Loading...
4.8. SR 09-08-2020Request for Action To Item Number Mayor and Ci T Council 4.8 Agenda Section Meeting Date Prepared by Consent September 8, 2020 Ryan Sandhoefner, Engineering Technician II Item Description Reviewed by Pay Estimates Justin Femrite P.E., Public Works Director Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, the pay estimate detailed below. Background/Discussion The following pay estimate has been reviewed and found to be accurate and in accordance with approved contracts. Financial Impact PROJECT Pay Est. # Contractor Amount Main Street Force Main Relocation 1 GM Contracting, Inc. $155,148.58 Elk River Municipal Utilities is to reimburse the city for all project costs accumulated through this project. Mission/Policy/Goal This project helped to meet changing needs of Elk River Municipal Utilities by relocating a key utility before construction of their new substation and field service facilities could begin. Attachments ■ Pay Estimate — GM Contracting, Inc. The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei l_ y. M TUREJ Updated.• August 2020 CONTRACTOR'S PAY REQUEST _....m..__ I DISTRIBUTION: MAIN STREET FORCEMAIN RELOCATION CONTRACTOR (1) OWNER (1) CITY OF ELK RIVER, MN ENGINEER (1) BMI PROJECT NO R13.120817 BONDING CO. (1) T6TAIAMOUNT BID PLUS TOTAL, COMPLETED WORK TOPDATEVED CHANGE ORDERS $163,314.29 TOTAL, STORED MATERIALS TO DATE $0.00 DEDUCTION FOR STORED MATERIALS USED IN WORK COMPLETED $0.00'. TOTAL, COMPLETED WORK & STORED MATERIALS $163,314.29 RETAINED PERCENTAGE 5% TOTAL AMOUNT OF OTHER PAYMENTS OR (DEDUCTIONS) $0.00 NET AMOUNT DUE TO CONTRACTOR TO DATE $155 148.58 TOTAL AMOUNT PAID ON PREVIOUS ESTIMATES $0.00 PAY CONTRACTOR AS ESTIMATE NO. 1 $155,148.58 Certificate for Partial Payment I hereby certify that, to the best of my knowledge and belief, all items quantities and prices of work and material shown on this Estimate are correct and that all work has been performed in full accordance with the terms and conditions of the Contract for this project between the Owner and the undersigned Contractor, and as amended by any authorized changes, and that the foregoing is a true and correct statement of the contract amount for the period covered by this Estimate. Contractor: GM Contracting, Inc. 19810 515th Avenue, P.O BOX 736 Lake Crystal, MN 56055 Name Title Date e f"7 9 0 CHECKED AND APPROVED AS TO QUANTITIES AND AMOUNT: ENGINEER: BOLTON & MENK, INC., 7533 Sunwood Drive NW, Suite 206, Ramsey, MN 55303 By PROJECT MANAGER I Date 8/19/2020 I APPROVED FOR PAYMENT: OWNER: CITY OF LK RIVER, MINNB" BY. � Name Title Date And Name Title Date go 4 , q " 1010- H53o CITY OF ELK RIVER, MINNESOTA MAIN STREET FORCEMAIN RELOCATION BMI PROJECT NO. R13.120817 MRK LPL_-D -HR U H U U - - t, 202 ITEM NO. AS BID PREVIOUS ESTIMATE COMPLETED TO DATE UNIT ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ITEM PRICE QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 MOBILIZATION $31,500.00 1 LUMP SUM $31.500.00 0 LUMP SUM $0.00 1 LUMP SUM $31,500.00 2 TRAFFIC CONTROL $5,250.00 1 LUMP SUM $5.250.00 0 LUMP SUM $0.00, 1 LUMP SUM $5,250.00 3 REMOVE FENCE $3.00 75 L F $225.00 0 L F $0.00 75 L F $225.00 4 REMOVE CONCRETE PAVEMENT $6.77 140 S Y $947.80 0 S Y $0.00, 102.88 S Y $696.50 5 REMOVE CONCRETE CURB & GUTTER $3.50 175 L F $612.50 0 L F $0.00 0 L F $0.00 6 IREMOVE 12" SANITARY FORCEMAIN $2.00 52 L F $104.00 0 L F $0.00 12 L F $24.00 7 CONSTRUCT 4" STANDPIPE & CAP $300.00 2 EACH $600.00 0 EACH $0.00 2 EACH $600.00 8 SALVAGE & REINSTALL SIGN $400.00 1 EACH $400.00' 0 EACH $0.00 0 EACH $0.00 9 EXPLORATORY EXCAVATION $325.00 10 HR $3,250.00 0 HR $0.00 7.50 HR $2,437.50 10 AGGREGATE SURFACING CLASS 2 $44.67 13 C Y $580.71 0 C Y $0.00 12.35 C Y $551.67 11 BITUMINOUS PATCH $82.50 195 1 S Y $16,087.50 0 S Y $0.00 0 S Y $0.00 12 4" CONCRETE WALK $10.05 880 SF $8,844.00 0 SF $0.00 418 SF $4,200.90 13 16" PEDESTRIAN RAMP $12.50 130 SF $1,625.00 0 SF $0.00 50 SF $625.00 14 8" CONCRETE DRIVEWAY $14.06 555 SF $7,803.30 0 SF $0.00 458 SF $6,439.48 15 CONCRETE CURB & GUTTER DES. B61_8 $50.00 175 L F $8,750.00 0 L F $0.00' 0 L F $0.00 16 TRUNCATED DOMES $50.00 22 SF $1,100.00 0 SF $0.00 0 SF $0.00 17 ADJUST FRAME & CASTING $431.05 1 EACH $431.05' 0 EACH $0.00 0 EACH $0.00 18 CONNECT TO EXISTING SANITARY FORCEMAIN $8,544.65' 2 EACH $17,089.30 0 EACH $0.00 2 EACH $17,089.30 19 SANITARY FORCEMAIN 12" 10 $115.15' 766 L F $88,204.901 0 L F $0.00 756 L F $87,053.40 20 IFORCEMAIN BYPASS PUMPING $4,700.00 1 LUMP SUM $4,700.00 0 LUMP SUM $0.00 1 LUMP SUM $4,700.00 21 SILT FENCE TYPE MACHINE SLICED $5.26 100 L F $526.00 0 L F $0.00 120 L F $631.20 22 STORM DRAIN INLET PROTECTION $347.32 1 EACH $347.32 0 EACH $0.00 0 EACH $0.00 23 SEEDING $7,500.00 0.07 ACRE $525.00 0 _ ACRE $0.00 0.07 ACRE $525.00 24 SEED MIX 25-151 $6.44 13 LB $83.72 0 LB $0.00 13 LB $83.72 25 HYDRAULIC MATRIX - TYPE BOLDED FIBER $2.00 245 LB $90.00 0 LB $0.00' 245 LB $490.00 26 FERTILIZER TYPE 3 $3.22 25 LB $8050 0 LB $0.00' 25 LB $80.50 27 COMMON TOPSOIL BORROW (L $27.78 57 C Y $1,583,46 0 C Y $0.00 4 C Y $111.12 28 4" SOLID LINE -EPDXY $5.00 11 L F $55,00 1 0 L F $0.00 0 L F $0.00 TOTAL: $201,796.06 $0.00 1 $163,314.29