Loading...
6.1.G ERMUSR 5-12-2020UTILITIES COMMISSION MEETING TO:FROM: ERMU Commission Mark Fuchs – Operations Director MEETING DATE: AGENDA ITEM NUMBER: May 12, 2020 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: th Staff has been working with the City of Otsego on the ParkviewAvenue and 88 Street project, located south of the Coborn’s that is being built. The project requires the installation of three phase underground primary infrastructurefor an apartment buildingand future developments, as well as forstreetlights. Elk River High School will be modifying theirparkinglotthis summer, with thesignal system needing to be moved to the west from its current location. During the modification, the existing water main in the parking lot will also be replaced. Staff continues working with MNDOT on the reconstruction and improvement of Highway 10that is slated to be completedin 2021. Staff continues to work with Kodet Architectural Group on the new field services building. We are looking at our current needs and considering options that would help us meet future needs. Most importantly, the building costs need to be in line with budget. Staff is also working with Power Systems Engineering (PSE) on plans to install electrical infrastructure to make room for the new field services building. ______________________________________________________________________________ Page 1 of 1 219