8.1. SR 08-03-2020Request for Action To Item Number Mayor and Council =8.1 Agenda Section Meeting Date Prepared by General Business August 3, 2020 Jason Cook, P.E., Project Manager Item Description Reviewed by Windsor Park 3rd Sewer Connection Feasibility Study Justin Femrite, P.E., Public Works Director Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, a resolution receiving of Feasibility Study and calling for Public Hearing Approve, by motion, a resolution ordering the preparation of plans Background/Discussion The Windsor Park 3' Addition Homeowners Association (HOA) has a shared use, low pressure sewer system with a failing treatment system. The HOA contracted to complete a feasibility study to find the cost and feasibility of connecting their existing sewer system to the city sanitary sewer system. This study found the 88 homes in the HOA could connect to the city system by running a new sewer line along Ranch Road from their existing shared drainage field to the forcemain currently being constructed along the Great Northern Trail. The HOA requested the city lead the improvement project and follow the MS 429 special assessment process. The MS 429 schedule is on page 1 of the feasibility report. The first steps are to pass a resolution calling for a public hearing on the improvement. To meet requirements for advancing this project through the process as rapidly as possible, it is also recommended to approve a resolution ordering the preparation of plans. Financial Impact The HOA put up a Letter of Credit for $54,900 for all engineering and survey services costs to produce the plans and specifications and obtain competitive bids. The costs will be rolled into the assessments, but a letter of credit was obtained as a surety in case the project does not gain final approvals through the process. Attachments ■ Windsor Park 3T`` Addition — Sewer Connection — Feasibility Report ■ Resolution Receiving Report and Calling for Public Hearing ■ Resolution Ordering Preparation of Plans ■ Engineering Design Fee Proposal ■ HOA Request and Letter of Credit The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional,` 01 e service, and community engagement that encourages and inspires pi ospei ly INAMIRE1 OBOLTON & MENK Real People. Real Solutions. Submitted by: Bolton & Menk, Inc. 7533 Sunwood Drive NW #206 Ramsey, MN 55303 P: 763-433-2851 F: 763-427-0833 Certification Feasibility Report For Windsor Park 3rd Addition — Sewer Connection City of Elk River Sherburne County, MN R16.120038 February 2020 Updated July 2020 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. By: a., LLA=- Qa sn W. Cook, P.E. License No. 47541 Date: July 17, 2020 Prepared by: Bolton & Menk, Inc. Certification Page Windsor Park 3rd Addition - Sewer Connection I R16.120038 Tah1p of Contents I. INTRODUCTION.....................................................................................................................................1 II. BACKGROUND.......................................................................................................................................1 A. SCOPE............................................................................................................................................1 B. MS 429 PROCESS & PROJECT SCHEDULE......................................................................................1 III. EXISTING CONDITIONS..........................................................................................................................2 A. WINDSOR PARK 3RD ADDITION.....................................................................................................2 B. GREAT NORTHERN TRAIL FORCEMAIN.........................................................................................2 C. SURROUNDING NEIGHBORHOODS...............................................................................................2 IV. PROPOSED IMPROVEMENTS................................................................................................................2 A. SANITARY SEWER.......................................................................................................................... 2 B. LIFT STATION.................................................................................................................................3 C. STORMWATER MANAGEMENT....................................................................................................3 D. FUTURE SERVICE TO NEARBY NEIGHBORHOODS.........................................................................3 V. PERMITS/RIGHT-OF-WAY/COORDINATION..........................................................................................4 VI. PRELIMINARY COST ESTIMATES...........................................................................................................4 VII. FUNDING AND ASSESSMENTS...........................................................................................................4 VIII. CONSTRUCTION PHASING.................................................................................................................5 IX. FEASIBILITY AND RECOMMENDATION.................................................................................................5 Appendix Appendix A: Sanitary Sewer Route Appendix B: Windsor Park 3" Addition Existing Drainfield Appendix C: Opinion of Probable Costs Appendix D: Assessable Properties Exhibit Appendix E: Preliminary Assessment Roll Prepared by: Bolton & Menk, Inc. Table of Contents Windsor Park 3rd Addition I R16.120038 INTRODUCTION This Feasibility Report prepared by Bolton & Menk, Inc., as authorized by the Windsor Park 31d Addition Home Owners Association, provides an initial analysis of the feasibility, cost- effectiveness and necessity of the proposed infrastructure improvements. The improvement costs are anticipated to be assessed to benefiting property owners. Public assessments applied to the properties described in this report are subject to the requirements of Minnesota State Statute, Chapter 429 (MS 429). This Feasibility Report is required by the MS 429 Statute and is the first step in the special assessment process. BACKGROUND A. SCOPE This report addresses the feasibility of connecting the Windsor Park 31d Addition low pressure sewer system to the force main that will be run along the Great Northern Trail (GNT). Additionally, this report evaluates the feasibility to provide service to the surrounding area and what improvements would be required to provide the additional service capacity. Included in this report is a description of the proposed improvements along with estimated project costs. The specific objectives of this report are to: • Evaluate the feasibility of the project. • Determine the necessary infrastructure improvements. • Prepare cost estimates for the proposed improvements. • Create a preliminary assessment roll following City assessment policy. B. MS 429 PROCESS & PROJECT SCHEDULE As mentioned above, infrastructure improvements financed through the assessment of benefiting property owners are regulated by Minnesota Statute, Chapter 429 (MS 429). The process prescribed by MS Chapter 429 along with the proposed project schedule is described below. The benefited parties must submit a petition for the proposed improvements to the City Council or the improvement process must be authorized by the City Council without a petition. After the City Council considers this Feasibility Report, the Council may pass a Resolution Receiving Report and Calling Hearing on Improvement, as well as a Resolution Ordering Preparation of Plans to indicate its plan to continue the process. Estimated date: August 3, 2020 A public hearing on the proposed improvements is held. After the improvement hearing the Council may pass a Resolution Authorizing the Improvement. After the City Council authorizes the improvement, it may pass a Resolution Approving Plans and Specifications and Ordering an Advertisement for Bids. Estimated date: September 8, 2020 The advertisement for bids must be published in the official local newspaper and trade publication such as the "Construction Bulletin" at least three weeks prior to the bid opening date. Estimated bid opening date: September 30, 2020 If the City Council wishes to continue with the improvements after consideration of bids, the City Council may pass a Resolution Calling for an Assessment Hearing. 2 weeks notice for this hearing needs to be published in the local paper and mailed to those assessed. Estimated date: October 5, 2020 Prepared by: Bolton & Menk, Inc. Windsor Park 3rd Addition — Sewer Connection I R16.120038 Page 1 The public hearing on the proposed assessments is held. After this assessment hearing the Council may pass a Resolution Adopting the Assessment. If no formal objection to the assessments is presented to the Mayor or City Clerk prior to the end of the assessment hearing, those assessed waive their right to challenge the assessment. If the City Council wishes to continue with the improvements after the assessment hearing, the City Council may pass a Resolution Accepting Bid. This resolution would award the project to the lowest responsible bidder and construction may begin. Estimated date: November 2, 2020 Construction start date will depend on weather and contractor's schedule. Estimated date: November 16, 2020 Estimated date of substantial completion (Dependent on completion of Great Northern Trail Forcemain): June, 2020 III. EXISTING CONDITIONS A. WINDSOR PARK 3"D ADDITION Windsor Park 3,d Addition is located along County Road 33 west of County Road 1. The development's 88 lots are serviced by a shared low pressure sanitary sewer system. The system converges to a 3-inch PVC low pressure forcemain that discharges to a drainfield and recirculating sand filter on the east side of the development. Per city standards, it is estimated that the 88 existing homes produce approximately 25,000 gallons per day of flow into the wastewater system. The existing drainfield is limited in its ability to treat effluent compared to that of a wastewater treatment plant. Located in the Windsor Park neighborhood, it occupies space that could be used for other applications. The cost to maintain and efforts required to monitor private drain fields can be substantial. Should the drainfield system fail, the impacts to those served can include sewer backups into homes and excessive emergency repair costs. B. GREAT NORTHERN TRAIL FORCEMAIN A 6-inch sanitary forcemain that follows the Great Northern Trail is planned to be constructed in 2020. It begins at the Elk River Landfill and conveys leachate south and ties into the existing sanitary gravity sewer north of Meadowvale Elementary School. C. SURROUNDING NEIGHBORHOODS The neighborhoods between Windsor Park 31d Addition and the Great Northern Trail are not currently served by any municipal sewer system. The neighborhoods to the south of Windsor Park 3,d Addition are served by a similar low pressure sanitary sewer forcemain and drainfield. All of these neighborhoods are outside of the current planned urban service area of the City. IV. PROPOSED IMPROVEMENTS A. SANITARY SEWER The proposed sewer improvements will connect the existing low pressure sanitary forcemain on the east side of the Windsor Park 31d Addition to the 6-inch forcemain Great Northern Trail. The current drainfield and recirculating sand filter should be removed once the new system is operational. Windsor Park 3,d Addition's 3-inch PVC low pressure sanitary forcemain will transition to an 8-inch gravity sewer near the current recirculating sand filter. This location would be the point of ownership transfer. The 8-inch gravity sanitary sewer will run trenchless along County Road 33 (Ranch Road NW) from the transition point to the planned lift station location about 3,230ft to the east. Manholes will be installed at standard spacing. Prepared by: Bolton & Menk, Inc. Windsor Park 31d Addition — Sewer Connection I R16.120038 Page 2 Starting at the lift station, a 6-inch sanitary forcemain will run trenchless along County Road 33 (Ranch Road NW) to the Great Northern Trail. To stay within the utility easements and clear of the trail underpass, the 6-inch sanitary forcemain will be open cut and installed approximately 200 ft south to tie in to the existing 6-inch sanitary forcemain. A 6-inch check valve will be required on the upstream side of the connection point for each the Great Northern Trail forcemain and the Windsor Park forcemain to prevent backflow issues. B. LIFT STATION The proposed Windsor Park lift station would be located on the west side of the drainage ditch between Fresno Street NW & Concord Street NW and the top should be constructed 1 foot above the 100 year flood plain elevation at a minimum. The Windsor Park lift station will need to be sized similarly to the lift station on the Great Northern Trail forcemain in order to pump the 2.6 miles to the south discharge point. The pumps will need to be designed to pump 180 gallons per minute (gpm). The resulting maximum capacity of the new lift station will need to be 216,000 gallons per day (gpd), which will have an available capacity of 191,000 gpd for additional flow from the surrounding area. Due to the sizing required to pump 2.6 miles, the lift station may only have 2 hours of run time per day which could result in odor issues at the lift station or at the discharge point. The Windsor Park lift station can not be operated until construction is completed on the Great Northern Trail forcemain. The Windsor Park lift station cannot be operated simultaneously with the lift station on the Great Northern Trail forcemain so coordination is necessary. Currently both systems are designed to have minimal run times, so alternating pumping through the use of a SCADA system may not be problematic. As development occurs, and additional flow is added to the system, a master regional lift station is recommended to be constructed at the connection point of the two 6-inch forcemains. This will eliminate the scheduling/alternating flow issue, and allow for additional service to be provided in the region. It is not anticipated that this regional lift station will be required prior to 2040 given the current plans for develpement in the area. The costs for this future "Trunk" station will be paid for using Trunk Sewer Fees paid by all contributors to the area at the time of connection. See costs that have been included in Section VI. C. STORMWATER MANAGEMENT Best Management Practices (BMP's), as required by the Minnesota Pollution Control Agency (MPCA), will be utilized during construction to minimize erosion and sediment runoff from the construction site. These BMP's may include silt fence, construction sediment control entrances and storm water inlet protection. D. FUTURE SERVICE TO NEARBY NEIGHBORHOODS This project layout would allow for future gravity sanitary sewer service to extend to the nearby streets off of County Road 33 (Ranch Road NW). Because County Road 33 (Ranch Road NW) is at a higher elevation than many of the connecting streets, many of the homes can not feasibly be served without the use of additional lift stations or individual grinder pumps. Due to the existing road grades in the area, it is not recommended to construct the lift station at any additional depth or size than required for the Windsor Park 3,d Addition plan as the additional service area would be negligible and the trunk sanitary mains would need to be in excess of 30' deep. Prepared by: Bolton & Menk, Inc. Windsor Park 3rd Addition — Sewer Connection I R16.120038 Page 3 V. PERMITS/RIGHT-OF-WAY/COORDINATION The need for temporary construction easements will be evaluated during the final design process. A permenant easement will need to be acquired for the lift station site. Approvals and permits are required from various public agencies for the construction of this project. They include: • Minnesota Pollution Control Agency (MPCA) - NPDES Stormwater Permit • Minnesota Pollution Control Agency(MPCA) - Sewer Extension Permit VI. PRELIMINARY COST ESTIMATES The estimated project costs are summarized in the tables below. A detailed Opinion of Probable Cost Estimate is included in Appendix C. The unit prices for the items of work have been estimated based on similar types of projects completed in the past. The costs shown in the table below are estimates that include construction, contingencies, and engineering costs. The Sewer Access Charge (SAC) to connect to the City sanitary sewer system is currently $5,385 per service. This has been included in the total estimated project costs. The Trunk Sewer Fee is an additional fee charged by the City to cover oversized trunk mains throughout the sanitary sewer system. This fee is estimated at $6,000 per buildable acre connected to the system. This has been included in the total estimated project costs. Estimated Project Costs Sanitary Sewer Improvements Sanitary Sewer Subtotal $1,081,000 Contingencies $108,000 Sewer Access Charge $473,880 Trunk Sewer Fee $168,120 Easement Acquisition $10,000 Engineering & Administration $180,000 TOTAL ESTIMATED COST — UTILITY IMPROVEMENTS $2,021,000 These cost estimates are based on public construction cost information and include contingencies, engineering and administrative costs. Since the consultant has no control over the cost of labor, materials, competitive bidding, weather conditions or other factors affecting the cost of construction, all cost estimates are opinions for general information and no warranty or guarantee as to the accuracy of construction cost is made. Financing for the project should be based on actual bid prices with reasonable contingencies. VII. FUNDING AND ASSESSMENTS Funding for the project would come from assessing the benefitting properties within the Windsor 31d Addition. Preliminary Assessments were calculated based on the City's current assessment policy. A property assessment exhibit can be found in Appendix D. Prepared by: Bolton & Menk, Inc. Windsor Park 3rd Addition — Sewer Connection I R16.120038 Page 4 The following are the preliminary proposed assessment rates based on the City's assessment policy. • A preliminary assessment roll has been included in Appendix E. VIII. CONSTRUCTION PHASING The existing drainfield system will need to remain in service until the lift station is ready to go online and the supporting infrastructure is in place. The Windsor Park lift station can not be operated until construction is completed on the Great Northern Trail forcemain. Construction of the proposed improvements can be completed in one phase. The abandonment or removal of the existing drain fields is not included in the project costs or assessments. This work would be contracted seperately by the HOA. IX. FEASIBILITY AND RECOMMENDATION Based on the findings presented in this report, the proposed improvements are cost effective, necessary, and feasible from an engineering perspective. Bolton & Menk, Inc. recommends that, if these improvements are determined to be financially feasible through the assessment process, the City Council approve this report, call for a public hearing, and authorize the preparation of final plans and specifications. It is not recommened for the City to increase the depth of the proposed lift station or enlarge the lift station pump capacity beyond what is required to provide service to Windsor Park 31d Addition as that additional cost would not result in additional benefit to the City. Prepared by: Bolton & Menk, Inc. Windsor Park 3rd Addition — Sewer Connection I R16.120038 Page 5 Appendix A: Sanitary Sewer Route WINDSOR PARK 3RD ADDITION - SEWER CONNECTION WINDSOR PARK THIRD HOA APPENDIX A: SANITARY SEWER ROUTE S&MENK BOLTON DECEMBER2019 3 z 0 Q COU N ryROgOI 0 Y Q Y � o /RgNCyROgO � Nw CONNECFTO EXISTING DRAINAGE FIELD GROUND ELEVATIO N: 989 FT INVERT ELEVATI ON: 9J9 FT s. pLC MANHOLE (TVP.) o U O � W > S` E., PVC pc 0 O y 4 WINDSOR PARK 3RD np �p ADDITION z" PVC SS LOTS ON EXISTING LOW s" pvc l>sp GRADE BREAK ELEVATION: 9FT PRESSURE FORCEMAIN a^�?l GRq�$TRFNc INVERT ELEVATION: 942 4z FT SFWRR�F� \ rNX G c � 88 P�Qo `y9n tiny mn QO 1N 945LIoN ATION: GROUND ELEVOFT INVERTELEVATION: 924 FT DEPTH TO PIPE INVERT 21 FT 0pM J� STRUCTURE DEPTH:27 FT - AIR RELEASE pFl 6, lRE - oR�FMa NFss LEGEND 5 II PROPOSED PROPOSED GREAT NORTHERN TRAIL FORCEMAIN (BY OTHERS) FORCEMAIN CONNECTION TO - ' PROPOSED GRAVITY SEW ER G REAL NORTH ERNTRAIL F GROUND WRCE MAIN ELEVATION:9J2 FT - EXISTING LOW PRESSURE FORCEMAIN ®0 I—E FEET INVERT ELEVATION:964 FT Appendix B: Windsor Park 3rd Addition Existing Drainfield N W P. V1 OJ Sa 1'oco `�• O L7 C7 O tJ O d 9 w .. n ! N... ... ........ ............. . .. .. .. .. .... .. .. :. .:.. .. ... : .. w � 6vCS 11 So 95 328 Yf : 9VCE 953.78 77 3RR41 MP NA N -9�.wtl a - B� 9 I,2S :- BYCE P5625 o ? 3 ____ RP Y a CNrJ J 25 eVCS -B3425 oo ?91R3 JCS Ta 5] 95 OB P 956-25 ... .. 4 PYl EL€Y. = 967,0 v 0:. (A I IMP i 8 959 b V 9B1 @i. ..p.. ; .. .... r Y L I i I 1 .:: .:: ::. .. '... .. .. .. .::.. ...:. ....t^ PP v4 .. I 1 I WeiQD 1b I- to to o fl 'E> . : pit .:.: ....................... g li tq oa ccn CCn CCA CA t°0n u� cn n C, N I.] 00 v_ 96aB . BYCS,i 7 28+50' Y n 96794 P N EYVCEr 96lti4 'XL2 d69'S tYC9 29a-9tt 4S 97MBO \ n O 877.07 .. BYC£.` R7S-:13 ....-,. • r 4 p' rn Gl 939. eves 3z12s L _.. a5a EN"E. 885. x _ Cs! s9M1 314:so:.. � �......... 7y R EQ ea773 - - z i 9S5.7y - a _- g ❑ 'ifs A tl 9B9B�.B6 x pticws- n5+.lual 9 t .a PST _ gg CJ IE�ep T G .. .. des _ .. .... cv�s 3a so. p c at y . . i m C,+ Ln . U5,73. €vC€ 985 73: aA fi i � g i� a� .:?t , .. ._ 5 Yh o....:. L 6'i 9BAi6R ¢¢� . 5184-76 y pxr ui avcs 3400 { K o �% V 666.i8w.:9Y.C� 9B9.aa.' - '�. T -'.' 1 F 1.0 3. ^G b fv DP b a I CJ W7a 482 saooa. :t� t`.r Eva. tc :Y70.74. 'ia®,. e., ..: �r N 9. o ^�a Rya g tR� W 9 jil R ®1 $ R vy ar Wekla till . [r cn en en en [n cn hi u, WINDSOR PARK 3RD Add. CITY OF ELK RIVER, WJ. -. o "pro�ru':�e:,t 3n7lox' ocsicu [ epc.ce na il rFscawrlml wr DYNAMICS DESIGN & LAND CO. L _ '' �t; m - m+i.= Iowa or rrA a pl— 6 ca.cco SANITARY SEWER, STORM mr9 _ IN SEWER & STREET PLAN ., cxe no �01,7Dv„Q wa:¢. Gas. uw n60G JOPLIN ST - - if, + i � 4a � i I r r ^ pr f ' 4Q 1 pEy i + , d Nl 0 m p � WiNO50R PARK 3Rp App. harc early !AM lnba q5n wa' � � ,,rn, arac n. u,� a4€.ynlm Na. o¢scx M K9.PG.ce w� uEsc�mn Q CITY OF ELK RIVER„ SIN. DYNAMICS P£SIGN & LRNp CO - � ''w L'�Uu�-se I3T, p �EfXi3G, &SSOCIATES, Itlfm- „d .m a wy Ew f �Fc M naawa CHECKED 8Y =..za oc .cc SANITARY SEWER REFERENCE PLAN N m x'�` SipBe°0 oar. �. rra rvyvo Fl Appendix C: Opinion of Probable Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F O �n oo vi O N O O O O O vi O O O M oo M N l r O O O O O � H'� � fs4 b4 l� a1 fs4 v1 b4 O [y4 --i Es4 Ef3 [A --i --i ER EA N b4 Ef3 00 O N 07 r E� E!j E!j Ef3 Ef3 Ef3 O � Y3 � M O bN4 b4 b�4 �"� O �n N oo �o �n vi O O O O O O O N O Ef3 cas fR ER Es5 [� ~ ~ ►-i O � �i O �n Ef3 v3 Ef3 �o N vi O O O �n O O Ef3 vi '�.i O py O ER Ef3 b4 b4 O V1 Y1 N --� V1 M � Vi ER o o o N 00 a z z w o w w x x x x WW H W U U w U U U U � rx w o w � �C w Q W � oa w Q Q a x O 0 z a v v w z W W w cn a a °23 C7 O D U � p�� C7 U U U a C7 ww ww CIO U 00 'o U C W U w o U U F E w W O N M vl �o l� 00 Q1 O w H l— 00 C1rq Appendix D: Assessable Properties Exhibit Zhd Oz JW OE Mau m O = N X w W co N 75; W_ U H w 0 Ol W r` m � v � ti OO N m r, LN � a J a0 f9 m � N Lr, BLOCK 1-000 Ln w 7.co ~' m J D m � z •►� �.' mAr Y a O m O co 00 � z �Jo� m c N �(0 o 00 S��ObN � h CPS Ln ^ OCJ� N N �v _� cy c-I 6LOC�3 00 P Ln � a N ) U m = m m � N `~ V C / N m I� W m O M� N N 0 Lf1 c-I N Ln 00 II I wv a¢eseetoz/te/zt aMp-�oa iNa wssassaaeoozraDidAaoAa�Aaeoorteta\ad aosawmV:N Appendix E: Preliminary Assessment Roll O O O O O O O O O O O O O O O O O O O O O O O O O O O O O i. Si Vl Vl Vl Vl Vl Vl Vl Vl - 10 - I0 - - 10 - - 10 - - 10 - - - - - Vl - - - I0 - - I0 - - 10 u F � y N 59 N Vi N GI) N 59 N fH N ifj N cA N 59 N EH N cf3 N 59 N GI) N GI) N 59 N EH N cf3 N 59 N Vi N GI) N 59 N fH N ifj N cA N Vi N cf3 N 59 N GI) N Ff3 N 59 �1r � 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O •.. �,i 69 69 69 69 EA 69 EA 69 EA 69 69 69 69 69 69 69 69 69 69 69 EA 69 EA EA 69 69 69 69 69 u N i' y OA u uFOU W O O W M O O W M O O W M O O W M O O W M O O W M O O W M O O W M O O W M O O W M Cl O W M O O W M Cl O W M O O W M Cl O W M O O W M O O W M O O W M O O W M O O W M O O W M O O W M O O W M CD O W M CD O W M ClO O W M O W M O O W M O O W M - 7 C h- 7 C 7 C h- 7 C 7 C h- 7 C 7 C h- 7 C 7 C h- 7 C 7 C h 7 O 7 C h 7 O 7 C h 7 O 7 C h- 7 C 7 C h- 7 C 7 C h- 7 C 7 C - 7 C h- 7 C 7 C h-- 7 O 7 C 7 O 1i i+ 01 01 01 01 GnbsGebsGebs�bs�bs�bs�bs�bsGnbsGebs 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 0\ 0\ 0\ 01 bs�bs�bs� 01 01 01 01 01 �w F� w L zzzzzzzz z z z z H N H N H N H N H N N U N U N U N U N U N U N U N U N U N U N U N U N U w �> w w >��� w w w v z w z w z w z w z w z w z w z w z w z w z w z w z w z w z w z w z w z w z w z w z w z w z w a 00 01 7 aaaaaaaaaaaaaaaaaaaaaa 00 00 7 00 h 7 00 ID 7 00 Vt 7 00 7 7 00 M 7 00 N 7 00 7 00 O 7 00 01 M 01 M 7 0o M_ N h M to Vt M_ Ic 7 M O M M_ .�. M v� N M_ .. M M c Vt M_ h M r o0 M NNNNNN m h 00 m ID 00 m 7 00 m M 00 m N 00 m O 00 z x w ¢ x cA z (J w ¢ a z xQ'd 44 U z a p Z w x a °d °d z W w w >C W O W 2a <z r xw x m O 0 N F44 z N 0x U U x t7 N u sz NNNNNN C O C y Qy Q 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 M y r yIc % to to to 01 to 01 to 01 to 01 to to lo Io to to to 01 to 01 to to lo to 01 to cl to lo Ic v1 •� y V C N b U y� O N M 7 d d d W d d d d 7 Vl d d d D\ N N N d N N N N N N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O i. q vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi c � m ri Ni ri Ni ri Ni ri Ni N cS cS Ni Ni ri ri Ni Ni ri ri Ni ri Ni Ni N cS cS Ni ri Ni ri N F � y N EA N 5A N EA N 69 N 69 N 69 N 69 N EA N 69 N EA N 69 N 69 N EA N 69 N 69 N 69 N 69 N 69 N 69 N 69 N EA N EA N EA N V3 N EA N 69 N 69 N 69 N 69 N 69 N 69 L fr h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 h 7 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O ;,� u x vi h vi h vi h vi h vi vi vi vi h vi vi h h h vi h vi vi vi vi vi vi vi vi vi vi vi 3 m U ss s9 ss s9 ss ss ss sA ss s9 ss s9 s9 ss ss sA sA ss ss sA ss s9 s9 ss s9 ss s9 ss s9 ss s9 y O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O ti y bA xi o0 00 00 00 00 00 00 00 00 m 00 00 00 00 00 00 00 00 00 00 00 m m 00 m 00 00 00 00 00 00 u W U u V U M (H M Gl9 M Gl9 M Gl3 M �9 M 6 M 69 M Gn M 69 M Gn M 69 M Gn M 5q M (A M (A M (A M Gl3 M GI) M Gl3 M !A M 69 M EA M (A M 69 M Gn M 69 M EA M Gl3 M Gl9 M Gl9 M 59 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 O O O O O O O O O O O O O O O O O O O O O C C O C O O O O O O .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. oq Gl3 69 Gl3 oq Gl3 69 Gl3 69 C q oq 69 Gl3 Gl3 69 oq Gl3 Gl3 69 Gl3 69 69 Gl3 69 CA 69 C q 69 C q 69 H � W Z Z Z VJ N N N N N N N N N N N N N N N N z H z H H - 0o - h - ID - vt - 7 - M - N ti Vl O 01 01 h .r M lO .r O 7 .r O N l� 7 .r V1 M .r M h N M ID N l� O N ti N 01 N N M N vt N O N M 7 7 M N rW a O H W Qd wQld W 'D a coo m W Wa U Q O CZ) U m U O F m 01 Y u en O tq � y O M M M M M M M M M M M M 7 7 V1 \O �O 1� 1� 1� 1� 00 00 00 00 00 00 00 00 00 q O �.I M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ,ti p m 4 d d d - - - - - - - - - - - - - - - - - - - - - C. O V •r y np p N b � d y yO o0 M 01 M O 77 �--i Hd Hd Hd 7 7 Vl Vl Vl Vl Vl Vl Vl Vl Vl Vl \O 3 V Ow =c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F � y N FH N (f3 N 6A N Vi N (f3 N 69 N 69 N FH N (A N (A N 69 N Vi N Ef3 N Ef3 N (f3 N (f3 N (f3 N (f3 N 69 N FH N 69 N FH N (f3 N 69 N Vi N Ef3 N 69 N (A N O y py � bR p - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 h 7 O O O O O O O O O O O O O O O O O O O O O O O O O O O O �„ d x vi vi vi vi vi h h h vi h vi vi vi vi vi vi vi vi h h vi h h vi vi vi vi vi y s9 Gn s9 Gn sA sA sA G,� G,� sA sA sA sA sA s9 Gn Gn sA sA sA sA sA sA sA sA sA sA s9 m O N O O O O O O O O O O O O CD CD O O O O O O CD O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O "+ y OA xl - W h W h W h W h W h W - W h W -- W W h W - W h W h W - W h W h W h W h W h W - W h W - W h W - W h W - W h W u W U u V U M FA M (H M Gl3 M Gl3 M 59 M Gl3 M 59 M Gl3 M Gl9 M 59 M Gl3 M Gl9 M Gl9 M (f3 M FA M Ef3 M ( q M ( s M (f3 M (A M 59 M Gl9 M 59 M Gl3 M Gl9 M Gl� M Gl� M Gl� h- 7 7 h- 7 7 h- 7 7 h- 7 7 - 7 h- 7 7 h- 7 7 - 7 h- 7 7 - 7 h- 7 7 7 h 7 7 h 7 7 h 7 7 h 7 7 O C C C C C O C C O C O C C C C C C C C O C O C C C O C H� w a a N N N N N N N N N N N N N o 0 0 0 0 o N N N o 0 0 0 0 0 O O O O O O O O O O O O O1 r r v1 O1 h h O1 'O 0 7 0 0 �O O1 Vt 00 V1 h Vt 10 V1 Vt V1 M V1 N V1 Ol 7 oo 7 h 7 �O 7 Vt 7 O M M N M M M 7 M �O M h 7 �O 7 7 7 O M M M M Vt M h M O1 M N N N N N N N N N N N N yy 0 w w � � 0 Qd w < a ° a 46 °� a Qld a wa> w � U pi, z � U z � 6 Z U R P wi w Z p Q Q W �• � 0.441 C]7 Z Q w a cn a y F+ N l� to N M 7 V1 N M N M N M 7----- � e M N O O, O O, O O, O O, o? O, o 0, o o 0 0 0 0 0 0 0 o 0 0 o 0 0 o 0 0 0 o 0 v 0 C, 0 v 0 C, 0 v 0 C, 0 C, v C, v C, C, v C, v C, C, v C, C, v C, v C, °m L a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, a, � y y vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi vi P4 •r y V eq! d N �= U y b O N M 7 'O V1 �O �O h �O o0 �O 01 �O O l� l� N r M N 7 r Vi r �O r l� r W r 01 N O W -a o0 N 00 M 00 7 00 Vt 00 �D 00 l� 00 o0 00 VI W CQ o .O City of Elk River City of Elk River City Council Resolution 20- A Resolution of the City Council of the City of Elk River Receiving Feasibility Report, and Calling Hearing on the Windsor Park 3"d Addition Sewer Extension Project WHEREAS, a feasibility report has been prepared by Bolton & Menk, Inc. with reference to the improvement of a sanitary sewer extension from the Great Northern Trail to the Windsor Park 3rd Addition along Ranch Road. The improvement shall consist of gravity sanitary sewer, a lift station, and forcemain construction. This report was received by the Council on August 3, 2020, and WHEREAS, the report provides information regarding whether the proposed improvement is necessary, cost-effective, and feasible; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for affected parcels. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota, as follows: The Council will consider the proposed improvement in accordance with the report and the assessment of benefited property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429, at an estimated total cost of the improvement of $2,021,000 including connection charges. 2. A public hearing shall be held on such proposed improvement at approximately 6:30 p.m. on the 8th day of September, 2020, in the Council Chambers at Elk River City Hall, 13065 Orono Parkway, Elk River, MN 55330 and the City Clerk shall give mailed and published notice of such hearing and improvement as required by law. Passed and adopted this 3rd day of August 2020. John J. Dietz, Mayor ATTEST: Tina Allard, City Clerk City of Elk River City of Elk River City Council Resolution 20- A Resolution of the City Council of the City of Elk River Authorizing Preparation of Plans on the Windsor Park 3"d Addition Sewer Extension Project WHEREAS, a feasibility report has been prepared by Bolton & Menk, Inc. with reference to the improvement of a sanitary sewer extension from the Great Northern Trail to the Windsor Park 3rd Addition along Ranch Road. The improvement shall consist of gravity sanitary sewer, a lift station, and forcemain construction. This report was received by the Council on August 3, 2020, and WHEREAS, as recommended in the Feasibility Report, in order to keep the proposed project on schedule for a September 30, 2020 bid opening, it is recommended that development of plans and specifications begin in advance of the public hearing, and WHEREAS, the Consultant Project Manager, Jason Cook, PE with Bolton & Menk, Inc. will complete the design of this project through the bidding phase at a not to exceed fee of $54,900, and WHEREAS, the Windsor Park 3rd Addition Homeowners Association have put up a Letter of Credit in the amount of $54,900 to cover the engineering fees to produce the plans and specifications and obtain competitive bids. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota, as follows: Bolton & Menk, Inc, is hereby designated as the engineer for this improvement and shall prepare plans and specifications for the making of such improvement for a not to exceed fee of $54,900. Passed and adopted this 3rd day of August 2020. John J. Dietz, Mayor ATTEST: Tina Allard, City Clerk DBOLTON & MENK Real People. Real Solutions. MEMORANDUM 7533 Sunwood Drive NW Suite 206 Ramsey, MN 55303-5119 Ph: [7631433-2851 Fax:(7631427-0833 Bolton-Menk.com Date: July 15, 2020 To: Justin Femrite, P.E., Chief Engineer City of Elk River From: Jason W Cook, P.E. Consultant Project Manager Subject: Engineering Proposal for the Windsor Park 3' Addition - Sewer Extension — Design Phase City of Isanti, MN Bolton & Menk, Inc. is pleased to present this proposal for professional engineering services for the design phase through bidding of the Windsor Park 3" Addition Sanitary Sewer Extension Project. We have previously completed the Feasibility Report for this project and have a full understanding of what is needed to deliver this project. Our scope of work will include the following: • Perform topographic survey and define right-of-way on the south side of Ranch Road for 1.30 miles from the existing manhole in Joplin St NW to the Great Northern Trail forcemain connection. • Design directional drilled sanitary sewer and forcemain • Design of lift station and electrical supply • Prepare construction plans and specifications • Establish a cost estimate for the proposed improvements • Administer the bidding process and process bids received • Create assessment roll based on recommended low bidder Design Phase $10,400 $14,700 $12,800 $14,000 $1,000 $1,000 $1,000 $54,900 We propose to complete the total described scope of work for an hourly, not to exceed, fee of $54,900. Should easements or land acquisition be required prior to bidding we would assist the City as needed for an additional fee. Thank you for the opportunity to present this proposal. Please contact me at (763) 200-2444 if you have any questions or need additional information. h:\elkr\$_city of elk river mn\windsor park plans & specs fee proposal.docx Bolton & Menk is an equal opportunity employer. ,uiv 30. 2020 Justin Femrite. City of UK KNIF Peter Beck. Beck Law Firm — City Anorm Via: Emai `: ntlemen. i he Windsor Park Third Addition homeowner's association is making a formal request for the City of Elk River to move forward with plans and specs for the city septic systern for the develoomem Currently we have a private community system that is failing. The association in June conducted a ;-'leering or memeers to vote on connecting to the city septic and received an amazing majority of 83% xf homeowners in favor of this action. Therefore. we would like to proceed in moving forward with the city in this manner. Currently, The Bank of Elk River is preparing the Leiter of Credit that has been requested by the City for $54,900. It is anticipated that this Letter of Credit will be completed in the next day or so, but may not be available by vour deadline this afternoon. Please reach out to the Windsor Park Third board you have any questions in this matter. We look forward to working auith this city to move forward on this project. Sincerel;; Windsor Park Third Add J a s n Bailey, President Lisa Becker, Vice President x Jim Sepeda Signature- Emaih jlal212l2@aoi.com Signature: Email., sepej0l@gmaiLcom Signature: — Board of Directors Email: carolynbammert@outiook.corn LA Carolyn Barnmen Reilly, Treas er x���� Chuck Bamrnert, Secretary 5rgnatum >EmaiE: lisabeckerso4@hotmall.com Signature: Entail: cbammert59@gmaii.com