Loading...
7.1 PRSR 05-13-2020 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To Parks and Recreation Commission Item Number 7.1 Agenda Section Action Meeting Date May 13, 2020 Prepared by Michael Hecker, Parks and Recreation Director Item Description CSAH 12 Highway Construction and Hillside Park Reviewed by Cal Portner, City Administrator Reviewed by Action Requested Receive presentation by Sherburne County Assistant Public Works Director David Roedel regarding CSAH 12 Highway Construction and Hillside Park access. Accept, by motion, the construction, and improvements by the county to CSAH 12 Highway without consideration of the city costs for construction. Background/Discussion At the April 20 City Council meeting, Sherburne County Assistant Public Works Director David Roedel presented the county’s $7.7 million CSAH 12 Highway Construction project proposal. He shared vehicular movements in and out of Hillside Park and the projected city portion of the cost share of $1.2 million. The City Council requested he present the updates at the May 13 Commission meeting. The county considered Park and Recreation Commission safety concerns with speeds and traffic volumes for a left turn out of the park. The county performed a roundabout analysis at Trott Brook Parkway, looked at and added a modified curb to allow the U-turn maneuver at Trott Brook in lieu of the roundabout and added the roundabout at Johnson Street. They added a dedicated right turn lane into the park which provides a safety benefit by getting traffic out of the through lane. The city was unable to secure money to continue the trail system on CSAH 12 to Cleveland. The cost is estimated at $61,000. The county is offering to pay for the trail construction as part of this reconstruction project. Financial Impact The county presented April 20 to City Council the city’s cost share of $1.2 million. Attachments  Project Comment Cards  CSAH 12 Improvements Map and Project Map New Signal - Creates a controlled crossing - Handles traffic better than the 4- way stop condition - Pedestrian crossing movement enhanced Added Left and Right Turn Lanes along the corridor, reduces chances of rear-end collisions. Concrete Medians- Separates traffic- Provides side friction which helps with speed reduction (urban feel) Extension of Trail to Spectrum School Roundabout - Provides traffic calming and reduced speeds - Provides a better access from neighborhood to access CSAH 12 - Aids existing sight distance issues. - Controlled pedestrian crossing - Facilitates u-turns and corridor mobility. Roadway superelevation meets speed standards Added Right Turn Lane Added Left Turn Lane Added Right Turn Lane to Park Added Left and Right Turn Lanes Added Left and Right Turn Lanes Added Left and Right Turn Lanes Pavement Rehabilitation in Muck Area Curb added, graded for future trail Entrance aligned with Johnson Street Sidewalk connection to neighborhood Radius modification to facilitate u-turns. Added Right Turn Lane to City Street Optional Trail 169 Date: Printed:WSB Filename:c:\users\ckochmann\appdata\local\bentley\projectwise\workingdir\wsbeng-pw.bentley.com_wsbeng-pw-01\ckochmann@wsbeng.com\dms07006\14875-000_Project_Map.dgn4/14/2020Sherburne County, Minnesota CSAH 12 Improvements S DYHTP GM Project Map N N 40 UOC YTN 13 UOC YTN12 UOC YTN MATCHLINEMATCHLINE11'LANE 13'RTL 11'LANE 11'LTL 13'RTL 11'LANE 11'LANE 13'RTL 12'LANE 11'LANE 13'RTL 12'LANE 13'LANE 11'LTL 11'LANE 12'LANE 12'LT L 11'LA NE 11'LA NE 13'RTL 11' L ANE 13'RT L12' LT L 11' L ANE 12'LA NE 13'LANE 12'LANE 13'LANE 12'LANE 13'LANE 12'LANE 13'LANE 12'LANE 13'LANE12'LANE 13'LANE 13'LANE 12'LANE 13'LANE 11'LANE 13'LANE 12'LANE 13'LANE 12'LANE 13'LANE 12'LANE 13'LANE 12'LANE 13'LANE 12'LANE 13'LANE 12'LANE 13'LANE 12'LANE 13'LANE 12'LANE12'LANE13'LANE13'LAN E12'LA NE11'LTL13'RTL13'LANEPark Trott Brook City Park Hillside Walmart TWIN LAKES RD NWTYLER DR NWLINE AVE NWZANE ST SWTROTT BROOK PKWY NW11'LANE 13'RTL 11'LTL 11'LANE 11'LTL 13'RTL 11'LANE 11'LANE 11'LANE11'LAN E11'RT L11'LTL 11'LANE 12'LANE 12'LANE 11'LANE 11'LANE 11'LANE 11'LANE 12'LANE 12'LANE 12'LANE 12'LANE 12'LANE 12'LANE 13'RTL 12'LANE 13'RTL 12'LANE 12'LANE 12'LANE 12'LANE 11'LTL Athletic Fields Spectrum High School NIXON STJOHNSON ST NWFILLMORE ST NWAVE NWCLEVELAND