Loading...
6.2. SR 07-18-2005 Item # 6.2. MEMORANDUM TO: Mayor and City Council FROM: Phil Hals, Street Department Superintendent DATE: July 14, 2005 SUBJECT: Public Works Buildings Bids Sealed bids were received on July14, 2005 for the construction of a cold storage building and salt sand storage building with a cast-in-place concrete footing and foundation. Bids were as follows: Pro Star Buildings Ebert Construction Greystone Construction Cold Storage Bldg. $ 57,800.00 66,300.00 131,640.00 Salt Sand Bldg. $ 88,900.00 82,600.00 119,964.00 Ebert Construction Cold Storage Foundation $ 78,400.00 Salt Sand Foundation $ 179,600.00 The only cast-in-place foundation bid came in $ 150,000.00 higher than our budget estimate. Staff is researching the reasons for the difference and hope to have some answers for the council meeting. The staff recommendation is to reject all bids and re-advertise for a insulated cold storage building that is redesigned to eliminate the cast-in-place foundation and a fabric covered salt storage building. Council action requested: . Reject all bids for cold storage building, salt sand storage building and cast-in-place foundations. . Authorize staff to re-advertise for a redesigned cold storage building and a fabric covered salt sand structure. PH:dl