Loading...
7.3D SR 10-19-2020Request for Action To Item Number Mayor and City Council 7.3d Agenda Section Meeting Date Prepared by Public Hearings October 19, 2020 Chris Leeseberg, Senior Planner Item Description Reviewed by Conditional Use Permit to Allow a Government Zack Carlton, Planning Manager Facility in Single Family Residential District Reviewed by Cal Portner, City Administrator Action Requested Open the public hearing, take comments, and continue the public hearing until November 2, 2020. Background/Discussion Case No. CU 20-19 Since the Planning Commission, the applicant has revisited the layout of the site. If there are minor changes, the council can act on the item November 2, 2020. If the layout changes significantly from when the Planning Commission reviewed the Conditional Use Permit (CUP), staff will readvertise the project and bring the CUP back to the Planning Commission on November 24, 2020, and to the City Council on December 7, 2020. Planning Commission While no spoke for or against the project, an email was received from a resident regarding the project. The Planning Commission unanimously recommended approval of the request. Financial Impact None Mission/Policy/Goal Reflect the culture of citizens and what is important (continue service to residents) and meeting the changing needs of the city. Attachments Planning Commission memo date September 22, 2020 Email received from a resident The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei ly. M TUREJ Updated.• August 2020 Request for Action Ciry nf Elk River To Item Number Planning Commission 4.3b Agenda Section Meeting Date Prepared by Public Hearings September 22, 2020 Chris Leeseberg, Senior Planner Item Description Reviewed by Elk River Municipal Utilities, 1643 Main St. NW Zack Carlton, Planning Manager Conditional Use Permit to allow a government Reviewed by facility in the R-lc zoning district, Case No. CU 20-19 Action Requested Recommend, by motion, approval of the Conditional Use Permit with the following condition to satisfy the standards set forth in Section 30-654: 1. The hours of operation shall be limited to 8:00 a.m. — 4:30 p.m., Monday through Friday, except for emergencies. Background/Discussion This application is part of the Elk River Municipal Utilities (ERMU) building expansion project. The project will consist of a Zone Change r (ZC 20-03), a Conditional Use Permit (CU 20-19), Preliminary and Final Plat (P 20-13 & P 20-14), a Variance (V 20-14), and an Easement Vacation (EV 20-05). The subject site is at the south east corner of the intersection of Main St. and Tipton Ave. " ` cR 33 P The property, if the associated Zone Change (ZC 20-03) request is also approved, is zoned R1-c where Government Facilities require a Conditional Use Permit (CUP). RR The applicant is seeking a CUP to construct a new maintenance facility Hwy io • ;s and associated site improvements. The site includes several parcels — CR 12 that will be consolidated into a single parcel. The existing homes will be removed, but the power plant and utility building will remain as part of the new maintenance complex. A new 59,518 sq.ft. building will be constructed on the northwest ytiy corner of the site and includes space for office and vehicle storage. %9 The building exterior will be constructed using precast concrete panels, metal wall panels and face brick. Figure The current code requires one parking space per 300 sq.ft. of office space and one parking space per 2,000 sq.ft. of warehouse space. With the existing buildings and new building there will be a total of 4,740 sq.ft. of office area, The Elk River Vision P O N E R E u 1 1 A welcoming community avith revolutionary and spirited resourcefulness, exceptional [NATURE service, and community engagement that encourages and inspires prosperity. Updated. August 2020 requiring 16 parking stalls and 38,637 sq.ft. of warehouse space, requiring 19 stalls for a total of 35 stalls. The site plan shows 45 parking stalls. The site currently has three access points on Main Street along the west side of property. They have proposed adding an additional access on Main Street on the north side of the property. This access, along with the northerly access on the west side, will be for those visiting the office building. The two other access points will be for company vehicle circulation to and from the storage garage and yard. A single monument sign is proposed, but the sign location has yet to be determined. A sign permit will be required prior to installation, and must comply with setback, size, and height requirements. The new building will operate under the same hours of operation as the current facility, Monday — Friday from 8:00 a.m. to 4:30 p.m. ERMU employs 30 people at this location and the new building will provide space for planned employment growth. An additional 75 trees will be added to the site to partially screen the parking and building from the adjacent roadways. In addition, the vehicle operations are to the rear of the site screened by the building. Applicable Regulations In approving a Conditional Use Permit, the council may impose such specific conditions with regard to the development or operation of the proposed use as it considers necessary to satisfy the seven standards set forth in Section 30-654 and the requirements contained in this article and to promote compatibility with and minimize any potentially adverse effects upon adjacent properties, the neighborhood or the city. The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 1. mill not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral n elfare of the neighborhood or the city. The ERMU facility has been located on the site for many years. With the proposed grading, much of the north half of the site will be below the grade of Main Street and most of the outdoor areas will be screened from the public by trees, buildings, and elevation changes. The use will not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience, or general welfare of the neighborhood or the city. With the landscaping and site layout proposed, staff does not see a need to impose additional conditions to satisfy this standard. 2. mill be consistent n ith the Comprehensive Plan. The subject area has an underlying land us of Mississippi Connections which is consistent with the R1-c zoning district where Governmental Facilities are allowed. The use will be consistent with the Comprehensive Plan. Staff does not see a need to impose specific conditions to satisfy this standard. 3. mill not impede the normal and orderly development and improvement of surrounding vacantproperty. There is no vacant property in the vicinity and the site plan continues to provide access to land -locked parcels to the east. The use will not impede the normal and orderly development and improvement of surrounding vacant property. Staff does not see a need to impose specific conditions to satisfy this standard. 4. mill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create traf c congestion or interference with traffic on adjacent and neighboring public thoroughfares. The use will be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. Staff does not see a need to impose specific conditions to satisfy this standard. 5. mill not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. While the project is an expansion of the operations, the increase of traffic generated by the site will be minimal. The spacing of access points has been reviewed by the city engineer. Glare and noise generated from the site will be mitigated by vegetation, buildings, and elevations changes. The use will not involve uses, activities, processes, materials, equipment, and conditions of operation that will be detrimental to any persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust, or vibrations. To ensure detrimental activities such as glare, noise, and traffic do not occur, the hours of operation shall be limited to Monday — Friday, 8:00 a.m. — 4:30 p.m., except for emergencies. 6. mill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. Although trees will be removed and significant site work will be completed, the use will not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. Staff does not see a need to impose specific conditions to satisfy this standard. 7. WINfull comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. The use will fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. Staff does not see a need to impose specific conditions to satisfy this standard. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. Financial Impact None Mission/Policy/Goal Reflect the culture of citizens and what is important (continue service to residents) and meeting the changing needs of the city. Attachments ■ Location Map ■ Applicant's Narrative ■ Site Plans ■ Architectural Plans/Elevations i /�14 4 to e 5 � J ERATU Prelim Final Plat, Conditional Use Perrnit Variance, EasementVacation', Zane Change 7? 8 L Case No: P 20-13 & 20-1 4 El EV 20-05 ZC 20-03 l�l� III I•°=.�If!• a :- .. s°eTR °uRRumin _� w17 Ruoe r 11LL � d" &I '-. A ..-- ° vll° Rrc^'r 1�11J3 4 n4➢ ql 11' A7]JJl � 0 p� OPP Y 4 ' I as as v r VIA 10 .90 PREPARED FOR \NG ME41 Elk River Municipal Utilities m P.O. Box 430 Elk River, MN 55330 %���� Spa PREPARED BY Landform Professional Services, LLC 105 511 Ave S, Suite 513 Minneapolis, MN 55401 Landform®, SensiblyGreen® and Site to Finish® are registered service marks of Landform Professional Services, LLC TABLE OF CONTENTS Introduction .................................... Rezoning .......................................... Conditional Use Permit ................... Preliminary Plat and Final Plat........ Vacation.......................................... Variance .......................................... Summary ......................................... Contact Information ........................ .......................................................................................................... 1 .......................................................................................................... 1 .......................................................................................................... 2 .......................................................................................................... 4 .......................................................................................................... 4 .......................................................................................................... 5 .......................................................................................................... 7 .......................................................................................................... 7 Introduction On behalf of Elk River Municipal Utilities (ERMU), Landform is pleased to submit this application for rezoning, conditional use permit, preliminary plat, final plat, ROW vacation and variances to allow construction of a new maintenance facility and associated site improvements at the southeast quadrant of Main Street and Main Street in Elk River. The site includes several parcels that will be consolidated to create a new 8.47-acre site. The existing homes will be removed, but the existing power plant and utility building will remain as part of the new maintenance complex. We are excited about the improvements proposed for this site to better serve the residents and businesses in Elk River. Rezoning Description of Request We are requesting a rezoning of the following parcels from the R-2a Two Family Residential zoning district to the R-1c Single Family Residential zoning district. • 75-411-0120 • 75-411-0230 • 75-411-0210 • 75-411-0240 What is the purpose of the Zone Change? There are currently two zoning districts present in the parcels that will be combined to create the single large parcel for ERMU. The purpose of the rezoning is to have a consistent zoning district for the entire ERMU site. We are requesting the rezoning to R-1 c because of the consistency with the surrounding zone districts. What has changed to warrant the Zone Change? The change that is occurring to warrant the zoning change is that the existing homes with the proposed zoning change have been purchased by ERMU and will be demolished to make room for the new maintenance facility. The proposed work includes combining the existing lots into a single larger parcel and now is the appropriate time to rezone the existing properties to have a consistent zoning for the entire parcel after combination. How is the request consistent with the Elk River Comprehensive Plan? The request is consistent with the Elk River Comprehensive Plan because it meets the goals set out for the Mississippi Connections land use guidance for the property. The Mississippi Connections area is encouraged to maintain the public facilities within the guided area and to encourage redevelopment and continued improvement in the facilities. How compatible is it with surrounding properties? Elk River Municipal Utilities, Elk River, MN August 31, 2020 ERMU18001 1 The zoning change is compatible with the surrounding districts. The change to an R-1 c zoning district will make the site have the same zoning as the surrounding area. What are the benefits to the City? The City benefits from the zoning change as it is needed to make necessary improvements to the ERMU site for continued service to the residents and businesses in the Elk River community. Conditional Use Permit Description of Request We are requesting a conditional use permit to allow a government facility in the R-1 c zoning district. A government facility is a permitted conditional use in the R-1c zoning district. Site Improvements A new 59,518 sq. ft. building will be constructed on the northwest corner of the site that will have space for office and vehicle storage. The building exterior will be constructed using precast concrete panels, metal wall panels and face brick. The current code requires one parking space per 300 sq. ft. of building space. With the existing buildings and new building there will be a total of 72,724 sq. ft. of building area on the site. This would require 243 parking stalls to be provided on the site. A variance request from this requirement is being requested to allow the site to provide 45 parking stalls. Further detail regarding the variance request is included below. A single monument sign is being proposed to identify the site. The sign location has yet to be determined but a sign permit will be applied for prior to installation and will comply with setback, size and height requirements. The new building being constructed on the site will operate during the same hours of operation as the current facilities from 8 a.m. to 4:30 p.m. ERMU currently employs 30 people at this location and the new building will provide space for identified future positions to be filled. An additional 75 trees will be added to the site to partially screen the parking and building from the adjacent roadways. In addition, the vehicle operations are to the rear of the site screened by the building. Standards for Issuance We have reviewed the request in accordance with City ordinance standards in Section 30-654 and find that the ordinance standards have been met. Specifically: 1. Will not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience or general welfare of the neighborhood or the city. Elk River Municipal Utilities, Elk River, MN August 31, 2020 ERMU18001 2 The conditional use to allow a government facility will not affect the properties located in the immediate vicinity or the nearby neighborhood. The ERMU facility has been located on the site for many years and the use is only being updated and expanded to serve the community. 2. Will be consistent with the comprehensive plan. The proposed use is consistent with the comprehensive plan which encourages investment and improvement in businesses to aid in job growth. ERMU is a government facility that provides a necessary service to the residents of Elk River and is consistent with the comprehensive plan which encourages existing public facilities to expand as needed to serve the community. 3. Will not impede the normal and orderly development and improvement of surrounding vacant property. The expanded development of the ERMU site will not impede adjacent properties from developing or improving their properties. 4. Will be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. The improvements to the ERMU facility will not adversely impact the public facilities and service including streets, police, fire, utilities, parks, schools or traffic. 5. Will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. The proposed government facility use will not cause excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations that would impact other properties. 6. Will not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. The proposed improvements to the ERMU site include keeping the existing power plant and maintaining the area adjacent to Elk River. 7. Will fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. The use will comply with all the requirements of the city code with the exception of the variances associated with this application as identified below. Elk River Municipal Utilities, Elk River, MN August 31, 2020 ERMU18001 3 Preliminary Plat and Final Plat Description of Request We are requesting a preliminary and final plat to combine the following parcels into a single lot for ERMU: • 75-411-0110 (1705 Main Street) • 75-411-0130 (No Address) • 75-411-0120 (1643 Main Street) • 75-411-0230 (No Address) • 75-411-0210 (1639 Main Street) • 75-411-0240 (1627 Main Street) • 75-411-0220 (No Address) • 75-411-0250 (1437 Main Street) The preliminary and final plat will combine the eight existing lots into a single lot to allow for the new building and associated site improvements to be constructed to serve ERMU. Vacation Description of Request We are requesting vacation of 4th (Depot) Street, which is an unimproved public right-of-way that extends northeast from Main Street north of Lot 6, Block 1 Auditor's Addition to the Village of Elk River to Main Street on the north and east of Lot 8, Block 2, Auditor's Addition to the Village of Elk River. The right-of-way is not adjacent to public waters. In order to maintain access to the property at 1433 Main Street NW, we are not requesting vacation for the triangular portion lying east of the east line of parcel 75-411-0130 (extended) as shown on the attached graphics. What is the purpose of the Vacation? The purpose of the vacation is to allow redevelopment of the site as the Elk River Municipal Utilities maintenance facility. The existing power plant buildings will remain and the two homes on the north portion of the site will be demolished. How is the request consistent with the City of Elk River Comprehensive Plan? The request would allow development of a new Elk River Municipal Utilities maintenance facility, which will help provide reliable service to Elk River residents is consistent with Comprehensive Plan. Specifically: 1. It is consistent with the vision statement themes to provide "well maintained and reliable infrastructure" and "As an Energy City, Elk River seeks to promote sustainable and energy efficient forms of development." Elk River Municipal Utilities, Elk River, MN August 31, 2020 ERMU18001 4 2. The Transportation Chapter does not anticipate construction of a new street in this location. Therefore, vacation of the street would not be inconsistent with the plan. The Utilities Chapter of the plan notes "Elk River Municipal Utilities provides electric and water services to Elk River and surrounding areas and is responsible for the construction, operation and maintenance of these systems." Vacation of the right-of-way allows them to expand the maintenance facilities to better serve the community. Our proposal would be consistent with the Utilities Chapter implementation goal to "Develop community utility facilities to the same aesthetic, environmental and development standards required for private property." What has changed to warrant the vacation? The street was platted but never constructed and consolidation of several lots to create a developable parcel for the new Elk River Municipal Utilities maintenance facility requires the vacation. Vacation of the unimproved right-of-way will allow for development of this necessary public facility. How compatible is it with surrounding properties? The new maintenance site would be bound by the river on the south, Main Street on the west and north and residential property to the east. Vacation of the right-of-way would allow redevelopment of the property and the north portion of the of the right-of-way will remain to provide access to the adjacent property (parcel 75-133-4211). What are the benefits to the City? The vacation allows full use of the site for the Elk River Municipal Utilities maintenance facility. If this unimproved right-of-way were to remain it would render the site unusable for the intended purpose. Variance Description of Request We are requesting the following variances from city code in order to develop the site: Variance to allow an impervious surface coverage of 61 % where 25% is allowed in Section 30-2025. Variance to allow the reduced number of parking stalls of 45 where 243 is required by city code Section 30- 903. Variance to allow a reduced front yard parking setback of 15 feet where 25 feet is required in Section 30- 895. We have reviewed the requests in accordance with City ordinance standards in Section 30-635 and find that the ordinance standards have been met. Specifically Elk River Municipal Utilities, Elk River, MN August 31, 2020 ERMU18001 5 1. The variance is in harmony with the general purpose and intent of the ordinance. The variance to allow an increased impervious surface is in harmony with the general intent of the ordinance. The city code does not have a different regulation for impervious surface of a commercial, industrial or public use within the shoreland overlay and simply restricts all sites to 25% impervious coverage. The site exists today with 43% impervious surface and we are incorporating additional stormwater management methods on the site to account for the additional impervious surface proposed. We believe this meets the intent of the ordinance to protect Elk River from additional stormwater and pollution impacts. The variance to allow a reduced number of parking stalls is in harmony with the general intent of the ordinance. The ERMU site is unlike most other sites with most of the building space being used for vehicle storage, with a smaller portion being used for office space. Given the number employees working on the site and the minimal number of guests at this location we believe 45 parking spaces to be sufficient for ERMU's needs. Additionally, adding greater parking would increase the impervious surface on the site which we are trying to avoid. The variance to allow a reduced parking setback meets the general intent of the ordinance. The current parking setback section restricts a nonresidential use in a single-family district to the same requirements as the business park district. We have met the intent of the ordinance by locating parking spaces outside of the setback with all spaces facing towards the interior of the site but are unable to have drive aisle located out of the parking setback given the location of the existing building. We believe this meets the intent of the ordinance to have parking not placed or oriented too close to a pedestrian area. 2. The variance is consistent with the City of Elk River comprehensive plan. The variances are consistent with the City of Elk River comprehensive plan because they allow ERMU to expand within the existing site. ERMU provides all water service to Elk River, which is a necessity for the community. ERMU has also been implementing additional measures to conserve water where possible and to reduce environmental concerns, which will be aided by the expansion. 3. The petitioner proposes to use the property in a reasonable manner not permitted by the zoning ordinance; We are proposing to continue the existing use of the property as a government facility which is a permitted conditional use for the R-1c zoning district. The proposed variances allow ERMU to expand from the existing structures and make needed improvements to the site to allow smooth operations and continued growth. 4. The plight of the petitioner is due to circumstances unique to the property not a consequence of the petition's own action or inaction; and The variance requests are due to the existing buildings and site layout and the code restrictions that have been put in place since the property was initially developed. This site is unique in that it is restricted by shoreland overlay standards that are catered towards residential lots you typically find near a lake. The combination of these circumstances creates a unique property. 5. The variance, if granted, will not alter the essential character of the locality. Elk River Municipal Utilities, Elk River, MN August 31, 2020 ERMU18001 6 The variances, if granted, will not change the essential character of the locality. The ERMU site has existed in this location for many years and become a part of the locality. These variances will allow the site to be developed around the existing buildings and to remain with the same character that exists today. Summary We respectfully request approval of the rezoning, conditional use permit, preliminary plat, final plat, ROW vacation and variances to allow construction of the new maintenance facility for Elk River Municipal Utilities on the site. Contact Information This document was prepared by: Kevin Shay Landform 105 South Fifth Avenue, Suite 513 Minneapolis, MN 55401 Any additional questions regarding this application can be directed to Kevin Shay at kshay@landform.net or 612.638.0228. Elk River Municipal Utilities, Elk River, MN August 31, 2020 ERMU18001 7 5 a 5 LEGEND General Notes y g — - — 3o CIVIL FOR pEfN L3 OF JOINTS IN — — RMNG LOT.—ACN FQNCF MAIN -`1. CURBS. CURB€ EER CONSTRUC TION TMFFI- VEER—O—RIGN �@ as mNORAIB, GUARDRAILS, & Esro (\ GNVEDMAI ° TO REMAIN �:o RemAIN uNpLL owNArELr �E - 11 11 rt ea.fl •• • Ra ° RED ° f 0 GARAGE L. REMAIN i K i GvsRspslur s p2 uN Nowui �( £ RETAINING WALL F GEACU R F-U I. BBense //—PI.Noer oNz I.is B isNB^eE sio Re w/� LonolNo oocrc - m QQ ,h m NO p -� < PA L-FINBT �EIJ 1� A - - J FiOOR an n eTa NG E / H yQy -B� Bps Ex IN. 2 U S 1 U TANKA G F I O U' 1 a RgpE 1x, - - - - - UREGFFICEEXPArsaN e —� O TO REMAN %TTING / �+ ➢ ` seceNp FinoRKAG aAro . ] I I I I. I ITIP e - 00 L I VTo BUILDING - FI \ 'aye � �a + / / e a o s M � N W 1 PARKING STALLE B zH r�sTo,,.s- sBz Nnw pRlvB _ -PlIVE r:L�, ° ELK RV Zi 2 ie �i� C \ \ B BGUAeETnnoN m U W o Z l MAIN ST. NW. MAIN ST. NW.0 Fo pBRGROUNO PowER § E W C p 0 5i > Y o I 2 S w W a E G m o n m of SITE PLAN N "� AO.1 7"=40'-0' NOT FOR CONSTUCTION SITE PLAN F_1 B C � D 1 3 4 5 TOTAL SQUARE FEET: 11 VEHICLE STORAGE & SHOPS 43,767 SF OFFICE ADDITION 15,751 SF as - - - - - - - - OFFICE REMODEL 2,401 SF�# EXIST TO REMAIN 4,520 SF� a 9 L - - - - J TOTAL 66,439 SF FUTURE EXPANSION OPTION 1 FUTURE EXPANSION OPTION 2 %E 1 1 I I CONCRETE PAID ! g L - L _ J } Y soPE Ta wnomc ooc g laR `- I I I I I I I I K r � I _ r I +ArR' I I Igel e E n•. a. o^ m-o^ ,'`o�Fm-o^ ;a " > O P I I I I I I I Y � g - ao ao ao ao ao a a e a o _F�- 1-4-) `zr r-� �_-2 W N � I TAM savwEs I - I iweee4 Z E 0 oP«z f . wo R` o "D 0 Es . __ _= o a x 29SSF 0 0RIF o O W -I - - - - - - - - - - y ----- - I ZLu l Par oo 3 �I T o I �, I I I I I I O W W O _ _ _ ----------- - �-�--� R •( A1.1 ,of1/FIRST FLOOR REFERENCE PLAN Fi- Floor t'-0' TRUE vux Reference PI.R NOT FOR CONSTUCTION F_m B 1 2 3 4 5 TOTAL SQUARE FEET: VEHICLE STORAGE & SHOPS 43,767 SF OFFICE ADDITION 15,751 SF as OFFICE REMODEL 2,401 SF EXIST TO REMAIN 4,520 SF s n TOTAL 66,439 SF 1 L ----J I a 1 i I ' I mom I -- — — 3.10 O 3 I I I I I I cue€ I 0 II I L\, L /J L_-_j I� sPl OPEN T�BELOW OPEN TO ELhW Ff T_F __l III j — —� — -y FeooxaL °� I I I I � 4—�" _ — — — — —— E W ——— — -- 8 �� � _I I I I I OPEN TO eeww I I I I I ' 0� P = I I I I I I I I M \ W € Tq n cOe �_ � g y~ g LZ �- -I - - - - - - - - - y - - - - - - - w Lu 0 0 o ffieF 47-0 1171-7 1 / T. Y J O ' n W\ w w a N� n� A1.2 of SECOND FLOOR REFERENCE PLAN n , a +a• az TRUE PUN Second Floor A,J vis•=r NOT FOR CONSTUCTION Reference Plan /_ B c � a 1 2 3 4 5 General Notes 1. —DETAP NEDIN5UlATIO� NTO NNO0 AGE ATALL ROOFAREAS E INSULATION AT ALL ROOF ENETRATIONS TO PROVIDE POSRME DRAINAGE, EC€� e S. SENMECHANDELpC. FOR ROOF INDIC g=# INEE A121OPoRTTVPICCADL ROIO �9 EE FVCOONDRIONSNOEDAF.1.1TRINGF NOTIFY ARCPANCHITECTIMMEDIAELV OF AED 5fi5 § 3y ND T. PROTECTREKSTINGMATERWSTO S. STEEL TUBDES FOR ROOFS —N AND A SCREEN N ITO TMETAL ROOF DECKING ALIGN WITH ROOF STRUCTURE W DECKING. TTP. SEE STRUCTURAL Key Notes a z ,� e•INsuur oN PLus BOARD ON SLOPING siau iuRF SL.IN DOWNANa PH11AE-11-1ERFooT OTEDOTHERWISE g s U 10 ira P ftDOW STRU TUBE AT ODTOEoN SAC ¢' H _ _ _ TAPE1EFop INsuunoN SLOPCTDoREwN AT va• �a ; InkONCRETE FLeALLSE xmumYxoP loeSwWwewAvr PAVERS AROUND ROOF HATCH AND N— I I I I I I I I SHALLBEMINIMUM$'-0•WIDE.M.N.O, SCREEN WAIL FOR MECH. UNITS. SEE DGTAILS $ _ _ _ _ — _ g 2 t — — — — I I I — — — — — — + — — — — — I I — — — — — — — — — — — — F 8 W Q � F b I H f a Lu O� I I I I I I I I I — — — — — — — M L" S $ — 1 w� € ry z e l> >¢� - - - - - - - - - - ,I - - - - - - - - - - t SZ - o w (D-- - -I - - - - - - - - - - y 4 - - - - MH - - - - - - a 2 Z D N l I Lu C 'fp >X d W LID W O & A — — oT Roof s A1.3 Roof Plan NOT FOR CONSTUCTION 1 2 3 4 5 General Notes CONCRETE BLOOXD.FNSI-A NFLOOR PLANS ARE NoMINALAND XPRETi oAG w..LLL. oaEu'.NS ARE FACE OF""TNGwnuACE E8 anmmTuiwsum BOARD OONs, DoI E NS,osiuo ETANEN 4. FOR PPRiIiION TYPES SE SHEET ABA. $ Cg # yy e TRANF­$ AS—FLOOR MATE"" TO BE.PHTERUNE OF C�OR BETWEEN °.sy A OTHER R�AE 3�E pIRE TRDANTSEAUN wnusio B[NSEALeP cO.PLEieLv7. TS ALLCOPA"T"TTO BED WCCFe cE D PRECASTOR ARM E BI-OCARD F p, Sy ARITITIONS ND A. AT EXPOSED PRECAST NS, AL COONOUIT NCEALED AHO PI PING TO FUFF NO OR RN ONPARTITIONS, CK SIDEINFURP NO OR A80VE CEILINGS 10. CONTRACTOR SHALL PROVIDEV) & Y Y ADDDIONALSURROUNDS Sv DEEP PER FOR.. g U i ONS. PARTTo O ¢ a m „ p SLOPE RE NST S FLOOR _IN. TO 1I T.EXCEPTATREETROOMSINEXISTING BUILDING, {� S B I I I I I I I I li �I C ICE HwnsH - DRv�EL­ i I i i i HAu—� 1 �J J `h a i ail i i ail li � � ssr zse sc '� i E � li li s € — -J L- -j L -j o 2SSSF o Lu- i � �E Bx2 sF —RSER w o 0 DBE ° PATS SOTORAGE zaosc r C 0 < Q g -- - - - - - - - - - - - - -- - - m-D _ _ O $ - R - - - 0 s _ W M M W N ; EFPAT, D NaLDcN ~ Z �z , 8 y 7 2 e @ U u D G,R_. o2 aZ U m i 1 3a (A— — — — — — — — — — — — — — — — Lu YJo�WW�� a FIRST Q) FLOOR OFFICEMORKSHOPS N� � Ax'1 Enlarged Plan NOT FOR CONSTUC;ON A B C D 1 2 3 4 5 F� - - 140 OF ME —NINE li 'il li 'il aF SLOPE TO LOPING COCK. SEE CNiI S L___r___J -___ _J I I IVei M IL m � s .a 7 F ------- ---,I--------------� u I p w s p p VE 51 SF 7 I 9 nry5t9'r- a„i 0- ^ 'ii i . --___--- — — — � �$ a I ' F„ o = 8 � S wOv H - — 71 14H SF --————— ——-—— — —� --- w F�,.rN�kar�.11e Qa N m g = ­CUEPAGE •- I, s °� � Y _ I E s 8 I � § w M 8 M w v vvvvv LU € Z F E J a!C oN E NN D�w e 9z i a DO g F w w a J t warv;Eo °Es wo z° o LVo A2.2 Ui FIRST FLOOR SOUTH STORAGE AREA N N "' Unnamed NOT FOR CONSTUCTION I_ B C? a d c 1 2 3 4 5 F� 4� Es � s= �a :F §a �q & a CONCRETE 11WSF F y I �EF a I EL �7 w F- W m VE", o a M 8 M W € F H Z E J � p ug N J > R @ U W E n Z d �U a W C 3 N > N iY @ of E ` W W I I I se I � � i b b b b of FIRST FLOOR REFERENCE PLAN "� A2.3 V8"=1'-0• _ Unnamed NOT FOR COZUCTION as Ea j ay �a i 4 i i 4 -------------14-1 I F CUB— E �� a0 O s ONF. 8 8 Y i it I aF o Cl)8 OF N W N € ; o t= z a x O @ U IFI a o z l a' C > �_ — — _ _ _ _ _ _ — — _ C > W On of SECOND FLOOR OFFICE PLAN .� A2.4 Enlarged Plan _ NOT FOR CONSTUCTION I ueE ag i � I. � sToaacE iu p I oPENTGEE<ow\ I I I� s GPEn.o eEw � � o o� 5 U �_� I I \ I I a — MovABLE GUAaoa/JL — — — — — — — — — — — — _ — — — ¢ 'I I I i I I I q E "d h —�——————� 7 i I I To OPEN BELOW OW/ I m g g � — -- --4_---- UJ — a —I 1 n - Y _OBOPEN TO M� w Nf € r f z C U w e g Z f � g I I 1 214-10' W N > > € 3 ww A2•5 SECONDFLOORSOUTHSTORAGEAREA "� 7/B"=1'-0" uN NOT FOR CONSTUCTaION Unnametl Key Plan IT OBCiwt30� ° ^1 T.O. PARAPET �$ {y Material Keying Legend �"`� a ❑ 4a EAALEVEL2 114'� �w�oA'ICK EXIST. LEVEL 2 +$, � E §� : F .� oaasaou a vre�.si I _ FIRSTFLOOR 10o'-0 V $ 4 Al NORTH ELEVATION 1142 AS 14 smNmD.«nee i g Da41,3.As u�ml��m mo, a' 4 al Notes GenePOrND g ASDRAwINGB 0 4�13A A2 63,,,3 , rP. BB 6,3A, D6 6,3 2 B3 3BBAz I ADNIM D ERF ATON. GENER ooNTRAo.oRBH uNER ALL DIMENSIONS AND CONDITIONS OF THE SITE $ Oe 1D.G1 TO PARAPET _WALL Il 128-0 lI 04113 At ANo exlsnNc su�o NO ANOReFaRTANv o scaevnrvcss ro mE AncH TECT Rrc y EXISTING BRICK CS 3613A1 — AREA A LEVEL 2 COW TONSTDURINFGDTIRE BID PERIOD, 114'-0" 7FITl� �ACTORrsu BCURTRAC,DRO—ES EXIST. LEVEL 2 111E 6'• _ —OREXPOSEDsTeeT wrm F FIRST FLOOR l� 100E-0" 1 6 A w J CONTINUOUS, smooTH "" 61 SOUTH ELEVATION %1 NORTH ELEVATION AT MAINT. j E P Graphic Scale v0INTItD. U 1/lEy D• x U Q 0' 0e F m D34w6.Az oT 4111A, T.O. PARAPET O yy WALL_ '— _: _� ____:- _. n AREA A LEVEL V 114E-0je,' EXIST. LEVEL 2 111E IC�f 6" n FIRST FLOOR _ V 100 0^ - O M N 5 8 ae 36t3.A, os3613A, WLu N ; EwsT. BiocK j z c ELEVATION Z) i l ,c.,11 /EAST Y aCl OB1 ^� C6 AS10 0 — @ U W aZ i 034500. 4tta A.i� V N T.O. PARAPET m m m m m m LU C WALL EXIST. BRICK W _ / F AFM REA A LEVEL 2 _ _ EXIST. LEVEL2 171E - 6" /� FIROSTOFLOOR_ _ l� — _ _ 0 — 01 WEST ELEVATION A3.1 NOT FOR CONSTUCTION Elevallons Key Plan �i Material Keying Legend a a General Notesy !9 �y DO NOT SCALE DRAWINGS FOR BUILDING PUOSES. USE RP DIMENSIONS NGS $a R�Fi roa so D VERNFr � OCR FIELD cs DIMENBION AND CONDITIONS OF THEE E ANO IXISTINO BUILOIRO, AND REPORT PNV GISCREEPANCIESTOTNEARCI1iTECCT RK : F S C SUBCONTRACTFRESHALL BECOME SUBMRTING AD Bo �EE THE WORKOD CO NSTTHHESANUNOERSTAN)INGGSYTHE CONOIACTOR/SUBCONTRACTOR THEE PAINT ALL °: EEiw STEEL m s c g SED H STIRnlrv� vlwR WITH CONi NUOUS WE o Q H 3 SNOOTHE CONT REGUIREDBASE MAT I—UNDERSREFlNIBHES-SEE (CATIONSBELOW UL . IOR GLASS ON GRACE PRONIDEW COMPACTED —R OVER POLY VAPOR BARRIER OVER COMPACTED BABE. S Graphic Scale Q Q Q Q Q A 1v S I I I I rIT^' I 3 - T.O. PARAPET E P - 7r CS F II II 8 Ae m 171 BE AREA ALE" tom- 0 EXIST. LEVEL2 U N HJ ENTORY V-B F E DRAG- 1 R LtMT� M III— III III III 111 a W c IIIII--(IIIII ; } LIU ct E/W SECTION AT INVENT., VEHICLE & OFFICE U (YID (YID M 8 € W Lo ; h Z m I �— > T.O. PARAPET _ ¢ � C _ WALL tzs•.� U W EE6 — — 7FFP0 u a o Z l EM/ U C � Ed N P FFq FH rN Hd C WLl � AREA A LEVEL m El U17— InEMn iti._6. W HALL as B BF - - - II II Soo; - - :1117 117 1 1=1 I 1=1 I 1 11 1� —I 1�111=111= [=Ill-- 1711171117111 17 117 11-11 1=1 I I I 1 —1117 171117 1 I= 7-1717- 1 1=1 I 1=1 I 1=1 —FIRST o" I 1=1 SECTION AT OFFICE of III — --01 BUIIdmg sBouDRs va"=r-o° I°ORC01vSTtlCiiON From: Tom and Rita Johnson To: Green, Jennifer Subject: [EXTERNAL] Re: Staff Reports for ERMU Project Date: Monday, September 21, 2020 9:29:23 AM The expansion of the ERMU facilities Is a large project for our neighborhood which has been residential for many years. It is important that a project of this magnitude is planned with respect for the residents' investments in their homes; for many of us, it is our most valuable asset. As noted in the Conditional Use Application, the site plan is designed to be compatible with the residential character of our neighborhood. The hours of operation are normal business hours, except in an emergency. This is an important consideration. Regarding aesthetics, the landscape as depicted in the site plan appears to be a continuation of the current tree plantings which screen the existing Utility building. As the process moves forward, I would like an opportunity to look at the full landscape plan in order to gain a better sense of the visual impact. If the monument sign location and design is not included in the landscape plan, I would appreciate an opportunity to review the signage, as well. Thank you, Rita Clark -Johnson 508 Tipton Ave. NW Elk River, MN