Loading...
08-12-2020 PC MIN JOINT W/CCSpecial Meeting of the Elk River Planning Commission Held at Elk River City Hall Wednesday, August 12, 2020 Members Present: Chair Jill Larson -Vito, Commissioners Perry Beise, Alexander Feinstein, Eric Johnson, and Brad Thiel Members Absent: Commissioners John Jordan and Robert Rydberg Also Present: Councilmember Nate Ovall Staff Present: Planning Manager Zack Carlton, Senior Planner Chris Leeseberg, and Planning Sr. Administrative Assistant Jennifer Green I . Call Meeting to Order Pursuant to due call and notice thereof, the meeting of the Elk River Planning Commission was called to order at 5:45 p.m. by Chair Larson -Vito. The Pledge of Allegiance was recited. 2. Copart Phase II Update: Copart of Connecticut, Inc. — 15932 Jarvis St. NW ■ Conditional Use Permit to Operate a Salvage Yard, Case No. CU 20-14 ■ Preliminary Plat of Cascade Industrial Park Third Addition, P 20-11 Mr. Carlton presented the staff report. Chair Larson -Vito re -opened the public hearing. There being no one to speak, Chair Larson -Vito closed the public hearing. Commissioner Beise asked if the site grading concerns were addressed. John Blenker with Westwood Engineering, stated they lowered the high point as much as possible to keep the earthwork balanced. He stated those efforts will push more dirt to the north, raising up the fence and allow for more buffering to the north and along the railroad tracks. He noted there will be ditches buffering the property lines as well as fencing. Councilmember Ovall asked what the minimum size requirements were for trees. Mr. Carlton stated any deciduous trees would be 2.5" caliper, evergreens are 6 feet high, and green and ornamental trees are 1.5" caliper. Trees will be a variety of deciduous trees to the west abutting the railroad tracks, and to the north a mix of evergreen and deciduous trees to help create the buffer along the proposed park space. Planning Commission August 12, 2020 Page 2 Moved by Commissioner Johnson and seconded by Commissioner Feinstein to recommend approval of an amendment to the City of Elk River Comprehensive Plan, swapping industrial and open space land uses with the condition that the associated preliminary plat (P 20-11) and CUP (CU 20-14) are approved by the City Council as outlined in the staff report. Motion carried 5-0. Moved by Commissioner Johnson and seconded by Commissioner Feinstein to recommend approval of the Preliminary Plat for Cascade Industrial Park Third Addition, with the following conditions: 1. A recommendation from the Parks and Recreation Commission (supporting or opposing) must be provided to the City Council. 2. Submittal of the Phase 1 environmental assessment for PIDs 75-712- 0030, 75-712-0040, and 75-603-0020. 3. Council adoption of a resolution vacating the right-of-way for Buchanan Street NW and 161st Avenue NW. 4. Planning Commission adoption of a resolution stating the proposed land swap has no impact on the Comprehensive Plan. 5. The Land Use Amendment (Case No. LU 20-03) swapping industrial and open space land uses is approved. Motion carried 5-0. Moved by Commissioner Beise and seconded by Commissioner Thiel to recommend approval of the Conditional Use Permit authorizing operation of a salvage yard on Lot 1, Block 1, Cascade Industrial Park Third Addition, with the following conditions: 1. City Council approval of the Preliminary and Final Plat of Cascade Industrial Park Third Addition. 2. The site plan must show the presence of an approved surface (bituminous, gravel, or concrete) on all driving and parking areas. 3. All fencing shall be eight feet tall and green in color in order to reduce visual impacts around the property. 4. Follow the 2015 Minnesota State Fire Code Appendix D for Fire Apparatus Access Roads. 5. Follow all city stormwater management practices and procedures established as part of Phase 1 of the Copart project. 6. NPDES permit should be amended to include both phases. 7. Submit a vehicle staging plan. Parking, stalling, and staging will not be permitted on Jarvis St., 163rd Ave., 165th Ave., or any other rights- of-way. 8. Staff approval of a vegetated screen along the railroad tracks. 9. Satisfaction of all staff comments in the letter dated July 9, 2020. 10. Staff approval of all site and civil plans. Motion carried 5-0. UXATURE AEI Bi Planning Commission August 12, 2020 Page 3 Moved by Commissioner Johnson and seconded by Commissioner Beise to adopt Resolution 20-01 finding compliance with the Comprehensive Plan regarding the proposed land swap with the applicant. Motion carried 5-0. 3. Adjournment The meeting was adjourned at 5:55 p.m. Minutes prepared by Jennifer Green. Tina Allard City Clerk J' arson -Vito Planning Commission Chair PP011O E1 OE Fa ■ATURE