Loading...
Steinbrecher Handout 326 3rd St. HRA Handout 06-01-2020 PROPOSAL 45 Companies, Inc. DATE PROPOSAL # 13792 24711'Avenue—Zimmerman,MN 55398 Phone(763)274-0925 Fax(763)274-0928 5/28/2020 5015 ROLL-OFFS ♦ SEPTIC SYSTEMS ♦ EXCAVATING LANDSCAPING ♦ DEMOLITION BILL TO City Of Elk River 13065 Orono Parkway Elk River, Mn 55330 PROJECT 326 3rd Street, Elk River ITEM DESCRIPTION QTY RATE TOTAL PERMITS PERMITS FEE 1.00 150.00 150.00 DEMOLITION Demolition, removal and proper disposal of house, 1.00 12,375.00 12,375.00 detached building, and foundation.All applicable material will be recycled. DEMOLITION Import material as needed to grade out lot with a 1.00 1,785.00 1,785.00 maximum 3:1 slope in the area of the previous foundation or home.All disturbed areas will be seeded. Sewer/Water Install Excavation of a to cap sewer and water includes: 1.00 7,200.00 7,200.00 -Permit from City of Elk River($65 allowance) -Dig 4x6 foot hole in blacktop up to a depth of 8 feet above water main and cap% inch or 1 inch water service to house. Hole will be backfilled and compacted. -Blacktop will be removed offsite and recycled. -Patch 4x6 foot blacktop -Pushing patch from basement of house out to City Main and insert of liner cap at service. -Traffic Control ** Price Does NOT include any excavation in the road to cap sanitary sewer line. SIGNATURE & DATE Subtotal *Customer agrees that bysigning this proposal,it becomes a legal binding contract and all invoices will be paid Sales Tax (0.0%) according to Steinbrecher Companies Inc(SCI)terms.Should there be any circumstances where SCI cannot complete thejob,Customer still agrees to payfor time and materials used up to termination ofjob.*Prices above may include sales tax.If you are Tax Exempt please complete and submit exemption form. *All prices are TOTAL based on cash or check payment.Alternate payment types may be charged additional 3%convenience fee. CONTRACTOR PRE-LIEN NOTICE(Minn.Stat.514.011 Subd. 1) This Notice is to advise you of your rights under Minnesota law in connection with the improvement to your property.(a)Any person or company supplying labor or materials for this improvement to your property may file a lien against your property if that person or company is not paid for the contributions.(b)Under Minnesota law, you have the right to pay persons who supplied labor or materials for this improverx gantt ddirictly and deduct this amount from our contract price,or withhold the amounts due them from us until 120 days after completion of the improvement unless we give you Hen waiver signed by persons who supplied any labor or material for the improvement and who gave you timely notice. 'Ireelten PROPOSAL Companies, Inc. DATE PROPOSAL # 13792247 1h Avenue—Zimmerman,MN 55398 Phone(763)274-0925 Fax(763)274-0928 5/28/2020 5015 ROLL-0FFS ♦ SEPTIC SYSTEMS ♦ EXCAVATING LANDSCAPING ♦ DEMOLITION BILL TO City Of Elk River 13065 Orono Parkway Elk River, Mn 55330 PROJECT 326 3rd Street, Elk River ITEM DESCRIPTION QTY RATE TOTAL Job Notes JOB NOTES: 0.00 0.00 *Above prices are based on doing this project in conjunction with the other 6. *All Prices above are valid for 30 days from date on Proposal. * City is responsible for having all utilities disconnected and removed. *The above prices do not include the following unless otherwise listed above: -Asbestos or hazardous waste inspections, abatement or removal of asbestos or hazardous material. -Any repairs to landscaping. -Any tree removal. -Any import or export of material to/from site. * SCI will contact Gopher 1 for locates. Gopher State 1 does not locate private utilities. * Owner agrees to hold SCI harmless for the following: -Any damage done to utilities that are marked, unmarked, mis-marked, or private. -Any damage done to driveway with heavy equipment. * Owner is responsible for all erosion of sediment, maintaining any landscaping, re-seeding/overseeding and washout that may occur. *All prices are based on cash or check payment. Alternate payment types may be charged additional 3% convenience fee. *Terms are: 1/2 down is due upon signing proposal and balance due when invoiced. SIGNATURE & DATE Subtotal $21,510.00 *Customer agrees that bysigning this proposal,it becomes a legal binding contract and all invoices will be paid Sales Tax (0.0%) $0.00 according to Steinbrecher Companies Inc(SCI)terms.Should there be any circumstances where SCI cannot complete the job,Customer still agrees to pay for time and materials used up to termination ofjob.*Prices above may include sales tax.If you are Tax Exempt please complete and submit exemption form. *All prices are TOTAL $21,510.00 based on cash or check payment.Alternate payment types may be charged additional 3%convenience fee. CONTRACTOR PRE-LIEN NOTICE(Minn. Stat.514.011 Subd. 1) This Notice is to advise you of your rights under Minnesota law in connection with the improvement to your property.(a)Any person or company supplying labor or materials for this improvement to your property may file a lien against your property if that person or company is not paid for the contributions.(b)Under Minnesota law, you have the right to pay persons who supplied labor or materials for this improver ntt di ctly and deduct this amount from our contract price,or withhold the amounts due them from us until 120 days after completion of the improvement unless we give you ien waiver signed by persons who supplied any labor or material for the improvement and who gave you timely notice.