VILLAGE OF ELK RIVER COUNCIL MEETING
October 31, 1960
A special meeting was held at Village Hall on October 31, 1960 for the purpose of making
assessment for Sewer Improvements. Figures for total cost of sections A, B & C footage and rate
per foot are attached.
A motion was made by Briggs and seconded by Bergerson to authorize Mayor and Clerk to sign
contract with the village of Dayton to furnish them with light and power.
Elk River Sanitary Sewer System
1960 Extensions
Section C
Industrial Area
Total footage to be assessed 1686.40
Rate per foot 6.63
Total to be assessed $11,180.83
Cost of Construction 10,063.40
Eng and Assessment Costs 11,106.97
$11,170.37
Elk River Sanitary Sewer System
1960 Extensions
Section B
Orono Area
Total footage to be assessed 7029.90
Rate per foot 6.34
Total to be assessed $44,569.57
Construction Cost 58,178.50
En and Assessment Costs 6,399.64
64,578.14
20,000.00
Less Lift station 44,578.14
Elk River Sanitary Sewer System
1960 Extensions
Section A
Upland Area
Total footage to be assessed 8495.34
Rate per foot 5.72
Total to be assessed $48.593.34
Construction cost 42,638.70
Engineering and assessment 4,689.16
Const. Cost (Robt. Olson Ext.) 1,271.30
Eng cost 10.00
$48,599.16
Meeting adjourned.
H.A. Briggs
Village Clerk