Loading...
4.3 SR 10-19-2020Request for Action To Item Number Mayor and Ci T Council 4.3 Agenda Section Meeting Date Prepared by Consent October 19, 2020 Ryan Sandhoefner, Engineering Technician II Item Description Reviewed by Pay Estimates Justin Femrite P.E., Public Works Director Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, the pay estimates detailed below. Background/Discussion The following pay estimates have been reviewed and found to be accurate and in accordance with approved contracts. Financial Impact PROJECT 2020 Street Improvement Project Multi -Purpose Facility & Lions Park Multi -Purpose Facility & Lions Park Mission/Policy/Goal Opportunity to live, work, and play. Attachments ■ Pay Estimate 2 — North Valley Inc. ■ Pay Estimate 15 — RJM Construction LLC ■ Pay Estimate 16 — RJM Construction LLC Pay Est. # 2 - Final 15 - Partial 16 - Partial Contractor Amount North Valley Inc. $85,851.94 RJM Construction LLC $75,753.02 RJM Construction LLC $620,586.98 The Elk River Vision P N W I e E U 0 V A welcoming community rvitb revolutionary and spirzted resourcefulness, exceptional NATURE service, and community engagement that encourages and inspires prosperz[ Updated. August 2020 PAY ESTIMATE #2 FINAL- WORT( COMPLETE THROUGH SEPTEMBER 1, 2020 2020 STREET IMPROVEMENTS CITY OF ELK RIVER, MINNESOTA ITEM APPROX. NO. ITEM QUANT. 1 COMMON EXCAVATION 270 2 AGGREGATE BASE, CLASS 5 150 3 TYPE 12.5 NON WEARING COURSE MIXTURE (SPNW8230C) 940 4 TYPE 9.5 WEARING COURSE MIXTURE (SPWEA240C) 3630 5 BITUMINOUSPATCH 20 6 CATCH BASIN CONCRETE REINFORCEMENT 35 7 TURF RESTORATION 1250 8 MILL BITUMINOUS SURFACE (1.25") 9500 9 MILL BITUMINOUS SURFACE (TAPER 1.25" -0") 20000 10 RECLAIM BITUMINOUS SURFACE 7000 11 PLACE SALVAGED RECLAIM - 380 12 SHAPE AND COMPACT IN -PLACE RECLAIM MATERIAL 1 13 B" WHITE PAVEMENT STRIPE - EPDXY ' 1075 14 4" WHITE PAVEMENT STRIPE - EPDXY 1647 PREVIOUS DEDUCTIONS ON ESTIMATE #1 $5.60 per ton on SPWEA240 used in Windsor Park Entrance CONTRACTOR:. North Valley, BY: DATE: CONTRACTOR: North Valley Inc. 20015 Iguana St. Nowthen, MN 55330 Contract Contract Previously UNIT Unit Price Amount Used CY (EV) $ 29.00 $ 7,830.00 266 TON $ 12.87 $ 1,930.50 241 TON $ 62.16 $ 52,214.40 920.26 TON $ 74.00 $ 268,620.00 2911.6 SY $ 83.13 $ 1,662.60 0 EA $ 648.93 $ 22,712.55 37 SY $ 9.57 $ 10,712.50 0 SY $ 1.10 $ 10,450.00 10042 LF $ 0.85 $ 17,000.00 11684 SY $ 1.34 $ 9,380.00 70DO CY (CV) $ 17.58 $ 6,680.40 386 LS $ 4,795.72 $ 4,795.72 1 LF $ 3.43 $ 3,687.25 0 LF $ 2.90 $ 4,776.30 0 TOTAL $ 422,452.22 TONS DEDUCTION PREVIOUS PAYMENTS 193.73 $ 1,084.B9 ENGINEER: Justin Ferririte, P.E. BY: DATE: 1 Amount Previously Paid $ 7,714.00 $ 3,101.67 $ 57,203.36 $ 215,45B.40 $ 24,010.41 $ 11,046.20 $ 9,931.40 $ 9,380.00 $ 6,785.88 $ 4,795.72 $ 349,427.04 $ 348,342.15 Used this Amount this Estimate Estimate 0 $ - 0 $ 0 $ 762.34 $ 56,413.16 0 $ 0 $ 2420.5 $ 20,743.69 1358 $ 1,493.80 0 $ - 0 $ 0 $ - 0 $ - 893 $ 3,062.99 1427 $ 4,138.30 Total Total Used Amount 266 $ 7,714.00 241 $ 3,101.67 920.26 $ 57,203.36 3673.94 $ 271,871.56 0 $ - 37 $ 24,010.41 2420.5 $ 20,743.69 11400 $ 12,540.00 11684 $ 9,931.40 7000 $ 9,380.00 386 $ 6,785.88 1 $ 4,795.72 893 $ 3,062.99 1427 $ 4,138.30 $ 435,278.98 CONSTRUCTION TO City of Elk River Owner: Attn: Justin Femrite 13065 Orono Parkway Elk River, MN 55330 CONTRACTOR'S APPLICATION FOR PAYMENT Please Remit Payment to: RJM Construction, LLC 830 Boone Ave North Golden Valley, MN 55427 APPLICATION AND CERTIFICATE FOR PAYMENT Project: 19520-0033 Elk River Multi -Purpose Facility and Lion John %V961s Street NW Elk River, MN 55330 Architect: Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet is attached. 1. Original Contract Sum ................. 2. Net Change By Change Order ....... 3. Contract Sum To Date .................. 4. Total Completed and Stored To Date. . 5. Retainage: a, 4.70% of Completed Work $1,241,173.96 b. 0.00% of Stored Material $0.00 Total Retainage .......................... 6. Total Earned Less Retainage ........ .......... 7. Less Previous Certificates For Payments ........ 8. Current Payment Due ................ ...... 9. Balance To Finish, Plus Retainage .... Invoice #: 9520003315 Distribution to Application No.: 15 0 Owner ArchitectContractor Application Date: 9/30/2020 Period From: 9/1/2020 TO: 9/30/2020 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief, the work covered by this Application for Payment has been completed in accordance with the Contract Documents. That all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. $25,934,028.00 CONTRACT RJM Construction LLC $567,579.40 $26,501,607.40 By, Dat $26,404,451.10 State of: Subscribed a sm to, fore me this Notary Public: My Commission expires: 1311 $1,241,173.96 $25,163,277.14 $25,087,524.12 $75,753.021 $1,338,330.26 CHANGE ORDER SUMMARY Additions Deductions Total changes agrgved in previous months y Owner $956,343.73 $388,764.33 Total Approved this Month $0.00 $0.00 TOTALS $956,343.73 $388,764.33 Net Changes By Change Order $567,579.40 10/7/2020 County of: D-N--4*— day of . "-AD JUSTIN M. KING In accordance with the Contract Documents, based on on -site observationsa`*_ l�u JC-Minnesota comprising the above application, the Architect certifies to the Owner that to My C_ftss. dos Jan 31. 2o22 Architect's knowledge, information, and belief, the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. ARCHITECT'S CERTIFICATE FOR PAYMENT AMOUNT CERTIFIED $75,753.02 (Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Continuation Sheet that are changed to conform with the amount certified.) ARCHffUI-_ 10/8/20 By: plL-Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET Page 2 of 3 Application and Certification for Payment, containing Contractor's signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. Invoice # : 9520003315 Contract : 19520-0033 Elk River Multi -Purpose Facility and Lion John Weicht Park Application No.: 15 Application Date : 09130120 To: 09130120 Architect's Project No.: A B C D E F G H I Item Description of Work Scheduled Work Com Ieted Materials Total % Balance Retainage From Previous This Period No. Value Presently Completed (G 1 C) To Finish Application In Place Stored and Stored (C-G) (D+E) To Date Not in D or E D+E+F 1 Elk River Multi -Purpose Facility and 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 Lion John Weicht Park 1A Final Cleaning 81,315.00 81,027.00 288.00 0.00 81,315.00 100.00% 0.00 4,065.75 1 B Survey 25,568.00 25,568.00 0.00 0.00 25,568.00 100.00% 0.00 1,278.40 2A Building Demolition 166,199.51 166,199.51 0.00 0.00 166,199.51 100.00% 0.00 8,309.98 213 Selective Demolition 236,477.21 231,415.21 5,062.00 0.00 236,477.21 100.00% 0.00 11,823.86 3C Concrete Floor Finishes 135,699.62 135,699.62 0.00 0.00 135,699.62 100.00% 0.00 6,784.98 4A Masonry Systems 2,982,936.83 2,982,936.83 0.00 0.00 2,982,936.83 100.00% 0.00 149,146.84 5A Structural Material 1,380,909.01 1,361,847.77 0.00 0.00 1,361,847.77 98.62% 19,061.24 68,092.39 513 Structural Labor 457,489.00 457,223.00 266.00 0.00 457,489.00 100.00% 0.00 22,874.45 6A Carpentry 1,654,857.23 1,633,220.44 21,546.59 0.00 1,654,767.03 99.99% 90.20 82,738.35 7A Waterproofing &WB 40,342.00 40,342.00 0.00 0.00 40,342.00 100.00% 0.00 2,017.11 713 Roofing Systems 1,067,619.73 1,064,679.73 2,940.00 0.00 1,067,619.73 100.00% 0.00 53,380.99 7C Metal Wall Panel 186,172.61 186,172.61 0.00 0.00 186,172.61 100.00% 0.00 9,308.63 8A Aluminum Entrances/Storefronts 642,926.46 642,926.46 0.00 0.00 642,926.46 100.00% 0.00 32,146.32 813 Overhead Coiling and Sectional 53,610.00 53,610.00 0.00 0.00 53,610.00 100.00% 0.00 2,680.50 Doors 9A Gypsum Board 349,769.37 349,769.37 0.00 0.00 349,769.37 100.00% 0.00 17,488.47 913 Tiling 175,149.90 175,149.90 0.00 0.00 175,149.90 100.00% 0.00 8,757.50 9C Acoustical Ceilings 147,905.95 147,905.95 0.00 0.00 147,905.95 100.00% 0.00 7,395.30 9D Flooring 132,262.50 132,262.50 0.00 0.00 132,262.50 100.00% 0.00 6,613.13 9E Painting 438,719.00 438,719.00 0.00 0.00 438,719.00 100.00% 0.00 21,935.95 10A Signage 12,161.18 10,807.14 0.00 0.00 10,807.14 88.87% 1,354.04 540.36 11A Athletic Equipment 175,176.84 175,176.84 0.00 0.00 175,176.84 100.00% 0.00 8,758.86 11 B Concessions 101,991.83 101,739.83 252.00 0.00 101,991.83 100.00% 0.00 5,099.60 12A Roller Shades 28,659.10 28,659.10 0.00 0.00 28,659.10 100.00% 0.00 1,432.96 13B Ice Rink Systems 2,162,742.00 2,162,742.00 0.00 0.00 2,162,742.00 100.00% 0.00 108,137.10 13C Leg Truss System 125,797.00 125,797.00 0.00 0.00 125,797.00 100.00% 0.00 6,289.85 14A Elevators 71,700.00 71,700.00 0.00 0.00 71,700.00 100.00% 0.00 3,585.00 21A Fire Protection 282,544.00 282,144.00 0.00 0.00 282,144.00 99.86% 400.00 14,107.22 22A Plumbing Systems 1,323,097.00 1,316,101.00 6,996.00 0.00 1,323,097.00 100.00% 0.00 66,154.85 23A HVAC 1,875,065.33 1,875,065.33 0.00 0.00 1,875,065.33 100.00% 0.00 93,753.27 26A Electrical Systems 1,874,010.43 1,861,882.23 12,128.20 0.00 1,874,010.43 100.00% 0.00 93,700.52 31A Multipurpose Earthwork 711,384.30 704,911.30 6,473.00 0.00 711,384.30 100.00% 0.00 35,569.22 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET Page 3 of 3 Application and Certification for Payment, containing Contractor's signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. Invoice # : 9520003315 Contract : 19520-0033 Elk River Multi -Purpose Facility and Lion John Weicht Park Application No.: 15 Application Date : 09130120 To: 09130120 Architect's Project No.: A B C D E F G H I Item Description of Work Scheduled Work Com feted Materials Total % Balance Retainage From Previous This Period No. Value Presently Completed (G 1 C) To Finish Application In Place Stored and Stored (C-G) (D+E) To Date Not in D or E D+E+F 31 B Lions Earthwork 510,815.67 510,815.67 0.00 0.00 510,815.67 100.00% 0.00 25,540.79 32A Asphalt Paving 293,489.00 293,489.00 0.00 0.00 293,489.00 100.00% 0.00 14,674.45 32B Concrete/Sidewalk/Curb/Gutter 384,713.41 383,446.94 1,266.47 0.00 384,713.41 100.00% 0.00 19,235.67 32C Multipurpose Landscaping 27,000.00 27,000.00 0.00 0.00 27,000.00 100.00% 0.00 1,350.00 32D Lions Landscaping 94,480.00 94,480.00 0.00 0.00 94,480.00 100.00% 0.00 4,724.00 32E Chain Link Fence 150,325.79 150,325.79 0.00 0.00 150,325.79 100.00% 0.00 7,516.30 33A Utilities 635,496.55 635,496.55 0.00 0.00 635,496.55 100.00% 0.00 31,774.83 313.1 Precast Concrete 1,182,922.00 1,182,922.00 0.00 0.00 1,182,922.00 100.00% 0.00 59,146.10 313.2 Precast Concrete 930,000.00 930,000.00 0.00 0.00 930,000.00 100.00% 0.00 46,500.00 313.3 Precast Raker/Plank/Stadia 1,048,025.00 1,048,025.00 0.00 0.00 1,048,025.00 100.00% 0.00 52,401.25 01-00 General Conditions/Requirements 1,250,912.96 1,228,266.20 19,071.48 0.00 1,247,337.68 99.71% 3,575.28 0.00 90-50 General Liability Insurance 268,451.52 268,451.52 0.00 0.00 268,451.52 100.00% 0.00 0.00 90-60 Construction Contingency 70,229.02 0.00 0.00 0.00 0.00 0.00% 70,229.02 0.00 90-80 Builders Risk Insurance 65,184.58 65,184.58 0.00 0.00 65,184.58 100.00% 0.00 0.00 99-99 Contractors Fee 489,303.96 484,410.92 2,446.52 0.00 486,857.44 99.50% 2,446.52 24,342.86 Grand Totals 26,501,607.40 26,325,714.84 78,736.26 0.00 26,404,451.10 99.63% 97,156.30 1,241,173.96 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 INVOICE Final Cleaning SUBCONTRACTS Midwest Specialty Maintenance Final Cleaning Inv# 19520-00333 288.00 Total SUBCONTRACTS 288.00 Final Cleaning Sub -Total: 288.00 Building Demolition SUBCONTRACTS Rachel Contracting Mass Structure Demoltion Inv# 19520-00334 0.00 Total SUBCONTRACTS 0.00 Building Demolition Sub -Total: 0.00 Selective Demolition MATERIAL PURCHASES Quality Cutting & Coring, Inc. Inv# 35444 5,062.00 Total MATERIAL PURCHASES 5,062.00 Selective Demolition Sub -Total: 5,062.00 Masonry Systems SUBCONTRACTS Crosstown Masonry, Inc. Concrete/Masonry Inv# 19520-003314 0.00 Total SUBCONTRACTS 0.00 Masonry Systems Sub -Total: 0.00 Structural Labor SUBCONTRACTS High Five Erectors II, Inc Structural Steel Erection Inv# 19520-003311 266.00 Total SUBCONTRACTS 266.00 Structural Labor Sub -Total: 266.00 Carpentry MATERIAL PURCHASES Home Depot Credit Services Inv# 20201120 516.43 Veit Disposal Systems 588742 550.00 Veit Disposal Systems 589280 275.00 Veit Disposal Systems 589696 275.00 Interior Components Group, Inc. 2587-1 7,686.45 Total MATERIAL PURCHASES 9,302.88 SUBCONTRACTS Kendell Doors & Hardware, Inc Hollow Metal Doors & Frames Inv# 19520-00338 4,988.57 Custom Caseworks Millwork 19520-00334 3,899.14 Total SUBCONTRACTS 8,887.71 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 INVOICE Carpentry LABOR Carpenters Regular Earnings 40.00 FIRS @ 83.90 3,356.00 Total LABOR 3,356.00 Carpentry Sub -Total: 21,546.59 Roofing Systems SUBCONTRACTS Hoigaards Custom Canvas Fabric Structures Inv# 19520-00331 2,940.00 To ta I SUBCONTRACTS 2,94D.OD Roofing Systems Sub -Total: 2,940.00 Overhead Coiling and Sectional Doors SUBCONTRACTS Skold Specialty Contracting, LLC Overhead Coiling Door Inv# 19520-00334 0.00 Total SUBCONTRACTS 0.00 Overhead Coiling and Sectional Doors Sub -Total: 0.00 Signage SUBCONTRACTS SDDI Signs Signage Inv# 19520-00332 0.00 Total SUBCONTRACTS 0.00 Signage Sub -Total: 0.00 Concessions MATERIAL PURCHASES Comdata Inv# F02753570 252.00 Total MATERIAL PURCHASES 252.00 Concessions Sub -Total: 252.00 Plumbing Systems SUBCONTRACTS Weidner Plumbing & Heating Co. Plumbing Inv# 19520-003314 6,996.00 Total SUBCONTRACTS 6,996.00 Plumbing Systems Sub -Total: 6,996.00 Electrical Systems SUBCONTRACTS Design Electric, Inc Electrical Inv# 19520-003313 12,128.20 Total SUBCONTRACTS 12,128.20 Electrical Systems Sub -Total: 12,128.20 Multipurpose Earthwork DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 INVOICE Multipurpose Earthwork SUBCONTRACTS Minnesota Utilities & Excavating, LLC Multipurpose Earthwork Inv# 19520-00336 6,473.00 Total SUBCONTRACTS 6,473.00 Multipurpose Earthwork Sub -Total: 6,473.00 Concrete/Sidewalk/Curb/Gutter SUBCONTRACTS Ebert Construction Site Concrete Inv# 19520-00338S 1,266.47 Total SUBCONTRACTS 1,266.47 Concrete/Sidewalk/Curb/Gutter Sub -Total: 1,266.47 Precast Concrete SUBCONTRACTS Fabcon Precast, LLC General Conditions/Requirements MATERIAL PURCHASES Biffs Inc. Biffs Inc. WEX Bank Verizon Wireless Timothy Ryan ALLOCATED EXPENSES LABOR General Foreman Superintendent Contractors Fee CONTRACTOR'S FEE 03B.1 Precast Wall Panels Inv# 19520-00336 0.00 Total SUBCONTRACTS 0.00 Precast Concrete Sub -Total: 0.00 Inv# W779386 96.26 W779387 138.86 67672748 438.61 20202109 146.03 EXP 09/11 /20 431.52 Total MATERIAL PURCHASES 1,251.28 0.00 HRS @ 0.00 456.00 Total ALLOCATED EXPENSES 456.00 Regular Earnings 15.00 HRS @ 109.90 1,648.50 Regular Earnings 143.00 HRS @ 109.90 15,715.70 Total LABOR 17,364.20 General Conditions/Requirements Sub -Total: 19,071.48 0.00% 2,446.52 Contractors Fee Sub -Total: 2,446.52 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 INVOICE (Summary ' 1A Final Cleaning 288.00 Retainage 78,736.26@ 5.00% (14.40) 2A Building Demolition Retainage 78,736.26@ 5.00% 0.00 2B Selective Demolition 57062.00 Retainage 78,736.26@ 5.00% (253.10) 4A Masonry Systems Retainage 78,736.26@ 5.00% 0.00 5B Structural Labor 266.00 Retainage 78,736.26@ 5.00% (13.30) 6A Carpentry 21,546.59 Retainage 78,736.26@ 5.00% (1,077.33) 7B Roofing Systems 2,940.00 Retainage 78,736.26@ 5.00% (147.00) 8B Overhead Coiling and Sectional Doors Retainage 78,736.26@ 5.00% 0.00 10A Signage Retainage 78,736.26@ 5.00% 0.00 11 B Concessions 252.00 Retainage 78,736.26@ 5.00% (12.60) 22A Plumbing Systems 6,996.00 Retainage 78,736.26@ 5.00% (349.80) 26A Electrical Systems 12,128.20 Retainage 78,736.26@ 5.00% (606.41) 31A Multipurpose Earthwork 67473.00 Retainage 78,736.26@ 5.00% (323.65) 32B Concrete/Sidewalk/Curb/Gutter 1,266.47 Retainage 78,736.26@ 5.00% (63.32) 313.1 Precast Concrete Retainage 78,736.26@ 5.00% 0.00 01-00 General Conditions/Requirements 197071.48 Retainage 78,736.26@ 0.00% 0.00 90-50 General Liability Insurance Retainage 78,736.26@ 0.00% 0.00 90-80 Builders Risk Insurance Retainage 78,736.26@ 0.00% 0.00 99-99 Contractors Fee 2,446.52 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 INVOICE Retainage 78,736.26@ 5.00% (122.33) CURRENT DUE: 75,753.02 Ln 0 M A M 00 co O O C) O C) O O N [h N M LO N Lf) 0') (Y O i:z O CO O O O O c6 Z p a) C C O O zO U U a) 0 _U a '� al N ca.'a Q c o E o a a Q a U U U cu LL a) Cn O Q 7 Y 7 a-" U c � 0 W -3 U O C C C L) U f6 N c ca c U � JZLO Cp JLO Z LO p LO LO c � > Z g a) D `a) ti L a> a) a) Q� a o c � U n � U ° c cD aaiw� O o m '06 O 3: Lo CO O N N Lo `O LL U m E 0 C H LL 0 m y o N c E aL m a a w o cL (6 a A U U m (6 C E O m O E U U LO E a 3 m o Q m c 0 w a) , m 12 oZM a o t N m -0-5 6Z o U O U y o - m o a) m O m O a C C y p-6 C O a) p O -0 0 a) L N co C U () T V N Oa 0 U m -O U a) m E E N m 0 C -O O O E U O p a m O -6 O a) O E Z U °"U o m at m coo"m 0 0 0 C) a) W �a) to U ' y a U m m Q O L_ 0-n m i o o m ItC 3 o w a a a 0 o m Ey w" LL m o¢ E 6 m o N w y wt LU w E E� U� maL o a E LL m-E-0 30 a c w ° o - F a w 4 L m a a to W o U O U LL N m z O a) Coc mo w mmootY O o g Y a) Q E L `o LLB LO CL m a`ai a c m m U o Q Y m F ti m 'E t a c ao of .--¢ E m o LL C a) w cz m t . N ba a) w F o mU a `m `o T m 0o c a o Q LLJ c CDW O (6 U .m-O yo LL O m E O C a) mEa) �U2 Q a)a0 o_<6 H 20a) cC O N x y.. E maU0 CTN O mEa)c E 6 C L W urT aur m () m m U E LLJ �a o W m c w ° Z ac N() OEo = o oa ma �_ m. o C T z m w m U U/ as m a 0 U c � �.� ) L).� `a) C a) r o m m O A o7 O Cn U 7 Cn O T z LL m E o c a s G Q O-'_' Q a o L,L_ T m m t y 3 F�UU a U Q c U -.- a) Q U Q Ft0 O O O O LLB LLB LLB O LLB O O O O N CD (O rl- L!) Lfl LLi O LO M LLi O CD N r` CD CD (D (O M M O N 6) N N O O 61) _ V r-� C9 6-3 V OJ OJ OJ ER i` i` ER I sa I Fa fFr L, to to Lri 0 I lI �0 O O :EW Q U Z � U F } Z CO O CD J z Q Q Z = U W O z a. W Q p O U F U Q Of F z O U M W w 0 W U` z Q O p W } a w Z_ Of O U z E c U `o Z w LL W Q W o p J z Q LU H J IL � C7 O O U Q Z LU of oa U o 00 m E U a 45 o 00 m _m_w E U m a) N F E U 0 n + m C J U) J W p L¢LI O a) N° CD C J U W tr a (n J ro U o ai o � C J Z W Qo z W U U) Z a) � w cn U ro J C m J LO cfl r-� ao of z O U p W p O O 64 O O ea O O (Al O O m va O O O O O O Z ti O O M N (O O _ 64 ba 6(Al H p p Q i a) O a) O N C L-+ c O U E , U 7 U) W } a) z Q o 2 :E a c U > cn O E w y Z 0� Q W O a) O (D o) > O W m OL (n z U Cc6 J 2 crf H U H H 0 w w U) O a z O LL LU Ln N o C? 0 O o O O V Ln 1l — H a7 GO O 00 V Ln W Ln H3 Ey 64 10 C — Q W J Z coH3 H3 d7 m Q Q Of W O C� M o W U N N 0 o o = U Z 2 M � U) co CD O Q z co LL Lu Oz o Z Z O U o 0 0 0 0 0 O O Q z o o o O 0 0 CD QQ~ F CD o 0 0 0 0 0 U U p O w a a LL LL W� 0 C7 O p 0 o Lri 0 0 co 0 0 o 0 0 co 0 0 0LU 0 0 ICi Q Q LL LL pW C14 LC] eq Ln CD t0 1- o 00 Cl C7 J F W LU 000 0 Q 6�s `fl 64 00 r�U❑ Op U Z Q Z �O QLL Z Z LLwLUw0 W p iiao U) 0 0 0 0 p 00 00 O_ 00 N 69 o N d9 W W p LL W H W 2 J H a O U U) p o O -00 o 0 0 0 o 0 LL O Z N N O 1- N O > O Lri 'r' (D co V�l o p d Q w 00 ssco iff U + li J OIL CO LL LL Q O C5 O O O O O O O O O O o O Ul L LO (0 O co (O 07 W L U c U W =p -1 LNr) CDC6 n LLO c» ss co Vf l 64 m m Q io a) W Q e3 a9 U> 0 c o m O 0— LL 'D m a) Z U w Q in U Y ai ai Q ~ m c a a N ~ a) UU n3 ai O m a m 3 0 mpLL p F = O LL Q- LL EL D LL LLw O O ZC0 wao En w aano Un o uZa o L)a U U F ? ?o �c .UcoN a 2� i Wi Zia C U.Cmoa5 Z . W a .o Ua aQ o ai a) o ro o _a�i U) p LLUC7 LLU LLU LL LL Q ".° tn U J'Fu L Q = Z N M Q U C O O O O O O 0 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 QUALITY CUTTING & CORING INC. Quality Cutting & 147191 st Ave. N.E. coring Blaine, MN 55449 763-785-9605 Office BILL TO RIM Construction, LLC 830 Boone Avcnuc North Golden Valley. MN 55427 Invoice DATE INVOICE # 9/l/2020 35444 JOB LOCATION Elk River Multi-Purposc Facilities 1000 School St Elk River, MN Job. # I P.O. # Elk River Multi-Pur... 1 19520-0033 DESCRIPTION Work completed on 07/27/20 & 08/24/20: Phase T: Cut as laid out by GC with no overcutting allowed, remove and haul debris to dumpster provided by GC for — 19' x 14' x 9' x up to 6" thick slab on grade concrete are located in wide open, unfinished area at ground level; approximately 219 sq. 1t. total. Vacuum to contain and dispose of slurry. All work to be completed during one mobilization on regular hours. No patch back included. Bid based on machine removal. Phase IT: Cut as laid out by GC with no overcutting allowed, remove and haul debris to dumpster provided by GC for — 19' x 14' x 9' x up to 6" thick slab on grade concrete are located in wide open, unfinished area at ground level; approximately 219 sq. ft. total. Vacuum to contain and dispose of slurry. All work to be completed during one mobilization on regular hours. No patch back included. Bid based on machine removal. Bid price. EXTRA: 08/24/20: Cut, remove and haul debris to GC dumpster for 8' x 3 1/2' x 7" thick concrete located outside. Total TERMS DUE DATE 30 Days 10/1/2020 AMOUNT 4,356.00 Notice: Pre -Lien Notice: If this amount is not paid in full within 90 days, we reserve the right to lien the property where work was conducted and labor supplied. Payments/Credits 706.00 $5,062.00 $0.00 Balance Due $5,062.00 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 APPLICATION AND CERTIFICATE FOR PAYMENT Page 1 of 2 SUBMITTED TO: RJM Construction, LLC PROJECT, Elk River Multi -Purpose Facilities APPLICATION 1\110: 6 830 Boone Avenue North 1000 School Street North APPLICATION DATE_ 911/2020 Golden Valley, MIN 55427 Elk River, MN PERIOD FROM: 712712020 SUBMITTED FROM: Quality Cutting & Caring, Inc ARCHITECT: PERIOD TO: 812412020 1471 9st Ave. N.E., Blaine, MN 55449 PROJECT NO: 19520-0033 CONTRACT DATE: CONTRACT FOR: concrete cutting CONTRACT NO.: 19520-0033 COMMITMENT: YES/NO I hereby certify that the work performed and the material supplied to date, as shown here, represent the actual value of accomplishment under the terms of the contract (and all authorized changes hereto) between the undersigned and RJM Construction relating to the above - referenced project. I further certify that no labor or materials have been supplied under contracts, agreements, verbal or written, or any other arrangement of any type whatsoever. other than the contract duly authorized and executed change orders, and the undersigned does hereby releases RJM Construction from any claim or liability therefor for the period covered by this application. I also certify that payments, less applicable retention, have been made through the period covered by previous payments received from the contractor to 1) all my subcontractors (sub -subcontractors) and 2) for all material and labor used in or in connection with the performance of this contract. I further certify that I have complied with Federal, State, and local tax laws, including Social Security laws, Unemployment Compensation Laws and Workman I s Compensation laws insofar as applicable to the performance this contract. Now therefore, upon receipt of the payment of the current payment due on this application the undersigned does hereby irrevocably release and waive any and all rner-hanio'F, liens or rights to claim any and all mechanic's liens or other liens against the above real estate or any part thereof for any of the materials and/or labopr therefore furnished or performed in connection with this project, reserving, however, all lien rights for labor and/or materials furnished after said date. The person signing below does hereby cerify that helshe is fully authorized and empowered to execute this instrument and to bird the undersigned hereto, and does in fact so execute this instrument. Quality Cutting & Coring, Inc, 1471 9st Ave. N.E., Blaine, MIN 55449 SIGNED: PRINTED, TITLE Karl L. Landrus, President ORIGINAL CONTRACT SUM, . .................................. ....... ....... $ 117764.00 NET CHANGE BY CHANGE ORDERS TO, ............... __ , $ 9,655.00 CONTRACT SUM TO DATE.........._ . _ ............ ......... ...... ....... $ 27,419.00 TOTAL COMPLETED AND STORED TO DATE..... ....... ......... ....... . ......... $ 27,41900 5 % OF COMPLETED WORK $ 1,370.95 5 0,/o OF STORED MATERIAL $ - TOTAL RETAINAGE ............ .. .. ...... ............ 1,370.95 TOTAL EARNED LESS RETAINAGE ..... ....... . ....... 26,048.05_ LESS OWNER DIRECT PAYMENT BY PURCHASE ORDER... ....... .......... LESS PREVIOUS CERTIFICATES FOR PAYMENT___ ............. ..... ....... $ 21 239.15 CURRENT PAYMENT DUE ............. ....... ........ ........ ............... . . 4.808.90 BALANCE TO FINISH INCLUDING RETAINAGE................... .......... 1,370.95 State of: Minnesota County of: Subscribed and sworn to before me this I day of 20 NOTARY PUBLIC: Tela Lee Souten Signed: N-,, �-- lublic My Commission Expires: Minnesota 2 oaDU jgquafy3t2 202IL DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 From: Qualm Cutting & Coring, Inc. 1471 91stAve. NE Schedule of Values Blaine, MN 55449 Invoice No. 35444 Appl. No.: #6 PLEASE SUBMIT PAYMENT APPLICATIONS TO: ACC BUNTING-MNa@R,JMCONSTRUC ION.GO To: I Construction, I 830 Boone Avenue North Golden Valley, MN 55427 Appl. Date: 09/01/20 From: 07127/20 To: 08/24120 IT NO. DESCRIPTION CURRENT CONTRACT I CURRENT APPLICATION I TOTAL PREVIOUS 1 WORK IN MATERL. i APPS. APPS. PLACE ON SITE • TO BATE PERCENT COMPLETE BALANCE TO COMPLETE RETAIN TO DATE 1 Riglet Cutting $12.464 $12 464 $0 S0 $12,464 100.00% 50 $623 2 Provide and install dowels $5,300 $5,3001 $0 Sol $5,300 100.00% 50 $265 3 -4 Cut to enlar e mar dour $1,060 $1,060' $0 .S0` $1,060 100.00% $0 $53 Wall saw precast plank edge $1,100 $1,100: $0 $0= $1,100 100.00% $0 $55 5 Cut & remove concrete $635 $635 $0 $0 $635 100.00% $a $32 fi lCore drill & au or & patch $1,798 $1. 98 $0 $0 $1.798 100 00% so— - $90 7 Cut & remove concrete $5,062 $5,062 $5.062 8 10 11 12 13 14 15 16 17 - 15 19 • 20 I __ 21 22 23 - 24 - 25 • , TOTAL $27;419 $22,357• $5,062 $0• $27,419 100 00% $0 $1.371 Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 APPLICATION FOR PAYMENT To: RJM Construction, LLC. Project: Elk River Multi -Purpose Facility and Lion Application No.: 11 830 Boone Avenue North John Weicht Park Golden Valley, MN 55427 Period To: 09/30/20 From: High Five Erectors II, Inc. Application Date: 09/10/20 3005 4th Avenue East Project No.: 19520-0033 P.O. Box 477 Shakopee, MN 55379 Contract Date: 07/23/19 Contract For: 195200033-051210 - Structural Steel Erection Commitment: 195200033-051210 1. ORIGINAL CONTRACT AMOUNT 2. NET CHANGE BY CHANGE ORDERS 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED AND STORED TO DATE (Column G) 5. RETAINAGE 5.00% of Completed Work (Columns D + E) 5.00% of Stored Materials (Columns F) Total Retainage (Line 5a + Line 5b OR Sum of Column 1) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PRIOR CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) S. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) $435,750.00 $21,739.00 $457,489.00 $457,489.00 $22,874.45 $22,874.45 $434,614.55 $434,361.85 $252.70 $22,874.45 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months $28,665.00 $7,192.00 Total approved this month $266.00 $0.00 TOTALS $28,931.00 $7,192.00 NET CHANGES by Change Orders $21,739.00 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by the Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: Tara Thompson Date: 09/10/20 State Of: County Of: Subscribed and sworn to before me this Notary Public: My commission expires: ARCHITECTS CERTIFICATE FOR PAYMENT day of In accordance with the Contract Documents, based on the on -site observations and the data compromising this application, the Architect certifies to the owner that to the best of the Architects knowledge, information and belief the Work under the Architect's Contract has progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED $252.70 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on the Application for Payment and on the Continuation sheet that are changes to conform to the amount certified.) ARCHITECT: By: Date: The Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 11 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/10/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 High Five Erectors II, Inc. PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 051200 Structural Steel $129,841.00 $129,841.00 $129,841.00 100.00% $6,492.05 2 052100 Steel Joists $100,523.00 $100,523.00 $100,523.00 100.00% $5,026.15 3 053100 Steel Decking $45,888.00 $45,888.00 $45,888.00 100.00% $2,294.40 4 055000 Metal Fabrications $8,508.00 $8,508.00 $8,508.00 100.00% $425.40 5 055100 Metal Pan Stairs $43,996.00 $43,996.00 $43,996.00 100.00% $2,199.80 6 055213 Pipe & Tube Railings $71,614.00 $71,614.00 $71,614.00 100.00% $3,580.70 7 Allowance $30,000.00 $30,000.00 $30,000.00 100.00% $1,500.00 8 Bond $5,380.00 $5,380.00 $5,380.00 100.00% $269.00 1 Structural Steel Erection (CO $4,190.00 $4,190.00 $4,190.00 100.00% $209.50 #1) 1 Structural Steel Erection (CO ($6,888.15) ($6,888.15) ($6,888.15) 100.00% ($344.41) #2) 1 Structural Steel Erection (CO $500.00 $500.00 $500.00 100.00% $25.00 #3) 1 Structural Steel Erection (CO $672.00 $672.00 $672.00 100.00% $33.60 #4) 1 Structural Steel Erection (CO $3,000.00 $3,000.00 $3,000.00 100.00% $150.00 #5) 1 Structural Steel Erection (CO $8,650.00 $8,650.00 $8,650.00 100.00% $432.50 #6) 1 Structural Steel Erection (CO $600.00 $600.00 $600.00 100.00% $30.00 #7) 1 Structural Steel Erection (CO $1,200.00 $1,200.00 $1,200.00 100.00% $60.00 #7) 1 Structural Steel Erection (CO $3,040.00 $3,040.00 $3,040.00 100.00% $152.00 #8) 1 Structural Steel Erection (CO $1,752.00 $1,752.00 $1,752.00 100.00% $87.60 #9) 1 Structural Steel Erection (CO ($303.85) ($303.85) ($303.85) 100.00% ($15.19) #10) 1 Structural Steel Erection (CO $4,217.00 $4,217.00 $4,217.00 100.00% $210.85 #10) 1 Structural Steel Erection (CO $844.00 $844.00 - - $844.00 100.00% - $42.20 Page 1 of 2 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 11 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/10/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 High Five Erectors II, Inc. PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE #11) 1 Structural Steel Erection (CO $266.00 $266.00 $266.00 100.00% $13.30 #12) PAYMENT TOTALS $457,489.00 $457,223.00 $266.00 $457,489.00 100.00% $22,874.45 Page 2 of 2 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 APPLICATION FOR PAYMENT To: RJM Construction, LLC. Project: Elk River Multi -Purpose Facility and Lion Application No.: 8 830 Boone Avenue North John Weicht Park Golden Valley, MN 55427 Period To: 09/30/20 From: Kendell Doors & Hardware, Inc. Application Date: 09/29/20 1312 Northland Drive Project No.: 19520-0033 Suite 100 Contract Date: 11/13/19 Mendota Heights, MN 55120 Contract For: 195200033-081105 - Hollow Metal Doors & Commitment: 195200033-081105 Frames 1. ORIGINAL CONTRACT AMOUNT $92,614.00 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by the Application for Payment has been completed in accordance with the 2. NET CHANGE BY CHANGE ORDERS $201,380.91 Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current 3. CONTRACT SUM TO DATE $293,994.91 payment shown herein is now due. 4. TOTAL COMPLETED AND STORED TO DATE $293,994.91 CONTRACTOR: (Column G) By: Jason Self Date: 09/29/20 5. RETAINAGE State Of: 5.00% of Completed Work $10,389.84 County Of: (Columns D + E) 5.00% of Stored Materials (Columns F) Total Retainage (Line 5a + Line 5b OR Sum of Column 1) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PRIOR CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) $10,389.84 $283,605.07 $278,865.92 $4,739.15 $10,389.84 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months $199,594.34 $1,322.50 Total approved this month $3,109.07 $0.00 TOTALS $202,703.41 $1,322.50 NET CHANGES by Change Orders $201,380.91 Subscribed and sworn to before me this Notary Public: My commission expires: ARCHITECTS CERTIFICATE FOR PAYMENT day of In accordance with the Contract Documents, based on the on -site observations and the data compromising this application, the Architect certifies to the owner that to the best of the Architects knowledge, information and belief the Work under the Architect's Contract has progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED $4,739.15 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on the Application for Payment and on the Continuation sheet that are changes to conform to the amount certified.) ARCHITECT: By: Date: The Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 8 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/29/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 Kendell Doors & Hardware, Inc. PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 Hollow Metal $84,079.00 $84,079.00 - $84,079.00 100.00% 2 Finish Hardware $8,535.00 $7,918.91 $616.09 $8,535.00 100.00% $426.75 1 Hollow Metal Doors & Frames $2,119.32 $2,119.32 - $2,119.32 100.00% - (CO #1) 1 Hollow Metal Doors & Frames $133,389.00 $133,389.00 $133,389.00 100.00% $6,669.45 (CO #2) 1 Hollow Metal Doors & Frames $17,013.00 $17,013.00 $17,013.00 100.00% $850.65 (CO #3) 1 Hollow Metal Doors & Frames $2,542.87 $2,542.87 $2,542.87 100.00% $127.14 (CO #4) 1 Hollow Metal Doors & Frames $2,723.59 $2,723.59 $2,723.59 100.00% $136.18 (CO #5) 1 Hollow Metal Doors & Frames $368.30 $368.30 $368.30 100.00% $18.42 (CO #6) 1 Hollow Metal Doors & Frames $909.84 $909.84 $909.84 100.00% $45.49 (CO #7) 1 Hollow Metal Doors & Frames $6,777.30 $6,777.30 $6,777.30 100.00% $338.87 (CO #8) 1 Hollow Metal Doors & Frames $549.51 $549.51 $549.51 100.00% $27.48 (CO #9) 1 Hollow Metal Doors & Frames $1,402.91 $1,402.91 - $1,402.91 100.00% $70.15 (CO #10) 1 Hollow Metal Doors & Frames $22,660.08 $22,324.39 $335.69 $22,660.08 100.00% $1,133.00 (CO #11) 1 Hollow Metal Doors & Frames $5,085.97 $5,085.97 - $5,085.97 100.00% $254.30 (CO #12) 1 Hollow Metal Doors & Frames $3,555.16 $2,627.44 $927.72 $3,555.16 100.00% $177.76 (CO #13) 1 Hollow Metal Doors & Frames $497.49 $497.49 - $497.49 100.00% $24.87 (CO #14) 1 Hollow Metal Doors & Frames ($350.00) ($350.00) ($350.00) 100.00% ($17.50) (CO #15) 1 Hollow Metal Doors & Frames ($972.50) ($972.50) ($972.50) 100.00% ($48.62) (CO #15) Page 1 of 2 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 8 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/29/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 Kendell Doors & Hardware, Inc. PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 Hollow Metal Doors & Frames $959.07 $959.07 $959.07 100.00% $47.95 (CO #16) 1 Hollow Metal Doors & Frames $1,200.00 $1,200.00 $1,200.00 100.00% $60.00 (CO #17) 1 Hollow Metal Doors & Frames $950.00 $950.00 $950.00 100.00% $47.50 (CO #18) PAYMENT TOTALS $293,994.91 $289,006.34 1 $4,988.571 1$293,994.91 100.00%1 1$10,389.84 Page 2 of 2 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 APPLICATION FOR PAYMENT To: RJM Construction, LLC. 830 Boone Avenue North Golden Valley, MN 55427 From: Custom Caseworks 1021 Industrial Dr. S Sauk Rapids, MN 56379 Contract For: 195200033-062020 - Millwork 1. ORIGINAL CONTRACT AMOUNT 2. NET CHANGE BY CHANGE ORDERS 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED AND STORED TO DATE (Column G) 5. RETAINAGE 5.00% of Completed Work (Columns D + E) 5.00% of Stored Materials (Columns F) Total Retainage (Line 5a + Line 5b OR Sum of Column 1) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PRIOR CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) S. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) Project: Elk River Multi -Purpose Facility and Lion John Weicht Park $132,918.00 $157,773.98 $290,691.98 $290,691.98 $14,534.61 $14,534.61 $276,157.37 $272,453.19 $3, 704.18 $14,534.61 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months $158,874.84 $5,000.00 Total approved this month $3,899.14 $0.00 TOTALS $162,773.98 $5,000.00 NET CHANGES by Change Orders $157,773.98 Application No.: 4 Period To: 09/30/20 Application Date: 09/16/20 Project No.: 19520-0033 Contract Date: 12/06/19 Commitment: 195200033-062020 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by the Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: Christine Weyer Date: 09/16/20 State Of: County Of: Subscribed and sworn to before me this Notary Public: My commission expires: ARCHITECTS CERTIFICATE FOR PAYMENT day of In accordance with the Contract Documents, based on the on -site observations and the data compromising this application, the Architect certifies to the owner that to the best of the Architects knowledge, information and belief the Work under the Architect's Contract has progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED $3,704.18 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on the Application for Payment and on the Continuation sheet that are changes to conform to the amount certified.) ARCHITECT: By: Date: The Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 4 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/16/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 Custom Caseworks PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 Architectural Casework Supply $41,622.99 $41,622.99 $41,622.99 100.00% $2,081.15 2 Architectural Casework Install $15,185.90 $15,185.90 $15,185.90 100.00% $759.30 3 Solid Surface & Quartz Supply $47,559.60 $47,559.60 $47,559.60 100.00% $2,377.98 & Install 4 Stainless Steel Countertops $7,897.33 $7,897.33 $7,897.33 100.00% $394.87 (Qty 4) - John Wiecht Park 5 Claridge Prefeb Trophy Cases $15,652.18 $15,652.18 $15,652.18 100.00% $782.61 6 5K Allowance $5,000.00 $5,000.00 $5,000.00 100.00% $250.00 1 Millwork (CO #1) $6,141.84 $6,141.84 $6,141.84 100.00% $307.09 1 Millwork (CO #2) $150,588.00 $150,588.00 $150,588.00 100.00% $7,529.40 1 Millwork (CO #3) ($5,000.00) ($5,000.00) ($5,000.00) 100.00% ($250.00) 1 Millwork (CO #4) $2,145.00 $2,145.00 - $2,145.00 100.00% $107.25 1 Millwork (CO #5) $545.24 $545.24 $545.24 100.00% $27.26 1 Millwork (CO #6) $3,353.90 $3,353.90 $3,353.90 100.00% $167.70 PAYMENT TOTALS $290,691.98 $286,792.84 $3,899.14 $290,691.98 100.00% $14,534.61 Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 APPLICATION FOR PAYMENT To: RJM Construction, LLC. 830 Boone Avenue North Golden Valley, MN 55427 From: Hoigaards Custom Canvas 835 highway 169 north plymouth, MN 55441 Contract For: 195200033-133105 - Fabric Structures 1. ORIGINAL CONTRACT AMOUNT 2. NET CHANGE BY CHANGE ORDERS 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED AND STORED TO DATE (Column G) 5. RETAINAGE 5.00% of Completed Work (Columns D + E) 5.00% of Stored Materials (Columns F) Total Retainage (Line 5a + Line 5b OR Sum of Column 1) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PRIOR CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) S. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) Project: Elk River Multi -Purpose Facility and Lion John Weicht Park $2,940.00 $0.00 $2,940.00 $2,940.00 $147.00 $147.00 $2,793.00 $0.00 $2,793.00 $147.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months $0.00 $0.00 Total approved this month $0.00 $0.00 TOTALS $0.00 $0.00 NET CHANGES by Change Orders $0.00 Application No.: 1 Period To: 09/30/20 Application Date: 09/23/20 Project No.: 19520-0033 Contract Date: 08/20/20 Commitment: 195200033-133105 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by the Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: Beth Brenny Date: 09/24/20 State Of: County Of: Subscribed and sworn to before me this Notary Public: My commission expires: ARCHITECTS CERTIFICATE FOR PAYMENT day of In accordance with the Contract Documents, based on the on -site observations and the data compromising this application, the Architect certifies to the owner that to the best of the Architects knowledge, information and belief the Work under the Architect's Contract has progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED $2,793.00 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on the Application for Payment and on the Continuation sheet that are changes to conform to the amount certified.) ARCHITECT: By: Date: The Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 1 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/23/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 Hoigaards Custom Canvas PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE two stationary style aawning $2,940.00 $2,940.00 $2,940.00 100.00% $147.00 PAYMENT TOTALS $2,940.00 $2,940.00 $2,940.00 100.00% $147.00 Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 APPLICATION FOR PAYMENT To: RJM Construction, LLC. Project: Elk River Multi -Purpose Facility and Lion Application No.: 14 830 Boone Avenue North John Weicht Park Golden Valley, MN 55427 Period To: 09/30/20 From: WEIDNER MECHANICAL Application Date: 09/17/20 29 WILSON AVENUE NE Project No.: 19520-0033 PO BOX 1087 ST CLOUD, MN 56304 Contract Date: 08/23/19 Contract For: 195200033-220105 - Plumbing Commitment: 195200033-220105 1. ORIGINAL CONTRACT AMOUNT 2. NET CHANGE BY CHANGE ORDERS 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED AND STORED TO DATE (Column G) 5. RETAINAGE 5.00% of Completed Work (Columns D + E) 5.00% of Stored Materials (Columns F) Total Retainage (Line 5a + Line 5b OR Sum of Column 1) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PRIOR CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) S. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) $1,206,000.00 $117,097.00 $1,323,097.00 $1,323,097.00 $66,154.85 $66,154.85 $1,256,942.15 $1,250,295.95 $6,646.20 $66,154.85 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months $115,284.00 $5,183.00 Total approved this month $6,996.00 $0.00 TOTALS $122,280.00 $5,183.00 NET CHANGES by Change Orders $117,097.00 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by the Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: Karen Schenk Date: 09/16/20 State Of: County Of: Subscribed and sworn to before me this Notary Public: My commission expires: ARCHITECTS CERTIFICATE FOR PAYMENT day of In accordance with the Contract Documents, based on the on -site observations and the data compromising this application, the Architect certifies to the owner that to the best of the Architects knowledge, information and belief the Work under the Architect's Contract has progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED $6,646.20 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on the Application for Payment and on the Continuation sheet that are changes to conform to the amount certified.) ARCHITECT: By: Date: The Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 14 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/17/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 WEIDNER MECHANICAL PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 10.105 Bond $10,333.00 $10,333.00 $10,333.00 100.00% $516.65 2 10.109 Allowance $7,500.00 $7,500.00 $7,500.00 100.00% $375.00 3 10.115 Pipe & Fittings $235,689.00 $235,689.00 $235,689.00 100.00% $11,784.45 4 10.119 Drains & Carriers $47,196.00 $47,196.00 $47,196.00 100.00% $2,359.80 5 10.123 Pumps & Tanks $5,400.00 $5,400.00 $5,400.00 100.00% $270.00 6 10.127 Water Heaters $82,739.00 $82,739.00 $82,739.00 100.00% $4,136.95 7 10.137 Plumbing Fixtures & $79,004.00 $79,004.00 $79,004.00 100.00% $3,950.20 Trim 8 10.139 Misc Plumbing $42,488.00 $42,488.00 $42,488.00 100.00% $2,124.40 9 11.185 Labor - Plumbing $560,753.00 $560,753.00 $560,753.00 100.00% $28,037.65 10 30.300 Digging/Backfill $37,034.00 $37,034.00 $37,034.00 100.00% $1,851.70 11 30.325 Rentals $13,000.00 $13,000.00 $13,000.00 100.00% $650.00 12 30.360 Pipe Covering $84,864.00 $84,864.00 $84,864.00 100.00% $4,243.20 1 Plumbing (CO #1) $7,430.00 $7,430.00 $7,430.00 100.00% $371.50 1 Plumbing (CO #2) ($2,203.00) ($2,203.00) ($2,203.00) 100.00% ($110.15) 1 Plumbing (CO #3) ($2,980.00) ($2,980.00) ($2,980.00) 100.00% ($149.00) 1 Plumbing (CO #4) $2,506.00 $2,506.00 $2,506.00 100.00% $125.30 1 Plumbing (CO #5) $10,815.00 $10,815.00 $10,815.00 100.00% $540.75 1 Plumbing (CO #6) $1,338.00 $1,338.00 $1,338.00 100.00% $66.90 1 Plumbing (CO #7) $15,209.00 $15,209.00 $15,209.00 100.00% $760.45 1 Plumbing (CO #8) $2,645.00 $2,645.00 $2,645.00 100.00% $132.25 1 Plumbing (CO #9) $10,615.00 $10,615.00 $10,615.00 100.00% $530.75 1 Plumbing (CO #10) $25,562.00 $25,562.00 $25,562.00 100.00% $1,278.10 1 Plumbing (CO #6) $2,041.00 $2,041.00 $2,041.00 100.00% $102.05 1 Plumbing (CO #11) $26,547.00 $26,547.00 $26,547.00 100.00% $1,327.35 1 Plumbing (CO #12) $1,943.00 $1,943.00 $1,943.00 100.00% $97.15 1 Plumbing (CO #13) $6,842.00 $6,842.00 $6,842.00 100.00% $342.10 1 Plumbing (CO #14) $771.00 $771.00 $771.00 100.00% $38.55 1 Plumbing (CO #15) $1,020.00 $1,020.00 $1,020.00 100.00% $51.00 Page 1 of 2 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 14 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/17/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 WEIDNER MECHANICAL PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 Plumbing (CO #16) $6,996.00 - $6,996.00 $6,996.00 100.00% $349.80 PAYMENT TOTALS $1,323,097.00 $1,316,101.00 $6,996.00 $1,323,097.00 100.00% $66,154.85 Page 2 of 2 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 APPLICATION FOR PAYMENT To: RJM Construction, LLC. 830 Boone Avenue North Golden Valley, MN 55427 From: Design Electric, Inc PO Box 1252 St. Cloud, MN 56302 Contract For: 195200033-260105 - Electrical 1. ORIGINAL CONTRACT AMOUNT 2. NET CHANGE BY CHANGE ORDERS 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED AND STORED TO DATE (Column G) 5. RETAINAGE 5.00% of Completed Work (Columns D + E) 5.00% of Stored Materials (Columns F) Total Retainage (Line 5a + Line 5b OR Sum of Column 1) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PRIOR CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) S. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) Project: Elk River Multi -Purpose Facility and Lion John Weicht Park $1,786,914.00 $111,657.43 $1,898,571.43 $1,898,571.43 $94,928.56 $94,928.56 $1,803,642.87 $1,792,121.08 $11,521.79 $94,928.56 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months $143,997.82 $44,468.59 Total approved this month $12,128.20 $0.00 TOTALS $156,126.02 $44,468.59 NET CHANGES by Change Orders $111,657.43 Application No.: 13 Period To: 09/30/20 Application Date: 09/30/20 Project No.: 19520-0033 Contract Date: 08/01/19 Commitment: 195200033-260105 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by the Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: Ashley Krueger Date: 10/05/20 State Of: County Of: Subscribed and sworn to before me this Notary Public: My commission expires: ARCHITECTS CERTIFICATE FOR PAYMENT day of In accordance with the Contract Documents, based on the on -site observations and the data compromising this application, the Architect certifies to the owner that to the best of the Architects knowledge, information and belief the Work under the Architect's Contract has progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED $11,521.79 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on the Application for Payment and on the Continuation sheet that are changes to conform to the amount certified.) ARCHITECT: By: Date: The Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 13 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/30/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 Design Electric, Inc PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 BOND/PERMIT $35,908.00 $35,908.00 $35,908.00 100.00% $1,795.40 /MOBILIZATION 2 SITE WORK/UNDERGROUND $33,158.00 $33,158.00 $33,158.00 100.00% $1,657.90 3 DEMOLITION/TEMP WIRING $64,200.00 $64,200.00 $64,200.00 100.00% $3,210.00 4M CONDUIT -MATERIAL $122,167.00 $122,167.00 $122,167.00 100.00% $6,108.35 4L CONDUIT - LABOR $180,320.00 $180,320.00 $180,320.00 100.00% $9,016.00 5M BOXESNVIRE/DEVICES - $110,400.00 $110,400.00 $110,400.00 100.00% $5,520.00 MATERIAL 5L BOXESNVIRE/DEVICES - $67,200.00 $67,200.00 $67,200.00 100.00% $3,360.00 LABOR 6M FIXTURES - MATERIAL $425,654.00 $425,654.00 $425,654.00 100.00% $21,282.70 6L FIXTURES - LABOR $90,400.00 $90,400.00 $90,400.00 100.00% $4,520.00 7M GEAR - MATERIAL $145,168.00 $145,168.00 $145,168.00 100.00% $7,258.40 7L GEAR -LABOR $38,400.00 $38,400.00 $38,400.00 100.00% $1,920.00 8M LOW VOLTAGE ROUGH -IN - $46,722.00 $46,722.00 $46,722.00 100.00% $2,336.10 MATERIAL 8L LOW VOLTAGE ROUGH -IN - $73,120.00 $73,120.00 $73,120.00 100.00% $3,656.00 LABOR 9M EQUIPMENT CONNECTIONS $68,400.00 $68,400.00 $68,400.00 100.00% $3,420.00 - MATERIAL 9L EQUIPMENT CONNECTIONS $12,200.00 $12,200.00 $12,200.00 100.00% $610.00 -LABOR 10M FIRE ALARM - MATERIAL $84,697.00 $84,697.00 $84,697.00 100.00% $4,234.85 10L FIRE ALARM - LABOR $20,000.00 $20,000.00 $20,000.00 100.00% $1,000.00 11M SOFTBALL FIELD - $153,200.00 $153,200.00 $153,200.00 100.00% $7,660.00 MATERIAL 11 L SOFTBALL FIELD - LABOR $15,600.00 $15,600.00 $15,600.00 100.00% $780.00 12 - - 1 Electrical (CO #1) $945.49 $945.49 $945.49 100.00% $47.27 1 Electrical (CO #2) $1,340.58 $1,340.58 $1,340.58 100.00% $67.03 1 Electrical (CO #3) $1,582.00 $1,582.00 $1,582.00 100.00% $79.10 Page 1 of 2 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 13 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/30/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 Design Electric, Inc PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 Electrical (CO #4) ($24,378.00) ($24,378.00) ($24,378.00) 100.00% ($1,218.90) 1 Electrical (CO #5) ($12,693.73) ($12,693.73) ($12,693.73) 100.00% ($634.69) 1 Electrical (CO #6) $396.52 $396.52 $396.52 100.00% $19.83 1 Electrical (CO #7) $2,162.06 $2,162.06 $2,162.06 100.00% $108.10 1 Electrical (CO #8) $7,694.97 $7,694.97 $7,694.97 100.00% $384.75 1 Electrical (CO #10) $5,773.48 $5,773.48 $5,773.48 100.00% $288.67 2 Joist Work - Electrical (CO #9) $24,561.00 $24,561.00 $24,561.00 100.00% $1,228.05 1 Electrical (CO #7) $1,035.41 $1,035.41 $1,035.41 100.00% $51.77 1 Electrical (CO #7) $12,342.68 $12,342.68 $12,342.68 100.00% $617.13 1 Electrical (CO #7) $1,170.60 $1,170.60 $1,170.60 100.00% $58.53 1 Electrical (CO #7) ($7,396.86) ($7,396.86) ($7,396.86) 100.00% ($369.84) 1 Electrical (CO #11) $42,232.20 $42,232.20 $42,232.20 100.00% $2,111.61 1 Electrical (CO #12) $12,952.00 $12,952.00 $12,952.00 100.00% $647.60 1 Electrical (CO #13) $1,677.13 $1,677.13 $1,677.13 100.00% $83.86 1 Electrical (CO #14) $9,491.86 $9,491.86 $9,491.86 100.00% $474.59 1 Electrical (CO #15) $1,044.26 $1,044.26 $1,044.26 100.00% $52.21 1 Electrical (CO #15) $5,221.53 $5,221.53 $5,221.53 100.00% $261.08 1 Electrical (CO #16) $3,536.88 $3,536.88 $3,536.88 100.00% $176.84 1 Electrical (CO #17) $2,741.41 $2,741.41 $2,741.41 100.00% $137.07 1 Electrical (CO #18) $1,389.62 $1,389.62 $1,389.62 100.00% $69.48 1 Electrical (CO #19) $356.00 $356.00 $356.00 100.00% $17.80 1 Electrical (CO #19) $1,759.00 $1,759.00 $1,759.00 100.00% $87.95 1 Electrical (CO #20) $2,591.14 $2,591.14 - $2,591.14 100.00% $129.56 1 Electrical (CO #21) $12,128.20 $12,128.20 $12,128.20 100.00% $606.41 PAYMENT TOTALS 1 $1,898,571.43 $1,886,443.23 $12,128.20 $1,898,571.43 100.00% $94,928.56 Page 2 of 2 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 APPLICATION FOR PAYMENT To: RJM Construction, LLC. 830 Boone Avenue North Golden Valley, MN 55427 From: Minnesota Utilities & Excavating, LLC 13932 Lake Drive Forest Lake, MN 55025 Contract For: 195200033-312205 - Multipurpose Earthwork 1. ORIGINAL CONTRACT AMOUNT 2. NET CHANGE BY CHANGE ORDERS 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED AND STORED TO DATE (Column G) 5. RETAINAGE 5.00% of Completed Work (Columns D + E) 5.00% of Stored Materials (Columns F) Total Retainage (Line 5a + Line 5b OR Sum of Column 1) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PRIOR CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) S. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) Project: Elk River Multi -Purpose Facility and Lion John Weicht Park $572,787.00 $142,167.30 $714,954.30 $714,954.30 $29,772.80 $29,772.80 $685,181.50 $679,032.15 $6,149.35 $29,772.80 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months $140,639.30 $4,945.00 Total approved this month $6,473.00 $0.00 TOTALS $147,112.30 $4,945.00 NET CHANGES by Change Orders $142,167.30 Application No.: 6 Period To: 09/30/20 Application Date: 09/18/20 Project No.: 19520-0033 Contract Date: 07/23/19 Commitment: 195200033-312205 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by the Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: Jodi Russ Date: 09/18/20 State Of: County Of: Subscribed and sworn to before me this Notary Public: My commission expires: ARCHITECTS CERTIFICATE FOR PAYMENT day of In accordance with the Contract Documents, based on the on -site observations and the data compromising this application, the Architect certifies to the owner that to the best of the Architects knowledge, information and belief the Work under the Architect's Contract has progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED $6,149.35 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on the Application for Payment and on the Continuation sheet that are changes to conform to the amount certified.) ARCHITECT: By: Date: The Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 6 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/18/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/30/20 Minnesota Utilities & Excavating, LLC PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 Earthwork $572,787.00 $572,787.00 $572,787.00 100.00% $28,639.35 1 Multipurpose Earthwork (CO $43,459.00 $43,459.00 $43,459.00 100.00% #1) 1 Multipurpose Earthwork (CO $26,672.30 $26,672.30 $26,672.30 100.00% #2) 1 Multipurpose Earthwork (CO $3,157.00 $3,157.00 $3,157.00 100.00% #4) 1 Multipurpose Earthwork (CO $11,096.00 $11,096.00 $11,096.00 100.00% #5) 1 Multipurpose Earthwork (CO ($1,338.00) ($1,338.00) ($1,338.00) 100.00% #6) 2 Geogrid (CO #3) $3,570.00 $3,570.00 $3,570.00 100.00% 1 Multipurpose Earthwork (CO $2,338.00 $2,338.00 $2,338.00 100.00% #7) 1 Multipurpose Earthwork (CO $26,310.00 $26,310.00 $26,310.00 100.00% #8) 1 Multipurpose Earthwork (CO $4,234.00 $4,234.00 $4,234.00 100.00% - #8) 1 Multipurpose Earthwork (CO $3,647.00 $3,647.00 $3,647.00 100.00% $182.35 #9) 1 Multipurpose Earthwork (CO ($2,674.00) ($2,674.00) ($2,674.00) 100.00% ($133.70) #10) 1 Multipurpose Earthwork (CO ($933.00) ($933.00) ($933.00) 100.00% ($46.65) #11) 1 Multipurpose Earthwork (CO $16,156.00 $16,156.00 $16,156.00 100.00% $807.80 #12) 1 Multipurpose Earthwork (CO $3,800.00 $3,800.00 $3,800.00 100.00% $190.00 #13) 1 Multipurpose Earthwork (CO $2,376.00 $2,376.00 $2,376.00 100.00% $118.80 #14) 1 Multipurpose Earthwork (CO $297.00 $297.00 $297.00 100.00% $14.85 #15) PAYMENT TOTALS $714,954.30 $708,481.30 $6,473.00 $714,954.30 1 100.00% $29,772.80 Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 APPLICATION FOR PAYMENT To: RJM Construction, LLC. 830 Boone Avenue North Golden Valley, MN 55427 From: Ebert Construction 23350 County Road 10 Corcoran, MN 55357 Contract For: 195200033-321305 - Site Concrete 1. ORIGINAL CONTRACT AMOUNT 2. NET CHANGE BY CHANGE ORDERS 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED AND STORED TO DATE (Column G) 5. RETAINAGE 0% of Completed Work (Columns D + E) 0% of Stored Materials (Columns F) Total Retainage (Line 5a + Line 5b OR Sum of Column 1) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PRIOR CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) S. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) Project: Elk River Multi -Purpose Facility and Lion John Weicht Park $387,400.00 ($7,340.24) $380,059.76 $380,059.76 N/A N/A $0.00 $380,059.76 $359,620.42 $20,439.34 $0.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months $13,281.15 $21,887.86 Total approved this month $1,266.47 $0.00 TOTALS $14,547.62 $21,887.86 NET CHANGES by Change Orders ($7,340.24) Application No.: 8 Period To: 09/23/20 Application Date: 09/23/20 Project No.: 19520-0033 Contract Date: 07/23/19 Commitment: 195200033-321305 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by the Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: Caleb Pelkey Date: 09/24/20 State Of: County Of: Subscribed and sworn to before me this Notary Public: My commission expires: ARCHITECTS CERTIFICATE FOR PAYMENT day of In accordance with the Contract Documents, based on the on -site observations and the data compromising this application, the Architect certifies to the owner that to the best of the Architects knowledge, information and belief the Work under the Architect's Contract has progressed as indicated, the quality of Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED $20,439.34 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on the Application for Payment and on the Continuation sheet that are changes to conform to the amount certified.) ARCHITECT: By: Date: The Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Page 1 of 1 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO.: 8 containing Contractor's signed Certification is attached. APPLICATION DATE: 09/23/20 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 09/23/20 Ebert Construction PROJECT NO.: 19520-0033 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF WORK SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED % BALANCE TO RETAINAGE (IF NUM VALUE APPLICATION (D THIS PERIOD STORED (NOT IN AND STORED TO (G + C) FINISH (C - G) VARIABLE RATE) + E) D OR E) DATE 1 General Conditions $14,700.00 $14,700.00 $14,700.00 100.00% 2 MPB - Walks - Materials $30,617.00 $30,617.00 $30,617.00 100.00% 3 MPB - Walks - Labor $44,082.00 $44,082.00 $44,082.00 100.00% 4 MPB - Curb - Materials $18,273.00 $18,273.00 $18,273.00 100.00% 5 MPB - Curb - Labor $22,333.00 $22,333.00 $22,333.00 100.00% 6 Lion - Walks - Materials $83,053.00 $83,053.00 $83,053.00 100.00% 7 Lion - Walks - Labor $123,318.00 $123,318.00 $123,318.00 100.00% 8 Lion - Curb - Materials $18,461.00 $18,461.00 $18,461.00 100.00% 9 Lion - Curb - Labor $22,563.00 $22,563.00 $22,563.00 100.00% 10 Allowance $10,000.00 $10,000.00 $10,000.00 100.00% 1 Site Concrete (CO #1) $3,311.40 $3,311.40 $3,311.40 100.00% 1 Site Concrete (CO #2) ($1,570.47) ($1,570.47) ($1,570.47) 100.00% 1 Site Concrete (CO #3) ($4,286.00) ($4,286.00) ($4,286.00) 100.00% 1 Site Concrete (CO #4) ($1,561.90) ($1,561.90) ($1,561.90) 100.00% 1 Site Concrete (CO #5) ($10,522.07) ($10,522.07) ($10,522.07) 100.00% 1 Site Concrete (CO #6) $3,937.50 $3,937.50 $3,937.50 100.00% 1 Site Concrete (CO #7) ($3,947.42) ($3,947.42) ($3,947.42) 100.00% 1 Site Concrete (CO #8) $6,032.25 $6,032.25 $6,032.25 100.00% 1 Site Concrete (CO #9) $1,266.47 $1,266.47 $1,266.47 100.00% PAYMENT TOTALS $380,059.76 $378,793.29 $1,266.47 $380,059.76 100.00% Page 1 of 1 Ti &L CONSTRUCTION TO City of Elk River Owner: Attn: Justin Femrite 13065 Orono Parkway Elk River, MN 55330 CONTRACTOR'S APPLICATION FOR PAYMENT Please Remit Payment to: RJM Construction, LLC 830 Boone Ave North Golden Valley, MN 55427 APPLICATION AND CERTIFICATE FOR PAYMENT Project: 19520-0033 Elk River Multi -Purpose Facility and Lion John Weicht Park Architect: Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet is attached. 1. Original Contract Sum ............. 2. Net Change By Change Order ................... 3. Contract Sum To Date ............... 4, Total Completed and Stored To Date ... 5. Retainage: a. 2.35% of Completed Work $620,586.98 b. 0.00% of Stored Material $0.00 Total Retainage ............... ......... 6. Total Earned Less Retainage ... ........ 7. Less Previous Certificates For Payments .... 8. Current Payment Due ................. ......... 9. Balance To Finish, Plus Retainage ..... $25,772,257.00 $729,350.40 $26,501,607.40 $26,404,451.10 $620,586.98 $25,783,864.12 $25,163,277.14 $717,743.28 CHANGE ORDER SUMMARY Additions Deductions Total changes agngved in previous moms y Owner $956,343.73 $226,993.33 Total Approved this Month $0.00 $0.00 TOTALS $956,343.73 $226,993.33 Net Changes By Change Order $729,350.40 Invoice #: 9520003316 Distribution to Application No.: 16 0 Owner Application Date: 9/30/2020 ArchitectO Contractor Period From: To: The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief, the work covered by this Application for Payment has been completed in accordance with the Contract Documents. That all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. RJM Construction LLC State of: My Ccmmissid7t expires:% [.*, I,-,_ 101712020 County of: day of Q-4-4-- , %— In accordance with the Contract Documents, based on on -site observatio, KING comprising the above application, the Architect certifies to the Owner that NOtarY Public-MinneWa a Architect's knowledge, information, and belief, the Work has progressed 2 COM Expires eS Jan 31, 2o the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. ARCHITECT'S CERTIFICATE FOR PAYMENT AMOUNT CERTIFIED $ 620,586.98 (Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Continuation Sheet that are changed to conform with the amount certified.) ARCHITECT- 10/8/20 By:— � —Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET Page 2 of 3 Application and Certification for Payment, containing Contractor's signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. Invoice # : 9520003316 Contract : 19520-0033 Elk River Multi -Purpose Facility and Lion John Weicht Park Application No.: 16 Application Date : 09130120 To: Architect's Project No.: A B C D E F G H I Item Description of Work Scheduled Work Com Ieted Materials Total % Balance Retainage From Previous This Period No. Value Presently Completed (G 1 C) To Finish Application In Place Stored and Stored (C-G) (D+E) To Date Not in D or E D+E+F 1 Elk River Multi -Purpose Facility and 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 Lion John Weicht Park 1A Final Cleaning 81,315.00 81,315.00 0.00 0.00 81,315.00 100.00% 0.00 2,032.96 1 B Survey 25,568.00 25,568.00 0.00 0.00 25,568.00 100.00% 0.00 639.20 2A Building Demolition 166,199.51 166,199.51 0.00 0.00 166,199.51 100.00% 0.00 4,154.99 213 Selective Demolition 236,477.21 236,477.21 0.00 0.00 236,477.21 100.00% 0.00 5,911.93 3C Concrete Floor Finishes 135,699.62 135,699.62 0.00 0.00 135,699.62 100.00% 0.00 3,392.49 4A Masonry Systems 2,982,936.83 2,982,936.83 0.00 0.00 2,982,936.83 100.00% 0.00 74,573.42 5A Structural Material 1,380,909.01 1,361,847.77 0.00 0.00 1,361,847.77 98.62% 19,061.24 34,046.19 513 Structural Labor 457,489.00 457,489.00 0.00 0.00 457,489.00 100.00% 0.00 11,437.22 6A Carpentry 1,654,857.23 1,654,767.03 0.00 0.00 1,654,767.03 99.99% 90.20 41,369.17 7A Waterproofing &WB 40,342.00 40,342.00 0.00 0.00 40,342.00 100.00% 0.00 1,008.55 713 Roofing Systems 1,067,619.73 1,067,619.73 0.00 0.00 1,067,619.73 100.00% 0.00 26,690.49 7C Metal Wall Panel 186,172.61 186,172.61 0.00 0.00 186,172.61 100.00% 0.00 4,654.31 8A Aluminum Entrances/Storefronts 642,926.46 642,926.46 0.00 0.00 642,926.46 100.00% 0.00 16,073.16 813 Overhead Coiling and Sectional 53,610.00 53,610.00 0.00 0.00 53,610.00 100.00% 0.00 1,340.25 Doors 9A Gypsum Board 349,769.37 349,769.37 0.00 0.00 349,769.37 100.00% 0.00 8,744.23 913 Tiling 175,149.90 175,149.90 0.00 0.00 175,149.90 100.00% 0.00 4,378.75 9C Acoustical Ceilings 147,905.95 147,905.95 0.00 0.00 147,905.95 100.00% 0.00 3,697.65 9D Flooring 132,262.50 132,262.50 0.00 0.00 132,262.50 100.00% 0.00 3,306.56 9E Painting 438,719.00 438,719.00 0.00 0.00 438,719.00 100.00% 0.00 10,967.97 10A Signage 12,161.18 10,807.14 0.00 0.00 10,807.14 88.87% 1,354.04 270.18 11A Athletic Equipment 175,176.84 175,176.84 0.00 0.00 175,176.84 100.00% 0.00 4,379.43 11 B Concessions 101,991.83 101,991.83 0.00 0.00 101,991.83 100.00% 0.00 2,549.80 12A Roller Shades 28,659.10 28,659.10 0.00 0.00 28,659.10 100.00% 0.00 716.48 13B Ice Rink Systems 2,162,742.00 2,162,742.00 0.00 0.00 2,162,742.00 100.00% 0.00 54,068.55 13C Leg Truss System 125,797.00 125,797.00 0.00 0.00 125,797.00 100.00% 0.00 3,144.92 14A Elevators 71,700.00 71,700.00 0.00 0.00 71,700.00 100.00% 0.00 1,792.50 21A Fire Protection 282,544.00 282,144.00 0.00 0.00 282,144.00 99.86% 400.00 7,053.61 22A Plumbing Systems 1,323,097.00 1,323,097.00 0.00 0.00 1,323,097.00 100.00% 0.00 33,077.42 23A HVAC 1,875,065.33 1,875,065.33 0.00 0.00 1,875,065.33 100.00% 0.00 46,876.63 26A Electrical Systems 1,874,010.43 1,874,010.43 0.00 0.00 1,874,010.43 100.00% 0.00 46,850.26 31A Multipurpose Earthwork 711,384.30 711,384.30 0.00 0.00 711,384.30 100.00% 0.00 17,784.61 DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 CONTINUATION SHEET Page 3 of 3 Application and Certification for Payment, containing Contractor's signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. Invoice # : 9520003316 Contract : 19520-0033 Elk River Multi -Purpose Facility and Lion John Weicht Park Application No.: 16 Application Date : 09130120 To: Architect's Project No.: A B C D E F G H I Item Description of Work Scheduled Work Com feted Materials Total % Balance Retainage From Previous This Period No. Value Presently Completed (G 1 C) To Finish Application In Place Stored and Stored (C-G) (D+E) To Date Not in D or E D+E+F 31 B Lions Earthwork 510,815.67 510,815.67 0.00 0.00 510,815.67 100.00% 0.00 12,770.39 32A Asphalt Paving 293,489.00 293,489.00 0.00 0.00 293,489.00 100.00% 0.00 7,337.22 32B Concrete/Sidewalk/Curb/Gutter 384,713.41 384,713.41 0.00 0.00 384,713.41 100.00% 0.00 9,617.83 32C Multipurpose Landscaping 27,000.00 27,000.00 0.00 0.00 27,000.00 100.00% 0.00 675.00 32D Lions Landscaping 94,480.00 94,480.00 0.00 0.00 94,480.00 100.00% 0.00 2,362.00 32E Chain Link Fence 150,325.79 150,325.79 0.00 0.00 150,325.79 100.00% 0.00 3,758.15 33A Utilities 635,496.55 635,496.55 0.00 0.00 635,496.55 100.00% 0.00 15,887.41 0100 Internal Fund Transfer - Covid 19 & 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 GCs 313.1 Precast Concrete 1,182,922.00 1,182,922.00 0.00 0.00 1,182,922.00 100.00% 0.00 29,573.05 313.2 Precast Concrete 930,000.00 930,000.00 0.00 0.00 930,000.00 100.00% 0.00 23,250.00 313.3 Precast Raker/Plank/Stadia 1,048,025.00 1,048,025.00 0.00 0.00 1,048,025.00 100.00% 0.00 26,200.62 01-00 General Conditions/Requirements 1,250,912.96 1,247,337.68 0.00 0.00 1,247,337.68 99.71% 3,575.28 0.00 90-50 General Liability Insurance 268,451.52 268,451.52 0.00 0.00 268,451.52 100.00% 0.00 0.00 90-60 Construction Contingency 70,229.02 0.00 0.00 0.00 0.00 0.00% 70,229.02 0.00 90-70 Value Engineering 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 90-80 Builders Risk Insurance 65,184.58 65,184.58 0.00 0.00 65,184.58 100.00% 0.00 0.00 99-99 Contractors Fee 489,303.96 486,857.44 0.00 0.00 486,857.44 99.50% 2,446.52 12,171.43 Grand Totals 26,501,607.40 26,404,451.10 0.00 0.00 26,404,451.10 99.63% 97,156.30 620,586.98 ERMU Background ■ Zone Change (ZC 20-03), ■ Easement Vacation (EV 20-05) ■ Preliminary Plat (P 20-13) ■ Conditional Use Permit (CU 20-19) ■ Final Plat (I' 20-14) Cit, Elk River ERNMU Pielim/Final Plat, Conditional Use Perinit Variance., Easement Vacation, Zone Change IF Case No: P 20-13 & 20- 4 CLJ 20-19 V 20-14 EV 20-05 hEiL*k=,.z' ZC 20-03 River a. Zone Change ■ R2-a currently ■ RI-c proposed ■ Consistent with surrounding zoning ■ Government facilities allowed in both with CUP ■ The rezoning would be consistent with the City of Elk River Land Use Plan R2a 5 --n 5 t h 55 LLI Q W LL- I s To 6 Action Requested - Zone Change ■ Adopt, by motion, an ordinance rezoning certain properties from R-2a to R-1 c b. Easement Vacation ■ ERMU is requesting a portion of Fourth Street right-of-way be vacated to allow for their building expansion project ■ Dedicated in 1882 ■ Has never been improved or maintained for public use ■ Vacation will transfer the property to ERMU Action Requested - Easement Vacation ■ Adopt, by motion, a resolution vacating a portion of the right- of-way platted as Fourth Street (Depot Street) c. Preliminary Plat ■ ERMU is requesting a preliminary plat to combine eight parcels and street right-of-way ■ One 8.5-acre parcel Applicable Regulations ■ Meets the eight criteria for approval Planning • The Pc Commission unanimously recommended approval of the request Action Requested - Prelim Plat ■ Approve, by motion, the Preliminary Plat for ERMU Addition. d. Conditional Use Permit ■ The site plan is significantly changing ■ One email received — in packet Actions Requested - CUP ■ Open PH, take comments, and close PH ■ CUP will be readvertised for PH ■ Planning Commission - Nov 24, 2020 ■ City Council - Dec 7, 2020 e. Final Plat ■ If preliminary plat is approved ■ The final plat is consistent with the preliminary plat Action Requested= Final Plat ■ Adopt, by resolution, the final plat of ERMU Addition with the following condition: 1. The easement vacation (EV 20-05) shall be recorded. Cit, Elk River ERNMU Pielim/Final Plat, Conditional Use Perinit Variance., Easement Vacation, Zone Change IF Case No: P 20-13 & 20- 4 CLJ 20-19 V 20-14 EV 20-05 hEiL*k=,.z' ZC 20-03 River