Loading...
6.1.J ERMUSR 09-08-2020UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Dave Ninow – Water Superintendent MEETING DATE: AGENDA ITEM NUMBER: September 8, 20206.1j SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: Delivered 13 new water meters. Sealed the water meter, installed encoder receiver transmitter, and took curb stop ties from 15 water services. Completed 15 BACTI/Total Chlorine Residual Samples o All confirmed negative for Coliform Bacteria. o Bacteriological/Disinfectant Residual Monthly Report submitted to the Minnesota Department of Health (MDH). Completed 21 routine fluoride samples o All samples met MDH standards. o Submitted MDH Fluoride Report Completed two Total Trihalomethanes and Haloacetic Acids samples for the MDH. Interior painting has been completed in the Gary Street Water. There was a slight delay in getting the tower back in service because a shear pin on the shut off valve broke when staff attempted to open the valve. Utilities staff excavated and repaired the valve, the tower is now back in service. Our new Water Operator Chad Johnson started on August 31. The water operators have been locating and exercising watermainvalves located in the 2020 and 2021 street project areas. This allows us to identify if there are issues with any valves and excavate to make repairs before new roadsurfaces areconstructed. ATTACHMENTS: August 2020 Pumping by Well ______________________________________________________________________________ Page 1 of 1 93 August 2020 Monthly Pumping By Well Well #2, 2.055, 2% Well #9, 12.649, 11% Well #3, 21.857, 20% Well #8, 12.815, 12% Well #7, 10.968, 10% Well #4, 22.069, 20% Well #6, 14.373, 13% Well #5, 12.911, 12% Values Are Displayed in Millions of Gallons (Well #, Gallons Pumped, Percentage of Pumping) 94