8.3 PRSR 08-12-2020
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires prosperity
Request for Action
To
Parks and Recreation Commission
Item Number
8.3
Agenda Section
Discussion
Meeting Date
August 12, 2020
Prepared by
Michael Hecker, Parks and Recreation Director
Item Description
Orono Park Plans
Reviewed by
Cal Portner, City Administrator
Reviewed by
Action Requested
Discussion of Orono Park Plans
Background/Discussion
Staff has been working with SRF consulting on the plans for Orono Park the past several months. They
have been revised several times to stay with the original budget of $2.5 million. The budget was based on
architectural estimates from two years ago which did not include earthwork, utilities, parking lots, trails,
lighting, shade structures, site furnishings and equipment. We are fortunate that the parking lots will be
paid for from a separate fund.
The park amenities recommended by the Commission as part of Active Elk River include a skate park,
basketball court, splash pad, restrooms and park pavilion, accessible beach area, open recreation lawn
(needed for stormwater) and pickleball courts. Our legal counsel drafted the referendum language loosely
so as to not bind elected and appointed officials to any project with the expectation of inflationary and
other added contingency costs.
A few options to consider when keeping within budget could include the following:
Eliminate certain park amenities from this project and postpone to a later date if other funding
becomes available
Fund trails from a separate fund
Eliminate or reduce park lighting
Utilize Park Dedication or Park Improvement Funds
The Commission may want to prioritize the Orono Park amenities.
Financial Impact
The total cost estimate for the park amenities recommended by the Commission for Orono Park is $2.5
million.
Attachments
Orono Park Master Plan
Orono Park Plans and Cost Estimates
Orono Park Plans Revised
0’ 300’ 600’
Orono Park Master Plan
Approved: Park and Recreation Commission - 7.12.2017
City Council - 7.17.2017
Dave Anderson Athletic Complex
with expanded fencing where
feasible given property lines,
lighting and scoreboard locations
Future parking needs to be considered
Ex. Dog Park
Dog Park
ExpansionGeothermal
Well Area
Lighted Pickleball & Basketball
290’
290’
285” 285’
285’285’
300’
300’
300’300’
300’
300’
300’300’
300’
300’
Sherburne County
Fairgrounds
Existing Playground
Existing Lights & Scoreboards
Fitness Area
Reserve for Dropoff s
Existing Shelters
Relocated Sand Volleyball
with Lights
Splash Pad Expansion Area
Relocated Parking (+/- 75)
Splash Pad
Park Pavillion with Restrooms
& Kayak/SUP Rentals
Open Recreation Lawn
(Kuss Field Relocated in Elk River)
Refurbished Shelter
Expand Beach Area
Boat Ramp Picnic Shelter
Reconfi gured Boat Ramp
(14 Trailer, 11 Car, Overfl ow)
and DNR AIS Stations
Skate Park
MNDOT Pond With
Prairie Plantings
Highway 10 Trail Trail Connection
over Bridge
Gary StreetYMCA
City HallPolice
Fire
Orono Road
OvOvOvOvOvOvOvvOvOvOvOvOvOvOOOOOOererererererererererrrererererrflfl flflflflfl flfl flfl fl flfl fl fl owowowowowowowwowwwowowowowwowowowowowowowwwwwwwwwwwwwwwwwow
TTTTTToToToToToTTTToToToToTTToToToToToToToToTTToToTT urururururururururururururururrururururrrurururrurrrnanananananannaanananaananaaanaananannanananaanaaanaanaaanammmmemmmmememememememememmememememeeeemmememmmemememeemememmmemmeeememmmmeeeeeeeeenttnntntnntntntntnntntntntntntntntntntntntntntntnnntntntntnntntnnttntnttnt
PPPPPPaPaPPaPaPaPaPaPaPPPaaPaPPaPaaaPPaPPPaaaPaPaarkrkrkrkrkrkrkrkrkrkrrkrkkrkrkrkrkkrkkkkkrkininininininiinininininininninininininininiininnininininninnnnnggggggggggggggggggggggggggggggggggggggggg
(~(~(~(~(~(~(~(~(~(~(~~(~(~~(~(~(~~808080808080808008008080808080808080080800808888 sssssssssssssssssssspapappppapapapapapapapapapapapaappppapapapapapapapapaappaappcececececececececececeecccececceeececececccs)s)s)s)s)s)s)s)ss)s)))s)))s)s)s)s))
OvOvOvOvOvOOvOvOvOvOOvOvOvOvOvOvOvOvOvOvOvOvOOvOvOvOvOvOvOOvOvOOOvOvOOOvOOvOvOvOvOOOOOOOOvOvOOvOvOvOOOvOOOOvOOvOvvvererererererererererereerererereeerererrerererererererererererrerreereeeerrreerrrfl fl fl flfl flflflflflfl flfl fl fl fl flflfl fl flfl flflflflflfl flflflflflflflfl flflflfl flflflflflflflflflflflflflflowowowowowowowowowowowowowowowowowowowowowwowowowowowowwowowowowwowoowowwwowwooowwowwowwoo
ToToToToToToToToToToToToToToToToToToToToToToTTToToToToTTToToToToToToToTToTToToTTToTooTToToToToTToTToTururururururururururururururrurururuurururururruuururururuururururururrurururururrruruunanananananananananananananananananananaannanannanananaaaananannnnnnanannaanananaaannnmemememememememememememememememememmemememememememememememememememememememeemmememmememmeeemeeemeeemntnntntntntnntntnntntntntntntntntntntntntnnttntnnnnnnnnnttnttnnttnn
PaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPPaPPPaPPaaPaPPaPPaPaPaPPPaPPPPPaPPPaPPPPPPrkrkrkrkrkrkrkrkrkrkrkrkrkkrkrkrkkkrkrkkrkrkrkrkkrkrkrkrkrkkrkrkrkkrkrkkkrkrkrkkrrrkkrkiniininininininininininininininiinininininininniniininininninninnnniinininnnininiiininiig g g g g g gg g g g gg gggg g g ggg gggggggg g gggg g ggggg
(~(~(~(~(~(~(~(~(~(~(((~(~(~~(~(~~~(~(~(~(~(~~(~(~(~(~(~(~(~(~(~(~~(~(~(~~(~(~(~((~~~(~~(~((~(((((((((((10101010101010101010101010101010100010010101010101010101010100001001000100101001100100100000000 00 0 0 00 0 0 00 00 0 0 0 0000 0 000 00 000 00 00000000000 spspspspspspspspspspspspspspspspspsspsppspspspsspsspspsspspspspspspspspsppspspsppspsppspspspppacacacacacacacacacacacacacacacaaacacacacacacacacaacacacacacccacaccaccacacacccacccaceseseseseseseseseseseseseseseeseeesesesesessseseseeseseeeseseeeesessseesssses)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))
Small Dog
Area
Po
w
e
r
l
i
n
e
Powerlin
e
-
R
e
l
o
c
a
t
e
t
o
t
h
e
n
o
r
t
h
a
l
o
n
g
H
w
y
1
0
SW
SW
SW
SW
SW
SW
SW
Trail Connection
to Orono Pkwy
10
JB +JBGRPB + JB -GRPB -PEDCPEDCPEDCVLTCVLTCVLTCVLTCPEDCVLTCPEDCPEDCVLTCVLTCVLTCVLTCPEDCGMBAAAI hereby certify that this plan,specification, or report was preparedby me or under my direct supervisionand that I am a duly LicensedLandscape Architect under the laws ofthe State of Minnesota.SHEETDATE:LICENSE #:PRINT NAME:REVISIONSDATENO.BYCHKDAPPRDRAWN BYDESIGNED BYCHECKED BYCOMM. NO.SIGNATURE:0201367306/13/2020TIMOTHY B. WOLD42164J. FILLMORET. WOLDK. GRIESHABERL2.0ORONO PARK
CITY OF ELK RIVER
GENERAL SITE IMPROVEMENTS
OVERALL LAYOUT PLAN
GARY ST NORTH PARK LAYOUTENLARGEMENT PLAN -SEE SHEET L2.3LAYOUT NOTES:1.REPORT ALL LAYOUT DISCREPANCIES IMMEDIATELY TO THELANDSCAPE ARCHITECT FOR DIRECTION PRIOR TO PROCEEDING.2.ALL ANGLES ARE 90 DEGREES UNLESS OTHERWISE NOTED.3.ALL RADII ARE 5'-0" UNLESS OTHERWISE NOTED.SIGNAGE/STRIPING NOTES:1.ALL STRIPING AND SIGNAGE SHALL BE PER THE MOST RECENTVERSION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFICCONTROL DEVICES.2.ALL ACCESSIBLE PARKING AISLES SHALL INCLUDE STENCILEDLETTERING "NO PARKING" IN ACCORDANCE WITH STATE LAW.GENERAL NOTES:1.STATE LAW: 48 HOURS BEFORE EXCAVATION BEGINSCONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT651-454-0002 FOR FIELD LOCATION OF UNDERGROUND UTILITIES.2.CONTRACTOR SHALL FURNISH, INSTALL, AND MAINTAIN ALLNECESSARY TRAFFIC CONTROL DEVICES TO THE SATISFACTIONOF THE OWNER.3.CLEAR AND GRUB VEGETATION WITHIN CONSTRUCTION LIMITSAND AS REQUIRED TO CONSTRUCT THE PROPOSEDIMPROVEMENTS. VERIFY LIMITS WITH OWNER.EROSION CONTROL NOTES:1.THE CONTRACTOR SHALL INSTALL EROSION CONTROLMEASURES AS SHOWN ON THE PLANS AND AS REQUIRED TOPREVENT SILT MIGRATION PRIOR TO BEGINNING CONSTRUCTION.THESE MEASURES SHALL INCLUDE INLET PROTECTION AT ALLSTORMWATER INLETS RECEIVING RUN OFF FROM THE PROJECTSITE.2.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN A 30' WIDE X50' LONG ROCK ACCESS DRIVE FOR THE DURATION OFCONSTRUCTION. THE CONTRACTOR SHALL REMOVE THEACCESS DRIVE AND RESTORE ALL AREAS DISTURBED BYCONSTRUCTION ACTIVITIES AND ACCESS UPON COMPLETION OFCONSTRUCTION.3.THE CONTRACTOR SHALL INSTALL AND MAINTAIN CATEGORY 3N(NON-WLEDED) EROSION CONTROL BLANKET ON ALL SLOPES 3:1OR STEEPER.TREE PROTECTION NOTES:1.PROTECT ALL TREES IN IMMEDIATE VICINITY OF WORK. NOPARKING VEHICLES OR EQUIPMENT UNDER DRIP LINES OFTREES.2.TREE PROTECTION TO BE SNOW OR CONSTRUCTION FENCE OF 4'HEIGHT WITH POSTS 8' O.C. WITH 2' MIN. BURY AT THE DRIPLINEOR OUTERMOST BRANCHES. FENCE TO ENCIRCLE TREE WITHINCONSTRUCTION LIMITS. THE OWNER WILL IDENTIFY TREEPROTECTION FENCING LOCATIONS.3.TREE PROTECTION FENCING SHALL BE CONSIDERED INCIDENTALTO GRADING OPERATIONS.SOUTH PARK LAYOUTENLARGEMENT PLAN -SEE SHEET L2.1PICKLEBALL/BASKETBALLCOURT LAYOUTENLARGEMENT PLAN -SEE SHEET L2.4BEACH LAYOUT PLAN- SEE SHEET L2.5ORONO RD NWUS HWY 10ORONO LAKELEGENDPROPOSED BITUMINOUSDRIVE/PARKING AREAPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE WALKPROPOSED SANDCONSTRUCTION LIMITSCENTRAL PARK LAYOUTENLARGEMENT PLAN -SEE SHEET L2.2
FCL +FCL FCLFCL -
BLDG +
BLDG -BLDG +BLDG -
E
PED
C
PED
CVLT
CVLT
C
VLT
C
VLT
C
D883.05883.05
883.91883.91D
883.95
SP
FW
FW XCL
FCL +
FCLFCL
FCL XCL
PED
C
VLT
C
WW
S 880.73
SAMH
E
E
E
883.83883.83883.82
884.90884.89
E
E
EBOH +
BOH +
BOH
BOH
BOH
BOH
BOH XCL
ORONO LAKEGARY STACCESSIBLE ROUTE TO
BEACH WITH SEATING
NODES/SHADE STRUCTURES
POTENTIAL PATIO
EXPANSION AREA
SAND VOLLEYBALL
COURTS (2)
10' WIDE CONCRETE WALK
WITH INTEGRAL CURB, TYP.
SOUTH
PARKING
AREA
SPLASH PAD
OPEN LAWN
SHOWER TOWER
EXISTING
SHELTER
BITUMINOUS
TRAIL, TYP.
PADDLE PORT LOCATION
(BY VENDOR)
CENTRAL
PARKING AREAL5.0
1
L5.0
1
CONCRETE WALK
6"X18" CURB - INTEGRAL
WITH CONCRETE WALK
L5.0
3
L5.0
6
6"X18" CURB - INTEGRAL
WITH CONCRETE WALK L5.0
6
6" X 18" CONCRETE CURBL5.1
3
CONCRETE WALKL5.0
3
24" WIDE CONCRETE
MAINTENANCE STRIPL5.2
3
L5.0
2
L5.3
1PICKLEBALL COURT
B612 CONCRETE CURBL5.1
3
PROPOSED
RESTROOM
BUILDING
PROPOSED
SHELTER
I hereby certify that this plan,
specification, or report was prepared
by me or under my direct supervision
and that I am a duly Licensed
Landscape Architect under the laws of
the State of Minnesota.
SHEET
DATE:
LICENSE #:
PRINT NAME:
REVISIONS
DATENO.BY CHKD APPR
DRAWN BY
DESIGNED BY
CHECKED BY
COMM. NO.
SIGNATURE:
02013673
06/13/2020
TIMOTHY B. WOLD
42164
J. FILLMORE
T. WOLD
K. GRIESHABER
L2.1ORONO PARKCITY OF ELK RIVERGENERAL SITE IMPROVEMENTSSOUTH PARK LAYOUT ENLARGEMENT PLANLEGEND
PROPOSED BITUMINOUS
DRIVE/PARKING AREA
PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE WALK
PROPOSED SAND
CONSTRUCTION LIMITS
E
SPSP
S 881.82
SAMH
DI
881.15
E
883.03883.03
D
E
SACPP 15884.14884.14884.14
BOH +
BOH
BOH
BOH
BOH
BOH XCL
E
E
E
THH
57355
878.070
TRE 14 THH
57356
876.529
TRE 14
THH
57357
876.895
TRE 14
CONCRETE WALK
6"X18" CURB - INTEGRAL
WITH CONCRETE WALK
CONCRETE WALK
6"X18" CURB - INTEGRAL
WITH CONCRETE WALK
CENTRAL
PARKING AREAL5.0
1
L5.0
3
L5.0
6
L5.0
3
L5.0
6
BITUMINOUS TRAIL L5.0
2
CONCRETE WALK
6"X18" CURB - INTEGRAL
WITH CONCRETE WALK
L5.0
3
L5.0
6
B612 CONCRETE CURBL5.1
3
EXISTING SHELTER
EXISTING SHELTER
I hereby certify that this plan,
specification, or report was prepared
by me or under my direct supervision
and that I am a duly Licensed
Landscape Architect under the laws of
the State of Minnesota.
SHEET
DATE:
LICENSE #:
PRINT NAME:
REVISIONS
DATENO.BY CHKD APPR
DRAWN BY
DESIGNED BY
CHECKED BY
COMM. NO.
SIGNATURE:
02013673
06/13/2020
TIMOTHY B. WOLD
42164
J. FILLMORE
T. WOLD
K. GRIESHABER
L2.2ORONO PARKCITY OF ELK RIVERGENERAL SITE IMPROVEMENTSCENTRAL PARK LAYOUT ENLARGEMENT PLANLEGEND
PROPOSED BITUMINOUS
DRIVE/PARKING AREA
PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE WALK
PROPOSED SAND
CONSTRUCTION LIMITS
SP
SP
E
E
881.76881.76
D
SP
SPSP
882.14
S 881.82
SAMH
ORONO LAKE
US H
W
Y
1
0
GARY STBOAT CLEANING AREA
OPEN LAWN
SKATE PARK
TRAIL CONNECTION
TO HIGHWAY 10 TRAIL
ACCESSIBLE TRAILER
STALL WITH AISLE
BOAT LAUNCH
PICNIC SHELTER
NORTH PARKING AREA
CONCRETE WALK
6"X18" CURB - INTEGRAL
WITH CONCRETE WALK
CONCRETE PAD
L5.0
1
L5.0
3
L5.0
6
L5.0
3
BITUMINOUS TRAIL L5.0
2
B612 CONCRETE CURBL5.1
3
I hereby certify that this plan,
specification, or report was prepared
by me or under my direct supervision
and that I am a duly Licensed
Landscape Architect under the laws of
the State of Minnesota.
SHEET
DATE:
LICENSE #:
PRINT NAME:
REVISIONS
DATENO.BY CHKD APPR
DRAWN BY
DESIGNED BY
CHECKED BY
COMM. NO.
SIGNATURE:
02013673
06/13/2020
TIMOTHY B. WOLD
42164
J. FILLMORE
T. WOLD
K. GRIESHABER
L2.3ORONO PARKCITY OF ELK RIVERGENERAL SITE IMPROVEMENTSNORTH PARK LAYOUT ENLARGEMENT PLANLEGEND
PROPOSED BITUMINOUS
DRIVE/PARKING AREA
PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE WALK
PROPOSED SAND
CONSTRUCTION LIMITS
ORONO RD NW
883.95
SP
PED
C
VLT
C
E
E
BITUMINOUS TRAILL5.0
2
24" WIDE CONCRETE
MAINTENANCE STRIPL5.3
3
PICKLEBALL COURTL5.3
1
CHAIN LINK FENCE L5.2
1
L5.2
4
TRASH RECEPTACLE L5.0
7
BENCH L5.0
8
CONCRETE WALK L5.0
3
4 FOOT WIDE CHAIN
LINK FENCE GATE L5.2
2
BITUMINOUS TRAILL5.0
2
BITUMINOUS PICKLEBALL COURTL5.3
2
PICKLEBALL NET POST
BASKETBALL COURT
I hereby certify that this plan,
specification, or report was prepared
by me or under my direct supervision
and that I am a duly Licensed
Landscape Architect under the laws of
the State of Minnesota.
SHEET
DATE:
LICENSE #:
PRINT NAME:
REVISIONS
DATENO.BY CHKD APPR
DRAWN BY
DESIGNED BY
CHECKED BY
COMM. NO.
SIGNATURE:
02013673
06/13/2020
TIMOTHY B. WOLD
42164
J. FILLMORE
T. WOLD
K. GRIESHABER
L2.4ORONO PARKCITY OF ELK RIVERGENERAL SITE IMPROVEMENTSLAYOUT ENLARGEMENT PLANPICKLEBALL/BASKETBALL COURTLEGEND
PROPOSED BITUMINOUS
DRIVE/PARKING AREA
PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE WALK
PROPOSED SAND
CONSTRUCTION LIMITS
ORONO LAKE
6"X18" CURB - INTEGRAL
WITH CONCRETE WALK L5.0
6
CONCRETE WALKL5.0
3
SHADE STRUCTURE, TYP.
(POTENTIAL ALTERNATE BID ITEM)
SEAT WALL
SHOWER TOWER
TABLE SEATING, TYP.
SHADE STRUCTURE, TYP.
(POTENTIAL ALTERNATE BID ITEM)
TABLE SEATING, TYP.
SEAT WALL
METAL HANDRAIL, TYP.
LANDSCAPE
PLANTING
LANDSCAPE
PLANTING
I hereby certify that this plan,
specification, or report was prepared
by me or under my direct supervision
and that I am a duly Licensed
Landscape Architect under the laws of
the State of Minnesota.
SHEET
DATE:
LICENSE #:
PRINT NAME:
REVISIONS
DATENO.BY CHKD APPR
DRAWN BY
DESIGNED BY
CHECKED BY
COMM. NO.
SIGNATURE:
02013673
06/13/2020
TIMOTHY B. WOLD
42164
J. FILLMORE
T. WOLD
K. GRIESHABER
L2.5ORONO PARKCITY OF ELK RIVERGENERAL SITE IMPROVEMENTSBEACH LAYOUT PLANLEGEND
PROPOSED BITUMINOUS
DRIVE/PARKING AREA
PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE WALK
PROPOSED SAND
CONSTRUCTION LIMITS
E
BOH +
BOH
BOH
BOH XCL
BOH +
BOH
BOH
BOH
BOH
BOH XCL
I hereby certify that this plan,
specification, or report was prepared
by me or under my direct supervision
and that I am a duly Licensed
Landscape Architect under the laws of
the State of Minnesota.
SHEET
DATE:
LICENSE #:
PRINT NAME:
REVISIONS
DATENO.BY CHKD APPR
DRAWN BY
DESIGNED BY
CHECKED BY
COMM. NO.
SIGNATURE:
02013673
06/13/2020
TIMOTHY B. WOLD
42164
J. FILLMORE
T. WOLD
K. GRIESHABER
L2.6ORONO PARKCITY OF ELK RIVERGENERAL SITE IMPROVEMENTSSPLASH PAD LAYOUT PLANEXISTING PLAY AREA
BEACH
EXISTING SHELTER
EXISTING SHELTER
PROPOSED
RESTROOM/SHELTER
BUILDING
SPLASH PAD
(4,800 SF OVERALL
AREA)
OPEN LAWN
OPEN LAWN
OPEN LAWN
LEGEND
PROPOSED BITUMINOUS
DRIVE/PARKING AREA
PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE WALK
PROPOSED SAND
CONSTRUCTION LIMITS
Orono ParkPreliminary Cost EstimateCity of Elk River, MNSRF Consulting Group, Inc.Project No. 136738/6/2020Item DescriptionPotential AlternateBase Bid Parking Lot/TrailsAlternate or Future PhaseSurvey, Staking, and Mobilization$150,000Removals$90,000Earthwork/Drainage$300,000Circulation/Parking-Boat Launch Parking & Access Drive$180,000-Central Parking Area & Access Drive$80,000-South Parking Area & Access Drive$90,000-Beach Walk (10' wide concrete w/ integral curb) $130,000- Bituminous Trails$90,000Splash Pad-Equipment, Surfacing, and Installation $500,000Skate Park-Equipment, Surfacing, and Installation $385,000Pickleball Courts-Bituminous Court Surfacing/Color Coating $42,000-10' High Chain Link Fencing $22,000-Site Furnishings/Equipment $18,000-Shade StructureX$20,000Basketball Court-Bituminous Court Surfacing/Color Coating$34,000-Site Furnishings/Equipment$12,000Sand Volleyball Courts-6" X 18" Concrete Curb $15,000-Sand$15,000-Site Furnishings/Equipment $12,000Orono ParkPreliminary Cost Estimate (Expanded) - August 6, 2020City of Elk RiverPage 1 of 3
Orono ParkPreliminary Cost EstimateCity of Elk River, MNSRF Consulting Group, Inc.Project No. 136738/6/2020Beach Access Node-Ramps with Railings $20,000-Site Furnishings $18,000-Shade StructuresX$40,000-Retaining Walls $60,000Park Entrance Plaza-Concrete Walks $60,000-Site Furnishings $24,000Buildings/Shelters-Restroom/Consessions with Shelter $578,000-Small Watercraft Rental Area $20,000-Existing Shelter Improvements (3 Shelters)X$75,000Landscaping/Turf Establishment/Irrigation-Seed/Sod$40,000-Irrigation (connect to existing system) $25,000-Shrubs, Perennials, and Grasses $50,000-Coniferous and Deciduous Trees $25,000Lighting-Park Drive$50,000-Parking Lots $70,000-TrailsX$20,000$60,000-Sand Volleyball CourtsX$45,000-Basketball CourtX$25,000-Pickleball CourtsX$45,000Estimated Subtotal$2,739,000 $440,000 $356,000Contingency (10%)$273,900 $44,000 $35,600Total Estimated Construction Costs with 10% Contingency *$3,012,900 $484,000 $391,600Page 2 of 3
Orono ParkPreliminary Cost EstimateCity of Elk River, MNSRF Consulting Group, Inc.Project No. 136738/6/2020* Based on construction in 2021.Page 3 of 3