Loading...
9.6. SR 09-21-2020 Request for Action To Item Number Mayor and City Council 9.6 Agenda Section Meeting Date Prepared by Work Session September 21, 2020 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Orono Park Plans Cal Portner, City Administrator Reviewed by Action Requested Receive information and discussion about Orono Park Plans. Background/Discussion The Orono Park Plans were presented to the Parks and Recreation Commission at the August regular meeting, reviewed at a special meeting on August 27 and reviewed again at the September regular meeting. The Commission unanimously agreed to proceed with the amenities shown by SRF Consulting. The highest priorities were the skate park, splash pad, restroom building, picnic pavilion and pickleball courts. SRF plans to present 90% construction documents at the November 11 Commission meeting and then City Council will review the documents in December before they go out to bid early January 2021. Financial Impact The total cost estimates for the park amenities recommended by the Commission is just over $3 million. The original estimate of $2.5 from two years ago did not include design work, trails, earthwork, utilities, lighting, site furnishings and equipment. Attachments  Updated Orono Park Plans The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity OVERALL LAYOUT PLAN APPR T. WOLD 02013673-A J. FILLMORE K. GRIESHABER CHKD CITY OF ELK RIVER BY SHEET 42164 GENERAL SITE IMPROVEMENTS 09/09/2020 L2.0 ORONO PARK DATE I hereby certify that this plan,specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. CHECKED BYCOMM. NO. PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY X 4' AT3N3:1 TOOFBYOFOF NO ALLALL THETHE OF TREE LIMITS WITHIN AT WIDE BEGINS TORECENT TRAFFIC CALL DRIPLINE PROJECT CONTROL LINES 30' STENCILED SLOPES PROPOSED INCIDENTAL FENCE WORK. ATREE THE THE ONE SATISFACTIONREQUIREDCATEGORY REMOVE MAINTAIN MOST DURATION ALL DISTURBEDIDENTIFY CONSTRUCTION.OF DRIP COMPLETION AT THE AS UNIFORM THEON THE AND FROM THEINCLUDE PROTECTION EROSION STATE WILL EXCAVATION SHALL TO UPONIMMEDIATELYON CONSTRUCTIONANDMAINTAINBURY ENCIRCLE AREAS MAINTAINPER UNDER OFF CONSIDERED VICINITY FOR TO INLET BE BEGINNING MIN.SHALL AND CONSTRUCTION BE BLANKET AND ALL RUN INSTALL,2' PLANS WITHIN TOOWNER GOPHER ACCESS DEVICESOR INSTALL MANUAL BEFORE CONSTRUCT FENCE DRIVE SHALL SHALL THE WITHAISLES AND THE INCLUDE PROVIDE IMMEDIATE PRIORINSTALL EQUIPMENT CONTRACTOR SNOW TO CONTROL ON DISCREPANCIES RESTORE O.C. SHALL FURNISH,IN RECEIVINGBE HOURSCONTACT CONTROL OR 8' THE SHALLSIGNAGE ACCESS VEGETATIONSHALL SHALLFENCING TOMINNESOTA PARKING 48 AND LIMITS. BRANCHES. ACTIVITIES SHOWN SHALLEROSION TREES SHALL INLETS MIGRATIONLAYOUTAND THE POSTS TRAFFIC GRUB REQUIRED AS ROCK ALL VEHICLES CONSTRUCTION LIMITSOF LEGEND PROPOSED BITUMINOUSDRIVE/PARKING AREAPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE WALKPROPOSED SAND DRIVE SILT ALL LAW: WITH ANDMEASURES AS CONTRACTOR PROTECTION PROTECTION CONTRACTORACCESSIBLE CONTRACTOR LONGSTRIPING OUTERMOST ANDACCESSALL ANGLES ARE 90 DEGREES UNLESS OTHERWISE NOTED.ALL RADII ARE 5'-0" UNLESS OTHERWISE NOTED.ALLVERSIONCONTROL DEVICES.ALL STATECONTRACTOR651-454-0002 FOR FIELD LOCATION OF UNDERGROUND UTILITIES.CONTRACTORNECESSARYOF THE OWNER.CLEARTHEMEASURESPREVENTTHESESTORMWATERSITE.THE50'CONSTRUCTION.CONSTRUCTIONCONSTRUCTION.THE(NON- WLEDED)OR STEEPER.PROTECTPARKINGTREES.TREEORCONSTRUCTIONPROTECTION FENCING LOCATIONS.TREETO GRADING OPERATIONS.REPORTLANDSCAPE ARCHITECT FOR DIRECTION PRIOR TO PROCEEDING.LETTERING "NO PARKING" IN ACCORDANCE WITH STATE LAW. IMPROVEMENTS. VERIFY LIMITS WITH OWNER.HEIGHT 2.3.2.3.TREE PROTECTION NOTES:2.3.2.3.SIGNAGE/STRIPING NOTES:2. GENERAL NOTES:1.EROSION CONTROL NOTES:1.1.LAYOUT NOTES:1.1. JB + JB GRPB + JB - GRPB - 1 L5.0 3 L5.0 CC VLT VLT C C CC C C VLT PED PEDPEDCVLTC VLT VLTVLT C PEDC C PED VLT C C C PEDPED VLT MB SOUTH PARK LAYOUT ENLARGEMENT PLAN APPR T. WOLD 02013673-A J. FILLMORE K. GRIESHABER CHKD CITY OF ELK RIVER BY SHEET 42164 GENERAL SITE IMPROVEMENTS 09/09/2020 L2.1 ORONO PARK DATE specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. I hereby certify that this plan,by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. CHECKED BYCOMM. NO. PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY 6 L5.0 3 L5.1 6 L5.0 BOH + 3E L5.0 E E E 1 L5.0 BOH BOH BOH + E BOH BOH XCL BOH 3 L5.1 2 L5.0 W W 880.73SAMH E C 883.83883.82883.83 VLT 883.05883.05 884.89884.90 883.91883.91 FCL - FCL C C C C C VLT FCL PED C PEDVLT VLT 3 1 VLT L5.0 L5.0 C 883.95 FCL + PED BLDG - BLDG + BLDG + FCL FCL + 1 FCL FCL XCL L5.3 3 L5.2 PROPOSED BITUMINOUSDRIVE/PARKING AREAPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE WALKPROPOSED SANDCONSTRUCTION LIMITS LEGEND BLDG - E FW XCL FW CENTRAL PARK LAYOUT ENLARGEMENT PLAN APPR T. WOLD 02013673-A J. FILLMORE K. GRIESHABER CHKD CITY OF ELK RIVER BY SHEET 42164 GENERAL SITE IMPROVEMENTS 09/09/2020 L2.2 ORONO PARK DATE specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. I hereby certify that this plan,by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. CHECKED BYCOMM. NO. PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY 6 L5.0 6 L5.0 873.49 DI 57356876.529TRE 14 T 57357876.895TRE 14 T 6 L5.0 BOH BOH 3 L5.0 BOH BOH 3 L5.0 BOH + BOH XCL 3 L5.0 E 57355878.070TRE 14 T E E 1 L5.0 2 L5.0 E 3 L5.1 CONSTRUCTION LIMITS LEGEND PROPOSED BITUMINOUSDRIVE/PARKING AREAPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE WALKPROPOSED SAND W W E 881.15 DI SACPP 15 881.82SAMH C E VLT 883.03883.03 884.14884.14884.14 883.00 APPR T. WOLD 02013673-A J. FILLMORE K. GRIESHABER CHKD CITY OF ELK RIVER BY SHEET 42164 GENERAL SITE IMPROVEMENTS 09/09/2020 L2.3 ORONO PARK DATE specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. I hereby certify that this plan,by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. CHECKED BYCOMM. NO. PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY 3 L5.1 E E 2 L5.0 1 L5.0 PROPOSED BITUMINOUSDRIVE/PARKING AREAPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE WALKPROPOSED SANDCONSTRUCTION LIMITS LEGEND 882.14 881.76881.76 LAYOUT ENLARGEMENT PLAN APPR PICKLEBALL/BASKETBALL COURT T. WOLD 02013673-A J. FILLMORE K. GRIESHABER CHKD CITY OF ELK RIVER BY SHEET 42164 GENERAL SITE IMPROVEMENTS 09/09/2020 L2.4 ORONO PARK DATE specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. I hereby certify that this plan,by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. CHECKED BYCOMM. NO. PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY C E E 3 VLT L5.0 C 883.95 7 2 8 L5.0 L5.0 L5.0 PED 2 L5.0 4 L5.2 2 L5.2 3 L5.3 1 L5.2 1 L5.3 CONSTRUCTION LIMITS LEGEND PROPOSED BITUMINOUSDRIVE/PARKING AREAPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE WALKPROPOSED SAND BUILDING/SPLASH PAD LAYOUT PLAN APPR T. WOLD 02013673-A J. FILLMORE K. GRIESHABER CHKD CITY OF ELK RIVER BY SHEET 42164 GENERAL SITE IMPROVEMENTS 09/09/2020 L2.5 ORONO PARK DATE specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. I hereby certify that this plan,by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. CHECKED BYCOMM. NO. PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY 3 L5.0 LEGEND PROPOSED BITUMINOUSDRIVE/PARKING AREAPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE WALKPROPOSED SANDCONSTRUCTION LIMITS E BOH BOH BOH + BOH BOH XCL BOH 2 L5.0 883.83883.82883.83 883.05883.05 BEACH LAYOUT PLAN APPR T. WOLD 02013673-A J. FILLMORE K. GRIESHABER CHKD CITY OF ELK RIVER BY SHEET 42164 GENERAL SITE IMPROVEMENTS 09/09/2020 L2.6 ORONO PARK DATE specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. I hereby certify that this plan,by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. CHECKED BYCOMM. NO. PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY CONSTRUCTION LIMITS LEGEND PROPOSED BITUMINOUSDRIVE/PARKING AREAPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE WALKPROPOSED SAND 6 L5.0 3 L5.0 BOAT LAUNCH LAYOUT PLAN APPR T. WOLD 02013673-A J. FILLMORE K. GRIESHABER CHKD CITY OF ELK RIVER BY SHEET 42164 GENERAL SITE IMPROVEMENTS 09/09/2020 L2.7 ORONO PARK DATE specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. I hereby certify that this plan,by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. CHECKED BYCOMM. NO. PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY 1 L5.0 3 L5.0 E E CONSTRUCTION LIMITS LEGEND PROPOSED BITUMINOUSDRIVE/PARKING AREAPROPOSED BITUMINOUS TRAILPROPOSED CONCRETE WALKPROPOSED SAND