Loading...
90-017 RES . . . RESOLUTION 90-17 RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION REQUESTING A CORP OF ENGINEERS STUDY OF LAKE ORONO UNDER SECTION 205 FOR SMALL FLOOD CONTROL PROJECTS WHEREAS, properties within the City of Elk River adjacent to the Elk River have suffered damage and been seriously threatened by flooding; and, WHEREAS, Lake Orono has lost significant depth due to siltation to the point where many acres are no longer navigable; and, WHEREAS, it is the opinion of the City of Elk River that the siltation of Lake Orono has lead to the frazzled ice conditions which have caused the flooding problems. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The City Council requests the U.S. Army Corps of Engineers to conduct studies to determine the feasibility of developing a small flood control project at Lake Orono under the authority provided by Section 205 of the 1948 Control Act as amended. 2. It is understood that, if it is found feasible and advisable to develop a small flood control project at Lake Orono, the City Council would be required before construction commences to enter into a contractual agreement that it will provide such local cooperation as may be prescribed by the Secretary of the Army. 3. The City Clerk of the City of Elk River shall be, and is hereby, directed to transmit three copies of this resolution to the District Engineer, St. Paul District, U.S. Army Corps of Engineers, 1421 U.S. Post Office and Custom House, St. Paul, MN 55101-9809. Passed and adopted by the City:].coun il Of. the C. itYmf E River this 23rd Day of April, 1990. ~ ' .vt("~ yf AL . James A. Tralle, Mayor