plan. After doubling in size over the last decade, the park required additional design and planning to incorporate a new property into the park plan. The park master plan focused on identifying a site and concept for a new visitor center and updating the pedestrian and vehicular circulation throughout the park. Rachel assisted with design development and created plan graphics for the county park master plan. City of Duluth Lincoln and Memorial Parks Mini -Master Plans. Assisted with design development and created plan graphics for two existing city parks in Duluth. STEVE MCHENRY, PE I ELECTRICAL DESIGN 31 Steve is an experienced electrical engineer with 30 years of design in electrical engineering. Steve has expert knowledge in solar power systems for portable equipment and small-scale (<4kW) off -grid installations including battery power (FLA, AGM, GEL) and inverter/UPS variations. He is also familiar with grid -tie solar power systems, small-scale wind energy, and fuel -cell systems. Steve provides electrical and lighting design for all of SRF's projects. Project Experience Rice Park Reconstruction, St. Paul. Steve led the design for new lighting and electrical distribution plan for the reconstruction of Rice Park in St. Paul. The design included updating all the electrical systems while minimizing above ground facilities and enhancing the lighting with pole mounted, bollard and holiday lighting functions. The project also included power and communications options for Winter Carnival, concerts and other events. Dakota County Mississippi River Regional Trail Pine Bend Bluffs Trailhead. Steve led the design of a for new lighting and electrical distribution for trailhead project through a Minnesota DNR Scientific Natural Area in Inver Grove Heights. The design included LED lighting with special selection of color temperature for the park setting. CCTV and security system were also part of Steve's design function. Minneapolis Park and Recreation Board Mississippi East Bank Trail. Steve led the design for trail lighting to extend the trail from Boom Island Regional Park to Sheridan Memorial Park and a new Scherer Park site. The lighting design required special consideration for Broadway Avenue bridge underpass, optimizing lighting design while under the constraint of pole height limits due to a large overhead power line and LED color temperature selection. Three Rivers Park District Hyland Ski & Snowboard Area. Steve led the design for site electrical power, lighting and communications. Lighting included new LED parking lot lighting along with area and specialty lighting for plaza and ski hill areas. Communication design included infrastructure design for phone line, fiber communications and parking lot access/revenue control system with remote server hardware/software and parking status notification to variable message signs. SRF CONSULTING GROUP CITY OF ELK RIVER // Active Elk River Park Improvements 11 DEAN DUSHECK, LS I SURVEYING Dean has 40 years of experience as a professional land surveyor and supervises SRF's survey operations. Respected as a detail - oriented land surveyor and efficient supervisor, he is involved in all SRF projects where design surveys and/or land surveys are required. Dean's involvement extends beyond surveys prepared by SRF and includes quality control reviews of mapping and survey -related data received from third parties. He has provided land surveying services, including right of way research and legal descriptions, for numerous SRF projects. Project Experience • Dakota County Lake Byllesby Improvements • TRPD Silverwood Park • Three Rivers Park District Dakota Rail Trail Crossing • City of Lakeville Aronson, Quigley-Sime, & Dodd Trail Park Parking Lot Improvements • City of Plymouth Northwest Greenway Trail Legacy Greenway Park and Trail Reconstruction • MPRB Minnehaha Creek Regional Park Site Topographic / Location / ALTA Survey TIM MCILWAIN, AIA I PARK BUILDING ARCHITECTURE Tim is a Founding Principal and Partner at HCM Architects. Tim will provide strong project design and development skills gained from over 35 years of professional experience. Tim has extensive experience with master planning and design of park and recreation facilities, community centers and municipal buildings of all types for multiple counties and cities in the Twin Cities metro area. Project Experience • Peony Lane Trailhead Building, Plymouth, MN • Washington County Public Works Facility, Stillwater, MN • Washington County Nordic Center, Lake Elmo, MN • Washington County St. Croix Bluffs Campground Facility, Hastings, MN • Roseville Parks Community Buildings • Cedarholm Community Center, Roseville, MN • Tony Schmidt County Park Shelters & Beach Building, Ramsey County • Duluth & Case Recreation Center Study • Palace Recreation Center Study • West Medicine Lake Multi -Use Building, Plymouth, MN • White Bear Township Band Shell • Snail Vadnais Park Buildings & Shelters • Lakeside Commons Park Buildings, Blaine, MN • Thompson Park, Dakota County • Bald Eagle Regional Park, Ramsey County • White Bear Township Park Shelters • Highland Park Pool House, St. Paul, MN DAN LAWRENCE, AIA I PARK BUILDING ARCHITECTURE Dan is a Senior Project Architect at HCM. He has 20 years of professional experience working in ' many facets of the profession from programming to construction administration. He has worked in both design and technical roles on a variety of project types ranging in value from $500K to $50 million. His focus in the firm has been civic buildings and corporate projects involving manufacturing, industrial/technical spaces and office environments, as well as park and recreation facilities. Project Experience • Roseville Parks Community Buildings - Roseville, MN • Cedarholm Community Center — Roseville, MN • Keller Regional Park Buildings — Maplewood, MN • Ramsey County Public Works Facility Study — Arden Hills, MN • City of Woodbury Valley Park Master Plan — Woodbury, MN • Public Works Facility —Woodbury, MN SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 12 HARMON PARK West St. Paul, Minnesota Shatle Structure In sh Patl G Ay BuidinglRes with Light �P king Ci/5e1'unTGgT�I Enhanced Park Emrance -Park I . Sq. -Landscape Plantings -WPNSIN.y Scholl Plagues Ornamental screen FenceTyp 7Backstop w3h / LL Fie Netted Bood,- nl Typ_ Co klncessiondhP B o u ng wAh Upper Storage Area 1�`, - ` /k �_�--¢ f Bat�ng Cage Typ. - - - _ rn` Warm up Area Typ. WPA Wall to reman i along sidewalk I Scoreboard, Typ. .-� LLFdd 200' Ar Bike Rack, Typ.— Ball Fiekl Lighting, Ty p. pedestrian Trail a1 Lighting, Typ. The City of West St. Paul retained SRF to develop a master plan for the 14-acre property. The site included four softball fields that were used primarily by adult leagues. In addition, the fields had overlapping outfields, allowing only two to be used safely at the same time. Neighborhood concerns coupled with the adjoining middle school land use provided the basis to consider converting the fields to a dedicated youth athletic facility. SRF prepared concept plans, illustrating several configurations and partnering opportunities with the school district to maximize benefits to residents. Upon adoption of the master plan, SRF completed design development, prepared construction documents, and oversaw construction. The final plan included four 200-foot baseball fields configured in a pinwheel layout with a concessions/restroom building at the center, lending itself well to youth tournaments. In addition, a premier field for older youth players was included on the adjoining school district property. A new hockey rink and warming house, a larger centralized parking area, a new playground, splash pad, and community building with restrooms and changing rooms were also constructed. A formal entrance feature at the corner of Bernard and Charleton provides park identity and enhances the character of the neighborhood. HCM provided building architecture design. SRF CONSULTING GROUP a• " u iiiiiiii�'' �on�uA :mm�mmmmm - - MEN Is Ill0�b��0 mmmmmme:1, mmimmmui �( � �ulaluluu� �ammmmmm� vwmr� 1�11 r1 J �5Orrmep Exstnr Perk ng Area Heritage Ni School CITY OF ELK RIVER // Active Elk River Park Improvements 13 LAKESIDE COMMONS PARK Blaine, Minnesota SRF, in conjunction with HCM, worked with the City of Blaine to develop a master plan for a new community lakefront park that integrates with a new commercial retail complex, parking lot area, and surrounding residential development. Amenities in the park include a beach and shower building facility, playground and picnic area, a splash pad water park, paddle boat rentals, and trail circulation. Water edge treatments include a combination of native vegetation buffering and boardwalks to allow visitors to interact with the lake shoreline. Innovative stormwater treatment techniques were also implemented throughout the park. SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 14 THOMPSON PARK BUILDINGS Dakota County HCM Architects and SRF worked with Dakota County Parks to design the next phase of the development of Thompson Park, a Dakota County Park located in West St. Paul, MN. HCM Architects provided programming, master planning and schematic design services for a large picnic pavilion, a picnic shelter and a maintenance building. The structures are designed to incorporate stone, wood and detailing that recalls the qualities of the existing Lodge structure that create special gathering places that maximize views and access to the site. SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 15 LEXINGTON ATHLETIC COMPLEX Blaine, Minnesota The City of Blaine retained SRF to provide construction administration services for this premier athletic complex within the northeast quadrant of the city. Working closely with the general contractor, project architect, and city staff, SRF oversaw development of the $3.5 million facility. Key features include a barn-themed concessions/restroom building with community meeting space and maintenance garage, two full size baseball fields, and four soccer/football fields. All fields include lighting and irrigation. Other amenities include a play area for pre-K and K-5 age groups, a picnic shelter, and tennis, pickleball, and basketball courts. Four parking areas with a total of roughly 380 stalls are located centrally in relation to amenity groupings off of 121st Avenue. SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 16 OTSEGO PARKS (NORIN LANDING) Otsego, Minnesota SRF worked with the City of Otsego to develop a master plan and construction documents for the development of Norin Landing, a special use park on the Mississippi River at the northwest border of the city. The central focus of the park is a wood shelter with river overlook deck and lawn space to accommodate weddings. Other key features include a boat launch providing small water craft access to the river, fishing pads, internal trail system, and naturalized landscape buffers. A future phase will include a small natural play area. The park opened fall of 2019. SRF CONSULTING GROUP CITY OF ELK RIVER // Active Elk River Park Improvements 17 TOWN CENTER PARK CONCEPT PLAN St. Michael, Minnesota Perimeter Paved 'Loop Trail r k A'� Native Planting/Habitat Restoration Aref Boardwalk Overlook, typ Small Picnic Shelter fi--- ( 20 Capacity);Winter Skating AArea - --_ Private Development Open Space - FutureExpanded- �. Stormwater Pond, typ. Parking (t 25 Spaces) PROPOSED DEVELOPMENT Wetland Trail System Light, typ., -": - U LEGACY OF ST. MICHAEL-�- Lawn Game Court ASSISTED LIVING _ Proposed Trees, typ. —� Bench,typ. -- - Small Picnic Shelter Capacity)- ' _.Pickleball Courts FRANKE RTPKWY NE Large Picnic Shelter�r� / ( 75 Capacity) /Stage WR4p w Multipurpose Lawn R� oPatio Seating o wFUTURE Restroom/Changing % 1 DEVELOPMENT ROOmBuilding PARCEL Splash Pad Park Plaza Entry& Entrance Sign Patio Seating POND ,I _ a . — v Futu re Expanded ,� Iu PROPOSE DD_EVELOPMENT O _-_ Pat king (180 Spaces) -R_ n �F - Pre-K Play Container U �� HAL I Ii II K-S Play Container � II�1I1 L !_SwingGo tamer _ Spray Fountain t% (� / �O 4 g , Existing Parking -"-� LIBRARY SENIOR DockOverlook _ CENTER - 111 Small Picnic Shelter ,��^r III vll s - ('- 20 Capacity) TOWN CENTER DRIVE NE \ % pace Outdoor Class roomSmall Event Fire Pit i ---�� Trellis Structure ' - - Park Entrance Sign Park Plaza Ent Expanded Patio kith Planter Seat Walls SRF is currently working with the City of St. Michael on the planning and development of a new signature destination park adjacent to the their City Hall, Library, and Senior Center as part of their new civic center campus. Park programming elements will include a large multi -purpose open lawn space that will be used for special City events and large group picnicking, a water splash pad and destination play area, a restroom and changing room building, and picnic shelters which can be reserved for small group gatherings. Other amenities that will be added to the park include pickleball courts, a synthetic turf lawn court area, and an expanded patio and seating area to meet the needs of senior center visitors. A looped one -mile trail system is also planned and will be developed around the perimeter of an existing storm pond adjacent to the park - this will be restored as a natural preserve as another feature for visitors to experience at the park. SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 18 5 1 Schedule F_ WORK TASK Project Gather ParkKickoff:..... APR CIENNEEMENNEEMEN MAY JUN JUL 2020 AUG SEP OCT NOV DEC JAN FEB MAR 2021 APR MAY JUN JUL DesignSchematic R=3■■■■■■■■■■■■■ De......R .............. Construction,. ................ Athletic Complex MMK:=:Immmmmmmmmmm PermittingYouth MMMMMMC==MMMMMMM Bidding and Award mmmmmmmmmmmmmmmm Youth Athletic Complex MMMMK:=Mmmmmmmmmm Construction mmmmmmmmmmmmmmmm Youth Athletic Complex MMMMMM Parks and Recreation Commission 6 1 Why SRF EXTENSIVE PARK EXPERTISE The SRF Team has an outstanding track record managing a wide range of park projects, from small neighborhood parks, to community parks, to large-scale regional park facilities. Our wide-ranging expertise provides us the opportunity to propose innovative and creative solutions that will meet the unique needs of your community. C� IN-HOUSE MULTIDISCIPLINARY TEAM SRF's award -winning landscape archi- tecture and engineering services provide Elk River with a complete, multi -disciplinary team. Our team will use methodolgies, solid technical analyses, and realistic implementable strategies to deliver your project. EXPERIENCED TEAM The SRF team includes specialists in park design and delivery across Min- nesota. We bring the synergy, col- laboration, and passion necessary to successfully work with the City of Elk River. SRF has partnered with HCM Architects who bring specialized park building expertise. Our team brings diverse perspectives in delivering highly success park facilities. SRF CONSULTING GROUP CITY OF ELK RIVER // Active Elk River Park Improvements 19 7 1 Total Consultant Cost STAFF HOURS SR. PHASE DESCRIPTION PRINCIPAL ASSOC. ASSOC. SR. PROF PROF. TECH ADMIN TOTALS FEE Phase 1 Survey 0 11 0 0 4 84 0 99 $9,197 Phase 2: Meetings 18 32 18 0 8 0 4 80 $11,092 Phase 3: Project Start -Up 2 12 0 24 8 0 2 48 $5,445 Phase 4: Schematic Design 8 60 90 16 24 0 2 200 $24,043 Phase 5: Design Development 12 60 124 24 36 10 2 268 $31,040 Phase 6: Construction Documentation and Specifications 12 86 124 130 60 20 8 440 $48,961 Phase 7: Bidding 0 16 16 0 0 0 2 34 $4,297 Phase 8: In -Construction Services 0 90 256 0 0 246 4 596 $62,027 Phase 9: Construction Administration $20,000 TOTAL ESTIMATED PERSON -HOURS 52 357 624 194 140 360 24 1,765 AVERAGE BILLING RATES $181 $155 $105 $99 $88 $85 $68 ESTIMATED LABOR AND OVERHEAD $9,433 $56,885 $65,978 $19,255 $12,320 $30,600 $1,632 $216,103 ESTIMATED DIRECT NON -SALARY EXPENSES - mileage and printing costs $2,500 SUBCONSULTANTS $104,000 HCM ARCHITECTS $92,750 WATAB (SEPTIC SYSTEM) $8,500 MAINLINE CONSULTING (IRRIGATION) $2,750 TOTAL ESTIMATED "NOT TO EXCEED" FEE $322,603 OPTIONAL SERVICES GEOTECHNICAL INVESTIGATION (NORTHERN TECHNOLOGIES, LLC) $6,250 CONSTRUCTION TESTING (NORTHERN TECHNOLOGIES, LLC) $38,319 See Appendix for Detailed Fee. 8 1 Insurance SRF has the ability to provide all necessary insurance certificates requested. SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 20 Appendix: Detailed Fee Proposa w a o m m o a a a o a 0 w W IF LL U) U J W ro O 0 Q O F U J U O V N N N U w Z N a W_ J U 7 C7 z O J V ro O O O O K U U U N 7 z a� 0 _ U Z~ n U F W Z W O F 0 ? V Z Z W M O Q m= Z O O N M 5 U Zap u - K U) Q, LL / u)MM w a O O v m v 0 LL O N N U)w a F z ~ ¢ Q J 7 J F w O O W N w U) Z U w Q OOU O U Co O U z U z o w w w i � m � m m a o U) U U O z ¢ U) m Y < O N N F Y � J Q a 0 � z a x t 3 ° -,0m Y m a m Y U) o ° ° o O n ° a o t E u°i O m n t o o o N `o m m o n� m j .S a' - ° s n o E m .� o ° O K a Q yi a T 3 a L T N Q C o .� a N o T O 0 o ii w o r N a ° a 6 o w F -0m .N ° m o m n n a o m n n X O.o o� o o so n ° o '° o am ` ° ° m w d `o T D ° o Q U N N Y o s o N a OI .M _ O C w N o N O 3 6I o N °� O E U°I� N E Q .� Y6 U .N N° T ° o w° N y F U ° a U m O O °_ - a W. s° E u p w H W Q 4 (6 `p O N w ww Q 3 ° Ul N ° o UI N a 3 N +' '6 L p � N UNI N ° U U NO U (6 N E O UI t N Q .. N E o ui - U� u� Q ._ O° 0I a M 09 2 O O O Y n m N t O >` O N Q 6I o� Q N a> N°� N (6 Q fl- E 6I N N 61 Q °O N "UOI 62 Q 2 d O Z '6 UI Y U t Y a d N UI UI 4 N fl- Y > O 00 -6 t N .. 4 E N� Q O .> 2 O X-� O `O 6I t E .� ' '� N T a. 7 W U N U � N w .N E a p .O O y 0 w Q N M N 4 C p O UI N U O >_ } U) w T Q m m L N 4 :N L y a E m C (6 Ul N y E �°-, .N O m°. N .N o.a U° Y K U) Q ° 0, w' w a Q F 0 so N n N y N UI � n A °_�m.�-u N y n" 0 .-Y U y ° ° m U n:.00 N o° n 9 Q 9 n=' O w m- p n=' 9 O Z Y c-�o�a15 -oL QaY�� n E o n- o�.. 0 Eaoi�E.-o �'Y '�Qo �'NQ°�� ��a��� ° wnn �aa w o .S ¢ o w o o> ¢ ° ¢ mU QaY w> ° .` o> E o- O o Y n o Y¢a¢oaL �Y 00- rn m w0Y¢0 U O N 2 E a n O o ate= coo U) o .. n } p o E H W N N N M N V N N N Z W O U) N L N L N L N L N L J K U a Q � a a a a a W z a z w w w z w SRF CONSULTING GROUP CITY OF ELK RIVER // Active Elk River Park Improvements A-1 W w K O z O wW z z Y N F Y K 0 0 m m W m N Q Lu V X W fA F LL U W v M J Q O F J � N Q J U Z N J a W U O O O ¢ o 0 K Z J U U N 7 2 _ Z O U U F W Z W O Lu F j=0 z = 0 o z 0 Mzmz O p U QZQ� U fr n 2 Z W a O O LL M o O (n W Ir F a z F Q J U) F J F Q U) Z U) O0 W O U Co(n D U U) Q W O O Q ctU U O U U N O J Q a U z Ir a a g 36 o � W Y N N N °O O a s O 0 N a N `m s� o> w ° E Y E > o o oa 1 a 0 o-2 0 y m F ° ° .u°-i'a°i g �£= ma°i ° o N ° o w E W E °p—�fly Eu`j °E E X w a°-M o m 6 o m N aOM so > so o w.0 �oN nm.. nm ° ..Q -p°o m o U E o n10 n t o a o n ° o �.o 0U E E E o> u�i `m o y m a s n a u .� E a M- m Q N n m a E x s� . v M,.� fl- w�° .w E E- s w 0 -� o a s o W pd >t-o 61 .oYd m a ° W N F� �O N N 0 0 W 0 6I C N Q> N Y O° -6 a `O `O Y '0 W N a> ci 0 O p y (6 E O U � 4 a O E m a> w a°i o ._ o E°° M 01 m N o� � `m 0 m .� E.Y 04 u F .Q M o s s `m .� Q a m mY m aym�o3�a co �sz �°��oa -�zE° a3iU owOmE ma>��o °� .` W u s .O .4 .�.E w 6 E o L6..0 m o E o E w N � o o a>> wl m E n m n °- > O W ° n o t :� E N n .W m 0 .3 '° .L W- m s K 0 o .. o o L x E .� O a> m> m> -� Y K Y E� ° E .. ° n m ° o o s n a> n a> ° o a° a> .Y o> Y E s m n t w Q ¢ `off a> m w°� ° m° o o° ° m a> s o 0 O il y w aEi w�¢ a m a° .� E a r `m `m � 2 `m m o�� a� a `m '-° `m `m `m `m °> a m u s m�� a . 0 a o a Z o� .N s p n o .o E N p o r n o n >..- s o s o n n n n n n ° o n- s Y� > } 0 O o o" o L o U ° o a> a> a> 2 o m a> a> a> a> a> a> n o ._ � o 'v ~ a Sao oU U Q�¢U¢a`a` oa` E61�cn¢cn¢a`oa`a`a`a` m r z W O N N W A A J K Q d d U a F W Z 3 a z Q w w w z Z W SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements A-2 W Q a 0 W N O O O O N O O O (O WI LL w M EA fA w W � J N r Q O F U J Q U N 0 EA M (O 000 000 V V Z N a W J U 0 C7 O * ¢ v w ro o a. Z J U N M EA (O ~ U Z n U F W Z W O W N=0 Z O v ro e, o 0 ::j w < O O N U z LL - H mo M u) � LL n x 2 Z W LL O V W N LL 0 m m N O u) w a z ¢ ~ Q Q J J� w � Z w Q N N N O O N 00 U m O U D (n U Q w Q m N M N ct U (n O v° Es U U Q O N M J Q Q- W C) Z a N .3 � ° m w y t O Q O d N *, Y OU 6I - Z Y N .� O (6 4 E OU W UI N O N U N N m N U O .Q w d OU Q -� E O N m O O N Y d' o O O .• W L o a N-oO O N N.O O 3 N O 6 °� s E 6 n ° E a N E H Q '> N N d 6I m UI(6 E O p O Ul m X W E E a N m m O O U O 2i = N E E- N .O N n ".. ._.� o f m mE (6 6 E Z W Q �ayi N M O D N' O t E ii -� r� _ n o Q XaX O - m y E °�s $. s° V o � N O W ZO ° � K W J x O E 61 o z O a o � o ° ° O O z 0 U ~ Q y -2 w'm 3 s'-Y E •. Q QEy N E UI .m `� E o$ •. !` � O W a w t m N w ° V s U m m� w Em .o ° u fl E a° a 3 a m m N N w a J m 0 Q Z W U W Z LL 7 W U O U O_ aU .F N N N.N w.N- a Q `O E> p> p a J } J 0 U O w 0 N � Y y6 3 0 w Q'06 N . n°° m o.N E Q W ¢ D O ¢ W ct Z F 7 W a v U z Q 0°` N o m o>° .in L° o ° nQ nw ..ate n� °-oa ..-o c O J 0 �Fa0 2 w a i ���sso a�u mm°m°oo°oLLsm 6 w �w u�ixwnVW u~i 0 O 0 Y a 3 N O 6 3 Y O y 3 N 3� 3� '06 a N �`p � N J Q Q O m Z J F Z 0 ~ O U N O LLLL OU O O� fl- N O O O fl- O O fl' O O Q N U 4 N LL' (6 UI LLr S� ci �ci oU oaa Na C O F O 1 (n U m 7UQQ 0 U O-UoQa°°QUUQm U¢ w w nx�� ~w O ro N m N Z W A A J K U a Q � d d z 0 z 0 K Z a Z Q w w w z z W SRF CONSULTING GROUP CITY OF ELK RIVER // Active Elk River Park Improvements A-3 j k k , ( \\ \ \ k 4 P. P. k )� � 5t7 % \ { a v 7 : / M : )wi 0 ) ) { k koc ) y = = y § ( \ \ {_ vk ƒ ƒ L L Ir \ \ \ § k \ {)\ \ § / \ § \ /)\\\)\a\\\ § K K ! w !22®2E222 & § 4 / 4 $}/ k//(/§/)/) o r G § 4 § ` Q § ` d m / k / JrCONSULTING GROUP CITY OF ELK RIVER H Actie m +e R& »Pme»m & Ll Oki I City of Elk -�- River Request for Proposals Active Elk River Park Improvements Orono Park and Youth Athletic Complex (YAC) Section 1: General Information All correspondence regarding this Request for Proposal (RFP) must be addressed to: Michael Hecker, CPRP Parks and Recreation Director City of Elk River 13065 Orono Parkway Elk River, MN 55330 mhecker&ElkRiverMN.gov Questions about the RFP All questions must be received before 4:00 p.m., March 27, 2020. Questions received after that time will not receive a response. Proposal Deadline Proposals will be accepted until 4:00 p.m. on Thursday April 2, 2020. Please submit five (5) hard copies and one (1) PDF copy (on a flash drive) of your firm's proposal. Acceptance of Proposal Contents The contents of this RFP and attached information provided to the proposer will be included as part of the contractual obligations if a contract ensues. All information in the proposal is subject to disclosure under the provisions of Minnesota Statutes Chapter 13 — Minnesota Government Data Practices Act. Proposal Timeline Submission of proposals: April 2, 2020, by 4:00 p.m. Consultant approved by City Council: April 20, 2020 The consultant team shall begin the project design phase upon contract approval. The construction of the identified park improvements is intended to occur during both 2020 and 2021, with availability of the project areas as follows: The Youth Athletic Complex project area will be available for construction activity late August 2020. The Orono Park project area is available for construction activity in the Spring of 2021. All construction and the final inspection of these improvements must be completed by October 1, 2021. Request for Proposal Active Elk River Improvements Project Overview The intent of this request is to obtain the services of a design team, hereinafter referred to as the "Consultant" to perform consultant services for the City of Elk River, Minnesota, hereinafter referred to as the "City." Services of a multi -disciplinary team with park design and construction plan experience in both active and passive public park components is required to assist staff preparing plans for the elements outlined in this proposal. Anticipated disciplines should include landscape architecture, architecture, civil engineering, mechanical, electrical, and structural engineering. The city is seeking proposals for a Consultant to fully design and administer the construction of park improvements at Orono Park and the Youth Athletic Complex (YAC). additional information related to the Orono Park improvements are shown in the attached Orono Park Master Plan approved by the City Council on July 17, 2017. Section 11: Project Description The Consultant services to be performed are for landscape architecture, architecture, and engineering design services for the following: 1. Design review and update of the 2017 Orono Park Master Plan, including a review of site utilities, parking lot and pedestrian circulation, and layout of the proposed improvements identified in description of improvements. 2. Development of a preliminary design package for both project areas at Orono Park and YAC. 3. Development of final design packages including plans, specifications and construction documents for both the Orono Park and YAC improvements. 4. Coordination of bidding the projects including posting plans, supporting bidder questions, issuing required addenda, tabulation and bid review, and a recommendation of a qualified bidder for each project. 5. Construction administration and project inspection for both projects. Active Elk River Park Improvements Description and Background The Orono Park and YAC park improvements are part of a major investment in the quality -of -life for Elk River residents made possible by a 2018 voter -approved $35 million Local Option Sales Tax Referendum. Details of the plan and construction updates can be found at ActiveElkRiver.com. Orono Park Orono Park, located at 18599 Gary Street, is a family -friendly, 28-acre park located on the west shore of Lake Orono and south of and adjacent to Highway 10. The park is also adjacent to the City Hall campus and the Dave Anderson Athletic Complex (DAAC). Prominent park features include a sandy swimming beach, park shelters and a destination playground that opened in 2013. The 2017 master plan includes the addition of the following park features to make this signature park complete: ■ Reconfigured parking lots ■ Skate Park (designed by Spohn Ranch) ■ Park pavilion with integrated restrooms ■ Expanded beach area ■ Open recreation lawn ■ Splash pad ■ Pickleball courts ■ Basketball courts ■ Personal watercraft rental (attached to park pavilion) The total estimated budget for the Orono Park features as identified in the Active Elk River Plan is $2.5 Request for Proposals Active Elk River Park Improvements million, exclusive of design fees and parking lots. The parking lots and related design costs will be paid for from other designated funds. The funding for the design and construction administration will be the Active Elk River Fund. The construction and construction administration of the skate park is included in the estimated cost of the skate park amount of $385,000. The design of the skate park is complete. Skate Park Background Spoon Banco Skateparks was hired by the City to perform design services for the skate park. Spoon Banco Skateparks are listed on the Minnesota State Contract and City intends to utilize them as the contractor for skatepark implementation. The Consultant will need to coordinate with the skate park installer to ensure schedules, staging, and site construction activities are accomplished efficiently. The preparation of the skate park area and striping of grass and topsoil shall be coordinated between the Consultant and Spoon Banco. Splash Pad Background The City is working with Aquatix through Sourcovell public cooperative to provide design concepts and technical drawings for the Orono Park splash pad. It is expected the Consultant will coordinate with Aquatix during the design phases and integrate their designed system into the bid document package. This package includes complete written specifications, splash pad construction details, mechanical and electrical system design, and all product and material installation detailing. The Consultant shall coordinate the electrical and mechanical system improvements to connect to the designed splashpad system. The Orono Park parking lots and park amenity construction shall be started in 2021 with completion by late 2021. Youth Athletic Complex The YAC, located at 9950 1651h Avenue, is a 95-acre softball, baseball and football complex. This project scope includes new restrooms and a new or renovated storage/concession building. As part of this project, the Consultant will lead the City through a design process to explore options to make improvements to the existing two-story concessions/storage building. The range of improvements may vary from a renovation of the existing structure to the demolition and reconstruction of a new facility. Additionally, restrooms (unisex/family) also need to be installed as a separate structure in the park, including the design and implementation of an independent septic and water system. The estimated budget for the YAC features included in this project is $440,000, exclusive of design fees. City Council approved a project timeline of construction and installation for the building structure and restrooms at YAC by late summer 2020. The timing of the YAC project may be changed to match the Orono Park project if is found to be cost effective. Other ongoing or completed projects at YAC - The Active Elk River Project identified $2 million in YAC improvements to include athletic field lights and a playground. The lighting of six ball fields and a new playground are underway at a cost of $1,381,558. Lighting will be completed by May of 2020. Dugouts for all 6 ball fields are either built or under construction under a different contract. The dugouts and playground construction will be May 18 through mid July 2020. Request for Proposals Active Elk River Park Improvements Section 111: Overall Scope of Services Consultant services are anticipated to begin roughly in April of 2020 and end after final acceptance of the improvements and expiration of the warranty period, whichever comes later. The selected Consultant shall be the overall project lead and manager on behalf of the City. The City proposes a team approach in the development of the design utilizing the services of the Consultant in conjunction with the Parks and Recreation staff. This includes public presentations at one or more Parks and Recreation Commission meetings to discuss the design review and updates to the 2017 Orono Park Master Plan and design packages. The Consultant shall report to and take direction from city staff as directed by the City Council. The Consultant's proposal should include a detailed scope and budget estimate for all services as outlined in this RFP. The City stresses Consultant's innovation, uniqueness and ingenuity in proposing their scope of services. Recommended changes to the scope and project approach will be considered and concerns regarding budget and time frames should also be identified. This includes sequencing the bidding and construction timeline schedules of YAC and Orono Park. Bids for the YAC project in spring/summer of 2020 must remain within the established budget and may be rebid during Orono Park project bidding process with an anticipated construction of 2021. The budget for the trail, skate park and park improvements shall be allocated to the Active Elk River Project Fund and the budget for the parking lots shall be the Pavement Preservation Fund. Management Services The Consultant will serve as assistant to the Parks and Recreation Director throughout all elements of the park design project. Services rendered shall include as a minimum: 1. Assistance in defining the maximum utilization of project resources in completing the scope of services, considering budget and time frame constraints. 2. Coordination, preparation and delivery of monthly reports covering the project. Meeting with the Parks and Recreation Director on a regular basis. 3. Assistance in preparing documents, CAD, graphics and mapping standards to support the depiction of the design elements. Design Scope of Services The Consultant shall: 1. Include a topographic survey for Orono Park and the YAC building portion of this project. 2. Include Right -Of -Way title work for Orono Park. 3. Review and modify the master plan for the park including the layout and orientation of the parking lots, pickleball, basketball, and new restroom/pavilion for Orono Park. 4. Review and design the storage/concessions building at YAC. Explore repurposing the current building or demolish and construct a new building, depending on needs and costs. The concessions food preparation area must follow the Minnesota Department of Health standards. The City is recommending a seasonal operation with a basic design of an epoxy sealed floor, stainless counters and a hand sink. 5. Define materials and construction systems for the project in entirety. 6. Design water, storm and sanitary connections to accomplish the proposed park improvements, including the elimination of the Orono Park Kuss ballfield by making it into an open recreation lawn. 7. Design an independent septic system and utilities for the restroom and concession buildings at Request for Proposals Active Elk River Park Improvements YAC. Design an Orono Park pavilion building including picnic area, concessions, personal watercraft rental, restrooms and a splash pad mechanical room. The Consultant must coordinate mechanical systems design for an Aguatix re -circulating splash pad system. This includes a mechanical room estimated at 10x16 ft. in size. The mechanical room must provide adequate room to maintain equipment. 9. Design a lighting system for the Orono Park trails, parking lots, and electrical needs of the new pavilion and splash pad. Design shall be coordinated with Elk River Municipal Utilities. Trail lights should match the lights recently installed for the TH10 trail project. 10. Design trails for Orono Park as generally shown in the 2017 Park Master Plan. 11. Develop plans, details, sections, elevations, general and technical specifications for the entire scope of this project to facilitate the efficient bidding and construction of the proposed elements. 12. Coordinate with skate park designer and installer, Spoon Banco, regarding the coordination of the construction of the skate park. 13. Update the Parks and Recreation Commission regarding minor modifications to the master plan and designs for Orono Park. 14. Review draft and final design sets with city staff (60%, 90%, 100%) and the Parks and Recreation Commission (90%). The City is planning to apply for federal funding for construction elements. The consultant shall assume the plans will need to be design for to meet federal funding requirements. Construction Administration The Consultant shall: 1. Prepare ads for bids, bidding support, pre -construction meeting, bid tabulation and recommendations, and assume bi-weekly construction meetings during active portions of the project construction. 2. Coordinate with the City regarding the staging area for construction equipment and materials and the overall construction staging and schedule. 3. Review pay requests and recommended action to staff. 4. Process change orders, if required. 5. Complete inspections; prepare preliminary and final project punch lists and coordination of close-out documentation. All permit and other regulatory review fees shall be paid by the consultant and will be reimbursed by the city. These costs shall not be included in the consultants proposed fee for the project. Section IV: Proposals The proposal shall contain the type of information summarized below. Additional information is allowable, providing it is dir ectly relevant to the proposed project. Proposal Format The submittal should follow the Table of Contents listed below: 1. General Firm Introduction (include your firms' expertise about this pro)ect) 2. Project Understanding 3. Project Approach 4. Proposed Project Team and Experience 5. Schedule 6. Qualifications Statement 7. Any Additional Information as Needed Request for Proposals Active Elk River Park Improvements 8. Consultant Cost 9. Insurance Certificate A brief description of each section is as follows: 1. General Information Give general information and a brief history of the consulting firm. State whether the Consultant is registered and licensed to perform landscape architectural work in the State of Minnesota. Include similar- information on key subconsultants, if an_y, proposed for the project. 2. Project Understanding Include a summary of the Consultant's understanding of thisproject. 3. Project Approach Provide specific approaches, methods, and assumptions that will be utilised to accomplish each work item. 4. Proposed Project Team and Experience Identify the key project team members and describe their specific roles on the project. Include key team member from subconsultant firms, if any. Describe relevant experience and provide information on at least three (3) reference projects completed in the last ten (I0) years. Provide references and contact information. Include one page or smaller resumes ly for key members of the project team, including field personnel. 5. Schedule The project will begin as soon as a consultant is selected. The Consultant is to propose a schedule that shows how this project will be delivered. The schedule should include a list of key tasks within each phase, key milestones and approximate dates, and deliverables. 6. Statement Explaining Why Your Firm Should be Selected to Perform Services for This Project Several firms have been asked to respond to this Bequest for Proposal. Explain wh_ y your firm is the best gual f ed for this project. 7. Additional Information Include any other information that is believed to be pertinent, but not specifically requested elsewhere in this BFP. 8. Total Consultant Cost The Consultant cost should be separated as follows: a. Not to exceed cost. b. Hourly rates for all consultant employees expected to work on this project. These rates shall be the agreed upon costs for any additional services requested by the City, above what has been detailed in the RFP. c. Reimbursable costs including detail of service or item and applicable charge per unit. Proposals that do not include a Not to Exceed' cost will be disregarded without further consideration. It is the responsibility of the proposing firm to accurately predict the amount of time they require for services. 9. Insurance Certificate Indicate ability to provide all necessary insurance certificates if selected for the project. Certificate not required at time ofproposal submittal. Request for Proposals Active Elk River Park Improvements Section V: Consultant Selection Proposals will be reviewed and evaluated by City staff and based on the following criteria: 1. Consulting firm and key project staff experience. 2. Proven track record in successfully completing similar projects on time and within budget. Successful experience of both the firm itself and the individual team members will be considered. 3. Proposed approach to completing the project. 4. Consultant's familiarity with landscape architecture 5. Consultant's familiarity with the City's Active Elk River program. 6. Proposed project schedule. 7. Proposed consultant cost. Following review of the proposals by the City, only selected Consultants will be asked to make oral presentations of their proposals to City representatives. Upon conclusion of the presentations, staff will select a Consultant to negotiate a contract as follows: 1. If for any reason, a firm is not able to commence the services in that firm's proposal within 30 days of the award, the City reserves the right to contract with another qualified firm. 2. The City shall not be liable for any expenses incurred by the Consultant prior to the signing of a contract including, but not limited to, the proposal preparation, attendance at interviews, and/or final contract negotiations. 3. The proposal must be signed in ink by an official authorized to bind the Consultant to its provisions that will be included as part of an eventual contract. The proposal must include a statement as to the period during which the proposal remains valid. This period must be at least 90 days from the date of the submittal. 4. The City reserves the right to reject any and all proposals or to request additional information from any or all the proposing firms. Section Vl: Contract Terms and Conditions Upon selection of a Consultant, an Agreement or Contract for Services shall be entered into by the City and the Consultant. The standard City contract is attached. It is expected that the contract will provide for compensation for actual work completed on a not to exceed basis, with the following conditions. 1. Deletions of specific components, such as individual project meetings, will be at the discretion of the City. Payment or reimbursement shall be made based on actual tasks completed on the project plus necessary subcontractor work (as applicable) and out-of-pocket expenses. Billing that exceeds the not to exceed amount will not be compensated unless a contract extension has been approved in advance by the City Council. 2. The City shall retain ownership of all documents, plans, maps, reports and data prepared under this proposal. In addition to being provided hard copies and digital documents throughout the project, the consultant shall supply the City with a fully scanned (Laserfiche) project file upon completion. 3. If, for any reason, the Consultant is unable to fulfill the obligations under the contract in a timely and proper manner, the City reserves the right to terminate the contract by written notice. In this event, the firm shall be entitled to just and equitable compensation for any satisfactory work completed to that point at the discretion of the Parks and Recreation Director. 4. The Consultant shall not assign or transfer any interest in the contract without prior written consent of the City. The Consultant shall maintain comprehensive general liability insurance in accordance with Section 466.04 of the Minnesota Statutes. Request for Proposals Active Elk River Park Improvements The Consultant shall defend, indemnify and hold harmless the City of Elk River, its officials, employees and agents, from any and all claims, causes of action, lawsuits, damages, losses or expenses, including attorney fees, arising out of or resulting from the Consultant's (including its officials, agents, subconsultants or employees) performance of the duties required under the contract, provided that any such claim, damages, loss or expense is attributable to bodily injury, sickness, diseases or death or injury to or destruction of property including the loss of use resulting therefrom and is caused in whole or in part by any negligent act or omission or willful misconduct of Consultant. The Consultant contract shall be governed by the laws of the State of Minnesota. Project summaries shall be submitted with each invoice during the course of the project. Each summary shall detail the amount billed to date, outstanding work items with costs to completion, and timelines. Invoices submitted to the City shall include a detailed breakdown of all chargeable Section V11: Appendix Orono Park Master Plan Orono Park Aerial Skate Park Site Plan Youth Athletic Complex (YAC) Master Plan Youth Athletic Complex (YAC) Aerial Active Elk River Sales Tax Referendum Projects Active Elk River Project Timeline Standard Professional Services Agreement Request for Proposals Active Elk River Park Improvements # Consultant Total Cost* I ARI** $360,000 2 Clever $393,650 3 H GA $559,080 4 HI GI $344,825 5 HTPO $478,526 6 LHB** $348,000 7 SRF $367,172 8 WSB $283,437 Median $363,586 Total cost includes geotechnical investigation and construction testing if provided. Consultant did not provide pricing for geotechnical investigation or construction testing.