6.5. SR 07-18-2005 Item# 6. 5 . MEMORANDUM TO: FROM: Mayor and City Council Scali Harlicker. Senior Pianne~ July 18, 2005 \ DATE: SUBJECT: Northstar Corridor Update Councilmember Motin is the City's representative on the NCDA. He is scheduled to provide an update at the July 18th Council meeting. Attached are the agenda and the packet from the NCDA meeting held on July 7th, NCDA Meeting Agenda JUL 0 1200" July 7, 2005 4:30 P.M. Anoka County Government Center Anoka, MN Action Reauested 1. Minutes of the June 2, 2005 NCDA Meeting* Approval 2. Executive Committee Report: a) Resolution #2005-01: City of Big Lake Station Location* Approval b) Resolution #2005-02: Phase II of the Northstar Commuter Rail Project * Approval c) 2005 Professional Service Contract Amendments: i. Amendment #1 to the BNSF Rail Passenger Capacity Improvements Engineering Agreement* Approval ii. Amendment #2 to the North Woods Advertising, Inc. Agreement for Professional Services* Approval iii. Amendment #4 to the Agreement for Professional Services with Kenneth Stevens* Approval iv. Amendment #4 to the Richardson, Richter & Associates, Inc. Agreement for Professional Services* Approval 3. FTA Issues: Information a) Monthly Report* b) Final Design Application Update 4. Technical Reports: Discussion a) Advanced and Final Design of Commuter Rail b) Advanced and Final Design of LRT Connection .. . 1 NCDA Agenda Item #1 NORTHST AR CORRIDOR DEVELOPMENT AUTHORITY DRAFT: Meeting Minutes for Approval June 2, 2005 The Northstar Corridor Development Authority met on June 2, 2005, in regular session at the Anoka County Government Center, Anoka, Minnesota. In attendance: Duane Grandy, Tim Yantos, Joe Voigt, Steve Billings, Woody Bissett, Ewald Petersen, John Norgren, Felix Schmiesing, Lewis Stark, Scott Schulte, Paul Motin, Dennis Berg, Mike Schadauer, Mark Fuhrmann, Dave Peterson, Tim Kirchoff, Dean Michalko, Scott Johnson, Pat Wussow, Jim Barton, Steve Novak, Scott LeDoux, Linda Jungwirth, Margaret Langfeld, Lona Schreiber, Bill Schreiber, Robert Kirchner, Paul Danielson, Steve Apanian, Ken Stevens, Jill Brown, Tom Gamec, Bruce Nawrocki, Paul Ostrow, Carl Anderson, Peg Aho, Jan Lucke, Sue Youngs 1. Scott Schulte made a motion to approve the May 5, 2005 meeting minutes as presented. The motion was seconded by John Norgren and passed unanimously on a voice vote. 2. Executive Committee Report: Commuter Coach: Jon Olson gave an update on the current funding status for the Northstar Commuter Coach project and handed out a budget estimate for 2006. The budget estimate showed the 2005 budget year shortfall amounts and what the shortfalls would look like with or without a $0.75 increase in fares for riders to/from the Elk River station. Mr. Olson noted that there is a projected $251,529 shortfall for the remainder of 2005 and the beginning of 2006. The Executive Committee/Capital Budget Committee made a recommendation that the NCDA approve a fare increase of $0.75 for fares to/from the Elk River station which would be implemented along with the Metropolitan Council's fare increase of $0.25 on July 1. The Executive Committee directed that staff prepare an information sheet and hand out to current Northstar Commuter Coach users so they may understand what the issues are and why there needs to be a fare increase. Mr. Olson noted that the research for new funding sources by staff and members has been unsuccessful but they will continue to try to get funding from the State. Chair Grandy asked that the rider information sheet include a note stating that fares may decrease if additional funding is received from the State. Paul Motin said that it seems strange that there would be an increase of more than $.25 for less than 75% of the riders, why not also increase the fares to/from the Coon Rapids/Riverdale station. Mr. Olson noted that riders at the Coon Rapids/Riverdale station would be able to use Metro Transit buses which will also be charging $2.75. If Northstar Commuter Coach where to charge more than $2.75, people would use the Metro Transit coaches instead of the Northstar coaches and lose in riders would result in lower fare subsidies. Paul Motin asked if there had been a study of Coon Rapids/ Riverdale riders to see how a fare increase would affect them. Mr. Olson noted that he doesn't recall, but he will check and if he locates information he will get it to Paul. Tom Gamec made a motion that the NCDA approve a $0.75 per ride fare increase for riders to/from the Elk River station. The motion was seconded by Scott Schulte and passed unanimously on a voice vote. 3. Executive Committee Report: Northstar Project Office, Approval of Expenditures: Mike Schadauer gave an overview of the NPO space preparation and related moving costs. He noted that early lease negotiations included $70,000 as an amortized cost to be paid back over the life of the lease plus interest. Mr. Schadauer noted that as lease negotiations have progressed, however, the amount to be amortized was reduced to approximately $47,000, thereby reducing the amount subject to future interest but leaving $23,000 in costs that will have to be paid for in full as they are expended. The Executive Committee/Capital Budget Committee made a recommendation that the NCDA authorize Tim Yantos, Executive Director, to spend up to $23,000 for NPO move expenses. A motion was made by Paul Ostrow that the NCDA authorize the Executive Director to spend up to $23,000 for Northstar Project Office move expenses. The motion was seconded by Paul Motin and the motion passed by majority vote with one nay vote by Bruce Nawrocki. Ii . , 4. BNSF Rail Passenger Capital Improvements Engineering Agreement: Mary Richardson noted that the negotiation team has been working for the past six to eight months on negotiating an agreement with BNSF for the advanced and final design of the signal and rail improvements for the Northstar Commuter Rail Project. Because BNSF owns the railroad, Northstar will be paying BNSF to do the improvements. BNSF has agreed to absorb the first $50,000 in improvements. Ms. Richardson noted that the scope of work includes 21 track improvements and the proposed contract amount is $993,288. Because four of the improvements were not included in the contract maximum, a contract amendment will be necessary at an upcoming meeting. The reason that the full cost was not in the contract maximum is that BNSF has not yet completed its contract negotiations with its engineering consultant. Staff recommend moving ahead in order to get the work underway on the remaining requirements. Once these improvements are finished, BNSF will issue an RFP for signal design improvements. As required by the FTA, staff are preparing an independent cost estimate. Ms. Richardson noted that this Agreement is part of a sequential design process, there will also be a RFP for signal improvements, and there will need to be a contract amendment as these parts of the project develop. Chair Grandy asked if this agreement includes design for the railroad placement between Big Lake and Becker. Staff replied no. Scott Schulte made a motion that the NCDA authorize the Chair to finalize negotiations and execute the Rail Passenger Capital Improvements Engineering Agreement with BNSF as presented. The motion was seconded by Lewis Stark and passed unanimously on a voice vote. Ms. Richardson noted that reaching an agreement on the advanced and final design is like BNSF saying they are ready to move ahead on this Project and get into the next phase of work. This is a very positive sign. 5. Executive Committee Report: Selection of Broker/Insurance Consultant: Mary Richardson noted that an RFP for broker insurance consulting services hao been issued on April 18, 2005 because the NCDA wishes to engage a qualified property and casualty insurance consultant/broker with successful experience in commuter rail projects to perform professional services in connection with the Northstar Project, and who possesses the expertise and specialized knowledge required to provide professional advice and counsel in developing the risk management program for the Northstar Commuter Rail Project, and to specifically advise the NCDA and Mn/DOT in negotiating insurance terms and conditions with BNSF for both the construction and operational phases of the Project. Two firms responded: Willis of Minnesota, Inc. and Marsh USA, Inc. The Evaluation Team which consisted of Philip Blue and Marlys Williams, Mn/DOT, Phil Walljasper, Metropolitan Council, John Sullivan and Colleen Herrmann, Anoka 2 . , County and Mary Richardson and Jan Lucke, RRA, interviewed both firms on June 1. Staff then checked references. Based on written proposals, interviews and evaluations, the Evaluation Team ranked Marsh USA, Inc. the highest. Staff are asking for permission to negotiate an agreement with Marsh USA, Inc. and if negotiations are unsuccessful permission to negotiate an agreement with Willis of Minnesota, Inc. Ewald Petersen made a motion that the NCDA select Marsh USA, Inc. as top ranked proposer and direct staff to negotiate an agreement and if staff are not successful in these negotiations staff are directed to negotiate with the second ranked firm, Willis of Minnesota, Inc. Ms. Richardson noted that the FTA requires us to prepare an independent cost estimate which has been done by the State. The State's estimate was $130,000. These costs would be covered by the Full Funding Grant Agreement and would be funded by grant funds. Bruce Nawrocki asked if the services to be provided are for insurance or for consulting services. Ms. Richardson responded that the first year of services would be consulting and there would be for broker purchasing insurance services after the first year. The motion was second by Tom Gamec and passed unanimously on a voice vote. 6. Ms. Richardson noted that an additional agenda item was brought forward regarding the Metropolitan Council Grant Agreement for Northstar Commuter Bus. At the September 2004 meeting, the NCDA approved a grant agreement in amount of $78,000. The Metropolitan Council is going to give the NCDA $138,600 and wishes to revise the grant activity period. A motion was made by Dennis Berg that the NCDA rescind the September 2, 2004 action to approve a grant agreement with the Metropolitan Council for an amount to exceed $78,000 in federal and regional funding for the Northstar Commuter Bus for one year, from October 1, 2004 through September 30, 2005, and authorize the Chair to negotiate and execute a grant agreement with the Metropolitan Council for an amount not to exceed $138,601 for the capital lease payments for the Northstar Commuter Coach for the grant activity period from April 15, 2005 through June 30, 2007. The motion was seconded by Scott Schulte and approved unanimously on a voice vote. 7. Technical reports: PE Validation: Ken Stevens reviewed key items that the NCDA needs to respond to in order to keep the Project moving ahead. Key Item #1: ADA Regulations: Mr. Stevens handed out a FTA request for information regarding compliance with DOT-ADA regulations for level boarding. The FTA ADA regulations have been in force for many years and their methodology has applied to all systems developed over the past 12 years. These systems used mini high platforms. The approach developed for the Project during preliminary engineering is no longer acceptable to the FT A so we need to do some more research on the issue and hopefully reach a compromise with the FT A as to how the platforms will be developed to serve all needs. Key Item #2: Big Lake station location: The initial plan was to have the station located in the NW quadrant. Mr. Stevens noted that as part of staff's evaluation it may be more cost effective to move the station to the SE quadrant which would be closer to County Road 43. Staff are in the process of meeting with Big lake staff and council members to see if this idea will progress. Mr. Stevens noted that if the location does change, it will be brought back to the NCDA for their approval. 3 Key Item #3: pedestrian crossing at the Coon Rapids station: Current plans have the access over the tracks. There would be an elevator to take riders up and over to a center of the platform for loading onto the commuter rail system. This is a single family housing neighborhood and the tower would need to be approximately 40 feet in height to allow for freight trains, structure, etc.. Staff and consultants looked at possibly putting in a tunnel configuration instead. All options will be explored. Initially, it is thought that a tunnel would not be the preferred method because of cost, construction issues (a bridge would need to be built), and a high water table that would require dewatering. Staff and consultants are also looking at possibly relocating the site of the tower to a portion of the site that would provide the least offensive views to the neighborhood. Staff will be meeting with city representatives, councilmember and NCDA members to discuss the two alternatives. , Key Item #4: access and site plan at the Fridley station: Mr. Stevens noted that as staff looked at the preliminary engineering document, they noted that the Fridley station is in the middle of a five track system just out of Northtown. There are some concerns about handicap parking and length of distance for handicapped individuals to reach the platform. Staff are proposing to move the platform location more northerly and have access in the center of the platform with a tunnel which will have stairs and an elevator. Mr. Stevens noted that changing the platform design would give more visibility for security issues and development of a TOO that would allow parking closer to handicap spots which will allow better access to the platform. Staff are setting up additional meetings to explore TOO ideas and platform design. Key Item #5: operator maintenance input: Mr. Stevens noted the Project has received good input from the Hiawatha operations center. This item could come off the key items list. Key Item #6: control system: Staff are working with Metro Transit to decide whether to use a fiber optic control system versus a radio control system. Additional meetings are planned with Mn/DOT and Metro Transit to get additional technical input. Key Item #7: BNSF coordination: Ms. Richardson noted that BNSF is at the table and is providing necessary input. It is critical to our design is that BNSF is on board and can provide input on all pieces of the design and the Project progresses. Key Item #8: City of Minneapolis Intermodal Station Location. Mr. Stevens noted that staff are anticipating that the site could possibly be developed as a ball park and they are working with the Twins organization, the City of Minneapolis and others to plan. The station could have a long term impact on all systems coming in and out of that station. Staff will be meeting with Hennepin County within the next two weeks to get their input. Mr. Stevens noted that the Intermodal Station and the ADA regulations are two of the most difficult issues being faced at this time. Key Item #9: commuter rail rolling stock: Mr. Stevens noted that the design team and consultants have developed a preliminary engineering evaluation report which looks at rolling stock. The 2001 preliminary engineering document looked at using the push pull locomotive. Staff did evaluate the diesel units which could be married with train cars and their capacity is similar to push pull locomotives. Staff then met with manufacturers and others and discussed a number of key issues regarding push pull versus DMU options. Based on the discussions, staff ruled out pursuing the use of DMUs for the 4 f Northstar Commuter Rail Project. Part of the conclusion in favor of push pulls was fleet expansion costs, push pulls demonstrative reliability, procurement risk of DMUs (DMUs have no demonstrated reliability because there are no orders out there), and lower design risk of push pull (DMU design is new). Staff and consultants' recommendation is to move forward with the push pull locomotive concept. Ms. Stevens noted that the Study is available upon request for anyone who might like to review it. Mr. Stevens also noted that L TK Engineering has now initiated the study that the NCDA mandated for the use of biodiesel fuels in biodiesellocomotives. Paul Motin asked if the use of push pull or DMUs determines how the tracks/platforms are laid out. Mr. Stevens noted that BNSF has what is called a flow of axel rule. Shorter trains have a history of shunting at the signal crossings. There is an issue of a waiver that would be need to be acquired. Clearance also becomes an issue at the maintenance facility. Mr. Stevens noted that staff do not believe there is any clearance issues on the Northstar line but don't know what other lines might have a issue, such as Red Rock and other regional lines. Mr. Stevens noted that this list of items from the PE Validation will be kept on the agenda for NCDA update as work progresses. 8. FT A Issues: New Starts Submittals: Mike Schadauer noted that staff are engaged in submitting information to the FT A that will assist them in making decisions on the Northstar New Starts Project rating. As part of that submittal, staff are developing a detailed real estate plan, quality plan, fleet management plan and also plan on providing the FTA with before and after plan information (for instance, regarding ridership). All these items have to be provided to demonstrate how the Project is being developed. Mr. Schadauer noted that the ridership forecast is still not complete, which is putting submittal of plans on hold. Modelers are having a hard time getting the model calibrated. There is a meeting scheduled with ridership modelers on Friday. 9. FT A Issues: Monthly report is in your packet. The report includes a schedule of when the Plan's are expected to be submitted. Paul Motin asked when we can expect to enter the final design phase of the Project. Mike Schadauer noted that that will depend on the ridership forecast. 10. Legislative issues: Bill Schreiber noted that the regular session has completed and a special session called by the Governor. 11. Public Information Update: John Himle gave a quick run down of recent activities. He noted that there has been a variety of update pieces going out to various databases (supporters, businesses and others) giving an update on the status of the Project. Thank yous have been sent to legislators and other community leaders that have supported the Project. He noted that a contact at Comcast Cable is looking for further opportunities for interviews on their cable system. Himle Horner suggested interviewing Representative Tinglestad. These interviews would run during portions of CNN headline news. Jill Brown noted that there has been many requests for presentations by Northstar representatives at various functions around the region. Since the bonding bill has passed, folks want to hear about TOO. Ms. Brown handed out a Northstar Commuter Coach fact sheet which shows results of a survey completed of Commuter Coach riders. 5 Executive Committee Agenda Item #5 NCDA Agenda Item #2a NORTHST AR CORRIDOR DEVELOPMENT AUTHORITY Resolution 2005-01 City of Big Lake Station Location WHEREAS, approving Phase I CI Resolution 2004-05 o proceed to acquire the WHEREAS, on December 7, 2000, the Northstar Co (NCDA) approved the Advanced Corridor Plan, including at the station in the City of Big Lake; and WHEREAS, on November 4, requesting the Sherburne County Regi property needed for the station; and quires increased space to meet parking ngineering was conducted on the Northstar entify tential cost savings and operating efficiencies, as it A ministration; and WHER Station be move railroad tracks in 0 Project; and engineers recommended that the location of the Big Lake outheast corner of Sherburne County Road 43 and the BNSF to improve safety and to enhance operating efficiencies of the WHEREAS, on June 8, 2005, the City of Big Lake approved the new location of the station to the Southeast corner of Sherburne County Road 43 and the BNSF railroad tracks. NOW, THEREFORE BE IT RESOLVED that: 1) the Northstar Corridor Development Authority hereby approves the location of the Big Lake Commuter Rail Station in the Southeast corner of Sherburne County Road 43 and the BNSF railroad tracks in the Town of Big Lake; and 2) the Northstar Corridor Development Authority recommends that the Commissioner of Transportation incorporate the new location into the State's plan for the Northstar Commuter Rail Project; and 3) the Northstar Corridor Development Authority requests the Sherburne County Regional Railroad Authority to proceed to acquire the property as needed for the commuter rail station and maintenance facility, on behalf of the project and in accordance with Federal Transit Administration requirements. Duane Grandy, Chairperson J U [l!]@[ff3u[J{][ffiu[fJ[ff3 @@[ff3[ff30@@[ff3 Executive Committee Agenda Item #6 NCDA Agenda Item #2b June 30, 2005 MEMO TO: Executive Committee / Capital Budget Committee Members NCDA FROM: Paul McCarron RE: Benton County On June 21, 2005, Benton County Committee of the Whole discussed their continued involvement with the NCDA and further discussed requesting certain binding commitments from the NCDA. While it is my belief that the NCDA is not able to make those commitments acting within the constraints of the federal funding process, I do believe it is appropriate to address Benton County concerns. Attached please find a resolution that I have prepared for your consideration at the July 7,2005 NCDA meeting. Please call me if you have any questions or concerns, at 763-784-9773. C: Project Management Team Northstar Corridor Development Authority 2] 00 3' . Avenue. Anoka, Minnesota 55303-2265 (763) 323-5700 Fax: (763) 323-5682 \vww,northstartrain.org ~ NORTHST AR CORRIDOR DEVELOPMENT AUTHORITY Resolution 2005-01 Phase II of the Northstar Commuter Rail Project WHEREAS, the Northstar Corridor Development Authority (NCDA) was formed in May of 1997 by joint powers agreement among the 30 counties, county regional railroad authorities, cities and towns along the Northstar Corr".. from Minneapolis to the City of Rice; and 1. The NCDA a at Bent. County will not contribute to the capital c hase roject, until such time as Phase II of the . rove irms co mitment to Phase II will service the St. Cloud tatio 1. Cloud and a station in the City of Rice; ! y e blishes a Phase II Committee charged with the moting the extension of Northstar Commuter Rail from Big isting of the following members: y nty Regional Railroad Authority St. Clo MTC City of St. Cloud Sherburne County Sherburne County Regional Railroad Authority Other interested members of the NCDA 4. Until such time as Phase II of the Project proceeds, the allocation of capital costs for Phase I of the Northstar Project shall be as follows: Anoka County Regional Railroad Authority - 68.3% Sherburne County Regional Railroad Authority - 16.1 % r Project include the on Counties; and WHEREAS, the capital funding partners for t regional railroad authorities of Hennepin, Anoka, She b WHEREAS, on January 8, 2004, the approved Phase 1 of the Northstar Commut Corridor between Big Lake and Minneapolis an project including service to the St. Cloud area; an 2004-01 that n of the o the entire WHEREAS, the 2005 Minne for Phase 1 and stipulated that region fund a portion of the Phase 1 capital c equal to the amount they would have entire line. d $37.5 Million in bonding he NCDA who did not mount for the extension proportional share of the i Hennepin County Regional Railroad Authority - 15.6% Duane Grandy, Chairperson I hereby certify that the foregoing resolution is a true a presented to and adopted by the Northstar Corrido authorized meeting thereof held on the yth day of said meeting in my possession. Certification opy of the resolution uthority at a duly the minutes of (Name) (Title) U []!]@[ff3TlDDfBTl/lJ!XJ @@!XJ[1JO[g)@!XJ Executive Committee Agenda Item #7a NCDA Agenda Item #2ci June 30, 2005 MEMO TO: NCDA Executive Committee / Capital Budget Committee NCDA FROM: Staff RE: Amendment #1 to the Rail Passenger Capital Improvements Engineering Agreement with BNSF At its June 2, 2005 meeting, the NCDA approved the Rail Passenger Capital Improvements Engineering Agreement with BNSF. Pursuant to the agreement with the NCDA, BNSF will retain engineering consultants to perform engineering services, provide oversight and necessary flagging services, prepare and complete the advanced and final designs, prepare cost estimates, and prepare all bid packages. The contract specified the twenty-one capacity improvements that will be included in advanced and final design, but the contract maximum did not include the entire costs of engineering track improvements #11, 12, 13, 14 and 16. As noted in the memorandum dated May 27, 2005, contract amendments increasing the contract maximum are necessary to pay the costs of engineering these additional or revised track improvements. The contract maximum did not include the costs of engineering these improvements, because BNSF had not completed its contract negotiations with its engineering consultant. BNSF entered into the Agreement on the express condition that the contract be amended to include the additional funds necessary to cover the costs of engineering the improvements. Note that once preliminary engineering is complete on the track improvements, the Agreement will need to be amended again to include services and costs relating to the design of the signal improvements. The budget for the proposed amendment is $168,900 and is within the NCDA's budget for advanced and final design. As required by the FTA, staff are preparing an independent cost estimate. If the NCDA does not approve Amendment #1, the entire agreement is null and void. Action Requested: That the Executive Committee / Capital Budget Committee recommends that the NCDA authorize the chair to execute Amendment #1 to the Rail Passenger Capital Improvements Engineering Agreement with BNSF, increasing the contract maximum by $168,900. Northstar Corridor Development Authority 21003' Avenue. Anoka. Minnesota 55303-2265 (763) 323-5700 Fax: (763) 323-56x2 ww\v.northstartrain.org U [l(]@!13Ll[]{]~Ll!JJm @@!13!130@@m Executive Committee Agenda Item #7b NCDA Agenda Item #2cii June 30, 2005 MEMO TO: Executive Committee / Capital Budget Committee Members NCDA FROM: Staff RE: Amendment #2 to the North Woods Advertising, Inc. Agreement for Professional Services In November 2003, the NCDA issued an RFP for Public Information and Involvement services and selected North Woods Advertising, Inc. (North Woods) to provide such services for the Northstar Commuter Rail Project. North Woods was selected as best meeting the needs of the NCDA based on an evaluation of written proposals and oral interviews. The services provided by North Woods are specifically to involve engage the public in the final design of the Project and are paid for with federal grant funds. At the time NCDA executed its contract with North Woods, the Northstar Commuter Rail Project was expected to enter final design in early 2004. Final design has been delayed for several reasons, including the lack of commitment of State funds and the continued effort to develop a workable travel demand model. Due to these delays, North Woods did not begin work in 2004; and in November 2004, the NCDA extended the term of its contract with North Woods to December 31, 2005. Project delays continued in early 2005 and the request to enter final design was delayed in anticipation of the approval of the travel demand model. The application for approval to enter final design is being submitted in early July and North Woods' services are now needed and are anticipated to extend into 2006. Therefore, staff recommends that the NCDA extend the term of its contract with North Woods to December 31,2006, which will allow North Woods to provide public information services in final design. No additional funds are necessary. Action ReQuested: That the Executive Committee / Capital Budget Committee recommend that the NCDA authorize the chair to execute Amendment #2 to the North Woods Advertising, Inc. agreement for public information and involvement services extending the term of the Agreement to December 31,2006. Northstar Corridor Development Authority 21003. Avenue. Anoka. Minnesota 55303-2265 (763) 323-5700 Fax: (763) 323-5682 www.northstartrain.org U [J[J@m3ifOO@ifmm3 @@m3!X30@@m3 Executive Committee Agenda Item #7c NCDA Agenda Item #2ciii June 30, 2005 MEMO TO: Executive Committee I Capital Budget Committee Members NCDA FROM: Tim Yantos, Executive Director RE: Amendment #4 to the Agreement for Professional Services with Kenneth Stevens (Contract No. 2003-0264) Attached please find an analysis and justification of the need for an amendment to the Kenneth Stevens Agreement for Professional Services to increase the contract amount by $70,000. I have reviewed the proposal for additional time and fees and find it to be fair and reasonable based on the Project's needs for services for the remainder of the year. The services requested are within the scope of work of the Kenneth Stevens contract; the number of hours for 2005 were simply underestimated and unanticipated. As Executive Director, I provide oversight and monitor the contractor's performance, in his role as Deputy Director of Design and Construction. I recommend that the NCDA approve the proposed contract amendment. Note that the NCDA's budget has sufficient funding to cover the increased costs. Action Requested: That the Executive Committee I Capital Budget Committee recommend that the NCDA authorize the chair to execute Amendment #4 to the Kenneth Stevens Agreement for Professional Services increasing the contract amount by $70,000. Northstar Corridor Development Authority 21003 Avenue. Anoka. Minnesota 55303-2265 (763) 323-5700 Fax: (63) 323~5682 ww\v.northstartrain.org Kenneth Stevens: Rationale for Revised Estimated Hours for 2005 Contract Amendment #4 to Agreement for Professional Services (Contract No. 2003- 0264C) Basis: The estimated hours for 2005 are based upon historical requests for services and the level of effort estimated to complete advanced and final design of the Northstar Project. The level of effort is based upon the revised Northstar Project Organizational structure wherein Kenneth Stevens is assigned the position of Project Oversight Consultant representing the NCDA in technical issues and project development. In addition, Mr. Stevens is assigned the role of Chairman of the Project Advisory Committee. All of these assignments are consistent with the Scope of Services detailed within the referenced Contract. At the beginning of the year, both the Project Deputy Director of Design and the Assistant Deputy Director of Design resigned to pursue other employment. In the interim, Mr. Stevens has been assigned the additional position of Acting Deputy Director of Design along with Mr. Jon Olson of Anoka County. This interim position has resulted in Mr. Stevens being far more directly involved in managing the design consultant contracts for both Technical Services and Commuter Rail Stations and Maintenance Facilities. This additional assignment, which is expected to continue through August when a new Deputy Director of Design is anticipated, has resulted in expending far more time than originally estimated. In addition to the unanticipated temporary assignment, the nature of the project with a new organization structure, continuing prolonged negotiations with BNSF, considerable interaction and meetings with city staff regarding design, permits, approvals, and TOD, and the many requirements of FT A, have required a greater than expected time commitment. Of further consideration is the recent agreement with BNSF on an Engineering Contract, which will require Mr. Stevens to provide coordination and liaison between the BNSF, their engineering consultant, and the Northstar design consultants. Summary: The number of hours estimated in the original contract for services provided through December 31, 2005 are based upon three days per week, or 24 hours. Currently, Mr. Stevens is expending about 36 hours per week, or about 50 percent more time than anticipated. This time commitment is expected to continue through the end of 2005. Contract Amount: The contract Total is $300,000 from inception to end of 2005. The amount expended through May 31,2005 is $235,717.78. Estimated Hours per month June-December is 144 which amountsto $18,000/month. Estimated Direct Expense for June-December is $8,000.00. Estimated Cost 6/1-12/3/05 Contract Balance as of 5/31/05 Balance Required through 12/31/05 $134,000.00 64,000.00 $ 70,000.00 ~ t ,;.I' U !JD@fX37JDfJ@L1!Ni3 @@fX3fX3D[Q)@fX3 Executive Committee Agenda Item #7d NCDA Agenda Item #2civ June 30,2005 MEMO TO: Executive Committee I Capital Budget Committee Members NCDA FROM: Tim Yantos, Executive Director RE: Amendment #4 to the Richardson, Richter & Associates, Inc. Agreement for Professional Services (Contract No. 2003-0265) Attached please find an analysis and justification of the need for an amendment to the Richardson, Richter & Associates' Inc. Agreement for Professional Services to increase the contract amount by $126,300. I have reviewed the proposal for additional time and fees and find it to be fair and reasonable based on the Project's needs for services for the remainder of the year. The services requested are within the scope of work of the Richardson, Richter & Associates, Inc. contract; the number of hours for 2005 were simply underestimated. As Executive Director, I provide oversight and monitor the contractor's performance, acting as Deputy Director of Legal and Intergovernmental Affairs. I recommend that the NCDA approve the proposed contract amendment. Note that the NCDA's budget has sufficient funding to cover the increased costs. Action Requested: That the Executive Committee I Capital Budget Committee recommend that the NCDA authorize the chair to execute Amendment #4 to the Richardson, Richter & Associates, Inc. Agreement for Professional Services increasing the contract amount by $126,300. Northstar Corridor Development Authority 2100 Y Avenue, Anoka, Minnesota 55303-2265 (763) 323-5700 Fax: (763) 323-5682 www.l1onhstartrain.org Richardson. Richter & Associates. Inc.: Rationale for Revised Estimated Hours for 2005 Contract Amendment #4 to Agreement for Professional Services (Contract No: 2003-0265) Basis: The hours estimated for calendar year 2005 were based on historical requests for services, increased to reflect the new Northstar Project Office organizational structure and the estimated level of effort to prepare for the final design phase of the Project. In 2005, Mary Richardson is acting as the Deputy Director of Legal and Intergovernmental Affairs, responsible for real estate acquisition, transit oriented development, public involvement, BNSF negotiations, risk management, contract negotiations, and NCDA coordination. Jan Lucke is leading efforts in public involvement and transit oriented development. Peggy Aho is responsible for the administration of the Project Management Team and the Northstar Corridor Development Authority. The 2005 Contract Maximum reflects the following estimated hours for 2005: Mary Richardson - 110 hours per month / 25.5 hours per week Jan Lucke - 60 hours per month / 14.0 hours per week Peggy Aho - 60 hours per month /14.0 hours per week Clerical - 20 hours per month /4.75 hours per week The hours needed to provide requested services exceed the estimated hours for a number of reasons, including: prolonged negotiations with BNSF relating to the Engineering Agreement, the complexity of structuring a new organization, establishing and leasing a new office, development of necessary policies and procedures, the many requirements and meetings relating to the FTA including an unanticipated procurement audit, a greater role in documentation of the New Starts submittal, and extensive interaction with cities on TOO and station issues. As a result, RRA has been exceeding its estimated hours. In the last several months, the average has been: Mary Richardson Jan Lucke Peggy Aho Clerical Weekly Actual 29.50 20.25 22.00 5.00 Monthly Actual 124.00 84.75 91.00 20.00 As the project continues, RRA expects fulfilling its responsibilities on the project will require the current level of effort. While the FT A submittal is nearing completion and the new office is established, work will increase on negotiations with BNSF, development of TOO, administration of risk management committee, and procurement and policy development. It is estimated that the number of hours for RRA staff will be as follows: Mary Richardson Jan Lucke Peggy Aho Clerical Est. Weekly 30.00 22.75 22.75 7.00 Est. Monthly 120.00 95.00 95.00 30.00 Note that services are invoiced on an hourly basis. If services are not required, the contract amount is not spent. The total annual amount was calculated based on eleven months to account for vacations. Receptionist/Secretarial Services for NPO: Currently, URS provides receptionist/secretarial services to the HPO. Once the NPO move is accomplished, URS will no longer be providing such services. After discussion with PMT members, RRA was asked to provide the receptionist/secretarial services for the NPO beginning July 1, 2005. RRA will contract with a temp service for a full-time clerical person for the next six months. Contract Amount: The original contract amount for 2005 is: $325,000.00. The amount expended through May 31,2005 is $162,018.00. Estimated hours per month: 340 hours which would amount to $38,193.75 per month or $257,267.50 for seven months a difference of $104,374.30. Estimated cost for receptionist/secretary services: $22,000.00. 2005 Total: $429,300.00. 2005 Contract Amendment Amount Requested: $126,300.00 , NCDA Agenda Item #3a NORTHSTAR CORRIDOR RAIL PROJECT MONTHLY REPORT June 2005 Minnesota Department of Transportation in Cooperation with the Northstar Corridor Development Authority and the Metropolitan Council ~ The Northstar Corridor Rail Project \ii\ Medic-A Donlown SLOoud Center (Mtc T:wiI Cal.q '~'_ . ........ St. Cloud ""i".. Phase 2 (Proposed Future Route) cker :,.<..,."...,. QIIf .,. -., .Big!.akl' .... Phase 1 (2004 Minnesota Bonding Request) * }.hll DC !l!Ilu ia. Northstar Corridor Monthly Report June 17,2005 2 ."~~ '<\?u.,.~_ -m>> V'~ nvn _ nHilI.1f4D _J6IMIlE1I UIL I. Introduction The proposed Northstar Corridor Rail Project (Project) will provide commuter rail service along a 40-mile corridor from Downtown Minneapolis to Big Lake, Minnesota parallel to Trunk Highways 47 and 10. It will use existing rail tracks owned by the Burlington Northern Santa Fe Railway Company (BNSF) and include 6 stations. The commuter line is expected to carry 5,600 passengers per day by the year 2025. The rail line will have inter-modal connections to bus transit and to the Hiawatha Light Rail Transit (LRT) line. The Northstar connection to LRT consists of a four-block extension on the north end of the Hiawatha LR T to reach the Downtown Minneapolis commuter rail station. With the exception of the Downtown Minneapolis station, all of the stations will have park and ride facilities. The Minnesota Department of Transportation (Mn/DOT), the grantee, is working closely with its partners, the Northstar Corridor Development Authority (NCDA) and the Metropolitan Council, to deliver the Northstar Project. Since the last written report to the Federal Transit Administration (FT A), dated May 2005, the following occurred: . Project staffing changes . A series of decisions have been made to enable design to proceed . Second coordination meeting on Twins baseball stadium . FT A is conducting a procurement system review . The Project is submitting a series of materials to FTA to seek a "Recommended" rating and approval for entry into final design . A design agreement was reached with BNSF . The Project selected a firm for risk management services · Community and public meetings have been held regarding Northstar II. Project Milestones The following table lists the major milestones in the development and ongoing implementation of the Northstar project. Northstar Corridor Monthly Report June 17,2005 3 ,t~~ -';(IIDBTHSTAR alllllllD IUIll Date March 2000 June 2000 October 2000 January 2001 March 2002 December 2002 April 2005 September 2005 May 2006 Jul 2006 October 2006 S ring 2007 Early 2009 Northstar Pro' ect Milestones Activi Major Investment Study completed-Commuter rail recommended FT A a proveCl entry into Prelimin Engineering Draft Environmental 1m act Statement (DEIS) ublished Su lemental Information to the DEIS ublished Final Environmental 1m act Statement ublished FT A issued Record of Decision Minnesota Legislature commits $37.5 million in bonding for Northstar FTA approves entry into Final Design Minnesota Legislature commits remaining state funding for Northstar FTA issues Letter of No Pre'udice enabling utility relocation FT A enters into Full Funding Grant A reement for Northstar Construction be ins Revenue service begins III. Project Finances Project Budget The following table lists the existing Northstar Project budget by FTA Standard Cost Category. No. Cate 0 10 Guideway & Track Elements 20 Stations, Sto s, Terminals, Intermodal 30 Support Facilities: Yards, Shops, Admin. Bldgs 40 Sitework & Special Conditions 50 Systems Construction Subtotal (Cate ories 10-50 60 ROW, Land, Existing Improvements 70 Vehicles 80 Professional Services 90 Unallocated Contin ency Subtotal (Cate ories 10-90) 100 Finance Char es c=JTotal Project Cost et Amount (FY 2008 $) $32,920,00 $22,302,00 $20,927,00 $9,439,00 $23,964,00 $109,552,000 $7,959,00 $69,152,00 $40,929,00 $37,408,00 $265,000,000 Not determined $265,000,0001 Northstar Corridor Monthly Report June 17, 2005 4 ,~~ '~IIDBTHSTMI ~1IIU1 Funding Sources The following table summarizes the sources of funding to date for the Northstar Project. The NCDA member counties have passed resolutions committing their full share of the Northstar Project. Their commitment to date totals approximately $44 million or $26 million in addition to that shown below. Northstar Proiect Fundin~ Sources to Date Source Federal State Met Council NCDA 1998 Twin Cities Transitway Projects $ 350,000 $ 287,562 Section 5309 (Grant MN-03-0056) 1999 STP Grant Section 5307 (MN-90 $ 3,999,981 $ 1,000,000 X110) 1999 STP Grant Section 5307 (MN-90 $ 2,000,000 $ 500,000 X138) 2000 CMAQ Grant Section 5307 $ 960,000 $ 69,885 $ 170,115 (Amendment to MN-90-X138) 2000 & 2001 Twin Cities Transitway $ 4,346,669 $ 1,086,667 Proiects Section 5309 (MN-03-0088) 2002 New Starts Section 5309 (MN- $ 9,900,131 $ 2,475,033 03-0111) NCDA -- Advanced & Final Desion $ 10,000,00C NCDA (Hennepin County) -- LRV $ 6,300,OOC Procurement 2003 New Starts Section 5309 (no $ 4,917,912 grant yet) 2004 New Starts Section 5309 (no $ 5,659,028 grant yet) 2005 New Starts Section 5309 (no $ 4,960,000 grant vet) 2005 Minnesota Bonding $ 37,500,000 ITotal I $ 37,093,7211 $ 39,069,8851 $ 2,475,0331 $ 17,844,3441 Project Obligations The following table lists the contracts and obligations that have been incurred by the Northstar project, including the amount expended to date. All funds expensed to date have been for professional services. Purpose Contractor Obligated Expended Balance T otallhrouah Preliminary Engineering $ 8,474,650.71 $ 8474650.71 $ - Advanced Preliminary Enoineerino Kimlev Horn & Assoc $ 428,900.00 $ 341,522.64 $ 87,377.36 Proiect Manaoement Kenneth Stevens (2004) $ 150,000,00 $ 146491.92 $ 3,508.08 Proiect Management Kenneth Stevens (2005) $ 150,000.00 $ 28,127.81 $ 121,872.19 Project Management Richardson, Richter & Associates (2004) $ 322,000.00 $ 308,788.66 $ 13,211.34 Project Management Richardson, Richter & Associates (2005) $ 347,000.00 $ - $ 347,000.00 Proiect Manaoement Loch & Associates $ 50,000.00 $ 2,123.05 $ 47,876.95 Project Manaaement Mn/DOT (under MN-03-0088) $ 248,569.00 $ 222,694.63 $ 25,874.37 Project Manaaement Mn/DOT (under MN-03-0111) $ 320,000.00 $ 3,012.02 $ 316,987.98 Host Railroad Neootiations Greene-Esoel (2004) $ 100,000.00 $ 45,172.94 $ 54,827.06 Host Railroad Negotiations Greene-Esoel (2005) $ 300,000.00 $ - $ 300,000.00 Tech Support for Railroad Negotiations Mainline Manaaement $ 158,000.00 $ 79,297.14 $ 78,702.86 Public Information Northwoods Advertisino $ 245,285.00 $ - $ 245,285.00 Station and Maintenance Facility Advanced & Final Desian Kimley Horn & Assoc $ 4,173,632.00 $ 727,948.84 $ 3,445,683.16 LRT Advanced & Final Design & Commuter Rail Oversioht L TK Enaineerina $ 3,098,927.00 $ 295,112.75 $ 2,803,81425 Lioht Rail Vehicle Procurement Bombardier $ 6,300,000.00 $ - $ 6,300,000.00 Northstar Project Obligations and Expenses IGrand Total 1$ 24,866,963,71 1$ 10,674,943.11 I $14,192,020.60 I Based on invoices receiVed by Mn/DOT to date. Northstar Corridor Monthly Report June 17, 2005 5 l~'~ 'f,,~IIORTHSTAR ~RJlIL IV. Project Staffing The Deputy Director of Design position within the Northstar Project Office has been filled on an interim basis by a combination of Jon Olson, the Anoka County Public Services Division Manager and registered engineer, and Ken Stevens, a long time consultant to the Northstar Corridor Development Authority and former director of the Hennepin County Regional Railroad Authority. Metro Transit is engaged in a national search to fill the position. V. Advanced Design Advanced design is underway, with the assistance of two teams of consultants. A team led by Kimley Horn and Associates (KHA) is responsible for the six commuter rail stations and the maintenance facility including the central control facility. A team led by LTK Engineering (LTK) is responsible for the LRT Connection and providing technical support for KHA's work on the commuter rail stations and maintenance facility. The entire project design team meets on a weekly basis. Both teams submitted draft preliminary engineering validation reports for most of their areas of responsibility. These reports validate the original preliminary engineering completed in 2001, provide replacement preliminary engineering plans reflecting changes in the conditions or project since 2001, or identify issues to be addressed as the design advances. These reports will be carefully reviewed by Mn/DOT, NCDA, and Metro Transit to ensure they fulfill project requirements. Key issues that have been resolved through the Value Engineering and Preliminary Engineering Validation process include: · Location of the Fridley Station platform and access points. The platform is now moved northward and center loaded to better accommodate disabled passengers. · Access to the station platform at Coon Rapids has been confirmed as an overpass. The underground option has been ruled out as a result of high ground water tables, expensive construction to maintain continuous railroad operations, and long-term liability for potential settlements resulting from the construction methods, ground water, or both. · The commuter rail rolling stock has been reviewed and confirmed as a push-pull configuration of diesel locomotives and multi-level coaches as previously defined within the preliminary engineering documents. Project staff and consultants continue to evaluate several major issues including Central Control Communication technology and location; Big Lake Station location and layout; Inter-modal station coordination with prospective developers and uses; and compliance with the Americans with Disabilities Act. Project staff and consultants meet bi-weekly with the City of Minneapolis on design issues of the LRT Connection and inter-modal station. Periodic Northstar Corridor Monthly Report 6 ~.~.' '.. June 17,2005 ~ 'f):(IIDBTHSTAR ~IIAIL meetings are also held with the State Historic Preservation Office and Minneapolis Heritage Preservation Commission to get their input and concurrence on the proposed plans because of the adjacent Warehouse Historic District. Project staff will continue to work with these organizations to fulfill the programmatic agreement regarding cultural resources that was included in the Project's Record of Decision. BNSF will manage advanced and final design of track and signal improvements on their infrastructure with oversight by the Northstar Project Office with the assistance of the L TK team. See section IX of this report for more details on the progress of this contract. VI. Twins Baseball Stadium Coordination Meeting Chuck Ballentine of Northstar member Hennepin County chaired a second discussion at the Northstar Project Office on Thursday, June 16 with stafffrom HOK Architects, Twins Management, Hennepin County, and the Northstar Project Office. Discussion focused on areas of potential space conflicts adjacent to the commuter rail and light rail platforms. The Minnesota Twins and Hennepin County have agreed to a funding plan for a new baseball stadium in downtown Minneapolis. The plan for the $478 million facility will include private funding from Twins owner Carl Pohlad and public money from the county in the form of a 0.15% sales-tax increase. The Twins ballpark legislation is still pending, but could be considered during the current Special Legislative Session. The legislature is now focused on a budget bill in order to avoid a partial shutdown of state services after July 1, 2005. The property owners of the Twins ballpark site have announced plans for a major Transit Oriented Development either with or without the ballpark. Stated plans include 1,000 residential units with a ballpark or a mixed-use development including 3,000 residential units without a ballpark. The property owners cite the inter-modal access afforded by Northstar and Hiawatha as key elements in their development plans. Staff continue to meet with both ballpark designers and the developers. VII. Procurement System Review The FT A is conducting a procurement system review of Mn/DOT and the Metropolitan Council, including the Northstar and Hiawatha Projects. Staff from Leon Sneed and Associates arrived June 6 and will be working on the review here until June 24. Their review also took them to Anoka to review NCDA procured contract information for the Northstar project. Northstar Corridor Monthly Report June 17,2005 7 ~-~ ~1IOBTHS7JU1 . 11II.-.rBI U.IL VIII. New Starts Criteria and Request to Enter Final Design With $37.5 million in state bonding for Northstar approved by the 2005 Minnesota Legislature and signed into law by Governor Pawlenty, the Project is in the process of submitting material needed to gain a "Recommended" rating and to request to enter Final Design. The Project began this process with the early submittal of two chapters of the Project Management Plan (PMP). The remaining chapters of the PMP were submitted on March 31. New Starts Criteria and a revised Financial Plan, containing more specific information about the bonding passed by the legislature, will be submitted by July 8, 2005. A schedule for submittal appears below. Northstar Schedule for Request for Project Rating and Request to Enter Final Design (all months are in year 2005) Time Activity Feb 25 Northstar submitted to FTA Chapter 2, Project Organization, of the Project Management Plan (PMP) Mar 4 Northstar submitted to FTA Chapter 10, Real Estate Plan, of the PMP Mar 31 Northstar submitted to FT A full PMP Apr 11 Minnesota Legislature committed $37.5 million in bonding for Northstar and Governor Pawlenty signed into law July Northstar submits to FT A request to re-rate project and draft request to enter final design containing New Starts Criteria and the Financial Plan. The Project's response to the DOT request for ADA-related information, Real Estate Plan, Quality Management Plan, Before & After Study Plan will be submitted earlier if completed July FT A review of above. Northstar revises material based on comments from FT A. July Northstar submits to FT A final request to enter final design containing revised documents as necessary July FT A review of above. Northstar revises material based on comments from FT A. August FT A re-rates the Project and submits final design recommendation to Congress September FT A issues approval to enter Final Design Northstar Corridor Monthly Report June 17,2005 Northstar Project staff, including Metropolitan Council, and forecasting consultants met on Friday, June 3 to discuss issues and the process to complete the ridership forecast and resultant Cost Effectiveness Index. It was determined that a number of model inputs needed verification and several model functions needed to be revisited. The conclusion was that it would take a minimum of two months to attain a reasonably functional model and an acceptable forecast. Consequently, a conference call was held with the Washington staff ofFTA to explain the delay and discuss options to proceed. It was suggested by FT A and ~~. =- '~IIDBTIISTAB ....,.IUIIL 8 agreed by the Northstar Project Team that the existing model, which has been carefully vetted by FT A, would be used for the current New Starts submittal. Northstar will check on-board surveys conducted in Dallas and Seattle to validate the non-work trips included within the existing forecast. Northstar will also continue to work with the Twin Cities Region and FT A to resolve the outstanding issues and inconsistencies with the new forecast model. The date for submittal of the New Starts Criteria and Financial Plan to FTA has been delayed to July 8, 2005. This will be accompanied by a request for FTA to re-rate the Northstar project and a draft request to enter Final Design. Project staff understands there is a new requirement for FT A to submit recommendations for a project to enter final design to Congress and that Congress has a 30-day period to act on the recommendation. If Congress does not act, the recommendation is accepted. IX. BNSF Negotiations Northstar and the BNSF concluded negotiations on the advanced and final design agreement for capacity improvements to BNSF infrastructure. Final signatures are now underway. The agreement document has been sent to FT A Chicago for their information. BNSF procured a design consultant following federal procurement procedures. Preliminary engineering for the track capacity improvements that was not performed earlier will now proceed. A signal design consultant will be procured by BNSF once the track capacity preliminary engineering is complete. X. Risk Management On April 18, 2005, the NCDA issued an RFP for Broker/Insurance Consulting Services for the Northstar Commuter Rail Project. The services requested will assist the project in addressing the risks arising out of the construction and operations of the Northstar commuter rail project. Notice was published in the State Register on April 18, 2005. Twelve firms requested a copy of the RFP. A pre-proposal conference was held on Tuesday, May 3, and approximately five firms attended the meeting. On May 6, the NCDA issued an addendum to the RFP notifying potential vendors that the DBE goal for the project is race and gender neutral and there is no percentage participation goal established by Mn/DOT. Two firms submitted proposals by the May 20 deadline and the selection panel selected the best. At its June 2 meeting, the NCDA Board approved the selection and authorized staff to begin contract negotiations with the selected firm. Those negotiations are still underway. XI. Property Acquisition Northstar Corridor Monthly Report June 17,2005 Based on feedback from Andrea Orr ofFTA Region V, the Project is developing a stand-alone Real Estate Plan. This will supplement the ~. ')){IIDBTHSTAR ...". BAR. 9 information in Chapter 10 of the Project Management Plan and be changed more frequently. It will contain a description ofthe Project's property acquisition process and the roles and responsibilities of the participating counties and Mn/DOT personnel. The Real Estate Plan will contain a Parcel Status List with summary information that categorizes the number of parcels in defined value ranges. This will offer a quick method to understand the magnitude of real estate work. The Parcel Status List will be maintained and updated throughout the property acquisition process to ensure property rights are acquired in the time-frame necessary for construction and operations. It is included in this monthly report. The Real Estate Plan will be delivered to FT A by July 8, 2005. Northstar Corridor Monthly Report June 17,2005 10 ~- '/)(IIDBTHSTAB CIIIIMfiD MIL u; :::i "' ::J 1il iil ;; " :a lL :a U; .s::. 't= o Z /~ >> :-:. .. " ::::: ;:.' .9 ~ 8~ ~ 5 H il ~~ i c: o ~ ~ u ~ o ,~ F- ~.!! E ::l .!!~ ::l.s: tl"u )i"' c.s .. .. .5 E E 0 wC c: o 'lil c: o C .. In - .. l!.s: O~ ... .: (! :; ... ;; .. 'E"" :.~ 1:1: .. .. :i ~ E In .. .. ...W i!:-1: ~ E ..... E In .. .. t-W .. ::l ;; > .., .. In ::: In In ..: ..Iii ~~ :: :J 1: ~ ::l tJ .. ! 1: ~ ::l tJ c: o '" ~ o ...J ~ Ii " g ~j ~I J I 01 ' '" "'.1 tll :J g:; ,,; ~ x X o o ," A .;;; W, e', ~ .. U) " " a. ~\ '" Ii; n. ~ ~ 8 t- O Q ~ ~ g f<' a. 7.5 z ~; 'T (C v " s ., ~I "I cl ,'I "' o '" o ~ "' o '" o o '" o o o o .., '" ;;; .j c. (,:. <t .I c; ~ ., > " '.. ,\) t G "E o " ., <n ~ " E -'l5 ~j.. I.,; ~) ~ -G g :1: C'! '" ~ '~" .., '" C'! U ;~ (( c ;; ~ :<1 C?I ...r.i \!;:! i I I;O;j '_' ~I . C> If) ~ If.: o ~ o ro t- o c <> c Ol en ... '" 1? ~ << ." B " '" <n ., ~ -~ t.:: ;:. ~ (r. a: C (/) ':,~ a: U .., ~ ~j 01 I 21 "I 81 ~! ._01 ..c:i gj I,., o ~ C> C> <> ~ "' '" 'ffi a ! ~ i3 "5 .~ << ." .g ~ <n " .. E -(~ ~ ~ " " ~ fr '"5 OJ) "'; '" " U i'j LW o :', ." f', '0 '" If.. ~ x x c o c o o ...: .., '" 'C ~ u~ c w v '" ~ ({. a: o (/) .., '1" a: G t: " ? '" '-=: ~ f...J = ~ :; '" '" CI 1I~' <:> ?<: o <:> g N ~ 0> '" 'ffi t p << '" .~ ...J C &5 ...J ~ ? '" ...J '0 .g :i:i U) '0 W on ~ cr. n: " oj) ~ g u. '; (~ '.J -:; w o "" r:'.. Q, ~~ s: '0 '" It, o g 0;.0:, c. ~~: o IIJ t- o I!' '" o g '" ,- ..., ~"l '" 8 o i2 '" ~ E ~ ;; ~ .. a ~ " 4':1: (ij ~ .~ <( j J: " " ::< -J.? :s .9. ~ 0; " ~ ~ '0 ~ ~\1 "' '0 ". co :,"'~ ~.". co ~ ~ ~ o ;! ~ ~ i ~ ;; ~ '" o "" o o N x <> o o o '" .., .., ;;; ~ ~ ~ 'Vi d5 "' " 'e R o a: ~ " 1> ...J ~ .. '" '" '0 ;: v> .,., E; '" ... ;c' ~ ~ ~ 8 '0 :x '" o N x '" o o :2 ... ~j ... !'l rJi .~ ci 00 -" ffi a. !il :; u t- o ~~ ~ ;;: L ..c ~ r.E <0 o ~ o f!! - 8 o <:> co, '" ~ "" " c 11 '" :> ]l1 g "" a u ~ !ii rr. L '" o ;:~ , J t! .. ,', :;~ - - - - - ~"', ;:) '";) ,::, :~. ,,:', H. 0< E ': : "' o o N o <ll t- C> '" .., R l'{ ,,'j .... ,n u '~ W .~ :'~ ",1 iJ 5 :z '" g <( ;;;. " '" ~ .( '0 ;~ u ~ ~ ~", ~; of; t.C.1 ~ ~ co o o " o I!' o o o o N ~ V. '.0 <:) "' '0 ~ iD -~ i '" -~ g <( l: ~ o ~ ~ U * c o 'i3 W UJ g ~, ~. " eo '.Q U, "" <0 o ~ o f!! o <> o :2 0; V> '" '" i.ii '0 .~ iD -g '5 :;; -~ g ~: .'l! o ~ a i'- u ~ iji c " v> 6 ~ ~ ~ u c '" F ~ "" ~f' " CD t- tj ~:t u <. Ii r3 (; 1" <..; tj, :' t .- :'.; ,.. '=-, ,~, ',,~ :,.! ;".; \i (J f~~ lO C; " ~:' :,;,.j .:,~ II IJ<II ;;1. ;1.1 c., l"~ t- ~ ~; :3 ~~i c:: i;~ c. <, U :"0 .> (.'I -, :1. o c.:. ~~ ." ..~. .:~ .... ;:'. .... .., .:'~ fr I'.; I ~~ '- 1/; i --1, ~ ... o Co <J 0::: ~ C o 2 ..:., f ,... '~'. :.; ,,', i:~ ::: ': :: ? :, ':' :1:1 .,., 88 I... ("'.1 ~r--: g C g ;z~ ... o :g [ 5 .!I E ::I ,,;: ::I./: <1'" :l.'" . " .. ~./: C ~ ~ ?. E ~ ! ~ :; '0 lI.. .. ~ ... F- :e-'< :.~ :~ ;;: " '~ I : I L- 11:! c ..01 C E E 0 wC C o ill c o C 1:!1:! 5 E E : :~ ~1:! I! .. o E 0." E :: ~w . ::I 01 > " .. " " .. ~ . :!l 1:! ~ ::I U ~ 1:! ~ ::I U c o ~ o ..J S i " 9 ~ .. 0. C o '.l Ii> " g x <::> <::> '" '" ,,> o N ", ,,, II> N ~ " u; " " 0:: '" e '" l.L co " " a ..( [~ '" u -< " in co ~ m g r"", ,;:;. u -0 '" ,;: c (; 1... rd. I " c r (s x g g <<l, ~ "', ;;; r- ,-- ~ G '" " 0:: '" " '" "- co '" t (j ;~ '" u -< r-.:; ~ c :: 1'-' t/, C? ~I :;::j,; ., ~i b I ~:': '- ,'., 'l., ',< ,:;) '::) '.:J ,;;) ;:::, v". ;...: ~~. H, ~::J ~~ c, ri.i ... ,- :s ill ~; "0 " ("1 <" ~;1 ';j ~l} ii' :;; L1J l.!l ,i.; ~ CS G.! I::: ::..:' " ~;j tel '.r ~:~ L- vi ",:, ::. i;; J; I ~:1 H i ,'1 -, ::1 :1 .~ I I ~: I :'-.:' ,,": 5;~ ;;-,. ::2 .~~ " ~'jj !- ffi J~i ti1 ~~! "I: ....> 4: -<c, uJ 0) ::; ,,' 0:( '" t) ~;. u.; ".;: ~ ~:i :.:< _: , , i '-.' : 11. I w f~ :"'~ c. q r;:} (;:, ...~ " l';; E (~... ~~: N 8~ r.,.. ... c '" !- ;;:' q ~ c. ;( 111 UJ ~) .'6 l~) I::' C t C~ ..ic' (/; ir: ,.. .; ,.", c: {.,. .; ;6 (", ';::. I,,) i.i5 !- " 'C 'i: '0 iI": -J. c (;; [!': c.'~ !i.' C:. '; ...1 ;...1 ,-j -I :,1 J. -" ' '" <::> <::> N x o CO! <::> g '0 ... ,... II> r- .... co M '" (fj ll.J i= IX: l.W n o rr.: CL G _J CJ ii "- tu w ~ z < :; g, u; r;;,- ~ ,:; iii L...j o o .., 0, co ,,,..., ~~ '1 '" o o N ;..~ o C> c> <::> .., ", N II> "" ... 1.:: '" " ~ (fJ Iii t= fY lU n o rr: "- ~ (/ ,< "- ... lI.! lU a: ,- (fJ z :;;: L " ffi -6 t? lU 9 ~ c. t'.. "-, ,EI '" '=' ~ x 8 o '=' " ~ '" '1 ..; ~ ~ (fJ UJ ,- n' lU n " 6~ c- !i.i o ('2 Li. tJ lU !Y t1 z ;;: ::i ill ;;; '5 '" :.n '" ~ ill 01 o ~ '" r"", ;:~i ! >, -,~~, ; '" o g x o q c:- o '" ~ C', ~ ~ '" '" c .~ o c '" 'J ':\) " Iii '0 ru "- u Z rJ? UJ I::: '" UJ c- o Ct": c- o z :5 ~~ ~ lli ;;; .;;; m ~ {ii ; q ":', C "'i '.',1 ~! ~ ';;~ 1':) ~ '-'I ,;~ Cl (e ;,y " ""1 ~r, I' ~ .) ?:f; ,Ii ;;:, .. -, I 'I :;; U Z ;;: d '" .. o 0: .. ~ .( :;' W ~~ w Z '" c o C' '" '" '" u ~ ,> g :t ~. J ~ '" '" ~ ,~ o <::> " '" " ~ :-: ;..~ x ~ C <::> ;;; 8 o o " ~ 0' 8 c <::> <::> .... C', II> II ~II <"". if$.. '" o " " .:: M :;. F.: f:l ., '" ~ :;; !5! :i.: -, iJJ '" < CJ 0: ~ ~ 2" "U Z ;;;: .., w '" .. o ::r: ~: 7. >- -< :; ItJ [/) Uj z ;ij (fJ ... ;JJ Z - " 0; c ., ~ '-' ~ .8 iii t o 0- 0) cr:: >. ... ~ o :2 ~ ',' '" " v; '" 0': c;. o '" '" '" ~ ~ '" :;; ::; "'0 oE lr) 00 U~ ~ ~ ~r--... U'J_ E g ;Z $ ::;, ~, .~ -~ '11 -~ c: o E .. ~ ~ o .. ~ ~.:l :.~ I I a..! E" .!!~ "<= <Tu .:;.cn ii oS E E 0 wO :: t:!! -u o ~ " "- c- ~ ~ E :: .. .. "-w ~- .. c: (; E <>... E .. .. .. I-w .. " "iii > "Z .. .. .. ::: c( ... ~~ c: o 'iil c: o o .. '" .. I- :; ... .. ~ c ~ " u c ~ " u c: o ., :l o ..J ~ ~ Cl g ~ :;; "- .-< -, c) ;~; .;:<i ,,:~ ,.. ~l ~ ~~; ?:; " c, c> ,:,.-' v, {",'; ;::: ;! ~: _..i ~~- J " '" o ~ ;..:~ :5 <:;;, o o ...: N '" "J" o c ~~ "' :> ~ UJ Z <. ...J W ... <( o rr 0: ;.- ,.( .:!: Z LLJ ~l W z ~ in ~ til '!) '0 C') ,> o '? " .. .:,1 .J 'j € i :1 ,. cl c: o 'iil <il ~~ ,il co <> o N ;..~ :5 ci ~~ <1" Ij~ (:1 (:) c .. " ,n :> :?: ~ :5 w ., <( o D: ~ <( :;; W ~ tu Z 8 '" c ~ ~ " in :- o '" ~ ~ g .;.'. '" o :? r:;; u.: f~; >- ,,. it: <'r. u Z,' I. ei rn ;)' > .: .... co '" '=' (.; x co Cl n 6 (i) ".. ci ~~ :> ".;."f. lJ.J Z :s UJ '" <( o r< <( ?:: ~ z w (j) l UJ Z '" Vi Q m tn " Jj ;.,. c c :'!I ~1 > '':' '" '" g x :5 <::> o o ",,' <D ", <::> ~ c '" ~ ~ <- .., W ., <( o [C- o: >c ,.( :< z UJ CfJ .l UJ Z '" in ~ Q .~ {5 iii ? c o r-, I ~I .1 -''''_~_ "I J c~ o g 'x' ~ ;;:) E r. ~~': i" . - ii) ,,~ >- :i is ~h .~ ;. :' '. '" o ~ :-< x: <::> o c:i o o ,." 'D v, "" '" '- ~ :> :;;; UJ Z :3 w "" <( o rr <( ..,. :;;.: <( ::. z liJ ~~ W Z .:Po iJj ~ ill '" 'J en :;: g " " " N ~ '" o o '.~~ <:> <.:> cj >? '" o :~1 :~ UJ Z. < .J W '" <C o rr ?i ;.- <C '" :z: lLJ ~l UJ z s '" ~ ~ " "J :fi ;.,. r~';. ~ '" R >< " x '" o o S? ~f'; ." <:> Ci c '" m :> L: UJ Z ;;;; UJ "" ..( C 0: "". z >- <( ~ ~.U iJ) UJ '7 ~~ if. c o " !r. '" ,> i;': ~ g ,; S-; .> ,.:.; x o o 6 <> c:.. o <0 '" '" ", o C!l I- o "2 ~ o. in '" E '" "- of.? .] l;~j '0 "> 'J in (/i '-!)" 1ii c L:.. ~ m ''0 '" n u: w b ", 8 ~ ~ ..~ x o o o o o o "' o I!! '5 ~ ~ "- in € '" "- -g '" ..J ~. "' 15 '" n ;;; Z ~ '" "- (/l Z ID '0 '" n Vi W o ", 'T itl O'J! 8; ~;i IJ.:I 0' ~j ~i ~i x x 8 6 o o o N <0 o o o o o '" <:1> "" IJA.....I. ; \ II ...~. "Y.\ o In >- ~ ~ o ;; ~ i! .. "- <= e .. :> o. I co r< w z ~ "- o ~ L :::; is o ::J o U ..J ..J ~ " " ..J Ql C Ql > <( ., li; Cl. ~ "' 15 Ql " in Z z '" > <( g N ~ Z if; " .0 o E 8 '.u z ;., ~ (5 :2 ... o :2 ~~ u5 C"'J ~~ ~ 1: g o ::l Z-. in ~ '" U. /1) Z ill 15 '" '" in L;j "? ~ g; '" ~~ - ... o 0- OJ "' ~ 'T ~ a, ~I e, I ~.j ~ ~j in -g j XII. Land Use Anoka A Resolution to pursue a joint agreement with the Northstar Corridor Development Authority concerning the Development of the Anoka Station was signed on May 16,2005. It was resolved that the City of Anoka will continue to work in cooperation with the NCDA to pursue the successful development of the Northstar Corridor Commuter Rail Project and development of the Anoka Station. It was also resolved that the city of Anoka will continue to pursue development of the Commuter Rail Transit Village at and surrounding Anoka Station. Finally, it was resolved, that the city of Anoka is prepared to enter into a Memorandum of Understanding with the NCDA concerning the initial development and future expansion of the Anoka Station and requests that the NCDA agree to pursue a mutually beneficial long term relationship concerning development of the Anoka Station and the Anoka Commuter Rail Village. Project staff are scheduling meetings to discuss transit oriented development opportunities at Big Lake, Elk River, Anoka, Coon Rapids, Fridley and the Inter-modal station in Minneapolis with local government staff. XIII. Community Involvement Since the May 2005 Northstar report the following public meetings and presentations have been held: Date(s) May 11,2005 May 25, 2005 May 31,2005 Audience . Group of Metro Area Realtors, TPC Sensible Land Use Coalition Luncheon, St. Louis Park Quad County Meeting (Representatives from Stearns, Benton, Sherburne and Wright Counties), St. Cloud History Center NCDA Board Meeting, Anoka June 2, 2005 XIV. Next Steps Project staff continues work on the material FT A will need to change the project's rating from "Not Recommended" to "Recommended" and to approve entry into the final design phase. The date for submittal of the New Starts Criteria, Financial Plan is July 8, 2005. The Real Estate Plan, Quality Plan, Before & After Study Plan and the Project's response to the DOT request for ADA-related data will also be provided by July 8 or earlier if possible. Project staff will communicate with FT A Region V staff throughout the submittal process to ensure timely review and progress. Northstar Corridor Monthly Report June 17,2005 13 ~~ ~rllllRTllBTAR _-.rm aIL Mn/DOT, NCDA, and Metro Transit are providing comments on the draft preliminary engineering validation report. Work is beginning on updating environmental documentation and on Americans with Disabilities Act (ADA) issues at commuter rail platforms. Project staff keeps in contact with station cities and counties on design issues. Meetings are being scheduled to address the best location for the Big Lake Station. In addition, the staff will continue to work with the City of Minneapolis and Hennepin County on issues surrounding the inter-modal station, including the proposed Minnesota Twins stadium. The project takes advantage of public information opportunities, giving presentations to civic groups and business organizations. Northstar Corridor Monthly Report June 17,2005 14 ~ . '- ';;'fllDRTHBTMI _JIIIIfIlDIlVIlL