8.2. SR 05-18-2020 Request for Action To Item Number Mayor and City Council 8.2 Agenda Section Meeting Date Prepared by General Business May 18, 2020 Justin Femrite, P.E., Public Works Director Item Description Reviewed by Engineering Division Transition Cal Portner, City Administrator Reviewed by Action Requested Approve, by motion, contracting with Bolton & Menk, Inc. for engineering services detailed below. Background/Discussion With the sudden departure of the assistant city engineer, we have immediate project responsibilities that need to be met. We have reassigned some duties to current staff and evaluated a long-term divisional structure that will allow for better continuity of operations if a staff member leaves while providing continual opportunities for staff development and advancement. As we transition to a modified divisional structure over the next couple of years, we are seeking approval to bridge some of our short- and near-term project management and project development needs through a contract for services rather than replacing the position. We anticipate the consulting services terminating as the projects are complete. We solicited proposals from three firms that have completed work for us in the past who we believe could perform the work. We requested a single project manager to serve as an extension of city staff in the direct management and development of the following projects: 2021 Street Improvements, 169 Redefine Frontage and Backage Road Improvements, 169 Redefine Utility Relocations; and the Active Elk River Trail Improvements. In addition, the consultants were asked to include some basic project management services on the TH 10 /Lake Orono Trail project and attend our weekly engineering scheduling meeting. From the three proposals, we recommend entering into a service contract with Bolton & Menk, Inc. based on their qualifications, work history on city projects, and their estimated fees. Additionally, their project manager lives in Elk River, giving him access to respond to questions and/or review concerns very quickly. Financial Impact The change to hiring the consultant project manager vs rehiring of the assistant city engineer is budget neutral. It was our goal while considering a modified division structure to be budget neutral. Attachments  Bolton & Menk Proposal The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Djuz!pg!Fml!Sjwfs Nbz!9-!3131 Qspqptbm!gps Dpotvmubou!Qspkfdu! Nbobhfs Dpoubdu; Kbtpo!Dppl-!Q/F/ 874.311.3555 Kbtpo/Dppl @ cpmupo.nfol/dpn 8644!Tvoxppe!Esjwf!OX!}!Tvjuf!317!}!Sbntfz-!NO!66414.622: Qi;!)874*!544.3962!}!Gby;!)874*!538.1944!}!Cpmupo.Nfol/dpn 8644!Tvoxppe!Esjwf!OX Tvjuf!317 Sbntfz-!NO!66414.622: Qi;!)874*!544.3962 Gby;!)874*!538.1944 Cpmupo.Nfol/dpn May 8, 2020 Justin Femrite, P.E. Public Works Director/Chief Engineer City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: Consultant Project Manager - Proposal for Professional Engineering Services Dear Mr. Femrite: Voefstuboejoh!Fml!Sjwfs!— as we did on the 2019 Street Improvements project. We have developed a successful working relationship with your engineering department, public works, and Elk River Municipal Utilities. We will continue to build on those relationships, into project managers themselves. Qspkfdu!Lopxmfehf!boe!Ijtupsz!—!We have assisted the city with many recent construction projects and studies. Last year, we completed the design of the 2019 Street Improvements Project and Lions Park Drive Improvements. We are completion of these projects this summer. Qbsu!pg!uif!Dpnnvojuz!— projects to enable us to meet the city’s expectations. I live in the City of Elk River and have its best interests in mind. My experience in delivering federal aid, state aid, and assessment related projects will serve as a solid base to draw from while delivering future projects for the city. We are excited at the opportunity to serve as the consultant project manager for the city. Our proposal will remain valid for a period of no less than 90 days from the submittal date. I will serve as your lead client contact and project manager through the duration of this contract. Please contact me at 763-200-2444 or Jason.Cook@bolton-menk.com if you have any questions regarding our proposal. Respectfully submitted, Cpmupo!'!Nfol-!Jod/ Jason W. Cook, P.E. Principal Engineer Cpmupo!'!Nfol!jt!bo!frvbm!pqqpsuvojuz!fnqmpzfs/ 4 ! Qspqptfe!Qspkfdu!Nbobhfs!Rvbmjgjdbujpot!boe!Ufbn!Fyqfsjfodf This year, Jason is currently working with Ryan on Kbtpo!Dppl-!Q/F/, is proposed as the consultant project the Main Street Forcemain Relocation project and will manager, performing all project management tasks for the continue to work with him through project delivery. duration of this contract. Jason has more than 15 years of engineering experience and will serve as your primary Jason is also currently working with the City of Elk the trail lighting design with MnDOT. The addition coordinate each project phase. Jason will provide close of managing the overall trail construction would be a coordination with the City of Elk River engineering team. seamless addition to the tasks currently being performed under contract. and all schedules, costs, public outreach, and scope management. Jason is the city engineer for the City of Isanti and has needed to complete survey and site inspection as meetings as needed. This experience makes him the Jason will be supported by key individuals and support perfect candidate to serve the City of Elk River as their consultant project manager. more than 150 engineers, planners, landscape architects, Jason has delivered multiple federal aid, state aid, local partnership program, and special assessment projects from conception to project closeout. In addition, he has continued to deliver all aspects of our services. We created the City of Isanti’s Pavement Management have developed new, innovative ways to perform public Program and has extensive experience in pavement engagement and will be able to bring this talent to the evaluation and maintenance needs. City of Elk River should the stay at home order continue. Jason’s experience working on federal aid trails for Three Rivers Park District and the City of Ramsey set him apart from others in his ability to deliver the two trail projects included in this proposal. Xf!cfmjfwf!jo!uif! Jason will provide construction project management qpxfs!pg!gbdf.up. gbdf!nffujoht-!gsjfoemz! dpowfstbujpot-!boe!b! dpmmbcpsbujwf!efdjtjpo.nbljoh! managers and professional engineers. Over the past year, qspdftt!up!lffq!zpvs!qspkfdut! Jason has worked directly in this role with City of Elk River EIT Ryan Sandhoefner during the 2019 Street po!tdifevmf-!xjuijo!cvehfu-! Improvements project and the Lions Park Drive project. boe!gpdvtfe!po!sfbm-! xpslbcmf!tpmvujpot/ allowed for the delivery of the project seamlessly, while providing training for Ryan to continue to grow into the project manager role. Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub 5 ! Jason has been a project engineer and project manager on numerous street and utility projects since 2004. He has worked on local, state aid, and federal aid projects; site development projects; pavement management projects; and trunk utility projects. He has developed strong working relationships with other city engineers and has expanded opportunities beyond the day-to-day engineering services for the communities he serves by coordinating multidisciplined and complex projects. Solving unique problems and seeing concepts come to fruition motivates Jason every day. • • 2019 Street Improvements • • Lions Park Drive Improvements • Main Street Forcemain Relocation • TH 10 Trail Lighting • Schoot Street Easements • City Engineer • Railroad Avenue Improvements, Phase II (state aid, assessments) • TH 65 & Cajima RCUT Improvements (Level 1 Layout) • Palomino Road Improvements (state aid, assessments) • 2018 Street & Utility Improvements • 2017, 2018, 2019, and 2020 Pavement Management Projects th • 6 Avenue Reclamation (state aid, assessments) • 2018 Street Rehabilitation • Street & Utility Improvements nd • 2 Avenue North Improvements (state aid, assessments) • TH 169 Watermain Crossing • Bunker Lake Boulevard and Puma Street Improvements (state aid) • Riverdale Drive Extension (co-op) • Mississippi River Trail Phase III (federal aid) • Future Business Park Study • Sanitary Sewer Comprehensive Plan Update • Twin Lakes Regional Trail in Brooklyn Center (federal aid) • On Ramps Trail Segments (federal aid) Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub 6 ! Qspkfdu!Voefstuboejoh Menk is focused strongly on the successful delivery of Hfofsbm!Dpotjefsbujpot The scope of the engineering services requested is project delivery through all phases, including smart as described in your email on May 1, 2020 and as design choices to manage construction risks and costs. discussed during our Microsoft Teams meeting held on We will coordinate the work, so all tasks and design elements are targeted to meet the needed schedules. Our in our proposal for services, with additional private development services and miscellaneous project estimating and scoping included at an hourly rate, if We also understand the city’s need to develop their discussions occur throughout this contracted process. Three additional projects may be included in the Hfofsbm!Gjsn!Jogpsnbujpo We believe all people should live in a safe, sustainable, transition planning. The following are the primary and beautiful community and we take pride in our ability projects/tasks and our understanding of the scope of to make that happen. services for each. Our commitment to communities began in 1949 with 3132!Tusffu!Jnqspwfnfout This project includes 12.2 miles of bituminous overlay Martin Menk. They saw people in their surrounding in 6 regions of the city and 1.5 miles of full depth communities who had dreams of a bright future, a desire reclamation along Jackson Avenue NW as depicted on to grow, and a common challenge of aging infrastructure. the city website. John and Martin’s goal was to help communities make The scope of services will be similar to the 2019 Street best solutions for their needs, and treating them right. Improvements project we completed with the city last Their legacy lives on. We still want to help, we work hard year, with the addition of serving as the city’s project manager. has more than 450 employees including a professional Hfofsbm!Tdpqf!Ubtlt; Planning, design, inspection, and project management architects, and surveyors. UI!210Mblf!Pspop!Usbjm The city has already completed the planning, funding, solutions. We take care of our clients by providing the best services and solutions for them. From advocating assisted in designing the lighting along this project and we are currently under contract to complete shop funding; we take pride in our work throughout the Upper drawing review and site inspection of the lighting installation. We will be able to complete additional power of face-to-face meetings, friendly conversations, project management seamlessly as we are already and collaborative decision-making to keep your projects engaged in project delivery. on schedule, within budget, and focused on real, workable solutions. Hfofsbm!Tdpqf!Ubtlt; Construction project management We promise every client two things: we’ll work hard for you and we’ll do a good job. We take a personal interest in the work being done around us. At the end of the day, we’re Sfbm!QfpqmfSfbm!Tpmvujpot. Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub 7 ! Ixz!27:!Sfefgjof!—!Vujmjuz!SfmpdbujpoQsjwbuf!Efwfmpqnfou!Tfswjdft The overall scope of the needed utility relocation work The city is currently scheduled to complete the inspection and needed project management on three sanitary sewer crossing that will require the construction support on these projects, or if any additional private Street due to the proposed grade separation. With our provide any additional project management or inspection services as needed. the work needed to complete these utility relocations in Hfofsbm!Tdpqf!Ubtlt; Inspection and project management Hfofsbm!Tdpqf!Ubtlt; Planning, design, inspection, Xfflmz!Fohjoffsjoh!Tubgg!Nffujoht and project management Ixz!27:!Sfefgjof!—!Gspoubhf! discuss project status and work plans for each coming Dpoofdujpot week. The overall scope of the needed frontage road Hfofsbm!Tdpqf!Ubtlt; Communication and project management and discussed possible frontage and backage road Njtdfmmbofpvt!Qspkfdu!Ftujnbujoh!boe! Tdpqjoh improvements and the work needed to complete these assist the city in estimating and scoping additional projects to plan, budget, and identify their needs. We understand that this will include meeting state aid requirements. Hfofsbm!Tdpqf!Ubtlt; Planning, scoping, and estimating Hfofsbm!Tdpqf!Ubtlt; Planning, design, inspection, and project management Gvuvsf!Qspkfdut Should additional projects arise during the time our Bdujwf!Fml!Sjwfs!Usbjm!Fyufotjpot and Road Extension, Lincoln Safety Improvements at provide services as requested to assist the city in project seven of these locations as priority connections and are delivery. anticipated to be the general scope of this project. To Hfofsbm!Tdpqf!Ubtlt; Planning, design, inspection, and it is anticipated that federal funds will be applied for by project management the city, and, if awarded, these projects will need to meet federal aid requirements. Hfofsbm!Tdpqf!Ubtlt; Planning, design, inspection, and project management Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub 8 ! City Website: Qspkfdu!Bqqspbdi Posting construction notices and providing While the scope of some of these projects has not been contact information for RPR and project manager. • Eftjho!Tfswjdft/ This includes geometric design similar in nature. We will assist the city in determining the and plan production in accordance with city standards. to outline the proposed scope and deliverable schedule to anticipate the plan sets may include the following meet the city’s expectations, budgets, and schedules. sheets: Title sheet Our work scope may include preparation of all, or part Statement of Estimated Quantities of, the following tasks as needed to deliver a complete Details and typical sections Erosion control sheets requirements and city expectations. Our proposed Removals approach can generally be described as follows: • Ebub!Usbotgfs/! Intersection details Cross-sections This assumes 50 scale drawings and vehicular providing this data to our team. • Qsfmjnjobsz!Tvswfz/!Survey is anticipated along the rural reclamation portions of the street improvement and submitted for approval by the contractor for each project and at spot locations throughout the remainder project. of project roadways where drainage issues are • Qspkfdu!Tqfdjgjdbujpot/!These documents will be prepared in accordance with city standards. along proposed utility installations and new trail and • Qspkfdu!Qfsnjuujoh!boe!Vujmjuz!Dppsejobujpo/!We roadway construction. will coordinate with local, county, and state agencies; • Cbtf!Nbq!Qsfqbsbujpo/ Our team will use aerial utility companies; and permitting agencies, as photography, survey information, and city data to required. We will also coordinate with private utility create a base map for each project. companies throughout the course of the projects as • Gfbtjcjmjuz!Sfqpsu/! required. We will pay the required permit fees and the we will prepare a feasibility report for each project city will reimburse us for those costs. identifying each project scope and following • Cjeejoh!Tfswjdft/ We will solicit bids, answer requirements for assessment procedures when required. questions, issue addenda if needed, open bids, and • Qspkfdu!Nfnpsboevn/!For projects requiring prepare a letter of recommendation. federal aid, we will complete the required project • Uftujoh/!We will solicit for testing quotes and memorandum and submittals to the funding agencies. coordinate with the selected testing company. • Qvcmjd!Jowpmwfnfou/!We will keep the public • Sjhiu.pg.Xbz!boe!Fbtfnfou!Bdrvjtjujpo/!Any informed of each proposed project from concept to right-of-way or easement acquisition needed would completion through the following correspondence be in addition to the services included in the proposed techniques: service percentages. Public Meeting: • Dpotusvdujpo!Tvswfz/!Includes construction staking We will hold one public meeting if the city needed to construct each project. determines it is needed for each project. • Dpotusvdujpo!Pctfswbujpo0Nbobhfnfou/!Our Construction Notice: strategy for construction services will include the Notices to all abutting residents prior to use of an EIT or intern with construction observation beginning construction to explain the scope experience, combined with the proposed project of the project and schedule as well as any manager that has 15 years of experience. Construction additional notices needed due to any changes in observation includes full time inspection during all each project. Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub 9 ! major construction operations. Actual time will vary Through discussions with MnDOT and completion of an day-to-day depending on construction activities. ICE report at this intersection, an RCUT was determined Project management will include answering day-to be the optimal improvement. The RCUT will result construction notices, and processing monthly pay delay times. We were able to secure funding through requests. Where the city can supply the construction observer, we will provide project management required a Level 1 Layout to be completed and approved development and overall project delivery. The project has moved along seamlessly from • Bt.Cvjmut/!As-built drawings will be created and submitted to the city detailing any revisions to the has been bid and work is underway and is scheduled to be original plans. completed this spring. In addition to the above items, meetings will occur at logical periods throughout design and construction Cvolfs!Mblf!Cpvmfwbse!'!Qvnb!Tusffu! activities. We will prepare all exhibits and graphics for Jnqspwfnfout-!Djuz!pg!Sbntfz Sfgfsfodf;!Csvdf!Xftucz-!Q/F/-!Djuz!Fohjoffs-!874.544.:936 This project involved the extension of large regional Sfgfsfodf!Qspkfdut trunk sanitary sewer and watermain to provide the needed infrastructure for development to occur in the 3128-!3129-!312:-!boe!3131!Qbwfnfou! western portion of the city. We initially assisted the city Nbobhfnfou!Qspkfdut-!Djuz!pg!Jtbouj in completing their sanitary sewer comprehensive plan Sfgfsfodf;!Kptj!Xppe-!Djuz!Benjojtusbups-!723.381.7299 update where we evaluated service area and needed pipe The City of Isanti is following a 10-year Pavement A regional lift station and forcemain were also overlay work. Jason Cook developed the plan and has constructed as part of this project. extensive experience evaluating pavement conditions and determining the recommended maintenance solution. This project used state aid funds and reconstructed the Jason was also the project manager for the previous four existing rural roadway into an urban section. We are currently working on the next phase of the Puma Street Improvements where we are extending these utilities and UI!76!'!Dbkjnb!Tusffu!SDVU-!Djuz!pg!Jtbouj road section to Alpine Drive. Sfgfsfodf;!Kptj!Xppe-!Djuz!Benjojtusbups-!723.381.7299 312:!Tusffu!Jnqspwfnfout-!Djuz!pg!Fml!Sjwfs Sfgfsfodf;!Kvtujo!Gfnsjuf-!Q/F/-!Dijfg!Fohjoffs0Qvcmjd!Xpslt!Ejsfdups-! control. 723.332.77:1 This project was part of the city pavement management program and consisted of 12.5 miles of road resurfacing with full depth reclamation and mill and overlay sections. Pedestrian ramps were also brought into compliance with ADA standards. project delivery met city expectations. We made resident access a primary goal of the construction process and resolved any resident questions or complaints quickly Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub : ! Tdifevmf! the range. For the hourly fee tasks requested, Jason W. Jason is ready to begin serving as the city’s consultant Cook, P.E. will be billed at $155/hour. We will bill our project manager. Even as the stay at home order is in place, he will be available to attend weekly engineering attached on page 10. as requested. Qspkfdu!ObnfFtujnbufe!Gff Some projects that will be included in this agreement 3132!Tusffu!Jnqspwfnfout5.7& are already underway, and we will continue moving UI!210Mblf!Pspop!UsbjmIpvsmz!)QN* them forward. Other projects need scope and schedule Ixz!27:!Vujmjuz!Sfmpdbujpo22.24& Ixz!27:!Gspoubhf!Dpoofdujpot23.25& establish the scopes and timelines needed to deliver Bdujwf!FS!Usbjm!Fyufotjpot23.25& these projects. Qsjwbuf!EfwfmpqnfoutIpvsmz!)QN!'!Jotq* Upubm!Dpotvmubou!Dptu Xfflmz!Tubgg!NffujohtOp!Gff Njtd/!Tdpqjoh!'!FtujnbujohIpvsmz!)QN* +Xf!sftfswf!uif!sjhiu!up!sfofhpujbuf!gfft!jg!gfefsbmmz!gvoefe provide estimated engineering fees as a percentage based on the construction cost. The following table shows Jotvsbodf!Dfsujgjdbuf the anticipated fee percentage with a 2 percent range, scope, funding agency requirements, public involvement requirements, and extent of survey and inspection needs. XF!DBSF/ Xf!dpotjefs!qspkfdut!gspn!pvs!dmjfout“!qfstqfdujwf!boe!usfbu! uifn!bt!qbsuofst˜qvuujoh!uifjs!cftu!joufsftu!bifbe!pg!pvs!pxo/ Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub 21 ! 3131!TDIFEVMF!PG!GFFT The following fee schedule is based upon Ipvsmz!Cjmmjoh!! competent, responsible professional Fnqmpzff!Dmbttjgjdbujpo Sbuft services and is the minimum, below which adequate professional standards cannot Tfojps!Qsjodjqbm%2:6.3910Ipvs be maintained. It is, therefore, to the Qsjodjqbm!Fohjoffs0Tvswfzps0Qmboofs0HJT0Mboetdbqf!Bsdijufdu%256.336 advantage of both the professional and the client that fees be commensurate with Tfojps!Fohjoffs0Tvswfzps0Qmboofs0HJT0Mboetdbqf!Bsdijufdu%231.321 the service rendered. Charges are based Qspkfdu!Nbobhfs!)Jod/!Tvswfz-!HJT-!Mboetdbqf!Bsdijufdu*%226.311 the individuals performing the work. The hourly rates for principals and members Qspkfdu!Fohjoffs0Tvswfzps0Qmboofs0Mboetdbqf!Bsdijufdu%:1.286 Eftjho!Fohjoffs0Mboetdbqf!Eftjhofs0Hsbevbuf!Fohjoffs0Tvswfzps%:1.2:1 for any individual can be provided upon Tqfdjbmjtu!)Obu/!Sftpvsdft<!HJT<!Usbggjd<!Hsbqijdt<!Puifs*%81.286 request. 2 Tfojps!Ufdiojdjbo!)Jod/!Dpotusvdujpo-!HJT-!Tvswfz*%:1.291 The fee schedule shall apply for the period through December 31, 2020. 2 Ufdiojdjbo!)Jod/!Dpotusvdujpo-!HJT-!Tvswfz*%71.266 These rates may be adjusted annually thereafter to account for changed labor Benjojtusbujwf0Dpsqpsbuf!Tqfdjbmjtut%66.246 conditions. Tusvduvsbm0Fmfdusjdbm0Nfdibojdbm0Bsdijufdu%231.261 These rates include labor, general business, HQT0Spcpujd!Tvswfz!FrvjqnfouOP!DIBSHF and other normal and customary expenses DBE0Dpnqvufs!VtbhfOP!DIBSHF associated with operating a professional business. Unless otherwise agreed, the Spvujof!Pggjdf!TvqqmjftOP!DIBSHF above rates include vehicle and personal expenses, mileage, telephone, survey Spvujof!Qipup!Dpqzjoh0SfqspevdujpoOP!DIBSHF stakes, and routine expendable supplies; no separate charges will be made for these Gjfme!Tvqqmjft0Tvswfz!Tublft!'!FrvjqnfouOP!DIBSHF activities and materials. Expenses beyond the agreed scope of services and non- NjmfbhfOP!DIBSHF routine expenses, such as large quantities 2 !Op!tfqbsbuf!dibshft!xjmm!cf!nbef!gps!HQT!ps!spcpujd!upubm!tubujpot!po!Cpmupo!'!Nfol-! of prints, extra report copies, outsourced Jod/!tvswfz!bttjhonfout<!uif!dptu!pg!uijt!frvjqnfou!jt!jodmvefe!jo!uif!sbuft!gps!Tvswfz! graphics and photographic reproductions, document recording fees, outside Ufdiojdjbot/ professional and technical assistance, and other items of this general nature will be invoiced separately. Rates and charges do not include sales tax, if applicable. Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub 22 ! DATE (MM/DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE 12/10/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACT PRODUCER Mary Portner, CISR NAME: FAX PHONE Brown & Brown of Minnesota(507) 344-4505(866) 800-6599 (A/C, No): (A/C, No, Ext): E-MAIL 530 W Pleasant St, Suite 100mportner@bbmankato.com ADDRESS: INSURER(S) AFFORDING COVERAGENAIC # MankatoMN56001Westfield Insurance Company24112 INSURER A : INSURED Westfield National Insurance Company24120 INSURER B : Bolton and Menk, Inc.Continental Casualty Company20443 INSURER C : 1960 Premier Dr INSURER D : INSURER E : MankatoMN56001 INSURER F : 20/21 COVERAGESCERTIFICATE NUMBER:REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ADDLSUBR INSRPOLICY EFFPOLICY EXP TYPE OF INSURANCELIMITS POLICY NUMBER LTR(MM/DD/YYYY)(MM/DD/YYYY) INSDWVD COMMERCIAL GENERAL LIABILITY 2,000,000 EACH OCCURRENCE$ DAMAGE TO RENTED 1,000,000 CLAIMS-MADEOCCUR$ PREMISES (Ea occurrence) Blanket Addl Insured10,000 MED EXP (Any one person)$ AXCU CoverageYYCMM 3 406 73701/01/202001/01/20212,000,000 PERSONAL & ADV INJURY$ 4,000,000 GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE$ PRO- 4,000,000 POLICYLOCPRODUCTS - COMP/OP AGG$ JECT Emp Benefit$1M/2M $ OTHER: COMBINED SINGLE LIMIT AUTOMOBILE LIABILITY 1,000,000 $ (Ea accident) ANY AUTOBODILY INJURY (Per person)$ OWNEDSCHEDULED AYCMM 3 406 73701/01/202001/01/2021 BODILY INJURY (Per accident)$ AUTOS ONLYAUTOS HIREDNON-OWNEDPROPERTY DAMAGE $ (Per accident) AUTOS ONLYAUTOS ONLY Blkt Addl InsBlkt Waiver $ UMBRELLA LIAB 10,000,000 OCCUREACH OCCURRENCE$ A EXCESS LIAB YCMM 3 406 73701/01/202001/01/202110,000,000 CLAIMS-MADEAGGREGATE$ 0 DEDRETENTION$$ PEROTH- WORKERS COMPENSATION STATUTEER AND EMPLOYERS' LIABILITY Y / N 1,000,000 ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT$ BN N / A WCP 867764501/01/202001/01/2021 OFFICER/MEMBER EXCLUDED? 1,000,000 (Mandatory in NH) E.L. DISEASE - EA EMPLOYEE$ If yes, describe under 1,000,000 DESCRIPTION OF OPERATIONS belowE.L. DISEASE - POLICY LIMIT$ Per Claim$5,000,000 Professional Liability CAEH11401971812/31/201912/31/2020Aggregate$10,000,000 E&O Ded $25,000 Retro Date12/31/1997 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) City of Elk River is added as an additional insured under the general, auto & excess liability. Coverage provided is primary & non-contributory. Waivers of subrogation in favor of the City of Elk River apply to all policies except the Professional Liability & work comp. CERTIFICATE HOLDERCANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Elk River Public Works Director/Chief Engineer 13065 Orono Parkway AUTHORIZED REPRESENTATIVE Elk RiverMN55330 © 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03)The ACORD name and logo are registered marks of ACORD Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub